Upload
aleemudin86
View
20
Download
0
Tags:
Embed Size (px)
Citation preview
Saudi Aramco 2616-ENG (10/2002)
OP
RN
S
SAUDI ARABIAN OIL COMPANY
PM
T
CE
RT
EN
G’G
DE
SC
RIP
TIO
N
IS
SU
ED
FO
R
CO
MM
EN
TS
(F
WS
RE
V O
1)
IS
SU
ED
FO
R
PR
OJE
CT
PR
OP
OS
AL(
FW
S R
EV
D1)
JO/E
WO
10
-007
41
10
-007
41
DA
TE
FE
B-1
2
JUN
-12
RE
V.
NO
.
A
B
DISCIPLINE ENGINEER
DRD DATE JUN-12
PROJECT ENGINEER
________________
DATE ___________
CERTIFIED
RS DATE ___________
CONSTRUCTION AGENCY
________________
DATE ___________
OPERATIONS
________ DATE ___________
ED
SD
V
ER
IFI C
AT
ION
CO
NT
RO
L N
UM
BE
R
B
Y:
____
___
___
___
_
DA
TE
___
___
___
___
_
RE
VIS
ION
CE
RT
IFIC
AT
E
TH
IS IN
DIC
AT
ES
TH
AT
RE
V.
NO
. __
___
____
___
OF
TH
IS D
RA
WIN
G I
S C
OV
ER
ED
, FO
R A
LL
AP
PR
OV
AL
/CE
RT
IFIC
AT
ION
RE
QU
IRE
ME
NT
S,
BY
DR
AW
ING
CO
MP
LE
TIO
N C
ER
TIF
ICA
TE
(DC
C)N
O. _
____
___
___
__
____
___
___
___
____
_
MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 52
OF 71
B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY
RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741
DOC CLASS: 4 DSN: 2179
TH
IS D
RA
WIN
G A
ND
TH
E IN
FO
RM
AT
ION
CO
NT
AIN
ED
HE
RE
IN A
RE
TH
E S
OL
E P
RO
PE
RT
Y O
F S
AU
DI
AR
AM
CO
. N
O R
EP
RO
DU
CT
ION
IN
FU
LL O
R IN
PA
RT
SH
ALL
BE
OB
TA
INE
D F
RO
M T
HIS
DO
CU
ME
NT
WIT
HO
UT
TH
E W
RIT
TE
N C
ON
SE
NT
OF
IT
S O
WN
ER
.
APPENDIX 3 – PRELIMINARY SAFETY INSTRUCTION SHEET
psi
I.D. m(ft) Nom. Thick. mm(ins SHAPE
3 mm(in)
EQUIPMENT DATA
3 mm(in)
32-SAMMSS-004
FYC-Z12-32-A039-001-001
ASME VIII DIV 2 1977 Ed, API 510 9TH Ed 2006
; CORROSION ALLOWANCE
SERVICE
SA 266 Cl 2
HGH PRESSURE SEPARATOR
HEADI.D. m(ft.)
ORDER NO.
; CORROSION ALLOWANCE
LENGTH m(ft.)
55BOOT
3.98
0.91
BUTT (SINGLE SIDED GROOVE)SHELL TO HEAD
HEAD FULLBUTT (DOUBLE SIDED GROOVE)
SEAMS TYPE RADIOGRAPHY EFFICIENCY E
225
OC(OF)
7.62
1.67
3.98
: RATING AND FACING
1500# RTJ
1500# RTJ / RF
POSITIONkPa (psi) POSITION
: THICK, MAT'L. AND
LIMITED BY :
LINING
PACKING
TRAYS
BOTH
MDMT:
0.85 / 1.0 POST WELD HEAT TREATMENT
YES (TBC)
AT TOP
SHELL STRESS
232
2904
kPa (psi)
PROTECTED BY SAFETY VALVE ON
TEST PRESSURE, at TOP
103.4EXTERNAL PRESSURE :
S.V. SET AT
MINIMUM THICKNESS
HEADS :
PRESSURE AND TEMPERATURE 47.8
OTHER GOVERNING CONSIDERATION
SHELL SECTION tm mm(ins)
DRAWING NO.
