‘Making you WeatherSMART’
Ms. Mmapula Kgari: Interim Chief Executive Officer06 December 2016
Doc Ref no: SAWS Report Quarter 2 2016/17 – 06 December 2016
PARLIAMENTARY PORTFOLIO COMMITTEE PRESENTATION ON PERFORMANCE OBJECTIVES:
QUARTER 2 OF 2016/17
1
• High Level Structure
• Strategic Goals and Objectives
• Performance Q2, 2016/17
• Financial Performance Q2 2016/17
• Questions
CONTENTS
HIGH LEVEL STRUCTURE
2
HIGH LEVEL ORGANOGRAM
3
4
STRATEGIC GOALS AND OBJECTIVES
Strategic goals
Short Title
Strategic goals
Long Title
Strategic Objectives Goal Statement
Strategic Goal 1:
Provision of Products
and Services
Meteorological Products
and Services that meet the
needs of a weather-smart
nation are provided
1.1 Develop and provide meteorological
and related products and services for
targeted communities nationally
1.2 Develop and market meteorological and
related products and services for specific
economic sectors
1.3 Establish strategic partnerships for
products & services
The impact of climate change is resulting in
an increasing number of extreme weather
events, which impacts on food security, lives
and property. This calls for the development
and provision of innovative products and
services for both commercial and public
good purposes that enable a weather-
smart nation.
Strategic Goal 2:
Capability and Capacity
Developed
Service Delivery
Infrastructure and Human
Capital Capability and
Capacity developed
2.1 Upgrade, expand and optimise
infrastructure
2.2 Position SAWS as employer of choice
2.3 Build a talent pool for atmospheric
sciences as a national imperative
A shortage of skills in weather and climate
related sciences makes it difficult for SAWS
to consistently deliver on its mandate and
achieve its vision. This requires building a
talent pool both in-house and on a national
basis whilst extending and upgrading our
current infrastructure.
5
STRATEGIC GOALS AND OBJECTIVES
Strategic goals
Short Title
Strategic goals
Long Title
Strategic Objectives Goal Statement
Strategic Goal 3:
Engaged stakeholders
Strategic relationships
leveraged and Stakeholders
engaged
3.1 Position SAWS as a
relevant Meteorological
Institution
3.2 Manage and leverage
strategic relationships
SAWS functions in a complex scientific and service environment
where it is essential to maintain and manage stakeholder
relationships to the benefit of both parties. Through the
activities supporting this goal SAWS is committed to effectively
partner, collaborate, manage and leverage its key stakeholder
relations to deliver on SAWS' mandate and objectives and to
ensure its sustainability.
Strategic Goal 4:
Research, knowledge
and intelligence creation
Research, knowledge and
Intelligence created in
support of a weather-smart
nation
4.1 Grow weather and
climate knowledge base
SAWS is mandated to innovate and provide products and
services that are designed to solve real life weather related
challenges. This requires ongoing research to maintain its
technological edge in meteorology and related disciplines.
Strategic Goal 5:
Growth and
sustainability
Revenue growth and
organisational sustainability
achieved
5.1 Grow Revenue
Streams
SAWS is an essential element of South African public life,
contributing to both the country's economic activities and
safety of life. In order to grow while also ensuring that it
remains sustainable, SAWS must establish sustained and high
value sources of revenue to fund its operations.
Achieved Met all requirements(On target)
Partially Achieved
Metrequirements substantially –there may be changes to requirements(Work in progress)
Not Achieved
Met none/some requirements –Requires urgent attention(Off target)
Nomilestone
No set milestone for that period
Information not provided
Information notevaluated at the time of reporting
QUARTER 2 of 2016/17: ACTUAL PERFORMANCE AGAINST PRE-DETERMINED OBJECTIVES
6
INTERPRETATION KEY – ACTUAL PERFORMANCE AGAINST TARGETED PERFORMANCE
7
• 24/29 Achieved Targets (83%) - (24 targets)
• 1/29 Partially Achieved - (1 target)
• 4/29 Targets (13%) -Not Achieved
PERFOMANCE ON OBJECTIVES
Footnote: 2 of the 31 organisational targets didnot require any action during the period under review.
