12
Schneider Electric Singapore Pte Ltd MITA(P) No. 217/03/2004 JUL-DEC 04 Day after Day p03 Giving Heart Giving Hope Spotlight p04 Vigirex - Absolute Protection of Life And Property Blokset iMCC @ a Cocoa Processing Plant Snippets p09 Foster Strong Specialisation & Competency in Power Distribution Field A Journey into Speed

p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Embed Size (px)

Citation preview

Page 1: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Schneider Electric Singapore Pte Ltd MITA(P) No. 217/03/2004 JUL-DEC 04

Day after Day p03

Giving HeartGiving Hope

Spotlight p04

Vigirex - AbsoluteProtection of LifeAnd Property

Blokset iMCC@ a CocoaProcessing Plant

Snippets p09

Foster StrongSpecialisation &Competency inPower DistributionField

A Journeyinto Speed

Page 2: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

05

Contents

Day after Day 03Country Director’s Message

Giving Heart Giving Hope

Spotlight 04Vigirex - Absolute protection of life and property

Power Meter 700 Series

Electronic Over-Current Relays

Magelis XBT-G

Complete solution to your needs inPower Monitoring System

Customer Story 07Harnessing Power, Control & Automation intoBlokset iMCC @ a Cocoa Processing Plant

On the Podium at the Athens Olympic

Snippets 09Foster Strong Specialisation & Competency inPower Distribution Field

Operational Excellence Symposium

A Journey into Speed

Interlude 11Crossword puzzle

Winners of last issue

Time management cartoon

Your Voice 11Most appreciated feedback

Distributors' Network 1210

03

= The Guiding SystemBrand Values: b Generic b Simplicity b Flexibility b Reassurance b Productivitywww.merlingerin.com

= Turn It OnBrand Values: b Ingenuity b Innovation b Quality b Reliability b Safetywww.squared.com

= Simply SmartBrand Values: b Simplicity b Intelligent b Flexibility b Compactness b Opennesswww.telemecanique.com

Page 3: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Day after Day

Giving Heart Giving HopeSchneider Electric in Singapore continues to be activein Social Community Responsibility

03

July 2004 is a special day that theemployees of Schneider ElectricSingapore will always remember.

On this day, they were treated to a rare sight fromtheir South East Asia Senior Vice-President, MrAlex Khoo. Shortly after office hours, Mr Khoodonned a T-shirt and shorts and went to work bywashing the cars of his employees at the officeparking lot. This strong show of support from thetop management was in return for the employees'support of the LULI programme, a corporate charityprogramme of Schneider Electric.

The support from the management did not justend there. On 12 September 2004, all SchneiderElectric Singapore employees, business partnersand suppliers, together with their families, cametogether for a day of great fun, laughter andenjoyment under the sun at the Big Splash forSchneider Electric Family Sunshine Day 2004.

At the event, a wide array of exciting booths

peddling everything from cookies, cakes and otherconfectionery, nail art and face tattoos, and evena fishing pond, all run and supplied by SchneiderElectric employees.

Wrapping up the Luli programme was the Children'sCharities Fair on 28 November 2004 at Ngee AnnCivic Plaza. Employees manned a food stall sellingfish balls, chicken nuggets and soft drinks.

The total proceeds of S$36,856.17 collected in thewhole year were donated to the Spastic ChildrenAssociation of Singapore, the chosen associationsponsored by the LULI programme this year.

"Giving Heart Giving Hope", the motto for SchneiderElectric Singapore for 2004 was a huge successwith a total of 750 people embracing the spirit ofjoy and hope wholeheartedly.

27

Children’s Charities Fair atNgee Ann Civic Plaza

Dear reader,

As we enter next year, we realise this milestone was made possible by thesupport of clients, friends and associates like you, and our staff. At this joyoustime of the year, we reflect on how much we value your support and friendshipover the years. One of the real joys of the Holiday Season is this opportunityto say "THANK YOU". These ancient words ring truer today than ever: "Peaceon earth, Goodwill towards all." Our entire organisation joins me in wishingyou peace, joy and prosperity this Holiday Season and throughout the NewYear. May 2005 bring the promise of a new year that is very good to you.We look forward to a partnership of continuing success.

