1 Page 1 © 2015, ITER Organization Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Partners for the Future of Energy: ITER and the Swiss Plasma Centre Bernard Bigot Director-General ITER Organization Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 2 © 2015, ITER Organization q École Polytechnique Fédérale de Lausanne is recognized as one of the world’s pre-eminent engineering, teaching, and research institutions. q The Center for Plasma Physics Research has for decades made significant contributions to fusion science and materials science. q Switzerland has made vital contributions to ITER through EURATOM for many years and solidified its relationship in March 2009 by ratifying its accession to Fusion for Energy (F4E) q With the inauguration of the SPC today, the importance of this partnership and commitment is re-emphasized. Congratulations: inauguration of Swiss Plasma Center

Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

1

Page 1 © 2015, ITER Organization

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015

Partners for the Future of Energy: ITER and the Swiss Plasma Centre

Bernard Bigot Director-General

ITER Organization

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 2

© 2015, ITER Organization

q  École Polytechnique Fédérale de Lausanne is recognized as one of the world’s pre-eminent engineering, teaching, and research institutions.

q  The Center for Plasma Physics Research has for decades made significant contributions to fusion science and materials science.

q  Switzerland has made vital contributions to ITER through EURATOM for many years and solidified its relationship in March 2009 by ratifying its accession to Fusion for Energy (F4E)

q  With the inauguration of the SPC today, the importance of this partnership and commitment is re-emphasized.

Congratulations: inauguration of Swiss Plasma Center

Page 2: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

2

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 3

© 2015, ITER Organization

q  As requested, I will provide a brief update on progress at ITER

Setting ITER on the pathway to success

Ø  Creation of a reliable ITER project baseline

Ø  Progress on construction

Ø  Progress on component manufacturing

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 4

© 2015, ITER Organization

Facing present ITER challenges q  It is urgent to establish a stable ITER baseline and its associated

optimized resource loaded schedule necessary for a timely cost-effective start of D-T plasmas.

q This schedule must be elaborated and endorsed by all the stakeholders (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation.

q Bold changes in the whole ITER organization and management must be introduced now to meet these challenges. They rely on: Ø The decisions to be taken by this IC as requested in the action plan; Ø Active support by the members for their full implementation.

q The first deliverables from such changes would enable the IO-DG to establish the new baseline (scope, schedule, cost, risk) before the end of the current year and to set ITER on the right course for their timely realization in the next years.

Page 3: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

3

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 5

© 2015, ITER Organization

q  Past 6 months strongly focused on shifting to new ITER phase: Ø  Top priority to create a stable ITER project updated baseline and

an associated “optimized resource loaded schedule”; Ø  Comprehensive effort: to compile a detailed information set and to

develop a common understanding of scope, schedule, costs, & risks Ø  Latest step: Integrated Review meeting earlier this month Ø  Ultimate objective: presentation for review by the ITER Council

in November 2015 to establish the basis for moving forward q  Current status: Ø  Completed appointment of senior staff and most elements of

organizational reform; Ø  Maintaining momentum on a tight and challenging schedule,

including urgent steps to further refine resource estimates.

Overview of ITER Progress

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 6

© 2015, ITER Organization

ITER Project

CN

ITER: a global collaboration Central Team & Seven Domestic Agencies

IO

RF EU

KO JA

IN

In parallel with the ITER Organization and staffing changes and the effort to establish a new baseline, we are also focused on: q  Improving transparency

and communication with Domestic Agencies;

q Maintaining the pace of construction and global component production and delivery.

US

Page 4: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

4

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 7

© 2015, ITER Organization

Ø Project Teams integrate the work of the IO-CT and IO-DAs more effectively: ü Buildings Infrastructure and Power Supplies Project Team was the first to

be established

ü Vacuum Vessel Project Team was also established

ü Cryogenics Project Team will soon be established

First Project Teams established

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 8

© 2015, ITER Organization

On-Site Construction

Page 5: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

5

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 9

© 2015, ITER Organization

PF Coils Building

ITER HQ

Subcontractors Area

Tokamak Complex (Under construction)

Assembly Hall (Under construction)

400 kV switchyard

Cryostat Workshop

HQ Extension

Storage Area 2

Storage Area 3

Storage Area 1

Batching Plant

Worksite progress Under Installation Transformers

Preparatory works Cryogenics Building

Preparatory works Cooling Water Building

Preparatory works Control Building

Preparatory works RF Heating Building

August 2015

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 10

© 2015, ITER Organization

Tokamak Complex

Resting on 493 anti-seismic bearings, the 1.5-metre-thick Tokamak Complex basemat will support 400,000 metric tons of buildings, equipment and machinery. This « B2 slab » was finalized on 27 August 2014; wall construction is underway.

Page 6: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

6

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 11

© 2015, ITER Organization

Poloidal Field Coils facility

Too large to be transported by road, four of ITER’s six ring-shaped magnets (the poloidal field coils) will be assembled by Europe in this 12,000 m² facility. “White rooms” are currently being equipped prior to the start of manufacturing operations.

