15
PATCHING ASSOCIATES ACOUSTICAL ENGINEERING LTD Noise Impact Assessment West Can Seal Coating Gravel Pit LSD 8-35-32-6 W5M West of Sundre

PATCHING ASSOCIATES ACOUSTICAL ENGINEERING LTD Noise Impact Assessment West Can Seal Coating Gravel Pit LSD 8-35-32-6 W5M West of Sundre

Embed Size (px)

Citation preview

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Noise Impact Assessment

West Can Seal Coating Gravel Pit LSD 8-35-32-6 W5M

West of Sundre

Objective of the Assessment Assess the sound data of typical equipment and

operations that are proposed for the West Can Seal Coating Gravel Pit.

Predict the noise level from exploration phases, during the Stripping stage, the Crushing, Washing, Asphalt production, and Transportation operation phase at the potentially most affected receiver locations.

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Project Study Area

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Project Site Plan

Common Noise Levels

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Major Equipment DetailsEquipment Description Equipment Details

Operation 1 – Stripping

Two (2) CAT 627 or Terex TS14 Motor Scrapers

Engine Exhausts are assumed to be equipped with Hospital Grade Silencers

Operation 2 – Crushing, Washing, Asphalt Production & Transportation

Three (3) CAT 980 Loader One Feed Hopper and Conveyor One (1) 22” X 42” Jaw Crusher and 6’ X

16’ Double Deck Vibratory Screener One (1) 54” Cone Crusher One 7’ X 20’ Triple Deck Vibratory

Screener Surge Bin and Conveyor Three (3) CAT 980 Loader (Asphalt Plant) One (1) CAT 980 Loader (Washing Plant)

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Operation Scenarios Studied

Scenario Operation Section

Scenario-1 Stripping without Berms on 1 m depth Phase 1

Scenario-2 Crushing, Washing, Potential Future Asphalt Production &

Transportation without berms on 3 m depth (simultaneous operation)

Phase 1

Scenario-3 Stripping without Berms on 1 m depth Phase 2

Scenario-4 Crushing, Washing, Potential Future Asphalt Production &

Transportation without berms on 3 m depth (simultaneous operation)

Phase 2

Scenario-5 Stripping without Berms on 1 m depth Phase 3

Scenario-6 Crushing, Washing, Potential Future Asphalt Production &

Transportation without berms on 3 m depth (simultaneous operation)

Phase 3

Scenario-7 Stripping without Berms on 1 m depth Phase 4

Scenario-8 Crushing, Washing, Potential Future Asphalt Production &

Transportation without berms on 3 m depth (simultaneous operation)

Phase 4

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Predicted Noise Levels Generated by Stripping and Crushing, Washing, Asphalt Production & Transportation Operation Activity

Location

Predict Noise Level Day Time plus Ambient Sound Level (dBA)

Scenario 1

(Phase 1)

Scenario 2

(Phase 1)

Scenario 3

(Phase 2)

Scenario 4

(Phase 2)

Scenario 5

(Phase 3)

Scenario 6

(Phase 3)

Scenario 7

(Phase 4)

Scenario 8

(Phase 4)

Receiver 1 54 60 52 60 53 59 62 60

Receiver 2 50 49 51 51 61 55 52 50

Receiver 3 50 48 52 50 61 54 53 49

Receiver 4 50 47 60 53 56 49 54 48

Receiver 5 50 46 54 49 51 47 50 47

Receiver 6 50 47 49 46 47 46 48 46

Receiver 7 55 47 52 47 47 46 52 46

Receiver 8 49 57 47 57 47 57 50 57

Receiver 9 47 48 47 48 48 48 48 48

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Scenario 1- Predicted Facility Sound Contours (Not Including Ambient) from Stripping, without Berms - Phase 1

West Can Seal CoatingGravel Pit

R1

R2

R3R4

R5

R6

R7R8

R9

652500

652500

653000

653000

653500

653500

654000

654000

654500

654500

655000

655000

655500

655500

656000

656000

656500

656500

657000

657000

657500

657500

658000

658000

658500

658500

5737500

5737500

5738000

5738000

5738500

5738500

5739000

5739000

5739500

5739500

5740000

5740000

5740500

5740500

5741000

5741000

5741500

5741500

5742000

5742000

Study Area Location Shown in UTM Coordinates

Legend

<= 25 dBA 25 - 30 dBA 30 - 35 dB 35 - 40 dBA 40 - 45 dBA 45 - 50 dBA 50 - 55 dBA 55 - 60 dBA 60 - 65 dBA 65 - 70 dBA > 70 dBA

Pictured sound levels do not include the ambient sound level.

