Audit PlanYM-ARP-95-10Page 1 of 4
OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT
QUALITY ASSURANCE AUDIT PLAN
FOR AUDIT YM-ARP-95-10
OF
THE REYNOLDS ELECTRICAL AND ENGINEERING COMPANY, INC.
LAS VEGAS, NEVADA
JUNE THROUGH 9,1995
Prepared by:nthia A. Humnries
Audit Team LeaderYucca Mountain Quality Assurance Division
Approved by: '0~ Donald G. Horton /DirectorOffice of Quality Assurance
Date.
Date: I 9/I h
PDR WASTE PR
Audit PlahiYM-ARP-95-10Page 2 of 4
1.0 SCOPE
This audit of the Reynolds Electrical and Engineering Company, Inc. (REECo) willbe conducted by a team of auditors from the Yucca Mountain Quality AssuranceDivision (YMQAD). The audit will consist of a limited scope audit of threeQuality Assurance (QA) program elements and a performance based audit of aspecific element as specified below.
The limited scope programmatic audit will evaluate the effectiveness of the REECo_ procedures-thatimplement-QAirogranmElements.1S0, "Nonconformances," 16.0,
"Corrective Action;" and 18.0, "Audits."
The performance based audit will evaluate the effectiveness of.selected productsand processes related to REECo activities supporting the corrective action processincluding QA Program Elements 2.0, "QA Program," 5.0, "ImplementingDocuments," and 17.0, "QA Records."
2.0 AUDIT SCHEDULE
Pre-audit Team/Observer Meeting 8:30 a.m., June 5, 1995Las Vegas, Nevada
Pre-audit Conference 9:00 a.m., June 5, 1995Las Vegas, Nevada
Audit Activities 10:00 a.m. to 4:00 p.m.June 5, 1995
8:00 a.m. to 4:00 p.m.June 6 through 8, 1995
8:00 a.m. to 11:30 a.m.June 9, 1995
Post-audit Conference 1:00 p.m., June 9, 1995Las Vegas, Nevada
There will be a daily Audit Team/Observer meeting at 4:00 p.m. to review auditprogress. Beginning on Tuesday, June 6, 1995, there will also be a daily AuditTeam Leader (ATL)/Observer/REECo management meeting at 8:15 a.m. tocommunicate audit progress, to discuss potential deficiencies and to establishneeded liaison.
Audit PlanYM-ARP-95-10Page 3 of 4
3.0 REQUIREMENTS TO BE AUDITED AND APPLICABLE REFERENCES
The requirements to be audited will be contained in programmatic and performancebased checklists. These checklists will be developed from the latest availablerevision of REECo's approved and issued QA program procedures, study plans,technical procedures and the performance objectives established and agreed uponwith REECo.
The conduct of the audit will be guided by the dociments (latest revision) listedbelow:
* Quality Assurance Procedure (QAP) 18.2, "Audit Program"* QAP 16.1, "Corrective Action"
4.0 ACTIVITIES TO BE AUDITED
The following QA program elements will be audited to determine the degree ofcompliance to REECo's implementing procedures:
15.0 Nonconformances16.0 Corrective Action1 8.0 Audits
The audit team will also conduct a performance based audit of activities supportingthe corrective action process including program elements 2.0, QA Program," 5.0,"Implementing Documents," and 17.0, QA Records."
A performance based audit evaluates products and activities to determine the degreeto which they meet program requirements and management commitments andexpectations. This evaluation of process effectiveness and product acceptabilitywill be based upon:
* Satisfactory completion of the critical process steps* Acceptable results and quality of the end products* Documentation that substantiates quality of products* Performance of trained and qualified personnel* Implementation of applicable QA program elements
5.0 AUDIT TEAM MEMBERS
Cynthia A. Humphries, YMQAD, Las Vegas, Nevada, Audit Team LeaderPatout H. Cotter, YMQAD, Las Vegas, Nevada, AuditorSam H. Horton, YMQAD, Las Vegas, Nevada, AuditorAlan W. Rabe, YMQAD, Las Vegas, Nevada, Auditor
Audit PianYM-ARP-95-1CPage 4 of 4
6.0 AUDIT CHECKLISTS
The following checklists will be used during the audit:
YM-ARP-95-10-01, Programmatic ChecklistYM-ARP-95-10-02, Performance Based Checklist
MISCELLANEOUS
COCRWM AUDIT NO. YM-ARP-95-10 OF REYNOLDS ELECTRICAL AND ENGINEERING COMPANY, INC.
MON A TUESDAYi 616 WEDNESDAY, 617 SITE THURSDAY 618 F: L0fRIDAY.: 619
8:15 MANAGEMENT MEETING (AS NEEDED)
10:00 -11:30 8:00 -11:30 8:00 -11:30 8:00 -11:30 8:00 - 11:30
16 P. COTTER 16 P. COTTER 16 P. COTTER 16 P. COTTER16 A. RABE 16 A. RABE 16 A. RABE 16 A. RABE FOLLOW-UP18 S. HORTON 18 S. HORTON 15 S. HORTON 15 S. HORTON
&
CLOSE-OUT
11:30 -12:30 LUNCH 1:00POST - AUDIT
12:30 - 4:00 12:30 - 4:00 12:30 - 4:00 12:30 - 4:00 CONFERENCE
16 P. COTTER 16 P. COTTER 16 P. COTTER 16 P. COTTER16 A. RABE 16 A. RABE 16 A. RABE 16 A. RABE18 S. HORTON 18 S. HORTON 15 S. HORTON 15 S. HORTON
4:00 DAILY DEBRIEFING
C C
L
I QUALITY ASSURANCEDEPARTMENT
William J. GlasserManager
I* CA Spctst I (DOE Liason) S. J. LofflMd I * Sr Staff Assist. R. L Bred* Sr Secretary -B. A. Kogans
I I I I.
QUALITY PROGRAMS& ENGINEERING . I PROCUREMENT
QUALITY I FIELD QUALITYCONTROL A
* Section Chief. (Vacat* Sr OA Spclist - P. J. Wilson (Lead)* Sr Engineer - (Vacn)* Sr QA Spcfist - V. J. Barish Jr.* Sr CA Spcilst - J. E. Ferguson.
* Section Chief .W. J. Grata* Sr OA Spclst -D. S. Haa* Sr A Spclst -J. C. Constable* Sr CA Spcllst - A. R. Matr* Sr QA Spdlst - (Vacant)* QA Spdst n - (Vacant)* Sect n - K.T Headington
* Section Chief -. A. Hackbert* Sr CA Spcilst - F. J. Ruth* Sr CA Spcllst - (Vacant)* Sr OA Spcist - M. V. Adklns* QA Spcllst n - D. L Kirby.
* QC Secton Chief -W. C. Pugrnr* secretary n -(vacanm)* Office Assistant n-C. A. Smit* Sr CA Spcfflst - E. R. Mouser*s Sr CA Spcdst -C. 0. Osbom e* Sr CA Spdflst - E. K Williams* QA Spcfld N -s.s. Rics* CA Spcffs It -W. K Johnson* QA Spc n - J. R. Sleve* Comst. Inspeetor - (Vacant)* Const. nspector D. L Buit* Const. inspector R. 0. Cnz* QA Spcllst Il- J. K Devers* CA Spenlst 11-0. J. Schu acher* OA Spclis 1n - T. E. Wilson
NOTE: SaMng lewis dependent on FY95 Budget.(March 22, 1995)
May 9Jr95
WNM
REECo YU CC4' )UNTAIN PROJECTTELt JNE LIST r
PTON am ROM PiONB M/8 ROOM 7AM PHOR M/8 ROOM NAME
ADRINS. MICHAEL V ...... 4-S331ALLEN, JOSN R .......... 5-4990APPRILL, KAREN ......... 4-7003
ARNOLD, JES ........ . 4-725
BAISE, VICTOR J. . 4-7243
BARKER, MARION C ....... 4-7190
BOORCIER, DONALDM ..... 4-1962BOYD, DAVID C .......... S-6019
VROD, ROBIN L .......... 4-7299BUSICK, DAVSD L ........ S-SS21
CCOW, JOSEPH A......4-7311
CONSTABLE, JUA-CARLOS.4-S199COMLLO, A ......... 5 -5340CROSSLEY, PATRICIA J... 5-3429
CUEZ, XPF 0......... 5-3673CURLER, JOYCE . ....... 47560
DvPPERN DALE ........ 5 -6056DAVENPORT, CRTr N ...... 5-s596
DORSTY, JO . ....... 4-7537
406 1111-BOAC750 R 111-E8?406 1145-rOAC408 1116-BOAC
408 1122-BOAC406 1113-BOAC408 1120-POAC750 R 112-EST406 1110-OAC730 OC TRAILER
408 1119-OAC403 1107-BOAC750 FR 103-ESP735 R265-POC730 QC TRAILR403 1125-BOAC
751 166-POC750 R 102-ES?407 P106-BOAC
JAKoS, PATRICIA J ...... 5-5428JOHNSON, WILLIAM H ..... 5 -7344JOYCEF JAMS .......... 5-6069
EARUTI, JOHN J ........ 4-7304XXITI.!, STEPI ...... -7259KELLNER, DCK .......... 5 -0196ET, CLIPORD D ........ 5 -5933KILUx, LINDA A ......... 4-7378KIT DBORAH L ....... 4-7790rNOTT, RYEM I3R ......... 4-7193FROX, SA-RON ......... 5-6011ROSS, DANIX L L......... 4-751
LEOMORD, THOMAS ...... 5-59e3LIMOW, KRISTIa L ...... 4-7306LOPsTErLD, SCOTT J ..... 4-5330LUPIANT, JOYCE X ....... 5 -4861
751 W138-?oC730 A-25 BATCH751 136-Poc
408 1120-OAC750 RH 106-BP404 LOSE RD735 265-FOC406 1121-BOAC403 1111-BOAC408 1114-BOAC750 ES? PAD
403 1125-BOAC
750 R 101-ES?408 1125-BOAC408 R 5-P250751 W133-FOC
RUTH, FREDERICK J ...... 4-7319 403 1111-BOAC
HsURTTE, ROBERT P...5-6045 750 ER 105-Es?SCHUMACRER, GALYN J....--4620 406 W235 FCnrNoleTON, RANDY A..-..4-7312 408 1119-BOACSEVERS, JACK It ........ 5-5522 730 QC TRAILER
510IO9, TONY P ........ 5-5529 750 R 110-ES?SMITH, CRAIO A ......... 5 -3676 730 W235 FC
SNYDE, TA JO ........ 4-7909 523 P220-BOACSORENSEN, VAL L ........ 5 -6040 735 W142-FOC
sTOWE, JDDTN A ........ 4-7300 408 1113-BOAC
SDAY, RAY ............ 5 -4750 404 LOSER RD
TUR-AROD, DSK ... 4-7324 1123-BOACTHOMPSON, FARBARA S....5-6705 764 R 4-4314TREDER, PAULA ......... 5-2061 404 IO9E RD
DEREAN, MARGARET AM ... 4-7003 400 1146-BOAC
VEWasOUEI, RISTI L....4-7321 406 1143-BOAC
rYm11JSD RABICD ..... 5 -5333 750 R 111-ES?
PASS & J ..........ED 4-7320 406FERUSION, J. EARL ...... 4-1958 403FIELDS, RIAN ......... 4-7362 406
1123-BOAC1122-BOAC1145-BOAC
FINNEY, DMS J ........ 5-6706 7S0 R 110-US?Fox, RYAN a ............ 5-56s41 750 FM 103-ES?FRANCIS, MICeL ....... 5-5625 764 M 2-4314VORTEM, ROBERT C ....... 5-7669 764 R 5-4314
OGADELLA, DR R ...... 4-7309 406 1115-BOACGILL, PAT .............. 5-2742 404 OSRE RDOLASSR, WILLIAM ..... 4-7562 406 1100-BOACORACT, CYNTH ........5.-6077 751 W136-FOCORAUTE, WILLIX, J ..... 4-7316 406 1107-BOACoRIFFITH, ROERT ........ 5-9634 406 1119-BOAC
AS, DAVID * ......... 4-7317 403 1107-BOACBACKERT, DAVID A ...... 4-7315 406 1111-DOACHANINWAY, DIANE C ...... 5-3674 735 XSF-CON?InoMn, MM J....... 4-1959 406 1146-BOAC
MMRPER, MARY A ......... 5-9e7 750 ES? PADMrADINOToW, ARMN ... .4-7299 406 1110-BOACEDLUND, JOm P ......... 5-535 750 R 105-ES?
