2018 2019 2020 2021
Parkland CountyFour Year
Road Program
ENGINEERING SERVICES
Presented as part of 2018 Spring Budget Adjustment - April 2018
2018 Road Program
2018 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 82056 ( RR 274, 970m North Twp 510) Design for Bridge Repair
A2 Twp 514 (Woodbend Rd), Hwy 60 to RR 273 Conceptual Design (Upgrade)
A3 Acheson Rd, extend 200m to Spruce Valley Rd Conceptual Design (New Road)
A4 Railway Ave Extension, Fallis Design (New Road)
A5 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Collector Road Design + Land Acquisition
A6 RR 30, Twp Rd 524A to Mayatan Subdivision Gravel Road Design + Land Acquisition
A7 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Gravel Road Design + Land Acquisition
B0 B. ROAD CONSTRUCTION PROJECTSB1 RR 274 (Campsite Rd), Twp 540 to Hwy 633 Reconstruction + Widen
B2 Twp 533A, RR 274 (Campsite Rd) to Cul-de-sac Reconstruction + ACP Surfacing
B3 Bridge File 70364 (Twp 514A, 600m West of RR25) Bridge Repair - Design + Construction
B4Gravel Road Reconstruction Program - County Wide (Locations mapped separately)
Reconstruction
C0 C. ASPHALT SURFACING PROJECTSC1 Twp 531 (Northview Rd), 279 St to 274 St and 269 St to Hwy 60) ASBC Resurfacing
C2 Twp 533, RR 13 to to Mayfair Heights ASBC Resurfacing
C3 RR 13, Hwy 16 to Mayfair Heights ASBC Resurfacing
C4 South Service Rd Hwy 16, RR 20 to RR 21 ASBC Resurfacing
C5 RR 53, Sundance Rd to Beaver Bay Estates ASBC Resurfacing
C6 RR 12, Hwy 16 to Hwy 16A ASBC Resurfacing
D0 D. SEAL COAT SURFACING PROJECTS D1 Twp 540, Hwy 779 to RR13 Seal Coating
D2 RR 21, Twp 523 to 524 Seal Coating
D3 RR 15, Twp 524 to Twp 530 Seal Coating
D4 Twp 524, RR 15 to RR 21 Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION SURFACING PROJECTSF1 Beaver Bay Estates - Krane Watchers Drive, RR 53 to 375m Southeast Subdivision Preservation - ASBC
F2 Cameron Heights - Cameron Dr, Avco Lane Subdivision Preservation - ASBC
F3Cameron Lake Estates - Sherman Dr, Lynn Valley Dr, Ogilvie Dr, Pincherry Lane, Cameron Lake Dr
Subdivision Preservation - ASBC
F4 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Preservation - ACP
F5 Mayfair Heights - Mayfair Dr, Mayfair Cres, Mayfair Pl Subdivision Preservation - ASBC
F6 Panorama Heights - Neumann Crescent Subdivision Preservation - ASBC
F7 Pine Valley Acres III - Spruce Ave Subdivision Preservation - ASBC
F7 Pine Valley Acres IV - Bailey Ave, Pine St, Evergreen Dr Subdivision Preservation - ASBC
F7 Pine Valley Acres - Birch Ave Subdivision Preservation - ASBC
F8 Roslaire Estates - Roslaire Dr Subdivision Preservation - ASBC
G0 G. WATERG1 Walker Lake - Lakeshore Waterloop Concept & Land Acquisition
G2 Acheson Zone 4 Reservoir Expansion Design
H0 H. WASTEWATERH1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Design
Meridian Business Park
AchesonIndustrialArea
BEACHSEBAS.V.
BETULABEACHS.V.
S.V.KAPASIWINBEACHS.V.POINT ALISON
S.V.LAKEVIEW
WABAMUN
VILLAGE OFSPRING LAKE
STONY PLAIN
SPRUCEGROVE
WABAMUNINDIAN
RESERVENo. 133A STONY PLAIN
No.135
INDIANRESERVE
WABAMUN
LAKE
ISLELAKE
GLADULAKE
BIG LAKE
TOMAHAWK
KEEPHILLS
CARVELDUFFIELD
FALLIS
MAGNOLIA
GAINFORD
ENTWISTLE
C6G2
A1
A4
B3
G1
H1
A3
A2
A5
A7
A6
B2
B1
C3 C1
C2
C5
C4
D4
D3
D2
D1
F5 F4
F2
F7
F1
F3
F8
F6
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
5T.5
0T.5
1T.5
3T.5
4T.4
9T.5
2
T.55
T.51
T.52
T.54
T.50
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD11
RGE RD11
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
TWP R
D53
0
TWP R
D53
0
TWP R
D53
5
TWP R
D53
5
TWP R
D53
4
TWP R
D53
4
TWP R
D53
3
TWP R
D53
3
TWP R
D52
3
TWP R
D52
3
TWP R
D53
1
TWP R
D53
1
TWP R
D52
2
TWP R
D52
2
TWP R
D52
1
TWP R
D52
1
TWP R
D52
0
TWP R
D52
0
TWP R
D51
3
TWP R
D51
3
TWP R
D51
5
TWP R
D51
5
TWP R
D51
4
TWP R
D51
4
TWP R
D54
0
TWP R
D54
0
TWP R
D52
5
TWP R
D52
5
TWP R
D52
4
TWP R
D52
4
TWP R
D54
2
TWP R
D54
2
TWP R
D51
1
TWP R
D51
1TWP R
D51
2
TWP R
D51
2
TWP R
D54
1
TWP R
D54
1
TWP R
D54
3
TWP R
D54
3TWP R
D54
4
TWP R
D54
4
TWP R
D55
0
TWP R
D55
0
TWP R
D54
5
TWP R
D54
5
TWP R
D51
0
TWP R
D51
0
TWP R
D50
3
TWP R
D50
3
TWP R
D50
5
TWP R
D50
5
TWP R
D50
4
TWP R
D50
4
TWP R
D53
2
TWP R
D53
2
Parkland CountyRoad Program
20180 4 8 12 162
Kilometers
10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/29/2018
LegendRoad Program Features 2018
A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing Projects; C6D. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. WastewaterB4 - See Gravel Road Reconstruction Program 2018
G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\Output\SBA_R1\Gravel Road Reconstruction Program 2018\RoadProgram2018_Features.mxd
¯
2018 Gravel Road Reconstruction Program Project List*B4. GRAVEL ROAD RECONSTRUCTION PROGRAM
B4 - 1 Twp 530, RR 25 - RR 23 Approx. 600m Road Reconstruction at 3 locations
B4 - 2 RR 25, Twp 524A - Twp 530 Approx. 400m Road Reconstruction at 2 locations
B4 - 3 RR 270, Hwy 628 - Twp 530 Approx. 800m Road Reconstruction and shoulder pull at 2 locations
B4 - 4 Twp 510, RR 14 - Everington Rd Approx. 300m Road Reconstruction and ditching at 1 location
B4 - 5 RR 13, Twp 512 - Twp 514 Approx. 500m Road Reconstruction at 1 location
