Upload
hanguyet
View
224
Download
9
Embed Size (px)
Citation preview
©A
BB
Util
ities
Gm
bH9/
23/2
008
Water Leakage Manager
Anand Kumar D
Product Manager WLMS
©A
BB
SG
upd
_13J
un06
2Water Leakage Manager
� Introduction – Product Overview
� WLMS Project
� Water Business & ABB Products
©A
BB
SG
upd
_13J
un06
3“ABB” Water Leakage Manager (WLM)
� Estimation of NRW & leakage analysis in the distribution system.� Analyze leakage information based on the IWA* and BABE methodology� Optimization & Integration of Water Utilities in the Distribution system� WLM does,…
� …managing data acquisition and storage.� …evaluating Non-Revenue water & water losses in network components.� …handling alarms, data browsing, map navigation.� …analysis of loss components and trends.� …performance indicators .� …customized user access privileges.
� Higher revenue and bottom line
WLM
©A
BB
SG
upd
_13J
un06
4Water Leakage Manager – Features :
Features :� IWA standards & BABE methodology.� Integrated data management for optimization of
water networks operations.� Estimation of Non-Revenue Water (NRW) for
reduction of Water Leakage in the distribution system.
� Online monitoring and analysis of water flow and pressure.
� HMI covering Graphical Map navigation, Alarm setting, Trends, History Log access, Reports & other User Interfaces for periodic operation & monitoring.
� KPI’s & Trending analysis for decision making.� On-line repair monitoring & Economic Leakage
Level of repair job quality, repair strategy and network condition.
� Supports input from Controllers, RTU’s, Data loggers (Primeware, ABB AquaMaster, Radcom, XiLog and Techno Log).
� Historical data storage for 5-10 years.� Native language support.
DB
WLMSPGIM
DMA RTUs / Loggers
©A
BB
SG
upd
_13J
un06
5Water Leakage Manager – Benefits:
Benefits :� Online monitoring of Flow & Pressure
component in the distribution system helps to,�Analyze different types of leaks.�Reduction of Water Losses and Demand
Management by varying pressures in the field & by Leak Repairs.
�Usage of Alarms for Corrective Actions & efficiency improvement in the distribution system.
�Reduces Costs on administration, maintenance & field service activities (Men & Materials).
�Reduction on Capital expenditure through better asset Management.
�Plant personnel real-time opportunities improves efficiency & enhances Utility Profitability.
� Improves Customer Service & perception.
� Optionally can be integrated with GIS [e.g. ESRI GIS), 3rd party SCADA software’s, CMMS & Pressure Management system.
� Integrated with PGIM.
DB
WLMSPGIM
DMA RTUs / Loggers
©A
BB
SG
upd
_13J
un06
6Benefits: Reduces Non-Revenue Water/Leakage
� Non-Revenue Water (NRW) consists of three components
� Physical losses caused by bursts - Not all can be detected, but they can be controlled by pressure management
� Apparent losses caused by inaccurate metering and unauthorized use
� Unbilled authorized consumption
� NRW reduction needs a clear strategy
� Continuously active leakage control
� Pressure management
� Speed and quality of repairs
� Pipe materials
Business Case I:
System Input Volume: 1500 Mi. m3/yr
Revenue Water: 930 Mi. m3/yr
NRW: 38%
Water Price: 0.14 USD/m3
Target:
To reduce NRW by 25% of Today’s level!
Leakage control greatly affects the bottom line of your business.
©A
BB
SG
upd
_13J
un06
7Benefits: Pressure Management Economic Impact
� Pressure management is the most effective way to control leakage.
� For large systems with mixed pipes, a linear relationship between leakage and pressure can be assumed.
� Pressure management can be optimized by using the most appropriate PRV.
� Good continuous pressure monitoring prevents leakage, reduces amount of new bursts and prolongs lifespan of pipes.
Business Case II :
A utility covering 24 km2 and serving 0.5 Mi. people is suppliedvia two mains.� Water input = 22 Mi. m3/yr
at AZP = 80 m
After using pressure management:
� Water input = 13 Mi. m3/yrat AZP of about 50 m
� Payback time: < 0.5 yr(Source: WRP, South Africa)
©A
BB
SG
upd
_13J
un06
8Economic Benefits of NRW Reduction
Business Case :
System Input Volume: 1500 Mi. m3/yrRevenue Water: 930 Mi. m3/yrNRW: 38%Water Price: 0.14 USD/m3
Target:To reduce NRW by 25% of Today’s level!
� Maximize the existing water production capacity to satisfy fast growing demand.
� Reduce need for finding/ building new water sources.
� Reduce repair costs of bursts.
� Saving in Administrative & Operational costs, e.g.. Pumping, Treatment, Site management etc.
©A
BB
SG
upd
_13J
un06
9Water Leakage Manager - Architecture
SCADA
800xA
OPC
RT DB Historian
SCADAPortal
PRV(incl. Controller)
Valvepositioner
ProtocolDriver
Receiver/Transmitter
Communication
3rd PartySCADA
Water Leakage Manager Solution
PressureManagement
Pumping stationWater quality monitoringWater gate ....
