6
5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com http://marineengineeringonline.com/page/58/ 1/6 Marine Engineering Study Materials www.marineengineeringonline.com Search Blow Through Boiler Gauge Glass April 30, 2014 5:09 am | Leave a Comment | Frozee There must be two independent means of determining the water level, one of which must be a direct reading gauge glass. The other is usually a remote reading gauge in the control room which should regularly be compared with the boiler gauge glass. Procedure for Blowing Through Gauge Glass Categories Categories Select Category Follow Us Jab Froze Follow Recent Posts Videocon d2h HD offer Book online @Rs 1720 & get benefits upto Rs 4660. Subscribe d2h HD videocond2h.com Marine Engineering Online 3,302 Like Home General Engineering Knowledge Downloads Forums Contact Us

p58

Embed Size (px)

DESCRIPTION

meo

Citation preview

  • 5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com

    http://marineengineeringonline.com/page/58/ 1/6

    Marine Engineering Study Materialswww.marineengineeringonline.com

    Search

    Blow Through Boiler Gauge GlassApril 30, 2014 5:09 am | Leave a Comment | Frozee

    There must be two independent means of determining the water level, one of which must be a direct

    reading gauge glass. The other is usually a remote reading gauge in the control room which should

    regularly be compared with the boiler gauge glass.

    Procedure for Blowing Through Gauge Glass

    Categories

    Categories

    Select Category

    Follow Us

    Jab Froze

    Follow

    Recent Posts

    Videocond2h HD offer

    Book online @Rs 1720 & get benefits upto Rs4660. Subscribe d2h HD

    videocond2h.com

    Marine EngineeringOnline

    3,302Like

    Home General Engineering Knowledge Downloads Forums Contact Us

  • 5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com

    http://marineengineeringonline.com/page/58/ 2/6

    1. Close off cocks S and W and open drain D. Make sure both water and steam cocks are

    holding.

    2. Open cock W and blow through. Make sure that water is coming out and cock W is clear. Close

    water cock.

    3. Open cock S and blow through. Make sure that steam is coming out and cock S is clear. Close

    Scavenge Port Inspection onboard

    Ships

    Operation of Freshwater Generator with

    Jacket Cooling Water

    Shell and Tube Freshwater Generator

    Testing of Water Mist Fire Fighting

    System onboard Ships

    Maintenance of Water Mist Fire Fighting

    System

    Water Mist Fire Fighting System

    Alexa Rank

    Categories

    Air Conditioning BoilersCompressors DieselEngines Fire DetectorsFire Fighting Forms

  • 5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com

    http://marineengineeringonline.com/page/58/ 3/6

    steam cock.

    4. Close drain D.

    5. Open water cock W and check water level rises in the glass.

    6. Open steam cock S for showing boiler water level.

    The glasses should be kept clean. The glands should be nipped up at the first sign of leakage as the

    chemicals in the boiler water will leave a deposit on the glass. The glasses should have protective

    glass shields around them and be properly illuminated.

    Reference

    Operation and Maintenance of Machinery in Motor Ships by N.E. Chell

    share it...

    Posted in: Boilers | Tagged: blow through, boiler gauge glass

    and ChecklistsGeneralEngineeringKnowledge HeatExchangers Hydraulics Inert Gas

    System Instrumentation and

    Control Lubricating Oil MarineElectrical TechnologyMEOExaminationStudy MaterialsMotor EngineeringKnowledge NavalArchitecture and ShipConstruction Pumps

    Refrigeration Safety andEnvironmental ProtectionSewage Treatment Turbochargers

    May 2015

    M T W T F S S

    1 2 3

    4 5 6 7 8 9 10

    11 12 13 14 15 16 17

    18 19 20 21 22 23 24

    25 26 27 28 29 30 31

  • 5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com

    http://marineengineeringonline.com/page/58/ 4/6

    What is Ogee RingApril 30, 2014 5:05 am | Leave a Comment | Frozee

    Connecting the bottom of the furnace to the boiler shell plating is a seamless Ogee ring. This ring is

    pressed out of thicker plating than the furnace; the greater thickness is necessary since circulation in

    its vicinity is not as good as elsewhere in the boiler and deposits can accumulate between it and the

    boiler shell plating. Hand hole cleaning doors are provided around the circumference of the boiler in

    the region of the Ogee ring.

    Apr

    Top SIPInvestment plans

    Compare & invest in best Funds. 0 paperwork. Start today.myuniverse.co.in/ZipSip

  • 5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com

    http://marineengineeringonline.com/page/58/ 5/6

    Ogee Ring

    Figure above shows the method of attachment of the furnace and Ogee ring for Cochran and

    Clarkson welded boilers, welded to Class I Fusion Welding Regulations. Tell-tale holes drilled at

    equal circumferential intervals in the boiler shell enable leakage between the Ogee ring and the

    boiler shell to be detected.

    References

    REEDS GENERAL ENGINEERING KNOWLEDGE FOR MARINE ENGINEERS, by Leslie Jackson and

    Thomas D. Morton

  • 5/1/2015 Marine Engineering Study Materials - Page 58 of 89 - www.marineengineeringonline.com

    http://marineengineeringonline.com/page/58/ 6/6

    share it...

    Posted in: Boilers | Tagged: boiler, ogee ring

    Previous 1 56 57 58 59 60 89 Next

    Copyright 2014 - Marine Engineering Online Theme by WPJournals WordPress