Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 1 of 40
PDR.04 Interface Requirements
Document number……………………………………………………………SKA-TEL-SDP-0000039
Context………………………………………………………………………………………...….……SE
Revision…………………………………………………………………………………………………01
Author………………………………………………………………….………F. Graser, B. Opperman
Release Date…………………………………………………………………………..…….2015-02-09
Document Classification…………………………………………………………….……. Unrestricted
Status………………………………………………………………………………….……………. Draft
Name Designation Affiliation
Signature & Date:
Signature:
Email:Ferdl Graser (Feb 9, 2015)Ferdl Graser
SDP Systems Engineer
SKA-Science Data ProcessorFerdl Graser
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 2 of 40
Name Designation Affiliation
Signature & Date:
Version Date of Issue Prepared by Comments
0.1
ORGANISATION DETAILS
Name Science Data Processor Consortium
Signature:
Email:Paul Alexander (Feb 9, 2015)Paul Alexander
SDP Lead
University of CambridgePaul Alexander
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 3 of 40
Table of Contents Table of Contents ........................................................................ Error! Bookmark not defined.
List of Figures ............................................................................................................................ 4
List of Tables ............................................................................................................................. 4
Introduction ................................................................................................................................ 5
References ................................................................................................................................ 6
Applicable Documents ............................................................................................................ 6
Reference Documents ............................................................................................................ 6
1 Interface Register .......................................................................................................... 7
1.1 External Interfaces ..................................................................................................... 7
1.2 Internal Interfaces .....................................................................................................10
2 Interface Requirements ...............................................................................................13
2.1 External Interfaces ....................................................................................................13
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 4 of 40
List of Figures
Figure 1. Diagram illustrating the context of SDP with regard to other Elements (sub-
systems). .................................................................................................................................. 7
Figure 2: Diagram illustrating L4 Internal faces of Top Level SDP components. ................10
List of Tables
Table 1. External SDP interfaces. ............................................................................................ 8
Table 2. SDP L4 internal interfaces. ......................................................................................11
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 5 of 40
Introduction
In Systems Engineering an interface can be identified as any point where a system and
something, or someone, meet. The interface point may include other systems, internal
hardware, circuitry, external peripherals, networks, system users, etc. These interfaces are
described in an Interface Control Document (ICD) which defines and controls the interfaces of
the system and thereby bound its requirements.
In the context of the SKA1’s Science Data Processor (SDP) this ICD describes all possible and
potential external and internal inputs and outputs to and from the SDP and (other) relevant
subsystems and elements. The external Level 3 (L3) interfaces between SDP and other sub-
systems, i.e., SaDT, CSP, TM, INFRA, are illustrated in Figure 1. This ICD also describes the
internal SDP Level 4 (L4) interfaces between the Hardware, Software, Data Layer, Data
Delivery, Monitor and Control, Pipeline elements (Figure 2) which comprise the SDP. These
interfaces are described in more detail in the following paragraphs.
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 6 of 40
References
Applicable Documents
The following documents are applicable to the extent stated herein. In the event of conflict
between the contents of the applicable documents and this document, the applicable
documents shall take precedence.
Reference Number Reference
AD[01] SKA-TEL.SDP.SE-TEL.CSP.SE-ICD-001
AD[02] SKA-TEL.SDP.SE-TEL.TM.SE-ICD-001
AD[03] SKA-TEL.SDP.SE-TEL.INFRA.SE-ICD-001
AD[04] SKA-TEL.SDP.SE-TEL.INFRA.SE-ICD-001
AD[05] SKA-TEL.SADT.SE-TEL.SDP.SE-ICD-001
Reference Documents
The following documents are referenced in this document. In the event of conflict between the
contents of the referenced documents and this document, this document shall take
precedence.
There are no reference documents for this document.
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 7 of 40
1 Interface Register
1.1 External Interfaces
The SDP’s L3 external interfaces are summarised in Figure 1 and detailed in Table 1. These
interfaces are owned by SKAO.
Figure 1. Diagram illustrating the context of SDP with regard to other Elements (sub-systems).
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 8 of 40
Table 1. External SDP interfaces.
Connection connects to
I.S1L.SDP_CSP.001 SKA1-Low SDP_CSP Visibility Data Interface
C Science Data Processor CSP Central Signal Processor
I.S1M.SDP_CSP.002 SKA1-Mid SDP_CSP Pulsar Search Data
Interface
C Science Data Processor CSP Central Signal Processor
I.S1M.SDP_CSP.003 SKA1-Mid SDP_CSP Pulsar Timing Data
Interface
C Science Data Processor CSP Central Signal Processor
I.S1S.SDP_CSP.001 SKA1-Survey SDP_CSP Visibility Data Interface
C Science Data Processor CSP Central Signal Processor
I.S1L.SDP_INFRA-AUS.001 SKA1-Low SDP_INFRA-AUS Local
Infrastructure Interface
C Science Data Processor LINFA-AUS Local Infrastructure Australia
I.S1S.SDP_INFRA-AUS.001 SKA1-Survey SDP_INFRA-AUS Local
Infrastructure Interface
C Science Data Processor LINFA-AUS Local Infrastructure Australia
I.S1S.SDP_INFRA-SA.001 SKA1-Mid SDP_INFRA-SA Local Infrastructure
Interface
C Science Data Processor LINFA-SA Local Infrastructure South Africa
I.S1L.SADT_SDP.001.VIS CSP-SDP_VIS to SDP_SKA1_LOW
C Science Data Processor SaDT Signal and Data Transport
I.S1L.SADT_SDP.004 SDP to SADT.To_External_SKA1_LOW
C Science Data Processor SaDT Signal and Data Transport
I.S1L.SADT_SDP.010 TM_NETWORK to SDP_SKA1_LOW
C Science Data Processor SaDT Signal and Data Transport
I.S1M.SADT_SDP.003.PSS (CSP-SDP_PSS to SDP_SKA1_MID) Pulsar
Survey Search
C Science Data Processor SaDT Signal and Data Transport
I.S1M.SADT_SDP.003.PST (CSP-SDP_PST to SDP_SKA1_MID ) Pulsar
timing
C Science Data Processor SaDT Signal and Data Transport
I.S1M.SADT_SDP.003.VIS CSP- C Science Data Processor
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 9 of 40
SDP_VIS to SDP_SKA1_MID SaDT Signal and Data Transport
I.S1M.SADT_SDP.009 SAT to SDP_SKA1_MID
C Science Data Processor SaDT Signal and Data Transport
I.S1M.SADT_SDP.012 TM_NETWORK to SDP_SKA1_MID
C Science Data Processor SaDT Signal and Data Transport
I.S1S.SADT_S5 SDP to SADT to _External_SKA1_SURVEY
C Science Data Processor SaDT Signal and Data Transport
I.S1S.SADT_SDP.002.VIS CSP-SDP_VIS to SDP_SKA1_SURVEY
C Science Data Processor SaDT Signal and Data Transport
I.S1S.SADT_SDP.011 TM_NETWORK to SDP_SKA1_SURVEY
C Science Data Processor SaDT Signal and Data Transport
I.S1L.SDP_TM.001 SKA1-Low SDP_TM Control and Monitoring
Interface
C Science Data Processor TM Telescope Manager
I.S1L.SDP_TM.002 SKA1-Low SDP_TM Telescope State Information
Interface
C Science Data Processor TM Telescope Manager
I.S1M.SDP_TM.002 SKA1-Mid SDP_TM Telescope State Information
Interface
C Science Data Processor TM Telescope Manager
I.S1S.SDP_TM.001 SKA1-Survey SDP_TM Control and Monitoring
Interface
C Science Data Processor TM Telescope Manager
I.S1S.SDP_TM.002 SKA1-Survey SDP_TM Telescope State Information
Interface
C Science Data Processor TM Telescope Manager
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 10 of 40
1.2 Internal Interfaces
All the SDP L4 internal interfaces are summarised in Figure 2 and detailed in Table 2. These
interfaces are owned by SDP.
Figure 2: Diagram illustrating L4 Internal faces of Top Level SDP components.
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 11 of 40
Table 2. SDP L4 internal interfaces.
Connection connects to
SDP.C1_C2.001 OS to hardware C.1 Hardware Compute Platform C.2 Software Compute Platform
SDP.C1_C2.002 Hardware sensors C.1 Hardware Compute Platform C.2 Software Compute Platform
SDP.C1_C2.003 Out of Band Management to OS. (indirect support to
LMC)
C.1 Hardware Compute Platform C.2 Software Compute Platform
SDP.C2_C3.001 Container interface (OS packages required etc...)
C.2 Software Compute Platform C.3 Data Layer
SDP.C2_C3.002 Storage Interface C.2 Software Compute Platform C.3 Data Layer
SDP.C2_C3.003 Middleware interface (messaging, notifications, etc...)
C.2 Software Compute Platform C.3 Data Layer
SDP.C3_C4.001 Additional services provided by Pipeline wrapper supplied by
Data Layer (essentially through Data Objects like visibilities, weights, flags
etc.).
C.3 Data Layer C.4 Pipeline Components
SDP.C3_C4.002 Interface at the level of a Data Object.
C.3 Data Layer C.4 Pipeline Components
SDP.C3_C5.001 Interface at the level of a Data Product (collection of DOs)
C.3 Data Layer C.5 Data Delivery Platform
SDP.C3_C5.002 Make replication request on DP
C.3 Data Layer C.5 Data Delivery Platform
SDP.C3_C5.003 Meta information on DP (locality, size, creation date, owner, SB,
etc...)