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Scenario 2- Predicted Facility Sound Contours (Not Including Ambient) from Crushing, Washing, Asphalt production & Transportation, without

Berms - Phase 1

West Can Seal CoatingGravel Pit

R1

R2

R3R4

R5

R6

R7

R8

R9

654000

654000

654500

654500

655000

655000

655500

655500

656000

656000

656500

656500

657000

657000

657500

657500

658000

658000

5738500

5738500

5739000

5739000

5739500

5739500

5740000

5740000

5740500

5740500

5741000

5741000

Study Area Location Shown in UTM Coordinates

Legend

<= 25 dBA 25 - 30 dBA 30 - 35 dB 35 - 40 dBA 40 - 45 dBA 45 - 50 dBA 50 - 55 dBA 55 - 60 dBA 60 - 65 dBA 65 - 70 dBA > 70 dBA

Pictured sound levels do not include the ambient sound level.

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Scenario 1 - Predicted Facility Sound Contours (Not Including Ambient) from Stripping with 3 m Berms - Phase 1

West Can Seal CoatingGravel Pit

R1

R2

R3R4

R5

R6

R7R8

R9

652500

652500

653000

653000

653500

653500

654000

654000

654500

654500

655000

655000

655500

655500

656000

656000

656500

656500

657000

657000

657500

657500

658000

658000

658500

658500

5737500

5737500

5738000

5738000

5738500

5738500

5739000

5739000

5739500

5739500

5740000

5740000

5740500

5740500

5741000

5741000

5741500

5741500

5742000

5742000

Study Area Location Shown in UTM Coordinates

Legend

<= 25 dBA 25 - 30 dBA 30 - 35 dB 35 - 40 dBA 40 - 45 dBA 45 - 50 dBA 50 - 55 dBA 55 - 60 dBA 60 - 65 dBA 65 - 70 dBA > 70 dBA

Pictured sound levels do not include the ambient sound level.

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Scenario 2- Predicted Facility Sound Contours (Not Including Ambient) from Crushing, Washing, Asphalt production & Transportation with 3m

Berms - Phase 1

West Can Seal CoatingGravel Pit

R1

R2

R3R4

R5

R6

R7

R8

R9

654000

654000

654500

654500

655000

655000

655500

655500

656000

656000

656500

656500

657000

657000

657500

657500

658000

658000

5738500

5738500

5739000

5739000

5739500

5739500

5740000

5740000

5740500

5740500

5741000

5741000

Study Area Location Shown in UTM Coordinates

Legend

<= 25 dBA 25 - 30 dBA 30 - 35 dB 35 - 40 dBA 40 - 45 dBA 45 - 50 dBA 50 - 55 dBA 55 - 60 dBA 60 - 65 dBA 65 - 70 dBA > 70 dBA

Pictured sound levels do not include the ambient sound level.

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Predicted Noise Levels Generated by Stripping and Crushing, Washing, Asphalt Production & Transportation Operation Activity, with 3m and 5 m

high Berms

Location

Predict Noise Level Day Time plus Ambient Sound Level (dBA)

Scenario 1 (Phase 1)

Scenario 2 (Phase 1)

Scenario 3 (Phase 2)

Scenario 4 (Phase 2)

Scenario 5 (Phase 3)

Scenario 6 (Phase 3)

Scenario 7 (Phase 4)

Scenario 8 (Phase 4)

3m High

5m High

3m High

5m High

3m High

5m High

3m High

5m High

3m High

5m High

3m High

5m High

3m High

5m High

3m High

5m High

Receiver 1 54 54 59 59 52 52 59 59 53 53 59 59 61 60 60 60

Receiver 2 50 49 49 49 51 51 50 50 60 58 54 52 52 52 49 49

Receiver 3 50 50 47 47 52 52 49 49 60 59 54 53 52 52 48 48

Receiver 4 50 50 47 47 54 54 49 49 50 50 47 47 49 49 46 46

Receiver 5 49 49 46 46 52 52 48 48 49 49 46 46 48 48 46 46

Receiver 6 50 50 47 47 49 49 46 46 47 47 46 46 48 48 46 46

Receiver 7 49 49 46 46 48 48 46 46 47 47 46 46 48 48 46 46

Receiver 8 49 49 57 57 47 47 57 57 47 47 56 57 49 49 57 57

Receiver 9 47 47 48 48 47 47 48 48 48 48 48 48 48 48 48 47

P A T C H I N G A S S O C I A T E S A C O U S T I C A L E N G I N E E R I N G L T D

Conclusion

The Predicted Sound Level for stripping phase (without berms) exceeds the Permissible Sound Level (55dBA Daytime) at nearest Receiver to the respective phase of operation.

The Predicted Sound Level for the Crushing, Washing & Asphalt production phase (without berms) are within the Permissible Sound Level (55 dBA Daytime) at all Receivers around proposed gravel pit except Receiver 1 and Residence 8.

The predict Sound Level at Receiver 1 & 8 exceed the PSL due primarily to the hauling of product from the site.

The introduction of 3m and 5m high berms brings down the predicted sound level below the PSL during the Striping phase except phase 3 and Phase 4.

In the Crushing, Washing & Asphalt Production phase, berms bring down the predicted sound level at all Receivers except Residence 1 and 8.

Noise levels at Receiver 8 are due almost exclusively to the transportation of product on the adjacent road

Conclusion (continued)