Nelson Yeap, Country Director Schneider Electric Singapore

Nelson Yeap, Country DirectorSchneider Electric Singapore

Country Director’s Message

Risk taking and team workcontinue to shine

Row, row, row the ball, rollingup the hill..

Mr Alex Khoo playing a partfor charity

Bazaar Sale at Family Day

Mr Alex Khoo handing the donation cheque to Mr Edmund Wan,Executive Director of Spastics Children’s Association of Singapore

Page 4: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Spotlight

04

Vigirex - Absolute protection of life and propertyThe residual-current relays comply with all the majorstandards worldwide, in particular those dealing with:b residual-current protection: IEC 60755 and IEC 60947

for the protection of life and propertyb installation: IEC 60364b electromagnetic compatibility (EMC): IEC 61000b coordination of insulation: IEC 60664

Vigirex residual-current relays, with associatedtoroids, measure the earth-leakage current in theelectrical installation. They provide:b residual-current protection: RH86 and RH99b residual-current protection and earth-leakage

monitoring: RHU.

The protection relays interrupt the supply of powerto the monitored system in the event of a fault. Theyprotect:b people against direct and indirect contactb equipment and property against fire.

They are designed for AC installations implementing IT,TT and TN-S earthing arrangements and are suitable forvoltages up to 1000 V and frequencies from 50/60 Hzup to 400 Hz.

Continuous self-monitoringVigirex relays continuously monitor the power supply,relay/toroid link and internal electronics. Failure of thedetection circuit is signalled and may be used to trip thecircuit breaker. The LEDs in front can also be used tocheck operation at any time.

Eliminate unnecessary downtime

Reduced tripping tolerances

= Turn It On

= The Guiding System

Power Meter 700 SeriesAn entry level meter with mid-range functionality

he PowerLogic Power Meter 700 Series (PM700)is an inexpensive and compact 96 x 96 mm unitextending only 50mm behind the mounting

surface, that offers all the basic measurement capabilitiesrequired to monitor an electrical installation.

With its large display, you can monitor all three phasesand neutral at the same time. The anti-glare displayfeatures large 11 mm high characters and powerfulbacklighting for easy reading even in extreme lightingconditions and viewing angles.

The Power Meter 700 Series is available in three versions:b PM700, basic version with THD and min/max

readingsb PM700P, basic version plus two pulse outputs for

energy meteringb PM710, basic version plus an RS 485 port for

Modbus communication

Features and Benefitsb Large Easy to Read Characters

The display is easy to read and allows users to viewmultiple values at one time

b Large back lit display with integrated bar chartsb Only 50mm deep, with mounting clips that do not

require a toolThe PM700 is the most panel builder-friendly meteravailable

b Power Demand, THD and Mix/Max measurementsets

b Intuitive useb Power and current demand, THD and min/max

reading in basic versionb Energy class 1 as defined by IEC 61036

Applicationsb Panel instrumentationb Sub-billing and cost allocationb Remote monitoring of an electrical installationb Harmonic monitoring (THD)

T

PowerLogic PM700 Series

Vigirex relays trip between 0.8 and 1 x I n, thus increasingimmunity to nuisance tripping by 60% compared tothe residual-current protection requires of standardIEC 60947-2.

Frequency filteringFrequency converters, such as variable-speed drives,generate high levels of high-frequency leakage currents.During normal operation, these leakage currents are nota danger to users. Frequency filtering by Vigirex residual-current relays ensures maximum protection againstinsulation faults and a particularly high level of continuityof service.

Inverse-time tripping curveDuring circuit energisation, the inverse-time trippingcurve makes it possible to avoid nuisance tripping ofthe residual-current protection system by false zerophase-sequence currents caused by:b high transient currents of certain loads (e.g. motors,

LV/LV transformers, etc.)b the charging of capacitances between active

conductors and earth.

Rms measurements of earth-leakage currentsThe residual-current protection relay measures all typesof signals and calculates the true rms value weighted toallow for frequency filtering.

Test and resetTo monitor the protection or indication system, the relayincludes:b a complete test function with tripping of the protection

deviceb a test without tripping is possible

Vigirex RH86M

Vigirex RH86P

For product details,contact our DistributorNetwork listed on theback page

For product details,email Customer Careat [email protected]

Page 5: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Spotlight

05

Magelis XBT-GGraphic Terminals with Touch-Sensitive Screens

elemecanique Magelis XBT-G graphicterminals offer an optimised interfacesolution for control system operation.