C.3 Data Layer C.5 Data Delivery Platform
SDP.C3_C5.004 Notification on availability of new DP
C.3 Data Layer C.5 Data Delivery Platform
SDP.C3_C5.005 Open question on resource availability (does it come from
LMC / Data Layer)
C.3 Data Layer C.5 Data Delivery Platform
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 12 of 40
SDP.C3_C5.006 Replicate catalogue to DDL
C.3 Data Layer C.5 Data Delivery Platform
SDP.C6_C1.001 LMC hardware control C.1 Hardware Compute Platform C.6 Local Monitoring and Control
SDP.C6_C2.001 Out of Band Management to LMC
C.2 Software Compute Platform C.6 Local Monitoring and Control
SDP.C6_C2.002 Monitor OS to LMC C.2 Software Compute Platform C.6 Local Monitoring and Control
SDP.C6_C2.003 Control OS to LMC C.2 Software Compute Platform C.6 Local Monitoring and Control
SDP.C6_C3.001 Monitor metrics, power etc to LMC
C.3 Data Layer C.6 Local Monitoring and Control
SDP.C6_C3.002 Control metrics, power etc to LMC
C.3 Data Layer C.6 Local Monitoring and Control
SDP.C6_C3.003 Data Flow Manager to Data Layer Interface
C.3 Data Layer C.6 Local Monitoring and Control
SDP.C6_C4.001 Pipeline metrics to LMC C.4 Pipeline Components C.6 Local Monitoring and Control
SDP.C6_C4.002 Pipeline to Local Telescope Model interfacePL open
question
C.4 Pipeline Components C.6 Local Monitoring and Control
SDP.C6_C5.001 General specification of LMC guidelines - monitoring, power
control etc..
C.5 Data Delivery Platform C.6 Local Monitoring and Control
SDP.C6_C5.002 Single document with specialisation where appropriate (e.g.
DFM to DL and Pipeline metrics)
C.5 Data Delivery Platform C.6 Local Monitoring and Control
SDP.C6_C5.003 Authentication Interface (to be finalised)
C.5 Data Delivery Platform C.6 Local Monitoring and Control
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 13 of 40
2 Interface Requirements
2.1 External Interfaces
SDP Interface requirements and associated Verification methods are presented in Table 3. Note
that verification methods for interface requirements from the SaDT element are not shown here
as the requirements are led by SaDT and are not available to SDP at this time.
Table 3. SDP interface requirements and verification methods.
Requirement Description verified by
SDP_REQ_INT-1 Interface Management Self-
description- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP shall provide a self-description on request from the TM. Through self-
description the SDP provides information that describes the content of the interface,
including a set of valid commands, parameters, monitoring points, alarms and
events.
VR-1 Verification by Test
SDP_REQ_INT-2 Interface Management Structure of
Reporting- SDP SKA1 Low Survey Mid. Monitor and
Control
SDP shall report information in a hierarchical structure, including a product breakdown
structure and a capability structure.
VR-3 Verification by Demonstration
SDP_REQ_INT-3 Interface Management Configure
interface- SDP SKA1 Low Survey Mid. Monitor and
Control
The TM shall be able to request the SDP to configure the level of reporting of monitoring
points, alarms, events and logs.
VR-1 Verification by Test
SDP_REQ_INT-4 Interface Management Alarm and
event filtering- SDP SKA1 Low Survey Mid. Monitor
and Control
The SDP shall filter alarms and events to prevent the reporting of alarms for items that are not fitted or that are under maintenance.
VR-1 Verification by Test
SDP_REQ_INT-5 Control Configure SDP parameters-
SDP SKA1 Low Survey Mid. Monitor and Control
The TM shall configure the SDP parameters as required for the observation.
VR-1 Verification by Test
SDP_REQ_INT-6 Safety Locally failsafe- SDP SKA1 Low Survey Mid. Monitor
and Control
The SDP shall be designed to be locally fail-safe and not be dependent on any external
inputs from TM for safety.
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 14 of 40
SDP_REQ_INT-7 Monitoring. Report external
state model- SDP SKA1 Low Survey Mid. Monitor
and Control
The SDP shall report the SDP element external state to TM.
VR-3 Verification by Demonstration
SDP_REQ_INT-8 Monitoring.. Report internal
states- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP shall report the internal states of sub-elements to TM.
VR-3 Verification by Demonstration
SDP_REQ_INT-9 Monitoring. Report alarms-
SDP SKA1 Low Survey Mid. Monitor and Control
The SDP shall report alarms for conditions and failures that: a) pose hazards to
equipment, data or personnel b) reduce the effectiveness of SDP to perform its prime
functions or provide capabilities.
VR-1 Verification by Test
SDP_REQ_INT-10 Monitoring. Report specific
alarm information- SDP SKA1 Low Survey Mid.
Monitor and Control
The SDP shall provide the following alarm-related data to the TM: a) Time of detection:
Accuracy of TBD milliseconds with a resolution of TBD milliseconds b) Severity of the Event: Categorised by at least 3 levels of comparison c) Description of the event that
caused the alarm
VR-1 Verification by Test
SDP_REQ_INT-11 Monitoring. Log reporting- SDP SKA1 Low Survey
Mid. Monitor and Control
The SDP shall report log messages to TM. VR-3 Verification by Demonstration
SDP_REQ_INT-12 Monitoring. Log level- SDP
SKA1 Low Survey Mid. Monitor and Control
The TM shall control the level at which log messages are reported.
VR-3 Verification by Demonstration
SDP_REQ_INT-13 Monitoring. Drill-down
capability- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP shall make provision for an extensive set of "drill-down" monitoring
points in the SDP to enable a capability for fault diagnostics.
VR-1 Verification by Test
SDP_REQ_INT-14 Monitoring. Drill-down
activation- SDP SKA1 Low Survey Mid. Monitor and
Control
The activation of the drill-down capability is TBD.
VR-3 Verification by Demonstration
SDP_REQ_INT-15 Monitoring. Report failures-
SDP SKA1 Low Survey Mid. Monitor and Control
The SDP shall report detected failures, and identification of the source of the failure in
the SDP product breakdown structure, based on the FMECA analysis. Where
applicable, faulty Line Replaceable Units (LRUs) shall be identified.
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 15 of 40
SDP_REQ_INT-16 Monitoring. Failure
prediction- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP shall report monitoring points that are required for preventive maintenance, as
identified in the FMECA analysis.
VR-1 Verification by Test
SDP_REQ_INT-17 Monitoring. Capability
reporting- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP, when requested by the TM to commit/engage a capability, shall report the availability of that capability as either: a) Not
available b) Available, with degraded performance c) Available with full
performance
VR-1 Verification by Test
SDP_REQ_INT-18 Monitoring. Resource
Overview- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP shall present a high-level overview of SDP resource availability.
VR-3 Verification by Demonstration
SDP_REQ_INT-19 Monitoring. Current
Capability availability- SDP SKA1 Low Survey Mid.
Monitor and Control
The SDP shall report on all capabilities available to the telescope.
VR-3 Verification by Demonstration
SDP_REQ_INT-20 Monitoring. Event reporting - SDP SKA1 Low Survey Mid. Monitor and Control
The SDP shall report the following events to TM: a) Processing progress: SDP shall
report on "Processing Started", "Processing Completed" and "Processing Success/Fail" events to TM to indicate the progress of a
capability. b) Mode/Frequency change: SDP shall report on the successful/failed mode or
observational frequency band change requested by the TM. c) VO event: SDP
shall report on the creation of a VO event.
VR-1 Verification by Test
SDP_REQ_INT-21 Engineering Interface- SDP
SKA1 Low Survey Mid. Monitor and Control
The TM shall provide a "tunnelling" capability to access engineering interfaces
of sub-elements remotely.
SDP_REQ_INT-22 Life-cycle Management. Remote
updates- SDP SKA1 Low Survey Mid. Monitor and
Control
The SDP shall enable patching and upgrade of software and firmware remotely.
VR-1 Verification by Test
SDP_REQ_INT-23 Life-cycle Management.
Facilitate remote updates- SDP SKA1 Low Survey
Mid. Monitor and Control
The TM shall provide "tunnelling" capability to facilitate remote software and firmware
upgrades.
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 16 of 40
SDP_REQ_INT-24 Life-cycle Management. Report version information - SDP
SKA1 Low Survey Mid. Monitor and Control
The SDP shall report version information of all software and firmware.
VR-3 Verification by Demonstration
SDP_REQ_INT-25 Data Transport. Maximum data
rate- SDP SKA1 Low Survey Mid. Monitor and
Control
The maximum data rate for the transfer of control and monitoring data to facilitate the
SDP_TM interface is TBD.
VR-1 Verification by Test
SDP_REQ_INT-26 Protocol. Communications protocol- SDP SKA1 Low Survey Mid. Monitor and
Control
The communications protocol for this interface is defined in Section 5 of this
document.
SDP_REQ_INT-27 Data Identification. Exclusions- SDP SKA1 Low Survey Mid. Telescope State
Information
The TM shall ensure that all Telescope State Information contained in the Telescope
Model will be available for transmission to the SDP in one of the categories defined
below.
SDP_REQ_INT-28 Data Identification. Critical
information- SDP SKA1 Low Survey Mid. Telescope
State Information
The TM shall send and the SDP shall receive Telescope State Information as
detailed in Appendix X within TBD seconds of the TM receiving such state information. These information points are classified as critical for the purposes of this document.
VR-1 Verification by Test
SDP_REQ_INT-29 Data Identification. Non-critical information- SDP SKA1
Low Survey Mid. Telescope State Information
The TM shall send and the SDP shall receive Telescope State Information other
than that detailed in Appendix X within TBD seconds of the TM receiving such state
information. These information points are classified as non-critical for the purposes of
this document.
