Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD Phone : 4010437/4020781 74037124/4035273 Fax : 24044532/4024068/4023516 Email : [email protected] Visit At : http://mpcb.gov.in Kalpataru Point, 3rd & 4th floor, Sion- Matunga Scheme Road No. 8, Opp. Cine Planet Cinema, Near Sion Circle, Sion (E), Mumbai - 400022 Consent order No: Format 1. 0/BO/CAC-cell/ EIC-PN-2351 714 /E/CAC - M O S 6. To, M/s. Pegusas Properties Pvt. Ltd Megapolis Plot No R-l/1, R-l/2, R-l/3, R-l/4, Rajiv Gandhi Infotech Park-Ill Hinjewadi, Village Man & Bhoriwadi, Tal Mulshi, Dist. Pune Subject: Consent to Operate (part 3) Renewal of existing consent (part 1 & 2) & amalgamation of both consents of Residential cum Commercial project more than 5 MVA under Red category. Ref : 1. EC accorded by GoM vide no. SEAC-2010/CR.346/TC-2 dated 20,11.2010. 2. Your application approved in 3rd CACmeeting of 2015-16 held on 29.06.2015 Your application CO1502000211 Dated: 27 January 2015 ( For: Consent to Operate (part 3) Renewal of existing consent (part 1 & 2) & amalgamation of both consents under Section 26 of the Water (Prevention & Cbhtrol of Pollution) Act, 1974 & under Section 21 of the Air (Prevention & Control of Pollution) Act, 1981 and Authorization under Rule 5 of the Hazardoiis Wastes (M, H & T M) Rules 2008 is considered and the consent is hereby granted subject to the following terms and conditions and as detailed in the schedule 1, II, III & IV annexed to this order: 1. The consent is granted for a peritjd up to 31.01.2016 2. The actual capital investment of the project is Rs. 457.817- Crs (As per C. A. Certificate submitted by project proponent) 3. The Consent to 1st Operate (part 3) & Renewal of existing consent (part 1 & 2) with amalgamation of both consents is valid for commercial project named "Megapolis" of M/s. Pegusas Properties Pvt. Ltd Megapolis, Plot No R-l/1, R-l/2, R-l/3, R-l/4, fRajiv Gandhi Infotech Park-Ill, Hinjewadi, Village Man & Bhoriwadi, Tal Mulshi, Dist. Pune for Total Plot area 2,23,527.50 Sq. mtrs (Present) but of Total plot area 5,60,000 Sq. mtrs & total BuA 5,41,003.34 Sq. mtrs. (Preseht)Out of 11,20,000 Sq. Mtrs including services & utilities as per the occupation certificate issued by local body. Conditions under Water (P&CP), 1974 Act for discharge of effluent: Sr. no. 1. 2. Description Trade effluent Domestic effluent Permitted quantity of discharge (CMD) 00 2381 Standards to be achieved NA As per Schedule - I Disposal NA Recycle & 373 CMD for gardening

Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 1 of7

MAHARASHTRA POLLUTION CONTROL BOARDPhone : 4010437/4020781

74037124/4035273Fax : 24044532/4024068/4023516Email : [email protected] At : http://mpcb.gov.in

Kalpataru Point, 3rd & 4th floor, Sion- MatungaScheme Road No. 8, Opp. Cine Planet Cinema, NearSion Circle, Sion (E),Mumbai - 400022

Consent order No: Format 1. 0/BO/CAC-cell/ EIC-PN-2351 714 /E/CAC - M O S 6.

To,M/s. Pegusas Properties Pvt. Ltd MegapolisPlot No R-l/1, R-l/2, R-l/3, R-l/4, Rajiv Gandhi Infotech Park-IllHinjewadi, Village Man & Bhoriwadi, Tal Mulshi, Dist. Pune

Subject: Consent to Operate (part 3) Renewal of existing consent (part 1 & 2) &amalgamation of both consents of Residential cum Commercial project more than5 MVA under Red category.Ref :1. EC accorded by GoM vide no. SEAC-2010/CR.346/TC-2 dated 20,11.2010.2. Your application approved in 3rd CAC meeting of 2015-16 held on 29.06.2015

Your application CO1502000211Dated: 27 January 2015 (For: Consent to Operate (part 3) Renewal of existing consent (part 1 & 2) &amalgamation of both consentsunder Section 26 of the Water (Prevention & Cbhtrol of Pollution) Act, 1974 & underSection 21 of the Air (Prevention & Control of Pollution) Act, 1981 andAuthorization under Rule 5 of the Hazardoiis Wastes (M, H & T M) Rules 2008 isconsidered and the consent is hereby granted subject to the following terms andconditions and as detailed in the schedule 1, II, III & IV annexed to this order:

1. The consent is granted for a peritjd up to 31.01.2016

2. The actual capital investment of the project is Rs. 457.817- Crs (As per C. A.Certificate submitted by project proponent)

3. The Consent to 1st Operate (part 3) & Renewal of existing consent (part 1 & 2)with amalgamation of both consents is valid for commercial project named"Megapolis" of M/s. Pegusas Properties Pvt. Ltd Megapolis, Plot No R-l/1, R-l/2,R-l/3, R-l/4, fRajiv Gandhi Infotech Park-Ill, Hinjewadi, Village Man &Bhoriwadi, Tal Mulshi, Dist. Pune for Total Plot area 2,23,527.50 Sq. mtrs(Present) but of Total plot area 5,60,000 Sq. mtrs & total BuA 5,41,003.34 Sq.mtrs. (Preseht)Out of 11,20,000 Sq. Mtrs including services & utilities as per theoccupation certificate issued by local body.Conditions under Water (P&CP), 1974 Act for discharge of effluent:Sr.no.

1.

2.

Description

TradeeffluentDomesticeffluent

Permittedquantity ofdischarge(CMD)

00

2381

Standardsto beachieved

NA

As perSchedule -I

Disposal

NA

Recycle & 373 CMD forgardening

Page 2: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 2 of7

5. Conditions under Air (P& CP) Act, 1981 for air emissions:

10,

11.

Sr. No. Description of stack/ source Number Of Stack Standards to be achieved123

DG set (3 x 500 KVA)DG set (3 x 250 KVA)DG set (180 KVA)

111

As Per Schedule -IIAs Per Schedule -IIAs Per Schedule -II

6. Conditions under Municipal Solid Waste (Management and Handling) Rule,2000 :• Sr. No. Type Of Waste Quantity UOM Treatment Disposal

12

3

Bio-degradableNon-Biodegradable

STP sludge

58945893

50

Kg/DayKg/Day

Kg/Day

owe

Use as manureBy sale toauthorizedrecyclersManure

7. Conditions under Hazardous Waste (MH & TM) Rules, 2008 for treatnient anddisposal of hazardous waste

Sr. No. Type Of Category Quantity Treatment DisposalWaste UOM

01

02

Spent Oil

UsedBarrels/drurns

5.1

33.3

120 lit/Y

12 Nos/Y

Sale toauthorizedreprocessorCHWTSDF

The Board reserves the right to review, amend, suspend, revoke etc. this consentand the same shall be binding on th0 industry.This consent should not be construed as exemption from obtaining necessaryNOC/permission from any other Government authorities.PP shall submit the affidavit within 15 days in the prescribed format regarding thecompliance of conditions of EC and C to E.The applicant shall comply with the conditions stipulated in Environmental Clearancegranted by GoM vide nWSEA(3-2010/CR.346/TC-2 dated 20.11.2010.

C*\r and oijrt>ehalf of theXH j1 Maharashtra Pollution Control Board

] r

(Dr. PMemb

fn, IAS)r Secretary

Received Consent fee of-Sr. No. Amount(Rs.) DD. No. Date

09,15,7177- 049235 23.12.2014Drawn OnHDFC Bank

Copy to:1. Regional Officer, Pune and Sub-Regional Officer-Pune-II, MPCB, Pune

— They are directed to ensure the compliance of the consent conditions.2. Chief Accounts Officer, MPCB, Mumbai.3. CC/CAC desk- for record & website updation purposes.

Pegasus Properties Pvt. Ltd Megapolis SRO Pune II/I/O/L/67072000

Page 3: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 3 of7

Schedule-I

Terms & conditions for compliance of Water Pollution Control:

1) A] As per your application, you have installed 4 nos. of Sewage Treatment Plants (STPs)with the design capacities of 1100 CMD, 600 CMD, 600 CMD & 100 CMD.

B] The Applicant shall operate the effluent treatment plant (STP) to treat the sewage so asto achieve the following standards prescribed by the Board or under EP Act, 1986 andRules made there under from time to time, whichever is stringent.

SrNo.

01

02

03

04

Parameters

BOD(3days27oC)

Suspended Solids

COD

Residual Chlorine

Standards prescribed byBoardLimiting Concentration inmg/1, except for pH30

50

100 C"..̂ , ; ;Ippm v\!\

C ) The treated effluent shall be 60% recycled for secondary purposes such as toiletflushing, air conditioning, firefighting, on land for gardening etc.

