14
Saudi Aramco 2616-ENG (10/2002) OPRNS SAUDI ARABIAN OIL COMPANY PMT CERT ENG’G DESCRIPTION ISSUED FOR COMMENTS (FWS REV O1) ISSUED FOR PROJECT PROPOSAL(FWS REV D1) JO/EWO 10-00741 10-00741 DATE FEB-12 JUN-12 REV. NO. A B DISCIPLINE ENGINEER DRD DATE JUN-12 PROJECT ENGINEER ________________ DATE ___________ CERTIFIED RS DATE ___________ CONSTRUCTION AGENCY ________________ DATE ___________ OPERATIONS ________ DATE ___________ EDSD VERIFICATION CONTROL NUMBER BY: ______________ DATE _____________ REVISION CERTIFICATE THIS INDICATES THAT REV. NO. ____________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS, BY DRAWING COMPLETION CERTIFICATE (DCC)NO. _______________________________ MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO. HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 52 OF 71 B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741 DOC CLASS: 4 DSN: 2179 THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER. APPENDIX 3 – PRELIMINARY SAFETY INSTRUCTION SHEET

Pages From 2. R215-V6 (High Pressure Separator_RevP1

Embed Size (px)

Citation preview

Page 1: Pages From 2. R215-V6 (High Pressure Separator_RevP1

Saudi Aramco 2616-ENG (10/2002)

OP

RN

S

SAUDI ARABIAN OIL COMPANY

PM

T

CE

RT

EN

G’G

DE

SC

RIP

TIO

N

IS

SU

ED

FO

R

CO

MM

EN

TS

(F

WS

RE

V O

1)

IS

SU

ED

FO

R

PR

OJE

CT

PR

OP

OS

AL(

FW

S R

EV

D1)

JO/E

WO

10

-007

41

10

-007

41

DA

TE

FE

B-1

2

JUN

-12

RE

V.

NO

.

A

B

DISCIPLINE ENGINEER

DRD DATE JUN-12

PROJECT ENGINEER

________________

DATE ___________

CERTIFIED

RS DATE ___________

CONSTRUCTION AGENCY

________________

DATE ___________

OPERATIONS

________ DATE ___________

ED

SD

V

ER

IFI C

AT

ION

CO

NT

RO

L N

UM

BE

R

B

Y:

____

___

___

___

_

DA

TE

___

___

___

___

_

RE

VIS

ION

CE

RT

IFIC

AT

E

TH

IS IN

DIC

AT

ES

TH

AT

RE

V.

NO

. __

___

____

___

OF

TH

IS D

RA

WIN

G I

S C

OV

ER

ED

, FO

R A

LL

AP

PR

OV

AL

/CE

RT

IFIC

AT

ION

RE

QU

IRE

ME

NT

S,

BY

DR

AW

ING

CO

MP

LE

TIO

N C

ER

TIF

ICA

TE

(DC

C)N

O. _

____

___

___

__

____

___

___

___

____

_

MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 52

OF 71

B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY

RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741

DOC CLASS: 4 DSN: 2179

TH

IS D

RA

WIN

G A

ND

TH

E IN

FO

RM

AT

ION

CO

NT

AIN

ED

HE

RE

IN A

RE

TH

E S

OL

E P

RO

PE

RT

Y O

F S

AU

DI

AR

AM

CO

. N

O R

EP

RO

DU

CT

ION

IN

FU

LL O

R IN

PA

RT

SH

ALL

BE

OB

TA

INE

D F

RO

M T

HIS

DO

CU

ME

NT

WIT

HO

UT

TH

E W

RIT

TE

N C

ON

SE

NT

OF

IT

S O

WN

ER

.

APPENDIX 3 – PRELIMINARY SAFETY INSTRUCTION SHEET

Page 2: Pages From 2. R215-V6 (High Pressure Separator_RevP1

psi

I.D. m(ft) Nom. Thick. mm(ins SHAPE

3 mm(in)

EQUIPMENT DATA

3 mm(in)

32-SAMMSS-004

FYC-Z12-32-A039-001-001

ASME VIII DIV 2 1977 Ed, API 510 9TH Ed 2006

; CORROSION ALLOWANCE

SERVICE

SA 266 Cl 2

HGH PRESSURE SEPARATOR

HEADI.D. m(ft.)

ORDER NO.

; CORROSION ALLOWANCE

LENGTH m(ft.)

