36
BA381C/07/en/POD Valid as of: Software version 00.00.16 Operating Instructions Liquiline M CM42 Two-wire transmitter for pH/redox measurement Part 1: Commissioning

Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Embed Size (px)

Citation preview

Page 1: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

BA381C/07/en/POD

Valid as of:

Software version 00.00.16

Operating Instructions

Liquiline M CM42

Two-wire transmitter for pH/redox measurement

Part 1: Commissioning

Page 2: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Overview of documentation supplied

Operating Instructions

The Operating Instructions are split into two parts:

• Commissioning

– Description of your device

– All steps that you have to carry out once only during initial commissioning

• Operation

– Software description

– Trouble-shooting

– All steps that you have to carry out during the routine operation of your device,

depending on your measuring task

! Note!

This part of the Operating Instructions is the documentation on commissioning.

CD-ROM

Contents:

• Fundamentals of pH and conductivity measurement, fieldbuses

• Overview of analytical measuring technology

• Accessories

• Tables

• Applications

• Safety

• Ordering information

In addition

• Adhesive labels:

– Replacement nameplate

– Wiring adhesive label

Page 3: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Endress+Hauser

Liquiline M CM42

Table of contents

1 Safety instructions . . . . . . . . . . 4

1.1 Designated use . . . . . . . . . . . . . . . . . . . . . 4

1.2 Incoming acceptance, transport, storage . . 4

1.3 Installation, commissioning and operation 4

1.4 Operational safety . . . . . . . . . . . . . . . . . . 5

1.5 Return . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1.6 Notes on safety conventions and icons . . . 5

2 Identification . . . . . . . . . . . . . . 6

2.1 Device designation . . . . . . . . . . . . . . . . . . 6

2.2 Scope of delivery . . . . . . . . . . . . . . . . . . . 8

2.3 Reordering documentation . . . . . . . . . . . . 8

2.4 Certificates and approvals . . . . . . . . . . . . . 8

3 Device description . . . . . . . . . . 9

3.1 Housing closed . . . . . . . . . . . . . . . . . . . . . 9

3.2 Housing open . . . . . . . . . . . . . . . . . . . . . . 9

4 Installation . . . . . . . . . . . . . . . 10

4.1 Measuring system . . . . . . . . . . . . . . . . . 10

4.2 Installation conditions . . . . . . . . . . . . . . 11

4.3 Installation instructions . . . . . . . . . . . . . 12

4.4 Post-installation check . . . . . . . . . . . . . . 15

5 Wiring . . . . . . . . . . . . . . . . . . 16

5.1 Electrical connection . . . . . . . . . . . . . . . 16

5.2 Post-connection check . . . . . . . . . . . . . . 23

6 Commissioning. . . . . . . . . . . . 25

6.1 Function check . . . . . . . . . . . . . . . . . . . 25

6.2 Quick Setup . . . . . . . . . . . . . . . . . . . . . . 25

6.3 User administration . . . . . . . . . . . . . . . . 27

6.4 Calibration . . . . . . . . . . . . . . . . . . . . . . . 28

7 Accessories. . . . . . . . . . . . . . . 30

Index . . . . . . . . . . . . . . . . . . . 31

Page 4: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Safety instructions Liquiline M CM42

4 Endress+Hauser

1 Safety instructions

1.1 Designated use

Liquiline CM42 is a two-wire transmitter for liquid analysis in all areas of process engineering:

• Chemical processes

• Pharmaceutical industry

• Food technology

If the device is used for any purpose other than that described, this poses a threat to the safety

of people and the entire measuring system and is thus not permitted.

The manufacturer does not accept liability for damage caused by improper or non-designated

use.

1.2 Incoming acceptance, transport, storage

• Make sure the packaging is not damaged!

Inform your supplier of any damage to the packaging.

Please keep the damaged packaging until any issues have been resolved.

• Make sure the contents are not damaged!

Inform your supplier of any damage to the contents.

Please keep the damaged goods until any issues have been resolved.

• Check the scope of delivery against the delivery papers and your order to ensure it is complete

and nothing is missing.

