60
FUEL USED 5: COND. & CIRC 10: DEVIATION 11: WIRELINE LOG 12: RUN CSG & CMNT 14: NIPPLE UP BOP 15: TEST BOP 16: DRILL STEM TEST 17: PLUGBACK 18: SQUEEZE CMNT 2: DRILLING 3: REAMING 4: CORING 6: TRIPS 7: LUBRICATE RIG 8: REPAIR RIG 9: C/O DRILL LINE 13: WAIT ON CEMENT 19: FISHING 20: DIR. WORK DATE RIG NO. RIG PHONE NUMBER DAYS FR SPUD JOB NO. WELLNAME OPERATOR WEATHER SPUD DATE / TIME WATER SOURCE OPERATIONS @ REPORT TIME DEPTH INCL AZM CREW M / U MANHOURS PAST 24 ACCIDENTS OR NEAR MISSES: PROJECTED TD LAST INSPECTION REPORT REMARKS DEVIATION SURVEYS Total Hours (Today / Well) TIME BREAKDOWN BIT# SIZE TYPE MAKE NOZZLES OUT @ IN @ DRILLED HRS CONDITION R O P SERIAL # BITS LENGTH NO. STANDS WT of COLLARS / DRILLSTRING DRILLING ASSEMBLY ( BHA ) SINGLES HOURS SINCE LAST INSPECTION KELLY DOWN TOTAL DRILL PIPE DIRECTIONS TO MORNING REPORT JOB TYPE WELL TYPE O.D. DETAILS OF OPERATIONS IN SEQUENCE FROM TO HRS CODE 1: RIG UP / DOWN BOILER # HOURS SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS DRLLSTRG Used Today Used This Well DELIVERED TODAY On Hand Fuel Brand RIG FUEL Time Mud Wt IN / OUT Funnel Vis Fl. Loss PV 10 S GEL MUD MTR SERIAL # HRS LAST 24 TOTAL HRS CUM. WELL HRS FOOTAGE LAST 24 TOTAL FOOTAGE TODAY RIG MANAGER SAFETY MEETING TOPICS BOP TEST DATE / PRESSURE LAST CASING SIZE & SET DEPTH RIG COSTS BOP DRILL DATE / TIME DAILY AVERAGE CUMULATIVE CUMULATIVE DAYS CUM. HRS I.D. WELL STATE JOB START DATE DAYS ON JOB EST. RELEASE G.P.S. COORDINATES CROWN-O-MATIC CHECKED OPERATIONS NEXT 24 HRS CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS # STOP CARDS # OF JSA's NEXT CASING SIZE & SET DEPTH DAILY CUM. FILT CK YLD PT 10 M GEL RENTAL S & R ENGINES Co. No. HRS TODAY HRS LAST CHGE HRS ON WELL LOCATION DRILL STRING REMARKS FUEL ADDED TO MUD TODAY EXTRA CREWS / WHY? BOP DRILL DATE / TIME CUM. MUD COSTS CHANGED HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING RIG SAFETY DAYS INSPECTION BY / TITLE SAFETY RATE OFFICE NOTIFIED FROM TO CODE RPM W.O.B. DEPTH DRILLED LAST MEETING DATE RELEASE DATE / TIME AVERAGE KVA DISTRIBUTOR BLOWDOWN VOLUMES MUD OPS SAFETY HTHP FL HTTP FC TIME LOG ROTARY TORQUE pH MF PF CALCIUM CHLORIDES % SOLIDS % LCM % OIL % SAND % H2O Mud Type SHAKER TYPE SCREENS CENTRIFUGES PUMPS RENTAL ITEMS OPERATORS REPRESENTATIVE COUNTY / PARISH LEGAL DESCRIPTION CO. MAN PH NO. BOILER STDBY HRLY DESCRIPTION DAY RT Depth GPM PRESSURE Pump 1 Liner SPM Pump 2 Liner SPM Pump 3 Liner SPM Pump 4 Liner SPM Pump 1 Pump 2 Pump 3 Pump 4 TYPE STROKE HRS Total HRS MAX PSI KILL (SPM) Manufacturer SPR Kill Rate PATTERSON-UTI DRILLING COMPANY 2012-12-04 215 HORIZONAL 25713 OIL University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 17000.00 W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 1.00 0.00 01/05/13 Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler WAIT ON DAYLIGHT move rig none 5 831 0.00 N 32.4799 W -102.284 matierial handling 0 12/03/12 12/01/12 00:00 11/20/12 Todd Thomas - ssuperintendnt 6/5 No No 182.50 10/28/12 250 LOW 1000 H 11/23/12 12:00 - 8-15-2012 50 SEC 11/25/12 18:22 - 8-15-2012 45 SEC 0.00 0.00 0.00 0.00 0 0 0 156000.00 166000.00 131000.00 156000.00 6.00 - 9.00 0.00 0.00 0.00 0.00 00:00 0.00 0.00 0.00 0 0 0 0.00 0 0.00 0 no mud 1.5 0 0 0 0 0.00 0 0 2180 156000 0.00 0.00 0.00 0.00 N/A N/A N/A No 0 0.00 1744.55 202367.42 116.00 145.00 151.08 17525.00 116.00 06:00 18:00 12.00 1C Rig down with crews Rig down floor hang t/d hang blocks unstring dw lay over subs derrick start on electrical edward deleon ad 10-23-2012 worked John askew And crew from 0600 to 2200 18:00 00:00 6.00 1C Rig down with crews rigged down pitts electrical lines water lines rig down line in derrick rig down derrick board 00:00 06:00 6.00 1D WAIT ON DAYLIGHT worked Justin Murphree from 1200 to 0000 24.00 24.00 21: 22: 23: Other 24.00 24.00 n/a n/a n/a 0 0.00 0.00 0.00 0.00 0.00 n/a 0.00 0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 12P160 12.00 NATIONAL 24.00 1092.00 2700.00 20.00 472.00 12P160 12.00 NATIONAL 24.00 1092.00 2700.00 30.00 907.00 4.50 20.00 S135 3.83 6.25 NC 46 (EH) 350 11500.00 0 350 0 3.50 13.30 S135 0.00 4.75 NC 38 (IF) 0 0.00 0 0 0 NONE GEN 1 3512 0.00 0.00 882.00 0.00 GEN2 3512 24.00 24.00 890.00 0.00 GEN3 3512 0.00 0.00 527.00 0.00 CMP 3306 0.00 0.00 0.00 0.00 HPU DEUT 3.00 3.00 644.00 0.00 0.00 2077.00 290.00 290.00 OFFROAD INDUSTRIAL OIL 0 0.00 0.00 0.00 0.00 0.00 0 NA 0 0 0.00 0.00 Justin D Murphree JRAS-2 K-1,Froklift ops L-1,Manlift ops Justin D Murphree PTW-3 lowering subs, lowering derrick, jetting pits Justin D Murphree Fuel-21" 2077 Gals move rig 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 take 349 to patricia turn west on hiway 115 go 16.3 miles to location rd on right go to first rd to left follow road 1.5 miles to location Revision 2 Page 1 of 1 US 2.40.1

PATTERSON-UTI DRILLING COMPANY MORNING REPORT …

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-04 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 1.00

0.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

WAIT ON DAYLIGHT move rig

none 5 831 0.00 N 32.4799 W -102.284

matierial handling 0 12/03/12 12/01/12 00:00

11/20/12 Todd Thomas - ssuperintendnt 6/5 No No 182.50

10/28/12 250 LOW 1000 H

11/23/12 12:00 - 8-15-2012 50 SEC

11/25/12 18:22 - 8-15-2012 45 SEC

0.00 0.00 0.00 0.00 0 0 0

156000.00 166000.00 131000.00 156000.00 6.00 - 9.00

0.00 0.00

0.00 0.00

00:00 0.00 0.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1744.55

202367.42

116.00

145.00

151.08

17525.00

116.00

06:00 18:00 12.00 1C Rig down with crews Rig down floor hang t/d hang blocks unstring dwlay over subs derrick start on electricaledward deleon ad 10-23-2012worked John askew And crew from 0600 to 2200

18:00 00:00 6.00 1C Rig down with crews rigged down pitts electrical lines water linesrig down line in derrick rig down derrick board

00:00 06:00 6.00 1D WAIT ON DAYLIGHTworked Justin Murphree from 1200 to 0000

24.00 24.00

21:22:23:Other

24.00 24.00

n/a n/a n/a 0 0.00 0.00 0.00 0.00 0.00 n/a 0.00

0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1092.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1092.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0

NONE

GEN 13512

0.000.00

882.000.00

GEN2351224.0024.00

890.000.00

GEN33512

0.000.00

527.000.00

CMP3306

0.000.000.000.00

HPUDEUT

3.003.00

644.000.00

0.002077.00290.00290.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00

0.00Justin D Murphree JRAS-2 K-1,Froklift ops L-1,Manlift opsJustin D Murphree PTW-3 lowering subs, lowering derrick, jetting pitsJustin D Murphree Fuel-21" 2077 Gals

move rig

0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 2 Page 1 of 1US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-05 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 2.00

0.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

WAIT ON DAYLIGHT move rig

none 0 832 0.00 N 32.4799 W -102.284

matireal handle 0 12/04/12 12/01/12 00:00

11/20/12 Todd Thomas - ssuperintendnt 6/5 Yes yes Yes 198.00

10/28/12 250 LOW 1000 H

11/23/12 12:00 - 8-15-2012 50 SEC

11/25/12 18:22 - 8-15-2012 45 SEC

0.00 0.00 0.00 0.00 0 0 0

156000.00 166000.00 131000.00 156000.00 6.00 - 9.00

0.00 0.00

0.00 0.00

00:00 0.00 0.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1729.64

202367.42

117.00

145.00

151.03

17670.00

117.00

06:00 18:00 12.00 1A Move rig with truck truck arrived at 700 am started moving dpcranes showed up at 700 started moving rig had 15 haul trucks 3 tandems2 pole trucks 2 forklifts and man lift removed front yard hauled to new locationremove motor packages back yard hauled to new locationsplit derrick remove in two pieces from floor split subs and floorloaded out and sent to new location and set on edge of locationon new end set pits mud pumps mats an subs didnt get center steel ingot all rig exept for top house to and mics items to new locationtrucks left at 1800 total rig move miles was 13.2 milesEdward deleon ad 10-23-2012worked John crew from 600 to 2000worked Kevins crew from 600 to 1800

18:00 20:00 2.00 21 worked on removing valves and seats from pumps20:00 06:00 10.00 1D WAIT ON DAYLIGHT

worked Justins crew from 0600 to 2000

22.00 46.00

21: 2.00 2.0022:23:Other

24.00 48.00

n/a n/a n/a 0 0.00 0.00 0.00 0.00 0.00 n/a

0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1116.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1116.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0

NONE

GEN 13512

0.000.00

882.000.00

GEN23512

0.0024.00

890.000.00

GEN33512

0.000.00

527.000.00

CMP330624.0024.0024.000.00

HPUDEUT

0.003.00

644.000.00

0.002077.00

0.00290.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00

0.00John T Askew move rig rig upJustin D Murphree jra move rig and rig upJustin D Murphree fuel 27 "2077 gal

move rig

0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 2 Page 1 of 1US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-06 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 3.00

0.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

rig up with crews,run lines in derrick,electrical lines,koomey lines, move rig

none 3 833 0.00 N 32.4799 W -102.284

matierial handaling 3 12/04/12 12/01/12 00:00

11/20/12 Todd Thomas - ssuperintendnt 6/5 Yes yes Yes 228.00

10/28/12 250 LOW 1000 H

11/23/12 12:00 - 8-15-2012 50 SEC

11/25/12 18:22 - 8-15-2012 45 SEC

0.00 0.00 0.00 0.00 0 0 0

156000.00 166000.00 131000.00 156000.00 6.00 - 9.00

0.00 0.00

0.00 0.00

06:00 n/a n/a n/a n/a n/a 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

4242.04

1750.93

206609.46

118.00

145.00

150.97

17815.00

118.00

06:00 14:30 8.50 1A Move Rig with trucks had 1 tandam 2 cranes and 5 haul truckssqaured up subs fist thing insatlled center steel set mud boat matsput derrick on floor set electrical suit cases install top house and ods househoucked up all hydrolic lines to raise cylinders on derrick set scr houseset motor packages and front yard realesed trucks at 1430

14:30 18:00 3.50 1B Rig up with crews install electical line to pits hooked up electrical betweenmotors rigged up derrick boardworked Joeys crew from 600 to 2000worked alcaries padron crew from 600 to 2200all crew members was on confrence call alsopatterson uti midland trucks moved us 13.20 miles

18:00 06:00 12.00 1B rig up with crews,run lines in derrick,electrical lines,koomey lines,connect t.d. track,hand railsworked Nobertos crew 1600 to 0600

24.00 70.00

21: 2.0022:23:Other

24.00 72.00

n/a n/a n/a 0.00 0.00 0.00 0.00 0.00 n/a

0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1140.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1140.00 2700.00 30.00 907.00

4.50 20.00 S135 6.25NC 46 (EH) 0 03.50 13.30 S135 4.75NC 38 (IF) 0 0

NONE

GEN 13512

0.000.00

882.000.00

GEN23512

0.0024.00

890.000.00

GEN3351212.0012.00539.00

0.00

CMP330624.0048.0048.000.00

HPUDEUT

0.003.00

644.000.00

0.001936.00141.00431.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00

0.00Joey Wiegman s/m move rig with trucksNorberto M Musico s/m power lines,jras=3 stops=2 ,k-1 forkliftNorberto M Musico l-1 manlift, A-7 elec. lines rig upNorberto M Musico fuel=20 "

move rig

0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 1 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-07 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 4.00

0.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

spud & drill f/105-t/110 spud and run casing

none 8 834 0.00 N 32.4799 W -102.284

matierial handaling 2 12/04/12 12/07/12 00:00

11/20/12 Todd Thomas - ssuperintendnt 6/5 Yes yes Yes 230.50

10/28/12 250 LOW 1000 H

11/23/12 12:00 - 8-15-2012 50 SEC

11/25/12 18:22 - 8-15-2012 45 SEC

110.00 110.00 220.00 0.50 0.00 0 0 0

56000.00 56000.00 55000.00 56000.00 6.00 - 9.00

0.00 0.00

0.00 0.00

06:00 8.40 27.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

4363.10

1772.88

210972.56

119.00

145.00

150.92

17960.00

119.00

06:00 18:00 12.00 1B Rig up with crews raise derrick subs hang flow lineback steps spool up drawworks hook up stand pipe in derrickand from pumps to subs unhang blocks worked on hook up t/dworked crews from 600 to 2200