B4 - 6 Twp 524B, Duffield to Edinburgh Park Approx. 200m Road Reconstruction at 1 location
B4 - 7 RR 14, Twp 510 - 512 Approx. 700m Road Reconstruction at 1 location
B4 - 8 RR 21, Twp 511 - Twp 512 Approx. 700m Road Reconstruction at 1 location
B4 - 9 RR 75, Twp 513 - Twp 511 Approx. 400m Intersection Reconstruction at 1 location
B4 - 10 RR 11, Twp 512 - Twp 511 Approx. 700m Road Reconstruction at 1 location
B4 - 11 RR 73, Twp 514 - Twp 520 Approx. 200m Road Reconstruction at 1 location
B4 - 12 Twp 514, RR 12 - RR 11 Approx. 200m Road Reconstruction at 1 location
B4 - 13 RR 20, Twp 510 - 511 Approx. 800m Road Reconstruction at 2 locations
B4 - 14 RR 15, Twp 514 to Twp Hwy 627 Approx. 800m Road Reconstruction at 1 locations
B4 - 15 RR 13, Twp 513 - Twp 514 Approx. 300m Road Reconstruction at 1 location
B4 - 16 Twp 524, RR 23 - RR 22 Approx. 250m Road Reconstruction at 1 location
B4 - 17 Twp 534, RR 280 - RR 275 Approx. 300m Road Reconstruction at 1 location
* Locations which are planned for the 2018 gravel road reconstruction program - not in any prioritized order. *Will be constructed as schedule efficiencies and resources allow. *Locations subject to change and re-prioritized as other locations are identified with spring conditions.
B4-9
B4-2
B4-6
B4-17
B4-1
B4-11B4-12
B4-16
B4-4
B4-15
B4-5
B4-14
B4-3
B4-13
B4-8 B4-10B4-7
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
1T.5
5T.5
0T.5
3T.5
2T.5
4
T.55
T.51
T.52
T.54
T.50
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD11
RGE RD11
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
TWP R
D53
0
TWP R
D53
0
TWP R
D53
5
TWP R
D53
5
TWP R
D53
4
TWP R
D53
4
TWP R
D53
3
TWP R
D53
3
TWP R
D52
3
TWP R
D52
3
TWP R
D53
1
TWP R
D53
1
TWP R
D52
2
TWP R
D52
2
TWP R
D52
1
TWP R
D52
1
TWP R
D52
0
TWP R
D52
0
TWP R
D51
3
TWP R
D51
3
TWP R
D51
5
TWP R
D51
5
TWP R
D51
4
TWP R
D51
4
TWP R
D54
0
TWP R
D54
0
TWP R
D52
5
TWP R
D52
5
TWP R
D52
4
TWP R
D52
4
TWP R
D54
2
TWP R
D54
2
TWP R
D51
1
TWP R
D51
1TWP R
D51
2
TWP R
D51
2
TWP R
D54
1
TWP R
D54
1
TWP R
D54
3
TWP R
D54
3TWP R
D54
4
TWP R
D54
4
TWP R
D55
0
TWP R
D55
0
TWP R
D54
5
TWP R
D54
5
TWP R
D51
0
TWP R
D51
0
TWP R
D50
3
TWP R
D50
3
TWP R
D50
5
TWP R
D50
5
TWP R
D50
4
TWP R
D50
4
TWP R
D53
2
TWP R
D53
2
Parkland CountyRoad Program Project B4
Gravel Road ReconstructionProgram 20180 7.5 15 22.5 303.75
KilometersDrawn By: BAMDate: 3/29/2018
LegendGravel Road Reconstruction Program 2018
G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\Output\SBA_R1\Gravel Road Reconstruction Program 2018\RoadProgram_Gravel Road Reconstruction Program_2018_Features.mxd
¯
2019 Road Program
2019 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 09254 (RR70, 500m South Hwy 16) Design for Bridge Repair
A2 Twp 534, Hwy 44 to Hwy 779 Conceptual Design
A3 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Collector Road Design + Land Acquisition
A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design
A5 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Gravel Road Design + Land Acquisition
A6 RR 41, Twp 534 to 535 Gravel Road Design + Land Acquisition
B0 B. ROAD CONSTRUCTION PROJECTSB1 Bridge File 82056 ( RR 274, 970m North Twp 510) Bridge Repair - Design + Construction
B2 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Reconstruction
B3 County Facility Parking Lot Extension Construction + ACP Surfacing
B4 Railway Ave Extension, Fallis Construction (New Road)
B5 RR 30, Twp Rd 524 to Mayatan Subdivision Reconstruction
B6 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Reconstruction
C0 C. ASPHALT SURFACING PROJECTSC1 Prospector's Point Rd, Twp 511 (Graminia Rd) to Parking Lot ACP Resurfacing + base/subgrade repairs
C3 RR 14, Parkland Dr to 524 ASBC Resurfacing
C4 County Facility Paving ACP Resurfacing
C5 Next Valid Petition (2) Local Improvements
D0 D. SEAL COAT SURFACING PROJECTS D1 Parkland Drive, RR 15 to RR 21 Seal Coating
D2 RR 275, Twp 532A to Westbrook Crescent Seal Coating
D3 Twp 532A, RR 274 to RR 280 Seal Coating
D4 RR 274 (Campsite Rd), Hwy 16 to Twp 540 Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION SURFACING PROJECTSF1 Blueberry Hills Estates Subdivision Preservation - ACP
F2 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC
F3 Country Lane Estates Subdivision Preservation - ASBC
F4 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC
F5 Harris Acres - Harris Dr Subdivision Preservation - ASBC
F6 Osborne Acres - Osborne Dr, Osborne Pl, 178m 279th St Subdivision Preservation - ASBC
F7 Pine Wood - Pine Wood Dr, West Rd, East Rd Subdivision Preservation - ASBC
F8 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC
F9 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC
F10 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC
F11 Wesparkdale - Marion Cres Subdivision Preservation - ASBC
F12 Willow Park - Willow Park Drive Subdivision Preservation - ASBC
F13 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC
G0 G. WATERG1 Acheson Zone 4 Reservoir Expansion Design + Construction (2 years)
H0 H. WASTEWATERH1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Construction
Meridian Business Park
AchesonIndustrialArea
BEACHSEBAS.V.
