20
TOD Workshop Algiers 29-31 October 2019 Overview TOD Implementation in Algeria Mohamed MEZACHE Head of the Aeronautical Information Department - ENNA ICAO EUROCONTROL ACAO ENNA

Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

TOD WorkshopAlgiers 29-31 October 2019

Overview TOD Implementation in AlgeriaMohamed MEZACHE

Head of the Aeronautical Information Department - ENNA

ICAO EUROCONTROL ACAO ENNA

Page 2: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Structure of civil aviation system 1/2

Civil Aviation Authority (CAA)

Civil Aviation Authority (CAA): Department of Civil Aviation and Meteorology (DACM) under the Ministry of Public Works and Transport.

DACM is the regulator for civil aviation and meteorology.

Organigram

DACM

SDM SDSNA SDTA SDEA

Four (04) sub directionSDM. of MeteorologySDSNA. Safety and Air NavigationSDEA. of the operation of airports.SDTA: Air Transport.

July 17, 2019 Law N ° 19-04 Creation of a National Agency of Civil Aviation ANAC.

ENNA

Page 3: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Structure of civil aviation system 2/2

Air Navigation Service Provider (ANSP)

ENNA National Establishment of Air Navigation.

DTNA

ENNA Air Navigation Service provider on behalf of the Algerian State (ANSP).

DDNA DRFC

IGT

DJRH CQRENA DL

AIG

SIE

Aerodromes

General manager

DENA

FIU

ENNA

Organigram

Page 4: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Structure of civil aviation system 2/2

Air Navigation Service Provider (ANSP)

DTNADDNA DRFC

IGT

DJRH CQRENA DL

AIG

SIE

Aerodromes

General manager

DENA

CCR

DENA Operations of air navigationDIA Aeronautical Information DepartmentDCA Air traffic DepartmentCCR Area Control Center

FIU

ENNA National Establishment of Air Navigation.

Organigram

ENNA Air Navigation Service provider on behalf of the Algerian State (ANSP).

ENNA

DCA DIA

Page 5: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Structure of civil aviation system 2/2

Air Navigation Service Provider (ANSP)

DTNADDNA DRFC

IGT

DJRH CQRENA DL

AIG

SIE

Aerodromes

DENA

CCR DCA DIA AIS/AIMATMATFMATS

FIU

General manager

ENNA National Establishment of Air Navigation.

ENNA Air Navigation Service provider on behalf of the Algerian State (ANSP).

ENNA

DENA Operations of air navigationDIA Aeronautical Information DepartmentDCA Air traffic DepartmentCCR Area Control Center

Organigram

Page 6: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Functions of AIS/AIM including those related to TOD

Algeria Product-centric AIS.

Integrated Aeronautical Information Package (IAIP Non-Electronic)AIP - AIP AMDT - AIP SUP - AIC - NOTAM - Summary lists.

Paper format.Website (PDF files only).AIP CD (PDF files only).

Functions of AIS

Collection - Verification - Validation - Storage and Publishing

Notification of NOTAM to ATS

NOTAM briefing at the aerodrome

ENNA

Page 7: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

National geography organization in Algeria

National Institute of Cartography and Remote Sensing

INCT

Provides geographic data (Terrain) in multiple formats (Paper, Digital Elevation Model DEM).

ENNA

Page 8: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

National regulations (CAA) for TOD

No national TOD regulations are available.

Currently

In progress...

Enforcement Texts Governing Air Navigation Services (including AIS/AIM) UnderDevelopment by DACM.

Draft national TOD policy under development (EUROCONTROL Template) at the ANSP (ENNA).

ENNA

Page 9: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Control of obstacles in the vicinity of airports

Obstacle data are collected by ENNA (ANSP) at the aerodrome level.

The verification, validation and storage of obstacles at ENNA's central services level and also determine the areas concerned (approach and take-off area or circling area and at aerodrome)

The principle of area 2a, 2b, 2c, 2d is not yet applied.

