PDS Geosciences Node Page 1 PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

  • Upload
    duman

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008. Overview of Geosciences Node Archiving. Active Missions Mars Odyssey Mars Exploration Rovers (MER) Mars Express (ESA mission) - PowerPoint PPT Presentation

Citation preview

Page 1: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 1

PDS Geosciences Node Report

Ed Guinness

PDS Management CouncilCollege Park, MD

November 20, 2008

Page 2: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 2

Overview of Geosciences Node Archiving

• Active Missions– Mars Odyssey

– Mars Exploration Rovers (MER)

– Mars Express (ESA mission)

– Mercury Surface, Space, Environment, Geochemistry and Ranging (MESSENGER, led by PPI Node)

– Mars Reconnaissance Orbiter (MRO)

– Phoenix

• Missions in Development– Lunar Reconnaissance Orbiter (LRO)

– Lunar CRater Observation and Sensing Satellite (LCROSS )

– Mars Science Laboratory (MSL)

– Chandrayaan-1 (ISRO lunar mission)

– Gravity Recovery And Interior Laboratory (GRAIL)

Missions shown in red will be discussed in this presentation.

Page 3: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 3

LRO Mission Summary

Instrument P.I. (Archive Rep) PDS Curator

LOLA Lunar Orbiter Laser Altimeter David Smith (Greg Neumann)

Geosciences

LEND Lunar Exploration Neutron Detector

Igor Mitrofanov(Karl Harshman)

Geosciences

Diviner Diviner Lunar Radiometer Experiment

David Paige(John Schofield)

Geosciences

Mini-RF Synthetic Aperture Radar Paul Spudis(Helene Winters)

Geosciences

CRaTER Cosmic Ray Telescope for the Effects of Radiation

Harlan Spence(Larry Kepko)

PPI

LAMP Lyman-Alpha Mapping Project Alan Stern(Joel Parker)

Imaging

LROC Lunar Reconnaissance Orbiter Camera

Mark Robinson(Eric Eliason)

Imaging

SPICE Pointing and navigation data 

NAIF

Launch: April 24, 2009 Start of primary mission: June 24, 2009

Data releases: Six months after start of primary mission (first release December 24, 2009) and every three months thereafter.

Page 4: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 4

LRO Archive Development Status

ActivityDue Date Project/PDS CRaTER/PPI DLRE/GEO LAMP/IMG LEND/GEO LOLA/GEO LROC/IMG

Mini-RF/GEO SPICE/NAIF

Establish Archive Working Group Done Done Done Done Done Done Done Done DoneDevelop Archive Plan Done Done Done Done Done Done Done Done Done

Write Node ICDs Done Done Done Done Done Done Done Done DoneCreate SISs and sample products 5/31/07 n/a Done Done Done Done Done Done Done n/aCreate Local Data Dictionary 4/11/08 In Progress Done Done Done Done In Progress Done Done n/aBuild Catalog Files 12/1/08 In Progress In Progress In Progress In Progress Done In Progress In Progress In Progress In ProgressConduct Peer Reviews 2/29/08 n/a Done Done Done Done In Progress Done Done n/aConduct End-to-End Delivery Tests 7/3/08 Done Done Done Done Done Done Done Done n/a

Key: Done Task completed

In Progress Task in progress, on schedule

In Progress Task in progress, behind schedule

Delayed Task delayed, behind schedule

Page 5: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 5

LRO Issues

• Data Dictionary – Most additions to LRO LDD and main PDS DD are complete, but cannot finalize

until end of all peer reviews. LOLA review is still in lien resolution.

• Peer Reviews– LOLA: EDR complete; RDR in lien resolution. LOLA got a late start because of

a delay in instrument testing.

• Catalog Files– All teams have skeleton catalog files that Betty Sword has reviewed. All except

the LEND team need to “beef up” their descriptions.

– Drafts are due Dec. 12, 2008. Final versions are due two months before first release, Dec 24, 2009.