18:00 00:00 6.00 1B rig up with crews,catwalk v-door,tongs,elevators,bails,windwalls framskill line,sub walkways

00:00 02:00 2.00 21 nipple up conductor and secure02:00 05:30 3.50 21 load and strap bha05:30 06:00 0.50 2 spud & drill f/105-t/110

spud @5:30 on 12/07/12

18.00 88.000.50 0.50

21: 5.50 7.5022:23:Other

24.00 96.00

1 17.50 ROCK BAKER 3113 3 x 22.00 105.00 5.00 1.00 1.00 new 5.00n/a n/a n/a 0.00 0.00 0.00 0.00 0.00 n/a

0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00105.00 - 110.00 420.00 100.00 6.00 90.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1164.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1164.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0

NONE

GEN 13512

0.000.000.000.00

GEN23512

3.0027.003.000.00

GEN3351224.0036.00563.00

0.00

CMP330624.0072.0072.000.00

HPUDEUT

8.0011.00

652.000.00

7450.008837.00549.00980.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 17.00 0.00 1.701 BIT SUB 8.50 2.50 4.001 SHOCK SUB 8.50 2.50 12.291 8" D.C 8.00 2.50 30.601 REAMER 17.14 2.50 9.932 8" D.C 8.00 2.50 62.101 X-O SUB 8.00 2.50 3.648 6.5 D.C 6.50 2.38 249.72

01 31.51

405.49

0.50

0.00 0.00 0.000.00 0.00 0.000.00 0.00 0.00

Joey Wiegman s/mNorberto M Musico s/m hoist,jras=4 stops=2,c1 hoist,k1 forkliftNorberto M Musico l1 manlift,p/u bhaNorberto M Musico fuel=60" 8837.3 gals

spud in

0.00 0.00 0.00 0.00105.00 110.00 DRILL 110.00 15.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-08 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 5.00

1.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

nipple up b.o.p pu bha and drill

none 10 835 0.00 N 32.4799 W -102.284

matirieal handlin cont 3 12/04/12 12/07/12 00:00

11/20/12 Todd Thomas - ssuperintendnt 5/5 No No 149.00

10/28/12 250 LOW 1000 H

11/23/12 12:00 - 8-15-2012 50 SEC

11/25/12 18:22 - 8-15-2012 45 SEC

425.00 315.00 63.00 5.00 0.00 0 0 0

56000.00 56000.00 55000.00 56000.00 6.00 - 9.00

13.58 425.00

9.58 5600.00

06:00 8.40 29.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

4948.08

1799.34

215920.64

120.00

145.00

150.88

18105.00

120.00

06:00 11:00 5.00 2 Drill f/ 120' to 425'11:00 11:30 0.50 5 Condition mud & circulate11:30 13:00 1.50 6 P.o.o.h, dh 100% tied off, ck c.o.m (JW)13:00 14:30 1.50 21 Lay down tools, and break bit14:30 15:00 0.50 21 Change out bails & elevators15:00 17:00 2.00 12 Hold safety meeting, rig up casing crew, run casing & rig down17:00 18:00 1.00 12 Hold safety meeting, rig up cementers & cement

Elevator watchman (Justin Youkey)18:00 22:00 4.00 12 wait on cement22:00 01:30 3.50 21 cut conductor,final cut on casing & weld on well head test @ psi 100001:30 06:00 4.50 14 nipple up b.o.p

88.005.00 5.50

0.50 0.501.50 1.50

7.00 7.00

4.50 4.50

21: 5.50 13.0022:23:Other

24.00 120.00

1 17.00 rock smith n/a 3 x 22.00 110.00 425.00 315.00 5.00 6.00 new 52.50

120.00 - 425.00 110.00 350.00 6.00 110.00 6.00 0.00 0.00 0.00 0.00 0.00425.00 - 425.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1188.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1188.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0

NONE

GEN 13512

0.000.000.000.00

GEN23512

0.0027.003.000.00

GEN3351224.0060.00587.00

0.00

CMP3306

6.0078.0078.000.00

HPUDEUT24.0035.00

676.000.00

0.008087.00750.00

1730.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 17.00 0.00 1.501 BIT SUB 8.50 2.50 4.001 SHOCK SUB 8.50 2.50 12.291 8" D.C 8.00 2.50 30.601 REAMER 17.14 2.50 9.932 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.648 6.5 D.C 6.50 2.38 249.72

01 31.51

20.00425.29

5.50

0.00 0.00 0.00

Joey Wiegman s/m, material handling, 6 jra's, 4 stopsJoey Wiegman e-24 t.o.o.h, c-13 pull & set slips, h-1 casing crew rig upJoey Wiegman brk temp in/out 50, 43 psi, 223 gpm

s/m matrial handling,jras=4 stops=2,c1 hoistk1 forklift,l1 manlift,g3 nipple up b.o.pfuel=56" 8087.7 gal

drill out

120.00 425.00 DRILL 95.00 22.00425.00 425.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-09 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 6.00

2.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

drill f/425-t/1876 pu bha and drill

none 10 836 0.00 N 32.4799 W -102.284

crane and mobil cranes 2 12/08/12 12/07/12 00:00

11/20/12 Todd Thomas - ssuperintendnt 5/5 No No 149.00

12/08/12 250 LOW 1000 H

11/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

1876.00 1451.00 116.08 12.50 0.00 0 0 0

86000.00 88000.00 84000.00 85000.00 6.00 - 9.00

13.58 425.00

9.58 5600.00

06:00 8.40 29.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

480.00

1788.44

216400.64

121.00

145.00

150.83

18250.00

121.00

06:00 12:00 6.00 14 Nipple up b.o.p's, hang flow line, turn buckels, & test 250 low, 1000 high12:00 13:30 1.50 21 Put collars & tools on racks, strap & caliber13:30 14:00 0.50 21 Change out bails & elevators14:00 15:00 1.00 7 Rig service, work manual ibop, man rider working & stored @ crown,15:00 17:30 2.50 6 Pick up tools, make up bit & t.i.h, dh 100% tied off, ck c.o.m (JW)17:30 18:00 0.50 2 Tagged cement @ 380' & drill out

Elevator watchman (Justin Youkey)18:00 06:00 12.00 2 drill f/425-t/1876

elevator watchman-Omar Rodriguezbrake=71 psi 220 gpm 64 temp in/out

88.0012.50 18.00

0.502.50 4.001.00 1.00

7.00

6.00 10.50

21: 2.00 15.0022:23:Other

24.00 144.00

2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 1451.00 12.00 12.00 new 120.92

425.00 - 425.00 110.00 630.00 6.00 110.00 6.00 0.00 0.00 0.00 0.00 0.00425.00 - 1876.00 386.00 1680.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1212.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1212.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 36 314 03.50 13.30 S135 0.00 4.75NC 38 (IF) 549 0.00 549 0 0

NONE

GEN 13512

0.000.000.000.00

GEN2351218.0045.0021.000.00

GEN3351224.0084.00611.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT

0.0035.00

676.000.00

0.007342.00745.00

2475.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66

11 1047.752 63.74

10.001876.06

111000.0018.00

1466.00 0.40895.00 0.50475.00 0.20

0.00 0.00 0.00

1244 12.50 12.50 12.50 1451.00 1451.00

Joey Wiegman s/m hoisting/cranes,jras,stopsJoey Wiegman jra k1 forklift,jra b4 nipple up,jra b11 acc.hosesJoey Wiegman brk temp in/out 63 , 43 psi, 223 gpm

s/m matrial handling,jras=6 stops=1,c1 hoistk1 forklift,c7 mix mud,c4 con w/ir,c8 conn w/td,c13 slipsfuel=52" 7342.5 gal

drill out

425.00 425.00 DRILL 35.00 6.00425.00 1876.00 DRILL 40.00 18.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-10 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 7.00

3.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

drill f/3167-t/3794 drill

none 12 837 0.00 N 32.4799 W -102.284

cranes 2 12/08/12 12/07/12 00:00

12/07/12 gary wallace - rig manager 5/5 No No 149.00

12/08/12 250 LOW 1000 H

11/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

3794.00 1918.00 81.62 23.50 0.00 0 0 0

110000.00 112000.00 109000.00 110000.00 6.00 - 9.00

13.62 425.00

9.58 5600.00

06:00 9.60 29.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1773.78

216400.64

122.00

145.00

150.78

18395.00

122.00

06:00 16:00 10.00 2 Drill -/f 1876 -/t 304016:00 16:30 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown16:30 18:00 1.50 2 Drill -/f 3040 -/t 3167

Elevator watchman (Justin Youkey)Held B.O.P drill

18:00 06:00 12.00 2 drill f/3167-t/3794elevator watchman-Omar Rodriguezbrake-71 psi 217 gpm 60 temp in 81 out

88.0023.50 41.50

0.504.00

0.50 1.50

7.00

10.50

21: 15.0022:23:Other

24.00 168.00

2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 3369.00 35.50 47.50 new 70.93

1876.00 - 3167.00 150.00 2100.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.003167.00 - 3794.00 368.00 2216.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1236.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1236.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 36 314 03.50 13.30 S135 0.00 4.75NC 38 (IF) 549 0.00 549 0 0

NONE

GEN 1351212.0012.0012.000.00

GEN2351224.0069.0045.000.00

GEN3351212.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.0059.00

700.000.00

0.005513.001829.004304.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66

31 2950.892 63.63

25.003794.09

130000.0041.50

3377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40

895.00 0.50372.00 0.20

0.00 0.00 0.00

1244 23.50 36.00 36.00 1918.00 3369.00

s/m moble cranes,jras=6,stops=6jra k1 forklift,jra f6 pressure washing,jra c7 mix mud/chemicalsbrk temp in/out 72, 43 psi, 223 gpmp/u 132, s/o 126, r/w 130s/m material handling,jras=6 stops=2,c7 mix mudc1 hoist,c13 slips,c4 conn w/t.d,c8 conn w/i.r,k1 forkliftfuel=42''=5513.0 gals

drilling

1876.00 3167.00 DRILL 40.00 22.003167.00 3794.00 DRILL 40.00 30.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-11 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 8.00

4.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

drill f/4466-t/4968 drill

none 6 838 0.00 N 32.4799 W -102.284

cranes 8 12/08/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 Yes no No 149.00

12/08/12 250 LOW 1000 H

11/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

4968.00 1174.00 49.96 23.50 0.00 0 0 0

154000.00 161000.00 145000.00 154000.00 6.00 - 9.00

13.62 425.00

9.58 5756.00

06:00 9.90 28.00 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

390.00

1762.53

216790.64

123.00

145.00

150.73

18540.00

123.00

06:00 16:30 10.50 2 Drill -/f 3794 -/t 436616:30 17:00 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown17:00 18:00 1.00 2 Drill -/f 4366 -/t 4466

Elevator watchman (Justin Youkey)18:00 06:00 12.00 2 drill f/4466-t/4968

elevator watchman-Omar Rodriguez

88.0023.50 65.00

0.504.00

0.50 2.00

7.00

10.50

21: 15.0022:23:Other

24.00 192.00

2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 4543.00 59.00 106.50 new 42.66

3794.00 - 4466.00 160.00 2400.00 6.00 80.00 6.00 80.00 0.00 0.00 0.00 0.004466.00 - 4968.00 368.00 2590.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1260.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1260.00 2700.00 30.00 907.00

4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 36 314 03.50 13.30 S135 0.00 4.75NC 38 (IF) 549 0.00 549 0 0

NONE

GEN 1351224.0036.0036.000.00

GEN2351224.0093.0069.000.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.0083.00

724.000.00

0.003293.002220.006524.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66

44 4188.440

25.004968.01

156000.0065.00

4893.00 1.100.00 0.00 0.00

4377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20

1244 23.50 59.50 59.50 1174.00 4543.00

Joey Wiegman s/m cranes cont.,jras 6,stops6Joey Wiegman jra k1 forklift,jra c4 conn.w/top drive,jra c8 conn.w/st80Joey Wiegman brk temp in/out 60, 43 psi, 223 gpmJoey Wiegman p/u 150, s/o 145, r/w 150

s/m material handling,jras=6 stops=2, c1 hoistc7 mix mud,c13 slips,c4 conn w/td,c8 conn w/ir,k1 forkliftp/u 161 s/o 148 r/w 154

drilling

3794.00 4466.00 DRILL 40.00 25.004466.00 4968.00 DRILL 40.00 22.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 2US 2.40.1

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-12 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 9.00

5.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler

pump out 10 stds t.o.o.h d-man 100% tied off c-c-o-m (NM) drill

none 0 839 0.00 N 32.4799 W -102.284

walkways 0 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No No 149.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

5582.00 614.00 34.11 18.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

9.58 5582.00

06:00 10.3 39 9.00 19 3 16 8.00 0 0.00 0

no mud 1.5 0 0 0 0 9.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

6069.66

1797.26

222860.30

124.00

145.00

150.69

18685.00

124.00

06:00 09:00 3.00 2 Drill -/f 4968 -/t 503009:00 10:30 1.50 8E Repair t/d stand jump cylenders broke at the yoke soe remove sadle from blocks10:30 18:00 7.50 2 Drill -/f 5030 -/t 5321

Elevator watchman (Justin Youkey)18:00 01:30 7.50 2 drill f/5321-t/558201:30 04:00 2.50 5 circulate & pump sweep04:00 06:00 2.00 6 pump out 10 stds t.o.o.h d-man 100% tied off c-c-o-m (NM)

elevator watchman-Omar Rodriguez

88.0018.00 83.00

2.50 3.002.00 6.00

2.001.50 1.50

7.00

10.50

21: 15.0022:23:Other

24.00 216.00

2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 5582.00 5157.00 77.00 183.50 new 28.10

4968.00 - 5321.00 140.00 2700.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.005321.00 - 5582.00 368.00 2750.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1284.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1284.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.0060.0060.000.00

