78
Prepared By 5700 SW 34th Street, Suite 1235, Gainesville, Florida 32608-5371 • Phone: (352) 381-4400 • Fax: (352) 381-4444 • [email protected] • www.infotechfl.com Web-based AASHTOWare Project Interaction Guide AASHTOWare Project Estimator 2.12a AASHTOWare Project Preconstruction (web Trns•port 2.00 and Later Releases) June 2013 Last Updated June 2013

Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

  • Upload
    dongoc

  • View
    228

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

Prepared By

5700 SW 34th Street Suite 1235 Gainesville Florida 32608-5371 bull Phone (352) 381-4400 bull Fax (352) 381-4444 bull infoinfotechflcom bull wwwinfotechflcom

Web-based AASHTOWare Project Interaction Guide

AASHTOWare Project Estimator 212a

AASHTOWare Project Preconstruction (web

Trnsbullport 200 and Later Releases)

June 2013

Last Updated

June 2013

Address 5700 SW 34th Street Suite 1235 Gainesville Florida 32608-5371

Phone (352) 381-4400 bull Fax (352) 381-4444 bull E-mail infoinfotechflcom bull Web wwwinfotechflcom

FieldBook and FieldManager are registered trademarks of Info Tech Inc and represent products

of Info Tech Inc and the Michigan Department of Transportation

FieldNet is a trademark of Info Tech Inc and represents a product of Info Tech Inc

FieldBuilder and FieldPad are trademarks of Info Tech Inc and represent products of Info Tech

Inc and the Michigan Department of Transportation

AASHTO Trnsbullport the AASHTO Trnsbullport logo the AASHTOWare logo Trnsbullport

Estimator the Trnsbullport Estimator logo Trnsbullport Expedite the Trnsbullport Expedite logo

Trnsbullport FieldBook the Trnsbullport FieldBook logo Trnsbullport FieldBuilder the Trnsbullport

FieldBuilder logo Trnsbullport FieldManager and the Trnsbullport FieldManager logo are registered

trademarks of AASHTO

AASHTOWare Project AASHTOWare Project Estimator AASHTOWare Project Expedite

AASHTOWare Project FieldManager AASHTOWare Project FieldBook AASHTOWare

Project FieldBuilder and AASHTOWare Project FieldNet are trademarks of the American

Association of State Highway and Transportation Officials (AASHTO)

Other product names are trademarks or registered trademarks of their respective owners

Copyright copy 2013 Info Tech Inc All rights reserved Printed in the United States of America

This document or parts thereof may not be reproduced in any form without written permission of

Info Tech Inc

i

Contents

1 Introduction 1-1

11 Overview 1-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software 2-1

21 Exporting Information to the AASHTOWare Project Preconstruction

Application 2-1

22 Importing Information From the AASHTOWare Project Preconstruction

Application 2-2

23 Importing Checked-out Project or Proposals From the AASHTOWare

Project Preconstruction Application 2-3

3 Importing and Exporting in the AASHTOWare Project Preconstruction

Application (version Trnsbullport Preconstruction 200) 3-1

31 Contingency Percent vs Engineering and Construction Percent 3-2

32 Importing Project Data From the AASHTOWare Project Estimator Software 3-2

33 Importing Project Prices From the AASHTOWare Project Estimator

Software 3-5

34 Importing Proposal Prices From the AASHTOWare Project Estimator

Software 3-6

35 Exporting a Project to the AASHTOWare Project Estimator Software 3-8

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software 3-8

352 Setting the Estimate Catalog 3-12

36 Checking-Out Projects to the AASHTOWare Project Estimator Software 3-12

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software 3-13

362 Setting the Estimate Catalog 3-16

37 Exporting a Proposal to the AASHTOWare Project Estimator Software 3-16

371 Exporting a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software 3-17

372 Setting the Estimate Catalog 3-20

38 Checking-Out Proposals to the AASHTOWare Project Estimator Software 3-20

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software 3-21

382 Setting the Estimate Catalog 3-24

39 Exporting Code Tables to the AASHTOWare Project Estimator Software 3-24

4 Importing and Exporting in AASHTOWare Project Preconstruction (version

Trnsbullport Preconstruction 201 and later) 4-1

ii

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-13

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-15

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-23

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-23

5 Interface Information 5-1

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-1

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-1

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-3

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-3

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-4

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-4

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-4

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-4

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-6

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-6

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-8

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-8

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-9

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-10

58 Reference Data 5-11

iii

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-11

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator

software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project

(formerly known as web Trnsbullport

) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is

not provided through Info Tech Inc

Where applicable this guide distinguishes between web-based AASHTOWare Project

versions one Interfacing with AASHTOWare Project Preconstruction section describes

these procedures for web Trnsbullport 200 software and one section describes these

procedures for version 201 and later

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 2: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

Address 5700 SW 34th Street Suite 1235 Gainesville Florida 32608-5371

Phone (352) 381-4400 bull Fax (352) 381-4444 bull E-mail infoinfotechflcom bull Web wwwinfotechflcom

FieldBook and FieldManager are registered trademarks of Info Tech Inc and represent products

of Info Tech Inc and the Michigan Department of Transportation

FieldNet is a trademark of Info Tech Inc and represents a product of Info Tech Inc

FieldBuilder and FieldPad are trademarks of Info Tech Inc and represent products of Info Tech

Inc and the Michigan Department of Transportation

AASHTO Trnsbullport the AASHTO Trnsbullport logo the AASHTOWare logo Trnsbullport

Estimator the Trnsbullport Estimator logo Trnsbullport Expedite the Trnsbullport Expedite logo

Trnsbullport FieldBook the Trnsbullport FieldBook logo Trnsbullport FieldBuilder the Trnsbullport

FieldBuilder logo Trnsbullport FieldManager and the Trnsbullport FieldManager logo are registered

trademarks of AASHTO

AASHTOWare Project AASHTOWare Project Estimator AASHTOWare Project Expedite

AASHTOWare Project FieldManager AASHTOWare Project FieldBook AASHTOWare

Project FieldBuilder and AASHTOWare Project FieldNet are trademarks of the American

Association of State Highway and Transportation Officials (AASHTO)

Other product names are trademarks or registered trademarks of their respective owners

Copyright copy 2013 Info Tech Inc All rights reserved Printed in the United States of America

This document or parts thereof may not be reproduced in any form without written permission of