BETULABEACHS.V.
S.V.KAPASIWINBEACHS.V.POINT ALISON
S.V.LAKEVIEW
WABAMUN
VILLAGE OFSPRING LAKE
STONY PLAIN
SPRUCEGROVE
WABAMUNINDIAN
RESERVENo. 133A STONY PLAIN
No.135
INDIANRESERVE
WABAMUN
LAKE
ISLELAKE
GLADULAKE
BIG LAKE
TOMAHAWK
KEEPHILLS
CARVELDUFFIELD
FALLIS
MAGNOLIA
GAINFORD
ENTWISTLE
A2
G1
A1
B1
B4
B3C4
A4A5
A3
A6
B2B5
B6
C1
C3
D1
D4D2D3
F10
F9
F8
F7
F2
F12
F1
F13
F5
F3
F4
F6
F11
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
5T.5
0T.5
1T.5
3T.5
4T.4
9T.5
2
T.55
T.51
T.52
T.54
T.50
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD11
RGE RD11
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
TWP R
D53
0
TWP R
D53
0
TWP R
D53
5
TWP R
D53
5
TWP R
D53
4
TWP R
D53
4
TWP R
D53
3
TWP R
D53
3
TWP R
D52
3
TWP R
D52
3
TWP R
D53
1
TWP R
D53
1
TWP R
D52
2
TWP R
D52
2
TWP R
D52
1
TWP R
D52
1
TWP R
D52
0
TWP R
D52
0
TWP R
D51
3
TWP R
D51
3
TWP R
D51
5
TWP R
D51
5
TWP R
D51
4
TWP R
D51
4
TWP R
D54
0
TWP R
D54
0
TWP R
D52
5
TWP R
D52
5
TWP R
D52
4
TWP R
D52
4
TWP R
D54
2
TWP R
D54
2
TWP R
D51
1
TWP R
D51
1TWP R
D51
2
TWP R
D51
2
TWP R
D54
1
TWP R
D54
1
TWP R
D54
3
TWP R
D54
3TWP R
D54
4
TWP R
D54
4
TWP R
D55
0
TWP R
D55
0
TWP R
D54
5
TWP R
D54
5
TWP R
D51
0
TWP R
D51
0
TWP R
D50
3
TWP R
D50
3
TWP R
D50
5
TWP R
D50
5
TWP R
D50
4
TWP R
D50
4
TWP R
D53
2
TWP R
D53
2
Parkland CountyRoad Program
20190 4 8 12 162
Kilometers
10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/29/2018
LegendRoad Program Features 2019
A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. Wastewater
G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\MXD\RoadProgram2019_Features_Tabloid.mxd
¯
2020 Road Program
2020 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 13218 (RR73, 600m South Twp 514) Design for Bridge Repair
A2 Twp 524, Stony Plain (RR12 to Hwy 770) Conceptual Design
A3 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Collector Road Design + Land Acquisition
A4 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Arterial Design + Land Acquisition
A5 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition
A6 Twp 514, RR 20 to Hwy 770 Gravel Road Design + Land Acquisition
B0 B. ROAD CONSTRUCTION PROJECTSB1 Bridge File 09254 (RR70, 500m South Hwy 16) Bridge Repair - Design + Construction
B2 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Reconstruction + Widen
B3 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing
B4 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Reconstruction + ASBC Surfacing
B5 RR 41, Twp 534 to 535 Reconstruction
C0 C. ASPHALT SURFACING PROJECTSC1 Next Rd TBD ACP Resurfacing
C2 RR 20, Hwy 16A to Parkland Drive ASBC Resurfacing
C3 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs
C4 Next Valid Petition (2) Local Improvements
D0 D. SEAL COAT SURFACING PROJECTS D1 RR 41, Hwy 16 to Twp 534 Seal Coating
D2 Twp 534, RR 41 to RR 43 Seal Coating
D3 RR 43, Twp 534 to Twp 535 Seal Coating
D4 RR 32 (Duffield Rd), Twp 530 to Hwy 16 Seal Coating
D5 RR 33 (Alberta Beach Rd), Twp 533A to 535 Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION SURFACING PROJECTSF1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC
F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC
F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC
F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC
F5 Maude-West Acres Subdivision Preservation - ASBC
F6West Gentry - West Gentry Rd, Parkland Rd & Cres, Lakeview Cres, Hillside Dr, RR11
Subdivision Preservation - ASBC
F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC
Meridian Business Park
AchesonIndustrialArea
BEACHSEBAS.V.
BETULABEACHS.V.