OMINICU, hXd ......... 5-9613 406 1119-BOACRnE, ME .......... 5-6037 74 R 3-4314HICKS, LO R ......... 4-7329 409 1115-3OACrOMMS, BEVERLY A.....4-7790 406 1110-BOACHURGSa, SXAD! ........ 4-7192 400 1114-BOAC
JACKSO, ELLA J ........ 5-6798 725 W169-FOC
MADwOS, 10R1T W ....... 4-7327 423 P07-3010MA&R3, TOD ........... 4-5366 406 1145-BOACNAXTEAS, SHILY ....... 5-0745 404 ZOSM RDMTTrws, CNTA L .... 4-7030 406 1140-BOAC
SaTURA, ADOLPH ...... 4-5196 406 1137-BOACMCCwEY, Om .......... 5-769 764 R 5-4314MCCACKE, KE ........ 5-5017 404 LOSER DM2CEAD, ROBERT C ..... 4-7363 406 1115-BOACMCDONALD KBR2LY .... 4-7959 406 1113-80ACMCGOLDRICK, omn ....... 5-2007 404 LOSE RDNISMMOTT, BRIAN J ....... 5-5070 750 R 104-ES?MILITELLO, LORAI E ... 5-6093 750 ESF PADMOULDER, MARJORIE D .... 4-7498 427 1109-BOACMOUSER, VER R ........ 5-5521 730 QC TRAILER
WNTA, CANDIDA ....... 4-7163 407 P106-301CNINEYTYSK, TAD C ....... 5-4990 750 R 105-SFNIES CR, BAIS ?....... 4-7257 406 1112-BOACNORRS, LINDA P ........ 5-4345 761 W139-FOC1USD, LORA N .......... 5-9613 408 1147-30C
WASSOW, BARRY .......... 5-5064WATSON, MARJORIE R . 4-7069WEINTRAUB, STEEN B.... 4-7310WEST, JON W .5-6676WEETBY, JESSE A . 4-1957WILLIAM, BETTY C . 4-7702WILLIAMS, 31a191 K. 5-3697WILLIAM9, AMUEL N . 5-9656WILSON, PRRT .. 4-7051WILSON, THOMAS . 5-S-5522.WTST, W ............... 5-7203WONVERLY, DAVIDM ...... 5-6076WOODARD, JOYCE ........ 4-7697
404 LOR FD406 1109-OAC406 1115-DOAC764 ER 8-4314403 1145-OAC406 1113-BOAC730 W235-FOC406 1115-BOAC406 1122-3OAC730 QC TRAILER764 R 1-4314751 136-FOC523 P220-BOAC
ZIE3, MUSAN A ......... 4-7328 402 1112-BOACZOBENICA, ROBERT ...... 5-6072 750 R 109-ESP
O'NILL, MNICHIL W ..... 5-6149OLSO', CRYSTAL L ........ 4-73230RN, ClRLES DAVID.5-3694
"MIMINTO, OM i ...... 5-5984PRESSMAN, VIVIAN ....... 5-4824TZ, JOHN ........... 5-6011PUIIRE, WESLEY C ...... 5-3696
2R2Me, CURT V ......... 5-5019RICKS, TEVE8 S 9........ 5-5522RO MS1, LERAY X ...... 4-7563ROMMSL, ROBERT I ....... 5-6008ROOSA, BARBARA AM ..... 4-5332
750 R 113-EF406 1143-BOAC730 W235-FOC
750 R 103-RS?404 LOSER RD750 ESF PAD730 W235-FOC
404 LOSER RD730 W235-FOC408 1141-BOAC750 ER 107-ES?407 P106-BOAC
Bank of AmericaRoom 1123 (BOA)ES&H (A25)
4-73225-96365-4814
FACSMOM R
Drilling (FOC) 5-4840 Kiewit(LV)Const Pad 5-6041 Kiewit PadProcurement (LvM 5-1 R65
5-23195-5657
IF THERE ARE ANY CHANGES/ADDITIONS,PLEASE CALL THE DIVISION OFFICE
AT 4-7560
May 914)5
IIAU\ *PONE M/8 ROOM
ADKINS, MICHAEL V ...... 4-5331 408 1111-DOAC
ALLEN, JOHN R ........ 5-4990 750 3M ll-ESPAPPRLL, KAREN ........ 4-7003 408 1145-BOAC
AXNOLD JS. M .7 ....... 4-725 408 1116-DOAC
BAR3SH, VICTOR J., JR ..4-7243 408 1122-BOAC
BAR3R1 , MRON 1 ........ 4-7198 408 1113-BOAC
BOURCIER, DONALD K ..... 4-1962 408 1120-BOAC
BOYD, DAVID C .......... 5-6019 750 RN 112-ZBP
BROD, ROSN L .......... 4-7299 408 1110-BOAC
BV8ICK, DAVID L .. . -SS21 730 QC TRAILER
0330031, O8S3P1 A......4-7311 408 1119-0OACONs TABL, J.UN-7CNLOS.4-5199 406 1107-DOAC
COSTELLO, PAUL ......... 5-3840 750 RN 208-38?CROSSL03, PATRICIA J ... -3429 735 2265-FOC
CROS, Op 0......... 5-3678 730 QC TRAILICUFLZ3 p J3YC3 N . ....... 4-7560 408 1125-BOAC
DAPPERN, DALE D ........ 5-6056 751 W166-FOC
DAYVNPORT, CATERYS .... 5-59s5 750 RN 102-ZAP
DOSEY, MARY .. ...... 4-7537 407 P106-UOAC
XTrEAEDSE oRACI ..... 5-533 750 RN 111-ZIP
PAxxS, D J .......... 4-7320 406 1223-3030
PIKoTHOM, J. ZARL ...... 4-1958 408 1122-BOACFIELDS, BRXA 8 ........ 4-7362 408 1145-3031129, D J ........ 5-6706 750 RN 110-Z0PFOX, RYAN a...5.-5... 6-S@41 750 RN 108-ZIP13ANCI8, MICHAEL ....... 5-5625 764 RM 2-4314FURTEM, 03T3 c ....... 5.5-769 764 RN 5-4314
ARVDELLA, JIDCR R .......4-7309 408 1115-BOCGILL, PAT .........-. 5-2742 404 L011 RDaLR.8mM, WILIAM J ...... 4-7562 408 1108-BOACORACI, CnTHIA M ....... 5-6077 751 W138-FOCGRATA, WILLIAM, J ..... 4-7316 400 1107-BOACGRIFFITH, ROBRT ....... 5-9634 400 1119-BOA0
SlAM, DAVID S ........ 4-7317 409 1107-DOACIACIDIRT, DAVID A ...... 4-7315 406 1111-BOACNXN20WAY, DAE C ....... 5-3674 735 ZAP-CONPHANS3N, DONIE J ........ 4-1959 406 1146-3OA3fuRPlR, MRY A ....... 5-5907 750 ZIP PADRRADIIIOT0, SIN T .... 4-7299 409 1110-BOAC3131MND, J ......... 5-5885 750 RN 105-ZIPZ3D4L ERI, C ......... 5-9613 409 1119-BOACREM, J53S L ......... 5 -6037 764 R1 3-4314RIMN, LENN R ......... 4-7329 406 1115-BOACHOMNS, BEVERLY A ...... 4-7790 406 1110-3O1HUGHE1, ANDI L ........ 4-7192 406 1114-3AC
JAMCBON, JLLA J5...... 5-6798 725 W169-FOC
REMko Y UclAAd"UN IAIN PROJnCr1TELIt )NE LIST
to"E PRo N/S ROOM 511M3, PATRICIA J ...... -5428 751 W138-OCJ0NSON, WILLIAM a ..... 5-7344 730 A-25 BATCHJOYCE, Jm R ......... S-6069 751 136-POC
ZAT12NG, .O0N J ........ 4-7304 406 1120-BOACxxTM.Y, PN P . 5... 5-7259 750 IN 106-ZP3nCu1m, DI ............ 5-0196 404 LO813 RD
KEY, CLIPFORD D ..... 5-5933 735 2265-POC7.0L32MLINDA A ...... 4-7378 408 1121-BOAC
RINEY, DORAH L......4-7790 406 1111-BOACRNO0?, R I 3......... 4-7193 408 1114-DOACKN01, 8am-RON .........5-6011 750 ZJP PADROSS, D4I1L ......... 4-7561 408 1125-BOAe
LORMD, THOMAS N......5-5983 750 RN 101-ZIPLIMON, KRITDM L ....... 4-7306 406 1125-BOACLOF.TPLD, SCOTT J ..... 4-5380 408 RN 5-P250LPrA s, OYCE ....... 3.5-4661 751 W1136-10
RMDDOR, ROBERT W......4-7327 425 P107-BOACNAM33, TO ........... 4-5366 408 1145-BOACNATHAB, SmILEY ....... 5-0745 404 O1.0 RDMATT3RWS, CYNTHIA L .... 4-7030 406 1140-BOACMAURA, ADOLPH RN...... 4-5198 406 1137-BOAC
0CCLOSI1 JIM ......... 5 -7669 764 Kx 5-4314NCCRACKER, MKe-...0....5-17 404 LO0 RDMCCREY OMT C .....RM 4-7363 408 1115-BOACMCDOAxW, I11B11hLY J...4-7959 400 1113-BOACNMGOLDR3IK, JO0N ....... 5 -2007 404 LOSr1 DMMMOT, BIAN J ....... s-s70 750 RN 104-ZIPKILIZLW0, 0 LOKA20R Z...5-s093 750 ZIP PADMOULDER, MJORIE D .... 4-7496 427 1109-BOACMOUSE1, VXRT ........ . 5-5521 730 0C TRAILER
1.S0on, CNDIDA ...... 4-7183 407 P106-9OAC121MYJ1XX, TD C ....... 5 -4990 750 RN 105-ZIP
NmZT8CH, N I L ........ 4-7257 406 1112-1OACMORRIS, LInDA P ........ 5-4345 761 W139-OCNUDD, LORA K .......... 5-9613 408 1147-BOAC
O*1L1 M.C, EL W ... 5-6149 750 RN 113-ZIPOLSO0 , CRYSTAL L... 4-7323 406 1143-BOACOSBORNE, C03311 DAVSD.5-3694 730 W235-0oc
PERKNOnTOI, ER . 5-594 750 FM 103-IPPRESSMAN, VIVIAN . ...... 5-4624 404 LOSER3 EDPSUX, Jo M ........... 5 -6011 750 ZIP PADP1OR 3, WSLZY C....5-3696 730 W235-F10
R3110N, CURT V .5-5019 404 LOS3 RDRICKS, STMEY a . 5 -5s22 730 V23S-1OCROBINS, LINRAY . 4-7563 406 1141-BOACR0MMEL, 3OBE3T . 5-6008 750 RN 107-ZAPROOSA, BARBARA AM ..... 4-5332 407 P106-BOAC
NAME ROnre M/S ROOM PRKU?, PRDrRsC J......4-7319 408 1111-BOAC
SCRUETTI, RO1R P ..... 5 -6045 750 RN 105-ZIPSCHUMACER, LYN J .... 5-4620 406 W235 POCBHI2ur"ETOa, RANDY A .... 4-7312 408 1119-BOACSIZVERI, JACK R ........ 5-5522 730 QC TRAILERS1MMNS, TOMI P ........ 5 3-529 750 RN 110-Z8PSMITH, RAIGa ......... A-3678 730 W235 PoeSNDER, nTAJO ......... 4-7909 523 P220-BAC80331321 VAL L ........ 5 -6040 735 W142-OCSTOWE, OD!?S! A-.----4-7300 406 1115-BOACRUMDAY, RAY ............ 5 -4750 404 LO0R3 RD
TURN-AROUND, DK ...... 4-7324 1223-9OACTOMPSO3, BABARA 8 .... 5-6705 764 RN 4-4314TRSDER, PALA .......... -2061 404 LOfRR RD
03R1RN, MA1GART AM ... 4-7003 406 1146-BOAC
VZTABQWE, YJXBTI L.... 4-7321 406 1143-BOAC
WASSOI, BARRY . .........5 -5064 404 LOSIX RDWATSO, MARJORIE ...... 4-7069 406 1109-BOACWEINTRAU, STEVEN F .... 4-7310 406 1115-BOACWEST, JO0N w ........... 5-6676 764 FM 8-4314WZSTOY, J98 A . .4-1957 406 1145-BOAC1LLSAMS, PETTY C .... 4-7702 406 1113-BOACWILLIAMS, LMER ....... 5 -3697 730 W235-FO0WILLIAMS, SAU1 M ..... -658 406 1115-BOACWnLo0, 1rR3 J .. .. 4-7051 406 1122-BOACWILSON, THS B ........ 5-5522.730 QC TRAILERWIT?, JW.............. 5-7203 764 R 1-4314WONDEULY, DAVID M ... 5-6076 751 1136-100WOOD1RD, JOC 1 ........ 4-7697 523 P220-BOAC
ZXXES, SUSAN A . ... 4-7326 409 1112-BOACZOORKICk, ROBERT ! ..... 5-6072 750 IN 109-ZAF
IF THERE ARE ANY CHANGES/ADDITIONS,PLEASE CALL THE DIVISION OFFICE
AT 4-7560
Bank of AmericaRoom 1123 (BOA)ES&H (A25)
4-73225-96365-4814
FACO XIME I31 5
Drilling (OC) 5-4840 Kiewit(LV)Const Pad 5-6041 Kiewit PadProcurement (LV) 5-1865
5-23195-5657
15.18
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 1 OF 9
AXXXTiSURVEILLANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKUST
ORGANIZATION EVALUATED[x EXTERNAL I AUDIT
REECo[ INTERNAL ISURVEILLANCE PREPARED BYP. Cotter, A. Rabe DATE 5/12/95
DATES OF EVALUATION
June 5-9, 1995
CONTROLLING DOCUMENT (Title. Number, Revision) ACTMTY EVALUATED
QARD, DOE/RW-0333P, Revision 2
REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
N. of verification, personnel contacted
Checklist numbering is indexed to attached performancebased audit flowchart.
1.1-1 Review training records for 6 individuals (3 of whichare not in QA/QC) to ensure they are trained to
I CATE RE S CO MR SISFACY NSLE (-NA
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 2 OF 9AUDITISURVEILLANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKUST (continuation sheet)
REMARKSTEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method
___________________O.___________________________________ of veri ation,personnel contacted ____co ta tea
1.1-2 Interview 6 random employees to determine:
- Is there a negative connotation to initiating a DNfor an activity?
