17
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Embed Size (px)

Citation preview

Page 1: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Pat BennettEngineering Evaluation SectionMonitoring and Laboratory DivisionCalifornia Air Resources Board

AST EVR WORKGROUP MEETINGJuly 23, 2002

Page 2: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Workgroup Agenda• Welcome & Sign-In• Overview of April 17th Meeting• AST Inventory Request• Status of AST Monitoring Effort• Estimating AST Fugitive Emissions• Efficiency Testing / Procedure

Development• Open Discussion and Schedule Next

Meeting• Close

Page 3: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

April 17th Meeting Highlights

• AST Definition - Consensus to include requirement for emergency vent into AST definition found in ARB’s Interim AST Certification Guidelines

• AST Inventory - Current estimate of ASTs is very low. Recommend to contact AST manufacturers for more accurate number.

Page 4: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Revised AST Definition

A system that uses a gasoline storage tank that is intended for

fixed installation, without backfill, is located above or below grade and requires emergency relief venting.

Page 5: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

AST Inventory Request

• Letter Sent to AST Manufacturers

– list included 279 manufacturers from UL Listed Storage Tanks Directory

– requested response by August 15th

– requested information on number of ASTs for agricultural and non-agricultural applications, and size distributions

Page 6: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Status of AST Monitoring Effort

• Monitoring 1,000 and 6,000 gallon balance, single dispenser AST systems

• Difficulty in maintaining vapor integrity on 1,000 gallon AST due to component leakages and loose drain valve and tank bung following Phase I deliveries.

Page 7: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Status of AST Monitoring Effort (continued)

• High throughput of ORVR vehicles on 6,000 gallon AST

• Will not conduct pressure integrity test on 6,000 gallon tank until long-bolt manway emergency vent is replaced with new vent.

Page 8: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

-3

-2

-1

0

1

2

3

6/19

6/19

6/20

6/20

6/20

6/21

6/21

6/21

6/22

6/22

6/22

6/23

6/23

6/23

6/24

6/24

6/24

6/25

6/25

6/25

6/26

6/26

6/26

6/27

6/27

6/27

6/27

Pre

ssur

e (in

H2O

)

Tank Pressure

Pressure Decay Test #1 - Passed After

Replacing Fuel Gauge

Phase I Delivery

Loss of Vapor Integrity Following Phase I

Delivery

Vapor Integrity Maintained For Only 6 Days Following Successful Pressure Decay Test

1,000 Gallon Capacity Balance Tank3,000 Gallon/Month Throughput

Page 9: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

-4

-3

-2

-1

0

1

2

3

4

5

7/7

7/7

7/7

7/7

7/7

7/7

7/8

7/8

7/8

7/8

7/8

7/8

7/9

7/9

7/9

7/9

7/9

7/9

7/10

7/10

7/10

7/10

7/10

7/10

7/11

7/11

7/11

Pre

ssur

e (in

H2O

)

Pressure Decay Test #2 - Passed After Tightening 2" Tank Bung, Drain Valve,

and Cleaning Vapor Poppet

1,000 Gallon Capacity Balance Tank3,000 Gallon/Month Throughput

2nd Pressure Decay Test Conducted Within 3 Weeks Identifies Further Leaking Components

Page 10: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

-4

-3

-2

-1

0

1

2

3

4

5

6

6/18

6/18

6/19

6/19

6/19

6/20

6/20

6/20

6/20

6/21

6/21

6/21

6/21

6/22

6/22

6/22

6/23

6/23

6/23

6/23

6/24

6/24

6/24

6/25

6/25

6/25

6/25P

ress

ure

(in H

2O)

-10

10

30

50

70

90

110

Tem

pera

ture

(F

)

Tank Pressure

Ambient Temperature

High Throughput of ORVR Vehicles -Indicates Correlation Between Tank Pressure and

Ambient Temperature

6,000 Gallon Capacity Balance Tank20,000 Gallons/Month Throughput

Page 11: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

-2

-1

0

1

2

3

4

5

0

56

152

248

344

440

536

632

728

824

920

1016

1112

1208

1304

1400

1456

1552

1648

1744

1840

1936

2032

2128

2224

2320

Time

Pre

ssur

e (in

H2O

)

20

30

40

50

60

70

80

90

100

110

Tem

pera

ture

(F

)

Tank Pressure

Ambient Temperature

High Throughput of ORVR Vehicles - One-Day Tank Pressure and Ambient Temperature

Tank Still Operates at Positive Pressures

6,000 Gallon Capacity Balance Tank20,000 Gallons/Month Throughput

Page 12: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Methodology for Estimating AST Fugitive Emissions

• Use vapor system pressure data and system leak data to establish a correlation between system leak flow over time.

• Determine fugitive emissions by calculating the area under the leak flow curve.

Page 13: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Example of Fugitive Emissions Estimate Over Time

0.00

0.20

0.40

0.60

0.80

1.00

1.20

0 1 2 3 4 5 6 7 8 9 9.5

Time (hours)

Vap

or

Sys

tem

Lea

k R

ate

(ft3

/hr)

Area under curve is the total volume of vapors released from

the AST during the day

Page 14: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Efficiency Testing / Procedure Development

• Plan to conduct Phase I and Phase II efficiency testing on a small and large balance AST vapor recovery system and a processor type system.

• Purpose is to estimate in-use efficiencies of existing systems and update the current baseline Phase I and Phase II emissions estimate

Page 15: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Open Discussion

• Rupture Disk Emergency Vent (2000 Uniform Fire Code Section 7902.2.6.2)

• Existing Emergency Vents– Lubrication– Maintenance– UL Certification Requirements

• Tank Sticking– Dedicated stick port w/drop-tube

Page 16: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

Open Discussion (cont)• Anti-Siphon Devices

– Top-fill (holes in drop tube, size and location requirements)

– Side or remote fills (check valves/anti-siphon devices, location requirements)

• Poppeted Fill Adapters (top fill application)

• Poppeted Fill Adapters w/Close Coupled Shut-Off Valves (side and remote fill applications)

• Operations and Maintenance Manuals– Minimal response from ARB request

Page 17: Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002

ContactPat BennettEngineering Evaluation SectionMonitoring and Laboratory DivisionCalifornia Air Resources BoardP.O. Box 2815Sacramento, CA 95812

(916) [email protected]