9

Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Embed Size (px)

Citation preview

Page 1: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported
Page 2: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

OverviewOne of the wonders of modern timesLongest undersea section of tunnel in the world£12 Billion Cost35 million passenger vehicles transported so far

Page 3: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

HistoryFirst idea 1802Attempts to survey the seabed in mid 19th centuryWork on current tunnel began in mid 1986Tunnels met December 1990

Page 4: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Geological HistoryIce AgeCreation of the English ChannelGeology is key to the success of the project

Page 5: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Acquiring The Geological DataBoreholesGeophysical SurveySeismic Analysis

Page 6: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Detailed GeologyThe compositionLayers of ChalkPermeability

  DescriptionAverage

ThicknessTypical Intact

UCS (Mpa)Middle Chalk 85  

Lower Chalk

Grey Chalk 5 7.5Upper Chalk Marl 20 8.5Lower Chalk Marl 8 3.5Basal Chalk Marl 4 7.5glaucontic Marl 2.5 13Zone 6A(Upper) 4 8Zone 6A(Lower) 4 3.5Gault Clay(Upper) 17 2

Gault Clay   45 2Lower Greensand   50  

Page 7: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Tunnel Boring Machines (TBMs)French TBMsEarth Pressure Balanced Machines (EPBMs)High water pressure in the Folded and Faulted chalk

UK TBMsDouble shieldedBetter tunnelling condition

Page 8: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Tunnel Lining81.9 km of liningsPrecast ConcreteSpherodial Graphite Cast Iron

Page 9: Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported

Problems EncounteredMarch 1988:Water inflow on UK’s side2 miles stretch – 9 monthsUse of Spheroidal Graphite Cast Iron (SGI) liningPre-grouting the ground in front