EFFLUENT TREATMENT PLANT SCHEME
FOR
TREATMENT OF
DAY PALM OIL INDUSTRIAL WASTE WATER
8/3/2019 Palm Oil Effluent Treatment Scheme
2/11
Sa2
INDEX
SECTION PARTICULARS PAGE NO.
I Design Data 2
II Process Design 3
III Treatment Scheme 5
IV Civil Units & Works 6
V Electro-mechanical Units & Works 8
VIII Standard makes 10
IX Performance of ETP 11
8/3/2019 Palm Oil Effluent Treatment Scheme
3/11
Sa3
SECTION I
1.0. DESIGN DATA
RAW EFFLUENT CHARACTERISTICS :
PARAMETER UNIT VALUE
pH - 3.0 to 4.0
TSS mg/lt. 6000 to 10000
TDS mg/lt. 32000
COD mg /lt. 50000 to 60000
BOD 3days at 270C mg /lt. 20000 to 25000
Oil & Grease mg /lt. 100
TREATED EFFLUENT CHARACTERISTICS
PARAMETER UNIT VALUE
pH -- 7.0 to 8.0
Suspended Solids mg/lt. < 100
COD mg /lt. < 250
BOD 3days at 270C mg /lt. < 100
O & G mg /lt. < 10
DESIGN OF ETP PROCESSPrimary Physical & Chemical Treatment
Secondary Biological Treatment
8/3/2019 Palm Oil Effluent Treatment Scheme
4/11
Sa4
SECTION II
2.0. PROCESS DESIGN
The process design involves Physico-Chemical and Biological processes.
PHYSICAL & CHEMICAL PROCESS
Oil Separation Screening Collection & Equalization Neutralization Clarification Drying.
BIOLOGICAL PROCESS
Anaerobic Digester Bio-Towers One Stage Aeration System One Stage
8/3/2019 Palm Oil Effluent Treatment Scheme
5/11
Sa5
SECTION III
3.0. TREATMENT SCHEME
3.1. PRIMARY TREATMENT
Screening of Effluent Separation of Oil & Fat with Mechanical automatic scraper mechanism Collection and Equalisation of effluent at Equalisation Tank Neutralisation of effluent at Neutralisation Tank
3.2. BIOLOGICAL TREATMENT
Feeding of effluent to Circular and closed Anaerobic Digester Continuous mixing with Agitator in Anaerobic Digester Removal of major part of organic load at Digester. Instrumentation and safety devises for Anaerobic Digester Bio-Gas Flaring system. Anaerobic System followed by fixed type Bio towers. One Stage Bio-Tower system followed by settling Tank One stage aerobic system. Clarifier mechanism. Biological sludge handling by Sludge Drying Beds. Chlorination
3.4. INSTRUMENATION
Effluent Flow measurement
8/3/2019 Palm Oil Effluent Treatment Scheme
6/11
Sa6
SECTION IV
4.0. CIVIL UNITS & WORKSSR. NO. PARTICULARS QUANTITY
1. Bar Screen Chamber One No.
2. Oil & Fat Separation Tank One No.
3. Collection cum Equalization Tank One No.
4. Neutralization Tank One No.
5. Bio tower Two Nos
6. Settling Tank One No.
7. Aeration Tank One No.
8. Secondary Clarifier One No.
9. Chlorine Contact Tank One No.
10. Sludge Drying Beds Ten Nos
11. Control panel cum Lab Room One No.
12. Foundations, Earth pits, Piping pedestal
supports, Cable trenches etc.