- Who is responsible for initiating a DN?- Are other methods used other than a DN?- Is LN/CAR process felt to be effective in
resolving problems?
k�z�� 4; 6-� 4�-/' ;K Az4,,"�
'"'Wt
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 3 OF 9AUDITJSURVEILUANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKUST (contInuatlon sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verklication, personnel contacted
1.1-3 Review the following records for potential CAR conditions:
- Audits- Surveillances
- Monthly Progress Reports- Inspection Reports
1.1-4 Are conditions adverse to quality identified?
Determine how much DN are initiated by other than QA/QC.(review .Ns, IRs, SRs, AR., and PRsI
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 4 OF 9AUOITiSURVEILLANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, methodRESULTS
.____ _____________________________________________ of verification, personnel contacted 1.2-1
2.1
Are verification activities performed to identify
conditions adverse to quality of activities affecting quality?(suppliers, contractors, and REECo)
Have personnel who perform cause determinationattended formal training? review training records)
I. -
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 5 OF 9
AUDITASURVEILLANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSNEM CHARACTERISTICS TO BE EVALUATED Record objective evience reviewed, method RSULTS
of verification, personnel contacted2.2-1
2.2-2
Are significant conditions classified and criteria forclassification adequate? review reports and procedure)
Is the cause of significant conditions determined andare actions taken to preclude recurrence? (review reports)
- I. I
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 6 OF 9AUTSURVEILLANCE
No Y-ARP-95-10-02
QUALITY ASSURANCE CHECKUST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RSULTS
of verification, personnel contacted
2.2-3a Are conditions adverse to quality investigated by
responsible management? (review reports and correspondence)
2.2-4 Are stop work orders issued when required?
& I.
K>
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 7 OF 9
AUDITURVEILLANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSNO. . . of verification, personnel contacted
2.2-5 Do procedures include quantitative or qualitativecriteria for evaluation of adverse conditions for root cause?
3.1 Are conditions adverse to quality corrected as soon aspractical?
7OFFICE OF CIVILIAN
RADIOACTIVE WASTE MANAGEMENTU.S. DEPARTMENT OF ENERGY
WASHINGTON, D.C.
PAGE 8 OF 9
AUDITISURVEILLANCE
NO YM-ARP-95-10-02
QUALITY ASSURANCE CHECKLST (continuation sheet)
REMARKSNEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method SULTS
of verlication, personnel contacted
4.1-1
4.1-2
Does the Quality Assurance Organization concur withactions taken on adverse conditions?
Does the Quality Assurance Organization performfollow-up assessments to verify that the action takento prevent the recurrence is effective?
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 9 OF 9
AUDITiSURVEPLANCE
NO M-ARP-95-10-02
QUALITY ASSURANCE CHECKUST (contInuation sheet)
REMARKSITNEO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method ESULTS
of verication, personnel contacted
5.1
5.2
Is the trending of conditions adverse to quality effective?
Is the number and type of adverse conditions reportedrepresentative of an effective QA Program?
a a
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON D.C.
PAGE 1 OF 35
AUDTURVEILLANCE
NO YM-ARP-95-10-01
QUALTY ASSURANCE CHECKUST
ORGANIZATION EVALUATED[x] EXTERNAL [x AUDIT
REECO [ IINTERNAL ISURVEILLANCE PREPARED BY Sam H. Horton DATE 5/23/95
DATES OF EVALUATION
June 5-9, 1995
CONTROLLING DOCUMENT (Tkle, Number, Revision) ACTIVITY EVALUATEDProgram Elements 15, 16, 18
ITEM REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
Cindy Humphries - ATLPat Cotter - AuditorSam Horton - Auditor
Alan Rabe - Auditor
* INDICATE RESULTS: SATISFACTORY (SAT), UNSATISFACTORY (UNSAT), NOT APPLICABLE (N/A)
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
___ _ ,-
PAGE 2 OF 35
AUDTISURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, metod RESULTS
of verication, personnel contacted
1.
2
EFICIENCY NOTICES (DN - C-11.1 (Revision 4)
erify that any observed condition adverse to quality is
eported via a DN by REECo Personnel.
(MC-ll.1, Paragraph 5.1)
Verify that the REECo Quality Assurance Officer (QAO)
evaluates DNs and:
Initiates a Corrective Action Request (CAR) for
significant conditions; (C-11.1; Paragraph 6.2.2)
I) Initiates a Nonconformance Report INCR) for
material deficiencies and closes the N. INC-l1.1;Paragraph 6.2.3)
- ' I L
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 3 OF 35AUDITISURVEILLANCE
No YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSNO. of verication, personnel contacted
3 lerify that if the DN is valid and is not a CAR or NCR,he QAO issues the DN to the responsible manager.(MC-ll.I; Paragraph 6.2.4)
4 lerify that for invalid Ws, the originator is notifiedb receiving a copy of the DN, and thatrationale/criteria is provided on the N which explainshy the is invalid. (MC-.1; Paragraph 6.2.5)
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 4 OF 35AUDITJSURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSof verification, personnel contacted
5 Verify that upon receipt of the rU, the Responsible Organization:
a) evaluates the impact the completed work bedetermined and documented.
b) documents on Page 2 of the K
Block 10A - Remedial ActionBlock 10B - Apparent CauseBlock 10C - Measures to Prevent Recurrence
(MC-l1.1; Paragraphs 6.3.1.1 and 6.3.1.2)
�I. I. I.
<-I
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 5 OF 35AUDITISURVEILUANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuatlon sheet)
ITEM ~~~~~~~~~~~~REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RSULTS
of verification, personnel contacted
6
7
Verify that if the corrective action cannot be completed,ithin 30 days of DN issuance the interim steps to beiccomplished and the datels) for those interim steps areidentified in Blocks 10A and lOC of the N form.
IMC-11.1; Paragraph 6.3.1.3)
lerify that if the N response is not provided on orbefore the due date noted on the DN, that a request forextension is provided to the QAO on a DN Continuation Sheetrior to the due date. MC-l1.l, Paragraph 6.3.1.4)
- .1 £ .1
K-
OFFICE OF CIVIUANRADIOACilVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 6 OF 35
AUDITISURVEILLANCE
NO Y-ARP-95-10-01
QUALlTY ASSURANCE CHECKLIST (continuation sheet)
REMARKSTEOM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSof verification, personnel contacted
Verify that when proposed corrective action is accepted,~he QAO documents concurrence by:
checking the yes' box in Block 12signing and dating Block 12, andreturning a copy of the rN to the responsible organizatior
(MC-1l.1, Paragraph 6.4.41
Verify that after the corrective action is complete theQAO performs verification of corrective action and documentsobjective evidence reviewed and signs and dates the N in3lock 13. (NC-11.1; Paragraphs 6.7.1 and 6.7.2)
�-I. I.
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 7 OF 35
AUDITDSURVEILLANCE
No YM-ARP-95-lO-0l
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSNEOM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
10
11
12
erify that the PQAM approves the DN closure by signingBlock 13. (MC-11.l; Paragraph 6.7.3)
Obtain a sample of closed W1s that affect quality andverify they can be retrieved from the Records system.IMC-l1.1; Paragraph 7.1.1)
Verify via the DN Log the W1s are numbered such that N-XX-M.KX = Year initiatedNYY = Next sequential number
(mC-11.l; Paragraph 6.1.3)
I I.
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 8 OF 35AUDRISURVELLANCE
No Y-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method ESULTS
of verification, personnel contacted
1
2
MoRRECTIVE ACTION, MC-11.3, Revision 2, ICN 1
verify that an evaluation is done of Ns, NCRs, and trendsto determine if a CAR should be originated. MC-11.3,
Paragraph 6.1)
lerify that for each CAR the responsible organizationevaluates the following:
impact on completed workroot causemeasures to prevent recurrence
(MC-11.3, Paragraph 6.3.1.3)
4 4
K>-
OFFICE OF CIVLIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 9 OF 35AUDIT/SURVEIUANCE
NO Y-ARP-95-10-01
QUALITY ASSURANCE CHECKUST (continuation sheet)
ITEM_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ JiREM A RKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
. ____________________________________________ of verrication, personnel contactedVerify that the response to a CAR is received in 30 days,bas a scheduled completion date. MC-11.3, Paragraph 6.3.1.3)
lerify that CARs are submitted to Records Management aslifetime records. (MC-11.3, Paragraphs 6.7 and 7.1.1)
- a I. b
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 10 OF 35AUDITISURVEILLANCE
No YM-ARP-95-10-01
QUALITY ASSURANCE CHECKUST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSITNEOM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
_ _ _ _ _ _ _ _ _ _ _ of verification, personnel contacted
MRENDING - C-11.4 (Revision 2)
1 Verify that the following documents have been evaluatedfor trending purposes:
1LI Corrected on the Spot (COTS) conditions fromaudits and surveillances.
HI NCRsi) CARsa) DOE CARs DCAR)
(MC-11.4; Paragraph 6.1.1)
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 11 OF 35AUDITiSURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKUST (continuation sheet)
REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, metod RSULTS
of verification, Personnet contacted
2
3
lerify the existence of a tracking and trending database.(MC-11.4; Paragraph 6.1.2)
Jerify the tracking and trending database includes the following:
I1 Report Type (COTS, DN, CAR, NCR, DCAR)Report Number
:1 Issue or Identification date1) Responsible Organization) Deficient Item or Activity) Subject of deficiency) Apparent or Root Cause
(NC-11.4; Paragraph 6.1.2)
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 12 of 35
AUDITSURVEILLANCE
No Y-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSof verilcatbn, personnel contacted
erify that the QAO reviews the trending database on aarterly basis. (MC-11.4; Paragraph 6.1.3)
erify that when an adverse trend is identified, the QAOnitiates a N or CAR. (IMC-11.4; Paragraph 6.2.1)
erify that the QAO issues a quarterly trend evaluationreport with results of trend evaluation sent to YMP
anagement. (NC-11.4; Paragraph 6.2.2)
£
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON; D.C.
PAGE 13 OF 35AUDMSURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSNO. d verxication, personnel contacted
7 lerify that cognizant management promptly takes action toresolve any identified adverse trends. (C-1l.4;Paragraph 6.2.3)
I-\
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 14 OF 35AUDISURVEILLANCE
No YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
__________________________________________ of verification, personnel contacted-ONTROL OF NONCONFORMANCES - YAP-15.1Q (Revision 1)
Select a sample of NCRs internal to REECo (i.e., do not
zross organizational boundaries) and verify the following:
1 k detailed description of the nonconforming
Drovided - including:
condition is
X) Requirement violatedI Equipment/Hardware name)1 Location
I) Data Affected) Supplier
(YAP-15.1Q; Paragraph 5.1.1a)
L .5
-i
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 15 OF 35AUDITISURVEILLANCE
NO Y-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
The initiator has completed Block 1 and 2 of the NCR form.IYAP-15.lQ; Paragraph 5.1.1b)
The initiator applies a Hold Tag to the item that isliscrepant. (YAP-15.1Q; Paragraph 5.l.ld)
rhe initiator ensures segregation (when pratical by?lacing the item in a clearly identified hold area.(YAP-15.lQ; Paragraph 5.1.1el
£ I.
<-I
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 16 OF 35
AUDIT/SURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (contlnuatlon sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
5 ~ Ferify that the REECo NCR Coordinator logs the NCRaumbers into the NCR LOG and Tracking System (systemsupplied by YMSCO for universal tracking of YMP NCRs).(YAP-15.1Q; Paragraph 5.1.2a)
6 7erify the NCR Coordinator forwards the NCR to theSpecifying Organization's (SO) QA representative via theSO's NCR Coordinator. (YAP-15.1Q; Paragraph 5.1.2d)
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 17 OF 35
AUDIDSURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method
of verication, personnel contacted
7
8
erify the SO's QA organization determines whether the
onconformance is quality or non-quality related and*dicates by checking box 3. (YAP-15.1Q; Paragraph 5.l.3a)
petermine if any REECo initiated NCRs have beeninvalidated. If yes, verify the NCR Coordinator:
a) updates NCR LogI) retains copy of invalid NCR
C) sends copy of invalid NCR to orginator
(YAP-15.4Q; Paragraph 5.1.4
.. a
K>
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 18 OF 35
AUDITiSURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSNEOM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
. _ _ _ _ __ of verification, personnel contacted
9 Verify that the Dispositioner of the SO:
a) specifies the Disposition Evaluation and providesinformation relative to the disposition in Block 4.
b) if conditional release CR) is proposed,annotates the CR box and provides justification
and any limitation in Block 4.
signs and dates Block 5 of NCR.
(YAP-l5.lQ; Paragraphs 5.2.2 e, d, f, )
a
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 19 OF 35
AUDMISURVEILLANCE
NO Y-ARP-95-10-01
QUALITY ASSURANCE CHECKUST (continuation sheet)
ITFEM ~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSof vedrication, Personnel contacted
10 Verify that the SOs QA personnel:
a) signs and dates Block 6, indicating concurrenceof the disposition.
b) performs a Reportability Review per Attachment9.5 and checks the appropriate box in Block 6.
forwards NCR to the Performing Organization POIand sends a copy to NCR Coordinator.