BASED ON :
INDEX
TH
IS R
EV
ISIO
N N
O.
IS C
OV
ER
ED
, FO
R A
LL
AP
PR
OV
AL
RE
VIE
W F
OR
KE
Y D
RA
WIN
GS
CO
NS
T. A
GE
NC
Y/ D
AT
E
DE
SIG
N C
ER
TIF
ICA
TIO
N
OP
ER
AT
ION
S/D
AT
EC
ER
TIF
IED
/DA
TE
RIYADH REFINERYDR
AW
ING
CO
MP
LE
TIO
N C
ER
TIF
ICA
TE
NO
. NOTES:1. CORROSION ALLOWANCE HAS BEEN REVISED TO 3MM FROM ORGINAL 4.8MM. NO BENEFIT FROM THIS CHANGE HAS BEEN ASSUMED TO CONTRIBUTE TO MATERIAL PRESSURE THICKNESS, THE EXCESS HAS BEEN ASSUMED TO COVER ANY MATERIAL LOSS FROM OPERATION.2. CALCULATED TEST PRESSURE INDICATED IS AS A RESULT OF THE RERATE TO 232ºC DESIGN TEMPERATURE AND MUST BE CARRIED OUT IN THE FIELD.
BOTH 101.4 INDICATED DESIGN TEMP AND PRESSURE
: THICK AND TYPE
BASED ON INDICATED DESIGN
: NO. MAT'L. AND DRAWING NO.
: SHOP
: SIZE, HEIGHT AND MAT'L.
METHOD OF ATTACHMENT
kPa (psi)FIELD
SHELL
SPECIAL DESIGN CONSIDERATION OR
UNUSUAL CONSTRUCTION FEATURES
kPa (psi)
OPERATING LIMITS
(CHANGES TO OPERATING LIMITS REQUIRE OPERATIONS ENGINEERING APPROVAL)
14514DESIGN PRESSURE, AT TOP OC(OF)
SHELL
INDICATED DESIGN TEMP AND PRESSURE
20030 (Note 2)
TEST PRESSURE, WIND LOAD, OR
DWG. TYPE
: RATING AND FACING
INDICATED DESIGN TEMP AND PRESSURE
SIS
220.2
BOOT
NOTE BELOW ANY SPECIAL HAZARDS, RECOMMENDATIONS, INSPECTIONS, OR TESTS THAT ARE IMPORTANT FOR THIS EQUIPMENT.
1 OF 1
PLANT NO.
A
SHT.NO. REV.NOSIS FOR
SAFETY PRECAUTIONS
CALCULATED TEST PRESSURE OC(OF)kPa(g) (psi) @
TESTS NEW
AMB
APPLICABLE CODE AND EDITION
N/A
HEMISPERICAL
19123 HORIZ
kPa (psi)
MANWAY
NOZZLE
JOB
OR
DE
R/E
WO
NO
.T
HIS
RE
VIS
ION
IS N
OT
TO
BE
U
SE
D F
OR
CO
NS
TR
UC
TIO
N U
NT
ILC
ER
TIF
IED
AN
D D
AT
ED
ALL
BUTT (SINGLE SIDED GROOVE)
TH
IS D
RA
WIN
G A
ND
TH
E I
NF
OR
MA
TIO
N C
ON
TA
INE
D H
ER
EIN
AR
E T
HE
SO
LE P
RO
PE
RT
Y O
F S
AU
DI
AR
AM
CO
. N
O R
EP
RO
DU
CT
ION
IN
FU
LL O
R I
N P
AR
T S
HA
LL B
E O
BT
AIN
ED
FR
OM
TH
IS D
OC
UM
EN
T W
ITH
OU
T T
HE
WR
ITT
EN
CO
NS
EN
T O
F I
TS
OW
NE
R.
