8
24970313person s 2016/2 Environmental Communication FY2016 0persons Message from Compliance Administrator Compliance Administrators 285 Jalan Ahmad Ibrahim Singapore 639931 25176m² Lot area Total floor area Address Establishment day Employees Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Major Products 1978/12 ISO14001cert ification date 1997/12 visitors on factory tour Information disclosure 1items ISO14001r enewed AI set, CM602 set, NPM-W2, NPM-VF, Parts Making, SBD & CS, Agricultural Business Tatsuyoshi Ishii 1items TEL: collaboration with municipality Corporate Management Centre Contact +65 6861 6665 picture outline view of your site FY2016 was another positive year for Panasonic Factory Solutions Asia Pacific (PFSAP) as we continuously strive to further enhance our environmental sustainability and seek for greater environmental achievements. Through the ongoing effort of our ISO 14001 Committee, PFSAP managed to achieve all the key environmental targets for energy conservation (CO2 emission), water conservation, waste minimisation, chemical substance usage and number of environmental activity being carried out in FY2016. This year, we further enhanced our water management program by achieving the Water Efficient Building (WEB) silver certification award in October 2015 under the Industry Electronics Sector category awarded by the Public Utilities Board (PUB) which is the national water agency of Singapore. Previously, PFSAP has obtained the WEB basic certification in 2007. Through recent projects, we implemented additional water metering stations with the support of PUB’s Water Efficient Fund (WEF) to improve the monitoring and measurement of key water consumption areas as part of our water management program. PFSAP also continued with our upgrading plan to convert all air conditioning systems in phases from watercooling tower type to the more energy efficient VRV inverter type so as to improve energy and water conservation. Finally in the pursuit of green and clean energy, PFSAP managed to finalize the important project for solar panel leasing scheme with Sunseap Leasing Pte Ltd (Singapore) in March 2016. This would involve the installation of 3,476 number of Panasonic HIT®2 294Wp solar panels on the buildings’ rooftop areas and expect to generate clean power close to 20% of the total company's annual energy consumption. Completion of this solar panel installation project is estimated to complete at the end of 1 st Half FY2017 (September 2016).

Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

24970㎡

313persons

2016/2

Environmental Communication FY2016

0persons

Message from Compliance Administrator

Compliance Administrators

285 Jalan Ahmad Ibrahim Singapore 639931

25176m²Lot areaTotal floorarea

Address

Establishmentday

Employees

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

MajorProducts

1978/12

ISO14001certification date

1997/12

visitors onfactory tour

Informationdisclosure

1items

ISO14001renewed

 AI set, CM602 set, NPM-W2, NPM-VF, Parts Making, SBD &CS, Agricultural Business

Tatsuyoshi Ishii

1items

TEL:

collaboration withmunicipality

Corporate Management CentreContact +65 6861 6665

picture

outline view of your site

FY2016 was another positive year for Panasonic Factory Solutions Asia Pacific (PFSAP) as we continuously strive to further enhance our environmental sustainability and seek for greater environmental achievements.

Through the ongoing effort of our ISO 14001 Committee, PFSAP managed to achieve all the key environmental targets for energy conservation (CO2 emission), water conservation, waste minimisation, chemical substance usage and number of environmental activity being carried out in FY2016.

This year, we further enhanced our water management program by achieving the Water Efficient Building (WEB) silver certification award in October 2015 under the Industry Electronics Sector category awarded by the Public Utilities Board (PUB) which is the national water agency of Singapore. Previously, PFSAP has obtained the WEB basic certification in 2007. Through recent projects, we implemented additional water metering stations with the support of PUB’s Water Efficient Fund (WEF) to improve the monitoring and measurement of key water consumption areas as part of our water management program.

PFSAP also continued with our upgrading plan to convert all air conditioning systems in phases from water‐cooling tower type to the more energy efficient VRV inverter type so as to improve energy and water conservation.

Finally in the pursuit of green and clean energy, PFSAP managed to finalize the important project for solar panel leasing scheme with Sunseap Leasing Pte Ltd (Singapore) in March 2016. This would involve the installation of 3,476 number of Panasonic HIT®2 294Wp solar panels on the buildings’ roof‐top areas and expect to generate clean power close to 20% of the total company's annual energy consumption. Completion of this solar panel installation project is estimated to complete at the end of 1st Half FY2017 (September 2016).