(YAP-15.lQ; Paragraphs 5.2.3 c, d, )
S
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 20 OF 35
AUDITISURVEILLANCE
No YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKS[TEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
.O* of verllication, personnel contacted
11 erify that the PO:
performs the disposition and signifiescompletion by.signing and dating Block 7.
if CR is granted, ensures the Hold Tag ismodified to reflect the specific conditions
relative to the CR.
C) sends NCR to the PO's QA organization.
(YAP-15/1Q; Paragraph 5.3.1)
- A A
OFFICE OF CIVIUAN PAGE 21 OF 35
RADIOACTIVE WASTE MANAGEMENT AUDITISURVEILLANCE
U.S. DEPARTMENT OF ENERGY NO Y-ARP-95-10-01WASHINGTON, D.C.
QUALITY ASSURANCE CHECKUST (continuation sheet)
REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective vidence reviewed, method RESULTS
. _______________________________________________________ of verification, personnel contactedontacted12 Verify that the PO's QA or the SO's QA:
I) verifies all actions have been completed bysigning and dating Block 7.
ensures removal of Sold Tag.
I) sends NCR to the SO.
(YAP-15.1Q; Paragraph 5.3.2)
13 Verify that the SO's QA:
I performs final review and indicates acceptance bycompleting Block 8.
sends the completed NCR to the NCR Coordinator.
K>-~'
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 22 OF 35
AUDITJSURVEILLANCE
NO Y-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evience reviewed, method RESULTS
of verification, personnel contacted
14 lerify the NCR Coordinator:
ii updates the NCR Log
I) sends original NCR to LRC/DRC.
(YAP-15.lQ; Paragraph 5.3.5)
Verify that for repair' or 'use-as-is dispositions,:echnical justification for the acceptability of aionconforming item, is specified. IYAP-15.1Q; Paragraph 6.1.3)
15
a a
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 23 OF 35
AUDETURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verifcation, personnel contacted
16
17
Verify that the organization (by name) responsible forperforming the disposition action is identified in thelisposition. YAP-15.1Q; Paragraph 6.1.6)
3btain a sample of Q NCRs that cross organizationalBoundaries and verify that REECo adequately implementsapplicable requirement of this procedure. YAP-15.lQ;applicable sections)
.a a.
:;.-
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 24 OF 35AUDISURVEILLANCE
NO YM-ARP-95-10-01
QUAUTY ASSURANCE CHECKLIST (continuatIon sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verrlcation, personnel contacted
%DITS C-13.0 (Revision 41
1
2
lerify that audits of each applicable section3rogram is conducted within one year from the:revious audit activity. (C-13.0; Paragraph
of a QAdate of the6.2.3)
Verify that an audit schedule exists and the PQAMapproves the audit schedule. (MC-13.0; Paragraph 6.2.4)
�I. -
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 25 OF 35
AUDMTISURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuatlon sheet)
ITEM ~~~~~~~~~~~~REMARKS .EMCHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
3
4
5
erify that the Lead Auditor (LA) provides an orientation to the eam members and is documented on Exhibit 1 prior to
onducting the audit. MC-13.0; Paragraph 6.4.1)
erify the LA prepares and completes the QA Audit/Surveylan per the instructions from Exhibit II. (MC-13.0;aragraph 6.4.2)
Verify the LA provides the organization to be audited, awritten notice of the audit which includes the QAhudit/Survey Plan. (MC-13.0; Paragraph 6.4.31
idit
-. - a
I
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 26 OF 35AUDITISURVEILLANCE
NO Y-ARP-95-10-01
QUALITY ASSURANCE CHECKUST (continuation sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of ver~fication, personnel contacted
6 erify that QA Audit/Survey checklists Exhibit III) contain:
I} requirements applicable to the activity to be audited.reference documents which are sources of requirements.
a audit results (status).
SC-13.0; Paragraph 6.4.4)
K>_~
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 27 OF 35
AUDIT)SURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
ITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, methodN. of verification, personnel contacted
Verify that an Attendance Roster is completed at pre-auditmeetings. (IC-l3.O; Paragraph 6.5.11
Verify that the objective evidence reviewed is documentedmd that it is noted if the checklist attribute issatisfactory or unsatisfactory on the checklist.
(MC-13.0; Paragraph 6.5.2.5)
lerify the auditor enters initials in the initial column:o indicate completion of the checklist. MC-13.0;?aragraph 6.5.2.6)
- I. a a
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 28 OF 35
AUDITiSURVEILLANCE
No Y-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSITNEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
10 Terify that Attendance Rosters exist for post-auditmeetings. IMC-13.0; Paragraph 6.5.3)
lerify the Audit/Survey Report contains the following:
ii Audited organization and titleAudit dates and organization's location
I1 Audit Scope and purposeIi Summary
Brief description of each audit finding andinclude the numbers of any C/A documents.
) Appropriate signatures
{MC-13.0: Exhibit Wv)
I. £
K>OFFICE OF CIVIUAN
RADIOACTIVE WASTE MANAGEMENTU.S. DEPARTMENT OF ENERGY
WASHINGTON, D.C.
PAGE 29 OF 35
AUDIT/SURVEILLANCE
NO Y-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSTEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSNO. of verification, personnel contacted
12 erify that QA audit/survey reports are issued within 30calendar days of completion of the audit. MC-13.0;Paragraph 6.6.4, ICN 2)
13 Verify the PQAM issues external QA/Survey Reports to theocurement and Property Management Department.
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 30 OF 35
AUDITISURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSITEM CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
NO. of verfication, personnel contacted
14 Verify the Audit log aintained by the QAO contains:
Audit Numberb) Organization2l Date Notified1) Pre-audit Meeting Datea) Audit Report Issue Date
Identification of any Audit Findings
(MC-13.0; Paragraph 6.7)
15 Sample an Audit Package and verify it contains:
a) Audit OrientationQA Audit/Survey Plans
SO) QA Audit/Survey Checklists1) QA Audit/Survey Reporta) Attendance Rosters
(MC-13.0; Paragraph 7.1.11
-
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 31 OF 35AUDITWiURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
%UDITOR QUALIFICATIONS MC-13.1, (Revision 2)
1 Verify through a sample of QA auditors) that they havearticipated in at least one (1) audit as an auditor in
raining) prior to being certified as an auditor.(MC-13.1; Paragraph 6.1.2)
2 Verify that the PQAM certifies and documents theindividual's qualification as an auditor in theirraining file. (MC-13.1; Paragraph 6.1.31
K>
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 32 OF 35
AUDITURVEILLANCENo YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
REMARKSIN~O. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verification, personnel contacted
3
4
Verify that Technical Specialists used on audits have-heir qualification as a Technical Specialist documentedLn their training file by the PQAM. MC-13.1; Paragraph 6.2.21
erify that evidence is available to show that Leadwuditors have a minimum of 10 credits that qualify themts Lead Auditors, per the requirements of paragraphs;.3.1.1 and 6.3.1.2. (MC-13.1; Paragraph 6.3.1)
-' I.
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 33 OF 35AUDITISURVEILLANCE
No YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuation sheet)
rrEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTS
of verFicatofn. personnel contacted
5
6
Review Lead Auditors Record of Lead Auditor Qualificationmnd verify the forms are complete and accurate.
(MC-13.1; Exhibit I)
lerify that the LA has participated in at least 5 QAaudits within 3 years, prior to the date ofqualification, (one of these being nuclear related withinthe year prior to qualification). (C-13.15 Paragraph5.3.4.1)
- I. I. _______________
OFFICE OF CIVIUANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 34 OF 35
AUDT/SURVEILLANCE
No YM-ARP-95-10-01
QUALITY ASSURANCE CHECKUST (contInuaUon sheet)
ITEM REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RESULTSof verlicatbn, personnel contacted
7 Verify that if a LA is qualified as a LA by a previousloyer, the individual's qualifications are verified as
teeting the requirements of the procedure. (MC-13.l;Paragraph 6.3.4.2)
8 7erify the prospective LA participates in at least one(1) audit under the supervision of a YMP LA prior tojualification. (MC-13.1; Paragraph 6.3.4.3)
\KJ/
OFFICE OF CIVILIANRADIOACTIVE WASTE MANAGEMENT
U.S. DEPARTMENT OF ENERGYWASHINGTON, D.C.
PAGE 35 of 35
AUDRI/SURVEILLANCE
NO YM-ARP-95-10-01
QUALITY ASSURANCE CHECKLIST (continuatIon sheet)
ITEM ~~~~~~~~~~~~REMARKSNO. CHARACTERISTICS TO BE EVALUATED Record objective evidence reviewed, method RSULTS
. __________________________________________ of vrlication, personnel contacted
9
10
lerify the PQAM performs an annual assessment of Leadkuditors during January of each year. MC-13.1;?aragraph 6.5.2)
lerify the annual assessments are documented on ExhibitI. MC-13.1; Paragraph 6.5.2)
16
PROCEDURES
repared by: M. D. Moulder Yh& MM\L-? 3 - 3 9b( C ............ - - --- -
Print ame Signature
REECO/YMP CONTROLLED DOCUMENT CENTER
MASTER INDEX
REVISION 95-14,.DATED 03/23/95
RFEECO/YMP Coiftlied ;oo= nrv C'me
CONTROLLED COPY
No. eThis Is a Red Stp>.
f- oAv"A
QA
Date Run: 03/23/95Page: 1
UBS 1.2.12.2.5
locuent Source
'EECO/YMP
!EECO/YMP
!EECO/YMP
EECO/YMP
EECO/YMP'EECO/YMP
!EECO/YMP
!EECO/YMP
'EECO/YMP
:EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMPEECO/YMPEECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMPEECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
EECO/YMP
:EECO/YMP
!EECO/YMP
:EECO/YMP
EECO/YMP
'EECO/YMP
Document Type
PROCEDURELISTPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURECHANGE NOTICEPROCEDURECHANGE NOTICE
PROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURECHANGE NOTICECHANGE NOTICEPROCEDUREPROCEDUREPROCEDURECHANGE NOTICEPROCEDURE
CHANGE NOTICEPROCEDURECHANGE NOTICEPROCEDURECHANGE NOTICEPROCEDUREPROCEDURE
Document Nmber
(550)C-1.10.10/507586-ASL-1
MC-01.0
MC-01.1
MC-01.2MC-01.3MC-02.0MC-02.0-ICN-1MC-02.1MC-021- ICm-i
MC-02.2
MC-02.3
MC-02.4MC-02.4.1
MC-02.4.2MC-02.4.3
MC-02.4.4
MC-02.4.5MC-02.5MC-02.5-ICN-1
MC-02.5-ICN-2MC-02.6MC-02.7MC-02.9MC-02.9-ICN-1
MC-03.0MC-03.0-ICN-1MC-03. 1MC-03.1-ICN-1
MC-03.2
MC-03.2-ICN-1
MC-03.2.1
MC-03.3
Document Title
YUCCA MOUNTAIN PROJECT, EXPLORATORY StUDIES FACILITY, EMERGENCY...
APPROVED SUPPLIERS LIST, ISSUE NO. 95-1 (SCPB: N/A)
ORGANIZATION (SCPB: N/A)
STOP WORK AUTHORITY (SCPB: N/A)
RESOLUTION OF DISPUTES
DELEGATION OF AUTHORITY (SCPB: N/A)QUALITY ASSURANCE PROGRAM SCP:N/A
INTERIM CHANGE NOTICE TO MC-02.0, REVISION 3
DETERMINATION OF IMPORTANCE
INTERIM CHANGE NOTICE TO MC-02.1, REVISION 1
REGULATORY COMPLIANCE FOR REPORTING DEFECTS (SCP: N/A)
PREPARATION & CONTROL OF SUPPLIER'S REQUIREMENTS MATRIX (SCP: N/A)
TRAINING & QUALIFICATION SCP: N/A)
YMP INDOCTRINATION AND TRAINING (SCPB: N/A)
PERSONNEL QUALIFICATION & CERTIFICATION SCPR: N/A)
REQUIRED READING SCP: N/A)
CLASSROOM TRAINING (SCP: N/A)
DEVELOPING A TRAINING COURSE (SCP: N/A)
MANAGEMENT ASSESSMENT
INTERIM CHANGE NOTICE TO MC-02.5, REVISION 0
INTERIM CHANGE NOTICE TO MC-02.5, REVISION 0
PROCESSING EXTERNAL A FINDINGS SCPB: N/A)
QUALITY PROGRAM STATUS REPORT
READINESS REVIEWS
INTERIM CHANGE NOTICE Tb MC-02.9, REVISION 0
PROCUREMENT (SCPS: N/A)
INTERIM CHANGE NOTICE TO MC-03.0, REVISIO 3
PURCHASING REQUISITION AND PURCHASE ORDER PROCESSING (SCPS: N/A)
INTERIM CHANGE NOTICE TO MC-03.1, REVISION 2
SOURCE SELECTION & EVALUATION SCPB: N/A)
INTERIM CHANGE NOTICE TO MC-03.2, REVISION 2
SUPPLIER QUALITY APPROVAL (SCP8: NA)
SOURCE ERIFICATION (SCOP: N/A)
'INTERIM CHANGE NOTICE TO MC-03.3, REVISION 1
INTERIM CHANGE NOTICE TO MC-03.3, REVISION 1
Revision
095-1
S
1013
3
111I
15422
3
0
0
0
000
03
3
2
22
2
1
1I1
IssueYES
YES
YESYESYESYESYESYESYESYESYESYESYESYESYESYESYES
YESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYES
Date08/17/9401/18/9510/21/9410/18/9402/06/9206/20/9412/17/9312io2/9404/14/9301/10/9410/13/9312/17/9304/27/9403/03/9503/03/9504/07/9404/07/9404/07/9402/07/9205/10/9306/22/9307/20/9404/07/9305/26/9212/17/9307/06/9407/14/9407/06/9401/20/9507/06/9407/14/9401/30/9507/06/9407/14/9412/23/94
OA
StatusN/A
QA: L
OA: L
GA: L
aA
OA: NGAaA: L
OAaAOAOA
OAOA: L
OA: L
aA
OA
QA
QA
aA
OA
OA: L
OA
QA
OA
CA: L
GA: L
GA: L
QA: L
OA: L
CA: L
oA: L
QA:. L
QA: L
QA: L
EffectIveDate
08/17/9401/18/9511/07/9411/01/9402/28/9207/01/9401/03/9412/09/9404/29/9301/24/9410/29/9301/03/9405/11/9403/20/9503/20/9504/22/9404/15/9404/22/94.02/28/9205/14/9306/30/9307/29/9404/21/9306/10/9201/03/9407/15/9407/22/94
07/15/9401/27/9507/15/94
07/22/9402/10/9507/15/94
07/22/9401/02/9
CHANGE NOTICE MC-03.3-ICN-1
CHANGE NOTICE MC-03.3-ICN-2
(REECO/YMP CONTROLLED DOCUMENT CENTER
MASTER INDEX
REVISION 95-14, DATED 03/23/95
ua(e Run: 03/23/95Page: 2
Ri'ocunent Source Document Tve Docunent Number Document Title
!EECOIYMP!EECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMPEECO/YMP
PROCEDURE
CHANGE NOTICE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDURE
CHANGE NOTICE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDURECHANGE NOTICECHANGE NOTICE
CHANGE NOTICE
CHANGE NOTICE
CHANGE NOTICE
PROCEDURE
PROCEDURE
PROCEDURE
CHANGE NOTICE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDUREPROCEDURE
CHANGE NOTICE
PROCEDURE
CHANGE NOTICEPROCEDURE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDURE
PROCEDURE.