Quarter 2: 2016/17 Performance
83%
3%
14%
Achieved Parcially Achieved Not Achieved
STRATEGIC GOAL 1: PROVISION OF PRODUCTS & SERVICES
8
SO 1.1: Develop and provide meteorological and related products and services for targeted communities nationally
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd
Quarter Target
Achievement/ Challenges /
Corrective measures
% completion of the ‘As
is’ community weather-
smart Needs Analysis
Report across all
targeted communities
for the development of
products and services
to improve weather
resilience
‘As is’ and
community
weather-smart
Needs Analysis
Report (16/17
100% completion of
‘As is’ and community
weather smart Needs
Analysis Report across
all targeted
communities for the
development of
products and services
to improve the
weather resilience
Conduct
community
weather-smart
needs survey
Not Achieved
Draft Terms of Reference Developed
to be discussed with the appointed
resource.
In the process of appointing a
resource to assist with the survey
Number of community
segmented products
and/or services
provided
Community
segmented
products and/or
services in the
market
1 new (not previously
provided) product or
service for a
community segment
Maintain the provision
of 4 existing
community segmented
products and/or
services
Maintain the
provision of 4
existing products
Develop marketing
plan for additional
new products:
SWWS, seasonal
climate forecast,
public weather
forecasts, historic
weather reports
Achieved
Provision of 4 existing products
delivered throughout the quarter.
9
STRATEGIC GOAL 1: Provision of Products and Services
SO 1.2: Develop and market meteorological and related products and services for specific economic sectors
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
Number of sector
specific products
provided
Sector specific
products - Product
Release certificates
Quarterly Reports
3 sector specific
products provided
into the market in
2016/17
Agricultural sector
specific product
Achieved
Historic Heat Units product
developed for the Agricultural
Sector
% Completion of 5-year marketing plans for sector specific products on weather and climate in targeted sectors
5-year marketing
plans for sector
specific products and
services:
2016/17
Agriculture
100% completion of 5-year marketing plan for sector specific products on weather and climate for the agricultural sector
50% completion of 5-
year marketing plan
for sector specific
products on weather
and climate for the
agricultural sector
Not Achieved
In the process of appointing a
resource to assist with the
development of a five-year
marketing plan.
Research on the sector
completed with the UKMO.
Analysis of the findings
underway.
10
STRATEGIC GOAL 1: Provision of Products and Services
SO 1.2: Develop and market meteorological and related products and services for specific economic sectors
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
% Implementation of
annual milestones for
Sector specific 5- year
marketing plans
Sector specific 5-
year marketing
plans
% Implementation of
annual milestones for
Sector specific 5- year
marketing plans: 80%
agricultural sector
40% completion of
sector specific 5- year
marketing plan for the
agricultural sector
Achieved
R1,1m revenue secured from
sales of agro/hydro products.
SO 1.3: Establish partnerships for products and services
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
Number of joint
ventures and
strategic alliances
established
Agreements of
joint ventures and
strategic alliances
1 joint venture & 1
strategic alliance
established
Identify partners for joint
venture and strategic
alliance
Achieved
Aviation: General Aviation and
NRA Commercial Airlines
Pilot phase currently underway.
Engagements with existing
partners to explore potential
growth areas:
GRIP - GIS space
Hydrologic -DWS proposal
Campbell Scientific - equipment
11
STRATEGIC GOAL 1: Provision of Products and Services
STRATEGIC GOAL 2: CAPABILITY AND CAPACITY DEVELOPMENT
12
SO 2.1: Upgrade, expand and optimise infrastructure
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
% Availability of data
Radar
Radar data
availability
Report
Radar data
availability
= 80%
Radar data availability
= 80%
AchievedRadar data availability= 83.84%
Effort to ensure effective maintenance of peripheral equipment, such as air-conditioners, diesel generators and their refuelling, has contributed to the increased availability of the radar
% Availability of data
LDN
LDN data
availability
report
LDN data
availability = 95%
LDN data availability =
95%
Achieved
LDN data availability = 96.89%
Percentage availability
of SAAQIS
SAAQIS
availability
report
SAAQIS availability
= 90%
SAAQIS availability =
90%
Achieved
Q2 SAAQIS availability = 100%
13
STRATEGIC GOAL 2: CAPABILITY AND CAPACITY DEVELOPMENT
SO 2.2: Position SAWS as an employer of choice
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
% implementation of
annual milestones for
