PERFORMANCE AND FINANCIAL REPORT (1 APRIL 2013 TO 30 JUNE 2013) DR. PHIL MJWARA 11 SEPTEMBER 2013 1

P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ( 1 A P R I L 2 0 1 3 T O 3 0 J U N E 2 0 1 3 )

DR. PHIL MJWARA 11 SEPTEMBER 2013

1

Page 2: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

DST Overview

Conclusion

Financial Performance

Achievements for the First Quarter

Achievements per Programme

OUTLINE OF THE PRESENTATION

Summary of Outcomes Progress

2

Page 3: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

THE MANDATE OF THE DEPARTMENT (1)

NSI can be understood as a set of functioning institutions, organisations and policies that interact constructively in the pursuit of a common set of social and economic goals and

objectives, seeking to promote change through the introduction of innovations.

The NSI remains an ideal for which South Africa continues to strive. It is an enabling framework for science, technology and innovation (STI).

The Department of Science and Technology (DST) derives its mandate from the 1996 White Paper on Science and Technology, which introduced the concept of a National System of

Innovation.

3

DST OVERVIEW

Page 4: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

THE MANDATE OF THE DEPARTMENT (2)

In this regard, the measure of success will be the level to which science, technology and innovation (STI) play a driving role in enhancing productivity, economic growth and socio-

economic development.

The latter, particularly, seeks to contribute to the transformation of the South African economy from a resource-based into a knowledge-based economy, in which the production and

dissemination of knowledge will lead to economic benefits and enrich all fields of human endeavor.

The DST, as the custodial coordinator for the development of the NSI, influences this system through key strategies such as the National Research and Development Strategy (NRDS) and the

Ten-Year Innovation Plan (TYIP).

4

DST OVERVIEW

Page 5: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

.

5

Vision To create a prosperous society that derives enduring and equitable benefits from

science and technology

DST VISION .

Page 6: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

.

6

Mission To develop, coordinate and manage a National System of Innovation

(NSI) that will bring about maximum human capital, sustainable

economic growth and improved quality of life for all

DST MISSION STATEMENT .

Page 7: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

To enhance South Africa’s knowledge-generation capacity.

To develop the innovation capacity of the NSI.

To develop appropriate science, technology and innovation human capital to meet the needs of society.

To build world-class STI infrastructure.

To position South Africa as a strategic international RDI partner and destination.

7

KEY OBJECTIVES OF THE DEPARTMENT

Page 8: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

The Department contributes to and reports on the following

government outcomes:

Outcome 2: A long and healthy life for all South Africans.

O Outcome 4: Decent employment through inclusive economic growth

Outcome 5: A skilled and capable workforce to support an inclusive growth path.

Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all.

Outcome 10: Environmental assets and natural resources that are well protected and continually enhanced.

8

DST OVERVIEW

Page 9: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

DST PROGRAMMES

DST OVERVIEW

Research,

Development &

Innovation

International

Cooperation

& Resources

Socio-Economic

Partnerships

Corporate

Services

& Governance

White Paper on

S&T, National

Research &

Development Strategy,

Ten-Year Innovation

Plan

Human Capital

&

Knowledge

Systems 9

Page 10: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

PURPOSE OF THE PROGRAMMES (1)

Programme 1: Administration

To conduct the overall management and administration of the

department.

10

DST OVERVIEW

Page 11: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

PURPOSE OF THE PROGRAMMES (1)

Programme 2: Research, Development and Innovation

To facilitate knowledge generation and exploitation through R&D in

key priority areas, namely, space science, bio-economy, and energy.

11

DST OVERVIEW

Page 12: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

PURPOSE OF THE PROGRAMMES (1)

Programme 3: International Cooperation and Resources

This Programme aims to strategically develop, promote and manage

international relationships, opportunities and S&T agreements that

strengthen the NSI and enable an exchange of knowledge, capacity

and resources between South Africa and its regional and

international partners.