The most distinct features include:b an onboard Ethernet connectionb a multi-point link for simultaneous connection

to Uni-Telway, Modbus, Modbus TCP/IP, givingthese HMIs a high level of communicationcapability

b multimedia voice-data-image data is managedat all levels

b an external data carrier in the form of a compactflash card stores production and backup datafor the applications

b come with a monochrome or colour touchscreenin a range of sizes from 5 to 12 inches

The terminal is configured with Telemecanique'sVijeoDesigner, VJD SPUL software which operatesunder Windows. This user-friendly program hasmultiple configurable windows making project

development quick and easy. A number of toolsare available including a browser, library ofanimated graphic objects, display of on-line help,error reports, object properties and variables list.

VijeoDesigner, VJD SPUL, also processesinformation in the Magelis XBT-G terminal usingscripts written in Java. Many advanced functionsare available to enhance the speed and reliabilityof data processing: multi-language (up to 20languages) and multi-window management withpop-up windows, numerous character sets (Latin,Chinese, Japanese, Cyrillic), alarm or trend loggingand etc.

To facilitate connection to other control systemdevices, all screens in the Magelis XBT-G rangehave an identical compact housing. They alsooffer a wide variety of connection options on theside of the housing: a compact flash memory cardslot, audio output terminal, RJ45 connector forEthernet connection.

T

= Simply Smart

chneider Electric has once again provedourselves as the market leader in MotorStarting Solutions with the launch of the

new Electronic Over-Current Relays (EOCR), rangein LR97 and LT47.

With the increase in demand for more motor startersthat can perform "Machine protection function",

the new kid on the block, LR97 & LT47, has provenitself to be the only answer.

These relays have "Definite-Time characteristic",which differs from "Inverse-Curve characteristic",provided by standard Thermal OverloadRelays (TORs). This technology is particularlyrecommended for providing mechanical protectionon machines with high resistive torque, high inertiaand with strong probability of jamming understeady state conditions. LR97 & LT47 are alsosuitable for specific motor protection in case oflong starting time and frequent starting. So, lookno further, LR97 & LT47 is the ideal choice for yourMotor Protection Solution.

Electronic Over-Current Relays

S

= Simply Smart

Magelis XBT-G range

For product details,email Customer Careat [email protected]

For product details,email Customer Careat [email protected]

LR97 LT47

Ideal for protecting sensitivemachines

Page 6: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Spotlight

06

Complete Solution to Your Needs in

Power Monitoring System

Critical Power

Mains/ Feeders

Branch Circuits

CM4000 series

CM3000 series

PM800 series

PM700 series

s the leading supplier of power monitoring equipment in the industry, Square D has the portfolio of products required for each level of your power system.

Comprehensive POWERLOGIC metering, that is layered within a facility, canprovide real-time and event information to help diagnose and mitigate powerproblems. It can also help you improve power system reliability, reduce utilitycosts and increase equipment utilisation.

With a fully instrumented POWERLOGIC system, it's possible to achieve savingsthat result in an almost instantaneous return on your investment.

High-Speed Sampling and Zero Blind Time Metering Make All the DifferenceMost meters are capable of monitoring steady-state (continuous) power qualityconcerns such as voltage imbalance, under voltage or over voltage. However,other power quality categories such as higher order harmonics, voltagefluctuations and transient over voltage, require additional microprocessorresources to adequately represent the electric environmental condition.POWERLOGIC meets those requirements.

Zero Blind Time Means Continuously Metering Every CycleMetering techniques vary by manufacturer. Often, metering algorithms onlytake a snapshot every 60 cycles to perform algorithms. POWERLOGIC PowerMeters and Circuit Monitors perform metering algorithms and alarm detectionon every cycle for constant monitoring so you have accurate readings evenfor intermittent operations like welding loads.

Required Speed is Power Quality Problem Dependent - IEEE 1159Required sampling speed and alarm detection depends entirely upon the typeof power quality problem you are trying to detect. The IEEE 1159 found in thePowerLogic Meter Selection Guide, classifies power quality related problemswith sub-categories, descriptions and quantification, based on some combinationof magnitude, duration and spectral content. PowerLogic meters meet the IEEEstandards and help solve related power quality problems.