the SAWS dual career
pathing programme
Dual career
pathing
programme
implementation
report(s)
Implement
80% of annual
plan/ targets
of the dual
career pathing
programme
30% implementation
of the dual career
pathing programme
Achieved
30% implementation of the dual
career pathing programme
% (increase) in employee capability for core and critical skills
Employee
capability
programme
proposal/
concept
Establish
baseline in
employee
capability
Conduct analysis of
current employee
capability
Not Achieved
Targeted critical functions will be
identified through the OD exercise in
Q3. These functions will then form
part of the capability analysis
% increase in leadership
competency index
Leadership
development
programme
proposal/
concept
Competency
assessments
report(s)
5% increase in
leadership
competency
index
Conduct analysis of
current employee
leadership capability
Achieved
Analysis of current employee
leadership capability conducted
14
STRATEGIC GOAL 2: CAPABILITY AND CAPACITY DEVELOPMENT
SO 2.2: Position SAWS as an employer of choice
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges
/ Corrective measures
% employee retention
rate for core/critical
skills
Employee
retention reports
92% employee retention
rate for core/critical skills
92% employee
retention rate for
core/critical skills
Achieved
92% employee retention
rate for core/critical skills
% achievement of
Employment Equity (EE)
targets as per the
organisational EE plan
EE Plan
EE Reports
74% Africans
3% People With
Disabilities
40% women in core
42% women in
management
100% of EE targets
achieved
Achieved
100% of EE targets
achieved
SO 2.3: Build a talent pool for atmospheric and related science as a national imperative
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges
/ Corrective measures
% completion of the
phase of implementation
of the National
Educational Plan
NEP
implementation
reports
100% completion of
phase 1 of the NEP
Stakeholder engagement
as per the stakeholder
engagement plan for the
NEP
Achieved
Stakeholder engagement
as per the stakeholder
engagement plan for the
NEP
15
STRATEGIC GOAL 2: CAPABILITY AND CAPACITY DEVELOPMENT
SO 2.3: Build a talent pool for atmospheric and related science as a national imperative
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd
Quarter Target
Achievement/ Challenges /
Corrective measures
% Implementation of
annual targets of the
Regional Training Centre
(RTC) strategy
RTC Strategy
Implementation plan
RTC APP
80% of the RTC
APP targets
achieved
60% of the RTC APP
targets achieved
Achieved
Achieved 60% of the RTC APP targets
as per plan
Number of bursaries Report on bursaries
awarded
62 bursaries
awarded
Develop bursaries
marketing plan
Achieved
Developed bursaries marketing plan
Percentage of bursars
absorbed by SAWS in
critical strategic areas
Appointment letters
of absorbed bursars
Contracts of
employment of
absorbed bursars
60% of
bursars
absorbed
N/A No action required for quarter 2
% completion of
Doctoral programme
plan
% implementation of
Doctoral Programme
milestones
Report on progress of
implementation of
the Doctoral
programme
100%
completion of
Doctoral
programme
plan
10% of the
doctoral
programme
annual
milestones
50% completion of
Doctoral
programme plan
Achieved
50% completion of Doctoral
programme plan completed
Doctoral Programme plan
developed with planned activities
16
STRATEGIC GOAL 2: CAPABILITY AND CAPACITY DEVELOPMENT
STRATEGIC GOAL 3:ENGAGED STAKEHOLDERS
17
SO 3.1: Position SAWS as a relevant meteorological institution
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
% completion of
annual targets as set
out in the corporate
communications
strategy
Corporate
communications
strategy.
Progress reports on
the implementation of
the corporate
communications
strategy
Implementation of 80% of annual communications programmes for 2016/17 as per the communications strategy
Implementation of
40% of
communications
programmes as per
the communications
strategy for 16/17
Achieved
• Pipeline development
activities
• Press conference and media
releases regarding
Spring/Summer outlook
Media training for SAWs
employees
Communications and Media
Strategy
In the process of appointing a
resource to assist with the
review of the Communications
and Media Strategy
18
STRATEGIC GOAL 3: ENGAGED STAKEHOLDERS
SO 3.1: Position SAWS as a relevant meteorological institution
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
% (increase) in
traffic volumes on
media platforms
(website/ facebook,
twitter, YouTube)
Reports on traffic
volumes/ hits
(website/ facebook,
twitter, YouTube)
Establish a baseline in
traffic volumes on
media platforms
(website/ facebook,
twitter, YouTube)
Monitor media
platforms to engage
stakeholders
(website/facebook,
twitter, YouTube)
Achieved
Monitored and Maintained the
automated feed on twitter
Established SAWS Facebook
page
In process of identifying content
for YouTube.