VR-1 Verification by Test
SDP_REQ_INT-30 Data Transport. Maximum data
rate- SDP SKA1 Low Survey Mid. Telescope
State Information
The maximum data rate for the transfer of control and monitoring data to facilitate the
SDP_TM interface is TBD.
VR-1 Verification by Test
SDP_REQ_INT-31 Protocol. Communications protocol- SDP SKA1 Low Survey Mid. Telescope
State Information
The communications protocol for this interface is defined in Section 5 of this
document.
SDP_REQ_INT-32 Visibility Organisation- SDP SKA1
Low, Survey and Mid. Visibility Data
See 2.1.3 for information on data organisation.
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 17 of 40
SDP_REQ_INT-33 Visibility Coverage- SDP SKA1 Low, Survey and Mid. Visibility
Data
For a given set of frequency channels the CSP shall produce all possible cross-
correlations and auto-correlations.
VR-1 Verification by Test
SDP_REQ_INT-34 Visibility Transport- SDP SKA1 Low, Survey and Mid. Visibility
Data
The CSP shall produce visibility data using UDP/IP on IEEE 802.3 Ethernet frames.
VR-1 Verification by Test
SDP_REQ_INT-35 Visibility MTU- SDP SKA1 Low,
Survey and Mid. Visibility Data
The UDP MTU shall be as large as possible, whilst still maintaining transmission compatibility with COTS networking
equipment.
VR-2 Verification by Analysis
SDP_REQ_INT-36 Visibility Format- SDP SKA1 Low, Survey and Mid. Visibility
Data
See 2.1.3 for information on data format.
SDP_REQ_INT-37 Visibility Communications protocol- SDP SKA1 Low, Survey and Mid. Visibility Data
SPEAD [AD1] with visibility specific payload format. The communications protocol for this
interface is further defined in Section 5 of this document.
SDP_REQ_INT-38 Visibility Routing- SDP SKA1 Low, Survey and Mid. Visibility
Data
Subsets of the visibility data hierarchy shall be routable to specific IP and port
combinations. Subsets are still TBD.
VR-1 Verification by Test
SDP_REQ_INT-39 Visibility Multiple streams- SDP
SKA1 Low, Survey and Mid. Visibility Data
The CSP, when producing multiple streams of visibility data, will provide sufficient control
and meta-data to allow each stream to be independently received by the SDP.
VR-1 Verification by Test
SDP_REQ_INT-40 Visibility SKA-1 Low Data Rate- SDP SKA1 Low, Survey and Mid.
Visibility Data
The CSP-Low shall send and the SDP-Low shall receive visibility data at a maximum
rate of 72.64 Tbps (TBC).
VR-3 Verification by Demonstration
SDP_REQ_INT-41 Visibility SKA-1 Survey Data Rate- SDP SKA1 Low, Survey and Mid. Visibility Data
The CSP-Survey shall send and the SDP-Survey shall receive visibility data at a maximum rate of 45.54 Tbps (TBC).
VR-3 Verification by Demonstration
SDP_REQ_INT-42 Visibility SKA-1 Mid Data Rate- SDP SKA1 Low, Survey and Mid.
Visibility Data
The CSP-Mid shall send and the SDP-Mid shall receive visibility data at a maximum
rate of 33.45 Tbps (TBC).
VR-3 Verification by Demonstration
SDP_REQ_INT-43 Visibility Meta-data- SDP SKA1 Low,
Survey and Mid. Visibility Data
The CSP shall provide sufficient meta-data with the visibility data to allow the receiver to
fully decode any encapsulation without additional information. Specifically this will
include the ability to convert timestamp information into an absolute time standard
(UTC, TBD).
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 18 of 40
SDP_REQ_INT-44 Visibility Antenna Labelling- SDP
SKA1 Low, Survey and Mid. Visibility Data
Metadata included with visibility data will include labels of antennas forming the
visibility in the format as used by TM. The order of antenna labels forming the visibility shall be according to the sign convention of
the SKA telescope.
VR-3 Verification by Demonstration
SDP_REQ_INT-45 Visibility Timestamps- SDP SKA1
Low, Survey and Mid. Visibility Data
64-bit integer UTC timestamp epoch of the last sample that was integrated (i.e. whether flagged/not correlated, or not). 32 bits is 1 second count since UTC epoch; 32 bits is fraction of a 1 second, providing ~0.25 ns timestamp resolution. As a minimum each
integration time (60ms) needs to be uniquely identified. Nanosecond timestamp resolution
is needed for pulsar phase binning use cases.
VR-1 Verification by Test
SDP_REQ_INT-46 Visibility Channel / Baseline ID- SDP SKA1 Low, Survey and Mid.
Visibility Data
Channel ID, baseline ID and beam ID (Survey only) once per integration time. 26-bit baseline polarisation ID (to allow for 10e4 stations in SKA2) and a 22-bit channel ID for Low and Mid. 22-bit baseline ID (to allow for ~3k stations in SKA2), a 20-bit channel ID, and a 6-bit beam ID for Survey. Provides
offset into channel / baseline visibility array for this particular heap.
VR-3 Verification by Demonstration
SDP_REQ_INT-47 Visibility Channel / Baseline Count- SDP SKA1 Low, Survey and Mid. Visibility Data
Provides counts for the two dimensions of the channel / baseline visibility array. When
used in conjunction with the ID, uniquely identifies the portion of the overall array in
this heap. 26 bits for the baseline count and 22 bits for the channel count.
VR-3 Verification by Demonstration
SDP_REQ_INT-48 Visibility Schedule Block ID- SDP
SKA1 Low, Survey and Mid. Visibility Data
A 64-bit schedule block ID used to uniquely associate correlator data with a particular
observation. This ID will be provided to the CSP by TM. Actual bit length is TBD
pending decision from TM.
VR-3 Verification by Demonstration
SDP_REQ_INT-49 Visibility Hardware ID- SDP SKA1
Low, Survey and Mid. Visibility Data
Hardware source ID, 24-bit. This indicates the hardware source of the data for
testing/troubleshooting/back tracing to a hardware fault.
VR-3 Verification by Demonstration
SDP_REQ_INT-50 Visibility Time Centroid- SDP SKA1
Low, Survey and Mid. Visibility Data
Time centroid index (TCI), as 8-bit integer (TBD). Is the unit-less calculated centroid of
the integration interval.
VR-3 Verification by Demonstration
SDP_REQ_INT-51 Visibility Complex Visibility- SDP
SKA1 Low, Survey and Mid. Visibility Data
Complex visibility, two 32-bit single-precision floating point numbers already data valid
normalized.
VR-3 Verification by Demonstration
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 19 of 40
SDP_REQ_INT-52 Visibility Flagging Fraction- SDP
SKA1 Low, Survey and Mid. Visibility Data
8-bit (TBD) integer indicating the fraction of data (FD) that was correlated. Encode the square root of FD in 8 bits. Reserve 1 bit of
the FD for a hardware fault flag
VR-1 Verification by Test
SDP_REQ_INT-53 Visibility Normalisation- SDP SKA1
Low, Survey and Mid. Visibility Data
The CSP shall not perform Van Vleck, or any other normalization corrections, on the
visibility data.
VR-3 Verification by Demonstration
SDP_REQ_INT-54 Visibility Delay Tracking- SDP SKA1
Low, Survey and Mid. Visibility Data
The CSP shall apply delay tracking and fringe stopping corrections to each channel, as supplied by the TM, to all visibility data
sent to the SDP.
VR-1 Verification by Test
SDP_REQ_INT-55 Visibility Doppler Tracking- SDP
SKA1 Low, Survey and Mid. Visibility Data
The CSP shall apply Doppler tracking corrections, as supplied by the TM, to all
visibility data sent to the SDP
VR-1 Verification by Test
SDP_REQ_INT-56 Pulsar Search Transport- SDP
SKA1 Mid. Pulsar Search Data
The CSP shall produce pulsar search data using TCP/IP on IEEE 802.3 Ethernet
frames.
VR-3 Verification by Demonstration
SDP_REQ_INT-57 Pulsar Search Format- SDP SKA1
Mid. Pulsar Search Data
The format for pulsar search candidates is TBD.
VR-3 Verification by Demonstration
SDP_REQ_INT-58 Pulsar Search Communications protocol- SDP SKA1 Mid.
Pulsar Search Data
Unidirectional high-level message passing protocol running on TCP/IP.5
VR-3 Verification by Demonstration
SDP_REQ_INT-59 Pulsar Search SKA-1 Mid Data Rate- SDP SKA1 Mid. Pulsar Search Data
The CSP-Mid shall send and the SDP-Mid shall receive pulsar search data at a
maximum rate of 10 Gbps. The CSP-Mid shall send and the SDP-Mid shall receive transient or single pulse search data at a
maximum data rate of 4 Gbps.
VR-1 Verification by Test
SDP_REQ_INT-60 Pulsar Search Meta-data- SDP
SKA1 Mid. Pulsar Search Data
The CSP shall provide sufficient meta-data with the pulsar search data to allow the
receiver to fully decode any encapsulation without additional information.
VR-1 Verification by Test
SDP_REQ_INT-61 Pulsar Search Candidates- SDP SKA1 Mid. Pulsar Search
Data
List of pulsar search candidates in TBD format.
VR-3 Verification by Demonstration
SDP_REQ_INT-62 Pulsar Timing Transport- SDP
SKA1 Mid. Pulsar Timing Data
The CSP shall produce pulsar timing data using TCP/IP on IEEE 802.3 Ethernet
frames.