Page 6: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 6

LCROSS Mission Summary

Instrument P.I. (Archive Rep) Curator

VIS Visible Context Camera Tony Colaprete (Mark Shirley)

Imaging

NIR1, NIR2 NIR Camera (2) Tony Colaprete (Mark Shirley)

Imaging

MIR1, MIR2 Mid-IR Camera (2) Tony Colaprete (Mark Shirley)

Imaging

NSP1, NSP2 NIR Spectrometer (2) Tony Rico (Mark Shirley)

Geosciences

VSP Visible Spectrometer Tony Colaprete (Mark Shirley)

Geosciences

TLP Total Visible Luminance Photometer

Tony Colaprete (Mark Shirley)

Geosciences

SPICE Pointing and navigation data

Tony Colaprete (Mark Shirley)

NAIF

Launch: April 24, 2009 (with LRO) Impact: July, 2009 (date uncertain; target selection still in progress)

Data releases: One release, no more than 6 months after impact

Page 7: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 7

LCROSS Archive Development Status

Activity Due Date Project/PDS VIS/IMG NIR/IMG MIR/IMG NSP/GEO VSP/GEO TLP/GEO SPICE/NAIF

Establish Archive Working Group 10/30/06 Done Done Done Done Done Done Done Done

Develop Archive Plan 4/30/07 Done Done Done Done Done Done Done Done

Write Node ICDs 4/30/07 Done Done Done Done Done Done Done Done

Create SISs and sample products 5/8/08 n/a Done Done Done Done Done Done n/a

Conduct Peer Review 7/16/08 n/a In Progress In Progress In Progress In Progress In Progress In Progress n/a

Create Local Data Dictionary 7/16/08 In Progress In Progress In Progress In Progress In Progress In Progress In Progress n/a

Build Catalog Files

1/6/09 (draft) In Progress In Progress In Progress In Progress In Progress In Progress In Progress n/a

Conduct End-to-End Delivery Tests 2/17/09 In Progress <> <> <> <> <> <> <>

Key: Done Task completed

In Progress Task in progress, on schedule

In Progress Task in progress, behind schedule

Delayed Task delayed, behind schedule

Page 8: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 8

LCROSS Issues and Comments

• LCROSS has one person, who is new to PDS, to design and archive 18 data sets. Schedule has been revised several times.

• Peer review: Responses to liens were due 7/26/08, received 11/12/08. We are checking the responses.

• Coordinated ground observations from about 10 participating observatories:

– Geosciences Node provided text about PDS archiving for the RFP, and we are in contact with the Program Manager to work with selected investigators.

– Proposals were due 10/30/08; date for selection unknown. We offered to help review PDS-related parts.

– Proposers may need a lot of hand-holding to make a PDS archive.

• End-to-End Testing– Test plan is complete.

– Test 1 (sample archive volume for each data set) will be conducted in January 2009 along with other project testing.

– Test 2 will be conducted if needed depending on results of Test 1.

Page 9: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 9

Phoenix Mission Summary

Instrument P.I. (Archive Rep) PDS Curator

TEGA Thermal and Evolved Gas Analyzer William Boynton(Karl Harshman)

Geosciences

MECA Non-Imaging

Microscopy, Electrochemistry, and Conductivity Analyzer

Michael Hecht / Aaron Zent Geosciences

MET Meteorology Suite (LIDAR, P&T) Eric Choi, Leif Bloomquist, Cameron Dickenson

Atmospheres

EDL ACC EDL Accelerometer David Catling Atmospheres

RAC Robotic Arm Camera Mark Lemmon Imaging

MECA OM MECA Optical Microscope Michael Hecht Imaging

SSI Surface Stereo Imager Mark Lemmon Imaging

SPICE Pointing and navigation data 

NAIF

Launch: August 9, 2007 Start of primary mission: May 25, 2008

Data releases: December 24, 2008; February 25, 2009; May 2, 2009

End of mission: November 2, 2008 (sol 152)

Page 10: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 10

Phoenix Archive Development Status

Activity Due Date Project/PDS ASE/ATM MARDI/IMG MECA-NI/GEOMET LIDAR,

PT/ATM RA/GEO

RAC, SSI, MECA-OM/IM

G TEGA/GEO SPICE/NAIF

Establish Archive Working Group Done Done Done Done Done Done Done Done Done

Develop Archive Plan Done Done Done Done Done Done Done Done Done

Write Node ICDs Done Done Done Done Done Done Done Done Done

Create SISs and sample products 2/15/08 n/a Done Done In Progress Done Done In Progress Done n/a

Create Local Data Dictionary 2/15/08 Done Done Done Done Done Done Done Done n/a

Build Catalog Files 2/15/08 Done In Progress Done Done Done Done In Progress Done Done

