Payload Integration Capabilities
Contact Information:MEI Technologies, Inc.2525 Bay Area Blvd., Suite 300Houston, Texas 77058 Barbara Pearson [email protected]
Space Shuttle,International Space Station,
Expendable Launch Vehicles
22
Payload Integration OverviewSafety Data Ph 0/1
Verification Rpts
CoFREndorsementReqts Exceptions
C&DH Data Set P
Delta SafetyPhase 3
Integrated Exper .Hazard
Assessment input
IDRD Annex 5:PTP (Increment) B
PL OperatingProcedures
POIF Flight RulesVol B&C input
Integrated PayloadPlanning DS B
MissionOperationsExecution
Weekly Look -Ahead Plan
Short Term Plan
Onboard ShortTerm Plan
Integrated GroundData Services DS
B
KSC SupportRqts Data SetKSC TechnicalRqts Data Set
STRATEGIC TACTICAL OPERATIONSPayload
Manifested LaunchSORR
SW ICD P
On Orbit Summary(Final)
PDR CDR
Design Data Pckg
PIM Schedule BPIA/WIA P
Hardware ICD P PIM Schedule SHardware ICD U
Safety Data Ph 2Design Data Pckg
Geometric Model(Attached PLs ) F
Geometric Model(Attached PLs ) P
Thermal Model(Attached PLs ) P Thermal Model
(Attached PLs ) F
Review ItemDiscrepancies Review Item
Discrepancies
Training StrategyTeam input
Flight andGroundPhase 2
Hardware ICD B
IDRD Annex 1(Flight) B
Procedures andDisplays DS P
Export ControlLetter
Multi - IncrementTraining Plan B
ITRR
Grd Data ServicesData Set
Proc & DisplaysOpNom U
Procedures andDisplays DS U
Reqts Exceptions
Payload Trainer(Hdwr & SW)
Element LevelAnalysis Report FGuidelines andConstraints F
Payload VerificationReport F
CoFR(MI, PEI, PSI, POIF)
LPA
C&DH Data Set I
C&DH Data Set F
SW ICD I SW ICD FPL Config Files P PL Config Files IPL Config Files F
HOSC Export F
Delta Flight and GroundPhase 3 (if req’d )
PPIL (Test)
PCS Displays IPCS Displays P
PL Planning DS P
IncrementCapabilities Rpt F
CoFR PlanningLetter
PAYLOADDEVELOPER
PIA/WIA F
FLIGHT INDEPENDENT FLIGHT DEPENDENT
Integrated KSCSpt Rqts DS P
Integrated KSCTech Rqts DS
PDL KSC SRDS/TRDS Rev
LSSP P
MiddeckTGHR Table P LSSP B
MiddeckTGHR Table B
OMRS F8V2 B
OMRS F2V2 P
OMRS F2V2 B
LSSP/OMRS/TGHR Review
KSC ProcessingProcedures
CoFREndorsement
SSCCD B
On Orbit Summary(Basic)
PL Planning DS F
Integrated PayloadPlanning DS F
Procedures andDisplays DS U
PL Display Review
KSC ProcessingSchedules
PAYLOAD INTEGRATIONDATA FLOW DIAGRAM
Revision Date: 08/21/03
Training DS P
Training DS B
Training Plans &Courseware
Training DS P
Payload TrainingLesson Plan andCourseware F
SODF FPODF F
Procedures andDisplays DS U
Flight Rules P Flight Rules F
Generic &Increment Payload
Regulations B
PL TV/PhotoOperations Book
PIM Schedule S
Payload ICA inputs B
Integrated ConfigD ata Set
PIM Schedule S
PIM Schedule S
Payload ICA inputs B
IDRD Annex 1(Flight) U
SSCCD F
Manifest &Stowage DS P
Stage ConfigurationDrawings F
IntegratedSchematics F
PIM Schedule S
PPIL (Flight)
KSC Procedures PKSC PL Integ
Data Pckg
OMRS F8V2 P
Groundrules andConstraints
Flight and GroundPhase 0/1
Integrated PayloadMission Model
Increment Def.Reqt's Doc.