VR-3 Verification by Demonstration
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 20 of 40
SDP_REQ_INT-63 Pulsar Timing Format- SDP SKA1
Mid. Pulsar Timing Data
1. The format for the pulsar timing data is defined as PSRFITS file format. Individual
files are 10s dumps Each file is max 68 MB per beam per dump
SDP_REQ_INT-64 Pulsar Timing Communications protocol- SDP SKA1 Mid.
Pulsar Timing Data
File transfer between CSP and SDP using rsync (TBC).
VR-3 Verification by Demonstration
SDP_REQ_INT-65 Pulsar Timing SKA-1 Mid Data Rate- SDP SKA1 Mid.
Pulsar Timing Data
The CSP-Mid shall send and the SDP-Mid shall receive pulsar timing data at a
maximum rate of 9.4 Gbps (this data rate is for the payload data only and does not
include overhead for the file format, protocol, etc.)
VR-1 Verification by Test
SDP_REQ_INT-66 Pulsar Timing Meta-data- SDP
SKA1 Mid. Pulsar Timing Data
The CSP shall provide sufficient meta-data with the pulsar timing data to allow the
receiver to fully decode any encapsulation without additional information.
SDP_REQ_INT-67 Pulsar Timing Communications protocol- SDP SKA1 Mid.
Pulsar Timing Data
File transfer between CSP and SDP using rsync (TBC).
VR-3 Verification by Demonstration
SDP_REQ_INT-68 Pulsar Timing SKA-1 Mid Data Rate- SDP SKA1 Mid.
Pulsar Timing Data
The CSP-Mid shall send and the SDP-Mid shall receive pulsar timing data at a
maximum rate of 9.4 Gbps (this data rate is for the payload data only and does not
include overhead for the file format, protocol, etc.)
VR-1 Verification by Test
SDP_REQ_INT-69 Pulsar Timing Meta-data- SDP
SKA1 Mid. Pulsar Timing Data
The CSP shall provide sufficient meta-data with the pulsar timing data to allow the
receiver to fully decode any encapsulation without additional information.
VR-1 Verification by Test
SDP_REQ_INT-70 Rack size- SDP Compute SKA1
Common Mechanical
The racks referred to hereafter shall be of size 1200mm D x 600mm W x 2100mm H.
VR-4 Verification by Inspection
SDP_REQ_INT-71 Rack standard- SDP Compute
SKA1 Common Mechanical
The racks of equipment provided by the SDP for installation in the allocated space
provided by INFRA shall meet the IEC 60297-3-100 standard TBC in terms of
mechanical interfaces and size.
VR-4 Verification by Inspection
SDP_REQ_INT-72 Service area- SDP Compute SKA1
Common Mechanical
Additional aisle space in front of racks of 1200mm will be provided by INFRA for each rack of SDP equipment to allow for doors,
cabling and operator access.
VR-4 Verification by Inspection
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 21 of 40
SDP_REQ_INT-73 Floor loading- SDP Compute
SKA1 Common Mechanical
Equipment provided by the SDP for installation in the allocated space provided
by INFRA shall have a maximum floor loading of 2000 kg per square metre TBC.
VR-4 Verification by Inspection
SDP_REQ_INT-74 Connection- SDP Compute SKA1 Common Mechanical
INFRA will provide a fluid interface to each SDP rack that conforms to the TBD
standard.
VR-1 Verification by Test
SDP_REQ_INT-75 Temperature- SDP
Compute SKA1 Common Mechanical
INFRA shall ensure that the temperature of the cooling fluid at the point of ingress to the
SDP rack is no more than 22 degrees Celsius TBC.
VR-3 Verification by Demonstration
SDP_REQ_INT-76 Capacity- SDP Compute
SKA1 Common Mechanical
The SDP shall ensure that the SDP rack presents no more than 50 kW TBC of heat
load to the cooling medium.
VR-1 Verification by Test
SDP_REQ_INT-77 Environment- SDP
Compute SKA1 Common Mechanical
INFRA shall ensure that the ambient environment of the SDP equipment is no
more than 25 degrees Celsius TBC.
VR-1 Verification by Test
SDP_REQ_INT-78 Additional load- SDP
Compute SKA1 Common Mechanical
The SDP shall ensure that the SDP equipment inserts no more than TBD kW of additional load into the INFRA environment.
VR-1 Verification by Test
SDP_REQ_INT-79 Data centre power efficiency-
SDP Compute SKA1 Common Mechanical
The data centre housing SDP equipment shall have a PUE no greater than 1.25.
VR-2 Verification by Analysis
SDP_REQ_INT-80 Per rack power consumption- SDP Compute SKA1 Common
Mechanical
The SDP equipment will be limited to a maximum of 50 kW per rack.
VR-1 Verification by Test
SDP_REQ_INT-81 Nominal voltage- SDP Compute
SKA1 Common Mechanical
INFRA shall provide a power supply with a nominal voltage of 230V AC.
VR-3 Verification by Demonstration
SDP_REQ_INT-82 Level variation- SDP Compute
SKA1 Common Mechanical
INFRA shall provide a power supply with a variation of no more than TBD % from the
steady state level.
VR-1 Verification by Test
SDP_REQ_INT-83 Nominal level- SDP Compute SKA1
Common Mechanical
INFRA shall provide a power supply with a steady state voltage equal to the specified
nominal voltage +10/-6% TBC.
VR-1 Verification by Test
SDP_REQ_INT-84 Harmonic distortion- SDP Compute SKA1 Common
Mechanical
INFRA shall provide a power supply with total harmonic distortion less than TBD %.
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 22 of 40
SDP_REQ_INT-85 Frequency variation- SDP Compute SKA1 Common
Mechanical
INFRA shall provide a power supply with power supply frequency of 50Hz +/-TBD %.
VR-1 Verification by Test
SDP_REQ_INT-86 Controlled shutdown under UPS- SDP Compute SKA1
Common Mechanical
INFRA shall provide uninterruptable power at a TBD level for a duration of TBD to the SDP in the event of a major power supply
failure.
VR-2 Verification by Analysis
SDP_REQ_INT-87 Redundancy- SDP
Compute SKA1 Common Mechanical
Each rack shall be supplied by two independent power feeds.
VR-4 Verification by Inspection
SDP_REQ_INT-88 Scope- SDP Compute SKA1 Common Mechanical
An access control system provided by INFRA shall prevent unauthorised access to
all SDP equipment.
VR-1 Verification by Test
SDP_REQ_INT-89 Logging- SDP Compute
SKA1 Common Mechanical
The access control system provided by INFRA shall ensure that all access attempts
to the SDP equipment are logged.
VR-1 Verification by Test
SDP_REQ_INT-90 Configuration- SDP
Compute SKA1 Common Mechanical
The access control system provided by INFRA shall have the ability to provide temporary access for contractors and maintainers as authorised by the SDP.
VR-1 Verification by Test
SDP_REQ_INT-91 Ease of Use- SDP Compute SKA1
Common Mechanical
The access control system provided by INFRA shall not impact on staff activities
once inside the secure area.
SDP_REQ_INT-92 Authentication- SDP
Compute SKA1 Common Mechanical
The access control system provided by INFRA shall use authentication media that is
revocable and replaceable.
VR-3 Verification by Demonstration
SDP_REQ_INT-93 Space allocation- SDP Compute
SKA1 Mid Mechanical
INFRA-SA shall provide sufficient floor space for the installation of 100 racks TBC.
VR-2 Verification by Analysis
SDP_REQ_INT-94 Cable trays- SDP Compute SKA1
Mid Mechanical
INFRA-SA shall supply and install cable trays sufficient to cover the following requirements [width, mass loading,
above/below are TBD].
VR-4 Verification by Inspection
SDP_REQ_INT-95 Overall power consumption- SDP
Compute SKA1 Mid Electrical
The SDP equipment will be limited to an overall power limit of 3.2MW.
VR-2 Verification by Analysis
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 23 of 40
SDP_REQ_INT-96 Medium- SDP Compute SKA1 Mid Fire Control
The fire control system provided by INFRA-SA shall use a medium that complies to the following South African standards (TBD) in
order to ensure that unnecessary damage is not caused to SDP equipment in the case of
a fire suppression event.
VR-4 Verification by Inspection
SDP_REQ_INT-97 Warning- SDP Compute SKA1 Mid Fire Control
The fire control system provided by INFRA-SA shall provide visual and audible warnings prior to the activation of the fire suppression
system to allow evacuation of personnel from the environment.
VR-1 Verification by Test
SDP_REQ_INT-98 Space allocation- SDP Compute
SKA1 Low Mechanical
INFRA-AUS shall provide sufficient floor space for the installation of 25 racks TBC.
VR-2 Verification by Analysis
SDP_REQ_INT-99 Cable trays- SDP Compute SKA1
Low Mechanical
INFRA-AUS shall supply and install cable trays sufficient to cover the following requirements [width, mass loading,
above/below are TBD].
VR-2 Verification by Analysis
SDP_REQ_INT-100 Overall power consumption- SDP
Compute SKA1 Low Electrical
The SDP equipment will be limited to an overall power limit of 0.75 MW TBC.
VR-1 Verification by Test
SDP_REQ_INT-101 Medium- SDP Compute SKA1 Low Fire Control
The fire control system provided by INFRA-AUS shall use a medium that complies to
the following Australian standards (TBD) in order to ensure that unnecessary damage is not caused to SDP equipment in the case of
a fire suppression event.