Info Tech Inc

i

Contents

1 Introduction 1-1

11 Overview 1-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software 2-1

21 Exporting Information to the AASHTOWare Project Preconstruction

Application 2-1

22 Importing Information From the AASHTOWare Project Preconstruction

Application 2-2

23 Importing Checked-out Project or Proposals From the AASHTOWare

Project Preconstruction Application 2-3

3 Importing and Exporting in the AASHTOWare Project Preconstruction

Application (version Trnsbullport Preconstruction 200) 3-1

31 Contingency Percent vs Engineering and Construction Percent 3-2

32 Importing Project Data From the AASHTOWare Project Estimator Software 3-2

33 Importing Project Prices From the AASHTOWare Project Estimator

Software 3-5

34 Importing Proposal Prices From the AASHTOWare Project Estimator

Software 3-6

35 Exporting a Project to the AASHTOWare Project Estimator Software 3-8

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software 3-8

352 Setting the Estimate Catalog 3-12

36 Checking-Out Projects to the AASHTOWare Project Estimator Software 3-12

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software 3-13

362 Setting the Estimate Catalog 3-16

37 Exporting a Proposal to the AASHTOWare Project Estimator Software 3-16

371 Exporting a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software 3-17

372 Setting the Estimate Catalog 3-20

38 Checking-Out Proposals to the AASHTOWare Project Estimator Software 3-20

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software 3-21

382 Setting the Estimate Catalog 3-24

39 Exporting Code Tables to the AASHTOWare Project Estimator Software 3-24

4 Importing and Exporting in AASHTOWare Project Preconstruction (version

Trnsbullport Preconstruction 201 and later) 4-1

ii

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-13

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-15

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-23

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-23

5 Interface Information 5-1

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-1

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-1

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-3

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-3

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-4

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-4

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-4

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-4

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-6

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-6

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-8

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-8

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-9

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-10

58 Reference Data 5-11

iii

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-11

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator

software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project

(formerly known as web Trnsbullport

) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is

not provided through Info Tech Inc

Where applicable this guide distinguishes between web-based AASHTOWare Project

versions one Interfacing with AASHTOWare Project Preconstruction section describes

these procedures for web Trnsbullport 200 software and one section describes these

procedures for version 201 and later

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 3: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

i

Contents

1 Introduction 1-1

11 Overview 1-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software 2-1

21 Exporting Information to the AASHTOWare Project Preconstruction

Application 2-1

22 Importing Information From the AASHTOWare Project Preconstruction

Application 2-2

23 Importing Checked-out Project or Proposals From the AASHTOWare

Project Preconstruction Application 2-3

3 Importing and Exporting in the AASHTOWare Project Preconstruction

Application (version Trnsbullport Preconstruction 200) 3-1

31 Contingency Percent vs Engineering and Construction Percent 3-2

32 Importing Project Data From the AASHTOWare Project Estimator Software 3-2

33 Importing Project Prices From the AASHTOWare Project Estimator

Software 3-5

34 Importing Proposal Prices From the AASHTOWare Project Estimator

Software 3-6

35 Exporting a Project to the AASHTOWare Project Estimator Software 3-8

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software 3-8

352 Setting the Estimate Catalog 3-12

36 Checking-Out Projects to the AASHTOWare Project Estimator Software 3-12

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software 3-13

362 Setting the Estimate Catalog 3-16

37 Exporting a Proposal to the AASHTOWare Project Estimator Software 3-16

371 Exporting a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software 3-17

372 Setting the Estimate Catalog 3-20

38 Checking-Out Proposals to the AASHTOWare Project Estimator Software 3-20

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software 3-21

382 Setting the Estimate Catalog 3-24

39 Exporting Code Tables to the AASHTOWare Project Estimator Software 3-24

4 Importing and Exporting in AASHTOWare Project Preconstruction (version

Trnsbullport Preconstruction 201 and later) 4-1

ii

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-13

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-15

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-23

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-23

5 Interface Information 5-1

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-1

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-1

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-3

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-3

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-4

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-4

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-4

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-4

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-6

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-6

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-8

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-8

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-9

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-10

58 Reference Data 5-11

iii

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-11

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator

software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project

(formerly known as web Trnsbullport

) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is

not provided through Info Tech Inc

Where applicable this guide distinguishes between web-based AASHTOWare Project

versions one Interfacing with AASHTOWare Project Preconstruction section describes

these procedures for web Trnsbullport 200 software and one section describes these

procedures for version 201 and later

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 4: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

ii

41 Contingency Percent vs Engineering and Construction Percent 4-2

42 Exporting a Project to the AASHTOWare Project Estimator Software 4-2

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software 4-3

43 Importing Project Data From the AASHTOWare Project Estimator Software 4-6

44 Checking-Out Projects to the AASHTOWare Project Estimator Software 4-9

441 Checking-out an AASHTOWare Project Preconstruction Project to

the AASHTOWare Project Estimator Software 4-9

45 Checkin Project Prices From the AASHTOWare Project Estimator Software4-13

46 Exporting a Proposal to the AASHTOWare Project Estimator Software 4-14

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software 4-15

462 Setting the Estimate Catalog 4-18

47 Checking-Out Proposals to the AASHTOWare Project Estimator Software 4-19

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software 4-19

472 Setting the Estimate Catalog 4-23

48 Exporting Code Tables and Reference data to the AASHTOWare Project

Estimator Software 4-23

5 Interface Information 5-1

51 Importing Proposal or Project Data From the AASHTOWare Project

Estimator Software 5-1

511 Sample Import File From the AASHTOWare Project Estimator

Software 5-1

52 Importing Project Prices From the AASHTOWare Project Estimator

Software 5-3

521 Sample Import File From the AASHTOWare Project Estimator

Software 5-3

53 Importing Proposal Prices From The AASHTOWare Project Estimator

Software 5-4

531 Sample Import File From the AASHTOWare Project Estimator

Software 5-4

54 Exporting Projects to the AASHTOWare Project Estimator Software 5-4

541 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-4

55 Checking Out a Project to the AASHTOWare Project Estimator Software 5-6

551 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-6

56 Exporting a Proposal to the AASHTOWare Project Estimator Software 5-8

561 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-8

57 Checking Out a Proposal to the AASHTOWare Project Estimator Software 5-9

571 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-10

58 Reference Data 5-11

iii

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-11

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator

software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project

(formerly known as web Trnsbullport

) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is

not provided through Info Tech Inc

Where applicable this guide distinguishes between web-based AASHTOWare Project

versions one Interfacing with AASHTOWare Project Preconstruction section describes

these procedures for web Trnsbullport 200 software and one section describes these

procedures for version 201 and later

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 5: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

iii

581 Sample Export File From the AASHTOWare Project Preconstruction

Application 5-11

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator

software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project

(formerly known as web Trnsbullport

) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is

not provided through Info Tech Inc

Where applicable this guide distinguishes between web-based AASHTOWare Project

versions one Interfacing with AASHTOWare Project Preconstruction section describes

these procedures for web Trnsbullport 200 software and one section describes these

procedures for version 201 and later

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 6: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 1-1

1 Introduction

The AASHTOWare Project Estimator

software helps agencies estimate the cost of a

construction project using cost-based bid-based quote-based and ad hoc estimation

methods The software automates estimation data gathering and in doing so relieves the

tedium of the estimation process while providing consistent and flexible methods for the

estimation AASHTOWare Project Estimator software interacts with the web-based

AASHTOWare Project

(formerly known as web Trnsbullport

) application which is used

by highway agencies to prepare estimates and proposals before bid lettings

This guide documents the interfaces between the AASHTOWare Project Estimator

software and the AASHTOWare Project Preconstruction application It is intended as a

supplement to the documentation for those products and assumes that you already have a

working knowledge of AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application

Note For more information on AASHTOWare Project Estimator software basics and estimation techniques such as starting the software or logging on please see the Estimator Userrsquos Guide

