Part-financed by the European Union

WS 4: Financial issues

Joint Technical Secretariat

Lead Applicant SeminarHamburg, 2-4 April 2008

Page 2: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

2Lead Applicant Seminar, Hamburg, 2-4 April 2008

AGENDA

1

2

Questions& Answers

It’s your turn

Financial resources

& budget lines

Special financial issues

& financial control

Questions& Answers

It’s your turn

(45 min.)

(45 min.)

Page 3: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

Part-financed by the European Union

WS4: Financial issues – BLOCK 1

Dana HenningsJoint Technical Secretariat

Lead Applicant SeminarHamburg, 2-4 April 2008

Page 4: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

4Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Financial resources

2) Budget lines

3) Questions & Answers

4) It’s your turn

Page 5: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

5Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Financial resources

2) Budget lines

3) Questions & Answers

4) It’s your turn

Page 6: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

6Lead Applicant Seminar, Hamburg, 2-4 April 2008

A project’s financial resources

TO

TA

L P

RO

JEC

T B

UD

GET

ERDF budget

ERDF co-financing

(50%, 75%, 85%)

ERDF partner’s contribution

(50%, 25%, 15%)

Norwegian budget

Norwegian co-financing

(50%)

Norwegian partner’s contribution

(50%)

ENPI budget

ENPI co-financing

(90%)

ENPI partner’s contribution

(10%)

More details: Working Session 2 “Partnership and work plan”

Page 7: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

7Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Financial resources

2) Budget lines

3) Questions & Answers

4) It’s your turn

Page 8: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

8Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 9: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

9Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

Page 10: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

10Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 11: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

11Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL1 – Personnel

• Personnel costs of project staff

– Directly employed by project partners listed in the application form

– Basis: employment/labour contract

– Carrying out project activities

– Gross salary + employer’s obligatory contributions

• NON-ELIGIBLE

– Any voluntary remuneration and employer contribution

– Administration costs

Page 12: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

12Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL1 – Personnel

• Unpaid voluntary work

– Written agreement

– Carrying out project activities

– No remuneration at all

– Limit: project partner’s contribution (10%, 15%, 25%, 50%)

• NON-ELIGIBLE

– Unpaid voluntary work of project partner’s own staff

Page 13: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

13Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL1 – Personnel

Page 14: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

14Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 15: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

15Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL2 – External services

• Expenses paid by project partners to external providers

External = not employed by project partner institutions

• Basis:

– Contracts of work, supply contracts, service contracts

– Invoices/requests for reimbursement.

• Public procurement!

• NON-ELIGIBLE

– Contracting between project partners

Page 16: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

16Lead Applicant Seminar, Hamburg, 2-4 April 2008

Be clear and precise!

Page 17: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

17Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 18: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

18Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL3 – Travel and accommodation

• Travel and accommodation + subsistence allowances

• Essential for project activities

• Most economic way of transport

• Observe national and organisation internal rules!

• Prior approval of travels outside the programme area and the EU!

Page 19: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

19Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 20: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

20Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL4 – Equipment and investment

EQUIPMENT

• Tool/device to carry out project activities

• Not used by project target group after completion of activities

• Depreciation costs only!

INVESTMENT

• Result of project activities

• Used by project target group after completion of activities

• Full costs

More details: Plenary session!

Page 21: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

21Lead Applicant Seminar, Hamburg, 2-4 April 2008

Page 22: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

22Lead Applicant Seminar, Hamburg, 2-4 April 2008

Page 23: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

23Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL4 – Equipment and investment

• Group your equipment!:

– Office equipment: day-to-day management

– Multimedia equipment: interactive

– Measurement, research & laboratory equipment

– Others: Please specify!

Page 24: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

24Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 25: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

25Lead Applicant Seminar, Hamburg, 2-4 April 2008

BL5 – Other direct costs

• ELIGIBLE

– Transnational transfer charges and bank charges

– Participation fees for external events

– Direct office running costs

• NON-ELIGIBLE

– Overheads!