SPEC'N NO.
HORIZONTAL
1977
RU822M0008
CONCRETE LINED BOTTOM HALF OF VESSEL AND BOOT, BOTTOM NOZZLES MONEL LINED
KOBE STEEL LTD
SHELL
ASSEMBLY DRAWING
110
N/A
INSULATION
AZ12
1.0
1.0
HYDROCRACKER UNIT (Z12)
HIGH PRESSURE SEPARATOR
Nom. Thick. mm(ins)
Saudi Aramco 2694-ENG (11/2010)
SAUDI ARABIARIYADH,
EKRD/2694-1110.XLS
R215-V6NO.
POSITION
DESIGN SHEET NO.
HEADS
R215-V6
MANUFACTURER
SHELL SECTION
SAUDI ARABIAN OIL COMPANY
DATA AND OPERATING LIMITS SHEET - PRESSURE VESSELS
Z12-D-PP-E01204
MANUFACTURER'S SERIAL NO.
EQUIPMENT NO.
MATERIAL SPECIFICATION SA 516 Gr 70
YEAR BUILT
MATERIAL SPECIFICATION
RE
VIS
ION
DE
SC
RIP
TIO
ND
AT
ER
EV
. NO
.
AN
D C
ER
TIF
ICA
TIO
N R
EQ
UIR
EM
EN
TS
, PE
R S
AE
P-3
34
, UN
DE
R
OT
HE
R
RE
QU
IRE
D (
SA
UD
I AR
AM
CO
)R
EQ
UIR
ED
(S
AU
DI A
RA
MC
O)
BY
/DA
TE
EN
GG
./DA
TE
RE
VIS
ION
VA
LID
AT
ION
SPOT FULL
PARTIAL FULL YES NO
Saudi Aramco 2616-ENG (10/2002)
OP
RN
S
SAUDI ARABIAN OIL COMPANY
PM
T
CE
RT
EN
G’G
DE
SC
RIP
TIO
N
IS
SU
ED
FO
R
CO
MM
EN
TS
(F
WS
RE
V O
1)
IS
SU
ED
FO
R
PR
OJE
CT
PR
OP
OS
AL(
FW
S R
EV
D1)
JO/E
WO
10
-007
41
10
-007
41
DA
TE
FE
B-1
2
JUN
-12
RE
V.
NO
.
A
B
DISCIPLINE ENGINEER
DRD DATE JUN-12
PROJECT ENGINEER
________________
DATE ___________
CERTIFIED
RS DATE ___________
CONSTRUCTION AGENCY
________________
DATE ___________
OPERATIONS
________ DATE ___________
ED
SD
V
ER
IFI C
AT
ION
CO
NT
RO
L N
UM
BE
R
B
Y:
____
___
___
___
_
DA
TE
___
___
___
___
_
RE
VIS
ION
CE
RT
IFIC
AT
E
TH
IS IN
DIC
AT
ES
TH
AT
RE
V.
NO
. __
___
____
___
OF
TH
IS D
RA
WIN
G I
S C
OV
ER
ED
, FO
R A
LL
AP
PR
OV
AL
/CE
RT
IFIC
AT
ION
RE
QU
IRE
ME
NT
S,
BY
DR
AW
ING
CO
MP
LE
TIO
N C
ER
TIF
ICA
TE
(DC
C)N
O. _
____
___
___
__
____
___
___
___
____
_
MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 54
OF 71
B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY
RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741
DOC CLASS: 4 DSN: 2179
TH
IS D
RA
WIN
G A
ND
TH
E IN
FO
RM
AT
ION
CO
NT
AIN
ED
HE
RE
IN A
RE
TH
E S
OL
E P
RO
PE
RT
Y O
F S
AU
DI
AR
AM
CO
. N
O R
EP
RO
DU
CT
ION
IN
FU
LL O
R IN
PA
RT
SH
ALL
BE
OB
TA
INE
D F
RO
M T
HIS
DO
CU
ME
NT
WIT
HO
UT
TH
E W
RIT
TE
N C
ON
SE
NT
OF
IT
S O
WN
ER
.