D] Project proponent shall operate STP for five year>s from the date of obtainingoccupation certificate. \ >

2) The Board reserves its rights to review plans, specifications or other data relating to plantsetup for the treatment of waterworks for the purification thereof & the system for thedisposal of sewage or trade effluent or in connection with the grant of any consentconditions. The Applicant shall obtain prior consent of the Board to take steps to establishthe unit or establish any treatment and disposal system or and extension or additionthereto. f"\XS

3) The industry shall ensure replacement of pollution control system or its parts after expiryof its expected life as defined by manufacturer so as to ensure the compliance of standardsand safety of the operation thereof.

4) In case, the water consumption of the project is not covered under the water consumptionof local body, in that situation, the project proponent shall submit the CESS Returns in theprescribed format given under the provision of Water (Prevention & Control of Pollution)Cess Act, 1977 and Rules made there under for various category of water consumption.

In case the water consumption is duly assessed under the quantity of water consumptionof localObdijy; the project proponent shall submit certificate to that effect from theconcern local body with the request not to assess CESS on their water consumption, beingalready assessed on the water consumption of local body.

Sr. no.

1.

2.3.

4.

Purpose for water consumed

Industrial Cooling, spraying in mine pits or boilerfeedDomestic purposeProcessing whereby water gets polluted &pollutants are easily biodegradableProcessing whereby water gets polluted &pollutants are not easily biodegradable and aretoxic M

Water consumptionquantity (CMD)

0.00

288890.00

0.00

Pegasus Properties Pvt. Ltd Megapolis SRO Pune II/l/O/L/67072000

Page 4: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 4 of7

Schedule-II

Terms & conditions for compliance of Air Pollution Control:

1. As per your application, you have provided the Air pollution control (APC)system andalso erected following stack (s) and to observe the following fuel pattern-

Sr. Stack APC Height Type Of Quantit UOM S% S02No. Attached System inMtrs. Fuel y kg/day

To

1

2

3

4

DG set (3 x500 KVA)DG set (2 x250 KVA)DG set (250KVA)DG set (180KVA)

— -

6 each*

5 each*

5*

5

HSD

HSD

HSD

PNG

20

10

10

10

lit/deachlit/deachlit/d

lit/d

1%

1% ::

1%::^

1%

i

>, 2

*Ofc

4

* Above roof of the building in which it is installed or the nearest tallest building.

2. The applicant shall operate and maintain above mentioned air pollution controlsystem, so as to achieve the level of pollutants to the following standards.

I V I

Particulatematter

Not to exceed 150 mg/Nm3.

3. The Applicant shall obtain necessary prior permission for providing additional controlequipment with necessary specifications and operation thereof or alteration orreplacement alteration well before its life come to an end or erection of new pollutioncontrol equipment. \ *

4. The Board reserves its rights to vary all or any of the condition in the consent, if due toany technological imprayeinentjor otherwise such variation (including the change ofany control equipment, pther in whole or in tfjart is necessary).

f, -A

Pegasus Properties Pvt. Ltd Megapolis SRO Pune II/VO/L/67072000

Page 5: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 5 of7

ScheduIe-IIIDetails of Bank Guarantees

Sr.No.1

Consent(CtoE/O/R)

C to 0(existingto beextended

Amt of BGImposed

Rs. 10/-Lakhs

SubmissionPeriod

15 Days

Purpose of BG

Towards 0 & M of STP &MSW processing plant

r\e

Period31.01.2016

ValidityDate

31.05.2016

\-::.-•. %,-.

sJ \s Properties Pvt. Ltd Megapolis SRO Pune II/l/O/L/67072000

Page 6: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 6 of?

Schedule-IVGeneral Conditions:

1) The applicant shall provide facility for collection of environmental samples and samplesof trade and sewage effluents, air emissions and hazardous waste to the Board staff atthe terminal or designated points and shall pay to the Board for the services rendered inthis behalf.

2) Industry should monitor effluent quality, stack emissions and ambient air qualitymonthly/quarterly.

3) The applicant shall provide ports in the chimney/(s) and facilities such as ladder,platform etc. for monitoring the air emissions and the same shall be open for inspectionto/and for use of the Board's Staff. The chim^y^) vents attached to various sources ofemission shall be designated by numbers such as S-l, S-2, etc. and these shall be painted/displayed to facilitate identification. >

4) Whenever due to any accident or other unforeseen act or even, such emissions occur or isapprehended to occur in excess of standards laid down, such information shall beforthwith Reported to Board, concerned Police Station, office of Directorate of HealthServices, Department of Explosives, Inspectorate of Factories and Local Body. In case offailure of pollution control equipments, the production process connected to it shall bestopped. ,;\