Content will be further informed
by the Communications and
Media Strategy
Rand value
Advertising Value
Equivalent (AVE)
(cumulative)
Rand value Advertising
Value Equivalent (AVE)
(cumulative)
Progress reports on
AVE
Media monitoring
reports
Advertising Value
Equivalent (AVE) -
R22m
Achieved
R48 518 972
Ongoing drought associated
with El Nino created, amongst
journalists, an increased
awareness and interest on
weather phenomena19
STRATEGIC GOAL 3: ENGAGED STAKEHOLDERS
SO 3.2: Manage and leverage strategic relations
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
Number of
engagement
programmes for
targeted
stakeholder groups
as per
SES(2016/17)
Stakeholder
engagement plans
Engagement
programmes for
8 targeted
stakeholder
groups(SES)
Engagement
programmes for 2
targeted key stakeholder
groups
Partially Achieved
1 x engagement programme for
Social Responsibility Projects
In process of recruiting a resource
to assist with development of
strategy programme
Overall stakeholder
satisfaction rating
(expressed as a
percentage)
Overall stakeholder
satisfaction rating as
per stakeholder
perception survey
report
Overall
stakeholder
satisfaction rating
- 86%
No action required No action required for this quarter
2
20
STRATEGIC GOAL 3: ENGAGED STAKEHOLDERS
STRATEGIC GOAL 4: RESEARCH AND KNOWLEDGE / INTELLIGENCE CREATION
21
SO 4.1: Grow weather and climate knowledge base
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
% of funds secured
for conducting SEB
study
Funding proposals
Funding
commitments
25% of funds
secured for
conducting SEB
study
SEB study funding
proposal approved
Not Achieved
SEB Proposal drafted. Management
in process of allocating resources.
The SEB funds were not allocated for use in the SEB project by Management/ EXCO as there was no budget for SEB in the 2016/ 17 financial year.
Number of
partnership
agreements for
applications and / or
products
development for
various socio-
economic sectors in
support of the
NCCRP
Partnership
agreement for
applications and /
or product
development
1 partnership
that translates
into applications
or products for
decision making
in modelling
Negotiate with partners
on identified
application/ product
Achieved
Central University of Technology
and Pretoria University
(Department of Geography and
Informatics and Department of
Plant Sciences)-Pretoria University
(Department of Geography and
Informatics and Department of
Plant Sciences)
22
STRATEGIC GOAL 4: RESEARCH AND KNOWLEDGE / INTELLIGENCE CREATION
SO 4.1: Grow weather and climate knowledge base
Key Performance
Indicator
Baseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
National Framework
for Climate Services
(NFCS)
implementation per
key sector
NFCS
Implementation
report
Implementation
of NFCS facilitated
for 3 key climate
sensitive sectors
Implementation of NFCS
for agriculture
Achieved :SAWS has developed
Forecasted Heat units for the
Agriculture Sector
Review of the implementation plan
and consultation with the various
stakeholders will happen at a
Workshop planned for the last
week of November 2016.
Number of peer-reviewed articles published in accredited national or international scientific journals where SAWS scientists are the leading author or co-author.(cumulative target)
Peer- reviewed
articles published
in accredited
national or inter-
national scientific
journals where
SAWS scientists are
the leading author
or co-author
14 publications 7 publications Achieved
8 publications cumulative (see erratum on Q1 report) plus one conference proceeding
23
STRATEGIC GOAL 4: RESEARCH AND KNOWLEDGE / INTELLIGENCE CREATION
STRATEGIC GOAL 5:
GROWTH AND SUSTAINABILITY
24
SO 5.1: Grow revenue streams
Key Performance IndicatorBaseline
2015/16
Target
2016/17
2016/17 2nd Quarter
Target
Achievement/ Challenges /
Corrective measures
Parliamentary grant funding
excluding SAAQIS
MTEF allocation letter
Audited financial
statements
R189,28m R47,32m Achieved
R47,32m
Growth in year-on-year
aviation revenue
Audited financial
statements
R108,37m R22,43m Achieved
R32,80m
