Engineering Design
Sync R&D, with its partners, is imminently qualified to work with
various industries. Our staff has many years of experience designing
electro-mechanical systems of all types and sizes. Where specific
technical knowledge is not already in-house, we have identified
partners who have demonstrated history of high quality, high
performance solutions to guarantee that our proposed system is
the best possible system for its money on the planet. Our customers
and industries vary widely, but the skills that each employee brings
from their diverse backgrounds have enabled Sync R&D to
successfully deliver profitable solutions. Following are several
examples of projects in which Sync R&D and its partners have
participated.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
SCOMI Rail Berhad.
Description : Gen2 Monorail Prototype
Contracting Activity : SCOMI Rail Berhad, Malaysia
Contract # : MTrans# LOA01 – 20 Oct 2006.
Contract Type : Fixed Cost
Total Contract Value : RM2,000,000+ (~USD580,000+)
Contracting Officer : Johnny Boulianne
+60 (017) 880-0896
Summary of Work:
Sync R&D and its partners, MRDC and San Diego Composites
(SDC) designed, analyzed, and observed fabrication and testing of
the first Gen2 prototype of the world’s first structural composite
body monorail.
SDC designed and analyzed the composite body while Sync R&D
and MRDC designed the welded, stainless steel chassis and
composite interior structures using SolidWorks and Nastran.
The load cases for the vehicle included normal quasi-steady state
loads as well as fatigue assessments per BS7608
(similar to AWS D1.1) and dynamic loads for shock and vibration
situations.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
Standards to comply with:
There were also several standards that we have to comply with during
the design of the monorail train which include:
ASCE 21-98 (Part II)
Covers load cases for various chassis, exterior and interior parts.
Examples for interior parts are stanchions loads, wheel-chair space
and load requirements, ergonomic of passengers (size of seat,
standing area, etc), electrical safety, lighting requirement and flooring.
NFPA 130 –
Standard for Fixed Guideway Transit and Passenger Rail Systems
Fire rating for trains
Covers minimum requirement for fire worthiness of interior
components, and methods and best practices to ensure fire worthiness.
BS7608 –
Code of Practice for Fatigue Design and Assessment of Steel Structures
Weld classifications of steel
Fatigue criteria of welded steel sections
Vandal proof material needs to be used to avoid too frequent
refurbishment of the interior. Typically, interior of trains needs to be
refurbished a least every 7.5 years.
Solicitation Relevance:
The work performed for Scomi is relevant because it required a
comprehensive analysis of a very large structure comprised of composite,
steel, aluminum and various other materials represented as 1D, 2D and
3D elements.
Problems & Corrections:
No known problems with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
SCOMI Rail Berhad.
3P Prototype Switch
Description : 3-point prototype switch for full passenger
loading (AW3) train.
Contracting activity : Scomi Rail Berhad
Contract # : 3PS00002
Contract type : Fixed cost
Total Contract Value : RM250,000
Contract Officer : Khutubu R. Arrifin
+6019 316 0171
Summary of work:
Sync R&D design, integrate and observed fabrication and
installation of the hydraulic actuator and electrical control systems
of the 3-point prototype monorail switch. The engineering
drawing package is also managed and updated to ensure latest in
formation is available among the team members. As-built drawing
package is delivered at the end of the project to reflect all changes
and modifications made to the final design during fabrication phase.
Apart from design, Sync R&D also develops installation document,
inspection and testing plan, operation and maintenance manual and
training document. During inspection and testing phase, engineers
from Sync R&D are placed on-site to observed and provide
support for the tasks.
Solicitation Relevance:
The work performed for Scomi Rail Berhad is relevant because
the hydraulic actuator and electrical control system were designed, fabricated and installed on a tight budget and time
constraints. The systems fully comply with the performance
specification and other requirements set by the customer.
Problems and Corrections:
There were no known problems with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
SCOMI Rail Berhad.
2, 2Y, 3, 4, 5 and crossover switches
Description, contracting activity, contract number, etc as per
comments in original doc.
Contract # 3 PS 00002
Contract Type : Fixed Cost
Total Contract Value : RM800,000
Contract Officer : Khutubu bin Arifffin
Summary of work:
Sync R&D designed and participated in initial fabrication planning for
the 2-point, 2-point Y, 3-point, 4-point, 5-point and crossover depot
switches. Designs of these switches were based on the 3-point prototype
(AW3-loaded switch) switch developed by Scomi Rail Berhad. The
switches were optimized to carry trains within the depot area
(AW0 load). Changes include modifications of the beams, link beams and
trucks. New hydraulic actuator and electrical control systems are also
developed for the longer stroke 4-point and 5-point switches.
The whole information package including engineering drawings, bill of
material, installation document, testing & inspection plan, operation &
maintenance manual and training instructions are developed and delivered
by Sync R&D. These steel switches are part equipment supplied to the
Mumbai Monorail Project by Scomi Rail Berhad.
Solicitation Relevance:
This project is relevant because it demonstrate Sync R&D’s capabilities to
evolve an existing design to meet new criteria and requirements.
Modification, optimization and good problem-solving skills are applied to
ensure fully operational end product that meets the customer’s
specifications.
Problems and corrections:
There were no known problem with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
CMI, Inc.