– Any general costs allocated on a percentage or pro rata basis

– Debit interest and exchange rate losses

• Other expenses

– essential for project implementation

– exist because of the project

– supported by invoices directly attributable to the project/project staff

Page 26: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

26Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget lines

BL1 – Personnel

BL2 – External services

BL3 – Travel and accommodation

BL4 – Equipment and investment

BL5 – Other direct costs

Budget flexibility rule

Page 27: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

27Lead Applicant Seminar, Hamburg, 2-4 April 2008

Budget flexibility rule

BL1 BL2 BL3 BL4 BL5 Total

WP1 Flexibility

WP2 Flexibility

WPn Flexibility

Total Flexibility Flexibility Flexibility Flexibility Flexibility Total budget

Reallocated amount (cumulated since project start) ≤ 20% or 40,000 EUR, whichever is higher

• NOT POSSIBLE

– Changes of equipment/investment items

– Changes between project partners’ budgets

Page 28: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

28Lead Applicant Seminar, Hamburg, 2-4 April 2008

Any questions?

Page 29: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

29Lead Applicant Seminar, Hamburg, 2-4 April 2008

It’s your turn

Page 30: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

Part-financed by the European Union

WS4: Financial issues – BLOCK 2

Václav KaplanJoint Technical Secretariat

Lead Applicant SeminarHamburg, 2-4 April 2008

Page 31: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

31Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Time dimension

2) Horizontal rules

3) Control system

4) Questions & Answers

5) It’s your turn

Page 32: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

32Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Time dimension

2) Horizontal rules

3) Control system

4) Questions & Answers

5) It’s your turn

Page 33: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

33Lead Applicant Seminar, Hamburg, 2-4 April 2008

Project phases (1st call)

Preparation Contracting Implementation Closure Post-project

~ 17 months 3 months see application form 3 months

No costs can be reported

Limitations in BLs or WPs

-> Preparations costs BL 1-3/WP 0 only -> Closure costs WP 1 only

Eligible costs can be reported in all BLs and WPs

31/05/2007MC decision

(~ October 2008) 31/12/2025

Page 34: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

34Lead Applicant Seminar, Hamburg, 2-4 April 2008

Preparation phase

• From: 1 year before the call closure (31 May 2007)

To: MC decision date (expected end October 2008)

• Only personnel (BL1), external services (BL2) and travel & accommodation (BL3) in the Work Package 0

• Max. 50,000 EUR or 2% of the project budget, whichever is lower

• PPs eligible for ERDF/Norwegian co-financing

• For approved projects

Page 35: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

35Lead Applicant Seminar, Hamburg, 2-4 April 2008

Contracting & Implementation phase

• Contracting phase:3 months starting from day after MC decision date

• Implementation phase:duration 12-36 months according the application form

• All BLs and WPs in both phases

• Thematic & management activities

Page 36: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

36Lead Applicant Seminar, Hamburg, 2-4 April 2008

Closing phase

• 3 months after the end of project implementation phase

• All BLs in WP 1

• Costs related to the preparation of the final report/auditing

• Costs will be reported together with the last reporting period

• Last date of eligibility = Due date for submission of the final report

Post-Project phase

• No costs eligible

Page 37: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

37Lead Applicant Seminar, Hamburg, 2-4 April 2008

Spending plan & De-commitment

• ERDF information basis for eventual de-commitment

• Norwegian/ENPI information for assessment only

TOTAL: 0.00

Total expenditure per reporting period

0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENPI

ERDF

Reportingperiod 1

Reportingperiod 2

Reportingperiod 3

Reportingperiod 4

Reportingperiod 6

month 1-6 month 7-12 month 13-18 month 19-24Expenditure co-financed from:

Project implementation and closure expenditure

month 31-36

Reportingperiod 5Preparation

expenditure month 25-30

Norwegian

Page 38: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

38Lead Applicant Seminar, Hamburg, 2-4 April 2008

Spending plan & De-commitment

• Basis for quality assessment

• Basis for eventual budget cuts in case of significant under-spending

SPENDING PLAN MUST BE REALISTIC & LINKED TO WORK PLAN

Page 39: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

39Lead Applicant Seminar, Hamburg, 2-4 April 2008

Spending plan & De-commitment

Average project spending in IIIB (% of total budget)

=> ENABLE QUICK START

Year 1 Year 2 Year 3 Year 4 Total

Planned requests 31.0% 39.0% 30.0% 0.0% 100.0%

Real requests 21.0% 30.0% 32.0% 9.0% 92.0%

Page 40: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

40Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Time dimension

2) Horizontal rules

3) Control system

4) Questions & Answers

5) It’s your turn

Page 41: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

41Lead Applicant Seminar, Hamburg, 2-4 April 2008

“10% Flexibility rule”