12

DST OVERVIEW

Page 13: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

PURPOSE OF THE PROGRAMMES (2)

Programme 4: Human Capital and Knowledge Systems

Provide leadership in the creation of an innovative and competitive

society with highly skilled human capital, and competitive knowledge

and research infrastructure.

13

DST OVERVIEW

Page 14: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

PURPOSE OF THE PROGRAMMES (2)

Programme 5: Socio-Economic Partnerships

This Programme enhances the growth and development priorities

of government through targeted S&T-based innovation

interventions and the development of strategic partnerships with

other government departments, industry, research institutions and

communities.

14

DST OVERVIEW

Page 15: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

Figure 1: Overall DST Performance for Q1 2012/13

A total of 62 indicators are reporting during the year 2013/14.

Seven of these are ENE targets and six of these are on course

This quarter, five of the indicators were either bi- annual or annual targets, hence nothing was reported on them during this quarter.

15

DST ACHIEVEMENTS FOR THE FIRST QUARTER

Achieved3(5%)

On Course35

(56%)

Moderate Risk18(29%)

Certainty(2%

5(8%)Nothing to report

Page 16: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OVERALL PERFORMANCE OF SELECTED ENE DST INDICATORS (1)

16

ACHIEVEMENTS FOR THE FIRST QUARTER

Annual Target Quarter 1 Progress Status

8933 postgraduate research

students awarded bursaries, as

reflected in the project reports of the

National Research Foundation

(NRF).

5 070 postgraduate students. On Course

3650`researchers awarded research

grants through NRF-managed

programmes, as reflected in the

project reports.

2 253 researchers awarded research

grants.

On Course

R300 000 000 foreign science,

technology and innovative funds

secured for knowledge production,

technology transfer, enhanced

innovation and science, technology

and innovative human capital

development from international

partners through agreed

instruments per year.

R70 068 042 foreign STI funds by 30

June 2013.

On Course

Page 17: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OVERALL PERFORMANCE OF SELECTED ENE DST INDICATORS (2)

17

ACHIEVEMENTS FOR THE FIRST QUARTER

Annual Target Quarter 1 Progress Status

2300 small and medium enterprises

provided with technology support by

31 March 2014

498 small and medium enterprises

receiving technology support by 30

June 2013.

On Course

72 companies on a register of

companies receiving technology

assistance packages (TAPs) by 31

March 2014

50 companies currently on a register of

companies provided with TAPs by 30

June 2013.

On Course

17 knowledge and innovation

products added to the intellectual

property portfolio through fully

funded or co-funded research

initiatives per year.

No product currently added to the IP

but work in continuing well and the

contracts are being monitored

On Course

Page 18: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

ADMINISTRATION– (1)

As per National Treasury requirement, the Department's Quarter 4

and Annual reports were submitted to the National Treasury and to

the Auditor General by 31 May 2013.

In terms of Communication, the department held four public

participation programmes and these include:

Indigenous Knowledge Systems conference;

Launch of the Recordal System;

Nelson Mandela Science Centre and;

Public Service Week at Hartebeesthoek

The Vacancy rate of the department is reducing, reported at 8%

during this quarter.

18

ACHIEVEMENTS PER PROGRAMME

Page 19: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

ADMINISTRATION- (2)

19

ACHIEVEMENTS PER PROGRAMME

Annual Target Quarter 1 Target Quarter 1 Progress Status

Four DST 2013/14 quarterly

performance reports approved

by DST EXCO and signed by

Director-General within 60 days

after each quarter.

One DST 2012/13 annual report

approved by DST EXCO and

signed by Director-General by 31

May 2013.

Fourth Quarter report

approved

Annual report Approved

Fourth Quarter report

approved

Annual report Approved.

On

Course

Vacancy rate reduced to 7% by

31 March 2014.

Vacancy rate reduced to

12% by 30 June 2013.