CHANGE NOTICE
PROCEDURE
MC-03.4MC-03.4-ICN-lMC-04.0MC-04.1MC-04.2MC-04.3MC-04.4MC-04.4-ICN-lMC-04.5MC-05.0MC-05.1MC-05.2MC-05.3MC-05.3-CN-1MC-05.3 ICN-2MC-05.3-ICN-3MC-OS.3-ICN-4MC-05.3-ICN-5MC-06.0MC-06.1MC-06.2MC-06.2-ICN-1MC-06.3MC-06.4MC-06.5MC-06.6MC-07.0MC-07.0-ICN-1MC-07.1MC-07.1-ICN-1MC-07.2MC-07.3MC-07.4MC-07.5MC-07.6MC-O8.0MC-08.0-ICN-1MC-08.1
SUBCONTRACTS (SCPB: N/A)
INTERIM CHANGE NOTICE TO MC-03.4, REVISION 1
MATERIAL CONTROL (SCPB: N/A)
MATERIAL RECEIVING (SCPB: N/A)
RECEIPT INSPECTION (SCPS: N/A)
HANDLING, STORAGE, AND SHIPPING SCPB: N/A)
REQUEST FOR STOCK ISSUE AND JIT RELEASES (SCPB: N/A)
INTERIM CHANGE NOTICE TO MC-04.4, REVISION 1
MATERIAL IDENTIFICATION (SCPB: N/A)
INSTRUCTIONS, PROCEDURES AND DRAWINGS (SCPB: N/A)
PREPARATION, REVIEW & APPROVAL OF MANAGEMENT CONTROL PROCEDURES CSCP8: N/A)
PREPARATION, REVIEW & APPROVAL OF TECHNICAL CONTROL PROCEDURES (SCPB: N/A)
PREPARATION, REVIEW AND APPROVAL OF WORK PROCEDURES
INTERIM CHANGE NOTICE TO MC-05.3, REVISION 0
INTERIM CHANGE NOTICE TO MC-05.3, REVISION 0
INTERIM CHANGE NOTICE TO MC-05.3, REVISION 0
INTERIM CHANGE NOTICE TO MC-05.3, REVISION 0
INTERIM CHANGE NOTICE TO MC-05.3, REVISION 0
DOCUMENT CONTROL (SCP: N/A)
CONTROL AND DISTRIBUTION OF CONTROLLED DOCUMENTS (SCP: N/A)
CONTROL OF SUPPLIER SUBMITTALS (SCPB: N/A)
INTERIM CHANGE NOTICE TO MC-06.2, REVISION 1
EXTERNALLY CONTROLLED DOCUMENTS (SCPB: NA)
MANAGED DISTRIBUTION
EXPEDITED CHANGES
DOCUMENT REVIEW SCP: N/A)
WORK CONTROL (SCP: N/A)INTERIM CHANGE NOTICE TO MC-07.0, REVISION 2
WORK PLANNING
INTERIM CHANGE NOTICE TO MC-07.1, REVISION 0
INITIATION OF CHANGES TO SOURCE DOCUMENTSREQUEST FOR MATRIX SUPPORT SERVICES
CONSTRUCTION AND INSPECTION PLAN SCPB: N/A)
TEST CONTROL
TRACERS, FLUIDS AND MATERIALS REPORTS SCP: N/A
SPECIAL PROCESSES
INTERIM CHANGE NOTICE TO MC-08.0, REVISION 0
PREPARATION, REVIEW AND APPROVAL OF SPECIAL PROCESS PROCEDURES
Auth.
for
evIsion Issue
1 YES
1 YES
2 YES
2 YES
2 YES
3 YES
1 YES
1 NO
2 YES
4 YES
3 YES
3 YES
° YES
0 YES
0 YES
0 YES
0 YES° YES
3 YES
3 YES
1 YES
1 YES
3 YES
0 YES
0 YES
O YES
2 YES
2 YES° YES
° YES
0 YES
0 YES
2 YES
0 YES
O YES
° YES
0 YES
0 YES
Approved OA Effective
Data Status Date
07/06/94 OA: L 07/15/94
07/14/94 OA: L 07/22/94
07/15/94 OA: L 07/22/94
.07/15/94 QA: L 07/22/94
07/08/94 CA: L 07/15/94
01/20/95 CA: L 01/27/95
07/15/94 CA: L 07/22/94
01/11/95 CA: L 11/20/95
07/15/94 CA: L 07/22/94
06/28/94 OA: L 07/08/94
08/11/94 OA: L 08/26/94
08/11/94 OA: L 08/26/94
01/29/92 CA 02/14/9212/04/92 OA 12/18/92
12/11/92 OA 12/24/92
07/28/93 OA 07/30/93
01/10/94 OA 01/24/9402/01/94 CA 02/07/94
06/02/93 OA 06/18/93
07/23/93 CA 07/30/93
07/06/94 OA: L 07/15/94
08/08/94 QA: L 08/22/94
01/19/95 CA: L 01/26/95
06/08/92 N/A 06/29/92
04/26/93 CA 05/21/93
01/26/94 OA 02/10/94
01/26/94 CA 02/10/9409/07/94 CA: L 09/21/94
05/14/93 QA 05/21/93
07/08/93 CA 07/16/93
01/29/92 CA 02/14/92
11/19/92 N/A 11/30/92
03/02/95 OA: L- 03/13/95
01/07/93 OA 01/18/93
02/11/94 N/A 02/18/94
02/19/92 QA 03/16/92
05/06/93 oA 05/14/93
02/06/92 CA 02/28/92
C,REECO/YMP CONTROLLED DOCUMENT CENTER
MASTER INDEXREVISION 95-14, DATED 03/23/95
ate Run: 03/23/95Page: 3
)ocunent Source
IEECO/YMP
tEECO/YMP
fEECO/YMP
tEECO/YMP
tEECO/YMP
tEECO/YMP
tEECO/YMP
tEECO/YMP
tEECO/YMP
IEECO/YMP
tEECO/YMP
IEECO/YMP
IEECO/YMP
IEECO/YMP
!EECO/YMP
IEECO/YMP
:EECO/YMP
!EECO/YMP
EECO/YMP
IEECO/YMP
:EECO/YMP
:EECO/YMP
!EECO/YMP
!EECO/YMP
EECO/YMP
EECO/YMP
!EECO/YMP
!EECO/YMP
IEECO/YMP
!EECO/YMP
.EECO/YMP
tEECO/YMP
tEECO/YMP
tEECO/YMP
tEECO/YMP
IEECO/YMP
tEECO/YMP
tEECO/YMP
Document TPe Docunent Nuber
PROCEDUREPROCEDURECHANGE NOTICEPROCEDURE.PROCEDURECHANGE NOTICECHANGE NOTICEPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURECHANGE NOTICEPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURECHANGE NOTICECHANGE NOTICEPROCEDUREPROCEDURECHANGE NOTICEPROCEDUREPLANPLANPLANPLAN
PLAN
PROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURE
MC-08.2MC-09.0MC-09.0- ICN- 1MC-09.1MC-09.2MC-09.2-ICN-1MC-09.2- ICN-2MC-10.0MC-11.0MC- 11.1MC-11.2
MC- 11.3MC-11.3-ICN-1MC-11.4
MC-12.0MC-12.1MC-12.4MC-12.4.1MC-13.0MC-13.0-ICN-1MC- 13.0- ICN-2MC-13.1MC-13.2MC-13.2- ICN-1MC-14.1OIP-CND-92-001OIP-CND-93-001QP-CND-93-003QIP-DIV-93-002OIP-DRD-92-002TC-515-CP-DIM-0TC-515-CP-DIM-1TC-515-CP-DIM-16TC-515-CP-DIM-26TC-515-CP-DIM-28TC-515-CP-DIM-5TC-515-CP-DIM-9TC-515-CP-FLO-0
Document Title
QUALIFICATION AND CERTIFICATION OF SPECIAL PROCESS PERSONNEL
INSPECTION PROGRAMINTERIM CHANGE NOTICE TO MC-09.0, REVISION 2INSPECTION PLANNING AND PERFORMANCE SCPB: N/A)TRAINING, QUALIFICATIONl CERTIFICATION OF INSPECTION TEST...INTERIM CHANGE NOTICE TO MC-09.2, REVISION 2
INTERIM CHANGE NOTICE TO MC-09.2, REVISION 2MEASURING AND TEST EQUIPMENT (SCP: N/A)
PROBLEM IDENTIFICATION AND CONTROL SCP: N/A)
DEFICIENCY NOTICES (CPB: N/A)NONCONFORMANCE CONTROL (SCPB: N/A)CORRECTIVE ACTION (SCPB: NiA)
INTERIM CHANGE NOTICE TO MC-11.3, REVISION 2TRENDING SCPB: N/A)
YMP INFORMATION RESOURCES MANAGEMENT (SCPB: N/A)YMP RECORDS MANAGEMENT (SCPB: N/A)
HARDWARE AND SOFTWARE MANAGEMENT (SCPB: N/A)
SOFTWARE QUALIFICATION (SCPB: N/A)
AUDITS SCPB: NA)
INTERIM CHANGE NOTICE TO MC-13.0, REVISION 4INTERIM CHANGE NOTICE TO MC-13.0, REVISION 4AUDITOR QUALIFICATIONS SCPB: N/A)
SURVEILLANCES (SCPS: NA)
INTERIM CHANGE NOTICE TO MC-13.2, REVISION 2
ENVIRONMENT, SAFETY AND HEALTH INTERNAL APPRAISAL PROGRAMQUALITY IMPLEMENTING PLAN (SCPB: 8.3.1)
QUALITY IMPLEMENTING PLAN (SCPB: 8.3.1)
QUALITY IMPLEMENTING PLANQUALITY IMPLEMENTING PLAN
QUALITY IMPLEMENTING PLAN
GAGE BLOCKS (SCP: N/A)
DEPTH MICROMETERS (SCP: N/A)
CALIPERS (SCP: N/A)
MASTER PRECISION LEVELS (SCP: N/A)OOTSIDE MICROMETERS (SCP: N/A)
INSIDE MICROMETERS (SCP: N/A)
DIAL INDICATORS (SCP: N/A)
LP GAS METERS USING AN AUTOMATIC BELL PROVER
Auth.