APPENDIX 4 – EXTRACTS FROM ASME II D – MATERIAL PROPERTIES
Saudi Aramco 2616-ENG (10/2002)
OP
RN
S
SAUDI ARABIAN OIL COMPANY
PM
T
CE
RT
EN
G’G
DE
SC
RIP
TIO
N
IS
SU
ED
FO
R
CO
MM
EN
TS
(F
WS
RE
V O
1)
IS
SU
ED
FO
R
PR
OJE
CT
PR
OP
OS
AL(
FW
S R
EV
D1)
JO/E
WO
10
-007
41
10
-007
41
DA
TE
FE
B-1
2
JUN
-12
RE
V.
NO
.
A
B
DISCIPLINE ENGINEER
DRD DATE JUN-12
PROJECT ENGINEER
________________
DATE ___________
CERTIFIED
RS DATE ___________
CONSTRUCTION AGENCY
________________
DATE ___________
OPERATIONS
________ DATE ___________
ED
SD
V
ER
IFI C
AT
ION
CO
NT
RO
L N
UM
BE
R
B
Y:
____
___
___
___
_
DA
TE
___
___
___
___
_
RE
VIS
ION
CE
RT
IFIC
AT
E
TH
IS IN
DIC
AT
ES
TH
AT
RE
V.
NO
. __
___
____
___
OF
TH
IS D
RA
WIN
G I
S C
OV
ER
ED
, FO
R A
LL
AP
PR
OV
AL
/CE
RT
IFIC
AT
ION
RE
QU
IRE
ME
NT
S,
BY
DR
AW
ING
CO
MP
LE
TIO
N C
ER
TIF
ICA
TE
(DC
C)N
O. _
____
___
___
__
____
___
___
___
____
_
MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 59
OF 71
B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY
RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741
DOC CLASS: 4 DSN: 2179
TH
IS D
RA
WIN
G A
ND
TH
E IN
FO
RM
AT
ION
CO
NT
AIN
ED
HE
RE
IN A
RE
TH
E S
OL
E P
RO
PE
RT
Y O
F S
AU
DI
AR
AM
CO
. N
O R
EP
RO
DU
CT
ION
IN
FU
LL O
R IN
PA
RT
SH
ALL
BE
OB
TA
INE
D F
RO
M T
HIS
DO
CU
ME
NT
WIT
HO
UT
TH
E W
RIT
TE
N C
ON
SE
NT
OF
IT
S O
WN
ER
.
APPENDIX 5 – FWS STANDARD MINIMUM NOZZLE LOADS
Extract from FWS Standard Nozzle Loads for 1500# Process Nozzles
Fx Fy Fz Mx My Mz
Nozzle Size (inch), D = 4 4.0 4.0 5.6 1.9 1.9 2.610 10.8 10.8 15.2 11.3 11.3 15.912 13.5 13.5 19.2 16.4 16.4 23.316 19.4 19.4 27.6 29.4 29.4 41.4
Direct Loads (kN) Moment Loads (kNm)
Saudi Aramco 2616-ENG (10/2002)
OP
RN
S
SAUDI ARABIAN OIL COMPANY
PM
T
CE
RT
EN
G’G
DE
SC
RIP
TIO
N
IS
SU
ED
FO
R
CO
MM
EN
TS
(F
WS
RE
V O
1)
IS
SU
ED
FO
R
PR
OJE
CT
PR
OP
OS
AL(
FW
S R
EV
D1)
JO/E
WO
10
-007
41
10
-007
41
DA
TE
FE
B-1
2
JUN
-12
RE
V.
NO
.