Vacancy rate as of 30

June 2013 is 8%.

On

Course

Page 20: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

ADMINISTRATION- (3)

20

ACHIEVEMENTS PER PROGRAMME

Annual Target Quarter 1 Target Quarter 1 Progress Status

Three IT governance

framework

components

implemented by 31

March 2014.

IT risk management and

control (phase one of two)

components developed

and implemented by 30

June 2013.

The IT risk management and

control component is implemented

in the Enterprise Risk

Management Risk Register.

On Course

Six approved

communication,

marketing or media

plans developed for

DST Programmes to

profile the

Department by 31

March 2014.

One approved

communication,

marketing or media plan

developed for DST

Programmes to profile the

Department by 30 June

2013.

A total of nine strategies were

developed (five media and four

events).

Annual

target

achieved

Ten public

participation

programmes

conducted by 31

March 2014.

Three public participation

programmes conducted

by 30 June 2013.

A total of four public participation

programmes were conducted

On Course

Page 21: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (1)

Tender for the development of MeerKAT dish has been published in

various media.

Public consultations on the development of regulations on the

Astronomy Advantage Area has commenced, which included different

notices gazetted.

Despite the challenges on availability of funds, work on supporting

research and development initiatives is continuing. Business Plan for

Follow- on African Consortium on Tenofovir Studies (FACTS) Clinical

Trial has been approved. In addition, Business Plans for HySA Centres

of Competence (CoCs) were received, though there is minimal budget

to adequately fund these CoCs.

The Minister approved the draft Bioeconomy Strategy scheduled to be

submitted to Cabinet for approval in August 2013.

21

ACHIEVEMENTS PER PROGRAMME

Page 22: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (2)

Financial support of targeted solutions in the areas of space science,

energy and bio sciences is continuing. During this quarter seven

solutions were supported and these include:

Compass calibrations for the South African Air Force (SAAF) contract and

private aviation.

High Frequency Propagation Predictions and Magnetic field maps for the

South Africa National Defence Force (SANDF).

Magnetic technology services for the Institute for Maritime Technology

and the Sharks Board.

22

ACHIEVEMENTS PER PROGRAMME

Page 23: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (3)

The National Mosaic of Satellite Pour I'Observation de la Terre (SPOT)

Five data provided to all relevant government departments and entities.

Time series applications, the forest and carbon tracking portal and

Geohazard Atlas were accessible to decision makers and remote-sensing

technologists.

Phase one of the calibration and validation site at Paardefontein was

established. Pilot measurement campaigns are planned for the winter

season of 2013.

23

ACHIEVEMENTS PER PROGRAMME

Page 24: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (4)

The following are the technology solutions that are either

commercisalised or used by the community in the areas of space

science, energy and biosciences that are financially supported by the

DST:

The Centre for High Performing Computing Architecture Revision Project

Space Weather bulletins for stakeholders and the public

Fire investigation services to various clients.

The Fundisa Disk containing various data sets applicable to students

provided to all interested academic institutions.

Remote-sensing short courses to students and end-users.

24

ACHIEVEMENTS PER PROGRAMME

Page 25: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (5)

Annual Target Quarter 1

Target

Quarter 1 Progress Status

MeerKAT antennae

designed and installed as

per SKA specifications by 31

March 2014.

No target. The tender for the development of the first

MeerKAT dish was advertised in the media. On Course

Three technology solutions

(proof of concepts, pilots

and demonstrators)

financially supported in the

areas of space science,

energy and biosciences

through DST funding by 31

March 2014.

No target. Six technology solutions were supported during

the quarter

Achieved

Nine concept notes and

reviews approved by DST

EXCO by 31 March 2014.

No target.

The Minister approved the draft Bioeconomy

Strategy scheduled to be submitted to Cabinet

for approval in August 2013.