55BOOT

3.98

0.91

BUTT (SINGLE SIDED GROOVE)SHELL TO HEAD

HEAD FULLBUTT (DOUBLE SIDED GROOVE)

SEAMS TYPE RADIOGRAPHY EFFICIENCY E

225

OC(OF)

7.62

1.67

3.98

: RATING AND FACING

1500# RTJ

1500# RTJ / RF

POSITIONkPa (psi) POSITION

: THICK, MAT'L. AND

LIMITED BY :

LINING

PACKING

TRAYS

BOTH

MDMT:

0.85 / 1.0 POST WELD HEAT TREATMENT

YES (TBC)

AT TOP

SHELL STRESS

232

2904

kPa (psi)

PROTECTED BY SAFETY VALVE ON

TEST PRESSURE, at TOP

103.4EXTERNAL PRESSURE :

S.V. SET AT

MINIMUM THICKNESS

HEADS :

PRESSURE AND TEMPERATURE 47.8

OTHER GOVERNING CONSIDERATION

SHELL SECTION tm mm(ins)

DRAWING NO.

BASED ON :

INDEX

TH

IS R

EV

ISIO

N N

O.

IS C

OV

ER

ED

, FO

R A

LL

AP

PR

OV

AL

RE

VIE

W F

OR

KE

Y D

RA

WIN

GS

CO

NS

T. A

GE

NC

Y/ D

AT

E

DE

SIG

N C

ER

TIF

ICA

TIO

N

OP

ER

AT

ION

S/D

AT

EC

ER

TIF

IED

/DA

TE

RIYADH REFINERYDR

AW

ING

CO

MP

LE

TIO

N C

ER

TIF

ICA

TE

NO

. NOTES:1. CORROSION ALLOWANCE HAS BEEN REVISED TO 3MM FROM ORGINAL 4.8MM. NO BENEFIT FROM THIS CHANGE HAS BEEN ASSUMED TO CONTRIBUTE TO MATERIAL PRESSURE THICKNESS, THE EXCESS HAS BEEN ASSUMED TO COVER ANY MATERIAL LOSS FROM OPERATION.2. CALCULATED TEST PRESSURE INDICATED IS AS A RESULT OF THE RERATE TO 232ºC DESIGN TEMPERATURE AND MUST BE CARRIED OUT IN THE FIELD.

BOTH 101.4 INDICATED DESIGN TEMP AND PRESSURE

: THICK AND TYPE

BASED ON INDICATED DESIGN

: NO. MAT'L. AND DRAWING NO.

: SHOP

: SIZE, HEIGHT AND MAT'L.

METHOD OF ATTACHMENT

kPa (psi)FIELD

SHELL

SPECIAL DESIGN CONSIDERATION OR

UNUSUAL CONSTRUCTION FEATURES

kPa (psi)

OPERATING LIMITS

(CHANGES TO OPERATING LIMITS REQUIRE OPERATIONS ENGINEERING APPROVAL)

14514DESIGN PRESSURE, AT TOP OC(OF)

SHELL

INDICATED DESIGN TEMP AND PRESSURE

20030 (Note 2)

TEST PRESSURE, WIND LOAD, OR

DWG. TYPE

: RATING AND FACING

INDICATED DESIGN TEMP AND PRESSURE

SIS

220.2

BOOT

NOTE BELOW ANY SPECIAL HAZARDS, RECOMMENDATIONS, INSPECTIONS, OR TESTS THAT ARE IMPORTANT FOR THIS EQUIPMENT.

1 OF 1

PLANT NO.

A

SHT.NO. REV.NOSIS FOR

SAFETY PRECAUTIONS

CALCULATED TEST PRESSURE OC(OF)kPa(g) (psi) @

TESTS NEW

AMB

APPLICABLE CODE AND EDITION

N/A

HEMISPERICAL

19123 HORIZ

kPa (psi)

MANWAY

NOZZLE

JOB

OR

DE

R/E

WO

NO

.T

HIS

RE

VIS

ION

IS N

OT

TO

BE

U

SE

D F

OR

CO

NS

TR

UC

TIO

N U

NT

ILC

ER

TIF

IED

AN

D D

AT

ED

ALL

BUTT (SINGLE SIDED GROOVE)

TH

IS D

RA

WIN

G A

ND

TH

E I

NF

OR

MA

TIO

N C

ON

TA

INE

D H

ER

EIN

AR

E T

HE

SO

LE P

RO

PE

RT

Y O

F S

AU

DI

AR

AM

CO

. N

O R

EP

RO

DU

CT

ION

IN

FU

LL O

R I

N P

AR

T S

HA

LL B

E O

BT

AIN

ED

FR

OM

TH

IS D

OC

UM

EN

T W

ITH

OU

T T

HE

WR

ITT

EN

CO

NS

EN

T O

F I

TS

OW

NE

R.