A
B
DISCIPLINE ENGINEER
DRD DATE JUN-12
PROJECT ENGINEER
________________
DATE ___________
CERTIFIED
RS DATE ___________
CONSTRUCTION AGENCY
________________
DATE ___________
OPERATIONS
________ DATE ___________
ED
SD
V
ER
IFI C
AT
ION
CO
NT
RO
L N
UM
BE
R
B
Y:
____
___
___
___
_
DA
TE
___
___
___
___
_
RE
VIS
ION
CE
RT
IFIC
AT
E
TH
IS IN
DIC
AT
ES
TH
AT
RE
V.
NO
. __
___
____
___
OF
TH
IS D
RA
WIN
G I
S C
OV
ER
ED
, FO
R A
LL
AP
PR
OV
AL
/CE
RT
IFIC
AT
ION
RE
QU
IRE
ME
NT
S,
BY
DR
AW
ING
CO
MP
LE
TIO
N C
ER
TIF
ICA
TE
(DC
C)N
O. _
____
___
___
__
____
___
___
___
____
_
MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 61
OF 71
B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY
RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741
DOC CLASS: 4 DSN: 2179
TH
IS D
RA
WIN
G A
ND
TH
E IN
FO
RM
AT
ION
CO
NT
AIN
ED
HE
RE
IN A
RE
TH
E S
OL
E P
RO
PE
RT
Y O
F S
AU
DI
AR
AM
CO
. N
O R
EP
RO
DU
CT
ION
IN
FU
LL O
R IN
PA
RT
SH
ALL
BE
OB
TA
INE
D F
RO
M T
HIS
DO
CU
ME
NT
WIT
HO
UT
TH
E W
RIT
TE
N C
ON
SE
NT
OF
IT
S O
WN
ER
.
APPENDIX 6 – INSPECTION REPORTS
••RIYADH REFINERY DEPARTMENT
ENGINEERING DIVISIONINSPECTION UNIT
2009, TRS INSPECTION FINAL REPORT
2009Field Insp. Supervisor:M. Banammahl M.RALAL
4.8mm
177 .C
03/23/2009Plant No.:2-12
Date prepared:Locationl Area:G-H drocracker
Date Inspected:110/2009Unit Supervisor:Yahya, Kh Ii
Corrosion Allowance
Design Press.
Design Temp.
Claddingl Lining
E ui ment data:Material
Report No.: INSP G/021/09Equipment No. & Service:215-V-6 Se arator
Reason for Inspection:TRS, March/Februa
P&E Inspector:Greg Jolley API #5184
Thick.
Inspection summary:
A full internal and external visual inspection was performed per API-510 and Aramcoguidelines, during the February 2009 plant wide T&1. A scaffold was erected for fullaccess. The bottom half is concrete lined. Civil required minimal repairs. The top halfwas grit blasted for WFMP on the welds with no relevant indications. A new demisterwas installed. The top unlined portion of the vessel has mild corrosion .030" (.nOmm)shell and .060" (1.54mm) nozzles. Corrosion in the manway RTJ "0" ring will requirerepairs next scheduled T&1.
Observations:
There was 3" of product sludge found in the bottom prior to cleaning. The vertical walldemister was removed and replaced with like kind 316ss, double wired down andvisually accepted. The support ring was securely attached by to the shell with no visiblecracking or corrosion noted. This demister was moderately fouled with scale andproduct. Previous process changes eliminated the use of the outlet gas demister. A fullscaffold was erected for access. The bottom half is concrete lined with minor repairs.The boot section was also lined. Minor repairs were required (see civil for iining issues).The top half had a scattered thin hard scale. Corrosion in the top half is generally .030"(.770mm) with isolated pitting in the middle top section to .040" (.1OOmm). The welds arein the same condition as the adjacent base metal with no visual defects. Nozzles wereclear and free of obstruction. General corrosion in the nozzles 10 was .040" (.700mm)and isolated pitting in the top nozzles to .060" (.150mm). The inlet distributor was clearwith no corrosion. The slots were full thickness. There were 2 of the 3 hold downbolts/nuts missing. These were replaced with like kind and accepted. The liquid outletstand pipe was intact and secure with no corrosion or erosion. The bottom outlet nozzlewas flushed free of any loose hardware and debris. The top gas outlet nozzle (12") andmanway RTJ "0" rings and seats were PT tested and had no corrosion. The top manwayand cover has moderate corrosion on the RTJ "0" ring seating surface and is
738
•recommended to weld build up and machine next scheduled T&1. The top half of theshell welds were grit blasted for WFMP with no relevant indications reported. This vesselis fit for continued service until the next T&1.