On Course

25

ACHIEVEMENTS PER PROGRAMME

Page 26: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (6)

Annual Target Quarter 1 Target Quarter 1 Progress Status

Three regulations

(Frequency Spectrum;

Electronic Magnetic

Interference and SKA

procedural matters) gazetted

by 28 February 2014.

Public consultations on

three regulations:

(Frequency Spectrum;

Electronic Magnetic

Interference and SKA

procedural matters) by

30 June 2013

Notices gazetted for public

consultation. On Course

Three collaborative

partnerships with private

sector through signed MoUs

by 31 March 2014.

No target.

A MoU has been signed between the

University of the Western Cape,

Coventry University and Microcab

Industries Ltd for the joint

development of hydrogen and fuel

cell vehicle platforms and

technologies

One non-disclosure agreement was

signed between the DST and Afrox,

which paves the way for possible

collaboration in areas of hydrogen

delivery infrastructure.

On Course

26

ACHIEVEMENTS PER PROGRAMME

Page 27: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (7)

Annual Target Quarter 1 Target Quarter 1 Progress Status

10 OTTs financially

supported by 31 December

2013.

Evaluated proposals

for financial support

from OTTs against DST

Guiding Principles for

OTTs by 30 June 2013.

11 proposals were evaluated for

support, based and has been

submitted for approval.

On Course

250 new disclosures

received by OTTs at

institutions by 31 March

2014.

No target. 97 new disclosures were received

from institutions. On Course

27

ACHIEVEMENTS PER PROGRAMME

Page 28: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (1)

Major step towards defining the management of research infrastructures –

• 1st stakeholders’ consultation workshop on the development of a Research Infrastructures Roadmap for SA (June 2013)

Africa recognised as key contributor to global innovation agenda –

• 5th Global Forum on Innovation and Technology Entrepreneurship in East London

Finalisation of a high a skills development programme in Agriculture (in partnership with DAFF, ARC, and 3 previously disadvantaged and French and Flemish universities)

SADC

• Hosted STI Policy Training Workshop

• Hosted Engineering Needs and Numbers Working Group (audit of engineering needs and numbers in several SADC countries)

• Women in Science, Engineering and Technology draft Charter finalised and roadmap finalised to present Charter to SADC Ministerial meeting for S&T

28

ACHIEVEMENTS PER PROGRAMME

Page 29: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (2)

Lesotho

• Revival of Potato Tissue Culture Project and initiation of phase 2 of the project

Kenya

• Supported Kenya STI week through SAASTA

Norway

• SA signed MoU and lauched joint call – selected research projects in climate change, the environment and clean energy will be funded for 3 years

Germany

• Closing session of the Germany-South Africa Year of Science

IBSA

• S&T cooperation reviewed between the 3 countries

29

ACHIEVEMENTS PER PROGRAMME

Page 30: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (3)

Annual Target Quarter 1 target Quarter 1 Progress Status

R300 000 000 foreign STI funds

secured for knowledge production,

technology transfer, enhanced

innovation, and STI human capital

development from international

partners through agreed

instruments by 31 March 2014.

R28 000 000 R70 068 042

On

Course

R85,2 million South African and

foreign funds secured for

knowledge production, technology

transfer, enhanced innovation, and

STI human capital development in

Africa as agreed with foreign

partners by 31 March 2014.

R3 000 000 R5 764 338.

On

Course

30

ACHIEVEMENTS PER PROGRAMME

Page 31: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (4)

Annual Target Quarter 1 target Quarter 1 Progress Status

855 South African

Postgraduate (master's,

doctoral and postdoctoral)

students participating in

international knowledge

production, technology

transfer, enhanced

innovation, and STI human

capital development as

agreed with foreign partners

by 31 March 2014.

107 355

On

Course

31

ACHIEVEMENTS PER PROGRAMME

Page 32: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (1)

The Minister of Science and Technology launched the IKS

Bioprospecting and Product Development Consortium, comprising

16 organisations ranging from IKS communities of practice and

organisations, science councils, universities, cooperatives and

community-based trusts. The consortium is made up of three

flagships: African traditional medicines, nutraceuticals and

cosmeceuticals.