SPEC'N NO.

HORIZONTAL

1977

RU822M0008

CONCRETE LINED BOTTOM HALF OF VESSEL AND BOOT, BOTTOM NOZZLES MONEL LINED

KOBE STEEL LTD

SHELL

ASSEMBLY DRAWING

110

N/A

INSULATION

AZ12

1.0

1.0

HYDROCRACKER UNIT (Z12)

HIGH PRESSURE SEPARATOR

Nom. Thick. mm(ins)

Saudi Aramco 2694-ENG (11/2010)

SAUDI ARABIARIYADH,

EKRD/2694-1110.XLS

R215-V6NO.

POSITION

DESIGN SHEET NO.

HEADS

R215-V6

MANUFACTURER

SHELL SECTION

SAUDI ARABIAN OIL COMPANY

DATA AND OPERATING LIMITS SHEET - PRESSURE VESSELS

Z12-D-PP-E01204

MANUFACTURER'S SERIAL NO.

EQUIPMENT NO.

MATERIAL SPECIFICATION SA 516 Gr 70

YEAR BUILT

MATERIAL SPECIFICATION

RE

VIS

ION

DE

SC

RIP

TIO

ND

AT

ER

EV

. NO

.

AN

D C

ER

TIF

ICA

TIO

N R

EQ

UIR

EM

EN

TS

, PE

R S

AE

P-3

34

, UN

DE

R

OT

HE

R

RE

QU

IRE

D (

SA

UD

I AR

AM

CO

)R

EQ

UIR

ED

(S

AU

DI A

RA

MC

O)

BY

/DA

TE

EN

GG

./DA

TE

RE

VIS

ION

VA

LID

AT

ION

SPOT FULL

PARTIAL FULL YES NO

Page 3: Pages From 2. R215-V6 (High Pressure Separator_RevP1

Saudi Aramco 2616-ENG (10/2002)

OP

RN

S

SAUDI ARABIAN OIL COMPANY

PM

T

CE

RT

EN

G’G

DE

SC

RIP

TIO

N

IS

SU

ED

FO

R

CO

MM

EN

TS

(F

WS

RE

V O

1)

IS

SU

ED

FO

R

PR

OJE

CT

PR

OP

OS

AL(

FW

S R

EV

D1)

JO/E

WO

10

-007

41

10

-007

41

DA

TE

FE

B-1

2

JUN

-12

RE

V.

NO

.

A

B

DISCIPLINE ENGINEER

DRD DATE JUN-12

PROJECT ENGINEER

________________

DATE ___________

CERTIFIED

RS DATE ___________

CONSTRUCTION AGENCY

________________

DATE ___________

OPERATIONS

________ DATE ___________

ED

SD

V

ER

IFI C

AT

ION

CO

NT

RO

L N

UM

BE

R

B

Y:

____

___

___

___

_

DA

TE

___

___

___

___

_

RE

VIS

ION

CE

RT

IFIC

AT

E

TH

IS IN

DIC

AT

ES

TH

AT

RE

V.

NO

. __

___

____

___

OF

TH

IS D

RA

WIN

G I

S C

OV

ER

ED

, FO

R A

LL

AP

PR

OV

AL

/CE

RT

IFIC

AT

ION

RE

QU

IRE

ME

NT

S,

BY

DR

AW

ING

CO

MP

LE

TIO

N C

ER

TIF

ICA

TE

(DC

C)N

O. _

____

___

___

__

____

___

___

___

____

_

MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 54

OF 71

B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY

RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741

DOC CLASS: 4 DSN: 2179

TH

IS D

RA

WIN

G A

ND

TH

E IN

FO

RM

AT

ION

CO

NT

AIN

ED

HE

RE

IN A

RE

TH

E S

OL

E P

RO

PE

RT

Y O

F S

AU

DI

AR

AM

CO

. N

O R

EP

RO

DU

CT

ION

IN

FU

LL O

R IN

PA

RT

SH

ALL

BE

OB

TA

INE

D F

RO

M T

HIS

DO

CU

ME

NT

WIT

HO

UT

TH

E W

RIT

TE

N C

ON

SE

NT

OF

IT

S O

WN

ER

.