Specific file transfer procedures are not covered in the guide For help with file transfer

software please see your agencyrsquos network specialist Support for your file transfer is

not provided through Info Tech Inc

Where applicable this guide distinguishes between web-based AASHTOWare Project

versions one Interfacing with AASHTOWare Project Preconstruction section describes

these procedures for web Trnsbullport 200 software and one section describes these

procedures for version 201 and later

11 Overview

Sharing information between the AASHTOWare Project Estimator software and the

AASHTOWare Project Preconstruction application helps you create estimates and update

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 7: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

1-2 Introduction

project data and prices for projects and proposals much more quickly than working in

either application alone The following chapters contain instructions for importing and

exporting information from within the AASHTOWare Project Estimator software as well

as from within the AASHTOWare Project Preconstruction application

AASHTOWare Project Preconstruction Projects consist of items used in construction

These items typically fall into different project categories for funding purposes for

segregating types of work items or for segregating work phases In order to create a

AASHTOWare Project Preconstruction-compatible project in the AASHTOWare Project

Estimator software all items and associated cost bases must be AASHTOWare Project-

compatible

Once the estimate has been created in the AASHTOWare Project Estimator software it

must be delivered to the AASHTOWare Project Preconstruction application to be

included in a project or proposal and eventually a bid letting Three steps are required to

successfully complete the estimate

1 Export the AASHTOWare Project Estimator file as an XML file

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction application

3 Import the AASHTOWare Project Estimator XML file into the

AASHTOWare Project Preconstruction application

Each of these steps is described in detail in the following chapters

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 8: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-1

2 Importing and Exporting in the AASHTOWare Project Estimator Software

The AASHTOWare Project Estimator software stores estimates in separate data files

You can use the AASHTOWare Project Estimator softwarersquos import and export

capabilities to export data into other applications or import information created in

external programs into the AASHTOWare Project Estimator software See the Estimator

System Managers Guide for more details

When importing the software looks at the information being imported to determine if it

is a catalog or estimate and places it accordingly

The AASHTOWare Project Estimator softwarersquos data security measures are enforced

when you import catalogs and the software will import catalog data only for users that

have permission to edit a catalog You can export any catalog or estimate that you can

open

21 Exporting Information to the AASHTOWare Project

Preconstruction Application

The export command is content sensitive in the AASHTOWare Project Estimator

software That is the data you want to export must be currently active (displayed) For

example if you want to export an estimate you must have the estimate open

Follow these steps to export an estimate

1 Ensure that the estimate is active

2 Select Export from the File menu

The software displays the dialog box shown in Figure 2-1

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 9: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

2-2 Importing and Exporting in Estimator

Figure 2-1 Export Project Dialog Box

3 Click SAVE

Upon successfully exporting the estimate you are ready to transfer the project into the

AASHTOWare Project Preconstruction application The software used to transfer the

data to the AASHTOWare Project Preconstruction system is supported by your computer

staff Info Tech assumes that software and resources are available to you for transferring

your project to the AASHTOWare Project Preconstruction system

22 Importing Information From the AASHTOWare Project

Preconstruction Application

You can import AASHTOWare Project Preconstruction project or proposal information

into the AASHTOWare Project Estimator software Select Import from the File menu

and choose the project or proposal from the Import window Click OPEN

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 10: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 2-3

Figure 2-2 Import Projects and Proposals From the AASHTOWare Project Preconstruction Application

You can treat these imported projects and proposals like a normal estimate but you must

use the Save As option when saving them for the first time

23 Importing Checked-out Project or Proposals From the

AASHTOWare Project Preconstruction Application

You can import AASHTOWare Project Preconstruction projects or proposals that have

been checked-out for pricing or repricing into the AASHTOWare Project Estimator

software Once the file has been checked-out of web-based AASHTOWare Project

select Import from the File menu in the AASHTOWare Project Estimator software and

choose the project or proposal from the Import window (See Figure 2-2) Click OPEN

The AASHTOWare Project Preconstruction projects or proposals that have been

checked-out will import into the AASHTOWare Project Estimator software and will only

allow the unit price of the items to be edited Items can not be added nor deleted on

checked-out projects or proposals After pricing has been completed export the estimate

as detailed in Section 21

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 11: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

2-4 Importing and Exporting in Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 12: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-1

3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)

You can perform a number of types of imports and exports in the Trnsbullport

Preconstruction system

You can import information to create a new Trnsbullport Preconstruction project

from an AASHTOWare Project Estimator estimate

You can update project data already in the Trnsbullport Preconstruction

application with data from the AASHTOWare Project Estimator software

You can import new pricing information for Trnsbullport Preconstruction

projects and proposals from the AASHTOWare Project Estimator software

The Trnsbullport Preconstruction application will only accept estimate

information that already exists in the Trnsbullport Preconstruction system and

has been checked-out Pricing data is the only kind of information that can be

imported from the AASHTOWare Project Estimator software for checked-out

project or proposals

You can export a Trnsbullport Preconstruction project or proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a

new AASHTOWare Project Estimator estimate

The Trnsbullport Preconstruction system uses an information ldquocheck-incheck-outrdquo process

to protect the integrity of project and proposal information as it is passed to and from the

AASHTOWare Project Estimator software During the period that estimate information

is checked-out the entire project or proposal is locked and cannot be changed in the

Trnsbullport Preconstruction application When a project or proposal has been checked out

from the Trnsbullport Preconstruction system pricing information is the only information

that may be changed

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 13: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

31 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The Trnsbullport Preconstruction Engineering and Construction Percent (EampC) is an

industry standard percentage added by some agencies to the cost of the work items on a

project to account for the agencys cost of doing business and initiating the project

The Estimator Contingency Percent field does not affect the Trnsbullport Preconstruction

EampC Percent field Also the Trnsbullport Preconstruction EampC Percent field does not

affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The Trnsbullport

Preconstruction contingencies are used to obtain funding based on fixed percents of the

cost of the work Even if you use the Estimator contingency field for this other purpose

you need to re-enter it in the Trnsbullport Preconstruction application once the project is

imported into the Trnsbullport Preconstruction application

Because the Trnsbullport Preconstruction application does not use contingencies in the same

way as the AASHTOWare Project Estimator software the estimate in the AASHTOWare

Project Estimator software may be higher than the same one imported into the Trnsbullport

Preconstruction application when a non-zero contingency percentage is used

32 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

Trnsbullport Preconstruction project

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Project List and click

on the IMPORT ESTIMATOR XML button as shown in Figure 3-1

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 14: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-3

Figure 3-1 Project List Window

4 In the Import Estimator XML window shown in Figure 3-2 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-2 Import Estimator XML File Window

5 Once the file has been identified click the IMPORT button (Figure 3-2)

6 A confirmation window will open concerning adding the project If this is the

project desired for the import click the OK button otherwise click the

CANCEL button (Figure 3-3)

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 15: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-3 Import Estimator XML Confirmation Window

If the imported project data did not already exist in the Trnsbullport Preconstruction

application the Import Estimator XML window will close and the Project List will open

If the project is already in the Trnsbullport Preconstruction application the Import Estimator