for Approved
Revision Issue Date
0 YES 02/06/92
2 YES 11/19/92
2 YES 07/28/936 YES 03/22/95
2 YES 10/14/942 YES 12/02/94
2 YES 01/30/95
1 YES 12/08/93
2 YES 12/10/934 YES 11/10/94
4 YES 03/22/95
2 YES 08/12/94
2 YES 09/16/942 YES 08/12/943 YES 06/03/94
3 YES 06/06/94
0 YES 06/03/94
O YES 06/03/94
4 YES 06/28/94
4 YES 08/01/94
4 YES 09/07/94
2 YES 06/28/94
2 YES 06/28/94
OA
Status
OA
OA
OA
OAk L
OA: L
OA: L
OA: L
OA
QA
OA: L
QA: L
0A: L
QA: L
QA: L
OA: L
OA: L
OA:LQA:L
QA: L
QA: L
QA: L
QA: L
QA: L
GA: L
N/A
QA:NA
OA:NA
OA
OA
N/A
OA
OA
OA
OA
OA
QA
QA
aA
Effective
Date
02/28/92
11/30/92
07/30/9303/31/95
10/21/9412/09/94
01/30/95
12/22/93
12/27/93
11/28/94
03/31/95
08/26/94
09/29/94
08/26/94
06/17/94
06/17/94
06/17/94
06/17/94
07/12/94
08/12/94
09/21/94
07/12/94
07/12/94
11/04/94
07/30/92
02/14/95
02/14/95
03/29/93
03/10/9312/08/92
06/11/93
06/10/93
07/30/93
06/11/93
06/10/93
06/11/9306/10/9306/18/93
2 YES° YES
1 YES
2 YES
0 YES
0 YES
° YES
10/26/9407/14/9202/14/9502/14/9503/29/9303/10/9312/08/92
0 YES 06/01/930 YES 05/24/931 YES 07/16/930 YES 06/01/930 YES 05/24/930 YES 06/01/930 YES 05/24/930 YES 06/15/93
.1
(
)ocument Source
IEECO/YMP1EECO/YMPtEECO/YMPtEECO/YMPtEECO/YMPtEECO/YMP?EECO/YMPIEECO/YMP'EECO/YMPIEECO/YMPIEECO/YMPIEECO/YMPEECO/YMP:EECO/YMP
!EECO/YMP!EECO/YMP
tEECO/YMP
!EECO/YMP!EECO/YMP!EECO/YMP:EECO/YMP
!EECO/YMP
tEECO/YMP
!EECO/YMP:EECO/YMP
EECO/YMP:EECO/YMP1EECO/YMP
:EECO/YMP
!EECO/YMP!EECO/YMP-EECO/YMPIEECO/YMPtEECO/YMPtEECO/YMPtEECO/YMP
- tEECO/YMPIEECO/YMP
Document TypePROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURE
CHANGE NOTICE
PROCEDURE
PROCEDURE
PROCEDUREPROCEDURE
PROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDUREPROCEDURE
PROCEDUREPROCEDURE
PROCEDURECHANGE NOTICE
PROCEDUREPROCEDURE
PROCEDUREPROCEDURE
'CHANGE NOTICEPROCEDURECHANGE NOTICEPROCEDUREPROCEDURECHANGE NOTICEPROCEDUREPROCEDURECHANGE NOTICEPROCEDURE
REECO/YMP CONTROLLED DOCUMENT CENTER
MASTER INDEX
REVISION 95-14, DATED 03/23/95
Auth.
for
Document Number Document Title Revision Issue
TC-515-CP-FOR-2 FORCE GAGES SCP: N/A) 0 YES
TC-515-CP-FOR-3 VALVE SPRING TESTER (SCP: N/A) 0 YES
TC-515-CP-MASS-0 MASS AND WEIGHTS SCP:N/A) 0 YES
TC-515-CP-MASS-1 MECHANICAL SCALES SCP: N/A) 0 YES
TC-515-CP-MASS-2 DOUBLE PAN BALANCES SCP: N/A) 0 YES
TC-515-CP-MASS-3 ELECTRONIC BALANCE (SCP: N/A) 0 YES
TC-515-CP-PRES-1 PRESSURE GAUGES 1-1000 PSIG SCP: N/A) 0 YES
TC-515-CP-PRES-1-ICN-INTERIM CHANGE NOTICE TO TC-515-CP-PRES-1, REVISION 0 0 YES
TC-515-CP-REC-1 CHART RECORDERS'(SCP: N/A) 0 YES
TC-515-CP-SIEV-1 WIRE CLOTH SIEVES (SCP: N/A) 0 YES
TC-515-CP-TEMP-1 LIQUID IN GLASS THERMOMETERS AND DIAL TYPE TEMPERATURE GAUGES 0 YES
TC-515-CP-TEMP-4 ELECTRONIC THERMOMETERS SCP: N/A) 0 YES
TC-515-CP-TEMP-5 SLING PSYCHROMETERS SCP: N/A) 0 YES
TC-515-CP-TORO-1 TORQUE WRENCHES AND SCREWDRIVERS SCP: N/A) 0 YES
TC-528-SP-0001 YMP EMPLOYEE VERIFICATION (SCPB: N/A) 1 YES
TC-556-CP-GEN-1 MEASURING AND TEST EQUIPMENT. - GENERAL (SCPB: N/A) 0 YES
TC-580-SP-0001 EXPLORATORY STUDIES ACILITIES (ESF) TUNNEL ACCESS CONTROL (SCPB: NA) 2 YES
TC-580-SP-0002 OPERATION OF CAMPBELL PACIFIC NUCLEAR GAUGE SCPB: N/A) I YES
TC-580-SP-0003 SMOTCRETE NOZZLEMAN CERTIFICATION (SCP: 8.3.1) 0 YES
TC-580-SP-0004 CONTROL OF WELDING AND BRAZING (SCPB: N/A) 2 YES
TC-581-SP-O001 WATER USE, CONTROL AND ACCOUNTABILITY SCP: N/A) 2 YES
TC-581-SP-0002 SURVEY GUIDELINES MANUAL 0 YES
TC-581-SP-0003 ROCK BOLTING THE NORTH PORTAL SURFACE AREA I YES
TC-581-SP-0003-ICN-1 INTERIM CHANGE NOTICE TO TC-581-SP-0003, REVISION 1 1 YES
TC-581-SP-0004 NONELECTRIC SURFACE BLASTING SAFETY 0 YES
TC-581-SP-0005 CAST-IN-PLACE CONCRETE FOR SURFACE ACTIVITIES (SCPB 8.3.1) 1 YES
TC-581-SP-0006 SURVEY INSTRUMENT REPEATABILITY TESTS SCP: 8.3.1) 1 YES
TC-581-SP-0007 STARTER TUNNEL SHOTCRETE (SCP: 8.3.1) 2 YES
TC-581-SP-0007-ICN-1 INTERIM CHANGE NOTICE # 1 TO TC-581-SP-0007, REV 2 2 YES
TC-581-SP-0008 UNDERGROUND BLASTING SAFETY 0 YES
TC-S81-SP-0008-ICN-1 INTERIM CHANGE NOTICE TO TC-581-SP-0008, REVISION 0 0 YES
TC-581-SP-0009 WATER USE, CONTROL AND ACCOUTABILITY FOR UNDERGROUND CONSTRUCTION SCP: 8.3.2) YES
TC-581-SP-0010 OPERATION OF INITIAL TANK TRACER INJECTION SYSTEM SCPB: 8.3.1) 1 YES
TC-581-SP-0010-ICN-t INTERIM CHANGE NOTICE TO TC-581-SP-0010, REVISION 1 1 YES
TC-581-SP-0011 EXPLORATORY STUDIES FACILITY GROUND SUPPORT (SCP: 8.3.1) 3 YES
TC-581-SP-0012 MONTHLY INSPECTION OF NORTH ESF PORTAL PAD DRAINAGE CHANNEL 0 YES
ApprovedDato
05/24/9305/24/9306/15/9306/15/9306/01/9306/15/9305/24/9303/01/9406/01/9306/15/9306/15/9306/15/9306/15/9305/24/9302/02/9508/02/9408/25/9410/13/9412/29/9302/06/9501/27/9411/25/9203/26/9304/07/9302/11/93
10/26/9402/15/9412/28/9303/11/9403/26/9305/10/9303/07/9409/21/9412/05/9403/10/9403/31/93
ate Run: 03/23/95
Page: 4
OA EffectiveStatus Date
OA 06/10/93OA 06/10/93
OA 06/18/93OA 06/18/93OA 06/11/93
OA 06/18/93OA 06/10/93OA 03/04/94DA 06/11/93OA 06/18/93
OA 06/18/93
OA 06/18/93GA 06/18/93
OA , 06/10/93
OA: L 02/16/95OA: L 08/15/94N/A 09/02/94OA: L 10/13/94OA 12/30/93DA: L 02/07/95OA 02/09/94N/A 11/30/92N/A 03/29/93N/A 04/09/93N/A 02/16/93QA: L 11/01/94OA 02/18/94QA 12/30/93OA 03/11/94N/A 03/29/93OA 05/12/93OA 03/10/94OA: L 09/21/94OA: L 12/2794OA 03/11/94OA 03/31/93OA 05/10/93N/A 08/10/93
TC-581-SP-0012-ICN-1 INTERIM CHANGE NOTICE TO TC-581-SP-0012,,REVISION 0TC-581-SP-0013 DIESEL EQUIPMENT PREVENTATIVE MAINTENANCE (SCP: N/A)
0 YES 05/06/930 YES 07/30/93
. 0
C
Document Source
REECO/YMPREECO/YMP
REECO/YKP
REECO/YMP
REECO/YMP
REECO/YMP
REECO/YMP
REECO/YMP
REECO/YMP
REECO/YMP
REECO/YMP
REECO/YMP
IEECO/YMP
REECO/YMP
IEEC0/YMP
lEEC/YMP
?EECO/YMP
IEECO/YMP
REECW/YMP
IEECO/YMP
ZEECO/YMP
ZEECO/YMP
tEECO/YMP
1EEC/YMP
Document Type Document Number
PROCEDURE TC-581-SP-0014
PROCEDURE TC-581-SP-OOIS
PROCEDURE TC-581-SP-0016
PROCEDURE TC-581-SP 0017
PROCEDURE TC-581-SP-0018
PROCEDURE TC-581-SP-0019
PROCEDURE TC-581-SP-0020
PROCEDURE TC-581-SP-0021
PROCEDURE TC-581-TP-0001
CHANGE NOTICE TC-581-TP-0001-ICN-1
PROCEDURE TC-581-TP-0002
CHANGE NOTICE TC-581-TP-0002-ICN-1
CHANGE NOTICE TC-581-TP-OOO2-ICN-2
PROCEDURE TC-581-WP-0001
PROCEDURE TC-581-WP-0002
PROCEDURE TC-581-WP-0003
PROCEDURE TC-586-SP-0001
PROCEDURE TC-586-SP-0002
PROCEDURE TC-586-SP-0003
PROCEDURE TC-586-SP-0004
PROCEDURE TC-586-TP-0002
PROCEDURE TC-586-TP-0003
PROCEDURE TC-586-TP-0004
PROCEDURE TC-586-TP-001
(REECO/YMP CONTROLLED DOCUMENT CENTER
MASTER INDEX
REVISION 95-14, DATED 03/23/95
Auth.
forDocument Titte Revision Issue
STARTER TUNNEL VENTILATION CONTROL PLAN SCP: N/A) 0 YES
MINE RESCUE PLAN (SCP: N/A) 0 YES
SURFACE SHOTCRETE SCP: N/A) 1 YESSURVEYING OPERATIONS FOR THE STARTER TUNNEL (SCP: 8.3.1) 0 YES
OPERATION OF COMPRESSED AIR TRACER INJECTION SYSTEM SCP: N/A) 0 YES
BATCH PLANT AND CONCRETE PLACEMENT PERSONNEL TRAINING SCPB: N/A) 0 YES
STARTER TUNNEL INSPECTION AND MAINTENANCE SCP: N/A) 0 YES
OPERATION OF CONCRETE BATCH PLANT SCPB: 8.3.1) 1 YES
TESTING OF SPLIT SET & RESIN GROUTED ROCKBOLTS 1 YES
INTERIM CHANGE NOTICE TO TC-581-TP-0001, REVISION 1 1 YES
TESTING OF UNDERGROUND ROCK BOLT GROUND SUPPORT (SCP: 8.3.1) 1 YES
INTERIM CHANGE NOTICE TO TC-581-TP-0002, REVISION 1 1 YES
INTERIM CHANGE NOTICE TO TC-581-TP-0002, REVISION 1 1 YES
BLAST HOLE DRILLING FOR SURFACE CONSTRUCTION ACTIVITIES NORTH PORTAL.. 0 YES
EXPLOSIVES HANDLING AND DRILL HOLE BLASTING FOR SURFACE CONStRUCTION.. 0 YES
DRILLING AND BLASTING FOR UNDERGROUND CONSTRUCTION ACTIVITIES (SCP: 8.3.1) 1 YES
SAMPLING LIBR TRACER WATER (SCPB: N/A) 2 YES
MATERIAL TEST REQUEST LOG SCP: N/A) 0 YES
MATERIAL IDENTIFICATION BY COLOR COOING SCPB: N/A) 0 YES
VISUAL INSPECTION-WELDMENTS AND BASE MATERIALS (SCPB: N/A) 0 YES
BROMIDE ION (BR) TRACED WATER TESTING (SCPB: N/A) a YES
MAGNETIC PARTICLE EXAMINATION (MT) SCPB: N/A) 0 YES
RADIOGRAPHY RT-1) (SCPB: N/A) 0 YES
TESTING OF FRESHLY MIXED CONCRETE AND CONCRETE CONSTITUENTS SCPB: N/A) 0 YES
ApprovedDate
07/30/9309/09/9301/12/9410/06/9301/20/9412/29/9401/21/9410/25/94
03/17/9304/09/9307/19/9308/25/9302/16/9401/27/9301/27/9310/01/93
01/25/9510/20/93
01/19/95
02/03/9511/21/9402/06/95
02/27/9506/09/94
uat* Run: 03/23/95
Page: 5
OA EffectiveStatus Date
N/A 08/10/93
N/A 09/16/93N/A 01/19/94OA 10/11/93
N/A 01/21/94
OA: L 12/28/94
CA 01/31/94
OA: L 11/01/94
N/A 03/19/93
N/A 04/09/93OA 07/20/93OA 09/02/93OA 02/28/94N/A 02/01/93
N/A 02/01/93
OA 10/01/93OA: L 02/03/95N/A 10/29/93OA: L 01/23/95OA: L 02/06/95OA: L 12/02/94aA: L 02/07/95OA: L 03/06/95CA:L 06/14/94
CARS
May ±, 995) i;ju PM uualty Assurance AK Log ApplicationOPEN CARs b -ticipant: REECO
* 4****
Version: .1.UtOO3cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-95-030 1 03-21-95 04-18-95 04-18-95 E
RESP. ENGR./DEPT: JRD/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: REECO response received 18-apr-1995. QAR needs to evaluate response. 02-may-1995
NEXT ACTION: QAR needs to evaluate response.