Refractory lining:
The bottom half is concrete lined with minor repairs. The boot section was also lined.Minor repairs were done and accepted by civil inspector.
RepairsIT ests:
1. Minor concrete lining repairs were made per the civil recommendations.2. UT scanning the bottom external performed on the shell with no issues reported.3. UT thickness was performed with no measureable wall loss noted.4. WFMP was performed on the top welds after grit blasting with no indications
noted.5. A new vertical wall demister was installed.6. The top gas outlet was lifted and the RTJ "0" ring and seats PT tested with no
indications or corrosion
Future Recommendations:
1. Open, clean and Inspect during the next scheduled T&I,March 20132. Flush with firewater to remove sludge3. Build full scaffold for access to the top head4. Grit blast the top section welds for WFMP(grit blasting was performed this T&I
because wire brushing would not remove the hard scale)5. Flush outlet piping after all work is completed, break outside flange and gap
minimum 30mm to flush loose nuts and bolts6. Weld build up the manway gasket surfaces and machine (both head and cover)
due to corrosion on the seats.7. Install new demister pads8. Remove support rings on gas outlet nozzle for inspection and NOT.9. Open water boot and offer for inspection.10. Remove bottom insulation for UT11. Straight beam scan to check thickness under cement lining.12. Provide 110/220 power cable for WFMPI
cc:Area (G) foremenT&I SupervisorEquipment File
739
����
���
�� ��
���
�����
����
�� �
�����
���
����
���
��
����
����
���
���
�����
����
����
����
����
�������������� ��� ������������
���������������������������������
����
����
�
�����
����� ��!"��!��
#$����������%
���
��
��
��
��
���&
�����
�� �
��
���'
�����
�� �
���(
�����
�� �
���
�����
�� �
��
��)��$����
*����%��+&'�,��#��-�.����'
'&/,01
���)���%
����
��
���
���
����
����
����
���
���
��
���
���
����
����
���
���
���
���
��
���
���
���
�
����
����
� ��
��
����
����
���
��
����
����
���
���
���
����
���
����
����
����
�
���
���
���
����
����
����
��
���
����
���
���
���
���
�
����
����
� ��
��
����
����
���
��
�����
����
���
��
���
���
����
����
����
���
���
�
���
��
����
����
���
���
���
��
���
����
��
���
���
����
���
���
���
����
���
���
����
�����
���
���
��
����
���
����
����
����
�
���
��
�
����
����
����
��
���
����
�
���
���
���
�
����
����
� ��
��
����
����
���
��
������
����
���
��
���
���
����
����
����
���
���
��
��
����
����
����
���
��
���
���
���
����
��
��
���
����
���
���
���
����
���
���
����
�����
���
���
��
����
���
����
����
����
��
���
��
��
����
����
����
��
���
����
���
���
���
���
�
����
����
� ��
��
����
����
���
��
������
����
���
��
���
���
����
����
����
���
���
��
���
����
����
����
���
��
���
��
���
����
��
�
���
����
���
��
���
����
���
��
���
����
����
����
����
����
���
���
���
���
����
����
���
���
���
��
���
����
����
����
���
���
��
���
��
����
��
��
���
����
���
���
����
����
����
���
���
���
���
����
����
����
���
���
��
���
���
����
����
���
��
���
��
���
����
��
���
���
����
���
���
���
����
���
� �
���
����
����
� �
�����
����
���
���
���
���
����
����
����
���
���
��
���
� ��
����
����
���
����
���
��
��
����
��
���
���
����
���
���
���
����
���
���
����
�����
���
���
��
����
���
����
����
����
��
���
���
���
����
����
����
���
���
����
��
���
���
���
��
����
����
� ��
��
����
����
��
�
������
����
��
��
���
���
����
����
����
���
���
��
���
��
����
����
���
���
���
� �
���
����
��
��
���
����
���
�
���
����
���
��
���
����
����
��
������
����
���
���
���
���
����
����
����
���
���
��
��
���
����
����
���
����
���
���
���
����
��
���
���
����
���
���
���
����
����
���
���
�����
����
���
� �
��
����
���
����
����
����
��
���
���
��
����
����
����
���
����
��
��
���
����
��
��
���
����
���
��
����
����
���
��
���
���
����
��
���
���
����
����
����
���
���
��
���
����
����
����
���
� ��
�
���
��
���
���
���
���
����
����
� ��
���
����
����
���
��
���
���
����
��
���
���
����
����
����
���
���
��
��
����
����
����
���
����
��
���
��
���
���
���
���
����
����
� ��
��
����
����
���
��
���
���
����
��
���
���
����
����
����
���
��
��
����
��
����
����
����
���
���
��
���
���
����
��
���
����
����
���
���
����
����
���
���
����
����
����
���
���
����
����
��
���
���
����
����
����
���
��
��
��
����
����
����
���
����
��
���
���
���
���
���
� �
����
����
� ��
���
����
����
����
���
���
���
���
��
���
���
����
����
����
���
���
�
���
����
����
����
���
���
���
���
��
���
���
���
���
����
����
� ��
�
����
����
����
�
����
�
232�4�"���������������5
Saudi Aramco 2616-ENG (10/2002)
OP
RN
S
SAUDI ARABIAN OIL COMPANY
PM
T
CE
RT
EN
G’G
DE
SC
RIP
TIO
N
IS
SU
ED
FO
R
CO
MM
EN
TS
(F
WS
RE
V O
1)
IS
SU
ED
FO
R
PR
OJE
CT
PR
OP
OS
AL(
FW
S R
EV
D1)
JO/E
WO
10
-007
41
10
-007
41
DA
TE
FE
B-1
2
JUN
-12
RE
V.
NO
.
A
B
DISCIPLINE ENGINEER
DRD DATE JUN-12
PROJECT ENGINEER
________________
DATE ___________
CERTIFIED
RS DATE ___________
CONSTRUCTION AGENCY
________________
DATE ___________
OPERATIONS
________ DATE ___________
ED
SD
V
ER
IFI C
AT
ION
CO
NT
RO
L N
UM
BE
R
B
Y:
____
___
___
___
_
DA
TE
___
___
___
___
_
RE
VIS
ION
CE
RT
IFIC
AT
E
TH
IS IN
DIC
AT
ES
TH
AT
RE
V.
NO
. __
___
____
___
OF
TH
IS D
RA
WIN
G I
S C
OV
ER
ED
, FO
R A
LL
AP
PR
OV
AL
/CE
RT
IFIC
AT
ION
RE
QU
IRE
ME
NT
S,
BY
DR
AW
ING
CO
MP
LE
TIO
N C
ER
TIF
ICA
TE
(DC
C)N
O. _
____
___
___
__
____
___
___
___
____
_
MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 65
OF 71
B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY
RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741
DOC CLASS: 4 DSN: 2179
TH
IS D
RA
WIN
G A
ND
TH
E IN
FO
RM
AT
ION
CO
NT
AIN
ED
HE
RE
IN A
RE
TH
E S
OL
E P
RO
PE
RT
Y O
F S
AU
DI
AR
AM
CO
. N
O R
EP
RO
DU
CT
ION
IN
FU
LL O
R IN
PA
RT
SH
ALL
BE
OB
TA
INE
D F
RO
M T
HIS
DO
CU
ME
NT
WIT
HO
UT
TH
E W
RIT
TE
N C
ON
SE
NT
OF
IT
S O
WN
ER
.
APPENDIX 7 – PVELITE OUTPUT (FOR VALIDATION ONLY)