GEN2351224.00

117.0093.000.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT12.0095.00

736.000.00

7000.008087.002206.008730.00

OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66

50 4756.862 63.24

8.005582.67

160000.0083.00

5462.00 0.900.00 0.00 0.00

4893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20

1244 18.00 77.50 77.50 614.00 5157.00

Joey Wiegman s/m moble cranes, 9 jra's, 3 stopsJoey Wiegman c-13 pull & set slips, c-1 hoist operations, l-1 manlift operationJoey Wiegman brk temp in/out 57, 43 psi, 218 gpmJoey Wiegman p/u 160, s/o 154, r/w 158

s/m moble cranes,jras=6 stop=2,c1 hoistk1 forklift,c13 slips,c7 mix mud,c4 conn w/td,c8 conn w/irr/w 162 p/u 165 s/o 154

drilling

4968.00 5321.00 DRILL 40.00 36.005321.00 5582.00 DRILL 40.00 36.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 2US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-13 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 10.00

6.00

01/05/13

John G. Askew/ Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

cement cement 2 stages with DV Tool, nipple down, chg. spool,n/u stack, p/u 3.5 D.P.

none 8 840 0.00 N 32.4799 W -102.284

t.o.o.h, lay down directional tools, changing bales & elev.,run casing.5 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No 157.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

5582.00 0.00 0.00 0.00 0.0 0.0 0.0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

9.62

00:00 0 0.00 0

no mud 1.5 0 0 0 0 9.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1782.88

222860.30

125.00

145.00

150.64

18830.00

125.00

06:00 12:30 6.50 6 T.o.o.h, pull & ream out, dh 100% tied off, ck c.o.m (JW)12:30 14:30 2.00 21 Lay down all 8" tools & collars, break bit14:30 15:00 0.50 21 Change out bails & elevators & clean floor15:00 18:00 3.00 12 Hold safety meeting, rig up casing crew & run casing

Joey Wiegman & crew 1/2 hr. pre-post tour meeting and1/2 hr for Weekly Engagement callElevator watchman (Justin Youkey)

18:00 21:30 3.50 12 run casing21:30 22:00 0.50 8M repair hydraulic catwalk remove rollers to set trough back in place22:00 03:00 5.00 12 run casing wash down last joint03:00 04:00 1.00 5 circulate with rig pumps04:00 04:30 0.50 21 hold safety meeting and rig up cement crew04:30 06:00 1.50 12 cement

Norberto Musico & crew 1/2 hr pre-post meeting 1/2 Weekly Engagement callPedro Vilchez got 3 hrs extra need to Talk to Toddelev. watchman omar rodriguez

88.0083.00

1.00 4.006.50 12.50

2.000.50 2.00

13.00 20.00

10.50

21: 3.00 18.0022:23:Other

24.00 240.00

na NA

5582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.005582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1308.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1308.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351222.0082.0082.000.00

GEN2351224.00

141.00117.00

0.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT

0.0095.00

736.000.00

0.007342.00745.00

9475.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

14 6.5 D.C 6.50 2.38 436.664 6.5 D.C 6.50 2.38 124.66

50 4756.862 63.24

8.005389.42

160000.0083.00

0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20

1244 0.00 77.50 77.50 0.00 5157.00

Joey Wiegman s/m walkways,6 jras,stops 3Joey Wiegman jra l1 manlift,jrak1 forklift,jra e24Joey Wiegman Brk temp in/out 57, 43 psi, 217 gpmNorberto M Musico s/m walkways,jras=4 stops=2,c1 hoistNorberto M Musico k1 forklift,h2 casing,h13 cementNorberto M Musico fuel=52''=7341.5 gals

drilling

5582.00 5582.00 0.00 0.005582.00 5582.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 1 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-14 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 11.00

7.00

01/05/13

John G. Askew/ Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

pressure test b.o.p's bleed psi pick up new bha & make up same, trip in hole

None 14 841 0.00 N 32.4799 W -102.284

cementing,rig down same,forklift/manlift use,n / d stack,r/up stack jacks7 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No 152.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

5582.00 0.00 0.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

9.62 5582.00

06:00 na 0.00 0

no mud 1.5 0 0 0 0 9.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

1347.50

1779.43

224207.80

126.00

145.00

150.60

18975.00

126.00

06:00 07:00 1.00 12 Cement, dropped plug @ 6:30, dropped bomb @ 6:40, rig up lines to circulate07:00 11:00 4.00 5 Circulate 4 hours11:00 14:00 3.00 12 Cement, dropped second plug @ 12:30, washed through stack & rigged down cmt crew14:00 18:00 4.00 21 Hold safety meeting,rig up stack jacks, lift stack,set slips @ 17:30 w/149k

& cut casing, & remove same & set stack down finished @ 18:00 tour change.Elevator watchman (Justin Youkey)

18:00 20:00 2.00 21 Finish nipple down,pick up stack, remove 13 5/8 10m DSA to 11"5m spool20:00 22:00 2.00 21 Make finish cut on casing & install B-Section test to 2500 psi22:00 23:30 1.50 21 Install 13 5/8 10m DSA to 9 5/8 3m spool & set down stack23:30 04:00 4.50 14 Nipple up B.O.P.'s & install koomey lines04:00 05:30 1.50 21 secure & center B.O.P's & install flowline05:30 06:00 0.50 15 pressure test b.o.p's

88.0083.00

4.00 8.0012.502.002.00

4.00 24.00

4.50 15.000.50 0.50

21: 11.00 29.0022:23:Other

24.00 264.00

na NA

5582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.005582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1332.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1332.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 13512

0.0082.0082.000.00

GEN2351224.00

165.00141.00

0.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT

0.0095.00

736.000.00

0.006971.00371.00

9846.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

14 6.5 D.C 6.50 2.38 436.664 6.5 D.C 6.50 2.38 124.66

50 4756.862 63.24

8.005389.42

160000.0083.00

0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20

1244 0.00 77.50 77.50 0.00 5157.00

Joey Wiegman s/m ladders,jras=6,stops=6Joey Wiegman jra k1 forklift,jra l1 manlift,jra g3 nipple down/set slipsJoey Wiegman brk temp in/out 60, 43 psi, 219 gpmNorberto M Musico s/m walkways,jras=3 stops=2,k1 forkliftNorberto M Musico c1 hoist,l1 manlift,g3 nipple down/up ,B-9,B-2,B-4,B-8,B-10,B-1Norberto M Musico welding H-11Norberto M Musico fuel=50" = 6971drilling

5582.00 5582.00 0.00 0.005582.00 5582.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-15 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 12.00

8.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

drill f/5899-t/7349 drill

none 15 842 0.00 N 32.4799 W -102.284

E-23 t.i.h, e-18 pick up tools off cat walk, c-1 hoists/m walkways,jras=6 stops=1,c1 hoist,c13 slips 9 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No 152.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

7349.00 1767.00 114.00 15.50 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

9.62 5582.00

06:00 8.4 29 0.00 0 0 0 100.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1765.42

224207.80

127.00

145.00

150.55

19120.00

127.00

06:00 07:30 1.50 21 Change out bails & elevators, rig out floor07:30 09:00 1.50 21 Strap and caliber tools & pick up & make up bit09:00 12:00 3.00 6 T.i.h to 1835 & tagged dv tool, ck c.o.m (JW) dh 100% tied off12:00 12:30 0.50 2 Drill out dv tool12:30 15:00 2.50 6 T.i.h, dh 100% tied off, tagged cement & 551315:00 15:30 0.50 2 Drill out float collar & shoe15:30 18:00 2.50 2 Drill -/f 5582 -/t 5899

Elevator watchman (Justin Youkey)18:00 06:00 12.00 2 drill f/5899-t/7349

elevator watchman-Omar Rodriguez

88.0015.50 98.50

8.005.50 18.00

2.002.00

24.00

15.000.50

21: 3.00 32.0022:23:Other

24.00 288.00

3 8.75 MM66D Halliburton 12075017 6 x 22.00 5582.00 1767.00 15.50 15.50 good 114.00

5582.00 - 5899.00 140.00 2100.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.005899.00 - 7349.00 360.00 2250.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1356.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1356.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

106.00106.00

0.00

GEN2351218.00

183.00159.00

0.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT

0.0095.00

736.000.00

5292.401678.60

11524.60OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 1.001 MOTOR 22.451 FLOWDRIFT 4.971 3PT REAMER 7.341 6.5 D.C 31.311 3PT REAMER 6.6817 6.5 D.C 530.01

70 6656.612 63.63

25.007349.00

180000.0098.50

7040.00 0.806563.00 0.506054.00 0.50

0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20

1244 77.50 77.50 5157.00

Joey Wiegman s/m ladders, 9 jra's, 8 stopsJoey Wiegman E-23 t.i.h, e-18 pick up tools off cat walk, c-1 hoistJoey Wiegman brk temp in/out 65, 43 psi, 223 gpmJoey Wiegman p/u 157, s/o 149, r/w 157Zachary Ryan Savallo s/m walkways,jras=6 stops=1,c1 hoist,c13 slipsZachary Ryan Savallo c7 mix mud ,k1 forklift,c4 conn/t.d,c8 conn w/i.rZachary Ryan Savallo p/u 185 s/o 162 r/w 177drilling

5582.00 5899.00 DRILL 40.00 15.005899.00 7349.00 DRILL 40.00 15.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 2US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-16 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 13.00

9.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

hold safety meet,rig up and run gyro tripping

none 15 843 N 32.4799 W -102.284

jra c4 conn.w/top drive,jra c8 conn.w/st80,jra f6 pressure washingk1 forklift,c7 mix mud,c4 conn w/t.d,c8 conn w/i.r 4 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No 152.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

9400.00 2051.00 128.19 16.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

06:00 8.4 37 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 9.50 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

4843.01

1789.46

229050.81

128.00

145.00

150.51

19265.00

128.00

06:00 17:00 11.00 2 Drill -/f 7349 -/t 889517:00 17:30 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown17:30 18:00 0.50 2 Drill -/f 8895 -/t 894318:00 22:30 4.50 2 drill f/8943-t/940022:30 02:00 3.50 5 condition mud & circulate02:00 06:00 4.00 11 hold safety meet,rig up and run gyro

elevator watchma-Omar Rodriguez

88.0016.00 114.50

3.50 11.5018.00

0.50 2.502.00

4.00 4.0024.00

15.000.50

21: 32.0022:23:Other

24.00 312.00

3 8.75 MM66D Halliburton 12075017 6 x 22.00 5582.00 9400.00 3818.00 27.00 42.50 good 89.84

7349.00 - 8943.00 140.00 2700.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.008943.00 - 9400.00 360.00 2589.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1380.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1380.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

130.00130.00

0.00

GEN2351224.00

207.00183.00

0.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

119.00760.00

0.00

3783.701508.70

13033.30OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 1.001 MOTOR 22.451 FLOWDRIFT 4.971 3PT REAMER 7.341 6.5 D.C 31.311 3PT REAMER 6.6817 6.5 D.C 530.01

92 8749.791 31.59

15.009400.14

206000.00114.50

9037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.806563.00 0.506054.00 0.50

0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50

1244 77.50 77.50 5157.00

Zachary Ryan Savallo s/m ladders,jras=9,stops=4Zachary Ryan Savallo jra c4 conn.w/top drive,jra c8 conn.w/st80,jra f6 pressure washingZachary Ryan Savallo brk temp in/out 62, 43 psi, 223 gpmZachary Ryan Savallo p/u 202, s/o 195, r/w 198Zachary Ryan Savallo s/m walkways,jras=6 stops=,c1 hpist,c13 slipsZachary Ryan Savallo k1 forklift,c7 mix mud,c4 conn w/t.d,c8 conn w/i.rZachary Ryan Savallo p/u 210 s/o 195 r/w 203drilling

7349.00 8943.00 DRILL 40.00 16.008943.00 9400.00 DRILL 40.00 15.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 2US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-17 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 14.00

10.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

pick up hwdp&rent pipe tripping

none 9 844 0.00 N 32.4799 W -102.284

j-11 run gyro, e-24 t.o.o.h, c-13 pull & set slipss/m walkways,jras=3 stops=2,c1 hoist,h7 log 5 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No 149.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

9400.00 0.00 0.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

06:00 8.4 29 0 0.00 0

no mud 1.5 0 0 0 0 9.50 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

4054.65

1807.02

233105.46

129.00

145.00

150.47

19410.00

129.00

06:00 08:00 2.00 11 Wireline with gyro & rig down wireline08:00 09:30 1.50 5 Circulate bottoms up09:30 14:00 4.50 6 T.o.o.h, dh 100% tied off, ck com (JW)14:00 17:00 3.00 6 Lay down collars17:00 18:00 1.00 11 Hold safety meeting, rig up wireline truck & wireline

Elevator watchman (Justin Youkey)18:00 23:30 5.50 11 run wireline log23:30 06:00 6.50 6 pick up hwdp&rent pipe

elevator watchman-Omar Rodriguez

88.00114.50

1.50 13.0014.00 32.00

2.502.00

8.50 12.5024.00

15.000.50

21: 32.0022:23:Other

24.00 336.00

9400.00 - 9400.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.009400.00 - 9400.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1404.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1404.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

154.00154.00

0.00

GEN2351212.00

219.00195.00

0.00

GEN33512

0.0096.00623.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

143.00784.00

0.00

3134.30649.40

13682.70OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

92 8749.791 31.59

15.008796.38

206000.00114.50

0.00 0.00 0.009037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.806563.00 0.506054.00 0.505462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.00

1244 77.50 77.50 5157.00

Zachary Ryan Savallo s/m walkways & working surfaces 6 jra's, 3 stopsZachary Ryan Savallo j-11 run gyro, e-24 t.o.o.h, c-13 pull & set slipsZachary Ryan Savallo brk temp in/out 64, 43 psi, 223 gpmZachary Ryan Savallo s/m walkways,jras=3 stops=2,c1 hoist,h7 logZachary Ryan Savallo k1 forklift,Zachary Ryan Savallo fuel=28''=3134.3 gals

drilling

9400.00 9400.00 0.00 0.009400.00 9400.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-18 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 15.00

11.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

drill f/9564-t/9579 drill

none 12 845 0.00 N 32.4799 W -102.284

e-18 pick up tools off catwalk, e-23 t.i.h, c-1 hoist operationsc7 mix mus,c13 slips,e23 t.i.h,c-4 conn w/td,c4 conn w/ir 6 12/10/12 12/10/12 00:00