FilenameISS IPIC Level 1 Rev 9
Mission IntegrationPlan
CCCD F
IDRD Annex 5:PTP (Increment) U
BenchReview
PIM Schedule S
ETOV PL ActivitySummary
PL Pre -ship Review
PLTurnover
Data Flow Plan
Ops ConsoleDocumentation
LEGENDISS PAYLOAD PRODUCTISS/SSP PRODUCTPRODUCT REQUIRED BY MILESTONEPRODUCT UPDATED AFTER MILESTONEPRELIMINARY P PD MILESTONEUPDATE U ISS MILESTONEBASELINED B COMPLETED CFINAL F STATUS S
ACRONYMSCCCD Crew Compartment Configuration DrawingCP Control PlanDS Data SetEMI/EMC Electromagnetic Interference/ControlETOV Earth to Orbit VehicleGSP Ground Support PersonnelHFIT Human Factors Integration TeamICA Interface Control AnnexICD Interface Control DocumentITRR Integrated Training Readiness ReviewLSSP Launch Site Support PlanMicro -G MicrogravityOMRS Operations & Maintenance Req'ts SummaryOpNom Operations NomenclaturePODF Payload Operations Data FilePPIL Payload Product Integrated ListSODF System Operations Data FileSSCCD Space Station Configuration Control DrawingTGHR Time Critical Ground Handling Req'tsTST Training Strategy Team PL Training Dry Run
PSRD Volume 2
IntegrationStatus Review
HFIT Verification Status
Safety Phase 3
Flight and GroundPhase 3
PSRD Volume 1
delta CDR(if req’d )
Rack/PalletControl Plans P
Rack/PalletControl Plans F
Increment DefinitionReq’ts Plan
HOSC Export P
PCS Displays F
Groundrules andConstraints B
Groundrules andConstraints F
Proc & DisplaysOpNom B
Drawing DS P
Manifest &Stowage DS UDrawing DS U
Manifest &Stowage DS UDrawing DS U
InvestigationQuestionnaire
MIP Annex 1, 2, 4inputs B
RESEARCHAND
PAYLOADMISSION
INTEGRATION
PAYLOADENGINEERINGINTEGRATION
PAYLOADSOFTWARE
INTEGRATION
KSCINTEGRATION
PAYLOADOPERATIONSINTEGRATION
Safety Data Ph 0/1
Verification Rpts
CoFREndorsementReqts Exceptions
C&DH Data Set P
Delta SafetyPhase 3
Integrated Exper .Hazard
Assessment input
IDRD Annex 5:PTP (Increment) B
PL OperatingProcedures
POIF Flight RulesVol B&C input
Integrated PayloadPlanning DS B
MissionOperationsExecution
Weekly Look -Ahead Plan
Short Term Plan
Onboard ShortTerm Plan
Integrated GroundData Services DS
B
KSC SupportRqts Data SetKSC TechnicalRqts Data Set
STRATEGIC TACTICAL OPERATIONSPayload
Manifested LaunchSORR
SW ICD P
On Orbit Summary(Final)
PDR CDR
Design Data Pckg
PIM Schedule BPIA/WIA P
Hardware ICD P PIM Schedule SHardware ICD U
Safety Data Ph 2Design Data Pckg
Geometric Model(Attached PLs ) F
Geometric Model(Attached PLs ) P
Thermal Model(Attached PLs ) P Thermal Model
(Attached PLs ) F
Review ItemDiscrepancies Review Item
Discrepancies
Training StrategyTeam input
Flight andGroundPhase 2
Hardware ICD B
IDRD Annex 1(Flight) B
Procedures andDisplays DS P
Export ControlLetter
Multi - IncrementTraining Plan B
ITRR
Grd Data ServicesData Set
Proc & DisplaysOpNom U
Procedures andDisplays DS U
Reqts Exceptions
Payload Trainer(Hdwr & SW)
Element LevelAnalysis Report FGuidelines andConstraints F
Payload VerificationReport F
CoFR(MI, PEI, PSI, POIF)
LPA
C&DH Data Set I
C&DH Data Set F
SW ICD I SW ICD FPL Config Files P PL Config Files IPL Config Files F
HOSC Export F
Delta Flight and GroundPhase 3 (if req’d )
PPIL (Test)
PCS Displays IPCS Displays P
PL Planning DS P
