PDMP & Health IT Integration Use Case & Functional Requirements
March 11, 2014
1
PDMP & HIT Integration InitiativeProposed Use Case & Functional Requirements Development Timeline
Week Target Date (2014) All Hands WG Meeting Tasks Review & Comments from Community via Wiki page
due following Monday @ 12 noon
1 1/7Use Case Kick-Off & UC Process Overview
Introduce: In/Out of Scope, Context Diagram and ScenarioConcert Series Presentation: ASAP
Review: In/Out of Scope, Assumptions, and Context Diagram
2 1/14 Review: In/Out of Scope, Context Diagram, Assumptions , ScenarioIntroduce: User Stories
Review: User Stories, In/Out of Scope, Assumptions, and Context Diagram
3 1/21 Review: In/Out of Scope, Context Diagram, Assumptions , ScenarioIntroduce: User Stories
Review: User Stories, In/Out of Scope, Assumptions, and Context Diagram
4 1/28Review: Context Diagram and User StoriesIntroduce: Pre/Post Conditions, Actor and RolesConcert Series Presentation: OneHealthPort & WADOH
Review: Pre/Post Conditions, Actors and Roles, and User Stories
5 2/4 Review: Context Diagram and User StoriesIntroduce: Pre/Post Conditions, Actor and Roles
Review: Pre/Post Conditions, Actors and Roles, and User Stories
6 2/11 Review: Pre/Post Conditions, Actors and Roles, and User Stories Review: Pre/Post Conditions, Actors and Roles, and User Stories
7 2/21 Review: User Stories, Post Conditions, Actors and Roles, Activity Diagram and Base Flow Review: Activity Diagram and Base Flow
8 2/25 Review: Activity Diagrams, Base Flows, Functional Requirements and Sequence Diagrams Review: Functional Requirements and Sequence Diagrams
9 3/4Review Scenario #2 (HIT to Hub) and Scenario #3 (HIT to HIE/Ph. Intermediary)Introduce: Data Requirements
Review components of User Scenarios
10 3/11 Full review of Data Requirements, Risks & Issues, and Use Case DocumentBegin End-to-End Review End-to-End Review by community
11 3/18 End-to-End Comments Review & disposition Consensus vote
12 3/25 Review Comments & Consensus vote Conclude casting Consensus vote
Agenda
3
Topic Time Allotted
General Announcements 5 minutes
PDMP & HITI Use Case Development• Full Review of Data Requirements and Issues &
Risks• Begin End to End Review
80 minutes
Next Steps/Questions 5 minutes
Note- Below sections will be reviewed within the separate Use Case word document: Discuss and review the following sections:
1. Data Requirements2. Issues & Risks
Section Review
4
Click the icon to open the
Word DocumentSections for
Review
•1.0 Preface and Introduction
•2.0 Initiative Overview– 2.1 Initiative Challenge Statement**
•3.0 Use Case Scope– 3.1 Background**– 3.2 In Scope– 3.2 Out of Scope– 3.3 Communities of Interest
(Stakeholders)**
•4.0 Value Statement**
•5.0 Use Case Assumptions
•6.0 Pre-Conditions
•7.0 Post Conditions
•8.0 Actors and Roles
•9.0 Use Case Diagram
Use Case OutlineTailored for each Initiative
•10.0 Scenario: Workflow– 10.1 User Story 1, 2, x, …– 10.2 Activity Diagram
o 10.2.1 Base Flowo 10.2.2 Alternate Flow (if needed)
– 10.3 Functional Requirementso 10.3.1 Information Interchange Requirementso 10.3.2 System Requirements
– 10.4 Sequence Diagram
•11.0 Dataset Requirements
•12.0 Risks, Issues and Obstacles
•Appendices
– Privacy and Security Considerations– Related Use Cases– Previous Work Efforts– References
** Leverage content from Charter
5
Next Steps
• Review: End to End Review– End to End Review comment period will end on March
17, 2014 at 5 P.M. EST
• Next Meeting is March 18, 2014 from 12:00 - 1:30 P.M. EST
• Reminder: All PDMP & HIT Integration Announcements, Meeting Schedules, Agendas, Minutes, Reference Materials, Use Case, Project Charter and general information will be posted on the PDMP Wiki page– http://wiki.siframework.org/PDMP+%
26+Health+IT+Integration+Homepage
6
Contact Information
• For questions, please feel free to contact your support leads:– Initiative Coordinators:
• Johnathan Coleman [email protected]• Sherry Green [email protected]
– ONC Leads:• Mera Choi [email protected]• Jennifer Frazier [email protected]• Helen Caton-Peters [email protected]
– SAMHSA Leads• Jinhee Lee [email protected]• Kate Tipping [email protected]
– Support Team:• Project Management:
– Jamie Parker [email protected]– Ali Khan [email protected] (Support)
• Use Case Development: – Ahsin Azim [email protected] – Presha Patel [email protected]
• Vocabulary and Terminology Subject Matter Expert: – Mark Roche [email protected]
7