Software Integration and Test Techniques in a Large Distributed Project: Evolution, Process Improvement, Results. Paola Sivera - ESO. Chajnantor Plateau – looking north. V. Licancabur. Cº Chajnantor. Pampa La Bola. Center of Array. Antenna Prototypes at ALMA Test Facility: 2005. - PowerPoint PPT Presentation
Citation preview
Software Integration and Test Software Integration and Test Techniques in a Large Techniques in a Large Distributed Project: Distributed Project: Evolution, Process Evolution, Process
Improvement, ResultsImprovement, Results
Paola Sivera - ESO
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 2
Center of Array
Pampa La BolaV. Licancabur Cº Chajnantor
Chajnantor Plateau – looking north
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 3
Antenna Prototypes at ALMA Test Facility: 2005
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 4
ALMA Geographical distribution
ALMA
DRAOPenticton
ALMAATF
ArcetriObservatory
Jodrell Bank
BreraObservatoryIRAM
Grenoble
ATCEdinburgh
NAOJ
ESO
NRAO
Obs deParis
Univ.Calgary
c
c
Santiago
MPI Bonn
DAMIR/IEMMadrid
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 5
ALMAManagement
B. GlendenningG. Raffi
K.Tatematsu
Science Software Requirements
R. Lucas
High Level Analysis
J. Schwarz
Software EngM.Zamparelli
Common SWG. Chiozzi
ExecutiveP. Grosbol
ControlA. Farris
ArchivingA. Wicenec
Observation Preparation
A. Bridger
Operations Support
M. Chavan
OfflineJ. McMullen
PipelineL. Davis
Telescope Calibration
R. Lucas
CorrelatorJ. Pisano
IntegrationP. Sivera
SchedulerA.Farris
ACAM.Watanabe
Trilateral Computing IPT Organisation
Total Bilateral staff now: 40 FTEs
Total trilateral staff now: 65 FTEs
Total Bilateral staff now: 40 FTEs
Total trilateral staff now: 65 FTEs
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 6
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 7
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 8
ALMA System Dataflow
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 9
ObsPrep Visual Editor (to select spectral setup)
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 10
EXEC: Operator Master Client
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 11
CASA Viewer• Visibility displays (raw, corrected data)• Image, data cube displays
– Statistics; profiles; raster, contour, vector support
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 12
Standards and Tools
• Alma Common Software• Environment• CVS organization• Makefile• Standard Test Environment (STE)• Tool for automated testing• Bug tracking tool (JIRA)
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 13
ALMA Release Cycle
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Minor Release: Mar 31 Major Release: Sep 30
• • • • • • • • • • • •
Monthly integration = last day of the month
ICD Freeze = 15th of the month
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 14
Lessons learned
• Releases twice per year
but…• Subsystem developers
working in isolation• Results thrown over the wall
to ITS at release time– Each integration took ~2 months– At completion of integration
code was already obsolete
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 15
Function-based Teams
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 16
FBTs organization
Z SharedSimulator-2006-02-B (branch) SharedSimulator-2006-02-RootOfBranch (tag of the HEAD)
A SharedSimulator-2006-02-BeforeMerge
B TRUNK-SharedSimulator-2006-02-BeforeMerge
C TRUNK-SharedSimulator-2006-02-AfterMerge (tag of the HEAD)
SharedSimulator-2006-02-AfterMerge-B (branch) F SharedSimulator-2006-02-FINAL
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 17
Summing it up
• FBTs advantages:– Improve communication – More effective involvement of testers
• Testing end-to-end since the beginning– Good for object-oriented software– A lot of maintenance on the test cases – It is not enough -> user tests
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 18
Future developments
• … the list can be very long …
For the near future we want to focus on: • Stability tests• More automation
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 19
AOS Technical Building
AOS Technical Building
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 20
ALMA - 2012
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 21
ICALEPCS 2007, 15-19 Oct 2007, Knoxville TN 22
MELCO : August 2007