XML window will display the dialog box as shown in Figure 3-4

Figure 3-4 Import Estimator XMLWindow

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite

If you want the Trnsbullport Preconstruction application to delete all existing items in the

project before it imports the new project file click the option button labeled Delete all

existing items before loading

If you want web Trnsbullport to delete the entire project record before it imports the new

project file click the option button labeled Delete the project before loading

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 16: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-5

33 Importing Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to import pricing information from the AASHTOWare Project

Estimator software to update a Trnsbullport Preconstruction project

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction application

3 In the Trnsbullport Preconstruction application open the Project List and click

on the CHECKIN ESTIMATOR XML button as shown in Figure 3-5

Figure 3-5 Project List Window

4 In the Checkin Estimator XML window shown in Figure 3-6 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 17: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-6 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (Figure 3-2)

6 A confirmation window will open concerning checking-in the project If this

is the project desired for the checkin click the OK button otherwise click the

CANCEL button (See Figure 3-7)

Figure 3-7 Confirm Project Checkin From Estimator Window

34 Importing Proposal Prices From the AASHTOWare

Project Estimator Software

Follow these steps to import pricing information from the AASHTOWare

ProjectAASHTOWare ProjectAASHTOWare Project Estimator software to update a

Trnsbullport Preconstruction proposal

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the Trnsbullport Preconstruction system

3 In the Trnsbullport Preconstruction application open the Proposal List and click

on the CHECKIN ESTIMATOR XML as shown in Figure 3-8

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 18: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-7

Figure 3-8 Proposal List Window

4 In the Checkin Estimator XML window shown in Figure 3-9 click the

BROWSEhellip button and navigate to the location of the AASHTOWare Project

Estimator XML file stored in Step 2

Figure 3-9 Checkin Estimator Window

5 Once the file has been identified click the CHECKIN button (See Figure 3-2)

6 A confirmation window will open concerning checking-in the proposal If

this is the proposal desired for the checkin click the OK button otherwise

click the CANCEL button (See Figure 3-10)

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 19: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-10 Confirm Proposal Checkin From Estimator Window

35 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction project to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare

Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-18

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 20: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-9

Figure 3-11 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-12

Figure 3-12 File Download Window

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button in the Save As

window as shown in Figure 3-13

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 21: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-13 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-14

Figure 3-14 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-15

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 22: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-11

Figure 3-15 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-16

Figure 3-16 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-17

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 23: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-17 Estimate Window

352 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate (See Figure 3-17)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

36 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you export project information from the Trnsbullport Preconstruction system to the

AASHTOWare Project Estimator software to update pricing in an estimate the Trnsbullport

Preconstruction application considers the project checked-out and will not allow changes

to be made to the project until you check it back in Also you will only be allowed to

change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 24: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-13

361 Checking-out a Trnsbullport Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the project from the

Project List as shown in Figure 3-18

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-18

Figure 3-18 Project List Window With Selected Project

3 Click on the SAVE button as shown in Figure 3-19

Figure 3-19 File Download Window

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 25: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-20

Figure 3-20 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-21

Figure 3-21 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-22

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 26: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-15

Figure 3-22 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-23

Figure 3-23 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-24

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 27: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-24 Imported Estimate Window

362 Setting the Estimate Catalog

Once the project is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-24)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

projects from the Trnsbullport Preconstruction application Additionally items can not be

added nor removed for checked-out projects

37 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a Trnsbullport Preconstruction proposal to the AASHTOWare Project

Estimator software to use as the foundation for a new AASHTOWare Project Estimator

estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 28: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-17

371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare

Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-25

2 Click on the EXPORT TO ESTIMATOR XML button as shown in Figure 3-25

Figure 3-25 Proposal List Window With Selected Proposal

3 Click on the SAVE button as shown in Figure 3-26

Figure 3-26 File Download Window

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 29: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-27

Figure 3-27 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-28

Figure 3-28 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-29

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 30: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-19

Figure 3-29 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-30

Figure 3-30 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-31

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 31: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-31 Estimate Window With Imported Proposal

372 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

38 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you export proposal information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software to update pricing in an estimate the

Trnsbullport Preconstruction system considers the proposal checked out and will not allow

changes to be made to the proposal until you check it back in Also you will only be

allowed to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 32: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-21

381 Checking-out a Trnsbullport Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 In the Trnsbullport Preconstruction application select the proposal from the

Proposal List as shown in Figure 3-31

2 Click on the CHECKOUT TO ESTIMATOR XML button as shown in Figure 3-32

Figure 3-32 Proposal List Window

3 Click on the SAVE button as shown in Figure 3-33

Figure 3-33 File Download Window

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 33: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

4 Navigate to a location accessible to the AASHTOWare Project Estimator

software and store the XML file by clicking the SAVE button on the Save As

window as shown in Figure 3-34

Figure 3-34 Save As Window

5 Click the CLOSE button on the Download Complete window as shown in

Figure 3-35

Figure 3-35 Download Complete Window

6 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 3-36

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 34: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-23

Figure 3-36 Estimator Window

7 On the Import window highlight the file and click the OPEN button as shown

in Figure 3-37

Figure 3-37 Import Window

8 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 3-38

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 35: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

Figure 3-38 Estimate Window With Check-Out Proposal

382 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-38)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the Trnsbullport Preconstruction application Additionally items cannot be

added nor removed for checked-out projects

39 Exporting Code Tables to the AASHTOWare Project

Estimator Software

You can export code table information from the Trnsbullport Preconstruction application to

the AASHTOWare Project Estimator software Follow these steps to export code tables

to the AASHTOWare Project Estimator software

1 Select Export Reference Data from the Select ReportProcess pulldown

menu and click the RUN button as shown in Figure 3-39

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 36: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-25

Figure 3-39 Home Page Window

Note The Home Page is shown however the Select ReportProcess pulldown menu is available in all screens of the Trnsbullport Preconstruction system

2 On the Run Export Reference Data window select SAPW CAS and CES

under Export Type Also select Reference Code Table as shown in Figure 3-

40 and click the RUN button

Figure 3-40 Run Export Reference Data Window

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 37: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

3 An Export to SAPW CAS and CES window will open as shown in Figure 3-

41

Figure 3-41 Export to SAPW CAS and CES Window

4 When the process is finished a time will be listed in the Finish Time column

as shown in Figure 3-42 (you might have to refresh your screen to see this

listed) If you double-click on View link in the Output column a Process

History File List window will open as shown in Figure 3-43

Figure 3-42 Export to SAPW CAS and CES Window

Figure 3-43 Process History File List Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 38: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 3-27

5 Double-click on the REFERENCE_DATA_EXPORTLOG link to open a list

similar to that shown in Figure 3-44

Figure 3-44 Export Reference Data Log

6 The file EXPORT_CODEVALUETXT contains the code values for the

AASHTOWare Project Estimator software Trnsbullport Preconstruction writes

this file to a location specified by the Agency Options Contact your agencyrsquos

Trnsbullport Preconstruction System Administrator for the location of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 39: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

3-28 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 200)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 40: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-1

4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)

You can perform a number of types of imports and exports in the AASHTOWare Project