Faster Sampling Provides the Full StoryAs more data points are collected, with a higher sampling rate, the anomalycan be more accurately depicted. If a meter is sampling too slowly, an incidentcould be missed altogether, or it could miss the actual magnitude of the eventsince it could occur between samples. PowerLogic circuit monitors use asophisticated, high-speed sampling technique to simultaneously sample allcurrent and voltage channels.

From this sampling, the circuit monitor saves onboard waveform data. TheCM4000T samples at 5 MHz per channel for up to 2 ms per transient capture,recording an astonishing 100,000 samples per cycle at 50 Hz.

Similarly, the Series 4000 Circuit Monitor samples up to 512 samples per cycle,and the Series 3000 Circuit monitor and Power Meter from PowerLogic sampleat 128 points per cycle.

A

Page 7: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Customer Story

07

Harnessing Power, Control & Automation into

Blokset iMCC @ a CocoaProcessing Plant

eSys® model U is an integratedD O L M o t o r S t a r t e r P ro t e c t o r,which exceeds the most stringent

standards in motor control.

Designed to the continuity of service standardIEC947-6-2, the “Total Co-ordination” feature ofTeSys® model U provides maximum safety to plantand personnel in the event of a short circuit.

The patented design provides ‘no welding’ of thestarter contacts as permitted under type 2 shortcircuit conditions. This allows the production assetsof your plant to be utilised to their maximumefficiency.

TeSys® model U with its 45mm modular compactdesign performs the following functions:

Protection and control of 1-phase or 3-phasemotors:b Isolation breaking functionb Electronic short-circuit protectionb Electronic overload protectionb Power switching

Control of the application:b Alarming (warning protection function alarms,

e.g. overload pending)b Status monitoring (running, ready, fault)b Application monitoring (running time, number

of faults, motor current values)b Fault logging (last 5 faults saved, together with

motor parameter values)

These functions can be added by selecting controlunits and function modules that clip into the powerbase. The product can therefore be customisedat the last moment and simplify or completelyeliminate wiring between components usingaccessories.

Blokset, a complete range of LV Switchboardscomplying to IEC 60439-1 and PSB EMCtests (EN55011, EN61000 & ENV50204), wasrecently installed at a cocoa processingplant in Jurong for plant upgrading. Takinginto consideration the compact switch-room size,factory automation needs and coordination of finalload-list for interchangeability, TeSys® model UStarter was selected to provide the best solution.

Twelve withdrawable TeSys® model U starterdrawers were integrated in each Blokset columnto maximise the usage of the switch-room space.Each drawer contains a DOL starter of rating upto 15KW with "Total Co-ordination" specification.The starter is of modularity to enhance the feasibilityfor application adaptation. One example is themotor rating changing drastically from 2.2KW to15KW during the final stage of site commissioning,with the thermal module in the TeSys® model Ustarter as the only replacement.

Traditional starter with maximum coordination oftype 2 required all breakers, contractor, thermaloverload relay, the drawer module and its paneldoor to be replaced. This may lead to an increasein the size of the MCC or switch room at extra cost.

Tapping our local knowledge and past experiencein iMCC projects, our automation range of productswere integrated to harness the TeSys® model UStarters, soft-starter and variable speed drive tobuild another Intelligent Blokset for the localindustries by our Blokset Licensee - SMB ElectricPte Ltd.

T

Cocoa seeds

A new generation in Intelligent Motor Control is born!

Blokset iMCC under fabrication

TeSys® model U

Cocoa pods

Page 8: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Customer Story

08

Schneider Electric: On the Podium at the

Athens Olympicschneider Electric participated in the 2004Olympic Games in Athens, providingmission-critical electrical equipment to

distribute, control and manage the power neededto run the entire sports infrastructure and ensurea comfortable environment. More than eightOlympic venues were equipped with Merlin Gerin,Telemecanique and MGE UPS Systems productsand systems for a guaranteed, uninterrupted powersupply, so that athletes and spectators were safeand comfortable. These contracts were worth anaggregate Euro 10 million (S$21.9 million).

The Olympic VillageSchneider Electric manufactured and installed allthe electrical equipment, which managed the airconditioning systems in the Olympic Villageincluding Merlin Gerin circuit breakers and low-voltage equipment and Telemecanique contactors,overload relays, pushbuttons and soft starters.