• Pack the device in such a way as to protect it reliably against impact and moisture for storage

and transportation. Optimum protection is provided by the original packaging materials. In

addition, the permitted ambient conditions must be observed (see Technical data).

• If you have any queries, please contact your supplier or local sales center.

1.3 Installation, commissioning and operation

Observe the following points:

• Installation, commissioning, operation and maintenance of the measuring system must only

be carried out by trained technical personnel.

The technical personnel must be authorized to perform the tasks by the owner-operator.

• The electrical connection may only be established by an electrical technician.

• The technical personnel must have read and understood these Operating Instructions and

must follow the instructions they contain.

• Prior to commissioning the entire measuring point, check that all connections are correct.

Make sure that electric cables and hose connections are not damaged.

• Do not commission damaged products. Protect them against unintentional start-up. Label and

identify the damaged product as defective.

• Faults at the measuring point may only be rectified by authorized and properly trained

personnel.

Page 5: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Safety instructions

Endress+Hauser 5

• If the faults cannot be eliminated, take the products out of service and protect them against

unintentional start-up.

• Repairs not described in these Operating Instructions may only be carried out directly at the

manufacturer's or by the Service Organization.

1.4 Operational safety

The transmitter is designed to meet state-of-the-art safety requirements, has been tested and left

the factory in a condition in which it is safe to operate. The applicable regulations and European

standards have been taken into account.

As the user, you are responsible for observing the following safety regulations:

• Installation guidelines

• Local standards and regulations

1.5 Return

If returning the transmitter, please send it cleaned to your sales center.

Use the original packaging when returning the device.

1.6 Notes on safety conventions and icons

1.6.1 Warnings

1.6.2 Document symbols

#Warning!

This symbol alerts you to dangers.

If the warning is not observed, this can result in serious injury to people or damage

to property.

"Caution!

This symbol alerts you to possible malfunctions resulting from incorrect operation.

If not observed, this could result in damage to property.

! Note!

This symbol indicates important items of information.

È ä 1 This symbol stands for a cross-reference to a certain page (e.g. Page 1).

È å 2 This symbol stands for a cross-reference to a certain graphic (e.g. Fig. 2).

Page 6: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Identification Liquiline M CM42

6 Endress+Hauser

2 Identification

2.1 Device designation

2.1.1 Nameplate

Nameplates can be found:

• On the outside of the housing

• On the packaging

• On the adhesive label sheet provided for your own use

Compare the data on the nameplate with your order.

2.1.2 Serial number and order code

The order code and serial number of your device can be found in the following locations:

• On the nameplate

• Printed under the title drawing of the Operating Instructions

• In the delivery papers

! Note!

• Please note the documentation only contains information that was valid at the time of

delivery. If you have any queries, please contact your local sales center.

• You need the serial number of your device and that of the DAT memory module (inside the

display cover, adhesive label on the module) every time you reorder.

a0003281

Fig. 1: Nameplate information

The nameplate provides you with the following

information on your device:

1. Order code

2. Serial number

3. Device version

4. Measuring range(s)

5. Input, output values

6. Approvals (depending on the version ordered)

7. Protection class

8. Ambient temperature range

9. Approval symbols

10. Safety notices, warnings

Page 7: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Identification

Endress+Hauser 7

2.1.3 Product structure

Sensor input

A No module

C Conductivity, conductive measurement

I Conductivity, inductive measurement

M Digital sensor, Memosens

P pH (glass/ISFET) or redox

R pH (glass/redox redundant) or ISFET

Approval

A Non-hazardous area, CSA GP

G Atex II (1)2 G EEx ia/ib IIC T6 / II 3 D

H Atex II 3G EEx nA II T6

N NEPSI Ex nA II T6

P FM IS NI Cl. I, II, III, Div. 1&2, Groups A?G

S CSA IS NI Cl. I, II, III, Div. 1&2, Groups A?G

T TIIS

Certificate

A Not selected

B Test certificate to EN 10204, 3.1

C Test certificate to EN 10204, 3.1, factory calibration certificate

Output

0 1 current output 4 ... 20 mA, Hart®

1 2 current outputs 4 ... 20 mA, 1x Hart®

2 PROFIBUS PA

3 FOUNDATION Fieldbus

Housing

0 Plastic housing

1 Stainless steel housing 1.4404 (AISI 316L)

Cable entry

0 M20 x 1.5

1 NPT ½"

2 G½

Software

EA Standard version

EB Advanced version

EC Advanced Plus version

Device language

D De/En (Docs, German)