S.V.KAPASIWINBEACHS.V.POINT ALISON
S.V.LAKEVIEW
WABAMUN
VILLAGE OFSPRING LAKE
STONY PLAIN
SPRUCEGROVE
WABAMUNINDIAN
RESERVENo. 133A STONY PLAIN
No.135
INDIANRESERVE
WABAMUN
LAKE
ISLELAKE
GLADULAKE
BIG LAKE
TOMAHAWK
KEEPHILLS
CARVELDUFFIELD
FALLIS
MAGNOLIA
GAINFORD
ENTWISTLE
A3
A2A4
A6
A5
B3
B4
B2
B5
C2
C3
D1
D4
D3 D5
D2
F4
F6
F2
F7
F1
F3F5
A1
B1
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
1T.5
5T.5
0T.5
3T.5
2T.5
4T.4
9
T.55
T.51
T.52
T.54
T.50
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD11
RGE RD11
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
TWP R
D53
0
TWP R
D53
0
TWP R
D53
5
TWP R
D53
5
TWP R
D53
4
TWP R
D53
4
TWP R
D53
3
TWP R
D53
3
TWP R
D52
3
TWP R
D52
3
TWP R
D53
1
TWP R
D53
1
TWP R
D52
2
TWP R
D52
2
TWP R
D52
1
TWP R
D52
1
TWP R
D52
0
TWP R
D52
0
TWP R
D51
3
TWP R
D51
3
TWP R
D51
5
TWP R
D51
5
TWP R
D51
4
TWP R
D51
4
TWP R
D54
0
TWP R
D54
0
TWP R
D52
5
TWP R
D52
5
TWP R
D52
4
TWP R
D52
4
TWP R
D54
2
TWP R
D54
2
TWP R
D51
1
TWP R
D51
1TWP R
D51
2
TWP R
D51
2
TWP R
D54
1
TWP R
D54
1
TWP R
D54
3
TWP R
D54
3TWP R
D54
4
TWP R
D54
4
TWP R
D55
0
TWP R
D55
0
TWP R
D54
5
TWP R
D54
5
TWP R
D51
0
TWP R
D51
0
TWP R
D50
3
TWP R
D50
3
TWP R
D50
5
TWP R
D50
5
TWP R
D50
4
TWP R
D50
4
TWP R
D53
2
TWP R
D53
2
Parkland CountyRoad Program
20200 4 8 12 162
Kilometers
10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/19/2018
G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\MXD\RoadProgram2020_Features_Tabloid.mxd
¯
Road Program Features 2020A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. Wastewater
2021 Road Program
2021 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 70280 (RR64, 300m North Twp 504) Design for Bridge Repair
A2 Sundance Rd, RR 51 to RR 60 Concept Design
A3 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition
A4 Twp 524, RR12 to RR14 (Phase 1) Arterial Design + Land Acquisition
A5 RR 31, Twp 531 to Twp 532 Gravel Road Design + Land Acquisition
A6 RR 22, Twp 511 to Twp 510 Gravel Road Design + Land Acquisition
B0 B. ROAD CONSTRUCTION PROJECTSB1 Bridge File 13218 (RR73, 600m South Twp 514) Bridge Repair - Design + Construction
B2 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Reconstruction + Widen
B3 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Reconstruction + Widen + ACP Surfacing
B4 Twp 514, RR 20 to Hwy 770 Reconstruction
C0 C. ASPHALT SURFACING PROJECTSC1 Next Rd TBD ACP Resurfacing
C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing
C3 Next Valid Petition (2) Local Improvements
D0 D. SEAL COAT SURFACING PROJECTS D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating
D2 Parkland Drive, Hwy 16A to RR15 Seal Coating
D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating
D4 Parkland Drive, RR25 to Hwy 16 Seal Coating
D5 RR 280, Rolling Heights to Douglas Meadows Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION SURFACING PROJECTSF1 Aspen Hills - Aspen Dr, Aspen Place Subdivision Preservation - ASBC
F2 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC
F3 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC
F4 Garden Grove Estates Subdivision Preservation - ASBC
F5 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC
F6 Patricia Hills Subdivision Preservation - ASBC
F7 Pine Valley V Subdivision Preservation - ASBC
F8 Sunset View Acres Subdivision Preservation - ASBC
Meridian Business Park
AchesonIndustrialArea
BEACHSEBAS.V.
BETULABEACHS.V.
S.V.KAPASIWINBEACHS.V.POINT ALISON
S.V.LAKEVIEW
WABAMUN
VILLAGE OFSPRING LAKE
STONY PLAIN
SPRUCEGROVE
WABAMUNINDIAN
RESERVENo. 133A STONY PLAIN
No.135
INDIANRESERVE
WABAMUN
LAKE
ISLELAKE
GLADULAKE
BIG LAKE
TOMAHAWK
KEEPHILLS
CARVELDUFFIELD
FALLIS
MAGNOLIA
GAINFORD
ENTWISTLE
A1
B1
A2
A5
A6
A4
A3
B2
B3
B4C2
D1
D5
D4
D2
D3
F6
F1
F5F4
F3
F7
F2
F8
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
1T.5
5T.5
0T.5
3T.5
2T.5
4T.4
9
T.55
T.51
T.52
T.54
T.50
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD11
RGE RD11
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
TWP R
D53
0
TWP R
D53
0
TWP R
D53
5
TWP R
D53
5
TWP R
D53
4
TWP R
D53
4
TWP R
D53
3
TWP R
D53
3
TWP R
D52
3
TWP R
D52
3
TWP R
D53
1
TWP R
D53
1
TWP R
D52
2
TWP R
D52
2
TWP R
D52
1
TWP R
D52
1
TWP R
D52
0
TWP R
D52
0
TWP R
D51
3
TWP R
D51
3
TWP R
D51
5
TWP R
D51
5
TWP R
D51
4
TWP R
D51
4
TWP R
D54
0
TWP R
D54
0
TWP R
D52
5
TWP R
D52
5
TWP R
D52
4
TWP R
D52
4
TWP R
D54
2
TWP R
D54
2
TWP R
D51
1
TWP R
D51
1TWP R
D51
2
TWP R
D51
2
TWP R
D54
1
TWP R
D54
1
TWP R
D54
3
TWP R
D54
3TWP R
D54
4
TWP R
D54
4
TWP R
D55
0
TWP R
D55
0
TWP R
D54
5
TWP R
D54
5
TWP R
D51
0
TWP R
D51
0
TWP R
D50
3
TWP R
D50
3
TWP R
D50
5
TWP R
D50
5
TWP R
D50
4
TWP R
D50
4
TWP R
D53
2
TWP R
D53
2
Parkland CountyRoad Program
20210 4 8 12 162
Kilometers
10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/19/2018
G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\MXD\RoadProgram2021_Features_Tabloid.mxd
¯
Road Program Features 2021A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. Wastewater
2018-2021 Road Program
2018-2021 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTS A1 Bridge File 82056 ( RR 274, 970m North Twp 510) Design for Bridge Repair 2018
A2 Twp 514 (Woodbend Rd), Hwy 60 to RR 273 Conceptual Design (Upgrade) 2018
A3 Acheson Rd, extend 200m to Spruce Valley Rd Conceptual Design (New Road) 2018
A4 Railway Ave Extension, Fallis Design (New Road) 2018
A5 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Collector Road Design + Land Acquisition 2018
