P7.5.1 05 F02 BBNT Lap Dat Tinh

Embed Size (px)

Citation preview

  • 7/28/2019 P7.5.1 05 F02 BBNT Lap Dat Tinh

    1/2

    QUY TRNHNGHIM THU & A VO S DNGACCEPTANCE FOR OPERATION PROCEDURE

    M s : P7.5.1/05-F02.

    Ln pht hnh : 01.

    Ngy pht hnh: 08/07/2011.

    S trang : 02BIN BN NGHIM THU LP T TNHACCEPTANCE FOR INSTALLATION REPORT

    Bin bn s : ..Minutes number

    Cng trnh : ..Project :

    a im :Contruction in :

    Tn phn cng vic nghim thu:

    Name of work to be accepted :

    Hm nay, ngy / / 200 , Vo lc gi .. pht.Date : .. Time : ..

    Ti / Place : .......................................................................................................................................

    Chng ti gm / Were herein :

    i din Ch u t / Client :

    o ng / Mr: .. - Chc v / Position: .....................................

    i din T vn-Gim st / Consultant :

    o ng / Mr:.. - Chc v / Position : .....................................

    i din nh thu thi cng / Contractor:

    o ng / Mr:.. - Chc v / Position : .....................................

    Cc bn tham gia nghim thu tin hnh :

    Parties who take part in the acceptance of the project have carried out :

    1. Kim tra hin trngChecking at site

    - Tn thnh phn cng vic, b phn c kim tra gm :Works and items of project which have been examined , include :

    2. Xem xt cc ti liu , vn bn sau : Examination of the following documents :

    - Tiu chun p dng khi thi cng,kim tra , nghim thu

    Technical standards applied to construction, inspectiopn, acceptance ;

    - H s php lLegal documents;

    Bin bn nghim thu............

  • 7/28/2019 P7.5.1 05 F02 BBNT Lap Dat Tinh

    2/2

    QUY TRNHNGHIM THU & A VO S DNGACCEPTANCE FOR OPERATION PROCEDURE

    M s : P7.5.1/05-F02.

    Ln pht hnh : 01.

    Ngy pht hnh: 08/07/2011.

    S trang : 02BIN BN NGHIM THU LP T TNHACCEPTANCE FOR INSTALLATION REPORT

    - Ti liu v qun l cht lng

    Documents on quality management;

    3. Nhn xt khi lng, cht lng thi cng so vi thit k c thm nh : Comments of the quantity and the quality of construction in comparison with the approved design interms of :

    - V thi gian thi cng ( bt u , kt thc )Construction time (from commence to completion );

    - V khi lng thc hinQuantity perforomed ;

    - V cht lng thi cngConstruction quality.

    4. Kt lun: Conclusion :

    Chp nhn ( hay khng chp nhn ) trin khai cc vic tip theoAccept (or not }the implementation of next works ;

    Yu cu phi sa cha xong cc khim khuyt mi trin khai cc cng vic tip theoRequest a repair of defects before commencing of the next work

    Ch k v du ng ca cc bnSignature and seals of parties to the acceptance :

    SUBMITTED BY:..

    WITNESS BY:..

    APPROVED BY:..

    TnName

    TnName

    TnName

    Chc vPosition

    Chc vPosition

    Chc vPosition

    Ch kSignature

    Ch kSignature

    Ch kSignature

    NgyDate

    NgyDate

    NgyDate

    Bin bn nghim thu............