The successful launch of the National Recordal System (NRS) by

the Minister on 24 May 2013 in Moruleng, North West, marks a

milestone towards the protection, promotion, development and

management of indigenous knowledge systems in the country. The

event showcased how the NRS is implemented in communities that

are owners of IK. The event was carried live on e.tv, Kaya FM and

Motsweding.

32

ACHIEVEMENTS PER PROGRAMME

Page 33: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (2)

Annual Target Quarter 1 target Quarter 1 Progress Status

700 graduates and students

placed in DST-funded work

preparation programmes in

SETI institutions by 31 March

2014.

No target. 564 interns placed in DST-NRF

Internship Programme. On Course

60 research infrastructure

grants awarded as per award

letters by 31 March 2014.

No target.

DST EXCO approved the funds

for the infrastructure allocations.

Support for scientific equipment

and National Facilities has been

approved

On Course

3 822 researchers awarded

research grants through

NRF-managed programmes

as reflected in the NRF

project reports by 31 March

2014.

1 000 researchers

awarded research

grants by 30 June

2013.

2 253 researchers awarded

researcher grants.

On Course

33

ACHIEVEMENTS PER PROGRAMME

Page 34: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (3)

Annual Target Quarter 1 target Quarter 1 Progress Status

2 200 Mbps average

bandwidth capacity available

per SANReN site by 31

March 2014.

No target. Funds for the South African

National Research Network

(SANReN) project were

approved

On Course

Three indigenous

knowledge-based

technological innovations

developed and registered as

intellectual property by 31

March 2014.

No target. Corporation Treaty patent filed

in May 2013. On Course

One province (Western

Cape) with the NRS

infrastructure deployed and

with a coordinator appointed

by 31 March 2014.

Host institution for

IKS Documentation

Centre (IKSDC)

establishment in

the Western Cape

identified by 30

June 2013.

Meetings and site visits

conducted to identify host for

NRS in the Western Cape.

On Course

34

ACHIEVEMENTS PER PROGRAMME

Page 35: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (4)

Annual Target Quarter 1 target Quarter 1 Progress Status

904 646 people participated

in science awareness and

engagement programmes by

31 March 2014.

Grant funding

awarded to

organisations

implementing the

initiatives by 30

June 2013.

56 organisations awarded

grants. On Course

6 strategy documents

approved by DST EXCO.

No target At least 2 strategy documents

are on course to be approved

before the end of the financial

year. These are implementation

plans for:

• National Bioprospecting

platform and;

• Palaeosciences Strategy

On Course

35

ACHIEVEMENTS PER PROGRAMMES

Page 36: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

SOCIO-ECONOMIC PARTNERSHIP (SEP) – (1)

The amendments to section 11(d) of the Income Tax Act that became

effective on 1 October 2012 require companies to apply for their R&D

projects to be approved in order to qualify for the tax deductions under

the R&D Tax Incentive. Between 1 October 2012 and 30 June 2013, a

total of 384 applications were received by the DST.

Two policy briefs on "The implications of backyard housing for spatial

planning policies in Johannesburg" and "The realities of increased

concentration of population, poverty, service demands and economic

opportunities in South Africa's urban network" were jointly developed

by the CSIR, the HSRC and the DST through the Spatial Temporal

Evidence for Planning South Africa (stepSA) programme.

36

ACHIEVEMENTS PER PROGRAMMES

Page 37: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (2)

Annual Target Quarter 1 Target Quarter 1 Progress Status

400 livelihood

opportunities created,

sustained or improved by

31 March 2014.

70 79 On

Course

445 master's and doctoral

students fully funded or

co-funded in designated

niche areas by 31 March

2014.

276 476. Achiev

ed

55 scientific and technical

papers accepted for

publication by 31 March

2014.