A6 RR 30, Twp Rd 524A to Mayatan Subdivision Gravel Road Design + Land Acquisition 2018
A7 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Gravel Road Design + Land Acquisition 2018
A1 Bridge File 09254 (RR70, 500m South Hwy 16) Design for Bridge Repair 2019
A2 Twp 534, Hwy 44 to Hwy 779 Conceptual Design 2019
A3 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Collector Road Design + Land Acquisition 2019
A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design 2019
A5 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Gravel Road Design + Land Acquisition 2019
A6 RR 41, Twp 534 to 535 Gravel Road Design + Land Acquisition 2019
A1 Bridge File 13218 (RR73, 600m South Twp 514) Design for Bridge Repair 2020
A2 Twp 524, Stony Plain (RR12 to Hwy 770) Conceptual Design 2020
A3 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Collector Road Design + Land Acquisition 2020
A4 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Arterial Design + Land Acquisition 2020
A5 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition 2020
A6 Twp 514, RR 20 to Hwy 770 Gravel Road Design + Land Acquisition 2020
A1 Bridge File 70280 (RR64, 300m North Twp 504) Design for Bridge Repair 2021
A2 Sundance Rd, RR 51 to RR 60 Concept Design 2021
A3 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition 2021
A4 Twp 524, RR12 to RR14 (Phase 1) Arterial Design + Land Acquisition 2021
A5 RR 31, Twp 531 to Twp 532 Gravel Road Design + Land Acquisition 2021
A6 RR 22, Twp 511 to Twp 510 Gravel Road Design + Land Acquisition 2021
B0 B. ROAD CONSTRUCTION PROJECTS B1 RR 274 (Campsite Rd), Twp 540 to Hwy 633 Reconstruction + Widen 2018
B2 Twp 533A, RR 274 (Campsite Rd) to Cul-de-sac Reconstruction + ACP Surfacing 2018
B3 Bridge File 70364 (Twp 514A, 600m West of RR25) Bridge Repair - Design + Construction 2018
B4Gravel Road Reconstruction Program - County Wide (Locations mapped separately)
Reconstruction 2018
B1 Bridge File 82056 ( RR 274, 970m North Twp 510) Bridge Repair - Design + Construction 2019
B2 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Reconstruction 2019
B3 County Facility Parking Lot Extension Construction + ACP Surfacing 2019
B4 Railway Ave Extension, Fallis Construction (New Road) 2019
B5 RR 30, Twp Rd 524 to Mayatan Subdivision Reconstruction 2019
B6 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Reconstruction 2019
B1 Bridge File 09254 (RR70, 500m South Hwy 16) Bridge Repair - Design + Construction 2020
B2 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Reconstruction + Widen 2020
B3 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing 2020
B4 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Reconstruction + ASBC Surfacing 2020
B5 RR 41, Twp 534 to 535 Reconstruction 2020
B1 Bridge File 13218 (RR73, 600m South Twp 514) Bridge Repair - Design + Construction 2021
B2 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Reconstruction + Widen 2021
B3 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Reconstruction + Widen + ACP Surfacing 2021
B4 Twp 514, RR 20 to Hwy 770 Reconstruction 2021
C0 C. ASPHALT SURFACING PROJECTS C1 Twp 531 (Northview Rd), 279 St to 274 St and 269 St to Hwy 60) ASBC Resurfacing 2018
C2 Twp 533, RR 13 to to Mayfair Heights ASBC Resurfacing 2018
C3 RR 13, Hwy 16 to Mayfair Heights ASBC Resurfacing 2018
C4 South Service Rd Hwy 16, RR 20 to RR 21 ASBC Resurfacing 2018
C5 RR 53, Sundance Rd to Beaver Bay Estates ASBC Resurfacing 2018
C6 RR 12, Hwy 16 to Hwy 16A ASBC Resurfacing 2018
C1 Prospector's Point Rd, Twp 511 (Graminia Rd) to Parking Lot ACP Resurfacing + base/subgrade repairs 2019
C3 RR 14, Parkland Dr to 524 ASBC Resurfacing 2019
C4 County Facility Paving ACP Resurfacing 2019
C5 Next Valid Petition (2) Local Improvements 2019
C1 Next Rd TBD ACP Resurfacing 2020
C2 RR 20, Hwy 16A to Parkland Drive ASBC Resurfacing 2020
C3 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs 2020
C4 Next Valid Petition (2) Local Improvements 2020
C1 Next Rd TBD ACP Resurfacing 2021
C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing 2021
C3 Next Valid Petition (2) Local Improvements 2021
D0 D. SEAL COAT SURFACING PROJECTS D1 Twp 540, Hwy 779 to RR13 Seal Coating 2018
D2 RR 21, Twp 523 to 524 Seal Coating 2018
D3 RR 15, Twp 524 to Twp 530 Seal Coating 2018
D4 Twp 524, RR 15 to RR 21 Seal Coating 2018
D1 Parkland Drive, RR 15 to RR 21 Seal Coating 2019
D2 RR 275, Twp 532A to Westbrook Crescent Seal Coating 2019
D3 Twp 532A, RR 274 to RR 280 Seal Coating 2019
D4 RR 274 (Campsite Rd), Hwy 16 to Twp 540 Seal Coating 2019
D1 RR 41, Hwy 16 to Twp 534 Seal Coating 2020
D2 Twp 534, RR 41 to RR 43 Seal Coating 2020
D3 RR 43, Twp 534 to Twp 535 Seal Coating 2020
D4 RR 32 (Duffield Rd), Twp 530 to Hwy 16 Seal Coating 2020
D5 RR 33 (Alberta Beach Rd), Twp 533A to 535 Seal Coating 2020
D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating 2021
D2 Parkland Drive, Hwy 16A to RR15 Seal Coating 2021
D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating 2021
D4 Parkland Drive, RR25 to Hwy 16 Seal Coating 2021
D5 RR 280, Rolling Heights to Douglas Meadows Seal Coating 2021
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION SURFACING PROJECTS F1 Beaver Bay Estates - Krane Watchers Drive, RR 53 to 375m Southeast Subdivision Preservation - ASBC 2018
F2 Cameron Heights - Cameron Dr, Avco Lane Subdivision Preservation - ASBC 2018
