• Foundation• Column and Beams
• Lintel• DPC• Windows and doors• Roof • Floor
8/19/2019 Parts of Building1
3/15
Foundation :-
The portion of a structureunder columns and wallswhich transfer load of thestructure to the soil in a safe
way without excessivesettlement is calledfoundation.
8/19/2019 Parts of Building1
4/15
Importance ofFoundation :-
•The main function of foundation isto redistri!ute the concentratedload of walls and columns over alar"er area # reducin" the loadper unit area $ load intensity %
until it !ecomes e&ual to the safe!earin" capacity of the soil.
• 'f the proper foundation is notapplied # the structure maysu!side due to compression of
soil.
8/19/2019 Parts of Building1
5/15
• (election of foundationdepends on the conditions we
are facin". For example if soilis stron" and load is not verymuch )(hallow Foundation**is suita!le however if soil issoft and there is very hu"e
concentrated load then )Deepfoundation** should !e selected.
• +ostly for sin"le story !uildin"(tep Foundation is applied #details of which are "iven in
,"ure.
8/19/2019 Parts of Building1
6/15
Columns And Beams :-
Beam is a structural mem!er # used toprovide support to upper part of!uildin" leavin" clear spaceunderneath and transfer the imposedloads to supports at its ends. -suallythe load acts at ri"ht an"le to thelon"itudinal axis of the mem!er.
Whereas Column is a structuremem!er which provides a continuoussupport for upper part of the !uildin"and carries the load directly to thefoundations. 'n column load usually
acts alon" vertical axis.
8/19/2019 Parts of Building1
7/15
Beams and columns are usually madeof concrete # reinforced with steel !arConcrete is very wea in tension if no
reinforcement is provided !eam will cat !ottom and will fall down. 'f we prosteel !ars it !ecomes safe as steel issu/iciently stron" in tension.Columns are used where heavy load i!e supported # lie in multi story!uildin"s. 'n sin"le story !uildin"s onwalls serve the purpose.
8/19/2019 Parts of Building1
8/15
Lintel :-Lintel is a smallusually concealed!eam provided over
openin"s in wallslie doors # windowsand ventilators.
8/19/2019 Parts of Building1
9/15
Purpose Of Lintel :-
Whenever we "ive openin" in the wait weaens the structure # lintels areprovided over the openin" so that lo
can !e e/ectively overcome. (tren"of lintel should !e carefullyconsidered accordin" to amount ofload they are "oin" to !ear.
f C
8/19/2019 Parts of Building1
10/15
Damp Proof Course( D.P.C ) :-
Brics have a porous
structure and the pores areinterconnected to formcapillaries. 0s a result #!rics suc dampness fromthe soil underneath andpump it to upper parts of the!uildin" # and thus dama"esthe !uildin". To prevent thisa continuous water proof
layer is provided a!ove the
8/19/2019 Parts of Building1
11/15
Composition of DPC:-
DPC consist of 1 2 in to 3in thic layer of P.C.C $ 14546 %over which two coats of hot!itumen are applied. (ometimes #
for load !earin" walls # polythenesheet is also provided. The top of
DPC is made in level with the"round 7oor of the !uildin".
8/19/2019 Parts of Building1
12/15
indo!s andDoors :-
Window is the openin" inthe walls to mae the roomairy and li"hted. Whereasdoor is the openin" in the
walls to mae roomaccessi!le.
8/19/2019 Parts of Building1
13/15
1%There should not !e too many windows the !uildin" as it will mae the structurewea.
5%8ormally windows are 6 feet wide and thei"ht from 7oor is 3 feet.
3%Doors should not !e too wide that they occupy the whole space # and not too sm
that thin"s lie furniture # frid"e may nopass.6%-sually doors are 6 feet wide and 9 feet
hi"h.
8/19/2019 Parts of Building1
14/15
"oof :-'t is a structure used to cover
the re&uired parts of the!uildin". Roof coverin" of thetop of a !uildin"# servin" toprotect a"ainst rain # snow #sunli"ht# wind # and extremes
of temperature. Roofs have!een constructed in a wide
variety of forms 7at# pitched # vaulted# domed# or in
com!ination. 'n Paistan 7at
8/19/2019 Parts of Building1
15/15
Followin" points should !e ept in miwhile constructin" roof 4
1%Roof should have proper slope so that rawater may not stand over it
5%:xternal surface of roof must prevent ra
and other precipitations from penetratin!uildin".
3%Roof should !e stron" enou"h to !earexpected load.