Data logger/Transmitter/Modem
Flow-meters
Leakage control greatly
affects the bottom
line of your
business
ABB’s WLM helps!
Option
©A
BB
SG
upd
_13J
un06
10
Communication between Field Devices and SCADA
PGIM
PCU 400PCU 400PCU 400M M...
M
RTU
F P
D&L
F
GSM
P
D&LGSM M
RTU
Pumping Station
TCP/IP LAN/WAN
800xAWLM
� PCU 400 as protocol driver and data concentrator
� TCP/IP and OPC based for communication between PCU 400 and PGIM
� Flow and pressure meters via RTU or Data logger
� Easy communication integration
(F = Flow meter, P = Pressure meter, D&L = Data logger, M = Modem)
©A
BB
SG
upd
_13J
un06
11
Water Leakage Detection Methodologies
� With the WLM online results & analysis, field engineers can identify the leakages in the distribution system using some of the below techniques :
� Focus on methods, techniques & SOTA technologies
� Noise loggers and sounding techniques
� Non-metallic pipe correlation technology
� Best method selection criteria
©A
BB
SG
upd
_13J
un06
12
NRW Reduction: Business Process
Install Technical System
ConsultingService
Design DMAs
Locate BurstsRepair Bursts
©A
BB
SG
upd
_13J
un06
13
WLM System & Integration
Warehouse Status
Cost ofoperation
Maintenance Record Live Video
Faceplate
ProductDocumentation
FunctionalDescription
Alarms
Control Logic
Networkgraphs
©A
BB
SG
upd
_13J
un06
14
Water Leakage Manager
� Introduction – Product Overview
� WLMS Project
� Water Business & ABB Products
� Q & A
©A
BB
SG
upd
_13J
un06
15
WLM Projects
Projects Implemented
� PABW, Malaysia.
� MWA, Bangkok (Thailand).
On Pursuits
� Neptune, Yorkshire - Yorkshire Water Utilities & United Water Utilities.
©A
BB
SG
upd
_13J
un06
16
PABW – WLM Project Implementation Details
� WLM with 800xA
� PABW is the water distribution - NRW company in Kualumpur.
� PABW offices setup in Kualalumpur, [HQ – 1; District Office - 5].
� ABBSG provided PABW, Water Leakage Manager System.
� Implementation Architecture as shown
� No. of DMA’s 450
� Thin Client – Citrix [20 User License]
� Aspect Server – 1 No.
� Connectivity Server– 3 No.
� Domain Server – 1 No.
©A
BB
SG
upd
_13J
un06
17
PABW – WLM Project: System Architecture
Plant Network
WLM System
Laser Printer
Red. AS + Db Server
CS1
Tape Drive
ECDomain
EC EC
Printer
UPS
EC EC
Printer
EC
Data LoggersField Devices
Data Signal
EC
CS 2 CS3
External Clients
Remote Location 1 Remote Location 2 Remote Location 3
Printer
Red. AS – Redundant Aspect ServerCS –Connectivity ServerDomain – Domain ServerDb Server – Database Server(SQL)EC – Enterprise (Thin) Client
Citrix Server
LAN / WAN / PSTN
Data Server
©A
BB
SG
upd
_13J
un06
18
WLM – MWA (Bangkok) : Project ScopeCustomer Name : Metropolitan Waterworks Authority ( MWA )Location : Bangkok, ThailandScope of Delivery
� 15 SCADA Software (PGIM)
� 15 Water Leakage Management Software (WLMS)
� 395 DMA RTUs (CTU800-CPE)
� 395 Magnetic Flow Meters (ABB)
� Additional DCC 55 Trunk main RTUs (AC800M)
� Engineering work for SCADA & WLMS
� DCC Trunk main SCADA System expansion
(Existing 81 AC800Ms installed)
� Project Geographical Details & Requirements
�Population – 13 Mi
�Network Coverage( pipeline) – 35 K Km
�Water Requirement – 5 Mi Cu. Me
Contract Awarded : Dec 20,2005 Completion date : July 31,2007
©A
BB
SG
upd
_13J
un06
19
WLM-MWA (Bangkok): System Architecture
©A
BB
SG
upd
_13J
un06
20
WLM – MWA (Bangkok) DMA RTUs (Periodic)
Modbus-TCPYokogawaFCJ StardomRTU60408Minburi *
Primayer
RADCOM
Draco
Draco
Yokogawa
Yokogawa
Primayer
ABB
ABB
ABB
ABB
Draco
Draco
Primayer
Brand
Primayer 2Mi
RADCOM
DCX-II
DCX-II
FCJ Stardom
FCJ Stardom
Primayer 2Mi
AC800M
AC800M
AC800M
AC800M
DCX-II
DCX-II
Primayer 2Mi
Model
Data Logger
Data Logger
RTU
RTU
RTU
RTU
Data Logger
RTU
RTU
RTU
RTU
RTU
RTU
Data Logger
Remote Type
1,509995106Total
ftp60404Bangbuathong
ftp110735Phasicharoen
Draco-Connex1801209Taksin *
Draco-Connex70454Bangkoknoi *4
Modbus-TCP1308512Bangkhen *