F3Cameron Lake Estates - Sherman Dr, Lynn Valley Dr, Ogilvie Dr, Pincherry Lane, Cameron Lake Dr
Subdivision Preservation - ASBC 2018
F4 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Preservation - ACP 2018
F5 Mayfair Heights - Mayfair Dr, Mayfair Cres, Mayfair Pl Subdivision Preservation - ASBC 2018
F6 Panorama Heights - Neumann Crescent Subdivision Preservation - ASBC 2018
F7 Pine Valley Acres III - Spruce Ave Subdivision Preservation - ASBC 2018
F7 Pine Valley Acres IV - Bailey Ave, Pine St, Evergreen Dr Subdivision Preservation - ASBC 2018
F7 Pine Valley Acres - Birch Ave Subdivision Preservation - ASBC 2018
F8 Roslaire Estates - Roslaire Dr Subdivision Preservation - ASBC 2018
F1 Blueberry Hills Estates Subdivision Preservation - ACP 2019
F2 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC 2019
F3 Country Lane Estates Subdivision Preservation - ASBC 2019
F4 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC 2019
F5 Harris Acres - Harris Dr Subdivision Preservation - ASBC 2019
F6 Osborne Acres - Osborne Dr, Osborne Pl, 178m 279th St Subdivision Preservation - ASBC 2019
F7 Pine Wood - Pine Wood Dr, West Rd, East Rd Subdivision Preservation - ASBC 2019
F8 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC 2019
F9 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC 2019
F10 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC 2019
F11 Wesparkdale - Marion Cres Subdivision Preservation - ASBC 2019
F12 Willow Park - Willow Park Drive Subdivision Preservation - ASBC 2019
F13 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC 2019
F1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC 2020
F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC 2020
F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC 2020
F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC 2020
F5 Maude-West Acres Subdivision Preservation - ASBC 2020
F6West Gentry - West Gentry Rd, Parkland Rd & Cres, Lakeview Cres, Hillside Dr, RR11
Subdivision Preservation - ASBC 2020
F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC 2020
F1 Aspen Hills - Aspen Dr, Aspen Place Subdivision Preservation - ASBC 2021
F2 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC 2021
F3 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC 2021
F4 Garden Grove Estates Subdivision Preservation - ASBC 2021
F5 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC 2021
F6 Patricia Hills Subdivision Preservation - ASBC 2021
F7 Pine Valley V Subdivision Preservation - ASBC 2021
F8 Sunset View Acres Subdivision Preservation - ASBC 2021
G0 G. WATER 2018G1 Walker Lake - Lakeshore Waterloop Concept & Land Acquisition 2018
G2 Acheson Zone 4 Reservoir Expansion Design 2018
G1 Acheson Zone 4 Reservoir Expansion Design + Construction (2 years) 2019
H0 H. WASTEWATER 2018H1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Design 2018
H1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Construction 2019
Meridian Business Park
AchesonIndustrialArea
BEACHSEBAS.V.
BETULABEACHS.V.
S.V.KAPASIWINBEACHS.V.POINT ALISON
S.V.LAKEVIEW
WABAMUN
VILLAGE OFSPRING LAKE
STONY PLAIN
SPRUCEGROVE
WABAMUNINDIAN
RESERVENo. 133A STONY PLAIN
No.135
INDIANRESERVE
WABAMUN
LAKE
ISLELAKE
GLADULAKE
BIG LAKE
TOMAHAWK
KEEPHILLS
CARVELDUFFIELD
FALLIS
MAGNOLIA
GAINFORD
ENTWISTLE
18-G2
19-A2
19-G1
21-A1
21-B1
21-A2
21-F6
21-A5
21-D1
21-D5
21-B2
21-F1
21-F5
21-F4
21-D4
21-F3
21-F7
21-F2
21-B3
21-A6
21-A4
21-B421-C2
21-D2
21-F8
21-D3
21-A3
20-B1
20-A120-F7
20-F3
20-F4
20-F6
20-F2
20-C2
20-F1
20-B3
20-B4
20-B2
20-D1
20-D4
20-A3
20-D320-B5
20-F5
20-C3
20-D5
20-A4
20-A2
20-A6
20-D2
20-A5
19-A1
19-B1
19-B4
19-B319-C4
19-F10
19-F9
19-F8
19-F7
19-F2
19-F12
19-A4
19-A5
19-A3
19-F1
19-D1
19-C1
19-F5
19-F13
19-A6
19-D4
19-F3
19-D2
19-F4
19-B2
19-F618-C6
19-C3
19-B519-F11
19-D319-B6
18-H1
18-A1
18-B3
18-A418-G1
18-C5
18-D2
18-D1
18-F518-F4
18-A3
18-F2
18-D4
18-F7
18-B2
18-D3
18-C3
18-F1
18-A2
18-C1
18-F318-B1
18-F8
18-C2
18-A5
18-F6
18-A6
18-C418-A7
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
5T.5
0T.5
1T.5
3T.5
4T.4
9T.5
2
T.55
T.51
T.52
T.54
T.50
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD11
RGE RD11
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
TWP R
D53
0
TWP R
D53
0
TWP R
D53
5
TWP R
D53
5
TWP R
D53
4
TWP R
D53
4
TWP R
D53
3
TWP R
D53
3
TWP R
D52
3
TWP R
D52
3
TWP R
D53
1
TWP R
D53
1
TWP R
D52
2
TWP R
D52
2
TWP R
D52
1
TWP R
D52
1
TWP R
D52
0
TWP R
D52
0
TWP R
D51
3
TWP R
D51
3
TWP R
D51
5
TWP R
D51
5
TWP R
D51
4
TWP R
D51
4
TWP R
D54
0
TWP R
D54
0
TWP R
D52
5
TWP R
D52
5
TWP R
D52
4
TWP R
D52
4
TWP R
D54
2
TWP R
D54
2
TWP R
D51
1
TWP R
D51
1TWP R
D51
2
TWP R
D51
2
TWP R
D54
1
TWP R
D54
1
TWP R
D54
3
TWP R
D54
3TWP R
D54
4
TWP R
D54
4
TWP R
D55
0
TWP R
D55
0
TWP R
D54
5
TWP R
D54
5
TWP R
D51
0
TWP R
D51
0
TWP R
D50
3
TWP R
D50
3
TWP R
D50
5
TWP R
D50
5
TWP R
D50
4
TWP R
D50
4
TWP R
D53
2
TWP R
D53
2
Parkland CountyRoad Program
2018-20210 4 8 12 162
Kilometers
10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/29/2018
Legend2018*2018 - B4201920202021
G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\Output\SBA_R1\Gravel Road Reconstruction Program 2018\RoadProgram2018-2021_Features.mxd
¯
*18-B4 - See Gravel Road Reconstruction Program 2018
1. SURFACED ROAD RECONSTRUCTION
Suggested Guidelines for Criteria Ratings
Rating Criteria 1-2
Guideline 3-4
Guideline 5-6
Guideline 7-8
Guideline 9-10
Guideline
1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?