Page 2: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Main activities in FY2016

Target Result

Products of Environmentally-conscious information

Below are the environmentally friendly products (machine and agricultural business) produced by PFSAP:

To achieve CO2 BP plan ≦ 3,919 Ton CO2 emissions actual result = 3,314 Ton (118%)To achieve Water BP plan ≦ 10,056 m3 Water consumption actual result = 9,463 m3 (106%)To achieve Waste BP plan ≦ 223 Ton Waste generation actual result = 189 Ton (118%)To achieve Chemical BP plan ≦ 230 HEI count Chemical actual result = 130 HEI count (177%)

- Assembly of Surface Mounting Machines, Automated Old-Form / Axial / Radial Insertion, Jumper Wire Machines

Auto Insertion Machines

RG131RL132AV 132 JV131RG131‐S

NPM‐W2

CM602‐L

Surface Mounting Machines

NPM‐VF

Surface Mounting Machines

PFSAP Agriculture Products

Nourish Mix Antioxidant Mix Vibrant Mix

Consumer Sales – Salad Pack

Veggie Life Signature Salad 

Mix

Mini Red Radish Mizuna

Consumer Sales – SKU

Page 3: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Environmental performance data Year displayed in graph ex) 2016: April 1, 2015 - March 31, 2016

Energy Unit: 1000kl CO2 Emission Unit: 1000t-CO2

Natural Energy FY20

1000kW/hCalculation standards

Water Unit: 1000m³ Waste Unit: 1000t, %

Circulated water Rain-water FY20m³ m³

Chemical substances Unit:t Chemical substances Unit:CountMaterial balance of controlled substances FY20 Human/Environment Impact

into airHandled 0.11 Recycled

0.16 0.00

Removed as Products0.00 0.03

into waterway Transferred0.00 into soil 0.02

0.00About The Panasonic Group's Chemical Substances Management in Factories

About the above data http://panasonic.net/eco/factory/chemical_substance/

0.00 0.00

0.00

Numerical values for respective countries listed on the Calculation Tools in GHG Protocol website by World Business Council for SustainableDevelopment (WBCSD) and World Resource Institute (WRI). Levels for 2002 (Electricity-Heat Steam Purchase_tool1.0_final) has been used forall years.

0.00 0.00 0.00 0.00 0.00

0.23

0.18 0.17 0.20

0.19

100 100 100 100 100

12 13 14 15 16

Final disposal Total Recycle rate

7.8 9.2 10.5 6.1

9.5

13.8

1.8

12 13 14 15 16

Municipal Industrial

3.4

3.0 3.2 3.2 3.3

12 13 14 15 16

1.65 1.47 1.56 1.55 1.62

12 13 14 15 16

Electricity

248 213 221 236

163 130

11 12 13 14 15 16

Page 4: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Compliance FY2016

<Air pollutant measurement results>

Unit Legal limitVoluntary

limitAverage

measuredMaximummeasured

Measuring frequency

SOx Nm³/h 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

NOx ppm 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Particulate g/Nm³ 10.00 7.50 0.10 0.10

10.00 7.50 0.10 0.10

10.00 7.50 0.10 0.10

<Water pollutant measurement results>

Unit Legal limitVoluntary

limitAveragemeasured

Maximummeasured

Measuring frequency

COD mg/l 600.00 500.00 424.00 424.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

BOD mg/l 400.00 300.00 240.00 240.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Nitrogen mg/l 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Phosphorus mg/l 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

<Noise and vibration>

Unit Legal limitVoluntary

limitAverage

measuredMaximummeasured

Measuring frequency

Noise dB DT 85.00 85.00 73.04 83.10

NT 75.00 75.00 65.22 72.50

Vibration dB DT

NT

*Legal limit: The strictest value out of those specified by laws, ordinances or agreements.

*N/A(not applicable):The meaning when the facility is exempted from the regulation.