Modbus-TCP60408Prachachuen *
ftp84569Nonthaburi3
IEC60870-5-104906010Ladpraw *
IEC60870-5-10485555Thungmahamek *
IEC60870-5-104105706Phayathai *
IEC60870-5-104115755Mansri *2
Draco-Connex115756Samutprakarn *
Draco-Connex115757Prakanong *
ftp130868Sukhumvit1
ProtocolRTUDMAZoneBranchRegion
* Plus with MPS (Mobile Pressure Sensor), are installed at local Fire-hydrant
©A
BB
SG
upd
_13J
un06
21
4 Regions (Service Area)
©A
BB
SG
upd
_13J
un06
22
995 DMA ; 1500 DMA RTU; 201 Trunk Main RTU
©A
BB
SG
upd
_13J
un06
23
WLM – MWA (Bangkok) – DCC SCADA Graphic Displays 1
©A
BB
SG
upd
_13J
un06
24
WLM – MWA (Bangkok) – DCC SCADA Graphic Displays 2
©A
BB
SG
upd
_13J
un06
25
WLM – MWA (Bangkok) PGIM Functional Displays
©A
BB
SG
upd
_13J
un06
26
WLM’s: Structural Implementation - Example
©A
BB
SG
upd
_13J
un06
27
WLM’s: DMA Level Overview - Example
©A
BB
SG
upd
_13J
un06
28
WLM – MWA (Bangkok) WLM Functionalities
DMA Overview Pressure Step Test
Flow-Pressure-TrendDistrict Overview
©A
BB
SG
upd
_13J
un06
29
WLM – MWA (Bangkok) WLM FunctionalitiesNight Day FactorWater Balance
Infrastructure Leakage Index Step Test
©A
BB
SG
upd
_13J
un06
30
WLM’s: Key Performance Indicators - Examples
� KPI’s can be analyzed in different levels, i.e. Utility/ District/DMA levels
� Examples� Non-Revenue Water (m³/$)
� Real Loss Components (m³/$)
� Apparent Loss Components (m³/$)
� Infrastructure Leakage Index
� Unavoidable Annual Real Loss (m³/$)
©A
BB
SG
upd
_13J
un06
31
Water Leakage Management
� Introduction – Product Overview
� WLM Projects
� Water Business & ABB Products
©A
BB
SG
upd
_13J
un06
32
ABB Product’s for Water Utilities
� ABB has range of products to meet Water Business needs. � Scada System
� Water Leakage Management System
� Controllers
� Remote Terminal Units
� Field Devices & Instrumentations
� Motors etc
©A
BB
SG
upd
_13J
un06
33
Reference ABB ProductsReference ABB Products : Remote Terminal Unit (RTU): Remote Terminal Unit (RTU)
CTU800-CPE :� Small dimensions compact RTU,
� Real time operating systems,
� SCADA communication through
IEC870-5-101, 104 protocols,
� PSTN & GPRS Modem support when
using IEC 870-5-101, 104 protocol
� Fully integrated with PGP
� Log file saving
� Easily connectible to third-party SCADA’s
ABB DMA RTU : CTU800-CPE
©A
BB
SG
upd
_13J
un06
34
� Scalable CPU and Memory Models,
� Local / remote Input Output Modules,
� Fully Redundant supports,� CPU, Memory, Power Supply, Ethernet,
I/O Modules, Profibus, etc.
� Built in RS232, Ethernet Ports,
� Optional communication modules,� PROFIBUS, FF-H1, INSUM, Master Bus 300,
� RS232C, Serial Protocols, ������������ ��
� Hot-swappable of I/O modules
AC800M Controller :
Reference ABB ProductsReference ABB Products : Remote Terminal Unit (RTU): Remote Terminal Unit (RTU)
ABB Trunk Main RTU : AC 800M
©A
BB
SG
upd
_13J
un06
35
AquaMaster Aqua Probe
Battery or line powered
IP68 submersible sensor & electronic
Wide flow range with lowest night flows
GSM technology
DN 40 – DN 600
Low cost alternative to full bore EMF
Hot tap capability
Permanent or temporary installation
DN 200 – DN 8000
Electromagnetic Flowmeter
©A
BB
SG
upd
_13J
un06
36
2600T Pressure Transmitter Family
� Accuracy: 0,04% or 0.075% or 0.15% with turndown ratios up to 100:1
� Communications: HART / 4-20 mA, PROFIBUS PA, FOUNDATION Fieldbus or MODBUS
� Measurements: Gauge, Absolute, Differential, Level, Flow, Multi-Variable and Remote Seals
� Applications: Control Monitoring and Safety Shutdown (TÜV Approved for SIL2)
� Solution software: build the optimal 2600T model number, convert an installed old model number
� IndustrialIT enabled
©A
BB
SG
upd
_13J
un06
37
� Large case, on-line, ion-selective and colorimetric analysers for application primarily in the power and water industries and waste water discharges.
Product Groups
� Water Analysers
Water Analysers
©A
BB
SG
upd
_13J
un06
38