E En/De (Docs, English)

F Fr/En (Docs, French)

S Es/En (Docs, Spanish)

Documentation

0 Installation + operation

Additional fittings

0 Basic version

CM42- Complete order code

Page 8: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Identification Liquiline M CM42

8 Endress+Hauser

2.2 Scope of delivery

• 1 transmitter in the version ordered

• 1 wall securing unit incl. 4 flat head screws

• 1 sheet of adhesive labels (nameplates, terminal connection diagrams)

• 1 Operating Instructions Part 1, BA381C "Commissioning"

• 1 Operating Instructions Part 2, BA382C "Operation"

• 1 CD-ROM with additional documentation

If you have any queries, please contact your supplier or local sales center.

2.3 Reordering documentation

• Reordering documentation (both parts of BA, pdf files):

– Via Internet (www.endress.com/liquiline-documentation)

You need the serial number of your device to reorder items.

You receive the same documentation as received with the delivery.

• Initial ordering of appropriate documentation (both parts of BA, pdf files) for devices which

you have assembled yourself by inserting or replacing modules:

– Via Internet (www.endress.com/liquiline-documentation)

You need the serial number of your device and of the installed modules to reorder items. You

also have to indicate the order code the device corresponds to after installing the module.

You receive the documentation to suit your newly modified device.

2.4 Certificates and approvals

2.4.1 CE mark: Declaration of conformity

With this declaration, the manufacturer guarantees that the product conforms to the regulations

of European Directive 89/336/EEC. This is proven by observing the standards listed in the

declaration of conformity.

! Note!

The EC type-examination certificate can be found under the "Certificates" category on the

CD-ROM supplied.

Page 9: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Device description

Endress+Hauser 9

3 Device description

3.1 Housing closed

3.2 Housing open

a0001068

Fig. 2: CM42 with closed display cover

1

2

3

4?7

8

9

Wall securing plate

Display

Navigator

Soft keys,

assignment depends on menu

Alarm LED

PML terminal

a0002755

Fig. 3: With open display cover (without wiring)

1

2

3

DAT memory modules

CPU module

Transmitter module

4

5

6

DIN rail

Threaded joints

CDI socket (service interface)

2

3

4567

1

9

8

1 2 3

456

Page 10: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Installation Liquiline M CM42

10 Endress+Hauser

4 Installation

4.1 Measuring system

A complete measuring system consists of:

• Liquiline M CM42

• An assembly:

– immersion assembly, e.g. CPA140 or

– flow assembly, e.g. CPA240 or

– retractable assembly, e.g. CPA471

each with or without potential matching pin (PML)

• A pH/redox sensor:

– pH/redox combined electrode, e.g. CPS71 or

– pH?ISFET sensor, e.g. CPS471

• A relevant measuring cable:

– CPK9 (pH)

– CPK12 (ISFET)

a0002122

Fig. 4: Example of a measuring system

1 Liquiline M CM42

2 pH cable CPK9

3 pH/redox sensor

4 Retractable assembly CPA471 (manual version)

1

23

4

Page 11: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Installation

Endress+Hauser 11

4.2 Installation conditions

4.2.1 Dimensions

a0001073–en

Fig. 5: Dimensions

145

/5.7

1

134

/5.2

8

110

/4.3

3

132.5 / 5.22

136.5 / 5.37

160

/6.3

0

134.5 / 5.30

136.5 / 5.37

26 /1.02

174 / 6.85

174

/6.8

5

10/

0.3

9

3/0.1

2

220 / 8.66

95

/3.7

4

mm / inch

Page 12: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Installation Liquiline M CM42

12 Endress+Hauser

4.2.2 Mounting plate

4.2.3 Weather protection cover

! Note!