Preconstruction system

You can import information to create a new AASHTOWare Project

Preconstruction project from a AASHTOWare Project Estimator estimate

You can update project data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project

Estimator software

You can import new pricing information for AASHTOWare Project

Preconstruction projects and proposals from the AASHTOWare Project

Estimator software The AASHTOWare Project Preconstruction application

will only accept estimate information that already exists in the AASHTOWare

Project Preconstruction system and has been checked-out Pricing data is the

only kind of information that can be imported from the AASHTOWare

Project Estimator software for checked-out project or proposals

You can export an AASHTOWare Project Preconstruction project or proposal

to the AASHTOWare Project Estimator software to be used as the foundation

for a new AASHTOWare Project Estimator estimate

The AASHTOWare Project Preconstruction system uses an information ldquocheck-incheck-

outrdquo process to protect the integrity of project and proposal information as it is passed to

and from the AASHTOWare Project Estimator software During the period that estimate

information is checked-out the entire project or proposal is locked and cannot be

changed in the AASHTOWare Project Preconstruction application When a project or

proposal has been checked out from the AASHTOWare Project Preconstruction system

pricing information is the only information that may be changed

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 41: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-2 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

41 Contingency Percent vs Engineering and Construction

Percent

The Estimator Contingency Percent field is derived by adding a percentage to the total of

the items in the estimate

The AASHTOWare Project Preconstruction Engineering and Construction Percent

(EampC) is an industry standard percentage added by some agencies to the cost of the work

items on a project to account for the agencys cost of doing business and initiating the

project

The Estimator Contingency Percent field does not affect the AASHTOWare Project

Preconstruction EampC Percent field Also the AASHTOWare Project Preconstruction

EampC Percent field does not affect the Estimator Contingency Percent field

The AASHTOWare Project Estimator software uses contingency to make up for risk or

unknown factors not taken into account that might affect the estimate As you approach a

final estimate the contingency should drop to as close to zero as possible The

AASHTOWare Project Preconstruction contingencies are used to obtain funding based

on fixed percents of the cost of the work Even if you use the Estimator contingency

field for this other purpose you need to re-enter it in the AASHTOWare Project

Preconstruction application once the project is imported into the AASHTOWare Project

Preconstruction application

Because the AASHTOWare Project Preconstruction application does not use

contingencies in the same way as the AASHTOWare Project Estimator software the

estimate in the AASHTOWare Project Estimator software may be higher than the same

one imported into the AASHTOWare Project Preconstruction application when a non-

zero contingency percentage is used

42 Exporting a Project to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction project to the AASHTOWare

Project Estimator software to use as the foundation for a new AASHTOWare Project

Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

There are several different methods to export a AASHTOWare Project Preconstruction

project to the AASHTOWare Project Estimator The options are from the Global

Options Actions Menu the Project component action menu and the project row action

menu For this document we are using the Global Options Actions menu selection

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 42: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-3

421 Exporting an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to export a project to the AASHTOWare Project Estimator software

1 In the AASHTOWare Project Preconstruction application open up the Global

Options Action menu

2 Click on the Execute Process

3 Select EXPORT PROJECT TO ESTIMATOR row as shown in Figure 4-1

Figure 4-1 Execute Process window

4 Search for the project that you intend to export (See Figure 4-2)

Figure 4-2 Select Data window

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 43: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-4 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

5 Select the project by highlighting the row and then clicking on the Execute

button (See Figure 4-3)

Figure 4-3 Select Data page

6 Click the SAVE button on the File Download window as shown in Figure 4-4

Figure 4-4 File Download window

7 Save the file to an accessible directory

8 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-5

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 44: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-5

Figure 4-5 Estimator Window

9 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-6

Figure 4-6 Import Window

10 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-7

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 45: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-6 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-7 Estimate Window

43 Importing Project Data From the AASHTOWare Project

Estimator Software

This section contains information about how to import an estimate from the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Preconstruction project There are several different methods to

import an estimator file into web-based AASHTOWare Project The options are from the

Global Options Actions Menu the Project component action menu and the project row

action menu For this document we are using the Global Options Actions menu

selection

Follow these steps to import an estimate

1 Export the AASHTOWare Project Estimator file as an XML file (See Section

21)

2 Store the AASHTOWare Project Estimator XML file in a location accessible

by the AASHTOWare Project Preconstruction system

3 In the AASHTOWare Project Preconstruction application open the Global

Options Actions Menu Select Import File (See Figure 4-8)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 46: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-7

Figure 4-8 Global Options Action menu

4 In the Import window shown in Figure 4-9 click the SELECT FILE button

and navigate to the location of the AASHTOWare Project Estimator XML file

stored in Step 2

Figure 4-9 Import Window

5 Once the file has been identified click on the file and then click the IMPORT

button in web-based AASHTOWare Project (Figure 4-10)

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 47: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-8 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-10 Estimator Import window

6 An Import succeeded message box opens after the process completes as well

as a View project hyperlink Clicking the View Project hyperlink will

navigate directly to the project summary page (Figure4-11)

Figure 4-11 Import Estimator XML Confirmation Window

By default fields that contain blank values in the project you are importing are ignored

and do not overwrite information that already exists in the project If you want existing

data to be replaced by blank values in the imported project click the option button

labeled Update the existing items and blanks overwrite as shown in Figure 4-10

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 48: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-9

If you want the AASHTOWare Project Preconstruction application to delete all existing

items in the project before it imports the new project file click the option button labeled

Delete all existing items before loading

If you want web-based AASHTOWare Project to delete the entire project record before it

imports the new project file click the option button labeled Delete the project before

loading

44 Checking-Out Projects to the AASHTOWare Project

Estimator Software

When you checkout a project from the AASHTOWare Project Preconstruction system to

the AASHTOWare Project Estimator software to update pricing in an estimate the

AASHTOWare Project Preconstruction application considers the project checked-out and

will not allow changes to be made to the project until you check it back in Also you

will be allowed only to change the Contingency field and item prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

441 Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software

Follow these steps to check-out a project to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application click on the Global

Options Action menu and click Execute process (See Figure 4-12)

Figure 4-12 Global Options Actions Menu

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 49: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-10 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

2 Select the CHECKOUT PROJECT TO ESTIMATOR row as shown in Figure 4-13

Figure 4-13 Execute Process Select Process Window

3 Select the project to be checked out as shown in Figure 4-14 and click the

EXECUTE button

Figure 4-14 Select Data window

4 Click SAVE from the File Download window as seen in Figure 4-15 Save the

file to an accessible directory

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 50: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-11

Figure 4-15 File Download Window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-16

Figure 4-16 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-17

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 51: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-12 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-17 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-18

Figure 4-18 Imported Estimate Window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 52: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-13

45 Checkin Project Prices From the AASHTOWare Project

Estimator Software

Follow these steps to checkin pricing information from the AASHTOWare Project

Estimator software to update an AASHTOWare Project Preconstruction project

1 From the Project Component Action button select the Check-In task as seen in

Figure 4-19

Figure 4-19 Project Component Action Menu

2 From the Import Page Click the Select File button as shown in Figure 4-20

Figure 4-20 Import window

3 Select a checked out File such as the file that was checked out in section 441

Checking-out an AASHTOWare Project Preconstruction Project to the

AASHTOWare Project Estimator Software The web-based AASHTOWare

Project software will recognize the file is from a checked out project and will

automatically select the Checkin Project radio button (See Figure 4-21)

