PEBB T&E Facility. Presented to: PEBB Technical Review 7-9 April 1998 David E. McLaughlin VECTOR Research Program Manager (Technical) PEBB Program. Background. - PowerPoint PPT Presentation
Citation preview
PEBB T&E Facility
Presented to: PEBB Technical Review
7-9 April 1998David E. McLaughlin
VECTOR Research
Program Manager (Technical)
PEBB Program
Background• VECTOR has established
a PEBB Demonstration and T&E facility on the campus of the Annapolis Detachment of the Naval Surface Warfare Center, Carderock Division
VECTOR Facility in Annapolis
• VECTOR leased Building 32 on the NSWCCD Annapolis site in February 1997– 10,000 ft2 office and
lab space
– Facility Manager is David McLaughlin
VECTOR Facility in AnnapolisElectrical Power
• Excellent installed electrical power feeder circuits– Rated for more than 500kW
– Three 400 Amp, 480 Vac bus ducts installed
VECTOR Facility in AnnapolisOffice Space
• 2,500 ft2 of modern office space
• One conference room• Computer network
installed
VECTOR Facility in AnnapolisTest Floor Lay-out
• 7,500 ft2 of lab space in 6 lab bays and the central test floor.
• Includes lab bays for– PEBB demo area
– PEBB assembly
– PEBB thermal analysis
– a variety of power sources and loads
VECTOR Facility in AnnapolisEquipment Handling Capabilities
• All areas of test floor and lab bays served by overhead monorail rated for 1 ton
• 2 garage doors to facilitate movement of equipment in and out of the test floor
VECTOR Facility in AnnapolisBuilding Additions and Modifications
• VECTOR has purchased and installed a 300kW Inverpower 1000 Volt DC Power Supply– GPIB Remote Control
– Labview Software
• DC Power is being distributed to all lab bays and the central test floor
VECTOR Facility in AnnapolisInstrumentation
• VECTOR provides state-of-the-art equipment and instrumentation– Nicolet MultiPro for multiple
channel data recording
– Yokogawa digital power meter
– Nicolet PowerPro 620E digital recording O-scope
VECTOR Facility in AnnapolisAdditional Equipment
• 400kW resistive load bank
• 750kW resistive & inductive load bank to be installed in summer ‘98
• 110kW 60-400Hz converter installed
VECTOR R&D TasksPEBB Characterization
Operational PEBB-1 ARCP in Building 32– Principal Investigator is
Robert White
– Tests will include• Parametric studies
• Response to sudden load changes
• THD measurements
VECTOR R&D TasksThermal Studies
Two thermal/heat transfer test stands in Building 32– Principal Investigator is Dr.
Peter Harrison
– Tasks include• Establish thermal baseline for
PEBB
• Develop heat transfer models and validate with tests
• Provide standardized heat transfer measurements
• Explore new cooling concepts
VECTOR TasksPEBB Fabrication and Assembly
Electrical and electronic component fabrication and assembly stations located in Building 32– VECTOR point of contact is David
McLaughlin– Tasks include:
• Circuit board population• Circuit assembly• Cooling system “plumbing”
• Instrumentation • Data collection
VECTOR TasksPEBB Demonstrations
Current and past demonstrators set up in Building 32– VECTOR point of contact is
Jerry Castellucci
– Tasks include• Maintain demos operational
• Operate as required for demonstration or data collection
• Transport/set up/operate at trade shows, conferences, etc.