When installing outside, always use the weather protection cover (see 'Accessories', CD-ROM)

to protect the transmitter against rain and snow.

a0001676?en

Fig. 7: Weather protection cover

4.3 Installation instructions

4.3.1 Wall or field mounting

There are many ways of mounting the device:

• Wall mounting

• Mounting on a vertical pipe or post (round or square)

• Mounting on railing or on a horizontal pipe (round or square)

a0001075–en

Fig. 6: Mounting plate

320

/12.6

0

270 / 10.63

mm / inch

300 / 11.81

Page 13: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Installation

Endress+Hauser 13

! Note!

You require the field mounting kit to mount on a pipe or post. This is an accessory and is not

included in the scope of delivery (see "Accessories").

a0002161

Fig. 8: Mounting on a vertical pipe/post

1 CM42 (as delivered, incl. a mounting plate)

2 Securing screws (part of the field mounting kit, see Accessories)

a0003090

Fig. 9: Side view

3 Mounting plate (field mounting

kit)

4 Pipe or post

a0002163

Fig. 10: Mounting on a horizontal pipe/railing

1 CM42 (as delivered)

2 Securing screws (field mounting kit)

a0003091

Fig. 11: Side view

3 Mounting plate (field mounting

kit)

4 Pipe or railing

1 2

34

1

4 3

2

2

3

1

4

1

4 3

2

Page 14: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Installation Liquiline M CM42

14 Endress+Hauser

4.3.2 Panel mounting

! Note!

• For panel mounting, you need the installation kit consisting of tensioning screws and a front

seal. This is an accessory (see "Accessories") and is not included in the scope of delivery.

• If installing the units above one another, you must observe a minimum distance for the

cable glands of the upper device.

• If installing the units beside one another, you must observe a minimum distance for opening

the front of the housing.

• If arranging in a square, you must take into account the lengths of the mounting plates at the

rear of the device or the cable glands for minimum spacing distance.

a0002165

Fig. 12: Wall mounting (optional weather protection cover)

a0002396?en

Fig. 13: Panel mounting several devices above one another: left side view, right front view

Page 15: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Installation

Endress+Hauser 15

4.4 Post-installation check

• After installation, check the transmitter for damage.

• Check whether the transmitter is protected against moisture and direct sunlight.

a0002630?en

Fig. 14: Panel mounting several devices next to one another: left side view, right front view

Page 16: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Wiring Liquiline M CM42

16 Endress+Hauser

5 Wiring

5.1 Electrical connection

# Warning!

• The electrical connection may only be established by an electrical technician.

• The electrical technician must have read and understood these Operating Instructions and

must follow the instructions they contain.

• Prior to beginning any wiring work, make sure voltage is not applied to any of the cables.

5.1.1 Opening the housing

1. Loosen the four screws on the front with a Phillips screwdriver:

2. Open the housing with the aid of the suction button supplied:

" Caution!

Do not use any sharp or pointed objects, such as a screwdriver, knife etc., to open the housing.

Otherwise, you might damage the housing seal, scratch the housing etc.

Page 17: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Wiring

Endress+Hauser 17

5.1.2 Housing grounding

" Caution!

You must connect the outer ground connection of the housing to the foundation ground with a

separate 4 mm2 line (GN/YE).

5.1.3 Cable grounding in housing

! Note!

• If possible, only use terminated genuine cables.