12/07/12 gary wallace - rig manager 5/5 No 149.00

12/08/12 250 LOW 1000 H

12/08/12 12:00 - 8-15-2012 50 SEC

12/08/12 18:22 - 8-15-2012 45 SEC

9579.00 179.00 21.06 8.50 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

06:00 8.4 40 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1793.12

233105.46

130.00

145.00

150.42

19555.00

130.00

06:00 11:00 5.00 6 Pick up rental pipe & hwdp, stand back in derrick, dh 100% tied off, ck c.o.m11:00 16:00 5.00 20 Pick up directional tools, load mwd, scribe & down load tool, make up bit16:00 18:00 2.00 6 T.i.h, dh 100% tied off, ck c.o.m (JW)

Elevator watchman (Justin Youkey)18:00 21:30 3.50 6 t.i.h c-c-o-m d-man 100% tied off (nm)21:30 03:30 6.00 2 slide f/9400-t/9500 tf/165 m03:30 04:00 0.50 2 drill f/9500-t/950504:00 04:30 0.50 2 slide f/9505-t/9532 tf/170 m04:30 05:00 0.50 2 drill f/9532-t/954005:00 05:30 0.50 2 slide f/9540-t/9564 tf/180 m05:30 06:00 0.50 2 drill f/9564-t/9579

elevator watchman-Omar Rodriguez

88.008.50 123.00

13.0010.50 42.50

2.502.00

12.5024.00

15.000.50

5.00 5.0021: 32.0022:23:Other

24.00 360.00

4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 179.00 8.50 8.50 21.06

9400.00 - 9400.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.009400.00 - 9579.00 140.00 2250.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1428.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1428.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

178.00178.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00120.00647.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

167.00808.00

0.007050.009024.001160.30

14843.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.901 MOTOR 28.911 FLOAT SUB 2.801 M.W.D. 20.021 ABS 14.981 NON MAG DRILL COLLAR 29.261 X.O. 2.161 FLEX COLLAR 27.4236 4.5 DP 1142.4242 H.W.D.P. 1289.11

73 6942.682 63.64

15.009579.30

206000.00123.00

9482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26

0.00 0.00 0.009037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.806563.00 0.506054.00 0.505462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.00

1244 77.50 77.50 5157.00

Joey Wiegman s/m scaffoling, 6 jra's, 4 stopsJoey Wiegman e-18 pick up tools off catwalk, e-23 t.i.h, c-1 hoist operationsJoey Wiegman brk temp in/out, 61, 43 psi, 223 gpmNorberto M Musico s/m walkways,jras=6 stops=2,c1 hoist,k1 forkliftNorberto M Musico c7 mix mus,c13 slips,e23 t.i.h,c-4 conn w/td,c4 conn w/irNorberto M Musico p/u 202 s/o 183 r/w 198Norberto M Musico fuel=61''=9024.8 galsdrilling

9400.00 9400.00 0.00 0.009400.00 9579.00 35.00 20.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-19 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 16.00

12.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

slide f/9837-t/10150 tf/10 r drill

none 12 846 0.00 N 32.4799 W -102.284

c13 pull and set slips, c4 conn. with top drive, k1 forkliftc-4 conn w/td,c8 conn w/id,k1 forklift 9 12/18/12 12/18/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 149.00

12/08/12 250 LOW 1000 H

12/18/12 01:00 - 51sec

12/18/12 19:20 - 8-15-2012 45 SEC

10150.00 571.00 24.30 23.50 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

06:00 8.6 38 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

3908.04

1809.26

237013.50

131.00

145.00

150.38

19700.00

131.00

06:00 07:30 1.50 2 Drill -/f 9579 -/t 963607:30 09:00 1.50 2 Slide -/f 9636-/t 966209:00 09:30 0.50 2 Drill -/f 9662 -/t 967409:30 10:00 0.50 2 Slide -/ 9674 -/t 969010:00 10:30 0.50 7 Rig service, manrider working & stored @ crown adjust stand jump10:30 11:00 0.50 2 Drill -/f 9690 -/t 970011:00 12:30 1.50 2 Slide -/f 9700 -/t 972412:30 14:30 2.00 2 Drill -/f 9724 -/t 9734, slide -/f 9734 -/t 975614:30 18:00 3.50 2 Drill -/f 9756 -/t 9761, slide -/f 9761 -/t 9837

Held B.O.P drillElevator watchman (Justin Youkey)

18:00 06:00 12.00 2 slide f/9837-t/10150 tf/10 relevator watchman-Omar Rodriguez

88.0023.50 146.50

13.0042.50

0.50 3.002.00

12.5024.00

15.000.50

5.0021: 32.0022:23:Other

24.00 384.00

4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 750.00 32.00 40.50 18.52

9579.00 - 9837.00 140.00 2200.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.009837.00 - 10150.00 160.00 2250.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1452.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1452.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

202.00202.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00144.00671.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

191.00832.00

0.00

7527.501496.50

16339.50OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.901 MOTOR 28.911 FLOAT SUB 2.801 M.W.D. 20.021 ABS 14.981 NON MAG DRILL COLLAR 29.261 X.O. 2.161 FLEX COLLAR 27.4236 4.5 DP 1142.4242 H.W.D.P. 1289.11

79 7513.472 63.83

15.0010150.28

211000.00146.50

9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26

0.00 0.00 0.009037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.80

1244 77.50 77.50 5157.00

Zachary Ryan Savallo s/m openings & holes, 6 jra's, 6 stopsZachary Ryan Savallo c13 pull and set slips, c4 conn. with top drive, k1 forkliftZachary Ryan Savallo p/u 212,000 s/o 190,000 r/w 200,000Zachary Ryan Savallo brk temp 67 deg. flow 220 g.p.m.Zachary Ryan Savallo s/m walkways,jras= ,stops=,c13 slips,c7 mix mudZachary Ryan Savallo c-4 conn w/td,c8 conn w/id,k1 forkliftZachary Ryan Savallo p/u 213 s/o 196 r/w 209drilling

9579.00 9837.00 DRILL 35.00 19.009837.00 10150.00 DRILL 35.00 20.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 2US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-20 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 17.00

13.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

l/d 4 1/2 dp pick up pipe

none 12 847 0.00 N 32.4799 W -102.284

JRA'S-(9) C-1,Hoist ops C-13,Set and pull slips 3 12/18/12 12/18/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 167.00

12/08/12 250 LOW 1000 H

12/18/12 01:00 - 51sec

12/18/12 19:20 - 8-15-2012 45 SEC

10357.00 207.00 25.87 8.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

13.62 425.00

06:00 8.7 40 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

2122.81

1811.64

239136.31

132.00

145.00

150.34

19845.00

132.00

06:00 14:00 8.00 2 Slide F/10150 TD/ 1031514:00 14:30 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k. serv.catwalk14:30 15:30 1.00 5 Condition mud and circulate15:30 16:30 1.00 6 Pull 10 stand / Lay down drill pipe16:30 17:00 0.50 8 pipe wrangler rollers got off track,had to take the back two roller off

to adjust the trough to get it back in guide plates17:00 18:00 1.00 6 lay down drill pipe

crew stayed over .50 hours for safety stand upEleavtor watch man (Colten Herman)c.o.m. check o.k.B.O.P. drill 58sec

18:00 00:30 6.50 6 lay down drill pipe00:30 02:00 1.50 6 TIH d/m 100% tied off check com ok JA02:00 06:00 4.00 6 l/d 4 1/2 dp

Edward Deleon AD 10-23-12elevator watchman Gilbert Bejernoheld severe weather drill w/ crewcrew stayed over .50 for safety stand up

88.008.00 154.50

1.00 14.0014.00 56.500.50 3.500.50 2.50

12.5024.00

15.000.50

5.0021: 32.0022:23:Other

24.00 408.00

4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 10357.00 957.00 39.00 79.50 fare 12.04

10150.00 - 10315.00 165.00 2160.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.0010357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1476.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1476.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

226.00226.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00168.00695.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

215.00856.00

0.000.00

6235.001292.50

17632.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.901 MOTOR 28.911 FLOAT SUB 2.801 M.W.D. 20.021 ABS 14.981 NON MAG DRILL COLLAR 29.261 X.O. 2.161 FLEX COLLAR 27.4236 4.5 DP 1142.42

81 7704.051 31.41

22.009026.33

95000.00154.50

10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53

9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26

0.00 0.00 0.00

1244 77.50 77.50 5157.00

Zachary Ryan Savallo JRA'S-(9) C-1,Hoist ops C-13,Set and pull slipsZachary Ryan Savallo K-1,Forklift ops, C-8 CONNECTIONS W/Iron roughneck, C-14 Chk COMZachary Ryan Savallo C-7 Mixing mud and chemicals, D-59 Replace liner in pump, E-24 TOHZachary Ryan Savallo E-7 Laydown drill pipe w/o laydown machineZachary Ryan Savallo p/u 213 s/o 196 s/w 215Zachary Ryan Savallo pre tour- holes and openingZachary Ryan Savallo jras-3 stops=3 fuel 46"=6235 galsdrilling

10150.00 10315.00 DRILL 35.00 35.0010357.00 10357.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-21 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 18.00

14.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

NIPPLE DOWN B.O.P. nipple up

none 7 848 0.00 N 32.4799 W -102.284

C13 pull and set slips, D14 general cleaning, E24 trip out of holeJRAS8-C1 air hoist opp, C8 connection with st80, 4 12/18/12 12/18/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 161.50

12/08/12 250 LOW 1000 H

12/18/12 01:00 - 51sec

12/18/12 19:20 - 8-15-2012 45 SEC

10357.00 0.00 0.00 0.00 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

06:00 8.7 40 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1798.02

239136.31

133.00

145.00

150.30

19990.00

133.00

06:00 08:00 2.00 6 Lay down drrill pipe and dir tools08:00 10:00 2.00 21 Change out elevator and bells rig up casing crew make up CRT tool10:00 18:00 8.00 12 Run casing

Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P drill 58 sec

18:00 22:30 4.50 12 RUN CASING22:30 23:30 1.00 12 rig down casing crew23:30 00:30 1.00 5 CONDITION MUD & CIRCULATE and rig up otex00:30 04:00 3.50 12 CEMENT04:00 04:30 0.50 12 RIG DOWN CEMENTERS04:30 06:00 1.50 14 NIPPLE DOWN B.O.P.

AD- EDWARD DELEON 10/23/12

88.00154.50

1.00 15.002.00 58.50

3.502.50

12.5017.50 41.50

1.50 16.500.50

5.0021: 2.00 34.0022:23:Other

24.00 432.00

4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 10357.00 957.00 39.00 118.50 fare 8.08NA NA NA NA 0.00 0.00 0.00 0.00 0.00 fare

- 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0010357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1500.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1500.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

250.00250.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00192.00719.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

239.00880.00

0.00

5513.00722.00

18354.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00220000.00

154.50

10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53

9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26

0.00 0.00 0.00

1244 77.50 77.50 5157.00

Zachary Ryan Savallo JRAS8-C1 air hoist opp, C8 connection with st80,Zachary Ryan Savallo C13 pull and set slips, D14 general cleaning, E24 trip out of holeZachary Ryan Savallo K1 forklift opperation, K3 place equip on catwalk with forklift,Zachary Ryan Savallo rig up casing crew, run casing in holeZachary Ryan Savallo PRE TOUR- OVER HEAD HAZARDZachary Ryan Savallo JRAS-3 STOPS-2 FUEL= 42"=5513 GALS.

drilling

CORE 0.00 0.0010357.00 10357.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-22 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 19.00

15.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

p/u 3 1/2 dp drill

none 8 849 0.00 N 32.4799 W -102.284

JRA'S C-1 Hoist operations, B-1 Remove flowline,G-3 Nipple down set slips & nipple up,K-1 Forklift operations 4 12/18/12 12/18/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 161.50

12/08/12 250 LOW 1000 H

12/18/12 01:00 - 51sec

12/18/12 19:20 - 8-15-2012 45 SEC

10357.00 0.00 0.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

06:00 na na na na na 0.00 0 0.00 0

no mud 1.5 0 0 0 0 0.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

2574.39

1803.81

241710.70

134.00

145.00

150.26

20135.00

134.00

06:00 10:00 4.00 14 Nipple down B.O.P set slips10:00 18:00 8.00 14 Nipple up B.O.P Test well head 3000 psi change out pipe rams to 3 1/2

Elevator Watch Man (Colten Herman)18:00 19:30 1.50 21 strap bha and 3 1/2 dp19:30 23:30 4.00 21 change burn sub and dies install bails and elevators23:30 03:30 4.00 20 p/u and make up dir. tools03:30 06:00 2.50 6 p/u 3 1/2 dp

88.00154.50

15.002.50 61.00

3.502.50

12.5041.50

12.00 28.500.50

4.00 9.0021: 5.50 39.5022:23:Other

24.00 456.00

5 6.12 MDi611 smith jg4949 10357.00 0.00 newNA NA NA NA 0.00 0.00 0.00 0.00 0.00 fare

10357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0010357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1524.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1524.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

274.00274.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00216.00743.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

263.00904.00

0.007050.00

11982.00581.00

18935.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00220000.00

154.50

10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53

9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26

0.00 0.00 0.00

1244 77.50 77.50 5157.00

Zachary Ryan Savallo JRA'S C-1 Hoist operations, B-1 Remove flowline,Zachary Ryan Savallo G-3 Nipple down set slips & nipple up,K-1 Forklift operationsZachary Ryan Savallo pre tour-overhead hazardsZachary Ryan Savallo jras-3 stops-2 fuel- 77" = 11982 gal

drilling

10357.00 10357.00 0.00 0.0010357.00 10357.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-23 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 20.00

16.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

drill f/ 10360 t/ 10494 drill

none 6 850 0.00 N 32.4799 W -102.284

Jras 3 C1- Hoist Operation K1- Forklift Operation 2 12/18/12 12/18/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 161.50

12/21/12 250 LOW 1000 H

12/22/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

10494.00 137.00 19.57 7.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

06:00 8.6 36 0.00 0 00 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1790.45

241710.70

135.00

145.00

150.22

20280.00

135.00

06:00 18:00 12.00 6 Pick up 3 1/2 drill pipeElevator Watch Man (Colten Herman)C.O.M. check o.k.Trip drill 53 sec

18:00 20:00 2.00 6 P/U 3 1/2 DP20:00 21:30 1.50 21 count dp on location21:30 23:30 2.00 2 Drill out float and shoe and drill f/10298 t/ 1034023:30 01:00 1.50 20 slide f/ 10340 t/ 1036001:00 06:00 5.00 2 drill f/ 10360 t/ 10494