VR-4 Verification by Inspection
SDP_REQ_INT-102 Warning- SDP Compute SKA1 Low Fire Control
The fire control system provided by INFRA-AUS shall provide visual and audible
warnings prior to the activation of the fire suppression system to allow evacuation of
personnel from the environment.
VR-1 Verification by Test
SDP_REQ_INT-103 Space allocation- SDP Compute SKA1 Survey Mechanical
INFRA-AUS shall provide sufficient floor space for the installation of 75 racks TBC.
VR-2 Verification by Analysis
SDP_REQ_INT-104 Cable trays- SDP Compute SKA1
Survey Mechanical
INFRA-AUS shall supply and install cable trays sufficient to cover the following requirements [width, mass loading,
above/below are TBD].
VR-2 Verification by Analysis
SDP_REQ_INT-105 Overall power consumption- SDP Compute SKA1 Survey
Electrical
The SDP equipment will be limited to an overall power limit of 2.0 MW TBC.
VR-1 Verification by Test
SDP_REQ_INT-106 Medium- SDP Compute
SKA1 Survey Fire Control
The fire control system provided by INFRA-AUS shall use a medium that complies to
the following Australian standards (TBD) in
VR-4 Verification by Inspection
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 24 of 40
order to ensure that unnecessary damage is not caused to SDP equipment in the case of
a fire suppression event.
SDP_REQ_INT-107 Warning- SDP Compute
SKA1 Survey Fire Control
The fire control system provided by INFRA-AUS shall provide visual and audible
warnings prior to the activation of the fire suppression system to allow evacuation of
personnel from the environment.
VR-1 Verification by Test
SDP_REQ_INT-108 Rack size- SDP Archive SKA1
Common Mechanical
The racks referred to hereafter shall be of size 1200mm D x 600mm W x 2100mm H.
VR-4 Verification by Inspection
SDP_REQ_INT-109 Rack standard- SDP Archive
SKA1 Common Mechanical
The racks of archive equipment provided by the SDP for installation in the allocated
space provided by INFRA shall meet the IEC 60297-3-100 standard TBC in terms of
mechanical interfaces and size.
VR-4 Verification by Inspection
SDP_REQ_INT-110 Service area- SDP Archive SKA1 Common Mechanical
Additional aisle space in front of racks of 1200mm will be provided by INFRA for each rack of SDP archive equipment to allow for
doors, cabling and operator access.
VR-4 Verification by Inspection
SDP_REQ_INT-111 Floor loading- SDP Archive SKA1
Common Mechanical
Equipment provided by the SDP for installation in the allocated space provided
by INFRA shall have a maximum floor loading of 2000 kg per square metre TBC.
VR-2 Verification by Analysis
SDP_REQ_INT-112 Environment- SDP Archive SKA1 Common Thermal
INFRA shall ensure that the ambient environment of the SDP equipment is no
more than 25 degrees Celsius TBC.
VR-2 Verification by Analysis
SDP_REQ_INT-113 Humidity- SDP Archive
SKA1 Common Thermal
INFRA shall ensure that the ambient environment of the SDP equipment is in the range 20% to 80% humidity non-concensing.
VR-1 Verification by Test
SDP_REQ_INT-114 Data centre power efficiency-
SDP Archive SKA1 Common Electrical
The data centre housing SDP equipment shall have a PUE no greater than 1.25.
VR-1 Verification by Test
SDP_REQ_INT-115 Per rack power consumption-
SDP Archive SKA1 Common Electrical
The SDP equipment will be limited to a maximum of 20 kW per rack.
VR-1 Verification by Test
SDP_REQ_INT-116 Nominal voltage- SDP
Archive SKA1 Common Electrical
INFRA shall provide a power supply with a nominal voltage of 230V AC.
VR-1 Verification by Test
SDP_REQ_INT-117 Level variation- SDP Archive
SKA1 Common Electrical
INFRA shall provide a power supply with a variation of no more than TBD % from the
steady state level.
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 25 of 40
SDP_REQ_INT-118 Nominal level- SDP Archive SKA1 Common Electrical
INFRA shall provide a power supply with a variation of no more than TBD % from the
steady state level.
VR-1 Verification by Test
SDP_REQ_INT-119 Harmonic distortion- SDP Archive SKA1 Common
Electrical
INFRA shall provide a power supply with total harmonic distortion less than TBD %.
VR-1 Verification by Test
SDP_REQ_INT-120 Frequency variation- SDP Archive SKA1 Common
Electrical
INFRA shall provide a power supply with power supply frequency of 50Hz +/I TBD %.
VR-1 Verification by Test
SDP_REQ_INT-121 Controlled shutdown under UPS- SDP Archive SKA1
Common Electrical
INFRA shall provide uninterruptable power at a TBD level for a duration of TBD to the SDP in the event of a major power supply
failure.
VR-1 Verification by Test
SDP_REQ_INT-122 Redundancy- SDP Archive SKA1 Common Electrical
Each rack shall be supplied by two independent power feeds.
VR-4 Verification by Inspection
SDP_REQ_INT-123 Logging- SDP Archive
SKA1 Common Access Control
The access control system provided by INFRA shall ensure that all access attempts
to the SDP equipment are logged.
VR-1 Verification by Test
SDP_REQ_INT-124 Configuration- SDP Archive
SKA1 Common Access Control
The access control system provided by INFRA shall have the ability to provide temporary access for contractors and maintainers as authorised by the SDP.
VR-1 Verification by Test
SDP_REQ_INT-125 Ease of Use- SDP Archive SKA1 Common Access Control
The access control system provided by INFRA shall not impact on staff activities
once inside the secure area.
VR-3 Verification by Demonstration
SDP_REQ_INT-126 Authentication- SDP
Archive SKA1 Common Access Control
The access control system provided by INFRA shall use authentication media that is
revocable and replaceable.
VR-4 Verification by Inspection
SDP_REQ_INT-127 Space allocation- SDP Archive SKA1 Mid Mechanical
INFRA-SA shall provide sufficient floor space for the installation of TBD archive
racks.
SDP_REQ_INT-128 Cable trays- SDP Archive SKA1
Mid Mechanical
INFRA-SA shall supply and install cable trays sufficient to cover the following requirements [width, mass loading,
above/below are TBD].
VR-4 Verification by Inspection
SDP_REQ_INT-129 Total heat load- SDP Archive
SKA1 Mid Thermal
The SDP shall ensure that the SDP archive equipment inserts no more than TBD kW of
total load into the INFRA environment.
VR-1 Verification by Test
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 26 of 40
SDP_REQ_INT-130 Overall power consumption- SDP
Archive SKA1 Mid Electrical
The SDP archive equipment will be limited to an overall power limit of TBD kW.
VR-1 Verification by Test
SDP_REQ_INT-131 Medium- SDP Archive SKA1 Mid Fire Control
The fire control system provided by INFRA-SA shall use a medium that complies to the following South African standards (TBD) in
order to ensure that unnecessary damage is not caused to SDP archive equipment in the
case of a fire suppression event.
VR-4 Verification by Inspection
SDP_REQ_INT-132 Warning- SDP Archive SKA1 Mid Fire Control
The fire control system provided by INFRA-SA shall provide visual and audible warnings prior to the activation of the fire suppression
system to allow evacuation of personnel from the environment.
VR-1 Verification by Test
SDP_REQ_INT-133 Space allocation- SDP Archive SKA1 Low Mechanical
INFRA-AUS shall provide sufficient floor space for the installation of TBD archive
racks.
VR-2 Verification by Analysis
SDP_REQ_INT-134 Cable trays- SDP Archive SKA1
Low Mechanical
INFRA-AUS shall supply and install cable trays sufficient to cover the following requirements [width, mass loading,
above/below are TBD].
VR-2 Verification by Analysis
SDP_REQ_INT-135 Total heat load- SDP Archive
SKA1 Low Thermal
The SDP shall ensure that the SDP archive equipment inserts no more than TBD kW of
total load into the INFRA environment.
SDP_REQ_INT-136 Overall power consumption- SDP
Archive SKA1 Low Electrical
The SDP equipment will be limited to an overall power limit of TBD kW.
VR-1 Verification by Test
SDP_REQ_INT-137 Medium- SDP Archive SKA1 Low Fire Control
The fire control system provided by INFRA-AUS shall use a medium that complies to
the following Australian standards (TBD) in order to ensure that unnecessary damage is not caused to SDP equipment in the case of
a fire suppression event.
VR-4 Verification by Inspection
SDP_REQ_INT-138 Warning- SDP Archive SKA1 Low Fire Control
The fire control system provided by INFRA-AUS shall provide visual and audible
warnings prior to the activation of the fire suppression system to allow evacuation of
personnel from the environment.
VR-1 Verification by Test
SDP_REQ_INT-139 Space allocation- SDP Archive
SKA1 Survey Mechanical
INFRA-AUS shall provide sufficient floor space for the installation of TBD archive
racks.
VR-2 Verification by Analysis
SDP_REQ_INT-140 Cable trays- SDP Archive SKA1
Survey Mechanical
INFRA-AUS shall supply and install cable trays sufficient to cover the following requirements [width, mass loading,
above/below are TBD].
VR-2 Verification by Analysis
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 27 of 40
SDP_REQ_INT-141 Total heat load- SDP Archive SKA1 Survey Thermal
The SDP shall ensure that the SDP archive equipment inserts no more than TBD kW of
total load into the INFRA environment.
VR-1 Verification by Test
SDP_REQ_INT-142 Overall power consumption- SDP
Archive SKA1 Survey Electrical
The SDP archive equipment will be limited to an overall power limit of TBD kW.