Description : Concrete Paving Kit
Contracting Activity : CMI, Inc., OK
Contract # : N/A
Contract Type : Time & Materials
Total Contract Value : USD500,000+
Contracting Officer : Chapin Sipherd
(405) 787-6020
Summary of Work:
SRD and its partner led an engineering team that designed an updated
version of the Series I paving kit and some components of the tractor
leg structure to improve surface smoothness, integrate new actuation
methods to enhance performance range, incorporate features to
simplify machine maintenance and repair, identify cost reductions in
hydraulic and purchased parts components, and incorporate design
For manufacturability and assembly concepts to reduce manufacturing
cost.
Solicitation Relevance:
The work performed for CMI is relevant to this project because this
project required engineering design, analysis, and documentation
support for the fabrication of a welded steel structure using American
Welding Society (AWS) D1.1 standards which are similar in scope and
application to BS7608. The framework was made from stock structural
steel shapes, included many welded and fastened assemblies while also
requiring a fairly high degree of manufacturing accuracy.
Problems & Corrections:
There were no known problems with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
Motive Power Industries
Description : Passenger Locomotive Fuel Tank
Design & Analysis
Contracting Activity : MotivePower, ID
Contract # : N/A
Contract Type : Firm Fixed Price
Total Contract Value : USD380,000+
Contracting Officer : Norman Anderson
(208) 947-4882
Summary of Work:
SRD and its partner designed and analyzed a passenger
locomotive fuel tank to meet USA Code of Federal Regulations
regarding operational and crash safety.
Solicitation Relevance:
The work performed for MotivePower is relevant because the
structure is a welded tank which had to meet Federal Railroad
Administration regulations defining the design and analysis
procedures and evaluation criteria similar to those anticipated
for the off-shore oil platform. The fuel tank was designed in
Pro/E and analyzed in I-deas and NASTRAN.
Problems & Corrections:
There were no known problems with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
SCP Global Technologies
Description : Wafer Drying Process
Summary:
Wafers not evenly drying
Needed low cost solution to improve wafer drying time & uniformity
Used design of experiments & CFD to optimize design
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
Coherent Technology’s
Description : Airborne Laser Scanning System
Contract Type : Time and Materials
Total Contract Value : USD500,000
Summary of Work:
Sync R&D and its partner designed, analyzed, and coordinated
fabrication of components for an airborne laser scanning system.
The scope of work included designing the laser optical benches,
designing and analyzing the thermal management system, designing
and analyzing the vibration isolation system, and designing and
analyzing the aircraft mounting system.
Solicitation Relevance:
The work performed for Coherent Technologies is relevant
because the entire structure had to be designed an analyzed to
comply with USA Federal Aviation Administration regulations
regarding airworthiness and crashworthiness. The system was
designed in Pro/E and structurally analyzed in I-deas and
NASTRAN. Fluid flow and thermal management was analyzed
using CFDesign. The structure was comprise of steel and
aluminum components; some of which were welded items.
Problems & Corrections:
There were no known problems with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
Various other analysis projects with Sync R&D
technical partner:
Value Plastics; Contract 4988-1
Value: USD5k; Aug – Nov 2006
Study, model & propose methods to eliminate failures in plastic
medical devices.
USAF 846TS/46TG; Contract: FA9200-04-C-0319;
Value: USD850k; Aug 04 – Aug 07; Phase I & II SBIRs to design, fabricate
& test a 60’ long, high altitude simulation chamber for use with rocket sleds.
USAF 846TS/46TG; Contract: FA9200-06-C-0321
Value: USD850k; Apr 06 – Jan 09; Phase I & II SBIRs to design, analyze,
fabricate & demonstrate a machine to measure metal on metal sliding wear
including all ancillary lifting & motion generating equipment.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
Aker Solutions
Sdn. Bhd.
Description : Heat Transfer Thermal Profiling
Analysis on Subsea Well Equipment
Contracting Activity : Aker Solutions Sdn. Bhd.
Contract # : N/A
Contract Type : Firm Fixed Price
Total Contract Value : RM 63,000+
Contracting Officer : Mr. Frazer Crombie
Summary of Work:
SRD and its partner analyzed the thermal profile of the well equip-
ment components on those areas of the structure that exceed
121°C with particular concern on the seal area.
Solicitation Relevance:
The work performed involved design and analysis procedures and
evaluation criteria for off-shore oil platform.
The analysis was done using Nei Nastran as the solver and Femap
as the pre and post processor.
Problems & Corrections:
There were no known problems with this effort.
www.sync
-rnd.com
PASTS EXPERIENCES
PA
ST E
XPER
IEN
CES
sync r&d engineering solution provider
Engineering Design
Aker Solutions
Sdn. Bhd.
Description : Structural Analysis of Production and
Pigging Flowloop
Contracting Activity : Aker Solutions Sdn. Bhd.
Contract # : N/A
Contract Type : Firm Fixed Price
Total Contract Value : RM 9,000+
Contracting Officer : Mr. Chan Yok Tien
Summary of Work:
SRD and its partner did a linear static analysis on both the
Production and Pigging flowloops to determine the stresses and
safety factor on both of the flowloops.
Solicitation Relevance:
The work performed involved design and analysis procedures and
evaluation criteria for off-shore oil platform.
The analysis was done using Nei Nastran as the solver and Femap
as the pre and post processor.
Problems & Corrections:
There were no known problems with this effort.
www.sync
-rnd.com