No Deficiencies Minor Alignment Problems or Sight
Distance Concerns.
Significant Deficiencies Related to
Alignment or Sight Distance, etc.
Major Deficiencies
Major Multiple Deficiencies
2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile
$2,000 to $3,000/mile
$3,000 to $4,000/mile
+$4,000/mile
3) Are Traffic Volumes High? 0-250 251-500 501-750 751-1000 +1000
4) Is this Project of Network Importance to the County?
Access Local Minor Collector Major Collector Arterial
5) Is this Project Environmentally and Socially Friendly?
Major Multiple Impacts
Major Impact Significant Impact Minor Impact Negligible Impact
6) Is there Ratepayer Consensus in the Vicinity of this Project?
Unanimous Opposition
Majority Opposition
Mixed Support/Opposition
Majority Support Unanimous Support
7) Is Construction Technically and Economically Feasible?
Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems
Division Type Between Length Roadway Criteria Ratings
ROAD PROGRAM WORKSHEETUpdated Aug 2017
Surfaced Road Reconstruction List With Ratings
Number Name (km)
Safe
ty &
Sta
ndar
ds
(20%
)Main
tena
nce C
osts
(20%
)Tr
affic
Vol
ume (
25%
)Ne
twor
k Im
porta
nce
(10%
)Fr
iendl
ines
s (10
%)
Conc
ensu
s (10
%)
Feas
abilit
y (5%
)To
tal (
100%
) Comments
5 Reconstruction & ASBC Surfacing TWP 524 Mink Lake Road HWY 770- RR25 3.0 7 10 10 6 5 8 5 8.05 Grant Funding Required3 Widening & ACP Surfacing RR 274 Campsite Road TWP540-SH633 3.2 6 6 8 9 7 8 6 7.10 Grant Funding Required2 Widening & ACP Surfacing RR 274 Campsite Road TWP524-SG 1.6 4 6 10 8 4 8 4 6.70 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR263-270 4.8 5 4 10 7 7 6 6 6.60 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR270-273 4.9 5 4 10 7 7 6 6 6.60 Grant Funding Required4 Widening & ASBC Surfacing TWP 524 79TH Avenue RR12-15 4.8 3 6 10 10 5 6 4 6.60 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR51-53 3.5 4 10 5 8 6 7 5 6.40 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR53-60 5.0 4 10 5 8 6 7 5 6.40 Grant Funding Required
2 & 3 Widening & ACP Surfacing TWP 534 RR 271A to RR 274 6 5 10 4 10 6 5 5 6.35 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 RR 274 to Hwy 779 2.8 6 10 2 10 6 5 4 6.00 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 Hwy 44 to RR 271A 3.5 4 10 2 10 6 5 5 5.65 Grant Funding Required
3 Reconstruction & ACP Surfacing TWP 540 Hwy 779 - RR14 8 7 2 10 6 5 7 4 6.30 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR274-275 1.8 3 5 10 6 6 7 5 6.25 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 41 TWP532-534 1.6 6 4 7 6 8 7 7 6.20 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR275-280 1.7 6 2 8 6 6 7 5 5.75 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 32 Duffield Road TWP520-CN 7.9 8 2 6 9 4 6 4 5.60 Grant Funding Required4 Reconstruction & ASBC Surfacing SRS TWP532 RR13-13A 0.8 10 4 2 4 8 7 6 5.50 Grant Funding Required1 Widening & ACP Overlay TWP 511 Graminia Road RR261-263 3.2 5 2 8 6 6 6 4 5.40 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 SH779-RR280 1.6 4 2 8 6 5 6 5 5.15 Grant Funding Required1 Reconstruction & ASBC Surfacing RR 261 Fleming Road TWP511-512A 2.3 4 3 7 6 4 5 5 4.90 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR260-263 4.8 4 2 6 6 5 5 4 4.50 Grant Funding Required4 Reconstruction & ASBC Surfacing RR 21 Sundown Road CN-Park. Dr. 1.6 7 1 5 4 3 5 4 4.25 Grant Funding Required
2018 Road Program Project
2019 Road Program Project
2020 Road Program Project
2021 Road Program Project Within 10 Years
2. GRAVEL RECONSTRUCTION
Suggested Guidelines for Criteria Ratings
Rating Criteria 1-2
Guideline 3-4
Guideline 5-6
Guideline 7-8
Guideline 9-10
Guideline
1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?
No Deficiencies Minor Alignment Problems or Sight
Distance Concerns.
Significant Deficiencies Related to
Alignment or Sight Distance, etc.
Major Deficiencies
Major Multiple Deficiencies
2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile
$2,000 to $3,000/mile
$3,000 to $4,000/mile
+$4,000/mile
3) Are Traffic Volumes High? 0-50 51-150 151-250 251-400 +401
4) Is this Project of Network Importance to the County?
Access Local Minor Collector Major Collector Arterial
5) Is this Project Environmentally and Socially Friendly?
Major Multiple Impacts
Major Impact Significant Impact Minor Impact Negligible Impact
6) Is there Ratepayer Consensus in the Vicinity of this Project?
Unanimous Opposition
Majority Opposition
Mixed Support/Opposition
Majority Support Unanimous Support
7) Is Construction Technically and Economically Feasible?
Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems
Division Type Between Length Roadway
ROAD PROGRAM WORKSHEETUpdated Apr 2018
Gravel Road Reconstruction Project List With Ratings
Criteria Ratings
Number Name (km)
Safe
ty &
Sta
ndar
ds
(20%
)
Maint
enan
ce C
osts
(20%
)
Traf
fic V
olum
e (2
5%)
Networ
k Im
porta
nce
(10%
)
Frien
dlin
ess (
10%
)
Conse
nsus
(10%
)
Feas
abilit
y (5%
)
Tota
l (10
0%) Comments
5 Full Reconstruction RR 41 TWP534-535 1.6 5 7 8 4 7 7 4 6.40 Grant Funding Required5 Full Reconstruction RR 30 Meso Rd Cantebury Estates North 1.3 7 9 6 8 8 8 6.25 Grant Funding Required5 Gravel Road Reconstruction Program TWP 530 RR25 - RR23 0.6 6 7 7 4 5 5 5 6.00 Grant Funding Required5 Gravel Road Reconstruction Program RR 25 TWP524A-530 0.4 5 7 5 6 7 7 5 5.90 Grant Funding Required5 Full Reconstruction RR 35 Hwy 16 - TWP 533A 2.3 4 5 8 4 5 7 4 5.60 Grant Funding Required2 Gravel Road Reconstruction Program RR 270 Sandhills Rd Hwy 628 to Twp 530 0.8 4 7 8 5 3 4 3 5.55 Funding Required5 Full Reconstruction RR 30 TWP524A-Mayatan 2.6 6 7 4 4 7 6 5 5.55 Grant Funding Required5 Full Reconstruction RR 22 TWP510-511 0.8 9 6 4 3 5 5 5 5.55 Grant Funding Required4 Gravel Road Reconstruction Program TWP 510 Correction Road RR13-20 0.3 5 7 4 4 7 7 5 5.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 522 Hwy 22 to Hwy 759 14.8 5 7 5 8 3 4 5 5.40 Grant Funding Required5 Gravel Road Reconstruction Program RR 22 TWP510-511 1.6 8 8 2 4 5 5 5 5.35 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 Hwy 627 North 500m 0.5 5 7 4 4 6 7 4 5.30 Grant Funding Required
4 & 5 Gravel Road Reconstruction Program TWP 514 Woodbend Rd RR 20 to Hwy 770 4.8 7 8 2 4 5 5 8 5.30 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 TWP512-514 0.5 4 7 4 4 7 7 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR75-80 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR74-75 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction RR 73 South of TWP 534 0.4 9 6 2 4 6 5 4 5.20 Grant Funding Required5 Full Reconstruction RR 42 TWP534-535 1.6 7 4 3 6 7 6 5 5.10 Grant Funding Required5 Full Reconstruction RR 31 TWP531-532 1.9 7 4 4 3 5 8 5 5.05 Grant Funding Required5 Full Reconstruction RR 44 Lakeshore-HWY 16 2.2 5 5 4 4 7 7 5 5.05 Grant Funding Required4 Full Reconstruction TWP 514 RR274-275 1.8 7 6 2 4 6 7 4 5.00 Grant Funding Required5 Full Reconstruction RR 43 Lakeshore-HWY 16 1.8 4 3 7 3 7 6 5 5.00 Grant Funding Required5 Gravel Road Reconstruction Program TWP 524B Railway Ave Duffield Duffield to Edinburgh Park 0.2 6 7 3 4 5 5 5 5.00 Grant Funding Required3 Construction TWP 532 RR13-14 0.8 6 4 4 4 6 7 5 4.95 Grant Funding Required6 Full Reconstruction TWP 530 RR70-71 1.8 6 4 3 6 6 7 4 4.85 Grant Funding Required3 Gravel Road Reconstruction Program TWP 535 Chickakoo Rd RR12 - RR 13 1.8 8 4 4 4 3 5 3 4.75 Grant Funding Required4 Gravel Road Reconstruction Program RR 14 TWP510-512 0.7 5 8 2 4 5 5 5 4.75 Grant Funding Required5 Full Reconstruction RR 24 TWP511-512 1.5 7 4 3 3 6 6 6 4.75 Grant Funding Required4 Full Reconstruction RR 21 TWP512A-513A 1.6 8 6 2 3 4 5 4 4.70 Grant Funding Required6 Full Reconstruction TWP 531A SH759-RR61 2.0 7 3 4 3 5 7 4 4.70 Grant Funding Required3 Gravel Road Reconstruction Program TWP 534 RR280 - RR275 0.3 2 7 3 9 5 5 5 4.70 Grant Funding Required
4 & 5 Gravel Road Reconstruction Program RR 21 TWP511-512 0.7 2 8 4 4 5 5 5 4.65 Grant Funding Required3 Gravel Road Reconstruction Program RR 275 Boundary Rd Westbrook Cres to Twp 534 1.1 5 5 4 4 5 5 5 4.65 Grant Funding Required5 Full Reconstruction RR 31A RR31-TWP520 2.0 8 4 3 3 4 6 4 4.65 Grant Funding Required5 Gravel Road Reconstruction Program Edinburgh Park Subdivison 524B 1.7 4 7 3 4 5 5 5 4.60 Grant Funding Required5 Gravel Road Reconstruction Program Lakeside Park Subdivison RR 25 4.1 4 7 3 4 5 5 5 4.60 Grant Funding Required6 Gravel Road Reconstruction Program RR 75 RR513 to RR511 0.4 4 7 3 4 5 5 5 4.60 Grant Funding Required4 Gravel Road Reconstruction Program RR 275 Twp 512-511 4 8 2 4 5 5 5 4.55 Grant Funding Required6 Full Reconstruction TWP 514 RR81-82 1.6 5 3 4 3 7 6 6 4.50 Grant Funding Required6 Full Reconstruction TWP 524 RR72-73 1.6 4 3 4 5 7 6 6 4.50 Grant Funding Required
1 & 4 Gravel Road Reconstruction Program TWP 510 RR273 (N) - RR 275 (S) 1.1 5 5 3 5 5 5 5 4.50 Grant Funding Required3 Full Reconstruction RR 13 TWP535-540 1.8 8 4 4 3 3 3 3 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 Hwy 627 - Twp 514 3.2 4 5 4 4 5 5 5 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 TWP 514 - 511 0.7 4 5 4 4 5 5 5 4.45 Grant Funding Required6 Gravel Road Reconstruction Program RR 73 TWP514-520 0.2 5 4 4 4 5 5 5 4.45 Grant Funding Required