VR-1 Verification by Test
SDP_REQ_INT-143 Medium- SDP Archive
SKA1 Survey Fire Control
The fire control system provided by INFRA-AUS shall use a medium that complies to
the following Australian standards (TBD) in order to ensure that unnecessary damage is not caused to SDP equipment in the case of
a fire suppression event.
SDP_REQ_INT-144 Warning- SDP Archive
SKA1 Survey Fire Control
The fire control system provided by INFRA-AUS shall provide visual and audible
warnings prior to the activation of the fire suppression system to allow evacuation of
personnel from the environment.
VR-1 Verification by Test
SDP_REQ_INT-145 Visibility Wire data rate-SDP SKA1 Low Data
Exchange
59.15bit/s (64 bits/visibility) [RD8] (TBC)
SDP_REQ_INT-146 Visibility Data Link and
Framing-SDP SKA1 Low Data Exchange
Ethernet supporting Jumbo frames
SDP_REQ_INT-147 Visibility SADT-SDP end
point -SDP SKA1 Low Data Exchange
Demarcation at SDP switch
SDP_REQ_INT-148 Visibility Individual link
capacity-SDP SKA1 Low Data Exchange
100Gbit/s
SDP_REQ_INT-149 Visibility Data traffic profile-
SDP SKA1 Low Data Exchange
Continuous unidirectional data flow from CSP to SDP
SDP_REQ_INT-150 Visibility Flow control -SDP SKA1 Low Data Exchange
No flow control to be provided by SADT.
SDP_REQ_INT-151 Visibility Data buffering-SDP SKA1 Low Data
Exchange
None required
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 28 of 40
SDP_REQ_INT-152 Visibility Transport latency-
SDP SKA1 Low Data Exchange
No special requirements
SDP_REQ_INT-153 Visibility Packet loss-SDP SKA1 Low Data Exchange
Minimal better than 10-6 suggested
SDP_REQ_INT-154 Visibility Packet out of
order-SDP SKA1 Low Data Exchange
None
SDP_REQ_INT-155 Visibility Protocol support-
SDP SKA1 Low Data Exchange
Ethernet/IP/UDP/ Application Header /science data
SDP_REQ_INT-156 Visibility Pluggable
Modules-SDP SKA1 Low Data Exchange
The pluggable modules shall meet 4x25G electrical I/O CAUI-4 IEEE P802.3bm
SDP_REQ_INT-157 Visibility Type of connection between SADT and SDP-SDP SKA1 Low Electro-
optical
100 Gigabit Ethernet pluggable modules see document �CSP-SDP Data Transmission,
Concept Design, Equipment and Architecture� [RD6]. Note: The packet flow is presented as a 100Gigabit stream out of the pluggable module. SDP is responsible
for the Ethernet switching required to deliver the flows to the SDP receiving equipment.
SDP_REQ_INT-158 Visibility Number of
connections-SDP SKA1 Low Electro-optical
Number of 100GE connections 592 TBC
SDP_REQ_INT-159 Visibility Power for
pluggable module-SDP SKA1 Low Electrical
DC power for the pluggable units taken from the Ethernet switch.CAUI-4 IEEE P802.3bm
Power Watts (TBD)
SDP_REQ_INT-160 Visibility Power Source-
SDP SKA1 Low Electrical
Mains or 48v DC power for the transponder units. TBD
SDP_REQ_INT-161 Visibility Optical modules-
SDP SKA1 Low Mechanical
Receptor housings on the SDP equipment shall fit with pluggable modulesCFP4..
SDP_REQ_INT-162 Visibility Cabling -SDP SKA1 Low Mechanical
Physical space shall be available for the cables or fibres required for client and line
side connections.
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 29 of 40
SDP_REQ_INT-163 Visibility Rack space-SDP
SKA1 Low Mechanical
Standard 19 inch rack space conforming to IEC 60297 or ETS 300119 will be required
from SDP for SADT transponder equipment. The amount of rack space per SADT
transponder unit is 10 U TBC.
SDP_REQ_INT-164 Visibility Number of
transponder units-SDP SKA1 Low Mechanical
Expected number of rack SADT transponder units TBC.
SDP_REQ_INT-165 Visibility Transponder
management-SDP SKA1 Low Monitor and Control
The SADT transponders shall have a Network Management System capable of
controlling and monitoring the line and client side interfaces.
SDP_REQ_INT-166 Visibility Traffic
management user interface-SDP SKA1 Low Monitor
and Control
All traffic management functionality provided by SADT equipment shall have an end user controllable terminal interface provided by SADT e.g. Network manager/craft terminal
PC
SDP_REQ_INT-167 Visibility Physical layer
monitoring across interface-SDP SKA1 Low Monitor
and Control
SADT shall provide method to monitor OSI layer 1 statistics inside its interface boundary
and collect statistics from end element packetisers and transceiver modules (DOM)
via TM and the SADT network manager
SDP_REQ_INT-168 Visibility Built in self-test
data integrity and performance margin-SDP SKA1 Low Monitor and
Control
In non-observation mode the SADT equipment shall self-generate and receive
PRBS data streams, or interface to external test equipment, for the purpose of performance margin testing and
maintenance of SADT links
SDP_REQ_INT-169 Visibility Interoperability
between elements following upgrade-SDP SKA1 Low
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-170 Visibility Interoperability
between elements following upgrade-SDP SKA1 Low
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-171 Visibility System integration plan compliance-SDP SKA1
Low Operational
SADT equipment shall operate according to a system-wide (multi-element) integration
test plan owned by the SKAO � TBD
SDP_REQ_INT-172 Visibility Precursor
constraints-SDP SKA1 Low Operational
SADT equipment interfaces and constraints due to the precursor telescopes on site shall be provided system-wide by the SKAO and
AIV consortium - TBD
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 30 of 40
SDP_REQ_INT-173 Visibility Wire data rate-SDP SKA1 Survey Data
Exchange
37.07 Tbps (64 bits/visibility) [RD8] (TBC)
SDP_REQ_INT-174 Visibility Data Link and
Framing-SDP SKA1 Survey Data Exchange
Ethernet supporting Jumbo frames
SDP_REQ_INT-175 Visibility SADT-SDP end point -SDP SKA1 Survey
Data Exchange
Demarcation at SDP switch
SDP_REQ_INT-176 Visibility Individual link
capacity-SDP SKA1 Survey Data Exchange
100Gbit/s
SDP_REQ_INT-177 Visibility Data traffic profile-
SDP SKA1 Survey Data Exchange
Continuous unidirectional data flow from CSP to SDP
SDP_REQ_INT-178 Visibility Flow control -SDP
SKA1 Survey Data Exchange
No flow control to be provided by SADT.
SDP_REQ_INT-179 Visibility Data buffering-SDP SKA1 Survey Data
Exchange
None required
SDP_REQ_INT-180 Visibility Transport latency-
SDP SKA1 Survey Data Exchange
No special requirements
SDP_REQ_INT-181 Visibility Packet loss-SDP
SKA1 Survey Data Exchange
Minimal better than 10-6 suggested
SDP_REQ_INT-182 Visibility Packet out of
order-SDP SKA1 Survey Data Exchange
None
SDP_REQ_INT-183 Visibility Protocol support-SDP SKA1 Survey Data
Exchange
Ethernet/IP/UDP/ Application Header /science data
SDP_REQ_INT-184 Visibility Pluggable
The pluggable modules shall meet 4x25G electrical I/O CAUI-4 IEEE P802.3bm
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 31 of 40
Modules-SDP SKA1 Survey Electro-optical
SDP_REQ_INT-185 Visibility Type of connection between SADT and SDP-
SDP SKA1 Survey Electro-optical
100 Gigabit Ethernet using CFP4 modules see document CSP-SDP Data
Transmission, Concept Design, Equipment and Architecture [RD06]. Note: The packet
flow is presented as a 100Gigabit stream out of the pluggable module. SDP is responsible for the Ethernet switching required to deliver the flows to the SDP receiving equipment.
SDP_REQ_INT-186 Visibility Number of
connections-SDP SKA1 Survey Electro-optical
Number of 100GE connections 371
SDP_REQ_INT-187 Visibility Power for
pluggable module-SDP SKA1 Survey Electrical
DC power for the pluggable units taken from the Ethernet switch.CAUI-4 IEEE P802.3bm
Power Watts (TBD)
SDP_REQ_INT-188 Visibility Power Source-
SDP SKA1 Survey Electrical
Mains or 48v DC power for the transponder units. TBD
SDP_REQ_INT-189 Visibility Optical modules-
SDP SKA1 Survey Mechanical
Receptor housings on the SDP equipment shall fit with pluggable modulesCFP4.
SDP_REQ_INT-190 Visibility Cabling -SDP
SKA1 Survey Mechanical
Physical space shall be available for the cables or fibres required for client and line
side connections.
SDP_REQ_INT-191 Visibility Rack space-SDP SKA1 Survey Mechanical
Standard 19 inch rack space conforming to IEC 60297 or ETS 300119 will be required
from SDP for SADT transponder equipment. The amount of rack space per SADT
transponder unit is 10 U TBC.
SDP_REQ_INT-192 Visibility Number of
transponder units-SDP SKA1 Survey Mechanical
Expected number of rack SADT transponder units ~ TBC.
SDP_REQ_INT-193 Visibility Transponder
management-SDP SKA1 Survey Monitor and Control
The SADT transponders shall have a Network Management System capable of
controlling and monitoring the line and client side interfaces.
