Page 1: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

US Army Corps of Engineers

BUILDING STRONG®

Pavement & Geotechnical

Field Results Tribhuvan International Airport

Prepared by:

U.S. Army Corps of Engineers

09 July 2012

Page 2: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Agenda

Problem

Statement

Background

Approach

Results

► Pavement

► Geotechnical

Page 3: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Problem Statement

Due to a lack of information and limited record

keeping, TIA geotechnical subsurface details

and pavement condition and strength were

unknown.

► Without this information, details related to

liquefaction, water table levels, and slope stability

remained an assumption.

► The number of safe airfield operations remaining in

the runway surface was also unknown.

Geotechnical and pavement information is

needed to determine how an earthquake will

impact TIA operations and recovery.

Page 4: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Background

In April 2011, a seismic vulnerability assessment was

performed for structural and airfield features at

Tribhuvan International Airport (TIA) in Kathmandu,

Nepal.

The assessment recommended numerous seismic

structural retrofitting measures, as well as a geotechnical

investigation and a pavement strength/condition test.

Page 5: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

S.

N Description

Vulnerability Priority Action to carry out

L M H 1st 2nd 3rd

1 Soil of North Side of Airport

Soil Investigation for potential of

liquefaction, Water Table Level & Slope

Stability.

2 Runway Pavement Assess runway pavement capacity &

existing condition

3 Drainage System Regular maintenance (remove plants &

soil)

4 Radar Tower Assessment of structural & operation

system

5 Radar equipment Building Structural assessment

6 Power House for Radar Structural assessment

7 Fuel Tank at Radar Compound Structural assessment

8 Fuel Pipe Replacement of rigid pipe to flexible pipe

at Junction

9 Rescue and Fire Fighting Building Structural assessment

10 Foam Store Building Structural assessment

Initial Top 10 Seismic Vulnerability

Recommendations

Page 6: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Approach

Pavement: USACE partnered with

CAAN, TIA, USAF, and FAA to perform

a pavement strength and condition

survey in January 2012.

Geotechnical: USACE hired Multi

Lab, a geotechnical contractor, to drill

boreholes and perform analysis on the

soil samples collected.

Page 7: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Testing Locations

Page 8: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Testing Locations

Page 9: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Results - Passes

Airfield pavement can withstand 100,000+

passes (dependent upon aircraft type) if

engineering and maintenance recommendations

are performed.

If engineering and

maintenance

recommendations are not

performed, the number of

passes reduces to

100 – 1,000.

Page 10: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Results – AC Mixture

Asphalt composition and binder to aggregate

ratio varied greatly throughout the length of the

runway.

► Poor mix design or lack of materials during time of

batch plant production may be reason.

► The issue has led to large amounts of bleeding in

certain areas.

Results showed significant areas of subsurface

weakness on the north side of the domestic

apron.

Page 11: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Results - Distresses

Pavement Condition Index (PCI) ratings ranged

between “Good” and “Satisfactory.”

Airfield surfaces have a number of common

distresses, which if not monitored and maintained,

could lead to severe operational issues.

Distresses included bleeding, fatigue cracking, block

cracking, corrugation, jet blast erosion, depression,

joint-reflection cracking, longitudinal/transverse

cracking, oil spillage, patching, weathering, rutting,

corner breakage, joint seal damage, pumping,

settlement, and spillage cracking.

Page 12: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Results - Distresses

Bleeding

Cracking

Oil

Patching

Vegetation Joint Seals

Page 13: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Results - Rubber

Rubber removal has also yet to be

accomplished on the main runway.

This equates to approximately three years of

build-up.

This build-up will lead to aircraft traction loss

during take-off and landing.

It is recommended that rubber removal be

accomplished within the next 12 months.

Page 14: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Pavement Results – Other Concerns

Other pavement condition concerns includes:

► Rutting at the south end of the main taxiway.

► Low severity joint sealant damage in several

locations along the international apron.

► Fuel/oil spillage covering approximately 70% of

the domestic apron.

► Longitudinal cracking and potholes in several

apron locations.

► Inconsistent asphalt thickness (ex. ranges of 280-

380 mm from station 0+00 through 63+00, and

533-850 mm from 63+00 to 100+00.)

Page 15: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical Results - Overview

Ground investigation of the airport was carried

out by drilling 32 boreholes to varying depths of

4.5 m to 30 m.

Work performed

by a local

contractor

(Multi Lab) under

supervision of

USACE.

Page 16: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical

Results –

Priority Areas

During the seismic

vulnerability

assessment, this

map was produced to

indicate priority areas

for geotechnical

investigation.