The International Broadcast CenterOlympic events were televised live and aroundthe clock. Schneider Electric supplied safe, reliableelectrical equipment to ensure uninterruptedoperation of the broadcast facilities with 78 Prismalow-voltage switchboards, 12 Merlin Gerin capacitorbanks and a Telemecanique automation systemto control master switches and data transmissionto the building management system.

The Markopoulo Olympic Equestrian Center,the Pampeloponnisiako stadium in Patras, theSchinias Olympic Rowing and Canoeing Center,the Agios Kosmas Olympic Sailing Center andthe Helliniko Olympic Complex (baseball,softball and hockey fields)Schneider Electric supplied all the power supplysystems for these five venues, with MV/LVsubstations, medium-voltage cubicles, powertransformers and low-voltage master cubicles.

Upgrading and extending the Attiko MetroSchneider Electric guarantees high facility uptimefor the safety and comfort of users of the GreaterAthens Subway system. The installed solutioncomprises of 119 Merlin Gerin medium-voltagecubicles to deliver power for station lighting andventilation systems and for train traction systems.

Another project is extending lines 2 and 3 by 7.7kilometers to provide a link-up with the commuterrail network being built in the Athens suburbs. Therolling stock will comprise 17 trainsets that willeventually serve airport traffic as well. SchneiderElectric recently signed a new Euro 2.2 million(S$4.8 million) contract for work on the project,involving the design and installation of 123 MerlinGerin medium-voltage cubicles and 10 powertransformers to power lighting and ventilationsystems in the new stations and for train tractionsystems.

1,700 UPS systems in action in AthensMGE UPS Systems, the world leader in securedpower solutions, was also selected following aninternational call for bids to supply uninterruptiblepower supply (UPS) systems for the AthensOlympic Games.

In all, 1,700 Pulsar, Comet and Galaxy UPS unitshave been delivered, representing a total installedpower of around 4 MVA. They ensure theuninterrupted supply of high-quality power to suchcritical applications as telecom and media centers,timing systems and drug testing processes.

MGE UPS Systems has also provided theOlympics organisation with a number of MGEPowerServices™ experts, who are dedicated tothe prevention of any operating glitches, thanksto remote monitoring and emergency response.

The contract also calls for the supply of UPS unitsand additional related services as requested duringthe development of the Olympic installations valuedat Euro 1.7 million (S$ 3.7 million).

S

Everyday life of the athletes at the Olympic Village

Rhythmic gymnastics

Olympic Village

Page 9: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

0909

Snippets

his new facet of our market-orientedapproach affirms our commitment tocustomers with reliable busway product

& system, quality service and cost-effective powerdistribution solutions in the building, industrial,infrastructure and energy sectors.

Schneider Electric is the manufacturer for aspectrum of busbar trunking product & systemdistributes under its renowned brands, Square D

T

LKH Power Distribution Pte Ltd, a subsidiary of Lim Kim Hai Electric Co(S) Pte Ltd, has been appointed as the Distributor for Busway Product& System for Singapore market.

and Telemecanique.

With over a decade of experience serving in thepower distribution field, LKH Power Distribution iswell poised to venture together with SchneiderElectric in the industries that will provide customerswith a New Electric World. The Right Connectingcomprehensive edge needed to be successful inthe rapidly changing world.

Foster Strong Specialisation& Competency inPower Distribution Field

For more infomation onLKH Power Distribution, go towww.lkhpowerdistribution.com

Alex Khoo, Senior Vice-President of Schneider ElectricSouth East Asia, Nelson Yeap, Country Director of SchneiderElectric Singapore, Louis Lim, Group Joint ManagingDirector and Bobby Lim, LKH Group Chairman

Square D I-Line BusbarTrunking System

Telemecanique CanalisLighting Busway

Page 10: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

10

Snippets

ow do you achieve effective startingtorque while limiting current peaks in themotor control? The ideal solution is found

in the Telemecanique Altistart 01 soft starter andAltivar 31 variable speed drive.

Participants picked up this useful tip, and learnedabout the revolutionary development of drivesand starters in the serenity of Acacia Restaurantin Bishan Park on 16 July. The event wasorganised in conjunction with the launch of the

Altistart 01 and Altivar 31.