SDP_REQ_INT-194 Visibility Traffic
management user interface-SDP SKA1 Survey Monitor
and Control
All traffic management functionality provided by SADT equipment shall have an end user controllable terminal interface provided by SADT e.g. Network manager/craft terminal
PC
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 32 of 40
SDP_REQ_INT-195 Visibility Physical layer
monitoring across interface-SDP SKA1 Survey Monitor
and Control
SADT shall provide method to monitor OSI layer 1 statistics inside its interface boundary
and collect statistics from end element packetisers and transceiver modules (DOM)
via TM and the SADT network manager
SDP_REQ_INT-196 Visibility Built in self-test
data integrity and performance margin-SDP SKA1 Survey Monitor and
Control
In non-observation mode the SADT equipment shall self-generate and receive
PRBS data streams, or interface to external test equipment, for the purpose of performance margin testing and
maintenance of SADT links
SDP_REQ_INT-197 Visibility Interoperability
between elements following upgrade-SDP SKA1 Survey
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-198 Visibility Interoperability
between elements following upgrade-SDP SKA1 Survey
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-199 Visibility System integration plan compliance-SDP SKA1
Survey Operational
SADT equipment shall operate according to a system-wide (multi-element) integration
test plan owned by the SKAO � TBD
SDP_REQ_INT-200 Visibility Precursor
constraints-SDP SKA1 Survey Operational
SADT equipment interfaces and constraints due to the precursor telescopes on site shall be provided system-wide by the SKAO and
AIV consortium - TBD
SDP_REQ_INT-201 Visibility Wire data rate-
SDP SKA1 Mid Data Exchange
27.21 Tbps (64 bits/visibility) [RD8] (TBC)
SDP_REQ_INT-202 Visibility Data Link and
Framing-SDP SKA1 Mid Data Exchange
Ethernet supporting Jumbo frames
SDP_REQ_INT-203 Visibility SADT-SDP end
point -SDP SKA1 Mid Data Exchange
Demarcation at SDP switch
SDP_REQ_INT-204 Visibility Individual link
capacity-SDP SKA1 Mid Data Exchange
100Gbit/s
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 33 of 40
SDP_REQ_INT-205 Visibility Data traffic profile-
SDP SKA1 Mid Data Exchange
Continuous unidirectional data flow from CSP to SDP
SDP_REQ_INT-206 Visibility Flow control -SDP SKA1 Mid Data Exchange
No flow control to be provided by SADT.
SDP_REQ_INT-207 Visibility Data buffering-
SDP SKA1 Mid Data Exchange
None required
SDP_REQ_INT-208 Visibility Transport latency-
SDP SKA1 Mid Data Exchange
No special requirements
SDP_REQ_INT-209 Visibility Packet loss-SDP SKA1 Mid Data Exchange
Minimal better than 10-6 suggested
SDP_REQ_INT-210 Visibility Packet out of
order-SDP SKA1 Mid Data Exchange
None
SDP_REQ_INT-211 Visibility Protocol support-
SDP SKA1 Mid Data Exchange
Ethernet/IP/UDP/ Application Header /science data
SDP_REQ_INT-212 Visibility Pluggable
Modules-SDP SKA1 Mid Data Exchange
The pluggable modules shall meet 4x25G electrical I/O CAUI-4 IEEE P802.3bm
SDP_REQ_INT-213 Visibility Type of connection between SADT and SDP-SDP SKA1 Mid Electro-
optical
100 Gigabit Ethernet pluggable modules see document �CSP-SDP Data Transmission,
Concept Design, Equipment and Architecture� [RD6]. Note: The packet flow is presented as a 100Gigabit stream out of the pluggable module. SDP is responsible
for the Ethernet switching required to deliver the flows to the SDP receiving equipment.
SDP_REQ_INT-214 Visibility Number of
connections-SDP SKA1 Mid Electro-optical
Number of 100GE connections 273
SDP_REQ_INT-215 Visibility Power for
pluggable module-SDP SKA1 Mid Electrical
DC power for the pluggable units taken from the Ethernet switch.CAUI-4 IEEE P802.3bm
Power Watts (TBD)
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 34 of 40
SDP_REQ_INT-216 Visibility Power Source-
SDP SKA1 Mid Electrical
Mains or 48v DC power for the transponder units. TBD
SDP_REQ_INT-217 Visibility Optical modules-
SDP SKA1 Mid Mechanical
Receptor housings on the SDP equipment shall fit with pluggable modulesCFP4..
SDP_REQ_INT-218 Visibility Cabling -SDP SKA1 Mid Mechanical
Physical space shall be available for the cables or fibres required for client and line
side connections.
SDP_REQ_INT-219 Visibility Rack space-SDP
SKA1 Mid Mechanical
Standard 19 inch rack space conforming to IEC 60297 or ETS 300119 will be required
from SDP for SADT transponder equipment. The amount of rack space per SADT
transponder unit is 10 U TBC.
SDP_REQ_INT-220 Visibility Number of
transponder units-SDP SKA1 Mid Mechanical
Expected number of rack SADT transponder units TBC.
SDP_REQ_INT-221 Visibility Transponder
management-SDP SKA1 Mid Monitor and Control
The SADT transponders shall have a Network Management System capable of
controlling and monitoring the line and client side interfaces.
SDP_REQ_INT-222 Visibility Traffic
management user interface-SDP SKA1 Mid Monitor and
Control
All traffic management functionality provided by SADT equipment shall have an end user controllable terminal interface provided by SADT e.g. Network manager/craft terminal
PC
SDP_REQ_INT-223 Visibility Physical layer
monitoring across interface-SDP SKA1 Mid Monitor and
Control
SADT shall provide method to monitor OSI layer 1 statistics inside its interface boundary
and collect statistics from end element packetisers and transceiver modules (DOM)
via TM and the SADT network manager
SDP_REQ_INT-224 Visibility Built in self-test
data integrity and performance margin-SDP
SKA1 Mid Monitor and Control
In non-observation mode the SADT equipment shall self-generate and receive
PRBS data streams, or interface to external test equipment, for the purpose of performance margin testing and
maintenance of SADT links
SDP_REQ_INT-225 Visibility Interoperability
between elements following upgrade-SDP SKA1 Mid
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 35 of 40
SDP_REQ_INT-226 Visibility Interoperability
between elements following upgrade-SDP SKA1 Mid
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-227 Visibility System integration plan compliance-SDP SKA1
Mid Operational
SADT equipment shall operate according to a system-wide (multi-element) integration
test plan owned by the SKAO -TBD
SDP_REQ_INT-228 Visibility Precursor
constraints-SDP SKA1 Mid Operational
SADT equipment interfaces and constraints due to the precursor telescopes on site shall be provided system-wide by the SKAO and
AIV consortium - TBD
SDP_REQ_INT-229 Pulsar Search Wire data rate-SDP SKA1 Mid Data Exchange
0.222 Tbit/s TBC [RD10]
SDP_REQ_INT-230 Pulsar Search Data Link and
Framing-SDP SKA1 Mid Data Exchange
Ethernet supporting Jumbo frames
SDP_REQ_INT-231 Pulsar Search SADT-SDP end
point -SDP SKA1 Mid Data Exchange
Demarcation at SDP switch
SDP_REQ_INT-232 Pulsar Search Individual link
capacity-SDP SKA1 Mid Data Exchange
10 Gbit/s
SDP_REQ_INT-233 Pulsar Search Data traffic profile-
SDP SKA1 Mid Data Exchange
Continuous unidirectional data flow from CSP to SDP. Note the TCP transport uses bidirectional traffic but any feedback for the
Pulsar computation goes via TM.
SDP_REQ_INT-234 Pulsar Search Flow control -SDP SKA1 Mid Data Exchange
No flow control to be provided by SADT.
SDP_REQ_INT-235 Pulsar Search Data buffering-SDP SKA1 Mid Data Exchange
None required
SDP_REQ_INT-236 Pulsar Search Transport latency-
SDP SKA1 Mid Data Exchange
No special requirements
SDP_REQ_INT-237 Pulsar Search Packet loss-SDP
SKA1 Mid Data Exchange
Minimal better than 10-6 suggested
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 36 of 40
SDP_REQ_INT-238 Pulsar Search Packet out of order-
SDP SKA1 Mid Data Exchange
None
SDP_REQ_INT-239 Pulsar Search Protocol support-
SDP SKA1 Mid Data Exchange
Ethernet/IP/TCP/ Application Header /science data
SDP_REQ_INT-240 Pulsar Search Pluggable Modules-
SDP SKA1 Mid Electro-optical
The pluggable modules shall meet 4x25G electrical I/O CAUI-4 IEEE P802.3bm
SDP_REQ_INT-241 Pulsar Search Type of connection between SADT and SDP-SDP SKA1 Mid Electro-
optical
10 Gigabit Ethernet pluggable modules see document CSP-SDP Data Transmission,
Concept Design, Equipment and Architecture [RD06]. Note: The packet flow is presented as a 100Gigabit stream out of the pluggable module. SDP is responsible
for the Ethernet switching required to deliver the flows to the SDP receiving equipment.
SDP_REQ_INT-242 Pulsar Search Number of
connections-SDP SKA1 Mid Electro-optical
Number of 10 GE connections 23
SDP_REQ_INT-243 Pulsar Search Power for pluggable
module-SDP SKA1 Mid Electrical
DC power for the pluggable units taken from the Ethernet switch.CAUI-4 IEEE P802.3bm
Power Watts (TBD)
SDP_REQ_INT-244 Pulsar Search Power Source-SDP
SKA1 Mid Electrical
Mains or 48v DC power for the transponder units. TBD
SDP_REQ_INT-245 Pulsar Search Optical modules-
SDP SKA1 Mid Mechanical
Receptor housings on the SDP equipment shall fit with pluggable modulesCFP4.