APPENDIX 4 – EXTRACTS FROM ASME II D – MATERIAL PROPERTIES

Page 4: Pages From 2. R215-V6 (High Pressure Separator_RevP1
Page 5: Pages From 2. R215-V6 (High Pressure Separator_RevP1
Page 6: Pages From 2. R215-V6 (High Pressure Separator_RevP1
Page 7: Pages From 2. R215-V6 (High Pressure Separator_RevP1
Page 8: Pages From 2. R215-V6 (High Pressure Separator_RevP1

Saudi Aramco 2616-ENG (10/2002)

OP

RN

S

SAUDI ARABIAN OIL COMPANY

PM

T

CE

RT

EN

G’G

DE

SC

RIP

TIO

N

IS

SU

ED

FO

R

CO

MM

EN

TS

(F

WS

RE

V O

1)

IS

SU

ED

FO

R

PR

OJE

CT

PR

OP

OS

AL(

FW

S R

EV

D1)

JO/E

WO

10

-007

41

10

-007

41

DA

TE

FE

B-1

2

JUN

-12

RE

V.

NO

.

A

B

DISCIPLINE ENGINEER

DRD DATE JUN-12

PROJECT ENGINEER

________________

DATE ___________

CERTIFIED

RS DATE ___________

CONSTRUCTION AGENCY

________________

DATE ___________

OPERATIONS

________ DATE ___________

ED

SD

V

ER

IFI C

AT

ION

CO

NT

RO

L N

UM

BE

R

B

Y:

____

___

___

___

_

DA

TE

___

___

___

___

_

RE

VIS

ION

CE

RT

IFIC

AT

E

TH

IS IN

DIC

AT

ES

TH

AT

RE

V.

NO

. __

___

____

___

OF

TH

IS D

RA

WIN

G I

S C

OV

ER

ED

, FO

R A

LL

AP

PR

OV

AL

/CE

RT

IFIC

AT

ION

RE

QU

IRE

ME

NT

S,

BY

DR

AW

ING

CO

MP

LE

TIO

N C

ER

TIF

ICA

TE

(DC

C)N

O. _

____

___

___

__

____

___

___

___

____

_

MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 59

OF 71

B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY

RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741

DOC CLASS: 4 DSN: 2179

TH

IS D

RA

WIN

G A

ND

TH

E IN

FO

RM

AT

ION

CO

NT

AIN

ED

HE

RE

IN A

RE

TH

E S

OL

E P

RO

PE

RT

Y O

F S

AU

DI

AR

AM

CO

. N

O R

EP

RO

DU

CT

ION

IN

FU

LL O

R IN

PA

RT

SH

ALL

BE

OB

TA

INE

D F

RO

M T

HIS

DO

CU

ME

NT

WIT

HO

UT

TH

E W

RIT

TE

N C

ON

SE

NT

OF

IT

S O

WN

ER

.

APPENDIX 5 – FWS STANDARD MINIMUM NOZZLE LOADS

Page 9: Pages From 2. R215-V6 (High Pressure Separator_RevP1

Extract from FWS Standard Nozzle Loads for 1500# Process Nozzles

Fx Fy Fz Mx My Mz

Nozzle Size (inch), D = 4 4.0 4.0 5.6 1.9 1.9 2.610 10.8 10.8 15.2 11.3 11.3 15.912 13.5 13.5 19.2 16.4 16.4 23.316 19.4 19.4 27.6 29.4 29.4 41.4

Direct Loads (kN) Moment Loads (kNm)

Page 10: Pages From 2. R215-V6 (High Pressure Separator_RevP1

Saudi Aramco 2616-ENG (10/2002)

OP

RN

S

SAUDI ARABIAN OIL COMPANY

PM

T

CE

RT

EN

G’G

DE

SC

RIP

TIO

N

IS

SU

ED

FO

R

CO

MM

EN

TS

(F

WS

RE

V O

1)

IS

SU

ED

FO

R

PR

OJE

CT

PR

OP

OS

AL(

FW

S R

EV

D1)

JO/E

WO

10

-007

41

10

-007

41

DA

TE

FE

B-1

2

JUN

-12

RE

V.