5 7 On

Course

130 interns fully funded or

co-funded in designated

niche areas of design,

manufacturing and

product development by

31 March 2014.

100 116 On

Course

37

ACHIEVEMENTS PER PROGRAMMES

Page 38: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (3)

Annual Target Quarter 1 Target Quarter 1 Progress Status

2 300 small and medium

enterprises receiving

technology support by 31

March 2014.

400 498 On

Course

72 companies on a

register of companies

provided with TAPs by 31

March 2014.

50 50 On

Course

15 knowledge

and innovation

products (patents,

prototypes,

technology

demonstrators

or technology

transfer packages)

generated by 31

March 2014

Monitoring of

signed contracts

with implementing

agencies and take timeous

corrective action by 30 June

2013

Monitoring of signed

contracts ongoing. No

corrective action currently

required.

On

Course

38

ACHIEVEMENTS PER PROGRAMMES

Page 39: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

SOME CHALLENGES THIS REPORTING QUARTER PER INDICATOR (1)

Quarter 1

Target

Quarter 1

Progress

Status

Reason for variance

Action

Two TIA

investments

commercialised

through TIA

funding by 30

June 2013

One TIA

investments

commercialised

through TIA

funding

Modera

te Risk

Turnaround times for

investment decisions

took longer

Delegation of authority is

being reviewed and

support services

strenghtened

Three Guidelines

drafted by 30

June 2013

Two guidelines

(The IP Ownership

Guideline; and the

Referral of IP to

NIPMO Guideline)

and one Dispute

Practice note have

been drafted and

circulated internally

for comments.

Modera

te Risk

The development of the

Incentive Scheme

Guideline was delayed

slightly, as resources

were diverted to make

the necessary

amendments to the IP

Fund Guideline.

The Incentive Scheme

Guideline is currently being

drafted.

The first draft of the

Incentive Scheme Guideline

has been set as a priority

for completion during the

first 2 weeks of the second

quarter.

39

CHALLENGES ON SPECIFIC INDICATORS

Page 40: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

SOME CHALLENGES THIS REPORTING QUARTER PER INDICATOR (2)

Quarter 1

Target

Quarter 1

Progress

Status

Reason for variance

Action

Seven

technology

products/

processes

developed

through

TIA investments

by

30 June 2013

One technology

product/ process

was developed

through TIA

investments

during this

reporting period.

Moder

ate

Risk

There were delays in

signing of deals to

achieve this quarterly

target

Bottle necks has been

identified and are being

dealt with to speed up the

process

Establishment

of the working

group for the

development of

the Draft Marine

Biology

Research

Strategy y by 30

June 2013

The working group

has not been

established yet,

however, process

plan identifying

the allocation of

the working

groups

developed as

well as the

budget.

Moder

ate

Risk

There was an

agreement between

the DST and DEA to

first develop an

overarching framework

that incorporates

Marine and Antarctic

research.

Process plan developed in

consultation with the NRF

40

CHALLENGES ON SPECIFIC INDICATORS

Page 41: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

SOME CHALLENGES THIS REPORTING QUARTER PER INDICATOR (3)

Quarter 1

Target

Quarter 1

Progress

Status

Reason for variance

Action

Administer and

approve R&D

tax incentives

applications by

30 June 2013

Tax incentive

applications

administered, not

yet approved.

61 applications

were received, 40

screened for

completeness, 17

reviewed and

finalised by the

committee,

covering 41

projects.

Moder

ate

Risk

There is currently a

backlog in the

evaluation of

applications. There

was a major response

from the business

sector since the

introduction of the new

pre-approval

procedure.

The DST is responding to

the situation by

temporarily securing the

services of 10 external

experts and deploying

three existing DST staff to

the R&D Tax Incentive

Unit to assist in

processing applications.

Adjudication Committee

meetings.

41

CHALLENGES ON SPECIFIC INDICATORS

Page 42: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 2: A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS.