There is no obstacles DataSet.

ENNA

Military, local authority of the state, others ..

Page 10: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Publication of obstaclesENNA

Permanent obstacles AIP AMDT AIRAC

Temporary / Unpredictable Obstacles NOTAM, AIP SUP

Publication procedures

Page 11: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Publication of obstacles

AIP Algeria AD 2.16 Two areas

approach and take-off area or circling area and at aerodrome

Permanent obstacles AIP AMDT AIRAC

Temporary / Unpredictable Obstacles NOTAM, AIP SUP

ENNA

Obstacles data presentation

Publication procedures

Page 12: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Publication of obstacles

AIP Algeria AD 2.16 Two areas

approach and take-off area or circling area and at aerodrome

The digital DataSet is not used in the publication.

Raw text format

Permanent obstacles AIP AMDT AIRAC

Temporary / Unpredictable Obstacles NOTAM, AIP SUP

ENNA

Obstacles data presentation

Format

Publication procedures

Page 13: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Publication of obstacles

Obstacles data presentation

Format

Publication procedures

Permanent obstacles AIP AMDT AIRAC

Temporary / Unpredictable Obstacles NOTAM, AIP SUP

AIP Algeria AD 2.16 Two areas

approach and take-off area or circling area and at aerodrome

The digital DataSet is not used in the publication.

Raw text format

Published obstacle data

Type of obstacle HeightElevation WGS84 coordinatesMarking Lighting

ENNA

Page 14: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Entities would be involved in the process of collection of terrain and obstacle data (for different areas), development of digital datasets for TOD, publication and distribution,

updating and regulation (CAA regulations)

Regulation (elaboration and updating)

DACM Civil Aviation Authority

Collection of data donnéesTerrain Obstacles

INCTAreas 2, 3 et 4

ENNAArea 1

ENNA

Development of digital DataSets

Terrain Obstacles

INCTAreas 2, 3 et 4

ENNAArea 1 ENNA

Publication and distribution

ENNA

ENNA

Page 15: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Progress has been made for development and publication of terrain and obstacles datasets in digital format

Beginning of the year 2019 ENNA Purchase of TOD software (PANS-OPS software)

Beginning of the year 2019 Staff training

ENNA

Page 16: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Progress has been made for development and publication of terrain and obstacles datasets in digital format

Digital Terrain Model (DTM) zone 1 for the entire national territory meeting the ICAO requirements.

USGS DataUnited States Geological Survey

Page 17: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Progress has been made for development and publication of terrain and obstacles datasets in digital format

2019 D-GNSS equipment acquisition (geographic coordinates and altitude surveys).

Staff training D-GNSS equipment in November 2019.

Insensitive to interference

Very fast data acquisition ~15s

Very fast data acquisition ~15s

Tilt compensator

Page 18: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Progress has been made for development and publication of terrain and obstacles datasets in digital format

AIS / AIM automation project (Realization 2nd quarter of 2020).

ENNA

Technical specifications for the care of including :

- TOD Terrain and Obstacles Data.- AMDB Airport Mapping DataBase- AIXM Aeronautical Information eXchange Model

Page 19: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

Our challenges

Raise awareness among all TOD stakeholders.

Establishment of a national TOD policy.

Think of a new organization.

Staff training on TOD.

Establishment of ADQ (Aeronautical Data Quality).

The development of SLAs (Service Level Agreement) with data originators.

Set up a solid workflow (UPSTREAM)

Develop a national TOD regulation.

ENNA

Page 20: Overview TOD Implementation in Algeria Meetings Seminars... · CCR Area Control Center ... The principle of area 2a, 2b, 2c, 2d is not yet applied. There is no obstacles DataSet

TOD Workshop

Thank you for your attention

Algiers 29-31 October 2019

Overview TOD Implementation in Algeria

Mohamed MEZACHE

Head of the Aeronautical Information Department - ENNA

ICAO EUROCONTROL ACAO ENNA