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 53: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-14 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-21 Estimator Import Page

4 Click the Import button A Project check in succeeded message box will appear

and a View Project link (See Figure 4-22)

Figure 4-22 Confirm Project Checkin Window

46 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export an AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to use as the foundation for a new

AASHTOWare Project Estimator estimate

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 54: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-15

461 Exporting an AASHTOWare Project Preconstruction Proposal to the

AASHTOWare Project Estimator Software

Follow these steps to export a proposal to the AASHTOWare Project Estimator software

1 From the Global Options Actions Menu Select Execute Process (See Figure

4-23)

Figure 4-23 Global Options Action Menu

2 Select the Export Proposal to Estimator row as shown in Figure 4-24

Figure 4-24 Select Process Window

3 Select your data through the search highlight the row and then click on the

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 55: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-16 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

EXECUTE button (See Figure 4-25)

Figure 4-25 Execute Process Select Data window

4 Click on the SAVE button and save the file to an accessible directory (See

Figure 4-26)

Figure 4-26 File Download Window

In the AASHTOWare Project Estimator software select Import from the File menu as

shown in Figure 4-27

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 56: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-17

Figure 4-27 Estimator Window

5 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-28

Figure 4-28 Import Window

6 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-29

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 57: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-18 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-29 Estimate Window With Imported Proposal

462 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-31)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 58: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-19

47 Checking-Out Proposals to the AASHTOWare Project

Estimator Software

When you checkout a proposal from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate the AASHTOWare Project Preconstruction system considers the proposal

checked out and will not allow changes to be made to the proposal until you check it

back in Also you will only be allowed to change the Contingency field and item

prices

Once the job is imported into the AASHTOWare Project Estimator software you need to

set the Estimator catalog

471 Checking-out an AASHTOWare Project Preconstruction Proposal to

the AASHTOWare Project Estimator Software

Follow these steps to check-out a proposal to the AASHTOWare Project Estimator

software

1 In the AASHTOWare Project Preconstruction application open the Global

Options Action menu and select Execute Process (See Figure 4-30)

Figure 4-30 Global Options Actions Menu

2 Click on the CHECKOUT PROPOSAL TO ESTIMATOR ROW as shown in figure 4-

31

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 59: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-20 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-31 Proposal List Window

3 From the Select Data window search for the proposal to be checked out and

click the Execute button as seen in Figure 4-32

Figure 4-32 Execute Process Select Data window

4 Click SAVE in the File Download window and save the file in an accessible

directory (See Figure 4-33)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 60: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-21

Figure 4-33 File Download window

5 In the AASHTOWare Project Estimator software select Import from the File

menu as shown in Figure 4-34

Figure 4-34 Estimator Window

6 On the Import window highlight the file and click the OPEN button as shown

in Figure 4-35

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 61: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-22 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-35 Import Window

7 The AASHTOWare Project Estimator software opens the estimate as shown

in Figure 4-36

Figure 4-36 Estimate Window with Checked-Out Proposal

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 62: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-23

472 Setting the Estimate Catalog

Once the proposal is imported into the AASHTOWare Project Estimator software you

must set the estimate catalog

1 Open the estimate if it has been closed (See Figure 3-37)

2 Select Estimate Options from the File menu

3 Use the down arrow next to the Catalog field to select the desired catalog

4 When you are finished click OK

You can treat the imported job like a normal estimate but you must use the Save As

option when saving it the first time Only item unit prices can be edited on checked-out

proposals from the AASHTOWare Project Preconstruction application Additionally

items cannot be added nor removed for checked-out proposals

48 Exporting Code Tables and Reference data to the

AASHTOWare Project Estimator Software

You can export code table and reference data information from the AASHTOWare

Project Preconstruction application to the AASHTOWare Project Estimator software

The Export Reference Data process will be used to export code tables to Estimator

Follow these steps to export these tables to the AASHTOWare Project Estimator

software

1 From the Global Options Menu Click Execute System Interface Select

Export Reference Data as seen in Figure 4-37

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 63: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-24 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

Figure 4-37 System Interface window

2 Click the right arrow until you reach Set Parameters page 3 of 4 Ensure that

Ref Code Tables is checked as seen in Figure 4-38

Figure 4-38 Set Parameters for ExportReferenceData window

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 64: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 4-25

3 Click the Execute button The process will run and a message box will appear

as seen below in Figure 4-39 that shows the System Interface Started

Figure 4-39 System Interface Process Started Message box

4 The Reference data file contains the values for the AASHTOWare Project

Estimator software AASHTOWare Project Preconstruction writes this file to

a location specified by the Agency Options Contact your agencyrsquos

AASHTOWare Project Preconstruction System Administrator for the location

of this file

Note For information on loading code values into an Estimator catalog see Chapter 5 of the Estimator System Managerrsquos Guide

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 65: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

4-26 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version 201 and later)

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 66: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-1

5 Interface Information

This chapter contains AASHTOWare Project Estimator and AASHTOWare Project

Preconstruction interface information for importing and exporting projects project

prices proposals and proposal prices and for checking out projects and proposals

51 Importing Proposal or Project Data From the

AASHTOWare Project Estimator Software

You can import new proposal or project information from the AASHTOWare Project

Estimator software into the AASHTOWare Project Preconstruction application You can

also update proposals or projects data already in the AASHTOWare Project

Preconstruction application with data from the AASHTOWare Project Estimator

software

511 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt - ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 67: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

5-2 System Interface Information

ltLatitudegt385000ltLatitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 68: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-3

52 Importing Project Prices From the AASHTOWare Project

Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update a AASHTOWare Project Preconstruction project

521 Sample Import File From the AASHTOWare Project Estimator

Software

ltxml version=10 encoding=UTF-8 gt

- ltEstimategt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltEstimator gt

ltPreparationDate gt

ltLettingDategt20081017ltLettingDategt

ltEstimateType gt

ltEstimateTypeDescription gt

ltWorkType gt

ltWorkTypeDescription gt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltSeason gt

ltSeasonDescription gt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLongitudegt0771500ltLongitudegt

ltLatitudegt385000ltLatitudegt

ltGPS_Longitudegt714739ltGPS_Longitudegt

ltGPS_Latitudegt427458ltGPS_Latitudegt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltCheckedBy gt

ltDateChecked gt

ltApprovedBy gt

ltDateApproved gt

ltUnitSystemgtEltUnitSystemgt

ltCatalog gt

ltSpecYeargt94ltSpecYeargt

ltPriceRoundingLevelgt5ltPriceRoundingLevelgt

ltQuantityRoundingLevelgt2ltQuantityRoundingLevelgt

ltExtensionRoundingLevelgt2ltExtensionRoundingLevelgt

ltPercentageRoundingLevelgt2ltPercentageRoundingLevelgt

ltTrnsportFlaggtYltTrnsportFlaggt

ltTrnsportPriceBasesFlaggtNltTrnsportPriceBasesFlaggt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltComment gt

ltEstimatedCostUnfinished gt

ltEstimatedCostgt nnnnnnnnltEstimatedCostgt (cost removed and replaced with nrsquos)

ltContingencyPercentgt000ltContingencyPercentgt

ltEstimatedTotalUnfinished gt

ltEstimatedTotalgt nnnnnnnnltEstimatedTotalgt (cost removed and replaced with nrsquos)

ltEstimateMarketAreaMapSet gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltAlternateCode gt

ltComment gt

ltUsedInTotalgtYltUsedInTotalgt

ltGroupTotalUnfinished gt

ltGroupTotalgtnnnnnnnnltGroupTotalgt (cost removed and replaced with nrsquos)