Conduct Peer Reviews 2/15/08 n/a Done Done Done Done Done Done Done n/a

Conduct End-to-End Delivery Tests 2/22/08 Done Done Done Done Done Done Done Done n/aTest interface between nodes and EN 10/1/08 Done Done Done Done Done Done Done Done n/a

Key: Done Task completed

In Progress Task in progress, on schedule

In Progress Task in progress, behind schedule

Delayed Task delayed, behind schedule

Page 11: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 11

Preparations for Phoenix Release 1, Dec. 24, 2008

• Schedule: – December 10, 2008: Deliver sols 0-30 to PDS

– December 24, 2008: Release to public

– February 22, 2009: Release sols 31-90

– May 2, 2009: Release sols 91-152

• Tasks:– MIPL / Teams to reprocess EDRs to correct pointing errors and PDS label

errors

– Imaging Node to add many new keywords to Data Dictionary

– Teams to generate RDRs from reprocessed EDRs

– WU (wearing Phoenix hat) to collect calibration reports from all teams

– WU to secure ITAR clearance from JPL for all SISs and calibration reports

– WU to prepare table of coordinated observations with MRO

Page 12: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 12

Phoenix Issues

• SSI camera EDRs for sols 0-22 need to be reprocessed by MIPL to correct pointing errors discovered during mission operations.

• All imaging EDRs need label corrections resulting from peer review, which were identified too late to change the processing software.

– Corrections are being done by MIPL prior to delivery.

– Two label errors will not be corrected for Release 1 because they require MIPL software changes.

• Teams generating imaging RDRs need reprocessed EDRs to start with.

• MECA EDRs need to be reprocessed to correct duplicate packet errors, which were not noticed before because the team did not use the EDRs. MECA Team agreed to take over this task from MIPL. (Does not affect RDR production.)

• Imaging archive volumes are being assembled at WU (wearing Phoenix hat).

Page 13: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 13

Chandrayaan-1 Archive Summary(U.S. instruments only)

Instrument P.I. (Archive Rep) Curator

M3 Moon Mineralogy Mapper Carle Pieters Imaging (JPL)

Mini-RF (a.k.a. Forerunner)

Synthetic Aperture Radar Paul Spudis (Helene Winters) Geosciences

SPICE Pointing and navigation data

? NAIF

Launch: October 22, 2008 Start of primary mission: November 12, 2008

Data releases:

Mini-RF – January 2010, July 2010, January 2011, July 2011.

M3 – April 2009, October 2009, April 2010, October 2010, final RDRs at EOM+1 year.

End of primary mission: November 11, 2010

Page 14: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 14

Chandrayann-1 Archive Development Status

Activity Due Date PDS M3/IMG Mini-RF/GEO SPICE/NAIF

Establish Archive Working Group n/a n/a n/a n/a n/a

Develop Archive Plan n/a n/a n/a n/a n/a

Write Node ICDs n/a n/a ? 1/2/2007 n/a

Create SISs and sample products n/a n/a In Progress 4/22/2008 n/a

Create Local Data Dictionary n/a In Progress In Progress 4/22/2008 n/a

Build Catalog Files n/a In Progress In Progress In Progress ?

Conduct Peer Reviews n/a n/a In Progress 4/22/2008 n/a

Conduct End-to-End Delivery Tests n/a ? ? 5/20/2008 n/a

Key: Done Task completed

In Progress Task in progress, on schedule

In Progress Task in progress, behind schedule

Delayed Task delayed, behind schedule

Page 15: PDS Geosciences Node Report Ed Guinness PDS Management Council College Park, MD November 20, 2008

PDS Geosciences NodePage 15

Chandrayaan-1 Issues

• There is no relationship between ISRO and PDS for Chandrayaan-1 archiving. Hence there is no lead node, PDS-approved archive plan, archive working group, or schedule.

– Imaging has been working on M3, and Geosciences on Mini-RF, independently.

– Stephanie McLaughlin, SBN, is working for M3 to help develop processing software.

• The Chandrayaan-1 mission claims to be using PDS standards for archiving, but it’s not clear how well this is being done.

• At 10/29/08 MIWG telecon, the Geosciences Node agreed to track Chan-1 work for MIWG, including making summary page, checklist and report card. These are in progress.

• Catalog files exist in draft form but some need revision and review. This is in progress.

• Delivery schedules are tentative.