• Ground all the cables in the housing of the transmitter as shown in the following diagrams

(sample cable, does not necessarily correspond to the original cable).

a0003616

Fig. 15: Grounding the housing

1

2

Outer ground connection

4 mm2 line (GN/YE)

1

2

Page 18: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Wiring Liquiline M CM42

18 Endress+Hauser

5.1.4 Cable terminals

a0002679

Fig. 16: Terminated cable (example)

1 Outer shield (exposed)

2 Cable cores with ferrules

3 Cable sheath (insulation)

a0002680

Fig. 17: Inserting the cable

4 Grounding clip

a0002681

Fig. 18: Grounding the cable

(functional

ground)

a0003602

Fig. 19: Opening the terminal

1. Insert a suitable screwdriver into the opening

of the terminal spring (square opening) until

the stop.

a0003603

Fig. 20: Inserting the cable

2. Insert the terminated cable end into the

terminal opening (round opening).

a0003604

Fig. 21: Releasing the terminal spring

3. Remove the screwdriver. Make sure the cable

is securely positioned in the terminal.

1 2

3

4

Page 19: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Wiring

Endress+Hauser 19

5.1.5 Signal output / power supply

! Note!

Connect the transmitter with two-wire cabling shielded on both sides.

5.1.6 Sensor connection

Explanation of abbreviations in the following diagrams:

! Note!

• Cable colors indicated as per IEC 757 (see CD–ROM).

• You must connect shielded connections and terminals with functional ground ()) (there is

no protective ground (*) for plastic housings).

a0002379

Fig. 22: View in device (CPU module)

a0001092

Fig. 23: Wiring diagram

Abbreviation Meaning

pH Signal from pH membrane glass

Ref Signal from reference electrode

Src Source

Drn Drain

PM Potential matching

ϑ Signal of the temperature sensor

d.n.c. Do not connect!

+

23

42

33

23

22

31

13

41

33

13

21

31

133

134 +

133

134

4..

.2

0m

A

Page 20: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Wiring Liquiline M CM42

20 Endress+Hauser

With PML (symmetrical)

Glass electrodes

a0002385

Fig. 24: View in device (sensor module)a0001079

Fig. 25: Wiring diagram

PM

BN

GN

WH

YE

31

73

18

32

03

16

31

5111

11

311

23

19

112

113

111

320

318

317

BK

BN

BK

BN

GN

WH

YE

CPK9

318

320

112

113

111

317

CM42

319

316

315

J

PM

Ref

pH

Sensor

CPK1

Page 21: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Wiring

Endress+Hauser 21

ISFET sensors

a0002380

Fig. 26: View in device (sensor module)a0001076

Fig. 27: Wiring diagram

PM

BN

317

318

320

316

315

111

113

112

319

GN

WH

YE

112

113

111

320

318

316

BK

BN

RD315

BK

BN

GN

WH

YE

CPK12

317

318

112

113

111

319

CM42

315

316

320

RD

Src

J

Ref

PM

Drn

Sensor

Page 22: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Wiring Liquiline M CM42

22 Endress+Hauser

Without PML (asymmetrical)

Glass electrodes

a0002386

Fig. 28: View in device (sensor module)a0001080

Fig. 29: Wiring diagram

d.n.c.

BN

31

73

18

32

03

16

31

5111

11

311

23

19

BK

GN

WH

YE

112

113

111

317

BN320

BK

BN

GN

WH

YE

318

320

112

113

111

317

CM42

319

315

316

CPK9 / CPK1

J

d.n.c.

Ref

pH

Sensor

pH

CPK1

Page 23: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Wiring

Endress+Hauser 23

ISFET sensors

5.2 Post-connection check

Device condition and specifications

1. Are the transmitter and cables free from damage on the outside?

Electrical connection

2. Are the mounted cables strain relieved?

3. Are the cables run without loops and cross-overs?

4. Are the signal lines correctly connected in accordance with the wiring diagram?

5. Have you positioned unused connection wires on the "EMC barrier"?

a0002381

Fig. 30: View in device (sensor module)a0001077

Fig. 31: Wiring diagram

BN

317

318

320

316

315

111

113

112

319

GN

WH

YE

112

113

111

320

316BK

RD315

d.n.c.

BN

BK

BN

GN

WH

YE

317

318

112

113

111

319

CM42

315

316

320

RD

Src

Ref

Drn

J

d.n.c.