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 69: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

5-4 System Interface Information

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltSupplementalDescription gt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltUnitsgtLFltUnitsgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltIsFixedPricegtYltIsFixedPricegt

ltQuantitygt150000ltQuantitygt

ltUnitPriceUnfinished gt

ltUnitPricegt1103120ltUnitPricegt

ltUsedInTotalgtYltUsedInTotalgt

ltExtendedAmountUnfinished gt

ltExtendedAmountgt1654680ltExtendedAmountgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceId gt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceDescription gt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricePercentFlaggtNltEstimateItemReferencePricePercentFlaggt

ltEstimateItemReferencePricePercentgt000ltEstimateItemReferencePricePercentgt

ltActiveFlaggtYltActiveFlaggt

ltAbsoluteActiveFlaggtYltAbsoluteActiveFlaggt

ltComment gt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

53 Importing Proposal Prices From The AASHTOWare

Project Estimator Software

You can import pricing information from the AASHTOWare Project Estimator software

to update an AASHTOWare Project Preconstruction proposal

531 Sample Import File From the AASHTOWare Project Estimator

Software

The XML file format is the same as importing project prices from the AASHTOWare Project

Estimator software (See Section 521)

54 Exporting Projects to the AASHTOWare Project

Estimator Software

You can export a copy of an AASHTOWare Project Preconstruction project to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

541 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 70: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-5

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 71: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

5-6 System Interface Information

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUn

itPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

55 Checking Out a Project to the AASHTOWare Project

Estimator Software

You can export project information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the project to ldquochecked-outrdquo status and will not allow

changes to be made to the project in the AASHTOWare Project Preconstruction

application until you check it back in

551 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRMAINTENANCE AT VARIOUS INTERSTATEPRIMARY amp SECONDARY

LOCATIONSltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 72: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-7

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkType gt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR9A02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltJobNumber gt

ltLaneMile gt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltCePctgt000ltCePctgt

ltDateCreatedgt20020716ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1 gt

ltJobNumber2 gt

ltJobNumber3 gt

ltJobString1 gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltProjectGrade gt

ltPricedBy gt

ltPricedDate gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtREGULAR BID ITEMSltDescriptiongt

ltJobCatCode1 gt

ltJobCatCode2 gt

ltJobCatCode3 gt

ltJobCatCode4 gt

ltJobCatFlag1 gt

ltJobCatFlag2 gt

ltJobCatFlag3 gt

ltJobCatFlag4 gt

ltJobCatFlag5 gt

ltJobCatNum1gt0ltJobCatNum1gt

ltJobCatNum2gt0ltJobCatNum2gt

ltJobCatString1 gt

ltJobCatString2 gt

ltJobCatString3 gt

ltJobCatString4 gt

ltJobCatString5 gt

ltJobCatString6 gt

ltCategoryWorkClassgt191ltCategoryWorkClassgt

ltFederalWorkClassgtK000ltFederalWorkClassgt

ltSuppWorkClassgtSAFTltSuppWorkClassgt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 73: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

5-8 System Interface Information

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltFixedPricegtNltFixedPricegt

ltStateFurnishedMaterialgtNltStateFurnishedMaterialgt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

ltJobItemCode1 gt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

- ltEstimateFundgt

ltJobFundCodegtS100ltJobFundCodegt

ltJobFundDescriptiongt100 STATEltJobFundDescriptiongt

ltJobFundPrioritygt1ltJobFundPrioritygt

ltJobFundFedFlaggtNltJobFundFedFlaggt

ltJobFundPctgt1000000ltJobFundPctgt

ltJobFundLimit gt

ltJobFundGroupgtSTATEltJobFundGroupgt

ltJobFundFacsCode gt

ltEstimateFundgt

ltEstimateGroupgt

ltEstimategt

56 Exporting a Proposal to the AASHTOWare Project

Estimator Software

You can export a copy of a AASHTOWare Project Preconstruction proposal to the

AASHTOWare Project Estimator software to be used as the foundation for a new

AASHTOWare Project Estimator estimate

561 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtNltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 74: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-9

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081016ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

57 Checking Out a Proposal to the AASHTOWare Project

Estimator Software

You can export proposal information from the AASHTOWare Project Preconstruction

application to the AASHTOWare Project Estimator software to update pricing in an

estimate This process assigns the proposal to ldquochecked-outrdquo status and will not allow

changes to be made to the proposal or its associated projects until you check it back in

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 75: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