NEXT ACTION DATE: 02-may-1995
SUBJECT: ACCEPTED ITEMS WERE MODIFIED WITHOUT RESTORATION, RE-INSPECTION
CORRECTIVE ACTION:
KEYWORDS: QARD, QCP-008, YMP-SR-95-020.
YM-95-031 1 03-21-95 04-18-95 04-18-95 A 04-27-95 04-28-95 05-26-95
RESP. ENGR./DEPT: JRD/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: REECO extension request to corrective action due date received 15-may-1995. QAR needs to evaluate CA extension request.22-may-1995
NEXT ACTION: QAR needs to evaluate CA extension request.
NEXT ACTION DATE: 22-may-1995
SUBJECT: PERSONNEL PERFORMED WORK WITHOUT BEING TRAINED TO PROCEDURE
CORRECTIVE ACTION: Assignments to be completed and impact on work evaluation.
KEYWORDS: MCP-2.4, YMP-SR-95-020.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 1
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
OPEN CARs by ticipant: REECO*l **
. -s - -. 1 .-v
003cla)
K CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-95-038 1
RESP. ENGR./DEPT: RH/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: Number issued to QAR on 03-may-1995. QAR needs to prepare letter issuing CAR. 17-may-1995
NEXT ACTION: QAR needs to prepare letter issuing CAR.
NEXT ACTION DATE: 17-may-1995
SUBJECT: INADEQUATE CONTROLS ON WATER USAGE IN THE NORTH RAMP
CORRECTIVE ACTION:
KEYWORDS: YP-SR-95-025.
YM-95-040 1
RESP. ENGR./DEPT: RLM/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: QAR sent issuing letter to YMQAD on 16-may-1995. YMQAD needs to issue CAR issuance letter. 31-may-1995
NEXT ACTION: YMQAD needs to issue CAR issuance letter.
NEXT ACTION DATE: 31-may-1995
SUBJECT: RESPONSES TO CORRECTIVE ACTION REQUESTS NOT COMPLETE PER PROCEDURE REQUIREMENT.
CORRECTIVE ACTION:
KEYWORDS: KIEWIT/PB MCP 16.0, YMP-SR-95-029.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 2
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May ' 1995 1:0 PM Quality Assuranr- "AR Log ApplicationOPEN CLOSED CAT Participant: REECO
*s L* ***
Ver, : 3.1.0103cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-021 1 2 03-07-91 03-25-91 03-22-91 A 04-05-91 04-15-91 07-12-91 S 07-18-91
RESP. ENGR./DEPT: TJH/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 25-jul-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: FAILURE TO PROVIDE POSITION DESCRIPTIONS FOR ALL PERSONNEL DESIGNATED AS QUALIFIED FOR QUALITY-AFFECTING WORK.
CORRECTIVE ACTION:
KEYWORDS: QP 2.2, YP-SR-91-007.
YM-91-022 1 2 03-07-91 03-25-91 03-22-91 A 04-05-91 04-15-91 07-12-91 S 07-18-91
RESP. ENGR./DEPT: TJH/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 25-jul-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: FAILURE TO FOLLOW PROCEDURAL SEQUENCE IN THE QUALIFICATION OF PERSONNEL.
CORRECTIVE ACTION:
KEYWORDS: QP 2.2, YMP-SR-91-007.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 1
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 11. 1995 1:U4 LIM tud"L±Ly issULcliL- wllu% Sky At.WAL
OPEN CLOSED CARP Participant: REECO**1I *
t 1. - 41 . . * .
83cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-023 1 2 03-07-91 03-25-91 03-22-91 A 04-05-91 04-15-91 07-12-91 S 07-18-91
RESP. ENGR./DEPT: TJH/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 25-jul-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: PERFORMANCE OF QUALITY AFFECTING WORK BY AN UNQUALIFIED INDIVIDUAL.
CORRECTIVE ACTION:
KEYWORDS: QP 2.2, YMP-SR-91-007.
YM-91-024 1 2 03-07-91 03-25-91 03-22-91 A 04-05-91 04-15-91 07-12-91 S 07-18-91
RESP. ENGR./DEPT: AIA/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 25-jul-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: FAILURE TO PROVIDE TRAINING BEFORE THE EFFECTIVE DATE OF PROGRAM DOCUMENTS AND FAILURE OF PERSONNEL TO REMAIN CURRENTWITH DOCUMENT CHANGES.
CORRECTIVE ACTION:
KEYWORDS: QAPP 568-DOC-115, QP 2.4, YMP-SR-91-007.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 2
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May I. 199 .:U kM WUdlLy AULdale kAK Log Appl.lcdLIOlOPEN CLOSED CAP Participant: REECO
Versann: .i.U103cla)
'K-iCAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-025 1 2 03-14-91 04-15-91 04-12-91 A 04-22-91 04-30-91 06-01-91 S 06-07-91
RESP. ENGR./DEPT: MRD/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 27-jun-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO QAPP REQUIREMENTS, REECO HAS FAILED TO PROVIDE AN ADEQUATE NUMBER OF FULL-TIME DEDICATED QA PERSONNEL TOENSURE THAT THE REQUIRED SUPPORT FOR QUALITY AFFECTING ACTIVIITES IS ACHIEVED.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QAPP 568-DOC-115.
YM-91-026 1 2 03-14-91 04-15-91 04-12-91 E2 04-23-91 A 04-26-91 05-08-91 10-27-91 11-22-91 S 11-26-91
RESP. ENGR./DEPT: MRD/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 27-nov-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF QA 1.4, RECORDS OF PERSONNEL QUALIFICATION EVALUATIONS, INDOCTRINATION, TRAINING, ANDPROFICIENCY EVALUATIONS HAVE NOT BEEN TRANSMITTED TO THE LRC FOR PROCESSING.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02,, P 17.0,, QP 2.4,.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 3
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 17 1995 1:04 PM Quality Assurance CAR Log ApplicationOPEN & CLOSED CAP Participant: REECO
*<-Vers&-n: 3.1.0
'03cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-027 1 2 03-14-91 04-15-91 04-12-91 A 04-22-91 04-30-91 07-12-91 S 07-18-91
RESP. ENGR./DEPT: RHK/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 25-jul-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO QAPP REQUIREMENTS, THERE IS NO DOCUMENTED EVIDENCE OF INDOCTRINATION OF SOME PERSONNEL WHO HAD PERFORMEDQUALITY AFFECTING ACTIVITIES.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QAPP 568-DOC-115.
YM-91-028 12
2 03-14-91 04-03-91 04-01-91 A 04-08-91 04-16-91 09-09-9109-06-91 A 09-13-91 09-26-91 11-01-91 S 11-19-91
RESP. ENGR./DEPT: JSM/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REEC(
STATUS: Project Office QA issued CAR closure letter on 20-nov-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO QP 9.1 REQUIREMENTS, NDE REPORTS WERE NOT ATTACHED TO THE PQRs FOR THOSE WELD PROCEDURE QUALIFICATIONS FORWHICH NDE WAS PERFORMED.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QP 9.1.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
Page 4
May 11 199b 1:04 PM Quality Assurance CAR Log ApplicationOPEN CLOSED CAR Participant: REECO
** **
<-I
Versi-n: 3.1.0'03cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-029 1 2 03-14-91 04-15-91 04-12-91 A 04-16-91 04-19-91 09-09-912 09-06-91 A 09-13-91 09-26-91 11-01-91 S 11-19-91
RESP. ENGR./DEPT: JSM/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 20-nov-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO QAPP REQUIREMENTS, NO "CODE OF RECORD" HAS BEEN ESTABLISHED WITHIN THE NNWSI WELD PROCEDURES TO DESIGNATEWHICH YEAR OR ADDENDA IS APPLICABLE.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QAPP 568-DOC-115.
YM-91-030 12
2 03-14-91 04-03-91 04-01-91 A 04-08-91 04-16-91 09-09-9109-06-91 A 09-13-91 09-26-91 11-01-91 S 11-19-91
RESP. ENGR./DEPT: JSM/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REEC(
STATUS: Project Office QA issued CAR closure letter on 20-nov-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO ASME, SECTION IX REQUIREMENTS, THE REECO WELDER WITH STAMP NUMBER -001 HAD HIS QUALIFICATIONS RENEWED FORSEVERAL WELD PROCEDURES, WITHOUT THE PERFORMANCE OF ANY WELDING PROCESS FOR A PERIOD GREATER THAN 3 MONTHS.
CORRECTIVE ACTION:
KEYWORDS: ASME SECTION IX, AUDIT 91-02.
)
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 5
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
Hay 1 i9b 1L:U4 M Uuallty Assuzance CAK Log Applxcat.onOPEN CLOSED CAR Participant: REECO
*0**
'
Versin: .1.U03cla)
'J-1
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-031 1 2 03-14-91 04-15-91 04-12-91 E2 04-23-91 A 04-26-91 05-06-91 05-31-91 S 06-18-91
RESP. ENGR./DEPT: AEC/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 24-jun-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF QP 5.1 AND QP 5.3, NO OBJECTIVE EVIDENCE OF ANNUAL PROCEDURE REVIEW OR REVIEW TO AVOIDCONFLICT WITH EXISTING PROCEDURES WAS AVAILABLE.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QP 5.1, QP 5.3.
YM-91-032 1 2 03-14-91 04-15-91 04-12-91 A 04-19-91 04-30-91 05-31-91 S 06-06-91
RESP. ENGR./DEPT: TWN/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 24-jun-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF THE REECO QAPP, ONLY 4 OUT OF 11 SCHEDULED AUDITS WERE PERFORMED BY REECO IN 1990. INADDITION CRITERIA 16 AND 18 WERE NOT SCHEDULED FOR AN AUDIT IN 1990 AND ARE NOT ON THE 1991 AUDIT SCHEUDLE.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QAPP 568-DOC-115.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 6
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 1l- 99b 1:04 PM Quality Assurance CAR Log Application Versinn: 3.1.0OPEN a CLOSED CAP Participant: REECO 103cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARLOENO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-033 1 2 03-14-91 04-03-91 04-01-91 A 04-08-91 04-16-91 06-01-91 S 06-14-91
RESP. ENGR./DEPT: JSM/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 24-jun-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF QP 12, THE REECO METE TRACKING SYSTEM LOG DOES NOT INCLUDE THE REQUIRED PREREQUISITES, INADDITION, MGA-IP-CP-GEN-1 CONTAINS REQUIREMENTS FOR USER ORGANIZATIONS, ALTHOUGH IT IS SUPPOSED TO BE FOR INTERNAL USEONLY, AS STATED IN MQA-IP-QS-5.0.
CORRECTIVE ACTION:
KEYWORDS: AP 12.0, AUDIT 91-02, MA-IP-CP-GEN-1, MQA-IP-QS-5.0.
YM-91-034 1 2 03-14-91 04-15-91
RESP. ENGR./DEPT: MRD/Verification Branch
STATUS: Project Office QA issued CAR closure
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF QP 2.4,FOR THE YEARS 1989 AND 1990.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QP 2.4.
04-12-91 A 04-22-91 04-30-91 06-15-91
YMSCO ASST MANAGER: UNKNOW
S 06-18-91
PARTICIPANT: REECO
letter on 24-jun-1991.
THERE IS NO DOCUMENTED EVIDENCE OF OVERALL TRAINING PROGRAM EVALUATION BY THE TPO
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 7
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
*-21 I _ _ ..-. J ... LIy L .U9 L.lUdLUJ Ver 4 nn: 3.1.0OPEN & CLOSED CAr Participant: REECO 003cla)
* *
< J y " y~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-91-035 1 2 03-14-91 04-03-91 04-01-91 A 04-04-91 04-10-91 05-15-91 S 05-20-91
RESP. ENGR./DEPT: AEC/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 29-may-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: THERE IS NO OBJECTIVE EVIDENCE OF COMPLIANCE WITH PARA. 1.21 AND 1.2.3 OF QAPP 568-DOC-115, APPENDIX F, RELATIVE TO LEADAUDITOR QUALIFICATIONS.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QAPP 568-DOC-115, QP 18.0.
YM-91-036 1 2 03-14-91 04-03-91 04-01-91 A 04-08-91 04-16-91 03-29-91 S 05-07-91
RESP. ENGR./DEPT: JSM/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Verification was satisfactory and CAR is closed. Verification Branch sent letter to Project Office QA on 0S-may-1991concerning satisfactory verification and closure.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO QAPP REQUIREMENTS ON CLOSURE OF AFRs, AUDIT NO 001-90 HAS BEEN CLOSED WITHOUT FULL CORRECTIVEE ACTION BEINGIMPLEMENTED AND WITHOUT A COMPLETION DATE FOR PROPOSED CORRECTIVE ACTION.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, QAPP 68-DOC-liS.