CPK12 Sensor

Page 24: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Wiring Liquiline M CM42

24 Endress+Hauser

6. Are all the connection wires securely positioned in the cable terminals?

7. Are all the cable entries installed, tightened and sealed?

# Warning!

Only put the transmitter into operation if you can answer yes to all these questions. Otherwise,

safe operation cannot be guaranteed. In such instances, the manufacturer does not accept any

liability for the device.

Page 25: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Commissioning

Endress+Hauser 25

6 Commissioning

6.1 Function check

# Warning!

• Check that all connections have been established correctly.

• Make sure that the supply voltage matches the voltage indicated on the nameplate!

6.2 Quick Setup

1. Connect the supply voltage.

2. Wait for the initialization to be complete.

3. Completely work through the "Quick Setup" submenu in "PARAM".

6.2.1 Menu structure

6.2.2 Configuration options

PARAM

Quick Setup

Language

TAG number

Measurand

Potential matching

Sensor type (only pH)

Internal buffer entry (only if sensor type = "Glass (internal buffer entry)")

Damping

Temperature sensor

Temperature unit

Buffer manufacturer

Temperature compensation

Current output 1

Output value

Low value (4 mA)

Up value (20 mA)

Function Options Info

Language Options

• English

• Language ordered

Factory setting

Language ordered

! Note!

""Language ordered" refers to the language that you

selected for your device using the order code ("device

language").

If you select the other language in question, all the

other settings remain intact.

TAG number Enter any text

Page 26: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Commissioning Liquiline M CM42

26 Endress+Hauser

Measurand Options

• pH

• ORP mV

• ORP %

• rH

Factory setting

pH

Potential matching Options

• With PM

• Without PM

Factory setting

With PM

Indicate whether you want to measure symmetrically

(= with PM) or asymmetrically (= without PM).

! Note!

More information on symmetrical and asymmetrical

measurement on the CD-ROM.

Sensor type pH Options

• Glass 7.0

• Glass (internal buffer entry)

• ISFET

• Antimony

• Ceramic

Factory setting

Glass 7.0

"Ceramic" stands for electrodes with a

high-impedance reference (= Pfaudler electrodes).

Internal buffer entry –2.0 ... 16.0 pH

Factory setting

7.0

Only available if you have selected "Sensor type" =

"Glass (internal buffer entry)".

Damping 0.0 ... 60.0 s

Factory setting

0 s

Time constant

A value of 5.0 s means that the measured values are

interpolated over the period of 5 seconds.

Temperature sensor Options

• None

• Pt100/Pt1000

• NTC 30K

Factory setting

Pt100/Pt1000

If "Pt100/Pt1000" is selected, the system automati-

cally detects whether a Pt100 or Pt1000 is connected.

Temperature unit Options

• °C

• °F

Factory setting

?C

Buffer manufacturer Options

• E+H (NIST)

• Ingold/Mettler

• DIN 19267

• DIN 19266

• Merck/Riedel

Factory setting

E+H (NIST)

The menu is not available unless the buffer

recognition is set to "Automatic" or "Fixed" in the

PARAM/CAL-settings menu. The factory setting is set

here during initial commissioning.

You can define special buffers in the

PARAM/Cal-settings menu.

Function Options Info

Page 27: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Commissioning

Endress+Hauser 27

6.3 User administration

To protect the device against unwanted or unauthorized access, you can assign an access code

to the menu.

! Note!

The factory setting for the access code is an empty field (= no entry). The prompt to enter a

password is deactivated. Configuration is possible for everyone.

Assigning/changing access codes:

1. Go to PARAM menu, "General settings"/"User administration".

2. Select the type of protection:

– No password protection (=factory setting).

– Password protection per code entry.

3. If you select "Enter code", select the user role and assign a password to each of the user

roles.

Temp. compensation Options

• Auto. comp. (ATC)

• Man. comp. (MTC)

• Off

Factory setting

Auto. comp.

Temperature entry –20 ... +150 °C

Factory setting

25 °C

Only available if you have selected "Temperature

compensation" = "Manual comp.".