5-10 System Interface Information

571 Sample Export File From the AASHTOWare Project Preconstruction

Application

ltxml version=10 encoding=utf-8 gt

- ltEstimate xmlnsxsi=httpwwww3org2001XMLSchema-instance

xsinoNamespaceSchemaLocation=Estimatexsdgt

ltEstimateIdgtMNV902GR39672ltEstimateIdgt

ltDescriptiongtGUARDRAIL REPAIRREPLACEMENT AT VARIOUS ROUTESltDescriptiongt

ltUnitSystemgtEltUnitSystemgt

ltSpecYeargt94ltSpecYeargt

ltCountygtC000ltCountygt

ltCountyDescriptiongtARLINGTONltCountyDescriptiongt

ltDistrictNumbergt0A02ltDistrictNumbergt

ltLatitudegt385000ltLatitudegt

ltLongitudegt0771500ltLongitudegt

ltHighwayTypegtVltHighwayTypegt

ltHighwayTypeDescriptiongtVARIOUS ( SCHEDULES)ltHighwayTypeDescriptiongt

ltUrbanRuralTypegtUltUrbanRuralTypegt

ltUrbanRuralTypeDescriptiongtURBANltUrbanRuralTypeDescriptiongt

ltWorkTypegt11ltWorkTypegt

ltWorkTypeDescription gt

ltFederalStateProjectNumbergtGR-9A-02ltFederalStateProjectNumbergt

ltEditPricesOnlyFlaggtYltEditPricesOnlyFlaggt

ltBeginTerminigt029ltBeginTerminigt

ltEndTerminigtNFOltEndTerminigt

ltJobLength gt

ltJobPavementWidth gt

ltJobPavementDepth gt

ltJobTypegtMSltJobTypegt

ltDateCreatedgt20081001ltDateCreatedgt

ltLastUpdategt20081017ltLastUpdategt

ltEstimator gt

ltJobCode1 gt

ltJobCode2 gt

ltJobCode3 gt

ltJobDate1 gt

ltJobDate2 gt

ltJobDate3 gt

ltJobDate4 gt

ltJobDate5 gt

ltJobFlag1 gt

ltJobFlag2 gt

ltJobFlag3 gt

ltJobFlag4 gt

ltJobFlag5 gt

ltJobNumber1gt0ltJobNumber1gt

ltJobNumber2gt0ltJobNumber2gt

ltJobNumber3gt0ltJobNumber3gt

ltJobQty1 gt

ltJobQty2 gt

ltJobString1gtX20ltJobString1gt

ltJobString2 gt

ltJobString3 gt

ltJobString4 gt

ltJobString5 gt

ltJobLongString1gtNONEltJobLongString1gt

- ltEstimateGroupgt

ltGroupNumbergt0001ltGroupNumbergt

ltDescriptiongtALL PROJECT ITEMSltDescriptiongt

- ltEstimateItemgt

ltLineNumbergt0005ltLineNumbergt

ltItemCodegt13320ltItemCodegt

ltDescriptiongtGUARDRAIL GR-2ltDescriptiongt

ltRequireSupplementalDescriptionFlaggtNltRequireSupplementalDescriptionFlaggt

ltUnitsgtLFltUnitsgt

ltCommentgtREGRESSION FROM GBBPltCommentgt

ltAlternateCode gt

ltIsAdHocPricegtNltIsAdHocPricegt

ltQuantitygt1500000ltQuantitygt

ltUnitPricegt1103120ltUnitPricegt

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 76: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

AASHTOWare Project Estimator

AASHTOWare Project Preconstruction

Interaction Guide 5-11

ltJobItemExtendedAmtgt1654680ltJobItemExtendedAmtgt

- ltEstimateItemReferencePricegt

ltEstimateItemReferencePriceNamegt13320ltEstimateItemReferencePriceNamegt

ltEstimateItemReferencePriceUnitPricegt1103120ltEstimateItemReferencePriceUnitPricegt

ltEstimateItemReferencePricegt

ltEstimateItemgt

ltEstimateGroupgt

ltEstimategt

58 Reference Data

You can export reference data information from the AASHTOWare Project

Preconstruction application to the AASHTOWare Project Estimator software to update

an Estimator catalog Code tables are exported in a fixed-field format The format of

this file is one row per code table entry and has the form

Columns 1-8 Columns 9-16 Columns 17+

Code Table Name Name Code Value

Note Only the first 40 characters of the Code Value will import into the AASHTOWare Project Estimator software

581 Sample Export File From the AASHTOWare Project Preconstruction

Application

HWYTYPE 03 ASPHALT

UNITS MILE MILE

COUNTY 49 FRANKLIN

PWRKTYP ASPH ASPHALT

URBRUR U URBAN

SEASON SPRI SPRING

In the actual export file from the AASHTOWare Project Preconstruction application you

will get code table reference data that the AASHTOWare Project Estimator software

ignores and does not use

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application
Page 77: Web-based AASHTOWare Project Interaction Guide AASHTOWare Project ... AASHTO Trns•port, the AASHTO Trns•port logo, the AASHTOWare logo, Trns•port Estimator, the Trns•port Estimator

5-12 System Interface Information

  • Web-based AASHTOWare Project Interaction Guide
  • Contents
  • 1 Introduction
    • 11 Overview
      • 2 Importing and Exporting in the AASHTOWare Project Estimator Software
        • 21 Exporting Information to the AASHTOWare Project Preconstruction Application
        • 22 Importing Information From the AASHTOWare Project Preconstruction Application
        • 23 Importing Checked-out Project or Proposals From the AASHTOWare Project Preconstruction Application
          • 3 Importing and Exporting in the AASHTOWare Project Preconstruction Application (version Trnsbullport Preconstruction 200)
            • 31 Contingency Percent vs Engineering and Construction Percent
            • 32 Importing Project Data From the AASHTOWare Project Estimator Software
            • 33 Importing Project Prices From the AASHTOWare Project Estimator Software
            • 34 Importing Proposal Prices From the AASHTOWare Project Estimator Software
            • 35 Exporting a Project to the AASHTOWare Project Estimator Software
              • 351 Exporting a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
              • 352 Setting the Estimate Catalog
                • 36 Checking-Out Projects to the AASHTOWare Project Estimator Software
                  • 361 Checking-out a Trnsbullport Preconstruction Project to the AASHTOWare Project Estimator Software
                  • 362 Setting the Estimate Catalog
                    • 37 Exporting a Proposal to the AASHTOWare Project Estimator Software
                      • 371 Exporting a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                      • 372 Setting the Estimate Catalog
                        • 38 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                          • 381 Checking-out a Trnsbullport Preconstruction Proposal to the AASHTOWare Project Estimator Software
                          • 382 Setting the Estimate Catalog
                            • 39 Exporting Code Tables to the AASHTOWare Project Estimator Software
                              • 4 Importing and Exporting in AASHTOWare Project Preconstruction (version Trnsbullport Preconstruction 201 and later)
                                • 41 Contingency Percent vs Engineering and Construction Percent
                                • 42 Exporting a Project to the AASHTOWare Project Estimator Software
                                  • 421 Exporting an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                    • 43 Importing Project Data From the AASHTOWare Project Estimator Software
                                    • 44 Checking-Out Projects to the AASHTOWare Project Estimator Software
                                      • 441 Checking-out an AASHTOWare Project Preconstruction Project to the AASHTOWare Project Estimator Software
                                        • 45 Checkin Project Prices From the AASHTOWare Project Estimator Software
                                        • 46 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                          • 461 Exporting an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                          • 462 Setting the Estimate Catalog
                                            • 47 Checking-Out Proposals to the AASHTOWare Project Estimator Software
                                              • 471 Checking-out an AASHTOWare Project Preconstruction Proposal to the AASHTOWare Project Estimator Software
                                              • 472 Setting the Estimate Catalog
                                                • 48 Exporting Code Tables and Reference data to the AASHTOWare Project Estimator Software
                                                  • 5 Interface Information
                                                    • 51 Importing Proposal or Project Data From the AASHTOWare Project Estimator Software
                                                      • 511 Sample Import File From the AASHTOWare Project Estimator Software
                                                        • 52 Importing Project Prices From the AASHTOWare Project Estimator Software
                                                          • 521 Sample Import File From the AASHTOWare Project Estimator Software
                                                            • 53 Importing Proposal Prices From The AASHTOWare Project Estimator Software
                                                              • 531 Sample Import File From the AASHTOWare Project Estimator Software
                                                                • 54 Exporting Projects to the AASHTOWare Project Estimator Software
                                                                  • 541 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                    • 55 Checking Out a Project to the AASHTOWare Project Estimator Software
                                                                      • 551 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                        • 56 Exporting a Proposal to the AASHTOWare Project Estimator Software
                                                                          • 561 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                            • 57 Checking Out a Proposal to the AASHTOWare Project Estimator Software
                                                                              • 571 Sample Export File From the AASHTOWare Project Preconstruction Application
                                                                                • 58 Reference Data
                                                                                  • 581 Sample Export File From the AASHTOWare Project Preconstruction Application