NO

.

A

B

DISCIPLINE ENGINEER

DRD DATE JUN-12

PROJECT ENGINEER

________________

DATE ___________

CERTIFIED

RS DATE ___________

CONSTRUCTION AGENCY

________________

DATE ___________

OPERATIONS

________ DATE ___________

ED

SD

V

ER

IFI C

AT

ION

CO

NT

RO

L N

UM

BE

R

B

Y:

____

___

___

___

_

DA

TE

___

___

___

___

_

RE

VIS

ION

CE

RT

IFIC

AT

E

TH

IS IN

DIC

AT

ES

TH

AT

RE

V.

NO

. __

___

____

___

OF

TH

IS D

RA

WIN

G I

S C

OV

ER

ED

, FO

R A

LL

AP

PR

OV

AL

/CE

RT

IFIC

AT

ION

RE

QU

IRE

ME

NT

S,

BY

DR

AW

ING

CO

MP

LE

TIO

N C

ER

TIF

ICA

TE

(DC

C)N

O. _

____

___

___

__

____

___

___

___

____

_

MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 61

OF 71

B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY

RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741

DOC CLASS: 4 DSN: 2179

TH

IS D

RA

WIN

G A

ND

TH

E IN

FO

RM

AT

ION

CO

NT

AIN

ED

HE

RE

IN A

RE

TH

E S

OL

E P

RO

PE

RT

Y O

F S

AU

DI

AR

AM

CO

. N

O R

EP

RO

DU

CT

ION

IN

FU

LL O

R IN

PA

RT

SH

ALL

BE

OB

TA

INE

D F

RO

M T

HIS

DO

CU

ME

NT

WIT

HO

UT

TH

E W

RIT

TE

N C

ON

SE

NT

OF

IT

S O

WN

ER

.

APPENDIX 6 – INSPECTION REPORTS

Page 11: Pages From 2. R215-V6 (High Pressure Separator_RevP1

••RIYADH REFINERY DEPARTMENT

ENGINEERING DIVISIONINSPECTION UNIT

2009, TRS INSPECTION FINAL REPORT

2009Field Insp. Supervisor:M. Banammahl M.RALAL

4.8mm

177 .C

03/23/2009Plant No.:2-12

Date prepared:Locationl Area:G-H drocracker

Date Inspected:110/2009Unit Supervisor:Yahya, Kh Ii

Corrosion Allowance

Design Press.

Design Temp.

Claddingl Lining

E ui ment data:Material

Report No.: INSP G/021/09Equipment No. & Service:215-V-6 Se arator

Reason for Inspection:TRS, March/Februa

P&E Inspector:Greg Jolley API #5184

Thick.

Inspection summary:

A full internal and external visual inspection was performed per API-510 and Aramcoguidelines, during the February 2009 plant wide T&1. A scaffold was erected for fullaccess. The bottom half is concrete lined. Civil required minimal repairs. The top halfwas grit blasted for WFMP on the welds with no relevant indications. A new demisterwas installed. The top unlined portion of the vessel has mild corrosion .030" (.nOmm)shell and .060" (1.54mm) nozzles. Corrosion in the manway RTJ "0" ring will requirerepairs next scheduled T&1.

Observations:

There was 3" of product sludge found in the bottom prior to cleaning. The vertical walldemister was removed and replaced with like kind 316ss, double wired down andvisually accepted. The support ring was securely attached by to the shell with no visiblecracking or corrosion noted. This demister was moderately fouled with scale andproduct. Previous process changes eliminated the use of the outlet gas demister. A fullscaffold was erected for access. The bottom half is concrete lined with minor repairs.The boot section was also lined. Minor repairs were required (see civil for iining issues).The top half had a scattered thin hard scale. Corrosion in the top half is generally .030"(.770mm) with isolated pitting in the middle top section to .040" (.1OOmm). The welds arein the same condition as the adjacent base metal with no visual defects. Nozzles wereclear and free of obstruction. General corrosion in the nozzles 10 was .040" (.700mm)and isolated pitting in the top nozzles to .060" (.150mm). The inlet distributor was clearwith no corrosion. The slots were full thickness. There were 2 of the 3 hold downbolts/nuts missing. These were replaced with like kind and accepted. The liquid outletstand pipe was intact and secure with no corrosion or erosion. The bottom outlet nozzlewas flushed free of any loose hardware and debris. The top gas outlet nozzle (12") andmanway RTJ "0" rings and seats were PT tested and had no corrosion. The top manwayand cover has moderate corrosion on the RTJ "0" ring seating surface and is