IncrementCapabilities Rpt F
CoFR PlanningLetter
PAYLOADDEVELOPER
PIA/WIA F
FLIGHT INDEPENDENT FLIGHT DEPENDENT
Integrated KSCSpt Rqts DS P
Integrated KSCTech Rqts DS
PDL KSC SRDS/TRDS Rev
LSSP P
MiddeckTGHR Table P LSSP B
MiddeckTGHR Table B
OMRS F8V2 B
OMRS F2V2 P
OMRS F2V2 B
LSSP/OMRS/TGHR Review
KSC ProcessingProcedures
CoFREndorsement
SSCCD B
On Orbit Summary(Basic)
PL Planning DS F
Integrated PayloadPlanning DS F
Procedures andDisplays DS U
PL Display Review
KSC ProcessingSchedules
PAYLOAD INTEGRATIONDATA FLOW DIAGRAM
Revision Date: 08/21/03
Training DS P
Training DS B
Training Plans &Courseware
Training DS P
Payload TrainingLesson Plan andCourseware F
SODF FPODF F
Procedures andDisplays DS U
Flight Rules P Flight Rules F
Generic &Increment Payload
Regulations B
PL TV/PhotoOperations Book
PIM Schedule S
Payload ICA inputs B
Integrated ConfigD ata Set
PIM Schedule S
PIM Schedule S
Payload ICA inputs B
IDRD Annex 1(Flight) U
SSCCD F
Manifest &Stowage DS P
Stage ConfigurationDrawings F
IntegratedSchematics F
PIM Schedule S
PPIL (Flight)
KSC Procedures PKSC PL Integ
Data Pckg
OMRS F8V2 P
Groundrules andConstraints
Flight and GroundPhase 0/1
Integrated PayloadMission Model
Increment Def.Reqt's Doc.
FilenameISS IPIC Level 1 Rev 9
Mission IntegrationPlan
CCCD F
IDRD Annex 5:PTP (Increment) U
BenchReview
PIM Schedule S
ETOV PL ActivitySummary
PL Pre -ship Review
PLTurnover
Data Flow Plan
Ops ConsoleDocumentation
LEGENDISS PAYLOAD PRODUCTISS/SSP PRODUCTPRODUCT REQUIRED BY MILESTONEPRODUCT UPDATED AFTER MILESTONEPRELIMINARY P PD MILESTONEUPDATE U ISS MILESTONEBASELINED B COMPLETED CFINAL F STATUS S
ACRONYMSCCCD Crew Compartment Configuration DrawingCP Control PlanDS Data SetEMI/EMC Electromagnetic Interference/ControlETOV Earth to Orbit VehicleGSP Ground Support PersonnelHFIT Human Factors Integration TeamICA Interface Control AnnexICD Interface Control DocumentITRR Integrated Training Readiness ReviewLSSP Launch Site Support PlanMicro -G MicrogravityOMRS Operations & Maintenance Req'ts SummaryOpNom Operations NomenclaturePODF Payload Operations Data FilePPIL Payload Product Integrated ListSODF System Operations Data FileSSCCD Space Station Configuration Control DrawingTGHR Time Critical Ground Handling Req'tsTST Training Strategy Team PL Training Dry Run
PSRD Volume 2
IntegrationStatus Review
HFIT Verification Status
Safety Phase 3
Flight and GroundPhase 3
PSRD Volume 1
delta CDR(if req’d )
Rack/PalletControl Plans P
Rack/PalletControl Plans F
Increment DefinitionReq’ts Plan
HOSC Export P
PCS Displays F
Groundrules andConstraints B
Groundrules andConstraints F
Proc & DisplaysOpNom B
Drawing DS P
Manifest &Stowage DS UDrawing DS U
Manifest &Stowage DS UDrawing DS U
InvestigationQuestionnaire
MIP Annex 1, 2, 4inputs B
RESEARCHAND
PAYLOADMISSION
INTEGRATION
PAYLOADENGINEERINGINTEGRATION
PAYLOADSOFTWARE
INTEGRATION
KSCINTEGRATION
PAYLOADOPERATIONSINTEGRATION
The Payload Integration Process is complex, requiring coordination with multiple organizations.
MEI Technologies, Inc. has the experience and personnel to maximize your science return while meeting all integration requirements.
Figure courtesy of NASA
3
MEI Technologies, Inc.
