PACS IBDR, Garching 27/28 Feb 2002 Chopper Chopper R. Hofferbert R. Hofferbert D. Lemke, U. Grözinger, O. Krause D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) J. Katzer (ZEISS) PACS Instrument Baseline Design Review PACS Instrument Baseline Design Review 27/28 Feb 2002 27/28 Feb 2002 MPE, Garching MPE, Garching Max-Planck-Institut für Astronomie, Heidelberg Max-Planck-Institut für Astronomie, Heidelberg

PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg

Embed Size (px)

Citation preview

PACS IBDR, Garching 27/28 Feb 2002

ChopperChopper

R. HofferbertR. Hofferbert

D. Lemke, U. Grözinger, O. KrauseD. Lemke, U. Grözinger, O. Krause

J. Katzer (ZEISS)J. Katzer (ZEISS)

PACS Instrument Baseline Design ReviewPACS Instrument Baseline Design Review27/28 Feb 200227/28 Feb 2002MPE, GarchingMPE, Garching

Max-Planck-Institut für Astronomie, HeidelbergMax-Planck-Institut für Astronomie, Heidelberg

2

PACS IBDR, Garching 27/28 Feb 2002

Chopper

mechanicalI/F

electrical I/F

housing

mirror

actuator

P-sensor

flex pivot

T-sensor

Design Status

• LM: • QM:– Major changes

• ITT Cannon/GORE pigtail • Cover with straylight baffles• “Vacuum cleaner” magnet• Black coating on housing and

cover• Pre-qualified parts

– Minor changes• FP bushings• Cable routing• Grounding pins• T-sensor internal

3

PACS IBDR, Garching 27/28 Feb 2002

Chopper

• Manufacture procedures completed:– Cryo motor coils

• High purity Al wires, laminated, pre-tempered Cryoperm cores, microscope controlled coiling, ~1100 windings

– Position sensor• Precision gluing of magneto resistive field

plates, optically aligned, cryo-qualified soldering

– Rotor• Precision gluing of

drive/sense magnets and flex pivots, ZEISS in-house procedures for mirror coating incl. Au diffusion blocker

cryo motor coil

Design Status - Details

P-sensor

rotor

4

PACS IBDR, Garching 27/28 Feb 2002

Chopper

AIV QA Activities

• KIP 1: QA checks…– Procurement/material certificates– Event records (“Logbuch”)– Inspection certificates– Non-compliances

• MIP 1: QA checks…– Event records (“Logbuch”)– Inspection reports– Non-compliances– As built documentation

• MIP 2: QA checks…– Event records (“Logbuch”)– Qualification or acceptance

reports– Non-compliances– Final inspection

5

PACS IBDR, Garching 27/28 Feb 2002

Chopper

Testmatrix

• 4 independent models• Test items:

– Performance at 4K, 77K, 300K

– Lifetime – Vibration capability– EMC– Thermal cycling– Bake-out

6

PACS IBDR, Garching 27/28 Feb 2002

Chopper

The 5th Model

• Engineering model:– pre-tests of parts and unit– Determination of control

parameters– Preparation of test

procedures– Handling of chopper wrt.

cleanliness, storage, mounting in cryostats, cool-down/warm-up requirements

– Dummy for first compatibility tests with warm electronics (MEC, CSL)

„dummy chopper“

7

PACS IBDR, Garching 27/28 Feb 2002

Chopper

LM Verification Flowchart

LIF ET IM E T EST:

BB e lectron icsa lignment te lescope

PAT E C

PAT E C

alignment te lescope

cold function check

zero position

inclination anglem odula tion functionpower consum ption

evacuationcool-down to 4K

warm function check

in tegration in toStöhr cryostat

a lignment te lescopePAT E C

visua l check

rem oval from cryostat

warm function check

warm -up to 300Kventing

life tim e cycling1/3 opereration1/3 ca libra tion

co ld function check

life tim e cycling1/3 opereration1/3 ca libra tion

co ld function check

life tim e cycling1/3 opereration1/3 ca libra tion

co ld function check

VIBRATION TEST :

warm function check

warm -up to 300Kventing

integration in toStöhr cryostat

77K function check

cold vibration x-axis

77K function check

integration in tovibration cryostat

evacuationcool-down to 77K

warm function check

integration in toStöhr cryostat

8

PACS IBDR, Garching 27/28 Feb 2002

Chopper

CuBe double-stage flex pivot

Engineering Lifetime Test of Flex Pivots

• Test at Fraunhofer LBF (Darmstadt):– 300K environment: Worst case

scenario (higher loads) due to reduction of fatigue strength by factor 1.3

– 6 FPs in 3 independent rotors (simult. excitation, 50Hz, 9°, goal: 2 x lifetime = 126 Mio. cycles)

– Damages of two flex pivots in first run, optical measurement indicated bad alignment of ONE FP HOLDER on mounting bench test setup has been crucially improved, second run presently underway

actuator

rotor

laser control

FP

9

PACS IBDR, Garching 27/28 Feb 2002

Chopper

Schedule

J ul

01

Aug

01

Sep

01

Okt

01

Nov

01

Dez

01

J an

02

Feb

02

Mrz

02

Apr

02

Mai

02

J un

02

J ul

02

Aug

02

Sep

02

Okt

02

Okt

02

Nov

02

Dez

02

Kick OffChopper PDR

Freezing of SpecsLM Manufacture (MPI A)

LM AssemblyDummy Chopper Tests

LM Pre- TestsLifetimetestDelivery LM

QM Manufacture (MPI A)QM Critical Parts Qualification

QM AssemblyQM Tests

Delivery QMChopper CDR

Development FMDelivery FM

Development FSDelivery FS

today

10

PACS IBDR, Garching 27/28 Feb 2002

Chopper

Open Points

• How to order space-qualified pigtails (via TECNOLOGICA or directly) ?

• When to put black coating on the chopper parts ?

11

PACS IBDR, Garching 27/28 Feb 2002

Chopper

Conclusion

• Valuable experience wrt. flex pivot alignment and lifetime from tests at Fraunhofer LBF (Darmstadt)

• LM and QM test phases practically in parallel– Fastes way of completing verification plan– Critical wrt. transfer of lessons learned

• Start of cold lifetime tests in April 2002

• QM delivery in May 2002 critical due to– Tight schedule (no margins) – Pigtail procurement (GORE cables, ITT Cannon connectors +

manufacture)