88.007.00 161.50

15.0014.00 75.00

3.502.50

12.5041.50

28.500.50

1.50 10.5021: 1.50 41.0022:23:Other

24.00 480.00

5 6.12 MDi611 smith jg4949 3 x 22.00 10357.00 137.00 8.50 8.50 new 16.12

10357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0010298.00 - 10494.00 290.00 2050.00 6.00 0.00 6.00 70.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1548.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1548.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

298.00298.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00240.00767.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

287.00928.00

0.00

11072.00910.00

19845.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 1\2 DP 7921.7239 H.W.D.P. 1197.52

13 1240.560

5.0010494.52

155000.00161.50

10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53

9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26

0.00 0.00 0.00

1244 77.50 77.50 5157.00

Zachary Ryan Savallo Jras 3 C1- Hoist Operation K1- Forklift OperationZachary Ryan Savallo E23 Tripping In The HoleZachary Ryan Savallo pre tour-overhead hazardsZachary Ryan Savallo jras-3 stops-2 fuel-72"=11072 galZachary Ryan Savallo p/u-165 s/o-145 tq-3

drilling

10357.00 10357.00 0.00 0.0010298.00 10494.00 DRILL 45.00 15.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-24 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 21.00

17.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

slide f 11352/ t/ 11362 drill

none 11 851 0.00 N 32.4799 W -102.284

C-8,ST-80 C-7,Mixing Mud, C-13,Slips C-14,Check C.O.M.D-28,ST-80 Dies Replacement K-1,Forklift ops 4 12/23/12 12/23/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 161.50

12/21/12 250 LOW 1000 H

12/22/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

11362.00 868.00 43.40 20.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

06:00 8.7 36 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1777.28

241710.70

136.00

145.00

150.18

20425.00

136.00

06:00 07:00 1.00 2 Drill F/10494 T/1059507:00 08:30 1.50 20 Slide F/10595 T/1061508:30 10:30 2.00 2 Drill F/10615 T/1069010:30 11:00 0.50 20 Slide F/10690 T/1070011:00 12:30 1.50 2 Drill F/10700 T/1077512:30 13:00 0.50 7 Lubriate rig, manrider working stored at crown,manual IBOP o.k.13:00 18:00 5.00 2 Drill F/10775 T/11030

Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P drill 58 sec

18:00 21:30 3.50 2 Drill f/ 11030 t/ 1106721:30 22:30 1.00 20 slide f/ 11067 t/ 1107722:30 05:30 7.00 2 Drill f/ 11077 t/ 1135205:30 06:00 0.50 20 slide f 11352/ t/ 11362

AD-EDWARD DELEON 10/23/20012ELEVATOR WATCHMEN- CLAY BARBEE

88.0020.00 181.50

15.0075.00

0.50 4.002.50

12.5041.50

28.500.50

3.50 14.0021: 41.0022:23:Other

24.00 504.00

5 6.12 MDi611 smith jg4949 3 x 22.00 10357.00 1005.00 32.50 41.00 new 24.51

10494.00 - 11030.00 290.00 2320.00 6.00 70.00 6.00 0.00 0.00 0.00 0.00 0.0011030.00 - 11362.00 246.00 2400.00 6.00 70.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1572.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1572.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

322.00322.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00264.00791.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

311.00952.00

0.000.00

9960.001112.00

20957.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 12 DP 7921.7239 H.W.D.P. 1197.52

22 2098.520

15.0011362.48

155000.00181.50

11167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.9510882.00 90.84 171.7410789.00 91.80 172.3610597.00 87.58 170.6910691.00 91.54 172.4510500.00 86.50 169.5510180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53

9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.31

1244 77.50 77.50 5157.00

Zachary Ryan Savallo Jras-8 C-1,Air Hoist ops C-4,Conn Top DriveZachary Ryan Savallo C-8,ST-80 C-7,Mixing Mud, C-13,Slips C-14,Check C.O.M.Zachary Ryan Savallo D-28,ST-80 Dies Replacement K-1,Forklift opsZachary Ryan Savallo PRE TOUR- OVERHEAD HAZARDSZachary Ryan Savallo JRAS-3 STOPS-2 FUEL- 9960 gal 66inchesZachary Ryan Savallo PU-158 SO-148 TQ-5

drilling

10494.00 11030.00 DRILL 50.00 18.0011030.00 11362.00 DRILL 55.00 10.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-25 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 22.00

18.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

tih d/m 100% tied off JA drill

none 7 852 0.00 N 32.4799 W -102.284

Jras-5 C-1,Hoist ops C-7,Mix mud C-8,ST-80C-13,Slips F-6,Pressure washing0 12/23/12 12/23/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 161.50

12/21/12 250 LOW 1000 H

12/22/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

11808.00 446.00 34.31 13.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

06:00 trip 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1764.31

241710.70

137.00

145.00

150.15

20570.00

137.00

06:00 10:00 4.00 2 Drill F/11362 T/1154410:00 11:30 1.50 20 Slide F/11544 T/1155911:30 16:30 5.00 2 Drill F/11559 T/1172716:30 17:00 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k.17:00 18:00 1.00 2 Drill F/11727 T/11773

Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P. Drill 58 sec

18:00 21:00 3.00 2 DRILL F/11773 T/1180821:00 02:30 5.50 6 tooh d/m 100% tied off com working JA02:30 03:30 1.00 20 download data and change out motor03:30 04:00 0.50 20 make up motor and bit04:00 06:00 2.00 6 tih d/m 100% tied off JA

88.0013.00 194.50

15.007.50 82.500.50 4.50

2.50

12.5041.50

28.500.50

3.00 17.0021: 41.0022:23:Other

24.00 528.00

5 6.12 MDi611 smith jg4949 3 x 22.00 10357.00 11808.00 1451.00 44.50 85.50 new 16.976 6.12 FX64R security 11922159 3 x 22.00 11808.00 0.00

11362.00 - 11773.00 250.00 2560.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.0011773.00 - 11808.00 243.00 2571.00 6.00 70.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1596.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1596.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

346.00346.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00288.00815.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

335.00976.00

0.00

8837.001123.00

22080.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 12 DP 7921.7239 H.W.D.P. 1197.52

26 2478.542 62.65

18.0011808.15

155000.00194.50

11642.00 91.54 166.5611456.00 89.60 167.4411552.00 91.19 167.1711361.00 89.96 168.5811167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.9510882.00 90.84 171.7410789.00 91.80 172.3610597.00 87.58 170.6910691.00 91.54 172.4510500.00 86.50 169.5510180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53

1244 77.50 77.50 5157.00

Zachary Ryan Savallo Jras-5 C-1,Hoist ops C-7,Mix mud C-8,ST-80Zachary Ryan Savallo C-13,Slips F-6,Pressure washingZachary Ryan Savallo pre tour overhead hazardZachary Ryan Savallo Fuel-60"=8837 gals. jras-3 stops=2

drilling

11362.00 11773.00 DRILL 55.00 12.0011773.00 11808.00 DRILL 50.00 8.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-26 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 23.00

19.00

01/05/13

Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler

DRILL 12027/ 12361 drill

none 9 853 0.00 N 32.4799 W -102.284

JRA'S (6) E-23 T.I.O., C-14 Chk COM, E-24 Installrotating head, E-25 Well control procedures, K-1 Forklift 2 12/23/12 12/23/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 161.50

12/21/12 250 LOW 1000 H

12/22/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

12361.00 553.00 48.09 11.50 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

06:00 8.9 37 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1751.53

241710.70

138.00

145.00

150.11

20715.00

138.00

06:00 10:00 4.00 6 Trip in hole D.M. 100% tied off10:00 11:30 1.50 9 Slip and cut drill line 95ft11:30 12:00 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k.12:00 13:00 1.00 6 Trip in hole D.M. 100% tied off13:00 16:30 3.50 6 Trip in hole and circulaite gas out16:30 18:00 1.50 2 Drill F/11808 T/11871

Elevator Watch Man (Colten Herman)C.O.M. check o.k.

18:00 19:00 1.00 2 DRILL 11871/ 11923 com check ok19:00 20:00 1.00 20 slide 11923/1193320:00 21:30 1.50 2 DRILL 11933/ 1201721:30 22:30 1.00 20 slide 12017/ 1202722:30 06:00 7.50 2 DRILL 12027/ 12361

ad- edward deleonelevator watchmen- clay barbee

88.0011.50 206.00

15.008.50 91.000.50 5.00

2.501.50 1.50

12.5041.50

28.500.50

2.00 19.0021: 41.0022:23:Other

24.00 552.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 553.00 3.00 15.00 36.87

11808.00 - 11871.00 250.00 2600.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0011871.00 - 12361.00 240.00 3000.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1620.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1620.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0

NONE

GEN 1351224.00

370.00370.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00312.00839.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

359.001000.00

0.00

7527.001310.00

23390.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 12 DP 7921.7239 H.W.D.P. 1197.52

32 3048.862 63.86

12361.68155000.00

206.00

12212.00 90.84 166.6511926.00 93.12 167.7912017.00 91.63 168.0511831.00 91.54 165.6811735.00 91.36 166.2011642.00 91.54 166.5611456.00 89.60 167.4411552.00 91.19 167.1711361.00 89.96 168.5811167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.9510882.00 90.84 171.7410789.00 91.80 172.3610597.00 87.58 170.6910691.00 91.54 172.4510500.00 86.50 169.55

1244 77.50 77.50 5157.00

Zachary Ryan Savallo JRA'S (6) E-23 T.I.O., C-14 Chk COM, E-24 InstallZachary Ryan Savallo rotating head, E-25 Well control procedures, K-1 ForkliftZachary Ryan Savallo operations, L-1 Manlift operations.Zachary Ryan Savallo pre tour-over head hazardsZachary Ryan Savallo jras-3 stops-2 fuel-53"=7527 gals.Zachary Ryan Savallo spr@ 12107 20-430psi 30-775 psi 40- 1150 psi

drilling

11808.00 11871.00 DRILL 55.00 10.0011871.00 12361.00 DRILL 55.00 15.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 1 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-27 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 24.00

20.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

slide f/ 13037 t/ 13060 drill

none 0 854 0.00 N 32.4799 W -102.284

cold weather and electrical 0 12/23/12 12/23/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 141.00

12/21/12 250 LOW 1000 H

12/22/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

13061.00 700.00 43.75 16.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

5.50 17000.00

06:00 8.9 38 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1738.93

241710.70

139.00

145.00

150.07

20860.00

139.00

06:00 11:00 5.00 2 Drill F/12361 T/1259011:00 11:30 0.50 20 Slide F/12590 T/1259911:30 12:30 1.00 2 Drill F/12599 T/1261612:30 13:00 0.50 20 Slide F/12616 T/1263013:00 15:00 2.00 2 Drill F/12630 T/1267915:00 15:30 0.50 7 Lubriate rig15:30 16:00 0.50 2 Drill F/12679 T/1268516:00 16:30 0.50 20 Slide F/12685 T/1270016:30 18:00 1.50 2 Drill F/12700 T/12775

crew was on confrence callElevator Watch Man (Colten Herman)C.O.M check o.k.B.O.P Drill 58 sec

18:00 19:30 1.50 20 SLIDE F/12775 T/1280219:30 21:30 2.00 2 Drill f/ 12802 t/1287621:30 23:00 1.50 20 slide f/ 12875 t/1289523:00 02:00 3.00 2 Drill f/ 12895 t/ 1297102:00 03:00 1.00 20 slide f/ 12971 t/ 1298603:00 04:00 1.00 2 drill f/ 12986 t/ 1303704:00 06:00 2.00 20 slide f/ 13037 t/ 13060

crew was on confence callelevator watchman clay barbee

88.0016.00 222.00

15.0091.00

0.50 5.502.501.50

12.5041.50

28.500.50

7.50 26.5021: 41.0022:23:Other

24.00 576.00

6 6.13 fx64 security 119159 3 x 22.00 11808.00 1253.00 27.00 42.00 new 29.83

12361.00 - 12775.00 240.00 3100.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0012775.00 - 13061.00 255.00 3050.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1644.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1644.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

394.00394.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00336.00863.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

383.001024.00

0.000.00

6235.001292.00

24682.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

40 3812.510

13061.47155000.00

222.00

12594.00 89.60 165.5212403.00 90.04 165.7712690.00 88.46 91.1012498.00 89.60 165.4212307.00 90.84 165.6512212.00 90.84 166.6511926.00 93.12 167.7912017.00 91.63 168.0511831.00 91.54 165.6811735.00 91.36 166.2011642.00 91.54 166.5611456.00 89.60 167.4411552.00 91.19 167.1711361.00 89.96 168.5811167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.95

1244 24.00 101.50 101.50 700.00 5857.00

Justin D Murphree Jras-4 C-1,Hoist ops C-13,Slips K-1,Forklift opsJustin D Murphree C-7,Mix mudJohn T Askew pre tour- electrical hazardsJohn T Askew jras= stops= fuel=46"=6235gals p/u-174 s/o-133 tq.-6John T Askew spr@ #1 pump 20 stks-470 psi 30 stks-720 psi 40 stks-1000 psi

drilling

12361.00 12775.00 DRILL 55.00 18.0012775.00 13061.00 DRILL 55.00 10.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-28 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 25.00

21.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

drill f/ 13659 t/ 13730 drill

none 0 855 0.00 N 32.4799 W -102.284

eletrical safety cont 0 12/23/12 12/23/12 00:00

12/18/12 Ryan Savallo - rig manager 5/5 No 124.00

12/21/12 250 LOW 1000 H

12/22/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

13730.00 669.00 38.23 17.50 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

5.50 17000.00

06:00 9.0 37 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

750.00

1731.86

242460.70

140.00

145.00

150.04

21005.00

140.00

06:00 12:30 6.50 2 Drill F/13061 T/1335812:30 13:30 1.00 20 Slide F/13358 T/1337413:30 16:00 2.50 2 Drill F/13374 T/1344316:00 16:30 0.50 7 Lubriate Rig man rider stored at crown lower ibop ok16:30 17:00 0.50 2 Drill F/13443 T/1345417:00 18:00 1.00 20 Slide F/13454 T/13474