738

user
Cloud
user
Cloud
user
Text Box
Only head material SA 516 Gr. 70. Shell, boot, nozzles SA 266 Cl2
user
Arrow
user
Text Box
148 kg/cm2
Page 12: Pages From 2. R215-V6 (High Pressure Separator_RevP1

•recommended to weld build up and machine next scheduled T&1. The top half of theshell welds were grit blasted for WFMP with no relevant indications reported. This vesselis fit for continued service until the next T&1.

Refractory lining:

The bottom half is concrete lined with minor repairs. The boot section was also lined.Minor repairs were done and accepted by civil inspector.

RepairsIT ests:

1. Minor concrete lining repairs were made per the civil recommendations.2. UT scanning the bottom external performed on the shell with no issues reported.3. UT thickness was performed with no measureable wall loss noted.4. WFMP was performed on the top welds after grit blasting with no indications

noted.5. A new vertical wall demister was installed.6. The top gas outlet was lifted and the RTJ "0" ring and seats PT tested with no

indications or corrosion

Future Recommendations:

1. Open, clean and Inspect during the next scheduled T&I,March 20132. Flush with firewater to remove sludge3. Build full scaffold for access to the top head4. Grit blast the top section welds for WFMP(grit blasting was performed this T&I

because wire brushing would not remove the hard scale)5. Flush outlet piping after all work is completed, break outside flange and gap

minimum 30mm to flush loose nuts and bolts6. Weld build up the manway gasket surfaces and machine (both head and cover)

due to corrosion on the seats.7. Install new demister pads8. Remove support rings on gas outlet nozzle for inspection and NOT.9. Open water boot and offer for inspection.10. Remove bottom insulation for UT11. Straight beam scan to check thickness under cement lining.12. Provide 110/220 power cable for WFMPI

cc:Area (G) foremenT&I SupervisorEquipment File

739

user
Highlight
user
Highlight
user
Highlight
Page 13: Pages From 2. R215-V6 (High Pressure Separator_RevP1

����

���

�� ��

���

�����

����

�� �

�����

���

����

���

��

����

����

���

���

�����

����

����

����

����

�������������� ��� ������������

���������������������������������

����

����

�����

����� ��!"��!��

#$����������%

���

��

��

��

��

���&

�����

�� �

��

���'

�����

�� �

���(

�����

�� �

���

�����

�� �

��

��)��$����

*����%��+&'�,��#��-�.����'

