Pat BennettEngineering Evaluation SectionMonitoring and Laboratory DivisionCalifornia Air Resources Board
AST EVR WORKGROUP MEETINGJuly 23, 2002
Workgroup Agenda• Welcome & Sign-In• Overview of April 17th Meeting• AST Inventory Request• Status of AST Monitoring Effort• Estimating AST Fugitive Emissions• Efficiency Testing / Procedure
Development• Open Discussion and Schedule Next
Meeting• Close
April 17th Meeting Highlights
• AST Definition - Consensus to include requirement for emergency vent into AST definition found in ARB’s Interim AST Certification Guidelines
• AST Inventory - Current estimate of ASTs is very low. Recommend to contact AST manufacturers for more accurate number.
Revised AST Definition
A system that uses a gasoline storage tank that is intended for
fixed installation, without backfill, is located above or below grade and requires emergency relief venting.
AST Inventory Request
• Letter Sent to AST Manufacturers
– list included 279 manufacturers from UL Listed Storage Tanks Directory
– requested response by August 15th
– requested information on number of ASTs for agricultural and non-agricultural applications, and size distributions
Status of AST Monitoring Effort
• Monitoring 1,000 and 6,000 gallon balance, single dispenser AST systems
• Difficulty in maintaining vapor integrity on 1,000 gallon AST due to component leakages and loose drain valve and tank bung following Phase I deliveries.
Status of AST Monitoring Effort (continued)
• High throughput of ORVR vehicles on 6,000 gallon AST
• Will not conduct pressure integrity test on 6,000 gallon tank until long-bolt manway emergency vent is replaced with new vent.
-3
-2
-1
0
1
2
3
6/19
6/19
6/20
6/20
6/20
6/21
6/21
6/21
6/22
6/22
6/22
6/23
6/23
6/23
6/24
6/24
6/24
6/25
6/25
6/25
6/26
6/26
6/26
6/27
6/27
6/27
6/27
Pre
ssur
e (in
H2O
)
Tank Pressure
Pressure Decay Test #1 - Passed After
Replacing Fuel Gauge
Phase I Delivery
Loss of Vapor Integrity Following Phase I
Delivery
Vapor Integrity Maintained For Only 6 Days Following Successful Pressure Decay Test
1,000 Gallon Capacity Balance Tank3,000 Gallon/Month Throughput
-4
-3
-2
-1
0
1
2
3
4
5
7/7
7/7
7/7
7/7
7/7
7/7
7/8
7/8
7/8
7/8
7/8
7/8
7/9
7/9
7/9
7/9
7/9
7/9
7/10
7/10
7/10
7/10
7/10
7/10
7/11
7/11
7/11
Pre
ssur
e (in
H2O
)
Pressure Decay Test #2 - Passed After Tightening 2" Tank Bung, Drain Valve,
and Cleaning Vapor Poppet
1,000 Gallon Capacity Balance Tank3,000 Gallon/Month Throughput
2nd Pressure Decay Test Conducted Within 3 Weeks Identifies Further Leaking Components
-4
-3
-2
-1
0
1
2
3
4
5
6
6/18
6/18
6/19
6/19
6/19
6/20
6/20
6/20
6/20
6/21
6/21
6/21
6/21
6/22
6/22
6/22
6/23
6/23
6/23
6/23
6/24
6/24
6/24
6/25
6/25
6/25
6/25P
ress
ure
(in H
2O)
-10
10
30
50
70
90
110
Tem
pera
ture
(F
)
Tank Pressure
Ambient Temperature
High Throughput of ORVR Vehicles -Indicates Correlation Between Tank Pressure and
Ambient Temperature
6,000 Gallon Capacity Balance Tank20,000 Gallons/Month Throughput
-2
-1
0
1
2
3
4
5
0
56
152
248
344
440
536
632
728
824
920
1016
1112
1208
1304
1400
1456
1552
1648
1744
1840
1936
2032
2128
2224
2320
Time
Pre
ssur
e (in
H2O
)
20
30
40
50
60
70
80
90
100
110
Tem
pera
ture
(F
)
Tank Pressure
Ambient Temperature
High Throughput of ORVR Vehicles - One-Day Tank Pressure and Ambient Temperature
Tank Still Operates at Positive Pressures
6,000 Gallon Capacity Balance Tank20,000 Gallons/Month Throughput
Methodology for Estimating AST Fugitive Emissions
• Use vapor system pressure data and system leak data to establish a correlation between system leak flow over time.
• Determine fugitive emissions by calculating the area under the leak flow curve.
Example of Fugitive Emissions Estimate Over Time
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0 1 2 3 4 5 6 7 8 9 9.5
Time (hours)
Vap
or
Sys
tem
Lea
k R
ate
(ft3
/hr)
Area under curve is the total volume of vapors released from
the AST during the day
Efficiency Testing / Procedure Development
• Plan to conduct Phase I and Phase II efficiency testing on a small and large balance AST vapor recovery system and a processor type system.
• Purpose is to estimate in-use efficiencies of existing systems and update the current baseline Phase I and Phase II emissions estimate
Open Discussion
• Rupture Disk Emergency Vent (2000 Uniform Fire Code Section 7902.2.6.2)
• Existing Emergency Vents– Lubrication– Maintenance– UL Certification Requirements
• Tank Sticking– Dedicated stick port w/drop-tube
Open Discussion (cont)• Anti-Siphon Devices
– Top-fill (holes in drop tube, size and location requirements)
– Side or remote fills (check valves/anti-siphon devices, location requirements)
• Poppeted Fill Adapters (top fill application)
• Poppeted Fill Adapters w/Close Coupled Shut-Off Valves (side and remote fill applications)
• Operations and Maintenance Manuals– Minimal response from ARB request
ContactPat BennettEngineering Evaluation SectionMonitoring and Laboratory DivisionCalifornia Air Resources BoardP.O. Box 2815Sacramento, CA 95812
(916) [email protected]