Page 17: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical

Results –

Borehole Map

•32 boreholes

•Depths range from 4.5-

30 m

•Auger and percussion

main means of data

collection

•Collected 1/12 – 2/12

Page 18: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

BOREHOLE ELEV (M) DEPTH TO

WATER (M) DEPTH DRILLED

(M) START DATE END DATE METHOD LIQUEFACTION LIQ DEPTHS (M) TB-1 1314.92 17.0 30.0 2/4/2012 2/7/2012 Percussion No TB-2 1315.31 0.0 9.5 2/3/2012 2/4/2012 Auger No TB-3 1320.02 0.0 9.5 2/6/2012 2/6/2012 Auger No TB-4 1324.51 0.0 9.5 2/10/2012 2/10/2012 Auger No TB-5 1328.71 7.0 9.5 2/13/2012 2/13/2012 Auger No TB-6 1332.31 2.5 9.5 2/14/2012 2/14/2012 Auger No TB-7 1334.18 1.4 9.5 2/1/2012 2/1/2012 Auger Yes 4-5 & 8-9.5 TB-8 1337.11 2.2 5.0 2/2/2012 2/2/2012 Auger Yes 2.2-5 TB-9 1337.43 0.0 30.0 2/9/2012 2/14/2012 Percussion No

TB-10 1336.11 0.0 5.0 1/29/2012 1/29/2012 Auger No TB-11 1337.31 3.8 9.5 2/16/2012 2/16/2012 Auger Yes 5-9.5 TB-12 1337.43 0.0 30.0 1/31/2012 2/3/2012 Percussion No TB-13 1317.50 2.4 30.0 1/20/2012 1/23/2012 Percussion Yes 2.4-30 TB-14 1311.00 0.0 5.0 1/20/2012 1/20/2012 Auger No TB-15 1334.17 3.5 9.5 1/26/2012 1/27/2012 Auger Yes 7-9.5 TB-16 1334.45 2.0 30.0 1/24/2012 1/26/2012 Percussion Yes 14-30 TB-17 1337.25 0.0 9.5 1/25/2012 1/25/2012 Auger No TB-18 1307.21 0.0 9.5 1/21/2012 1/21/2012 Auger No TB-19 1297.50 2.3 9.5 1/19/2012 1/20/2012 Percussion Yes 2.3-4 & 5-9.5 TB-20 1300.21 4.1 12.0 1/19/2012 1/19/2012 Percussion Yes 4.1-12 TB-21 1318.32 0.0 30.0 1/26/2012 1/31/2012 Percussion No TB-22 1316.00 0.0 30.0 1/27/2012 1/30/2012 Percussion No TB-23 1333.43 0.0 9.5 1/28/2012 1/28/2012 Auger No TB-24 1327.50 0.0 5.0 1/18/2012 1/18/2012 Auger No TB-25 1336.12 0.0 9.5 1/31/2012 1/31/2012 Auger No TB-26 1336.00 0.0 9.5 1/18/2012 1/18/2012 Percussion No TB-27 1326.23 1.4 9.5 1/30/2012 1/30/2012 Auger Yes 1.4-9.5 TB-28 1326.50 0.0 5.0 1/27/2012 1/27/2012 Auger No TB-29 1323.11 5.8 9.5 2/12/2012 2/12/2012 Auger No TB-30 1308.10 0.0 9.5 1/24/2012 1/24/2012 Auger Yes 0-9.5 TB-31 1320.12 0.0 9.5 1/22/2012 1/22/2012 Auger No TB-32 1321.18 0.0 9.5 1/23/2012 1/23/2012 Auger No

Page 19: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical

Results – Depth

to Water Table

• Map below indicates

depth to water table

under airfield surface

Water

Table

Level

Terminal

Page 20: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical Results – Slope Stability

1. Static Case - Factor of Safety =

1.32 = Safe Slope

2. Dynamic/Seismic Case -

Factor of Safety = 0.57 =

Unsafe Slope

Arrows indicate where slope is located and potential direction of failure

Cargo

Warehouse

Road to

Cargo

Warehouse

Page 21: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical

Results –

Surface

Liquefaction

•This GIS map indicates

surface liquefaction potential

based off the borehole data

that was collected.

•The northern portion of the

runway, cargo warehouse,

CFR, domestic apron, and

Mid Air Base are most

susceptible.

Page 22: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical Results – Surface Liquefaction

TIA Master Plan 2010 - 2028

Future

International

Apron

Nepal Oil

Corporation

Future

Domestic

Hangars Remote

Domestic

Apron

Current

International

Terminal

Cargo

Warehouse

Page 23: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Geotechnical Results – Liquefaction

Depths

Boreholes are extruded (10x) to showcase subsurface liquefaction potential

Terminal

Page 24: Pavement & Geotechnical Field Results · Pavement Results – AC Mixture Asphalt composition and binder to aggregate ratio varied greatly throughout the length of the runway. Poor

BUILDING STRONG®

Point of Contact

Justin Pummell, GISP

Geographer

U.S. Army Corps of Engineers

+1 (808) 234-4633

[email protected]