42

HIGHLIGHTS ON OUTCOMES

• SHARP (SA HIV and AIDS Research and Innovation Platform) funds

the development of new and improved treatment and prevention

technologies that include the confirmation of the 1% tenofovir gel

microbicide to prevent HIV transmission, the discovery of a potential

HIV vaccine and the development of a diagnostic to detect drug

resistance

• The department is also involve in SATRII (SA TB Research and

Innovation Initiative) – drug discovery and development of TB

diagnostics.

• DST is also funding the South African Malaria Initiative (SAMI):

developing new treatment and diagnostics, as well as vector control

technologies .

Page 43: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 2: A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS.

43

HIGHLIGHTS ON OUTCOMES

• Involved in the funding of the Biovac Institute that provides

essential vaccines. Biovac is in the final stage of obtaining a

Good Manufacturing Practice certificate for their finish and fill

plant in Cape Town. This is an essential step in the

development of local manufacturing capacity.

• DST is funding the development and commercialisation of a

telemedicine workstation. Telemedicine system in the Eastern

Cape, Free-State and North West is being rolled- out. For

example, an m-health project amongst the schools in the

Cofimvaba district is currently been implemented.

Page 44: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC

GROWTH.

44

HIGHLIGHTS ON OUTCOMES

• Draft R&D expenditure strategy is in place consultation with the ESEC

and National treasury is on going to finalise the strategy. The draft

strategy has a strong focus on specific opportunities for increasing R&D

spending which are able to advance long- term growth opportunities.

• The DST continues to support key partner departments through various

initiatives such as the interdepartmental task team on bio-composites

and the Advanced Metals initiative, in post harvest innovation and

aquaculture.

• The DST also supports a portfolio consisting of a minimum of eight

large, long-term R&D-led industrial development opportunities over the

next four years. These include the development of a titanium industry,

growing our space industry, bio-composites, fuel cells, civilian

unmanned aerial systems, and electronics industries.

Page 45: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC

GROWTH.

45

HIGHLIGHTS ON OUTCOMES

• The department facilitates a minimum increase of 10% annually in the

number of small and medium-enterprises receiving technology support

through the Technology Stations Programme.

• The department also aims to introduce a research and development

incentive for small manufacturing firms who wish to increase spending

on research and development. Currently the department has

ammended the existing R&D incentive (offered under Section 11D of the

Income Tax Act) that became effective on 01 October 2012.

Page 46: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 5: A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN

INCLUSIVE GROWTH PATH

46

HIGHLIGHTS ON OUTCOMES

• The DST will increase the proportion of students receiving financial

support to study for Bachelor and Honours degrees, from 2.5% to

5% by 2014.

• The DST will increase the proportion of students receiving financial

support to study research Masters degree, from 6% to 10% by 2014

• The DST will increase the proportion of students receiving financial

support to study for Doctoral degree, from 14% to 18% by 2014

Page 47: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 5: A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN

INCLUSIVE GROWTH PATH

47

HIGHLIGHTS ON OUTCOMES

Page 48: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 7: VIBRANT, EQUITABLE AND SUSTAINABLE RURAL COMMUNITIES

AND FOOD SECURITY FOR ALL

48

HIGHLIGHTS ON OUTCOMES

• The DST is involved in different pilot projects. These include:

– Production of indigenous fin fish and shellfish

– Novel food, medicinal and cosmetic plant production from a

shortlist of indigenous or industrial crops.

• The DST is also involved in different research activities, which

includes:

– Case studies of the credibility and usefulness of community

enterprise development models in the natural resource waste

streams (organic waste/fertilizers) beneficiation sector;

– Case studies of the credibility and usefulness of community

enterprise development models in the agro-processing sector.

Page 49: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

OUTCOME 10: ENVIRONMENTAL ASSETS AND NATURAL RESOURCES THAT

ARE WELL PROTECTED AND CONTINUALLY ENHANCED.