* Abbreviations Used *A - Accepted S - SatisfactoryAR - Amended Response Required U - UnsatisfactoryE - Evaluating SC - Signifficant ConditionR - Rejected SC/SW - Stop Work
Page 8
May 1' 1995 1:04 PM Quality Assuranc 'AR Log ApplicationOPEN CLOSED CAR Participant: REECO
**` **
Vers"on: 3.1.0103cla)
CAR SEV ISSUE R~~seo~sE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.*
YM-91-037 1 2 03-14-91 04-15-91 04-12-91 E2 04-23-91 A 04-26-91 05-08-91 10-15-913 05-15-91 A 05-29-91 05-29-91 10-15-91 S 10-31-91
RESP. ENGR./DEPT: MRD/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 01-nov-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF QP 17.0, QA RECORD PACKAGES FOR PPROCEDURES AND THEIR REVISION, PLUS OTHER QA RECORDPACKAGES, NEITHER ARE FOUND WITHIN THE QA RECORDS SYSTEM NOR TRANSMITTED TO THE LRC IN A TIMELY MANNER.
CORRECTIVE ACTION:
KEYWORDS: AUDIT 91-02, IM-LRC-IP-01, QP 17.0.
YM-91-038 1 2 03-14-91 04-15-91 04-12-91 E2 04-23-91 A 04-26-91 05-08-91 10-15-91 S 10-31-91
RESP. ENGR./DEPT: MRD/Verification Branch YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: Project Office QA issued CAR closure letter on 01-nov-1991.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CONTRARY TO REQUIREMENTS OF QP 17.0, DOCUMENTS DESIGNATED AS RECORDS ARE INCOMPLETE. RECORDS DO NOT CONTAIN ALL THERECORDS GENERATED BY THE IMPLEMENTATION OF THE APPLICABLE PROCEDURES.
CORRECTIVE ACTION:
KEYWORDS: AP 17.0, AUDIT 91-02, QAPP 568-DOC-115.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 9
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 1 1995 1:04 PM Quality Assurance hAR Log ApplicationOPEN & CLOSED CAR, Participant: REECO
Version: 3.1.0'03cla)
k**
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CAR INO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-93-033 1 SC 02-24-93 03-24-93 03-24-93 A 04-01-93 04-01-93 07-02-93 S 07-13-93
RESP. ENGR./DEPT: JSM/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 14-jul-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: CALIBRATIONS NOT PERFORMED IN ACCORDANCE WITH PROCEDURES NOR WERE PROCEDURES REVISED OR NEW PROCEDURES GENERATED WHENTHE ONES IN EFFECT WERE NOT APPROPRIATE TO THE WORK ACCOMPLISHED.
CORRECTIVE ACTION:
KEYWORDS: AUDIT YMP-93-06, CALIBRATION, QAPP.
YM-93-055 12
SC 07-07-93 08-04-93 08-04-93 A 08-11-93 08-12-93 10-15-9310-18-93 A 10-21-93 10-21-93 11-15-93 12-10-93 S 12-17-93
PARTICIPANT: REECORESP. ENGR./DEPT: DJH/QAD YMSCO ASST MANAGER: UNKNOW
STATUS: YMQAD issued CAR closure letter on 17-dec-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: SUPPLIER EVALUATIONS AND TESTING NOT PERFORMED FOR COMMERCIAL GRADE ITEMS WHEN REQUIRED
CORRECTIVE ACTION: Review Title II Design procurements for JP 92-20(1A). Revise MC-04.2.
KEYWORDS: AUDIT YMP-93-12,, QARD.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 10
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
A4.y' IJJ A .U- L 1 WOuPN ty k-l£ CLAOE CAP P t pnt: RECO
OPEN & CLOSED CAR Participant: REECO*a ,**
VWlasl. J.±L.U
103cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-93-056 1 07-07-93 08-04-93 08-04-93 A 08-18-93 08-18-93 08-04-93 S 08-18-93
RESP. ENGR./DEPT: FHL/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 18-aug-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: UNSATISFACTORY STATUS INDICATORS AND VERIFICATION OF STATUS INDICATORS
CORRECTIVE ACTION:
KEYWORDS: AUDIT YMP-93-12,, TC-581-TP-0002.
YM-93-057 1 07-07-93 08-04-93 08-04-93 A 08-17-93 08-18-93 08-15-93 10-01-93 S 10-01-93
RESP. ENGR./DEPT: GH/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 01-oct-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: DOCUMENTATION OF SAMPLES TESTED DOES NOT PROVIDE TRACEABILITY TO MATERIALS
CORRECTIVE ACTION:
KEYWORDS: AUDIT YMP-93-12,, TC-581-SP-0007.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 11
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May li. 19b 1:u4 M Vuallty ASsurance CAR Log ppllcaLlullOPEN & CLOSED CARr Participant: REECO
** I***
Vezsion: .i.0'03cla)
'K-ICAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-93-058 1 07-07-93 08-04-93 08-04-93 E2 08-31-93 A 09-01-93 09-02-93 09-30-933 10-04-93 A 10-12-93 10-12-93 10-29-934 11-01-93 AR 12-14-935 12-14-93 12-29-93 01-04-94 A 01-19-94 01-19-94 01-28-946 01-28-94 A 02-04-94 02-07-94 02-17-94 04-05-94 S 04-06-94
RESP. ENGR./DEPT: SRD/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 07-apr-1994.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: SURVEY ACTIVITIES NOT PERFORMED IN ACCORDANCE WITH REECO YM QA PROCEDURES
CORRECTIVE ACTION: Surveyers to be qualified and instruments calibrated. Technical control procedure to be developed.
KEYWORDS: AUDIT YMP-93-12,, REECO QAPP.
YM-93-059 1 07-07-93 08-04-93 08-04-93 A 08-17-93 08-18-93 08-17-93 10-01-93 S 10-01-93
RESP. ENGR./DEPT: GH/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 01-oct-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: SHOTCRETE PLACEMENT LOGS DO NOT IDENTIFY M&TE USED
CORRECTIVE ACTION:
KEYWORDS: AUDIT YMP-93-12,, QARD.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
Page 12
may 1) 19%:�' i:U4 Im UdIlLy aSSuLdale WUK Lg ApplI.caLi.olOPEN CLOSED CAR Participant: REECO
*I,**
Version: .i.U103cla)
/I'
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-93-060 1 07-07-93 08-04-93 08-04-93 A 08-17-93 08-18-93 09-03-93 10-01-93 10-28-93
RESP. ENGR./DEPT: RAH/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 28-oct-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: INACCURATE, MISSING INFORMATION IN SHOTCRETE PLACEMENT LOGS
CORRECTIVE ACTION:
KEYWORDS: AUDIT YMP-93-12,, REECO QAPP.
YM-93-061 1 07-07-93 08-04-93 08-04-93 A 08-17-93 08-18-93 09-15-932 11-04-93 10-21-93 A 11-04-93 11-04-93 11-19-93 U3 12-14-93 12-29-93 01-04-94 A 01-18-94 01-19-94 01-28-944 01-28-94 A 02-04-94 02-07-94 02-28-945 02-28-94 A 03-01-94 S 03-14-94
RESP. ENGR./DEPT: RAH/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 15-mar-1994.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: FAILURE OF QC TO NOTIFY CONSTRUCTION TO TAKE ADDITIONAL SAMPLES
CORRECTIVE ACTION: Implement log system to ensure timely receipt of test data.
KEYWORDS: AUDIT YMP-93-12,, SPEC YMP-025-1-SP09.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 13
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 1' 1995 1:04 PM Quality Assurance CAR Log ApplicationOPEN CLOSED CAR, Participant: REECO
** a***
Version: 3.1.0'03cla)
'CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-93-084 1 07-28-93 08-25-93 08-25-93 A 09-01-93 09-02-93 10-01-93 S 10-18-93
RESP. ENGR./DEPT: SRD/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 19-oct-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: NOT IMPLEMENTING AP-5.39Q WHEN REQUESTING WORK FROM RSN MTL
CORRECTIVE ACTION:
KEYWORDS: AP-5.39Q, AUDIT YMP-93-13,.
YM-93-092 1 09-09-93 10-07-93 09-28-93 A 10-01-93 10-01-93 10-08-93 S 10-28-93
RESP. ENGR./DEPT: FHL/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: MQAD issued CAR closure letter on 28-oct-1993.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: UNTRAINED PERSONNEL USED IN STARTER TUNNEL
CORRECTIVE ACTION:
KEYWORDS: TC-881-WP-0003, YMP-SR-93-045,.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 14
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 1 1.99b 1:04 M Quality Assurance "AR Log ApplicationOPEN CLOSED CARr Participant: REECO
K>S,*
Version: 3.1.003cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. cYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-94-008 1 12-22-93 01-24-94 01-24-94 A 01-31-94 02-03-94 03-18-94 S 03-23-94
RESP. ENGR./DEPT: KOG/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 24-mar-1994.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: WATER REMOVED FROM THE ESF NOT BEING REPORTED AS REQUIRED
CORRECTIVE ACTION:
KEYWORDS: YMP-025-ISP09, YMP-SR-94-010,.
YM-94-009 1 12-22-93 01-24-94 01-24-94 A 02-02-94 02-04-94 02-25-94 03-11-94 S 03-22-94
RESP. ENGR./DEPT: SPN/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 22-mar-1994.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: FAILURE TO ADEQUATELY ADDRESS SPECIFICATION REQUIREMENTS
CORRECTIVE ACTION: Revise TC-581-SP-0001
KEYWORDS: YMP-025-1-SP08,, YMP-025-1-SPO9,, YMP-025-1-SP10, YMP-SR-94-010,.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 15
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May ' 1995 1:04 PM
1-1 '
Quality Assurance CAR Log ApplicationOPEN & CLOSED CAr Participant: REECO
*\ **
Version: 3.1.0003cla)
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-94-011 1 12-14-93 01-12-94 01-14-94 A 01-25-94 01-26-94 02-11-94 S 02-23-94
RESP. ENGR./DEPT: RAH/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 24-feb-1994.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: DOCUMENTATION OF ROCK BOLT INSTALLATION INCORRECTLY COMPLETED.
CORRECTIVE ACTION: Revise TC-581-SP-0011
KEYWORDS: TC-581-SP-0011, YMP-SR-94-004,.
YM-94-024 1 03-09-94 04-06-94 04-06-94 AR2 04-26-94 05-12-94 05-10-94 A 05-23-94 05-23-94 05-31-94 06-08-94
RESP. ENGR./DEPT: PHC/QAD YMSCO ASST MANAGER: UNKNOW PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 08-jun-1994.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: TEST EQUIPMENT NOT CALIBRATED
CORRECTIVE ACTION:
KEYWORDS: MC-10.0, YP-SR-94-023.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 16
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May-]' 1995 1:04 PM Quality Assuranc- "AR Log ApplicationOPEN & CLOSED CAP Participant: REECO
Verso'n: 3.1.0'103cla)
/
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-94-104 1 SC 10-03-94 11-01-94 10-31-94 AR2 12-01-94 12-15-94 12-15-94 A 12-28-94 12-28-94 01-27-95 03-06-95 S 03-07-95
RESP. ENGR./DEPT: RAH/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 08-mar-1995.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: INADEQUATE PROCEDURES FOR MATERIAL IDENTIFICATION AND STORAGE.
CORRECTIVE ACTION: MC 3.01 and 4.03 to be revised; training to be performed.
KEYWORDS: QARD, REVIEW.
YM-95-008 1 11-14-94 12-14-94 12-02-94 A 12-23-94 12-27-94 12-09-94 S 01-12-95
RESP. ENGR./DEPT: DJH/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 13-jan-1995.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: PURCHASE ORDERS ISSUED WITHOUT REQUIRED REVIEWS
CORRECTIVE ACTION: Technical reviews performed.
KEYWORDS: MCP-4.0, MCP-7.0, YMP-SR-95-011.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 17
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work
May 17 995 1:04 PM Quality Assurance-PAR Log ApplicationOPEN CLOSED CARs Participant: REECO
* * /** *
Versi-i: 3.1.013cla)
i
CAR SEV ISSUE RESPONSE RESPONSE *RESP. EVAL. EVAL. CORR. ACT. VERIF. VERIF. CARNO. CYC LEV DATE DUE DATE RECEIVED STAT. DATE LETTER COMPLETION SCHED. STAT.* CLOSED
YM-95-009 1 SC 11-14-94 12-14-94 12-02-94 A 12-09-94 12-12-94 12-16-94 02-10-95 S 02-23-95
RESP. ENGR./DEPT: JSM/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 24-feb-1995.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: WELDERS NOT QUALIFIED, AS REQUIRED
CORRECTIVE ACTION: Welder qualification documented.
KEYWORDS: SPP-008, YM-SR-95-011.
YM-95-010 1 SC 11-14-94 12-14-94 12-02-94 A 12-09-94 12-12-94 12-16-94 03-06-95 S 03-28-95
RESP. ENGR./DEPT: JSM/QAD YMSCO ASST MANAGER: RC PARTICIPANT: REECO
STATUS: YMQAD issued CAR closure letter on 29-mar-1995.
NEXT ACTION:
NEXT ACTION DATE:
SUBJECT: STEEL SETS NOT MANUFACTURED UNDER QA PROGRAM
CORRECTIVE ACTION: Program changes implemented to clarify requirements.
KEYWORDS: QARD, YM-SR-95-011.
* Abbreviations Used *A - AcceptedAR - Amended Response RequiredE - EvaluatingR - Rejected
Page 18
S - SatisfactoryU - UnsatisfactorySC - Signifficant ConditionSC/SW - Stop Work