Current output 1

Output value Options

• Main measured value (1)

• rH

• Sensor mV (1)

• Temperature

Factory setting

Main value

Low value (4 mA) –2 ... 11.5 pH or

–700 ... +400 mV

Factory setting

2 pH

Specify the measured value that should correspond to

the 4 mA or 20 mA value.

The smallest possible spread between4 mA and

20 mA value is:

1 for pH, 1 mV for ORP mV

Up value (20 mA) –1.5 ... 16 pH or

–600 ... +700 mV

Factory setting

12 pH

Function Options Info

Page 28: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Commissioning Liquiline M CM42

28 Endress+Hauser

6.3.1 User roles and access authorization

If the password protection has been defined and activated, you have to log in with the

appropriate user role before you can make changes to the settings in the menu.

Here, you will be prompted by the device to enter an access code as soon as you want to

configure a value:

User roles and access authorization (factory setting):

! Note!

If you are logged in as the "Specialist" (=Administrator), you can change the access

authorization of all other user groups:

1. Select a submenu where you want to assign authorization to, or take authorization from,

another user group.

2. Press and hold down the navigator button for at least 3 seconds.

The display shows all the user groups and the current access authorization to the menu

selected.

3. Use the navigator to change the authorization in question and confirm with "OK".

4. Make a note of the changes in your operating logbook or similar.

6.4 Calibration

Calibration is necessary:

• At initial commissioning

• After replacing a sensor

Maintenance team Specialist Operator

• Read access in the PARAM and

DIAG menus

• Read and write access in the

calibration menu

• Read and write access in all menus

• Change the access authorization

for other user groups

• Read access in the PARAM and

DIAG menus

• Read authorization in the

calibration menu

Page 29: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Commissioning

Endress+Hauser 29

• After periods of standstill

• At sensible, process-dependent intervals1).

6.4.1 Types of calibration

• Automatic buffer recognition (only pH):

– "PARAM"/"Sensor"/"Cal-settings"/"Buffer manufacturer" or

"PARAM"/"Quick Setup"/"Buffer manufacturer"

– You select the buffer type (e.g. DIN 19266).

– The device automatically recognizes the buffer during calibration.

• Fixed buffer (only pH):

– "PARAM"/"Sensor"/"Cal-settings"/"Buffer recognition"

– You select two buffer solutions from the menu.

• Manual:2)

– You enter the buffer values during calibration.

• Numeric input:

– "PARAM"/"Sensor"/"Cal-settings"/"Type of calibration"

– You enter the slope, zero point and temperature (for pH).

– You enter the mV value (for ORP).

6.4.2 Calibrate

Proceed as follows to calibrate the sensor:

1. Go through the menu "Param"/"Quick Setup" completely 3).

2. Remove the sensor from the process.

3. Clean the sensor.

4. Press the soft key for "CAL".

5. Follow the instructions in the menu.

6. Finish calibrating by switching back to the measuring mode.

7. Install the sensor back into the process.

Your measuring point is now ready for operation.

! Note!

• If calibration is aborted using ESC, or if the calibration is faulty, the system continues to use

the original calibration data. A calibration error is shown as plain text on the display.

• During each calibration, the device automatically switches to Hold (factory setting).

• Any offset set is automatically deleted after accepting the calibration.

1) Depending on the process conditions, the intervals can range from several times daily to once quarterly.

2) Not available during initial commissioning if you are working with the factory settings.

3) Only for initial commissioning

Page 30: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Accessories Liquiline M CM42

30 Endress+Hauser

7 Accessories

• Field mounting kit

– 1 Mounting plate

– 2 Securing screws

Order No. 51518286

• Panel installation kit

– 1 Panel installation seal

– 2 Tensioning screws M6x150 mm

– 4 Hexagonal nuts M6, DIN934 A2

– 4 Spring washers, A2 DIN127, form B6

– 4 Washers A6.4, DIN125 A2

Order No. 51518284

! Note!

The CD-ROM supplied provides you with all the relevant information on all the accessories,

including descriptions, graphics and ordering information.