Costs paid outside EU eligible only if :

• benefit EU MSs of the programme area

• do not exceed 10% of the ERDF co-financing

• are approved by MC (application form, pt. 3.10.2.) or by MA in advance

• Concerns ERDF funds only

• Do not confuse it with 20% rule ( covered in WS Partnership)

Page 42: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

42Lead Applicant Seminar, Hamburg, 2-4 April 2008

Value Added Tax (VAT)

• Recoverable VAT is not eligible

=> Partners who can get VAT refunded/offset by tax authorities have to plan their budgets without

VAT

• IMPORTANT: VAT status of partners must be declared => in the application form & => in the Partner declaration

Page 43: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

43Lead Applicant Seminar, Hamburg, 2-4 April 2008

Other financial charges

• Financial charges e.g. for transnational transactions, bank accounts of project or where required guarantees are eligible

• Debit interests, exchange rate loses are NOT eligible

Page 44: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

44Lead Applicant Seminar, Hamburg, 2-4 April 2008

Revenues & interests generated by projects

• Revenues

Example: Selling of project outputs, conference fees…

• Interests (and equivalent benefits) generated by ENPI co-financing

reduce the eligible expenditure

Page 45: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

45Lead Applicant Seminar, Hamburg, 2-4 April 2008

Cost sharing

• Pro rata allocation of expenditure to at least 2 partners

• Plan carefully => Prepare a written agreement on shared costs => Include partner shares in the partner budgets

• Indicate it in the application form

1 2 3 4 5 6 71

Value of the contract

Project co-ordination 100,000.00

1

External service corresponding WP Cost sharing

Contracting partner

Page 46: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

46Lead Applicant Seminar, Hamburg, 2-4 April 2008

Further points for consideration

• Total budget - project duration/scope/complexity of activities/partnership

• Detailed budget (per BL & WP) - Activities

• Ratio “WP1/total budget”

• Ratio “equipment/total budget”

• External services/equipment/investments

Page 47: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

47Lead Applicant Seminar, Hamburg, 2-4 April 2008

Content

1) Time dimension

2) Horizontal rules

3) Control system

4) Questions & Answers

5) It’s your turn

Page 48: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

48Lead Applicant Seminar, Hamburg, 2-4 April 2008

Control system

Other controls EU and national audit bodies, JTS, MA, CA, AA …

Second level audit(selected samples of projects)

Audit Authority (AA) & Group of Auditors (GoA)/

ENPI: External auditor

First level control(Validation/verification at PP and LP level)

ENPI: First level controller to confirmed by

MS/MA

Page 49: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

49Lead Applicant Seminar, Hamburg, 2-4 April 2008

Country-specific control requirements (ERDF/Norway)

• Organisation of the control = responsibility of MS/Norway

• Main types of systems

– Centralized system: Estonia, Latvia, Lithuania, Poland, Sweden

– Decentralized system: Finland, Germany, Norway

– Mixed system: Denmark

Page 50: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

50Lead Applicant Seminar, Hamburg, 2-4 April 2008

ENPI control requirements

• First level controller contracted by the Lead Partner, in exceptional cases by the project partner

• Selection has to be confirmed by MA

• Internationally recognized supervisory body for statutory auditing & member of IFAC

Page 51: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

51Lead Applicant Seminar, Hamburg, 2-4 April 2008

Do the project partners pay the First Level Controller?

GER DK EST FIN LT LV NOR PL SWE

Yes Yes No Yes Yes No Yes No No

• ERDF: Depends on the national system

• ENPI: Yes

Page 52: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

52Lead Applicant Seminar, Hamburg, 2-4 April 2008

Any questions?

Page 53: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

53Lead Applicant Seminar, Hamburg, 2-4 April 2008

It’s your turn

Page 54: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

54Lead Applicant Seminar, Hamburg, 2-4 April 2008

Further information

•Operational programme

•Programme Manual

•Programme website (eu.baltic.net)

•Joint Technical Secretariat

Page 55: Part-financed by the European Union WS 4: Financial issues Joint Technical Secretariat Lead Applicant Seminar Hamburg, 2-4 April 2008

Part-financed by the European Union

WS4: Financial issues

Dana Hennings & Václav KaplanFinancial Managers, Joint Technical Secretariat

Phone: +49 381 45 484 5271/-5290email: [email protected], [email protected]

eu.baltic.net