Lot
13. Puddle Pipes, Ladders, Railing, Manholes etc. Lot
8/3/2019 Palm Oil Effluent Treatment Scheme
7/11
Sa7
SECTION V
5.0. ELECTRO-MECHANICAL UNITS & EQUIPMENTS
SR. NO. PARTICULARS QUANTITY
1.0 Bar Screen One No
2.0 Oil & Fat Scraper Mechanism One No.
3.0 Effluent Transfer Pump (1W+1Sb) Two Nos.
4.0 Air Purging grid-ET & NT Lot
5.0 Air Blower-ET & NT (1W+1Sb) Two Nos.
6.0 Chemical Dosing System Two Nos.
7.0 CSTR Feed Pump (1W+1Sb) Two Nos.
8.0 CSTR One No.
9.0 Degassing Tower One No.
10.0 Lamella Clarifier One No.
11.0 Sludge Recycling Pump (1W+1Sb) Two Nos.
12.0 BT Bio fill media Lot
13.0 BT Distribution Grid Two Lots
14.0 Tube deck Media Lot
15.0 BT Recirculation Pumps(2W+2Sb) Four Nos
16.0 Flame Arrestor Two Nos
17.0 Pressure Relief Valve One No.
8/3/2019 Palm Oil Effluent Treatment Scheme
8/11
Sa8
18.0 Gas Flare Stack One No.
19.0 Liquid Flow Meter Two Nos
20.0 Moisture Trap Two Nos
21.0 Air Blower(2W+1Sb) Three Nos
22.0 Air Diffusers & Purging Grid Lot
23.0 Secondary Clarifier Mechanism One No
24.0 Bio-sludge recirculation Pumps (1W+1Sb) Two Nos.
25.0 Chlorine Dosing System One No.
26.0 Interconnecting Piping & Fittings Lot
27.0 Electric Control Panel One No.
28.0 Electrical Cabling Lot
29.0 Remote Push Button stations Lot
30.0 Earthing Lot
31.0 Pressure Pumps Two Nos
32.0 Sand Filter One No.
33.0 Activated Carbon Filter One No.
8/3/2019 Palm Oil Effluent Treatment Scheme
9/11
Sa9
SECTION VI
6.0 SCOPE OF CLEINT
ETP Roads, plant lighting, Gardening etc. Laboratory set up ETP street internal & external lighting Free Water at one Point for construction Free Power at one Point for construction
8/3/2019 Palm Oil Effluent Treatment Scheme
10/11
Sa10
SECTION VIII
8.0. STANDARD MAKES
UNIT/EQUIPMENT MAKES
Oil & Fat Scraper Mechanism SAI/Equivalent
PUMPS Johnson/Kirloskar
Air Blower KPT/Everest
Dosing Tank Syntax/Polycon
Dosing Pump Positive metering/ SR metering
SC Mechanism SAI/Equivalent
Bio-fills MMaqua/ Cool deck
Pressure Gauges Guru/EquivalentMoisture Trap SAI/Equivalent
Gas Flare Stack SAI/Equivalent
Liquid Flow Meter Forbes marshall/ Equivalent
Tube deck Media MMaqua/ Cool deck
Air Diffusers Rehau/Equivalent
Cement -53 Grade Duncun/ACC/L &T /Penna/Maha Gold
Steel SUJANA/Equivalent
Waterproof compound Fosrock/Equivalent
Painting Snowcem/Equivalent
Piping & Fittings Supreme/Finolex/TATA/JindalElectrical Commonest L & T /Siemens/Schneider
Electrical Cabling Polycab/Fine cab
Remote Push Buttons Technic /Equivalent
8/3/2019 Palm Oil Effluent Treatment Scheme
11/11
Sa11
SECTION IX
9.0 PERFORMANCE ON THE BASIS OF COD & BOD
9.1. RAW EFFLUENT CHARACTERISTICS
PARAMETER UNIT VALUE
COD Mg/lt. 60000
BOD Mg/lt. 25000
9.2. TREATED EFFLUENT CHARACTERISTICS
PARAMETER UNIT VALUE
COD Mg/lt. < 250*
BOD Mg/lt. < 30
*Refractory organic matter and inorganic TDS may change the value
9.3. STAGE WISE REDUCTION OF BOD
S. N. Treatment System BOD
% Reduction Mg/Lt.
Outlet
1 Raw Effluent -- 25000
a Anaerobic Treatment 80 5000
b Aerobic Treatment
BT System
75 1250
c Aerobic Treatment
ASP System
97 37.5
d Tertiary System -