•
Incorporated January 1992•
Service-Disabled Veteran-Owned Small Business
•
NAICS Code– 541712 Research & Development– 517110 Telecommunications
•
Prime and Subcontracts with NASA and Department of Defense
•
Over 800 employees
•
ISO 9001:2000•
AS9100•
CMMI Level 3•
OSHA VPP Star Designation
Annual Revenue
0102030405060708090
100110120
96 97 98 99 00 01 02 03 04 05 06 07 08
4 6 610
18 21 2430
34
90101
115 118M$
Year
4
Huntsville, ALRedstone/Marshall Space Flight CenterHuntsville, ALRedstone/Marshall Space Flight Center
Colorado Springs, COColorado Springs, CO
El Segundo, CA
Albuquerque, NMAlbuquerque, NM
Houston, TXMEI HeadquartersJohnson Space Center
Houston, TXMEI HeadquartersJohnson Space Center
MEI Technologies, Inc. Locations
Greenbelt, MDGoddard Space Flight Center
Denver, CO
MississippiStennis Space Center
White Sands Test FacilityWhite Sands Test Facility
Los Angeles, CA
MEI Operations
MEI Headquarters
MEI Facility
Littleton, CO
Huntington Beach, CA
55
– MEI has been the sole provider of integration and operations support for all DoD experiments flown on the Space Shuttle and ISS for the past 17 years.
– MEI has successfully integrated more than 125 payloads.– Payload carriers and destinations have included Space Shuttle
middeck, payload bay Cargo Bay Hitchhiker, Get Away Special (GAS), and Cross-Bay Carrier, Spacelab, Spacehab, Phase I - Shuttle/Mir, International Space Station (ISS), Progress, HTV, and ATV.
Miniature Satellite Threat Reporting System (MSTRS) installed on Spacehab rooftop in preparation for STS-107
The Lightweight Flexible Solar Array Hinge (LFSAH) experiment being operated in the orbiter middeck on STS-93
MightySat installed in the orbiter cargo bay (above) and ejected during STS- 88 (right)
MEI Experience
Photos courtesy of NASA
66
Our Personnel Supporting Recent Missions
Perform Payload Development, Testing, Integration, and Operations– Mechanical and electrical
engineers for payload design
– Safety engineers
– Payload integration engineers
CAPE free-flyers being installed into STS-116 Shuttle payload bay by DoD and MEI Team
– Crew training instructors
– Test and verification personnel
– Real-time console operators
MEI personnel supporting DoD Team during STS-126 operations
Photos courtesy of DoD Space Test Program
77
Newly Awarded DoD Human Exploration Payloads (DHEP) Contract
– Define and document payload requirements– Obtain safety certification for payload flight
and ground hardware– Support manifesting and flight assignment – Technical and schedule guidance to payload
developer during hardware design and integration– Verify compliance with SSP and ISS requirements– Perform payload element testing and engineering
analyses– Train crew and console support team– Pre-launch and post-landing hardware processing – Maintain the DoD Payload Operations Control Center– Provide console flight operations support to payloads– Gather post-flight data from the SSP and/or ISS– Maintain DoD document library and hardware vault– Transition to future launch systems with NASA MISSE 6 deployed on Columbus
module during STS-123
Photos courtesy of NASA
88
Other Shuttle/ISS Integration-Related ContractsMEI also supports development and delivery of flight hardware to NASA on several subcontracts relating to payload integration
– Engineering and Science Contract (subcontract to JACOBS)Provide design, safety, quality, and test
– Bioastronautics (subcontract to WYLE)Provide design, build, and test
– Boeing Engineering ServicesProvide systems integration support
– Lockheed MartinProvide systems integration support
– NASA Johnson Space Center Engineering Directorate (BETA Contract)
Integrated DragonSat picosats for STS-127 deployment via MEI-built ejection system
99
Multinational Vehicle IntegrationLaunch and Space Operating Vehicles
– Space Shuttle, Mir and International Space Station– Progress– HTV (H-II Transfer Vehicle)– ATV (Automated Transfer Vehicle)
Launch Integration Experience– Systems and Payload Integration– Mission Planning and requirements definition– Requirements Implementation, Verification and Certification– Flight and Ground Crew Training– Trainer and Simulator Design, Acquisition and Operations Support– Technical Interchange and Action Item / Conflict Resolution– Integration Documentation– Safety Certification– Pre-launch Processing and Checkout Support– Real-Time Mission Operations Support
1010
SummaryMEI has extensive payload integration experience
– Author payload requirements documentation– Perform testing, verification, and safety certification– Support payload manifesting, operations and logistics support– Lead payload organizations to successfully utilize chosen
vehicle and carrier– Navigate the requirements and
processes of several launch vehicles and associated carriers
• Space Shuttle• International Space Station• ELVs (Expendable Launch Vehicles)
– Progress, – HTV, – ATV– and COTS Increment 14/Jeff Williams operating
SPHERES with MEI ops supporting
Photos courtesy of NASA