7/28/2019 PAL - Technical Comparative Statement Between PAL Pre Insulated and GI
http://slidepdf.com/reader/full/pal-technical-comparative-statement-between-pal-pre-insulated-and-gi 1/3
PAL MIDDLE EAST PIR LLC Pre-Insulated Ducting TechnologyP.O. Box : 113826 , DUBAI , UAETel . : +971 4 2582640 Fax : +971 4 2582641E-mai l : in fo@pa lduc t . comWebs i t e : www.pa l -me .ne t
Listing No. 016PAL Panel Class O
TECHNICAL COMAPARATIVESTATEMENT
SN Description/Characteristics Galvanized InsulatedDuctwork
Pal Pre-insulatedsandwich Panels duct
work 1. Hygiene/Health hazard
-Fabrication Fiberglass dispersion whilstcutting, cause for asthma-
like ailments
No such dispersion as thematerial does not disintegrate
whilst cutting- Service In a warm and humid
environment, laggingadhesives used andinsulation work lead toeventual growth of fungus,bacteria, mildew (typical‘black’ spots) and kind of
messy site job
Meets the requirement of IAQ(indoor air quality), speciallyimportant in clean roomapplications such as hospitals,laboratories, food processing,etc.
2. Quality control-Manufacturing Stage Numerous vendors(at least
5 different manufacturersinvolved)
Single-point quality assessment,ISO 9002
-On-site / Storage Continuous supervisionrequired in ensuingconformity to materialspecifications, workmethod, workmanship.
Adhesives used have muchsmaller shelf life.
Minimum supervision only. Assystem is factory supplied insemi-finished condition;deviations from set proceduresand materials specificationscannot occur.
3. Dead-Weight & Handling Heavy on structure & noteasy to handle
Lightweight 15 % of conventional G.I. insulatedducts.
4. Heat transfer ‘U’ = 0.033. (with 25mm thk.Insulation).
‘U’=0.021 (21mm panels). Dueto reduced losses, energyconversation programme /environmental protection.
5. Aesthetic Awful, If installed withoutfalse ceiling
Decorative
7/28/2019 PAL - Technical Comparative Statement Between PAL Pre Insulated and GI
http://slidepdf.com/reader/full/pal-technical-comparative-statement-between-pal-pre-insulated-and-gi 2/3
PAL MIDDLE EAST PIR LLC Pre-Insulated Ducting TechnologyP.O. Box : 113826 , DUBAI , UAETel . : +971 4 2582640 Fax : +971 4 2582641E-mai l : in fo@pa lduc t . comWebs i t e : www.pa l -me .ne t
Listing No. 016PAL Panel Class O
SN Description/Characteristics Galvanized InsulatedDuctwork
Pal Pre-insulatedsandwich Panels duct
work 6. Permeability, Solubility Slightest damage to aluminium
foil vapour barrier is cause for condensation on duct surface
and consequential damages toceilings/ finishes. Fiberglassabsorbs water, loses thermalproperties. Damp areas are
susceptible to mildew / fungalgrowth
Closed cell content is very high;water immersion test was
conducted. Whereas aluminiumfacing laminate if damaged, can
be repaired; the chances of vapour condensation and water
drip-off are practically non-existent; thereby the risk factor for consequential damages toceilings / finishes is eliminated
7. Longevity / Ageing Galvanization begins to oxidize/ deteriorate over period of time, especially when the
installation is external, exposedto weather
Prolonged life due to use of aluminium laminate, coated with
3 gm / m2 of special anti-rustlacquer on both sides (all
panels). In addition, dedicatedpanel for highly corrosive
environment is available. Thispanel has additional polyester
film on aluminium laminate8. Productivity Low; very high fatigue,
especially in summer. Bigger work force/ deployment.Extended time-frame /
completion
High; very low fatigue. Smaller work force / deployment. Faster
completion; can easilycompensate for initial delays
9. Logistics Added transportation to site,site storage facilities / space
consuming. Extensive handling/ requirement of service lifts,
hoists; heavy scaffoldings etc.
Site fabrication and installed.Minimum storage area.
Lightweight handling equipment.Panels and accessories are
moved and fabricated into ductsat the actual work place itself
(such as various floors of amulti-storey building).10. Administrative Large workforce requiring
added accommodation,sanitation, transport, mess /dining space, government
departmental costs,naturalization, gratuity, travel
costs, added supervisory staff.Extensive procurement,
documentation.
Much smaller workforce, lesssupervision and efficient /competitive management.
Singe point procurement,efficient, material control.
7/28/2019 PAL - Technical Comparative Statement Between PAL Pre Insulated and GI
http://slidepdf.com/reader/full/pal-technical-comparative-statement-between-pal-pre-insulated-and-gi 3/3