'&/,01

���)���%

����

��

���

���

����

����

����

���

���

��

���

���

����

����

���

���

���

���

��

���

���

���

����

����

� ��

��

����

����

���

��

����

����

���

���

���

����

���

����

����

����

���

���

���

����

����

����

��

���

����

���

���

���

���

����

����

� ��

��

����

����

���

��

�����

����

���

��

���

���

����

����

����

���

���

���

��

����

����

���

���

���

��

���

����

��

���

���

����

���

���

���

����

���

���

����

�����

���

���

��

����

���

����

����

����

���

��

����

����

����

��

���

����

���

���

���

����

����

� ��

��

����

����

���

��

������

����

���

��

���

���

����

����

����

���

���

��

��

����

����

����

���

��

���

���

���

����

��

��

���

����

���

���

���

����

���

���

����

�����

���

���

��

����

���

����

����

����

��

���

��

��

����

����

����

��

���

����

���

���

���

���

����

����

� ��

��

����

����

���

��

������

����

���

��

���

���

����

����

����

���

���

��

���

����

����

����

���

��

���

��

���

����

��

���

����

���

��

���

����

���

��

���

����

����

����

����

����

���

���

���

���

����

����

���

���

���

��

���

����

����

����

���

���

��

���

��

����

��

��

���

����

���

���

����

����

����

���

���

���

���

����

����

����

���

���

��

���

���

����

����

���

��

���

��

���

����

��

���

���

����

���

���

���

����

���

� �

���

����

����

� �

�����

����

���

���

���

���

����

����

����

���

���

��

���

� ��

����

����

���

����

���

��

��

����

��

���

���

����

���

���

���

����

���

���

����

�����

���

���

��

����

���

����

����

����

��

���

���

���

����

����

����

���

���

����

��

���

���

���

��

����

����

� ��

��

����

����

��

������

����

��

��

���

���

����

����

����

���

���

��

���

��

����

����

���

���

���

� �

���

����

��

��

���

����

���

���

����

���

��

���

����

����

��

������

����

���

���

���

���

����

����

����

���

���

��

��

���

����

����

���

����

���

���

���

����

��

���

���

����

���

���

���

����

����

���

���

�����

����

���

� �

��

����

���

����

����

����

��

���

���

��

����

����

����

���

����

��

��

���

����

��

��

���

����

���

��

����

����

���

��

���

���

����

��

���

���

����

����

����

���

���

��

���

����

����

����

���

� ��

���

��

���

���

���

���

����

����

� ��

���

����

����

���

��

���

���

����

��

���

���

����

����

����

���

���

��

��

����

����

����

���

����

��

���

��

���

���

���

���

����

����

� ��

��

����

����

���

��

���

���

����

��

���

���

����

����

����

���

��

��

����

��

����

����

����

���

���

��

���

���

����

��

���

����

����

���

���

����

����

���

���

����

����

����

���

���

����

����

��

���

���

����

����

����

���

��

��

��

����

����

����

���

����

��

���

���

���

���

���

� �

����

����

� ��

���

����

����

����

���

���

���

���

��

���

���

����

����

����

���

���

���

����

����

����

���

���

���

���

��

���

���

���

���

����

����

� ��

����

����

����

����

232�4�"���������������5

Page 14: Pages From 2. R215-V6 (High Pressure Separator_RevP1

Saudi Aramco 2616-ENG (10/2002)

OP

RN

S

SAUDI ARABIAN OIL COMPANY

PM

T

CE

RT

EN

G’G

DE

SC

RIP

TIO

N

IS

SU

ED

FO

R

CO

MM

EN

TS

(F

WS

RE

V O

1)

IS

SU

ED

FO

R

PR

OJE

CT

PR

OP

OS

AL(

FW

S R

EV

D1)

JO/E

WO

10

-007

41

10

-007

41

DA

TE

FE

B-1

2

JUN

-12

RE

V.

NO

.

A

B

DISCIPLINE ENGINEER

DRD DATE JUN-12

PROJECT ENGINEER

________________

DATE ___________

CERTIFIED

RS DATE ___________

CONSTRUCTION AGENCY

________________

DATE ___________

OPERATIONS

________ DATE ___________

ED

SD

V

ER

IFI C

AT

ION

CO

NT

RO

L N

UM

BE

R

B

Y:

____

___

___

___

_

DA

TE

___

___

___

___

_

RE

VIS

ION

CE

RT

IFIC

AT

E

TH

IS IN

DIC

AT

ES

TH

AT

RE

V.

NO

. __

___

____

___

OF

TH

IS D

RA

WIN

G I

S C

OV

ER

ED

, FO

R A

LL

AP

PR

OV

AL

/CE

RT

IFIC

AT

ION

RE

QU

IRE

ME

NT

S,

BY

DR

AW

ING

CO

MP

LE

TIO

N C

ER

TIF

ICA

TE

(DC

C)N

O. _

____

___

___

__

____

___

___

___

____

_

MECHANICAL RERATE REPORT FOR DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

HIGH PRESSURE SEPERATOR (R215-V6) DOC Z12 D PP-E05448 65

OF 71

B CLEAN TRANSPORTATION FUELS PROJECT, RIYADH REFINERY

RIYADH, SAUDI ARABIA JO / EWO: BI-10-00741

DOC CLASS: 4 DSN: 2179

TH

IS D

RA

WIN

G A

ND

TH

E IN

FO

RM

AT

ION

CO

NT

AIN

ED

HE

RE

IN A

RE

TH

E S

OL

E P

RO

PE

RT

Y O

F S

AU

DI

AR

AM

CO

. N

O R

EP

RO

DU

CT

ION

IN

FU

LL O

R IN

PA

RT

SH

ALL

BE

OB

TA

INE

D F

RO

M T

HIS

DO

CU

ME

NT

WIT

HO

UT

TH

E W

RIT

TE

N C

ON

SE

NT

OF

IT

S O

WN

ER

.

APPENDIX 7 – PVELITE OUTPUT (FOR VALIDATION ONLY)