SDP_REQ_INT-246 Pulsar Search Cabling -SDP SKA1
Mid Mechanical
Physical space shall be available for the cables or fibres required for client and line
side connections.
SDP_REQ_INT-247 Pulsar Search Rack space-SDP
SKA1 Mid Mechanical
Standard 19 inch rack space conforming to IEC 60297 or ETS 300119 will be required
from SDP for SADT transponder equipment. The amount of rack space per SADT
transponder unit is 10 U TBC.
SDP_REQ_INT-248 Pulsar Search Number of
transponder units-SDP SKA1 Mid Mechanical
Expected number of rack SADT transponder units 1 shared with PST. TBC.
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 37 of 40
SDP_REQ_INT-249 Pulsar Search Transponder
management-SDP SKA1 Mid Monitor and Control
The SADT transponders shall have a Network Management System capable of
controlling and monitoring the line and client side interfaces.
SDP_REQ_INT-250 Pulsar Search Traffic management user interface-SDP SKA1 Mid Monitor and Control
All traffic management functionality provided by SADT equipment shall have an end user controllable terminal interface provided by SADT e.g. Network manager/craft terminal
PC
SDP_REQ_INT-251 Pulsar Search Physical layer
monitoring across interface-SDP SKA1 Mid Monitor and
Control
SADT shall provide method to monitor OSI layer 1 statistics inside its interface boundary
and collect statistics from end element packetisers and transceiver modules (DOM)
via TM and the SADT network manager
SDP_REQ_INT-252 Pulsar Search Built in self-test data integrity and performance
margin-SDP SKA1 Mid Monitor and Control
In non-observation mode the SADT equipment shall self-generate and receive
PRBS data streams, or interface to external test equipment, for the purpose of performance margin testing and
maintenance of SADT links
SDP_REQ_INT-253 Pulsar Search Interoperability
between elements following upgrade-SDP SKA1 Mid
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-254 Pulsar Search Interoperability
between elements following upgrade-SDP SKA1 Mid
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-255 Pulsar Search System integration
plan compliance-SDP SKA1 Mid Operational
SADT equipment shall operate according to a system-wide (multi-element) integration
test plan owned by the SKAO -TBD
SDP_REQ_INT-256 Pulsar Search Precursor
constraints-SDP SKA1 Mid Operational
SADT equipment interfaces and constraints due to the precursor telescopes on site shall be provided system-wide by the SKAO and
AIV consortium - TBD
SDP_REQ_INT-257 Pulsar Timing Wire data rate-SDP SKA1 Mid Data Exchange
0.002 Tbit/s TBC
SDP_REQ_INT-258 Pulsar Timing Data Link and
Framing-SDP SKA1 Mid Data Exchange
Ethernet supporting Jumbo frames
SDP_REQ_INT-259 Pulsar Timing SADT-SDP end
Demarcation at SDP switch
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 38 of 40
point -SDP SKA1 Mid Data Exchange
SDP_REQ_INT-260 Pulsar Timing Individual link
capacity-SDP SKA1 Mid Data Exchange
10 Gbit/s
SDP_REQ_INT-261 Pulsar Timing Data traffic profile-
SDP SKA1 Mid Data Exchange
Continuous unidirectional data flow from CSP to SDP. Note the TCP transport uses bidirectional traffic but any feedback for the
Pulsar computation goes via TM
SDP_REQ_INT-262 Pulsar Timing Flow control -SDP SKA1 Mid Data Exchange
No flow control to be provided by SADT.
SDP_REQ_INT-263 Pulsar Timing Data buffering-SDP SKA1 Mid Data Exchange
None required
SDP_REQ_INT-264 Pulsar Timing Transport latency-
SDP SKA1 Mid Data Exchange
No special requirements
SDP_REQ_INT-265 Pulsar Timing Packet loss-SDP
SKA1 Mid Data Exchange
Minimal better than 10-6 suggested
SDP_REQ_INT-266 Pulsar Timing Packet out of order-
SDP SKA1 Mid Data Exchange
None
SDP_REQ_INT-267 Pulsar Timing Protocol support-
SDP SKA1 Mid Data Exchange
Ethernet/IP/TCP/ Application Header /science data
SDP_REQ_INT-268 Pulsar Timing Pluggable Modules-SDP SKA1 Mid Electrical
The pluggable modules shall meet 4x25G electrical I/O CAUI-4 IEEE P802.3bm
SDP_REQ_INT-269 Pulsar Timing Type of connection between SADT and SDP-SDP SKA1 Mid Electro-
optical
10 Gigabit Ethernet pluggable modules see document CSP-SDP Data Transmission,
Concept Design, Equipment and Architecture [RD06]. Note: The packet flow is presented as a 100Gigabit stream out of the pluggable module. SDP is responsible
for the Ethernet switching required to deliver the flows to the SDP receiving equipment.
SDP_REQ_INT-270 Pulsar Timing Number of
connections-SDP SKA1 Mid Electro-optical
Number of 10 GE connections 1
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 39 of 40
SDP_REQ_INT-271 Pulsar Timing Power for pluggable
module-SDP SKA1 Mid Electrical
DC power for the pluggable units taken from the Ethernet switch.CAUI-4 IEEE P802.3bm
Power Watts (TBD)
SDP_REQ_INT-272 Pulsar Timing Power Source-SDP
SKA1 Mid Electrical
Mains or 48v DC power for the transponder units. TBD
SDP_REQ_INT-273 Pulsar Timing Optical modules-
SDP SKA1 Mid Mechanical
Receptor housings on the SDP equipment shall fit with pluggable modulesCFP4.
SDP_REQ_INT-274 Pulsar Timing Cabling -SDP SKA1
Mid Mechanical
Physical space shall be available for the cables or fibres required for client and line
side connections.
SDP_REQ_INT-275 Pulsar Timing Rack space-SDP SKA1 Mid Mechanical
Standard 19 inch rack space conforming to IEC 60297 or ETS 300119 will be required
from SDP for SADT transponder equipment. The amount of rack space per SADT
transponder unit is 10 U TBC.
SDP_REQ_INT-276 Pulsar Timing Number of
transponder units-SDP SKA1 Mid Mechanical
Expected number of rack SADT transponder units 1 shared with PSS TBC.
SDP_REQ_INT-277 Pulsar Timing Transponder
management-SDP SKA1 Mid Monitor and Control
The SADT transponders shall have a Network Management System capable of
controlling and monitoring the line and client side interfaces
SDP_REQ_INT-278 Pulsar Timing Traffic management user interface-SDP SKA1 Mid Monitor and Control
All traffic management functionality provided by SADT equipment shall have an end user controllable terminal interface provided by SADT e.g. Network manager/craft terminal
PC
SDP_REQ_INT-279 Pulsar Timing Physical layer
monitoring across interface-SDP SKA1 Mid Monitor and
Control
SADT shall provide method to monitor OSI layer 1 statistics inside its interface boundary
and collect statistics from end element packetisers and transceiver modules (DOM)
via TM and the SADT network manager
SDP_REQ_INT-280 Pulsar Timing Built in self-test data integrity and performance
margin-SDP SKA1 Mid Monitor and Control
In non-observation mode the SADT equipment shall self-generate and receive
PRBS data streams, or interface to external test equipment, for the purpose of
SDP_REQ_INT-281 Pulsar Timing Interoperability
between elements following upgrade-SDP SKA1 Mid
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
Document No: SKA-TEL-SDP-0000039 Unrestricted
Revision: 01 Author: F. Graser
Release Date: 2015-02-09 Page 40 of 40
SDP_REQ_INT-282 Pulsar Timing Interoperability
between elements following upgrade-SDP SKA1 Mid
Operational
Interoperability between end element equipment and internal interfaces shall be maintained during system build upgrades
using strict version control
SDP_REQ_INT-283 Pulsar Timing System integration
plan compliance-SDP SKA1 Mid Operational
SADT equipment shall operate according to a system-wide (multi-element) integration
test plan owned by the SKAO - TBD.
SDP_REQ_INT-284 Pulsar Timing Precursor
constraints-SDP SKA1 Mid Operational
SADT equipment interfaces and constraints due to the precursor telescopes on site shall be provided system-wide by the SKAO and
AIV consortium - TBD
PDR04InterfaceRequirements(4)EchoSign Document History February 09, 2015
Created: February 09, 2015
By: Verity Allan ([email protected])
Status: SIGNED
Transaction ID: XJEHDWA5R48XN63
“PDR04InterfaceRequirements (4)” HistoryDocument created by Verity Allan ([email protected])February 09, 2015 - 3:17 PM GMT - IP address: 131.111.185.15
Document emailed to Ferdl Graser ([email protected]) for signatureFebruary 09, 2015 - 3:18 PM GMT
Document viewed by Ferdl Graser ([email protected])February 09, 2015 - 3:20 PM GMT - IP address: 105.184.40.35
Document e-signed by Ferdl Graser ([email protected])Signature Date: February 09, 2015 - 3:21 PM GMT - Time Source: server - IP address: 105.184.40.35
Document emailed to Paul Alexander ([email protected]) for signatureFebruary 09, 2015 - 3:21 PM GMT
Document viewed by Paul Alexander ([email protected])February 09, 2015 - 6:46 PM GMT - IP address: 131.111.185.15
Document e-signed by Paul Alexander ([email protected])Signature Date: February 09, 2015 - 6:47 PM GMT - Time Source: server - IP address: 131.111.185.15
Signed document emailed to Ferdl Graser ([email protected]), Paul Alexander ([email protected]) andVerity Allan ([email protected])February 09, 2015 - 6:47 PM GMT