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 12

© 2015, ITER Organization

Cryostat Workshop

The Indian Domestic Agency has erected the Cryostat Workshop for assembly activities on the 30 x 30 metre cryostat, or giant “thermos”, that will completely enclose the ITER Tokamak. India will deliver the first cryostat elements in November 2015.

Page 7: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

7

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 13

© 2015, ITER Organization

Construction of ITER’s Largest Warehouse (10,000 m²): currently in finishing stages

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 14

© 2015, ITER Organization

Assembly Building

Components will be pre-assembled in this 60-metre high building prior to their integration into the machine.

Page 8: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

8

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 15

© 2015, ITER Organization

Raising the Assembly Hall Roof: September 2015

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 16

© 2015, ITER Organization

ITER: a global collaboration 7 billion € is currently engaged in construction

and manufacturing contracts for ITER worldwide

ITER

Page 9: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

9

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 17

© 2015, ITER Organization

Central solenoid

Toroidal field coils (18)

Cryostat

Blanket modules

Thermal shield

Correction coils (18)

Internal coils

Poloidal field coils (6)

Vacuum vessel Divertor

Cooling water system

Who manufactures what?

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 18

© 2015, ITER Organization

Manufacturing progress China

Chinaisresponsiblefortheprocurementof14poloidalfieldAC/DCconverterunitsthatwillprovidereliable,controlledDCpowertotheITERpoloidalfieldmagneBccoils.Thesystemischallengingtodesignandfabricate,inparBcularduetoanunprecedentedpowerlevelandshortcircuitcurrentandahighlyspecificoperaBonmode.InFebruary2015,aprototypeconverterunitwassuccessfullytested,openingthewaytofuturebatchproducBon.

Page 10: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

10

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 19

© 2015, ITER Organization

Manufacturing progress Europe

Europeisresponsiblefordeliveringremotehandlingsystemsforthedivertor,theneutralbeamsystem,in-vesselviewingandmetrology,andthecasktransfersystemforacBvatedcomponents—inall,aboutEUR250millionofinvestment.AttheDivertorTestPlaNormfacilityhostedbytheVTTTechnicalResearchCentreinFinland,thefinaldemonstraBonofthedivertorcassePeremotehandlingsystemwascarriedoutinFebruary2015.

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 20

© 2015, ITER Organization

Manufacturing progress India

IndiaisresponsibleforthefabricaBonandtheassemblyofthe30x30m.ITERcryostat.Pictured,six60°baseplatesaretemporarilyassembledatthefactoryinordertochecktolerancespriortoshipmenttoITER.ThefirstcryostatelementsarescheduledtoarriveatITERinNovember2015.

Page 11: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

11

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 21

© 2015, ITER Organization

Manufacturing progress Japan

Japanismanufacturinghalfofthe18gianttoroidalfieldcoilsneededforITER.Here,theD-shapedpancakewindingsareheattreatedat650°Cfor100hourstoreactBnandniobiumtoformthesuperconducBngcompoundNb3Sn.

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 22

© 2015, ITER Organization

Manufacturing progress Korea

InKorea,wheretwoofninevacuumvesselsectorsareunderconstrucBon,weldingiscarriedoutontheuppersecBonofaninnershell—onlyasmallpieceofthefullcomponent...

Page 12: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

12

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 23

© 2015, ITER Organization

ASN Inspection in Korea: 28-29 April 2015

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 24

© 2015, ITER Organization

Manufacturing progress Russia

RussiacompletesitsshareoftoroidalfieldconductorinJune2015.Themilestonemarkstheendofafive-yearcampaigntomanufacture28producBonlengths(morethan120tonsofmaterial).

Page 13: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

13

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 25

© 2015, ITER Organization

Manufacturing progress USA

TheUSisresponsibleforthedesign,R&D,andmanufacturingofthemaincentralsolenoidmagnet(usingconductorsuppliedbyJapan),aswellastheassociatedstructureandtooling.AtGeneralAtomics’MagnetTechnologiesCenterinPoway,California,windingoperaBonsbeganinApril2015onamockupmodule.

Page 26 © 2015, ITER Organization

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015

Drain Tanks Delivery: 7 May 2015

Page 14: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

14

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 27

© 2015, ITER Organization

Transformers Installation: began on 21 May

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 28

© 2015, ITER Organization

Superconductor Production: global milestone

Ø  Economically: EUR 610 million global investment Ø  Technologically: used latest materials science;

raised superconductor production globally Ø  Successful multinational collaboration on design,

production, QA and testing protocols

Page 15: Partners for the Future of Energy: ITER and the Swiss Plasma … · (ITER Members, IO-CT, IO-DAs and suppliers) who should feel fully and jointly committed to its implementation

15

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 29

© 2015, ITER Organization

ITER is moving forward!

Swiss Plasma Center Inauguration, Lausanne, 22 September 2015 Page 30

© 2015, ITER Organization

China EU India Japan Korea Russia USA

Thank you very much