Elevator Watch Man (Colten Herman)C.O.M. check o.k.B.O.P drill 58 sec

18:00 21:00 3.00 2 Drill f/ 13474 t/1357121:00 23:00 2.00 20 slide f/ 13571 t/ 1358623:00 02:00 3.00 2 Drill f/ 13586 t/ 1363902:00 04:00 2.00 20 slide f/ 13639 t/ 1365904:00 06:00 2.00 2 drill f/ 13659 t/ 13730

elevator watchman clay barbeec-o-m

88.0017.50 239.50

15.0091.00

0.50 6.002.501.50

12.5041.50

28.500.50

6.00 32.5021: 41.0022:23:Other

24.00 600.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 1922.00 63.00 105.00 new 38.00

13061.00 - 13474.00 255.00 3250.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0013474.00 - 13730.00 255.00 3350.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1668.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1668.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

418.00418.00

0.00

GEN23512

0.00219.00195.00

0.00

GEN3351224.00360.00887.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

407.001048.00

0.000.00

4806.001429.00

26111.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

47 4481.300

13730.26155000.00

239.50

134545.00 91.89 167.0913549.00 92.95 166.3813359.00 90.75 167.5313358.00 89.69 167.8813166.00 90.92 169.8113262.00 90.31 89.8713071.00 93.91 167.7912880.00 92.42 166.0312975.00 92.86 172.9712785.00 91.54 164.1812594.00 89.60 165.5212403.00 90.04 165.7712690.00 88.46 91.1012498.00 89.60 165.4212307.00 90.84 165.6512212.00 90.84 166.6511926.00 93.12 167.7912017.00 91.63 168.05

1244 23.50 125.00 125.00 669.00 6526.00

Justin D Murphree Jrs-3 C-1,Hoist ops C-13,Slips K-1,Forklift opsPRE TOUR- ELECTRICAL HAZARDSJRAS-3 STOPS-2 P/U-168 S/O-135 TQ.-6 fuel-38"-4806 gals

drilling

13061.00 13474.00 DRILL 55.00 12.0013474.00 13730.00 DRILL 55.00 12.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-29 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 26.00

22.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

drill f/ 14232 t/14493 drill

none 6 856 0.00 N 32.4799 W -102.284

cold weather 4 12/29/12 12/28/12 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No 111.50

12/21/12 250 LOW 1000 H

12/28/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

14493.00 763.00 40.16 19.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

5.50 17000.00

06:00 9.1 37 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

8486.25

1779.77

250946.95

141.00

145.00

150.00

21150.00

141.00

06:00 06:30 0.50 2 Drill F/13730 T/1373506:30 08:00 1.50 20 Slide F/13735 T/1375608:00 13:00 5.00 2 Drill F/13756 T/1392613:00 15:00 2.00 20 Slide F/13926 T/1394115:00 16:30 1.50 2 Drill F/13941 T/1401316:30 17:00 0.50 7 Lubriate Rig manrider stored at crown17:00 18:00 1.00 2 Drill F/14013 T/14047

Freddy Meise worked from 600 to 1800 12.5 hours could'nt get him off pick listElevator Watch Man (Colten Herman)C.O.M. check o.k.

18:00 23:00 5.00 2 drill f/ 14047 t/1421223:00 00:00 1.00 20 slide f/ 14212 t/ 1423200:00 06:00 6.00 2 drill f/ 14232 t/14493

Johnny Muck worked from 1800 to 0600 couldnt get him off picklistelevator watchman clay barbee

88.0019.00 258.50

15.0091.00

0.50 6.502.501.50

12.5041.50

28.500.50

4.50 37.0021: 41.0022:23:Other

24.00 624.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 2685.00 87.00 192.00 new 40.96

13730.00 - 14047.00 255.00 3100.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0014047.00 - 14493.00 255.00 3250.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1692.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1692.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351210.00

428.00428.00

0.00

GEN2351214.00

233.00209.00

0.00

GEN3351224.00384.00911.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

431.001072.00

0.007450.00

10888.001368.00

27479.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

56 5244.270

14493.23158000.00

258.50

14313.00 89.78 169.9014122.00 90.31 168.8414217.00 90.13 169.7214026.00 90.48 169.9913930.00 90.92 170.2513740.00 91.54 170.2513835.00 91.45 170.7813644.00 92.15 168.49134545.00 91.89 167.0913549.00 92.95 166.3813359.00 90.75 167.5313358.00 89.69 167.8813166.00 90.92 169.8113262.00 90.31 89.8713071.00 93.91 167.7912880.00 92.42 166.0312975.00 92.86 172.9712785.00 91.54 164.18

1244 23.50 148.50 148.50 763.00 7289.00

Jras-5 C-1,Air Hoist C-4,Topdrive C-13,slipsC-1,Manlift ops F-6,Pressure washingpre tour electrical hazardsjras-4 stops-2 p/u-168 s/o-142 tq-7 fuel=71"=10888 gals

drilling

13730.00 14047.00 DRILL 55.00 18.0014047.00 14493.00 DRILL 55.00 10.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-30 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 27.00

23.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

drill f/ 15021 t/15106 drill

none 8 857 0.00 N 32.4799 W -102.284

working together 4 12/29/12 12/29/12 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No 111.50

12/21/12 250 LOW 1000 H

12/28/12 15:55 - 53sec

12/22/12 19:20 - 8-15-2012 45 SEC

15106.00 613.00 38.31 16.00 0.00 0 0 0

162000.00 160000.00 154000.00 162000.00 6.00 - 9.00

7.62 10346.00

5.50 17000.00

06:00 9.0 37 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1767.23

250946.95

142.00

145.00

149.96

21295.00

142.00

06:00 08:00 2.00 2 Drill F/14493 T/1456708:00 10:00 2.00 20 Slide F/14567 T/1458210:00 14:00 4.00 2 Drill F/14582 T/1474614:00 16:00 2.00 20 Slide F/14746 T/1476616:00 16:30 0.50 2 Drill F/14766 T/1477516:30 17:00 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k.17:00 18:00 1.00 2 Drill F/14775 T/14810

Elevator Watch Man (Colten Herman)C.O.M. check o.k.B.O.P. Drill 58 sec also spill 1st on tour and H2S drill,medical and Firedrill

18:00 20:30 2.50 2 Drill f/ 14810 t/ 1487820:30 22:00 1.50 20 slide f/ 14878 t/ 1489822:00 01:00 3.00 2 Drill f/ 14898 t/ 1501101:00 03:00 2.00 20 slide f/ 15011 t/ 1502103:00 06:00 3.00 2 drill f/ 15021 t/15106

elevator watchman Clay BarbeeJohnny Muck worked from 1800 to 0600

88.0016.00 274.50

15.0091.00

0.50 7.002.501.50

12.5041.50

28.500.50

7.50 44.5021: 41.0022:23:Other

24.00 648.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 3298.00 99.00 291.00 new 11.336 6.12 FX64R security 11922159 3 x 22.00 11808.00 3298.00 111.00 303.00 new 10.88

14493.00 - 14810.00 255.00 3100.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0014810.00 - 15106.00 255.00 3250.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1716.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1716.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

452.00452.00

0.00

GEN2351224.00

257.00233.00

0.00

GEN33512

1.00385.00912.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

455.001096.00

0.000.00

9306.001582.00

29061.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

61 5815.541 31.85

10.0015106.35

158000.00274.50

14884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.1114405.00 90.22 170.6914313.00 89.78 169.9014122.00 90.31 168.8414217.00 90.13 169.7214026.00 90.48 169.9913930.00 90.92 170.2513740.00 91.54 170.2513835.00 91.45 170.7813644.00 92.15 168.49134545.00 91.89 167.0913549.00 92.95 166.3813359.00 90.75 167.53

1244 23.50 172.00 172.00 613.00 7902.00

Justin D Murphree JRAS-5 C-1,Hoist ops C-4,Conn Top Drive C-7,MixingJustin D Murphree mud C-13,Pulling slips C-14,check c.o.m.John T Askew pre tour valve replacement on pumpJohn T Askew jras-3 stops-2 p/u-180 s/o-142 tq-7 fuel-62"=9306 gals

drilling

14493.00 14810.00 DRILL 60.00 20.0014810.00 15106.00 DRILL 58.00 10.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2012-12-31 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 28.00

24.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

DRILL F/ 15653 T/15669 drill

none 6 858 0.00 N 32.4799 W -102.284

electical safety 4 12/29/12 12/30/12 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 111.50

12/21/12 250 LOW 1000 H

12/28/12 15:55 - 53sec

12/30/12 19:20 - 8-15-2012 45 SEC

15669.00 563.00 29.63 19.00 0.00 0 0 0

160000.00 165000.00 127000.00 160000.00 6.00 - 9.00

7.62 10346.00

5.50 17000.00

06:00 9.3 37 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1754.87

250946.95

143.00

145.00

149.93

21440.00

143.00

06:00 15:00 9.00 2 Drill F/15106 T/1534915:00 15:30 0.50 7 Lubriate rig15:30 17:00 1.50 20 Slide F/15349 T/1536617:00 18:00 1.00 2 Drill F/15366 T/15349

Freddy Meise worked from 600 to 1800Elevator (Colten Herman)C.O.M. check o.k.B.O.P Drill 58 sec

18:00 20:00 2.00 2 DRILL F/15349 T/ 1544920:00 21:30 1.50 20 SLIDE F/ 15449 T/ 1545921:30 04:00 6.50 2 DRILL F/ 15459 T/ 1564304:00 05:30 1.50 20 SLIDE F/ 15643 T/ 1565305:30 06:00 0.50 2 DRILL F/ 15653 T/15669

REVIEW DRILL PROCEDURES AND ALARMSJOHNNY MUCK WORKED FROM 1800 TO 0600

88.0019.00 293.50

15.0091.00

0.50 7.502.501.50

12.5041.50

28.500.50

4.50 49.0021: 41.0022:23:Other

24.00 672.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 3861.00 123.00 426.00 new 9.066 6.12 FX64R security 11922159 3 x 22.00 11808.00 3861.00 135.00 438.00 new 8.82

15106.00 - 15349.00 255.00 3400.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0015349.00 - 15669.00 255.00 3350.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1740.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1740.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

476.00476.00

0.00

GEN2351224.00

281.00257.00

0.00

GEN33512

0.00385.00912.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

479.001120.00

0.000.00

7527.001779.00

30840.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

67 6389.231 31.66

15669.85158000.00

293.50

15457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.7315264.00 91.01 165.5915073.00 91.63 166.8214884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.1114405.00 90.22 170.6914313.00 89.78 169.9014122.00 90.31 168.8414217.00 90.13 169.7214026.00 90.48 169.9913930.00 90.92 170.25

1244 23.50 195.50 195.50 563.00 8465.00

Justin D Murphree JRAS-4 C-1,Air Hoist C-13,slips C-7,mix mudJustin D Murphree C-1,Conn Top DriveJohn T Askew PRE TOUR ELECTRICAL HAZARDSJohn T Askew JRAS-3 STOPS-2 P/U-165 S/O-127 TQ.- 6 FUEL-53"=7527 GALS

drilling

15106.00 15349.00 DRILL 50.00 18.0015349.00 15669.00 DRILL 60.00 12.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-01 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 29.00

25.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

Drill f/ 16034 t/16120 drill

none 6 859 0.00 N 32.4799 W -102.284

electrical safety 4 12/29/12 12/30/12 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 111.50

12/21/12 250 LOW 1000 H

12/28/12 15:55 - 53sec

12/30/12 19:20 - 8-15-2012 45 SEC

16120.00 451.00 30.07 15.00 0.00 0 0 0

160000.00 168000.00 127000.00 160000.00 6.00 - 9.00

7.62 10346.00

5.50 17000.00

06:00 9.4 38 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1742.69

250946.95

144.00

145.00

149.90

21585.00

144.00

06:00 08:00 2.00 2 Drill F/15669 T/1573208:00 10:00 2.00 20 Slide F/15732 T/1574810:00 11:00 1.00 2 Drill F/15748 T/1578411:00 13:00 2.00 20 Slide F/15784 T/1580113:00 14:00 1.00 2 Drill F/15801 T/1582814:00 14:30 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k14:30 16:00 1.50 2 Drill F/15828 T/1586116:00 17:30 1.50 20 Slide F/15861 T/1587517:30 18:00 0.50 2 Drill F/15875 T/15892

Freddy Meise worked from 600 to 1800Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P drill 58 sec

18:00 20:00 2.00 2 Drill f/ 15892 t/1592920:00 21:30 1.50 20 slide f/ 15929 t/ 1593921:30 01:00 3.50 2 Drill f/ 15939 t/ 1602401:00 02:30 1.50 20 slide f/ 16024 t/ 1603402:30 06:00 3.50 2 Drill f/ 16034 t/16120

elevatorwatchman Clay BarbeeJohnny Muck worked from 1800 to 0600

88.0015.00 308.50

15.0091.00

0.50 8.002.501.50

12.5041.50

28.500.50

8.50 57.5021: 41.0022:23:Other

24.00 696.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 4312.00 159.00 597.00 new 30.00

15669.00 - 15892.00 255.00 3400.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0015892.00 - 16120.00 255.00 3650.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1764.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1764.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

500.00500.00

0.00

GEN2351224.00

305.00281.00

0.00

GEN33512

0.00385.00

0.000.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

503.001144.00

0.000.00

6235.001292.00

32132.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

72 6861.000

10.0016119.96

158000.00308.50

15939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.5015647.00 93.30 164.7115457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.7315264.00 91.01 165.5915073.00 91.63 166.8214884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.1114405.00 90.22 170.69

1244 23.50 219.00 219.00 451.00 8916.00

Justin D Murphree Jras-3 C1,Hoist ops K-1,Forklift C-13,SlipsJohn T Askew Pre Tour - Electircal SafetyJohn T Askew Fuel-46"=6235 gal JRA-3 STOP-3John T Askew p/u 168 s/o-128 tq. 8

drilling

15669.00 15892.00 DRILL 60.00 20.0015892.00 16120.00 DRILL 60.00 14.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-02 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 30.00

26.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

tih d/m 100% tied off drill

none 4 860 0.00 N 32.4799 W -102.284

electrical safety 2 12/29/12 01/01/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 111.50

12/21/12 250 LOW 1000 H

12/28/12 15:55 - 53sec

12/30/12 19:20 - 8-15-2012 45 SEC

16212.00 92.00 30.67 3.00 0.00 0 0 0

160000.00 168000.00 127000.00 160000.00 6.00 - 9.00

7.62 10346.00

5.50 17100.00

06:00 trip 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 11.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1730.67

