Part of the BRE Trust

BRE: BIM in Wales

Dan RossiterBIM Team, BRE Wales26th of September, 2014

– About me

– What is BIM

– The Origins of BIM– Egan, Latham, Construction Strategy

– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents

– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit

– How the BRE can help– Education– Certification– Consultancy

Agenda

About Me

??

Dan Rossiter

What is BIM

BIM (Building Information Modelling)

–It’s not just 3D CAD

–It’s not just a new technology application

–It’s not next generation, it here and now!

BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them.

http://www.bimtaskgroup.org/bim-faqs/

BETTER

INFORMATION

MANAGEMENT

What is BIM

What is BIM?

The Origins of BIM

The Origins of BIM

Latham Report1994

Egan Report1998

Never WasteA Good Crisis

2009

AcceleratingChange

2002

The Origins of BIM

Quiz Time

Based on the last eleven years of KPI’s:

What percentage of projects come in on time and no budget? ~50%

Wolstenholme, 2009

CostThe Origins of BIM

BIM was seen as a way to

Improve:

Carbon

The Origins of BIM

“Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous”

“Information is Uncoordinated…”

“Information is ambiguous… or why we need Standards”

“Information may be incomplete…”

“Information is uncoordinated…”

“Information is also geospatially incorrect…”

The Origins of BIM

– There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament.

– Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.

ConstructionStrategy

2011

The Origins of BIM

BIS BIM Strategy2011

– The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information.

BIM Level 2 Requirements

BIM Maturity Levels – Strategy Paper 2011

0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism.

1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration.

2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements.

3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.

UK Standards for BIM

BS1192:2007 PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2014(COBie)

BS 8541 Series

BIM Industry Documentation

PI For BIM(CIC)

BIM Protocol(CIC)

Uniclass(CPIC)

Digital Plan of Work(BIM Task Group)

CPIx Online(CPIC)

BIM in Wales

BIM in Wales

CEWales BIM Task Group

Working Paper2012

Recommendations:

–Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015.

–A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15.

–The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence

BIM in Wales

Welsh Construction Procurement Strategy

2013

Key Objectives and Milestones:

–Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015.

BIM in WalesContains:–Introduction

–Setting the BIM Scene

–Business Case IT Investment

–Employer Information Requirements Template

–Employer Information Requirements Example

–Glossary of Terms

–Procurement Guide

–BIM and GSL Guide

–Collaborative Maturity Assessment Tool

–Standards and Protocol Reference

The CLAW All Wales BIM Toolkit2014 (Draft)

How BRE Can Help

www.bre.co.uk/BIM

BIM Level 2 Training Course

– BIM Foundation Course (AP)Covering BIM processes, procedures, information models, management and collaboration

– BIM Level 2 PAS1192-2

Project Information Manager (PIM)

Task Information Manager (TIM)

– BIM Level 2 PAS1192-2

Project Delivery Manager (PDM)

BIM Level 2 Certification Schemes

BRE BIM Certificated Professional Schemes– Task Information Manager– Project Information Manager– Project Delivery Manager

BRE BIM Business System Certification Scheme– Audited BIM Capability Assessment

Business Certificate Scheme Benefits

– PAS 91 (Working towards UKAS accreditation )

– BRE Certificated

– Audited Business Evaluation

– Defined Industry Benchmark

– Lean Process– Reduced Employers Effort / Cost– Reduced Supply Chain Effort / Cost

– Checked by Industry Specialist and Supported by BuildingSMART UKI

BIM Checking Service

Documentation

–Employers Information Requirements (EIRs)

–BIM Execution Plans (BEP)

Models (BS 1192:2007. PAS 1192-2:2013, BS 1192-4, BS8541 Series)

–Naming Conventions

–Spatial Co-ordination

–Model Definition

–Volume Strategy

–Level of Definitions

–Data Segregation

–Annotations & symbology

– About me

– What is BIM

– The Origins of BIM– Egan, Latham, Construction Strategy

– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents

– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit

– How the BRE can help– Education– Certification– Consultancy

Summary

Any Questions?

Dan Rossiter

BIM Consulting / Training Manager

[email protected]