Amid a live demonstration on how to save costsin pump application and hands-on participationusing launched products, there were alsonetworking opportunities with other businessassociates and a sumptuous intercontinentalspread to satiate taste buds.

Capping the event was a Cycling and TreasureHunt Competition around the park.

H

A Journey into Speed - Joint event withdistributor go faster in a more cost saving way!

Operational Excellence SymposiumFor Marine, Offshore, Oil & Gas Industries

eld on 24 September at Raffles Marina(near Tuas Checkpoint), the symposiumsaw a successful turnout of 200 delegates

and visitors, mainly from the marine, offshore, andoil & gas industries.

Participants attended multiple seminars, andreceived the newest updates on productrevolutions, application solutions and servicesdelivery. Short seminars on "Building an Intelligent& Robust Power Distribution System", "CommonErrors in HV/LV Electrical Network ProtectionSystem" and "Mastering EMC to Safeguard YourInvestment" met with overwhelming response.Participants also had the opportunity of exchangingknowledge with distinguished guests from DNV(Det Norske Veritas), JM Pang & Seah, and EFIAsia Pacific.

As it was approaching the Mid Autumn festival,lantern quiz games and tasty moon cakes werealso prepared, much to the delight of everyone.

Making the event additionally special was thedonation of all seminar fees to Schneider Electric's

HOfficial Beneficiary for 2004, the Spastic Children'sAssociation of Singapore, to support childeducation and training.

Live demonstration on pumpapplication

Winner of the Cycling and Treasure Hunt Competition Hands-on participation with launched products

The ACB, MCCB & MCB range were showcased

Winner of the Lantern Quiz Game

Our engineers demonstratedthe detection products

Excellent crowd turnout atthe Symposium

Seminar in progress

Page 11: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

11

Time To Test Your Knowledge.CLUE: Total 8 words associated with Motorpactfeatured in the previous issue under the Spotlightsection. Alternatively, you can visit our website atwww.schneider-electric.com.sg for more clues.Your answers can be horizontal, vertical, diagonalor backwards.

Crossword Puzzle

Most Appreciated FeedbackYour Voice

Entry & Your Particulars

Interlude

Answer:

Share your thoughtswith us and our othercustomers!

• Ideas for improving our customer services

• Suggestions that will allowus to better understand your needs

• Comments on new products and services launched

Ways you can give usyour feedback:

• Use the ‘Feedback’ buttonon our website

• Give your valuable feedback to any SchneiderElectric staff who visits you

• Respond to our phone survey when you receive our call

Feedback 1:"He suggested that for fax enquiries to Customer Care, there should be anidentified contact person to fax to. This will help facilitate follow up on theprogress of the enquiries later." - Mr Phua Beng Huat of ITE Electric Co Ltd

Action Taken:In most cases, the person on background duty will attend to all fax enquiries.All Customer Care agents should also inform customers of the name ofthe person serving them.

Feedback 2:"He encountered some discrepancies in the delivery of some equipment. Asour delivery contractor did not possess any technical knowledge, it wasdifficult for him to make enquiries." - Mr Hernando R Villa of Kurihara Kogyo Co Ltd

Action Taken:For all local delivery of equipment, the delivery order sheet should includethe name of the project engineer and the relevant hand phone number. Thecustomer can call the project engineer immediately when there arediscrepancies or queries.

These writers win a S$30 shopping voucher each.

Apr/Jun 2004Puzzle Answers1. Motor starter2. Modularity3. Protection4. Modbus

Congratulations to thefollowing winners! They haveeach won a gift voucher.

Winners1. Max Fei

Lim Kim Hai Electric (S) Pte Ltd

2. John Tan C HHoneywell Singapore Pte Ltd

3. Margaret LiowNew Prosperity Electrical Pte Ltd

4. Mohamed AnsarPan-United Marine Ltd

5. Reverser6. Splitter box7. Power base8. Upgradeable

“I’m always late for work but I can make up by leaving early.”

Name:

Job Title:

Email:

Company:

Address:

Tel:

Fax:

■ Four (4) correct entries will be drawn to receivegift vouchers.

■ Circle your answers and send in your entry by31 January 2005.