250946.95

145.00

145.00

149.86

21730.00

145.00

06:00 09:00 3.00 2 Drill F/16120 T/1621009:00 12:30 3.50 5 Circulaite Mud and spot12:30 16:00 3.50 6 Trip out of hole D.M. 100% tied off16:00 17:00 1.00 5 Pulled 69 stands Circulaite Bottom up and spot pill17:00 18:00 1.00 6 Trip out of hole D.M. 100% tied off

Freddy Meise worked from 600 to 1800Eleavtor Watch Man (Colten Herman)C.O.M. check o.k.B.O.P drill 58 sec

18:00 22:30 4.50 6 Tooh d/m 100% tied off22:30 23:30 1.00 20 l/d motor and birt make up new motors and bit23:30 02:30 3.00 20 l/d mwd and awr p/u new mwd and awr scribe motors and program tools02:30 03:30 1.00 20 shallow test motor and mwd03:30 06:00 2.50 6 tih d/m 100% tied off

Johnny Muck worked from 1800 to 0600com ok JA

88.003.00 311.50

4.50 19.5011.50 102.50

8.002.501.50

12.5041.50

28.500.50

5.00 62.5021: 41.0022:23:Other

24.00 720.00

6 6.12 FX64R security 11922159 3 x 22.00 11808.00 4404.00 162.00 759.00 new 5.807 6.12 FX64R security 11620151 3 x 22.00 16220.00 0.00 0.00 0.00 new

16120.00 - 16210.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0016212.00 - 16212.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1788.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1788.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

524.00524.00

0.00

GEN2351224.00

329.00305.00

0.00

GEN33512

0.00385.00

0.000.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

527.001168.00

0.000.00

5334.00901.00

33033.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.801 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

73 6961.500

16210.48158000.00

311.50

16123.00 90.31 169.6415939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.5015647.00 93.30 164.7115457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.7315264.00 91.01 165.5915073.00 91.63 166.8214884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.11

1244 3.00 222.00 222.00 92.00 9008.00

Justin D Murphree Jras-4 C-1 Airhoist op, C-4 Connection W/TopdriveJustin D Murphree C-8 Connections W/Ironroughneck, C-13 Pulling Slips, K-1 ForkliftJohn T Askew pre tour electrical safetyJohn T Askew jras-3 stops- 2 fuel- 41"=5334 gals

drilling

16120.00 16210.00 DRILL 0.00 0.0016212.00 16212.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-03 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 31.00

27.00

01/05/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

Drill -/f 16417 -/t 16788 drill

none 12 861 0.00 N 32.4799 W -102.284

electrical safety 4 01/02/13 01/02/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 141.00

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

16788.00 576.00 42.67 13.50 0.00 0 0 0

15000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17100.00

06:00 9.5 40 10.00 19 3 6 9.50 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1718.81

250946.95

146.00

145.00

149.83

21875.00

146.00

06:00 09:30 3.50 6 t.i.h c-c-o-m d-man 100% tied off (nm)09:30 10:30 1.00 5 circulate bottoms up10:30 11:00 0.50 7 lubricate rig work manual ibop (ok) manrider working stored @ crown11:00 15:00 4.00 6 continue t.i.h d-man 100% tied off (nm)15:00 16:00 1.00 3 wash and ream down 6 stands d-man 100% tied off (nm)16:00 16:30 0.50 5 circulate bottoms up16:30 18:00 1.50 2 dril f/16210-t/16303

elevator watchman-Omar Rodriguezcrew was on confrence call

18:00 21:00 3.00 2 Drill -/f 16303 -/t 1640721:00 22:00 1.00 2 Slide -/f 16407 -/t 1641722:00 06:00 8.00 2 Drill -/f 16417 -/t 16788

fuel = 32" 3783.7 galelevator watchman (Daniel Baltimore)

88.0013.50 325.00

1.00 1.00

1.50 21.007.50 110.000.50 8.50

2.501.50

12.5041.50

28.500.50

62.5021: 41.0022:23:Other

24.00 744.00

7 6.12 FX64R security 11620151 3 x 22.00 16210.00 578.00 1.50 1.50 new 42.817 6.12 FX64R security 11620151 3 x 22.00 16210.00 578.00 13.50 13.50 new 42.81

16210.00 - 16303.00 75.00 3900.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0016303.00 - 16788.00 75.00 4000.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1812.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1812.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

548.00548.00

0.00

GEN2351224.00

353.00329.00

0.00

GEN33512

0.00385.00

0.000.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

551.001192.00

0.000.00

3783.001551.00

34584.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.13 0.00 0.751 MOTOR 4.00 0.00 29.801 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

79 7534.050

5.0016788.13

158000.00326.00

16602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.64

0.00 0.00 0.0016123.00 90.31 169.6415939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.5015647.00 93.30 164.7115457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.73

1244 13.50 235.50 235.50 576.00 9584.00

Norberto M Musico s/m electrical, jras=6 stops=1,c1 hoist,c13 slipsNorberto M Musico k1 forklift,e23 t.i.h,c7 mix chemicals,l1 manliftJoey Wiegman s/m electrical hazzards, 6 jra's, 2 stopsJoey Wiegman d-6 add methanol, c-13 pull & set slips, c-7 mix mudJoey Wiegman brk temp in/out 63, 43 psi, 217 gpmJoey Wiegman p/u 160, s/o 133, r/w 150

drilling

16210.00 16303.00 DRILL 60.00 15.0016303.00 16788.00 DRILL 58.00 15.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-04 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 32.00

28.00

01/07/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

Hold safety meeting, rig up logging tools log with tools

none 12 862 0.00 N 32.4799 W -102.284

electrical 6 01/03/13 01/02/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

17085.00 297.00 42.43 7.00 0.00 0 0 0

15000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17085.00

00:00 0 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1707.12

250946.95

147.00

145.00

149.80

22020.00

147.00

06:00 13:00 7.00 2 drill f/16788-t/1708513:00 15:00 2.00 5 condition mud & circulate15:00 18:00 3.00 6 t.o.o.h c-c-o-m d-man 100% tied off (nm)

elevator watchman-Omar Rodriguez18:00 00:00 6.00 6 T.o.o.h, dh 100% tied off, ck c.o.m (jw)00:00 01:30 1.50 20 Lay down directional tools, break bit01:30 06:00 4.50 11 Hold safety meeting, rig up logging tools

elevator watchman (Justin youkey)fuel=48"=6602.0 gls.

88.007.00 332.00

1.00

2.00 23.009.00 119.00

8.502.501.50

4.50 17.0041.50

28.500.50

1.50 64.0021: 41.0022:23:Other

24.00 768.00

7 6.12 FX64R security 11620151 3 x 22.00 16210.00 17085.00 875.00 22.50 36.00 new 42.00

16788.00 - 17085.00 274.00 4150.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1836.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1836.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351220.00

568.00568.00

0.00

GEN23512

4.00357.00333.00

0.00

GEN3351224.00409.0024.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

575.001216.00

0.004000.006602.001181.00

35765.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 FLOAT SUB 4.00 2.50 2.301 UPPER LATCH 4.00 0.00 4.501 LOWER LATCH 4.00 0.00 5.501 slc 4.00 0.00 8.201 SPE 4.00 0.00 39.001 SMS 4.00 0.00 3.00249 3 1\2 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

82 7819.680

17.0017018.42

158000.00333.00

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.50

1244 7.00 242.50 242.50 297.00 9881.00

s/m elec.safety,jras=6 stops=2,c1 hoist,c13 slips24 t.o.o.h,k1 forklift,c4 conn w/td,c7 mix mud,c8 conn w/irs/m electrical hazzards continued, 6 jra's, 4stopsl-1 manlift, c-13 pull & set slips, e-24 t.o.o.hbrk temp in/out 53, 43 psi, 218 gpm

log with tools

16788.00 17085.00 DRILL 60.00 15.0017085.00 17085.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-05 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 33.00

29.00

01/07/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

pooh while logging with weatherford log with tools

none 9 863 0.00 N 32.4799 W -102.284

weather 4 01/04/13 01/04/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

17085.00 0.00 0.00 0.00 0 0 0

15000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17085.00

00:00 0 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

2492.37

1712.43

253439.32

148.00

145.00

149.76

22165.00

148.00

06:00 18:00 12.00 6 t.i.h w/logging tools c-c-o-m d-man 100% tied off (nm)elevator watchman-Omar Rodriguez

18:00 20:00 2.00 6 T.i.h, dh 100% tied off ck c.o.m (JW)20:00 22:30 2.50 5 Deploy logging tools, circulate bottoms up22:30 06:00 7.50 6 pooh while logging with weatherford

derrickman 100% tied off c-o-melevator watchman=justin youkeyfuel=43"=5692.4 gls.

88.00332.00

1.00

2.50 25.5021.50 140.50

8.502.501.50

17.0041.50

28.500.50

64.0021: 41.0022:23:Other

24.00 792.00

na 0.00 0 0 0 0.00 0.00 0.00 0.00 0.00 new 0.00

17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1860.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1860.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

592.00592.00

0.00

GEN23512

0.00357.00333.00

0.00

GEN3351224.00433.0048.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

599.001240.00

0.000.00

5692.00910.00

36675.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 FLOAT SUB 4.00 2.50 2.301 UPPER LATCH 4.00 0.00 4.501 LOWER LATCH 4.00 0.00 5.501 slc 4.00 0.00 8.201 SPE 4.00 0.00 39.001 SMS 4.00 0.00 3.00249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

82 7819.680

17.0017018.42

158000.00333.00

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32

1244 0.00 242.50 242.50 0.00 9881.00

Norberto M Musico s/m ele. safety,jras=3,stops=1,c13 slips,c1hoistNorberto M Musico e23 t.i.h,c8 conn w/irJoey Wiegman s/m electrical continued,jras=6,stops=4Joey Wiegman jra c13 slips,jra e23 trip in hole,jra e24 trip out holeJoey Wiegman brk temp in/out 55, 43 psi, 220 gpm

log with tools

17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-06 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 34.00

30.00

01/07/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

T.i.h, dh 100% tied off ck c.o.m (JW) ream lay down dp

yes 0 864 0.00 N 32.4799 W -102.284

electrical safety 0 01/05/13 01/05/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 Yes No 149.00

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

17085.00 0.00 0.00 0.00 0 0 0

15000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17085.00

00:00 0 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1700.94

253439.32

149.00

145.00

149.73

22310.00

149.00

06:00 16:30 10.50 6 t.o.o.h w/logging tools16:30 18:00 1.50 21 laydown logging tools & equipment

elevator watchman-Omar Rodriguez18:00 20:00 2.00 21 Strap tools, pick up reamers & make up bit20:00 00:30 4.50 6 T.i.h, dh 100% tied off, ck c.o.m (JW)00:30 03:00 2.50 9 Hang blocks, slip & cut, unhang blocks03:00 03:30 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown03:30 05:00 1.50 6 T.i.h, dh 100% tied off ck c.o.m (JW)05:00 06:00 1.00 3 REAMING f/10300 to 11595

Elevator watchman (Justin Youkey)Fuel=38"=4806.0 gls.

88.00332.00

1.00 2.00

25.5016.50 157.000.50 9.00

2.502.50 4.00

17.0041.50

28.500.50

64.0021: 3.50 44.5022:23:Other

24.00 816.00

8 618.00 xp30tps smith px4926 3 x 22.00 17085.00 0.00 0.00 0.00 used

17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 80.00 0.00 6.00 0.00 6.00 80.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1884.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1884.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

616.00616.00

0.00

GEN23512

0.00357.00333.00

0.00

GEN3351224.00457.0072.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

623.001264.00

0.000.00

4806.00886.00

37561.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.18 0.00 1.001 BIT SUB 4.00 2.50 3.431 3 1\2 DP 3.50 2.76 31.941 3PT REAMER 4.00 2.73 6.851 3 1\2 DP 3.50 2.76 31.931 REAMER 4.00 2.76 6.641 3 1\2 DP 3.50 2.76 31.951 3PT REAMER 4.00 2.76 6.811 3 1\2 DP 3.50 2.76 31.931 REAMER 3.50 2.76 6.67249 3 1\2 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52

00

9278.39

334.00

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32

1244 0.00 242.50 242.50 0.00 9881.00

s/m cold weather,jras=6,stops=2,c13 slips,e23,tooh,c8 conn w/ir,l1 manlift,k1 forklift,e24 tih,c1 hoistbrake-71 psi,219 gpm,59 out 90 in temps/m electrical, 6 jra's, 6 stopsd-27 slip & cut, c-1 hoist, e -23 t.i.hbrk temp in/out 60, 43 psi, 220 gpm

log with tools

17085.00 17085.00 0.00 0.0017085.00 17085.00 REAM 75.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-07 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 35.00

31.00

01/07/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

Lay down pipe lay down dp run casing

none 9 865 0.00 N 32.4799 W -102.284

hydroil hoist 7 01/05/13 01/06/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

17085.00 0.00 0.00 1455.00 0 0 0

15000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17085.00

00:00 0 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1689.60

253439.32

150.00

145.00

149.70

22455.00

150.00

06:00 16:30 10.50 3 reaming in hole f/11598-t/1708516:30 18:00 1.50 5 condition mud & circulate

elevator watchman-Omar Rodriguez18:00 20:00 2.00 5 Circulate20:00 21:00 1.00 8E Repair top/drive repaired line going to brake caliper21:00 01:00 4.00 6 T.o.o.h. to shoe,dh. 100 % tied off, ck c.o.m. (jw)01:00 01:30 0.50 5 Break circulation, pump pill 833 stks01:30 06:00 4.50 6 Lay down pipe

elevator watchman (justin youkey)fuel=32"=3783.7 gls.