5) The applicant shall provide an alternate electric power source sufficient to operate allpollution control facilities installed to maintain compliance with the terms and conditionsof the consent. In the absence, the applicant shall stop; reduce or otherwise, controlproduction to abide by terms and conditions of this consent,

6) The firm shall submit to this office, the 30th day of September every year , theEnvironmental Statement Report for the financial year ending 31st March in theprescribed Form-V as per the provisions of rul§> 14 of the Environment (Protection)(Second Amendment) Rules, 1992. /^VV*

7) The industry shall comply with the Hazardous Waste (M,H & TM) Rules, 2008 andsubmit the Annual Returns as per |kile ^(jB) & 22(2) of Hazardous Waste (M,H & TM)Rules, 2008 for the preceding year April to March in Form-IV by 30th June of every year.

8) An inspection book shall be opened and made available to the Board's officers duringtheir visit to the applicant.

9) The applicant shall make an application for renewal of the consent at least 60days before the date qftlie expiry of the consent.

10) Industry shall strictly; eottjjjiy with the Water (P&CP) Act, 1974, Air (P&CP) Act, 1981and Environmental Prdtec-tion Act, 1986 and industry specific standard under EP Rules1986 which are available on MPCB website(www.mpcb.gov.in).

11) The industry shall constitute an Environmental cell with qualified staff/personnel/agencyto see the day to day compliance of consent condition towards Environment Protection.

12) The applicant shall install a separate meter showing the consumption of energy foroperation 6f domestic and industrial effluent treatment plants and air pollution controlsystem, A register showing consumption of chemicals used for treatment shall bemaintained.

13) Conditions for D.G. Seta) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or by

treating the room acoustically.b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/

acoustic treatment of the room should be designed for minimum 25 dB (A) insertion lossor for meeting the ambient noise standards, whichever is on higher side. A suitableexhaust muffler with insertion loss of 25 dB (A) shall also be provided. Themeasurement of insertion loss will be done at different points at 0.5 meters from acousticenclosure/room and then average.

c) Industry should make efforts to bring down noise level due to DG set, outside industrialpremises, within ambient noise requirements by proper sitting and control measures.

Pegasus Properties Pvt. Ltd Megapolis SRO Pune II/I/O/L/67072000

Page 7: Page 1 of7 MAHARASHTRA POLLUTION CONTROL BOARD...Page 3 of7 Schedule-I Terms & conditions for compliance of Water Pollution Control: 1) A] As per your application, you have installed

Page 7 of7

d) Installation of DG Set must be strictly in compliance with recommendations of DG Setmanufacturer.

e) A proper routine and preventive maintenance procedure for DG set should be set andfollowed in consultation with the DG manufacturer which would help to prevent noiselevels of DG set from deteriorating with use

f) D.G. Set shall be operated only in case of power failure.g) The applicant should not cause any nuisance in the surrounding area due to operation of

D.G. Set.h) The applicant shall comply with the notification of MoEF dated 17.05.2002 regarding

noise limit for generator sets run with diesel14) The industry should not cause any nuisance in surrounding area.15) The industry shall take adequate measures for control of noise levels from its own

sources within the premises so as to maintain ambient air quality standarddn respect ofnoise to less than 75 dB (A) during day time and 70 dB (A) during night time. Day time isreckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10)p.m. and6 a.m. OC\) The applicant shall maintain good housekeeping. = ;V %;W-

17) The applicant shall bring minimum 33% of the available open land under green coverage/plantation. The applicant shall submit a statement on available open plot area, numberof trees surviving as on 31st March of the year and number of trees planted by Septemberend, with the Environment Statement. ;;x

18) The non-hazardous solid waste arising in the factory premises, sweepings, etc. bedisposed of scientifically so as not to cause any nuisance /pollution. The applicant shalltake necessary permissions from civic authorities for disposal of solid waste.

19) The applicant shall not change or alter the quantity, quality, the rate of discharge,temperature or the mode of the effluent/emissions or hazardous wastes or controlequipments provided for without previous written permission of the Board. The industrywill not carry out any activity, for which this ;consent has not been granted/without priorconsent of the Board. \V\*

20) The industry shall ensure that fugitive emissions from the activity are controlled so as tomaintain clean and safe environment in and around the factory premises.

21) The industry shall submit quarterly statement in respect of industries' obligationtowards consent and pollution cdntrol compliance's duly supported with documentaryevidences (format can be downloaded from MPCB official site).

22) The industry shall submit official e-mail address and any change will be duly informed tothe MPCB. CA^

23) The industry shall achieve the National AmbienkAir Quality standards prescribed videGovernment of India, Notification dt. 16.11.2009/a$ amended.