■ Fax in your entry to Marketing Communication at 6484 7800.

■ All winners will be notified by telephone andresults published in the forthcoming issue.

Page 12: p03 Spotlight p04 p09 Blokset iMCC @ a Cocoa Processing · PDF fileMagelis XBT-G Complete solution to ... circuit breaker. The LEDs in front can also be used to ... b a complete test

Distributors’ Network

Choo Chiang Marketing Pte Ltd

Head Office:No. 10 Woodlands LoopSingapore 738388Tel: +65 6368 5922 Fax: +65 6363 5922Email: [email protected]

Branch Offices:Blk 5070 Ang Mo Kio Industrial Park 2 #01-1511Singapore 569573Tel: +65 6483 3233 Fax: +65 6483 2232

Blk 23 Bendemeer Road #01-527Singapore 330023Tel: +65 6296 4111 Fax: +65 6298 3620

Blk 640 Rowell Road #01-70Singapore 200640Tel: +65 6396 4111 Fax: +65 6296 3620

450-3/4 Sims AvenueSingapore 387540Tel: +65 6748 1377 Fax: +65 6748 2377

Blk 3 Toa Payoh Industrial Park #01-1381Singapore 319055Tel: +65 6250 4520 Fax: +65 6253 3328

Blk 3026 Ubi Road 1 #01-188Singapore 408719Tel: +65 6749 8922 Fax: +65 6741 8922

Blk 17 Pioneer Road North #01-90Singapore 628465Tel: +65 6266 5859 Fax: +65 6266 5059

Emersons Electric Pte Ltd30 Kallang Pudding Road #01-02Valiant Industrial Building Singapore 349312Tel: +65 6745 3500 Fax: +65 6745 6241

Interwell Pte Ltd59 Ubi Avenue 1 Bizlink Centre #07-13Singapore 408938Tel: +65 6547 4552/7 Fax: +65 6547 4552Email: [email protected]

Kim Chay Industrial Supplies Pte Ltd

Head Office:123 Tuas View Walk 1 Westlink Tech ParkSingapore 637738Tel: +65 6861 3933 Fax: +65 6861 5855Email: [email protected]

Branch Office:Blk 21 Pioneer Road North #01-108Singapore 628467Tel: +65 6265 4433 Fax: +65 6264 0820

Lim Kim Hai Electric Co (S) Pte Ltd

Head Office:Lim Kim Hai Building 53 Kallang PlaceSingapore 339177Tel: +65 6292 3711 Fax: +65 6297 0078Email: [email protected]

Subsidiary Office:(Precicon D&C Pte Ltd)27 Gul AvenueSingapore 629667Tel: +65 6759 1200 Fax: +65 6759 2100

New Prosperity Electrical Pte Ltd

Head Office:Blk 25 Pioneer Road North #01-125/126/127Singapore 628469Tel: +65 6264 1100 Fax: +65 6264 3635Email: [email protected]

Branch Offices:No. 10 Jalan Besar #03-13 Sim Lim TowerSingapore 208787Tel: +65 6392 5595 Fax: +65 6392 2362

Blk 20 Woodlands Links#02-28 Woodlands East Industrial EstateSingapore 738309Tel: +65 6756 2756 Fax: +65 6756 5455

Sam Huat Cables & Accessories Pte Ltd

Head Office:34 Kallang PlaceSingapore 339162Tel: +65 6295 5815 Fax: +65 6295 1320Email: [email protected]

Branch Office:Blk 16 Upper Boon Keng Road #01-1095Singapore 380016Tel: +65 6748 5354 Fax: +65 6743 4183

SciGate Automation (S) Pte LtdNo. 1 Bukit Batok Street 22 #0-11GRP Industrial BuildingSingapore 659592Tel: +65 6561 0488 Fax: +65 6562 0588Email: [email protected]

Sinic Pte LtdBlk 1004 Toa Payoh Industrial Park #01-1495Singapore 319076Tel: +65 6250 2437 Fax: +65 6253 1582Email: [email protected]

Schneider Electric Singapore Pte LtdSchneider Electric Services Singapore Pte Ltd10 Ang Mo Kio Street 65 #02-17/20TechPoint Singapore 569059Tel: +65 6484 7877 Fax: +65 6484 7800Email: [email protected]: www.schneider-electric.com.sg