88.00332.00

10.50 12.50

4.00 29.508.50 165.50

9.001.00 3.50

4.00

17.0041.50

28.500.50

64.0021: 44.5022:23:Other

24.00 840.00

8 618.00 xp30tps smith px4926 3 x 22.00 17085.00 0.00 0.00 used

17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 70.00 2500.00 6.00 0.00 6.00 70.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1908.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1908.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

640.00640.00

0.00

GEN23512

0.00357.00333.00

0.00

GEN3351224.00481.0096.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

647.001288.00

0.000.00

3783.001023.00

38584.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

1 BIT 6.18 0.00 1.001 BIT SUB 4.00 2.50 3.431 3 12 DP 31.941 3PT REAMER 4.00 2.73 6.851 3 12 DP 31.931 REAMER 4.00 2.76 6.641 3 12 DP 31.951 3PT REAMER 4.00 2.76 6.811 3 12 DP 31.931 REAMER 3.50 2.76 6.67249 3 12 DP 7921.7239 H.W.D.P. 3.50 2.76 1197.52

00

9278.39

344.50

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32

1244 0.00 242.50 242.50 0.00 9881.00

Norberto M Musico s/m electrical safety,jras=3,stops=1,c13 slipsNorberto M Musico e24 t.i.h,c8 conn w/ir,brake 71 psi 219 gpm temp 67 in 84 outJoey Wiegman s\m electrical safety,6 jras,6 stopsJoey Wiegman jra c13 slips,jra e24 trip out hole,jra e7 laydown drill pipeJoey Wiegman brk temp in/out 67, 43 psi, 218 gpm

lay down dp

17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-08 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 36.00

32.00

01/07/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

Hold safety meeting,rig up casing crew,run casing run casing

none 6 866 0.00 N 32.4799 W -102.284

hoist cont 4 01/07/13 01/07/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

17085.00 0.00 0.00 0.00 0 0 0

150000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17085.00

00:00 0 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1678.41

253439.32

151.00

145.00

149.67

22600.00

151.00

06:00 12:30 6.50 6 lay down pipe & reamers12:30 13:00 0.50 7 lubricate rig work manual ibop (ok) manrider stored @ crown13:00 16:00 3.00 6 t.i.h c-c-o-m d-man 100% tied off (nm)16:00 18:00 2.00 6 lay down pipe

elevator watchman-Omar Rodriguez18:00 00:30 6.50 6 Lay down pipe00:30 04:00 3.50 21 Change out bails & elevators, change saver sub04:00 06:00 2.00 12 Hold safety meeting,rig up casing crew,run casing

elevator watchman (Justin Youkey)fuel=27"=2976.7 gls.

88.00332.0012.50

29.5018.00 183.500.50 9.50

3.504.00

17.002.00 43.50

28.500.50

64.0021: 3.50 48.0022:23:Other

24.00 864.00

na

17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1932.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1932.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351218.00

658.00658.00

0.00

GEN23512

6.00363.00339.00

0.00

GEN3351224.00505.00120.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

671.001312.00

0.000.00

2976.00807.00

39391.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00

344.50

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32

1244 0.00 242.50 242.50 0.00 9881.00

Norberto M Musico s/m hoist oper,jra=3,stops=1=c1 hoist,k1 forkliftNorberto M Musico c13 slips,c8 conn w/ir,Joey Wiegman s/m material handleing,jras=6,stops=4,Joey Wiegman jra h1 xcaseing rig up and run,c13 slips,c1 hoistJoey Wiegman brk temp in/out 60, 43 psi, 217 gpm

run casing

17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-09 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 37.00

33.00

01/09/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler

Circulate while waiting on cement to arrive cement rig down

none 6 867 0.00 N 32.4799 W -102.284

electrical safety 6 01/07/13 01/07/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 Yes yes Yes 186.50

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

17085.00 0.00 0.00 0.00 0 0 0

150000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

5.50 17085.00

00:00 0 0 0.00 0 0 0 0.00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

1348.17

1676.23

254787.49

152.00

145.00

149.64

22745.00

152.00

06:00 07:30 1.50 12 run casing07:30 08:30 1.00 21 change out casing tongs08:30 12:30 4.00 12 run casing12:30 13:30 1.00 21 rig up C.R.T tool & make up x.o13:30 18:00 4.50 12 run casing18:00 02:00 8.00 12 Run casing02:00 06:00 4.00 5 Circulate while waiting on cement to arrive

elevator watchman (Justin Youkey)fuel=23"=2367.6 gls.

88.00332.0012.50

4.00 33.50183.50

9.503.504.00

17.0018.00 61.50

28.500.50

64.0021: 2.00 50.0022:23:Other

24.00 888.00

na

17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 1900.00 0.00 6.00 0.00 6.00 50.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1956.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1956.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 0 546 0

NONE

GEN 13512

0.00658.00658.00

0.00

GEN2351224.00

387.00363.00

0.00

GEN3351224.00529.00144.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

695.001336.00

0.000.00

2367.00609.00

40000.00OFFROADINDUSTRIAL OIL

0

0.000.00

0.000.00

0.00

0 NA

00

0.00

344.50

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32

1244 0.00 242.50 242.50 0.00 9881.00

s/m material jras=3 stops=2,c1 hoist,k1 forkliftl1 manlift,

Joey Wiegman s/m hoist air hydrolic,jras=6,stops=4Joey Wiegman jra k1 forklift,jra h13 run casing,jra h8 rig down casing crewJoey Wiegman brk temp in/out 62, 43 psi, 221 gpm

cement rig down

17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

FUEL USED

5: COND. & CIRC

10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT

14: NIPPLE UP BOP15: TEST BOP

16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT

2: DRILLING

3: REAMING4: CORING

6: TRIPS7: LUBRICATE RIG8: REPAIR RIG

9: C/O DRILL LINE

13: WAIT ON CEMENT

19: FISHING

20: DIR. WORK

DATE RIG NO.

RIG PHONE NUMBER

DAYS FR SPUD

JOB NO.

WELLNAME

OPERATOR

WEATHER

SPUD DATE / TIME

WATER SOURCE

OPERATIONS @ REPORT TIME

DEPTH INCL AZM

CREW M / U MANHOURS PAST 24

ACCIDENTS OR NEAR MISSES:

PROJECTED TD

LAST INSPECTION

REP

OR

T R

EMA

RK

S

DEVIATION SURVEYS

Total Hours

(Today / Well)TIME BREAKDOWN

BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #

BIT

S

LENGTHNO.

STANDS

WT of COLLARS / DRILLSTRING

DRILLING ASSEMBLY ( BHA )

SINGLES

HOURS SINCE LAST INSPECTION

KELLY DOWN

TOTAL

DRILL PIPEDIRECTIONS TO

MORNING REPORT JOB TYPE WELL TYPE

O.D.

DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE

1: RIG UP / DOWN

BOILER #

HOURS

SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS

DR

LLST

RG

Used Today

Used This Well

DELIVERED TODAY

On Hand

Fuel BrandRIG

FU

EL

Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL

MU

D M

TR SERIAL # HRS LAST24

TOTALHRS

CUM.WELL HRS

FOOTAGELAST 24

TOTALFOOTAGE

TODAY

RIG MANAGER

SAFETY MEETING TOPICS

BOP TEST DATE / PRESSURE

LAST CASING SIZE & SET DEPTH RIG COSTS

BOP DRILL DATE / TIME

DAILY

AVERAGE

CUMULATIVE

CUMULATIVEDAYS

CUM. HRS

I.D.

WELL

STATE JOB START DATE DAYS ON JOB EST. RELEASE

G.P.S. COORDINATES

CROWN-O-MATIC CHECKED

OPERATIONS NEXT 24 HRS

CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS

# STOP CARDS

# OF JSA's

NEXT CASING SIZE & SET DEPTH

DAILY CUM.

FILT CKYLD PT 10 M GEL

RENTALS & R

ENG

INES

Co. No.

HRS TODAY

HRS LAST CHGE

HRS ON WELL

LOCATION

DRILL STRING REMARKS

FUEL ADDED TO MUDTODAY

EXTRA CREWS / WHY? BOP DRILL DATE / TIME

CUM.MUD COSTS

CHANGED

HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING

RIG SAFETY DAYS

INSPECTION BY / TITLE

SAFETY RATE

OFFICE NOTIFIED

FROM TO CODE RPM W.O.B.DEPTH DRILLED

LAST MEETING DATE

RELEASE DATE / TIME

AVERAGE KVA

DISTRIBUTORBLOWDOWNVOLUMES

MU

DO

PSSA

FETY

HTHP FL HTTP FC

TIM

E LO

G

ROTARY TORQUE

pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type

SHAKER TYPE SCREENSCENTRIFUGES

PUM

PSR

ENTA

L IT

EMS

OPERATORS REPRESENTATIVE

COUNTY / PARISH

LEGAL DESCRIPTION

CO. MAN PH NO.

BO

ILER

STDBY HRLYDESCRIPTION DAY RT

Depth GPM PRESSUREPump 1

Liner SPMPump 2

Liner SPMPump 3

Liner SPMPump 4

Liner SPM Pump 1Pump 2

Pump 3Pump 4

TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate

PATTERSON-UTI DRILLING COMPANY 2013-01-10 215 HORIZONAL 25713 OIL

University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00

W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 38.00

34.00

01/07/13

Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 01/10/13 01:00 cooler

Rig down flow line, back stairs,clean pits, rig down floor, hang top drive & rig down

none 8 868 0.00 N 32.4799 W -102.284

l1 manlift,k1 forklift,g1 l/d bop,h1 cementjra k1 forjklift,jra l1 manlift,jra i3 bridle up4 01/07/13 01/07/13 00:00

12/18/12 Ryan Savallo - rig manager 5/4 Yes 3 extra hands Yes 224.50

12/21/12 250 LOW 1000 H

01/02/13 15:55 - 53sec

01/02/13 19:20 - 8-15-2012 45 SEC

0.00 17085.00 0.00 0.00 0 0 0

150000.00 160000.00 133000.00 150000.00 6.00 - 9.00

7.62 10346.00

00:00 0 0.00 0

no mud 1.5 0 0 0 0 10.00 0 0 2180 156000

0.00 0.00

0.00 0.00

N/A N/A N/A No 0

0.00

1665.28

254787.49

153.00

145.00

149.61

22890.00

153.00

06:00 10:30 4.50 5 circulate while waiting on cement to arrive10:30 13:30 3.00 12 hold safety meet,rig up cement crew & cement13:30 14:00 0.50 21 rig down cement equipment14:00 14:30 0.50 21 rig up stack jacks14:30 17:00 2.50 14 nipple down bop & set slips cut casing17:00 18:00 1.00 14 nipple down l/d bop's install tubing head & jet pitts18:00 22:00 4.00 14 Nipple down b.o.p.'s, rig down stack jacks & install tubing head22:00 06:00 8.00 1C Rig down flow line, back stairs,clean pits, rig down floor, hang top drive &

blocks, unspool drill line from drumNorberto Musico and his crew worked over 2.5 hours 20:50fuel=18"=1662.5 gls.

8.00 96.00332.0012.50

4.50 38.00183.50

9.503.504.00

17.003.00 64.50

7.50 36.000.50

64.0021: 1.00 51.0022:23:Other

24.00 912.00

na

17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00

12P160 12.00 NATIONAL 24.00 1980.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1980.00 2700.00 30.00 907.00

4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0

NONE

GEN 1351224.00

682.00682.00

0.00

GEN23512

0.00387.00363.00

0.00

GEN33512

0.00529.00144.00

0.00

CMP3306

0.0078.0078.000.00

HPUDEUT24.00

719.001360.00

0.00

1662.00705.00

40705.00OFFROADINDUSTRIAL OIL

00.00 0.00

0.00

0 NA

00

0.00

344.50

0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32

1244 242.50 242.50 9881.00

Zachary Ryan Savallo s/m electrical safety,jras=6 stops=2,c1 hoistZachary Ryan Savallo l1 manlift,k1 forklift,g1 l/d bop,h1 cementZachary Ryan Savallo s/m electrical safety,jras=9,stops=2Zachary Ryan Savallo jra k1 forjklift,jra l1 manlift,jra i3 bridle up

run casing

17085.00 17085.00 0.00 0.000.00 0.00 0.00 0.00

take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation

Revision 0 Page 1 of 1US 2.50.0

W & T OFFSHOREDAILY WORKOVER REPORT

LEASE NAME & WELL # UNIVERSITY 6-23 #2H DATE: 2/25/13 DAY: 1OBJECTIVE: Run Gas Lift, Set PKR at 10,062' UNIT SIZE:SUPERVISOR: Jr Salinas SPM:OPERATOR: Rig #25 (Blackhawk) Daily Cost: $4,115 STROKE LENGTH:

Daily Cost: Prev. Cost:Blackhawk: $2,915 Cumm. Cost: $4,115

$500S & S: BOP $700

Daily Total: $4,115 ANCHORS: 2/13ROD FAILURE PUMP FAILURE Size

Polish Depth Size Stuck Mo.In Hole

Sucker RFS Corrosion Yes Worn Split Pull Rod

Pony Pin Break No Scaled Up Corrosion Yes No

TUBING FAILURE Jts to Leak OTHER- Explain

Body Coating Failure Yes No

Pin Rod on Tbg Wear Yes No

Cplg Corrosion Yes No

Pulled Description Ran Ran Coupling Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts Type Set at; Tension; etc.

PBTD: 17,001'

PERFS: 10,211'-16,971'

TAC:SN:EOT:

WORK PERFORMEDMove in pulling unit. Spot Rig, ND Frac Valve, NU BOP, Shutdown due to weather. Leave flowing to tanks.

CONTRACTORS:

Mustang:

W & T OFFSHOREDAILY WORKOVER REPORT

LEASE NAME & WELL # UNIVERSITY 6-23 #2H DATE: 2/26/13 DAY: 2OBJECTIVE: Run Gas Lift, Set PKR at 10,062' UNIT SIZE:SUPERVISOR: Jr Salinas SPM:OPERATOR: Rig #25 (Blackhawk) Daily Cost: $32,463 STROKE LENGTH:

Daily Cost: Prev. Cost: $4,115Blackhawk: $4,930 Cumm. Cost: $36,578

$300Mustang $1,800Lufkin $25,433

Daily Total: $32,463 ANCHORS: 2/13ROD FAILURE PUMP FAILURE Size

Polish Depth Size Stuck Mo.In Hole

Sucker RFS Corrosion Yes Worn Split Pull Rod

Pony Pin Break No Scaled Up Corrosion Yes No

TUBING FAILURE Jts to Leak OTHER- Explain

Body Coating Failure Yes No

Pin Rod on Tbg Wear Yes No

Cplg Corrosion Yes No

Pulled Description Ran Ran Coupling Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts Type Set at; Tension; etc.

PBTD: 17,001'FOLLOWING TABS HAVE TBG& PKR DEPTHS PERFS: 10,211'-16,971'

TAC:SN:EOT:

WORK PERFORMEDRU Unit, Picked up Pkr w/ Valves and 314 jts of 2 3/8", Set Pkr, ND BOP, RU Tree, RD Pulling Unit, Clean location, Move off.

CONTRACTORS:

Key Pump Truck