20
© 2004 Weatherford. All rights reserved. PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELD Presenter: Ken Hilse Author: Abdul Thani Sulai

PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

1© 2004 Weatherford. All rights reserved.

PACK OFF GAS LIFTENHANCES PRODUCTION IN OLDER FIELD

Presenter: Ken HilseAuthor: Abdul Thani Sulai

Page 2: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

2© 2004 Weatherford. All rights reserved.

Insert String TechnologySarawak Fields Layout

Page 3: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

3© 2004 Weatherford. All rights reserved.

Insert String TechnologyTemana Field

Temana West Temana Central

Temana East

1.7 MMstb8.2 MMstb9.9 MMstb

63.2 MMstb

=• Undev=• Dev=RUR=Np

TEMANA WEST

12.4 MMstb10.1 MMstb22.5 MMstb29.5 MMstb

=• Undev=• Dev=RUR=Np

TEMANA CENTRAL

3.4 MMstb0.2 MMstb3.6 MMstb6.3 MMstb

=• Undev=• Dev=RUR=Np

TEMANA EAST

8.001.4TEJT-T21.512.48.7TEJT-C/WNpUndevDev

Higher remaining oil potential in Temana Central area

Page 4: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

4© 2004 Weatherford. All rights reserved.

Insert String TechnologyIdle Wells

• In flowing wells, water cut increases and reservoir pressure depletion causes some wells to cease to flow.

• Gas lift well not producing due to the liquid level having dropped below the last mandrel (SPM).

AFTER INSERTSTRING INSTALLEDBEFORE

Page 5: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

5© 2004 Weatherford. All rights reserved.

Insert String TechnologyPressure Depth Analysis

Page 6: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

6© 2004 Weatherford. All rights reserved.

Insert String TechnologyWhat is Insert String?

• The string tally consists of the following:– 2 3/8-in. O.D. tubing (spacer pipe) 15-ft, stinger and

receptacle– Upper and lower pack-off– Pack-off mandrel + GLV/orifice valve with check valve– 5- or 10-ft spacer pipe– Upper and lower tubing stop

• Install and retrieve using normal wireline operations• Installed in the existing 3 ½-in. O.D. tubing without

workover and no rig required

Page 7: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

7© 2004 Weatherford. All rights reserved.

PACK OFF

UPPER PACK OFF

LowerPack Off

Page 8: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

8© 2004 Weatherford. All rights reserved.

PACK OFF GLV MANDREL

PACK OFF GAS LIFT MANDREL

CONVENTIONAL GLV 1” O.D.

Page 9: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

9© 2004 Weatherford. All rights reserved.

Insert String Technology

• 2-3/8-in. O.D. tubing or spacer pipe

Page 10: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

10© 2004 Weatherford. All rights reserved.

GS Running /Pulling Tool

Page 11: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

11© 2004 Weatherford. All rights reserved.

Insert String Technology

Page 12: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

12© 2004 Weatherford. All rights reserved.

Insert String Technology

Page 13: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

13© 2004 Weatherford. All rights reserved.

Insert String Technology

• Total length of one insert assembly per run is maximum 15.6-ft

• Total wireline lubricator is about 30-ft

Page 14: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

14© 2004 Weatherford. All rights reserved.

Insert String TechnologyCase Study No. 1• TE-15L closed-in since 1988• Low THP due to water cut increase• Installed in Dec. 2002 with a total

length of 624-ft, cost: USD $74,000• Produced about 1,500 BPD gross with

60% water cut – net 600 BPD• To date still producing, FTHP 150 psig

Page 15: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

15© 2004 Weatherford. All rights reserved.

Insert String Technology

Page 16: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

16© 2004 Weatherford. All rights reserved.

Insert String TechnologyCase Study No. 2• TE-28 closed-in since 1987 due to

depleted reservoir pressure (from 682-to 415-psig), FTHP 20 psig

• Insert string installed in May 2003 with total length about 400-ft, cost: USD $57,000

• Produced net oil about 100 BPD and to date still producing FTHP 100 psig

Page 17: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

17© 2004 Weatherford. All rights reserved.

Insert String TechnologyCase Study No. 3• TE-67S closed-in since 1991 due to

low THP and back pressure (flow 280 psig)

• Insert string installed in June 2003 with total length 557-ft, cost: USD $68,000

• Produced net oil about 370 BPD and to date still producing FTHP 550 psig

Page 18: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

18© 2004 Weatherford. All rights reserved.

Insert String TechnologyCase Study No. 4• TE-67L closed-in since Dec. 2000 due

to low THP and back pressure (flow line: 280 psig)

• Insert string installed in Sept. 2003 with total length 966-ft, cost: USD $107,000

• The well was reactivated and currently flowing

Page 19: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel

19© 2004 Weatherford. All rights reserved.

Insert String TechnologyConclusion

• Pack Off Insert string is a proven technology and successfully reactivated idle wells

• Can deepen gas lift injection point below production packer

• Increase FTHP and raise up liquid level in the tubing

• Less expensive than workover and very low risk

Page 20: PACK OFF GAS LIFT ENHANCES PRODUCTION IN OLDER FIELDalrdc.org/workshops/2005_Spring2005GasLift/presentations... · 2012. 11. 20. · – Upper and lower pack-off – Pack-off mandrel