Additional accessories include:

• Sensors

• Assemblies

• Calibration solutions

• Cleaning solutions

• Pressure-reducing valves

• Water filters

• Additional documentation

Page 31: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Endress+Hauser

Liquiline M CM42

Index

AAccess authorization

Change . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

User roles. . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Access code

Factory setting . . . . . . . . . . . . . . . . . . . . . . . 27

Accessories. . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

CCable grounding . . . . . . . . . . . . . . . . . . . . . . . . 17

Cable terminals . . . . . . . . . . . . . . . . . . . . . . . . 18

Calibrate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

CE mark. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Check

Electrical connection . . . . . . . . . . . . . . . . . . 23

Function . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Post-installation . . . . . . . . . . . . . . . . . . . . . . 15

Commissioning. . . . . . . . . . . . . . . . . . . . . . . 4, 25

Connecting ground. . . . . . . . . . . . . . . . . . . . . . 17

Connection

Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

With PML . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Without PML . . . . . . . . . . . . . . . . . . . . . . . . 22

DDeclaration of conformity . . . . . . . . . . . . . . . . . . 8

Designated use . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Documentation

Methods of ordering . . . . . . . . . . . . . . . . . . . . 8

EElectrical connection . . . . . . . . . . . . . . . . . . . . 23

Power supply . . . . . . . . . . . . . . . . . . . . . . . . 19

Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Signal output . . . . . . . . . . . . . . . . . . . . . . . . 19

Transmitter . . . . . . . . . . . . . . . . . . . . . . . . . 16

Electrical technician . . . . . . . . . . . . . . . . . . . . . 16

FFactory setting

Access code . . . . . . . . . . . . . . . . . . . . . . 27–28

HHousing

Closed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Open . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Housing grounding . . . . . . . . . . . . . . . . . . . . . . 17

Housing opening . . . . . . . . . . . . . . . . . . . . . . . 16

IIcons

Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Identification

Nameplate . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Serial number. . . . . . . . . . . . . . . . . . . . . . . . . 6

Incoming acceptance . . . . . . . . . . . . . . . . . . . . . 4

Installation . . . . . . . . . . . . . . . . . . . . . . . . . . 4, 10

Installation instructions

Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . 11

Panel mounting . . . . . . . . . . . . . . . . . . . . . . 14

Wall or field mounting . . . . . . . . . . . . . . . . . 12

MMeasuring system. . . . . . . . . . . . . . . . . . . . . . . 10

Mounting plate. . . . . . . . . . . . . . . . . . . . . . . . . 12

NNameplate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

OOpening the housing . . . . . . . . . . . . . . . . . . . . 16

Operation

Safety instructions . . . . . . . . . . . . . . . . . . . . . 4

Operational safety. . . . . . . . . . . . . . . . . . . . . . . . 5

PPost-installation

Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Power supply . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Product structure . . . . . . . . . . . . . . . . . . . . . . . . 7

QQuick Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

RReturn . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Page 32: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42

32

SSafety conventions and icons. . . . . . . . . . . . . . . . 5

Scope of delivery. . . . . . . . . . . . . . . . . . . . . . . . . 8

Sensor

Connection with PML . . . . . . . . . . . . . . . . . 20

Connection without PML . . . . . . . . . . . . . . . 22

Electrical connection. . . . . . . . . . . . . . . . . . . 19

Serial number . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Signal output . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Symbols

Document . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

TTransport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Types of calibration. . . . . . . . . . . . . . . . . . . . . . 29

UUse. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

User administration. . . . . . . . . . . . . . . . . . . . . . 27

User groups . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

User roles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

WWarnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Page 33: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42

Endress+Hauser

Page 34: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Index Liquiline M CM42

34 Endress+Hauser

Page 35: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

Liquiline M CM42 Index

Endress+Hauser 35

Page 36: Part 1: Commissioning - 天健水务集团(杭州 ...€¦ · Part 1: Commissioning. ... – All steps that you have to carry out once only during initial commissioning ... H Atex

www.endress.com/worldwide

BA381C/07/en/POD

Printed in Germany / FM+SGML 6.0