About excess of legal limit value

Improvement of direction by government, or point outs by neighborOccurrence situation Countermeasure

once every 3 years

once every 3 years

once every 3 years

0

0

0

0

0

0

0

0

Measurement Area

Facility name

0

Grinding, milling

Boundary noise (

Final Wastewater Di

Facility name

NA

NA

NA

0

once every 3 years

once every 3 years

once every 3 years

0

0

once every 3 years

NA

NA

Parts Making Area

NA

NA

NA

NA

NA

NA

Grinding Room

Final Wastewater Di

Wire Cutting Room

NA 0

0

NA

NA

NA

0

0

NA

Page 5: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Environmental Policy

Environmental Awards for PFSAP

ISO 14001 EMS Certification Award by TUV SUD PSB,                                         

Singapore

Water Efficient Building AwardBCA Green Mark Gold Award  BCA Green Mark Gold Plus Award  Water Efficient Building (Silver) Award 

BCA Green Mark Award by Building & Construction Authority, Singapore

Water Efficient Building Award byPublic Utilities Board, Singapore

Page 6: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Aiming to reduction of environmental impact

Installation of VRV Inverter Air Con System

April 2015 : Installation of VRV Inverter Air Con System  at B1L1 due to ABU expansion 

February 2016 : MD office, CPD office and CorporateMeeting Rooms

To reduce energy & water consumption  

Removal of Cooling Tower (B1L1) 

May 2015: Cooling Tower (B1L1) have been terminated due to installation of VRV air con system

Before After

Convert Company Streetlight to LED

June 2015: Converted 21 nos. of streetlight to LED Type

Nov 2015: Completed Air Con Temperature Audit for PFSAP

Air Con Temperature Audit

Feb 2016: Conducted air leak diagnosis check in MFG, PM, Training Center, R&D room & Air compressor Room

Compress Air Supply Audit

Air Conditioner is selected for FY2015 CO2 Itakona implementation project in PFSAP

Focus Area: B3L1 (PM), B3L2 (MFG) & ABU (2nd Half FY2015) 

FY2015: Completed CO2 Itakona Project for air‐con power consumption in Parts Making Dept (B3L1).

CO2 Itakona Project continue in FY2016 

CO2 Itakona Project

Page 7: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Environmental Communication

Panasonic Environment Month (Jun 15)

Promotion of PC President’s Environment Month Message

Promotional posters on company screen saver

Organised PFSAP Environmental Quiz Contest 2015 for all employees. Received 104 entries and given out 10 prizes x $10 voucher each to winners

Panasonic Tree Planting Day @ Siglap Park Connector (9 Oct 15)    

Contribute to nature conservation & celebration of SG50 with NParks

Earth Hour (19 Mar 16) Earth hour screen saver message Encourage all staffs to turn off 

lights for 1 hour at home Email message disseminated                    

on 15 Mar 16

Panasonic 10% Energy & Water Challenge (Jul – Oct 15)    

To encourage employees to save energy & water in their household.

Employees who manage to reduce 10% of energy or water usage at home from Jul to Oct (vs. the period Mar to Jun), are eligible for the draw.  

PFSAP : 3 winners ($850)

Eco Learning Visit At Energy Research Institute @ NTU (24 Jun 15)

To raise the environmental awareness for our members and learn from NTU on their eco initiatives. 

PFSAP Environment Clean Up Day (15 Mar 16)

A total of 59 members participated, 70 kg (est.) of rubbish collected. 

PFSAP QES Month Campaign (Nov 15)

Environmental Slogan Contest – 48 entries 

Home Energy Calculator Exhibition (supported by SP)

PFSAP Salvation Army Donation Drive‐ 3 bins provided‐ Items not weigh due to adverse weather

Eco tour & Solar Hybrid Car Workshop @ NEWater Visitor Centre ‐ 31 PFSAP , 8 family members 

Page 8: Panasonic Factory Solutions Asia Pacific (PFSAP ...Panasonic Group Site Report 2016 FY2016 :April 1, 2015 - March 31, 2016 Panasonic Factory Solutions Asia Pacific (PFSAP) Environmental

Panasonic Group Site Report 2016FY2016 :April 1, 2015 - March 31, 2016Panasonic Factory Solutions Asia Pacific (PFSAP)

Emergency preparedness and response

FY2015 EMERGENCY DRILL REVIEW

IN PLACE PROTECTION DRILL – 27 Nov 2015  FIRE DRILL – 29 Mar 2016

WSH TRAINING 

Table Top Exercise

Lifting Equipment Safety Operation First Aider Refresher Training