49

HIGHLIGHTS ON OUTCOMES

• The DST is currently doing a feasibility study into the use of a SA developed technology that can convert waste to fuel in rural areas.

• DST is in the process of finalising modalities around Phase 3 (2013/14-2015/16) of SA Risk and Vulnerability Atlas (SARVA). SARVA continues to provide up-to- date spatial information related to environmental risks and vulnerability which is used to inform sector climate change adaptation plans.

• DST supports research that support ecosystem rehabilitation and restoration through the implementation of the GCRP and the large-scale research programme of Global Change, Society and Sustainability (GCSSRP).

Page 50: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

DST Financial Performance

FINANCIAL PERFORMANCE REPORT

50

BUDGET SPLIT – BY PROGRAMME

Programme 1 R268,158

(4.3%) Programme 2

R1,627,145 (26.3%)

Programme 3 R148,430

(2.4%)

Programme 4 R2,476,821

(40%)

Programme 5 R1,677,601

(27.1%)

Page 51: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

BUDGET SPLIT – BY ECONOMIC CLASSIFICATION

51

FINANCIAL PERFORMANCE REPORT

Compensation of Employees R260,733

(4.2%)

Goods and Services R193,341

(3.1%)

Transfer Payments R5,741,903

(92.6%)

Capital Assets R2,178 (0.04%)

Page 52: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

FINANCIAL PERFORMANCE - SUMMARY

52

DST Financial Performance Report DST Financial Performance Report DST Financial Performance Report

FINANCIAL PERFORMANCE REPORT

Budget R6,198,155

Planned expenditure R1,498,814 (24.2% of budget)

Actual expenditure R1,439,709

(23.2% of budget)

Deviation R59,105 (3.9% of budget)

-

1 000 000

2 000 000

3 000 000

4 000 000

5 000 000

6 000 000

7 000 000

Budget Planned Actual Deviation

Page 53: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

EXPENDITURE BY PROGRAMME – 30 JUNE 2013

53

FINANCIAL PERFORMANCE REPORT

Amount % of total

budget Amount

% of

total

budget

Amount

% of

expenditure

plan

Administration 268,158 61,065 22.8% 56,051 20.9% 5,014 8.2%

Research Development & Innovation 1,627,145 657,759 40.4% 550,743 33.8% 107,016 16.3%

International Cooperation & Resources 148,430 30,222 20.4% 32,734 22.1% -2,512 -8.3%

Human Capital & Knowledge Systems 2,476,821 426,187 17.2% 478,116 19.3% -51,929 -12.2%

Socio-economic Partnerships 1,677,601 323,581 19.3% 322,065 19.2% 1,516 0.5%

Total 6,198,155 1,498,814 24.2% 1,439,709 23.2% 59,105 3.9%

Planned expenditure Actual spending Deviation from

expenditure plan Programme

R'thousands Budget

Page 54: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

EXPENDITURE TRENDS AS AT 30 JUNE 2013

54

1 011 729

336 111

150 974

976 508

108 818

354 383

-

200 000

400 000

600 000

800 000

1 000 000

1 200 000

R't

ho

us

an

ds

Months

Actual vs Revised Planned Expenditure JUNE 2013

Revised Planned expenditure Actual expenditure

FINANCIAL PERFORMANCE REPORT

Page 55: P E R F O R M A N C E A N D F I N A N C I A L R E P O R T ...pmg-assets.s3-website-eu-west-1.amazonaws.com/130911dst.pdf · marketing or media plans developed for DST Programmes to

55

The National Development Plan will play a key role in the work of the department in the next five years and beyond.

Currently 56% of our annual 2013/14 targets are on course.

Human capital development, knowledge generation and exploitation, infrastructure and Africa collaboration will remain key focus areas and are central in our 2014-2019 strategic plan.

The department is committed in achieving minimum of 80% of its targets this financial year and improve performance information.

CONCLUSION