Aviation income exceeds budget
for the quarter, mainly due to
increased air traffic volumes
Growth in commercial
revenue as per set target
(annual total revenue)
Audited financial
statements
R18,00m R3,89m Achieved
R5,82m
Due to increased sales across
various product lines,
particularly hydrological
products
25
STRATEGIC GOAL 5: GROWTH AND SUSTAINABILITY
SAWS EMPLOYMENT EQUITY STATISTICS
26
27
Occupational Levels Male Female Foreigners Total
A C I W A C I W
Top management 1 0 0 0 3 0 0 1 5
Senior management
6 0 1 0 4 0 0 2 13
Professionally qualified and experienced specialists
40 3 2 21 17 1 0 7 6 97
Skilled technical and academically qualified workers,
supervisors
60 6 5 23 36 5 2 16 1 154
Semi-skilled and discretionary decision making
42 9 0 7 44 7 1 3 113
Unskilled and defined decision making12 3 0 0 4 0 0 0 19
Temporary Employees 14 0 0 2 13 0 1 0 30
TOTAL PERMANENT
175 21 8 53 121 13 4 29 7
431
SAWS PROFILE AS AT 30/09/16 - EMPLOYMENT EQUITY
28
RaceNational
Demographics
SAWS
Targets
SAWS Actual
Statistics
VarianceSAWS Target versus
Actual
Africans 80.50% 74.00%69.81% -4.19%
Whites 8.30% 14.70%19.33% 4.63%
Coloured 8.80% 8.80%8.01% -0.79%
Indians 2.50% 2.50%2.83% 0.33%
Total 100.10% 100.00% 100.00%
Foreigners 0.00% 0.00% 1.62% -
Employees with Disabilities 2.00% 3% 1.39% -1.61%
SAWS STATS VS THE DEMOGRAPHICS OF SA- EMPLOYMENT EQUITY
FINANCIAL REPORT FOR THE PERIOD ENDING 30 June 2016
29
FINANCIAL REPORT ACTUAL VERSUS BUDGET for the period ending 30 September 2016
Description
2015/16
FULL YEAR
Actual
R
2016/17
FULL YEAR
Budget
R
2016/17
FULL YEAR
Forecast
R
2016/17
YTD
Budget
R
2016/17
YTD
Actual
R
2016/17
YTD
Budget
Variance
R
2016/17
YTD
Budget
Variance
%
Total Revenue 310,333,066 341,356,000 369,788,337 169,713,000 186,492,770 16,779,770 9.89%
Total Expenditure (299,106,873) (341,356,000) (345,549,733) (170,381,278) (154,381,663) 15,999,615 9.39%
Administrative Expenditure (9,919,429) (10,251,459) (9,593,160) (5,169,180) (3,096,902) 2,072,278 40.09%
Compensation of Employees (187,183,858) (222,763,000) (219,261,797) (112,300,000) (102,324,899) 9,975,101 8.88%
Other Operating Expenditure (102,003,586) (108,341,541) (116,694,776) (52,912,098) (48,959,862) 3,952,236 7.47%
Operating Surplus/(Deficit) 11,226,193 - 24,238,604 (668,278) 32,111,107 32,779,385 4905.05%
(before depreciation and amortisation)
Depreciation (26,967,798) (23,964,894) (27,686,680) (11,982,449) (15,704,237) (3,721,788) -31.06%
Amortisation (3,233,246) (4,927,106) (4,444,708) (2,463,553) (2,252,334) 211,219 8.57%
Gains from Fair Value Adjustments 2,625,739 - - - - - 0.00%
(Deficit)/Surplus for the Period (16,349,112) (28,892,000) (7,892,784) (15,114,280) 14,154,536 29,268,816 193.65%
FINANCIAL REPORTREVENUE – Actual versus Budget for the period ending 30 September 2016
Revenue:
Total revenue above budget by R16,78 million (9.89%)
Aviation revenue above budget by 20.39% %(R11,05 million)
Non-Regulated Commercial revenue 14.20 % above budget (R10,28 million)
31
FINANCIAL REPORT EXPENDITURE – Actual versus Budget for the period ending 30 September 2016
32
FINANCIAL REPORT EXPENDITURE – Actual versus Budget for the period ending 30 September 2016
(continued)
ExpenditureTotal Expenditure (excluding Depreciation and Amortisation) amounted to R154,38m which is 9.39% (R16m) below the year-to-date budget of R170,38m.
Administrative Expenditure• below the year-to-date budget of R5,17m by 40.09% (Actual:R3,10m) mainly due to:Training – budget of R1,19m is 35% spent with actual amounting to R411k.Printing Forms and Stationery - budget of R528k is 58% spent with actual
amounting to R306k.
Employee Costs• below the year-to-date budget of R112,30m by 8.88% (Actual: R102,32m) mainly
due to: vacancies which are expected to be filled during the course of the year.
Operating Expenditure • Actual below the year-to-date budget of R52,91m (Actual: R48,96m). :Software Licenses below budget by R2,22 million (timing difference); andSystems Support & Maintenance lower than Budget by R2,34 million
(timing difference) 33
34
Thank you!