Peel Park Masterplan Supporting Document

This document provides information that has informed the Peel Park Masterplan.  People Place and Partnership have compiled this document from information provided by Hawkesbury City Council, Arterra Landscape Designs and Clouston Associates – July 2018

Page 2: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

ContentsProject Background 3Introduction 3Planning Setting 4Demographic Setting 4Community Engagement 5Community Values 6

Site Analysis 7North Richmond Context Plan 8Redbank Masterplan 9Existing Peel Park Site 10Site Constraints 12Peel Park Current Conditions 13

181920202121

Final Mastperplan Masterplan VisionKey PrinciplesMasterplan Objectives FundingMasterplan Inclusions Peel Park Final Masterplan

22

Page 3: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Introduction

Peel Park Masterplan | Supporting Document

Peel Park is a district level park that sits within the context of a larger open space system that will be established as part of the adjacent ‘Redbank’ development.  It provides for a variety of passive and recreation activities within a low key setting.

The adjacent Greenfield development site known as ‘Redbank' is also of historic significance for its contribution to the development of keyline farming practices. Until recently this history has informed the rural character setting in which the park is positioned.

BackgroundPeel Park will be required to contribute to meeting the active recreation needs of both the existing residents of North Richmond and the incoming population at the adjacent development ‘Redbank’. The site will be required to continue to meet the needs of the existing population of North Richmond.

A Plan of Management addressing all future parkland within the Redbank Precinct, including Peel Park, has been developed which guides the management and use of parks and reserves within the precinct.

A draft Masterplan has been developed for Peel Park which will guide the evolution of the park from a low-use, mostly undeveloped site, into a high quality district level park which provides for a range of passive and recreation activities for the existing and future population of North Richmond.

!3

Page 4: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Planning Setting

A Voluntary Planning Agreement (VPA) has been entered into between Hawkesbury City Council and the Redbank developer which addresses the developer contribution toward the upgrade of Peel Park.

The final Peel Park Masterplan is to include the requirements of the VPA and be consistent with the Hawkesbury Regional Open Space Strategy and its associated Design Guidelines.

Identified in the VPA are the following improvements that are to be provided by the developer, subject to item footprint and available space:

• Off street parking• Training spaces• Field area in adjustable configuration for summer and winter codes

(two winter codes as a minimum)• Sports amenity building• Multi use sports courts• Appropriate Lighting to Training Spaces to Australian Standards• Irrigation to Training Spaces using Potable Water• Fixed Fencing to Field Area• Park shelters and pathways• Dog off leash area• Fitness trail

Improvements to include as standard:

• Passive recreation and open space for kick about/carnival space• Connection to district cycleway• Minor path link to site and bushland areas

Demographic Setting

North Richmond has an existing population of 4,980 people (2016 census). This is set to almost double, with the development at Redbank predicted to house an additional 3,920 people.

With the increase in population there will be a likely increase in demand for formal sporting facilities, informal open space and walking and cycling trails

!4Peel Park Masterplan | Supporting Document

Page 5: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Community EngagementTo ensure the upgraded Peel Park will meet community needs and expectations, a series of community engagement activities have been undertaken to inform the design. Two community engagement periods were undertaken in order to ensure an appropriate outcome for the site.

Engagement Period 1

The purpose of Engagement Period 1 was to gather feedback on the provisions made within the first draft of the Peel Park Masterplan. Engagement activities undertaken during this phase included:

• Public Hearing• Community Meeting• Public Exhibition of draft Masterplan• Community Questionnaire

Key outcomes of this period included a series of revisions to the Masterplan in response to community feedback and a resolution by Council to perform further community consultation in order to resolve the Masterplan.

Engagement Period 2

The purpose of this phase was to clarify feedback submitted during the first round of community engagement and to resolve spatial concerns raised in the second draft of the Peel Park Masterplan. Engagement activities included:

Direct engagement • Community Workshop• Key Stakeholder InterviewsDigital engagement • Community Survey

Key outcomes of this period included the clarification of spatial concerns and recommendations for next steps, community members becoming educated on the Masterplan process and select aesthetic considerations being clarified.

Engagement Period 3

This phase included a Community Meeting to present the revised draft masterplan for feedback before presenting the plan to Council for public exhibition.

!5

NOV 2016 - AUG 2017

Engagement Period 1MAR - MAY 2018

Engagement Period 2MAY - JUN 2018

Design RefinementAUG 2018

Revised Draft Masterplan

Community Survey Key Stakeholder Interviews Community Workshop

Public Hearing Community Survey Public Exhibition of draft Masterplan

Refine Masterplan design based on feedback

Revised Draft Masterplan presented to Council briefing session

Community Workshop Community Workshop Community Workshop

Peel Park Masterplan | Supporting Document

AUG 2018

Engagement Period 3

Community Meeting

AUG 2018

Public Exhibition

Draft Masterplan presented to Council for public exhibition

WE ARE HERE

Page 6: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Community ValuesThe North Richmond community values various aspects of Peel Park for different reasons. By understanding the reasons why the community and users value the park, the Masterplan can protect and enhance these values.

Value Valued Aspects

Recreation

• Passive parkland for walking and low key activities• Children’s play• Youth facilities (BMX track)• Large, fenced dog off-leash area• Junior Cricket – two fields• Training area for winter sports• Access to water (creek)

Natural

• Bushland – protected, maintained• Wet Meadow – protected and maintained• Large paddock tree – protected• Slope/gradient

Cultural • Community interaction• Pansy railway alignment

Access and Linkage

• Trails for recreation use that are suitable for walking and cycling• Connection to future development area, shopping precinct• Access to water (creek and dam)

Character

• Low-key, rural feel• Open, uncluttered nature of the park• Quiet• Large size

!6Peel Park Masterplan | Supporting Document

Page 7: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

9

Site Analysis

Peel Park Masterplan | Supporting Document

Page 8: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

North Richmond Context Plan

100 2000 m500Scale 1: 5000

Path Connection

Redbank Site Boundary

Peel Park Boundary

LEGEND

Potential future Pedestrian /Cycle Shared Path connection

N o r t h R i c h m o n d C o n t e x t M a p 1 : 5 0 0 0 Scale: 1:5000@A1, 1:10000@A3 Date 20.06.18

PEEL PARK

NORTH RICHMONDVILLAGE CENTRE

REDBANKDEVELOPMENT

!8Peel Park Masterplan | Supporting Document

Page 9: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Redbank Masterplan

!9Peel Park Masterplan | Supporting Document

Page 10: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

!10

Existing Peel Park Masterplan Site

Peel Park Masterplan | Supporting Document

Page 11: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Existing Peel Park Masterplan Site

!11

View across existing cricket fields towards Redbank Creek Stand of Native Trees High Value Paddock Tree with dog off-leash area in background

View Over adjacent dam toward future playground and picnic area Sports Amenity building and kiosk High Value Paddock Tree with dog off-leash area in background

Peel Park Masterplan | Supporting Document

Page 12: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Site Constraints

Peel Park is a 9.4ha park, however only 4.8 ha of the site remains unconstrained. 

There are existing constraints onsite that restrict usage, including:

• 3 electricity easements• 1 drainage easement• Riparian corridor• Native vegetation• Buffers to adjoining properties• Slope/terrain

!12Peel Park Masterplan | Supporting Document

Page 13: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Current Landform

!13Peel Park Masterplan | Supporting Document

Page 14: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Vegetation Analysis

!14Peel Park Masterplan | Supporting Document

Page 15: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Water Analysis

!15Peel Park Masterplan | Supporting Document

Page 16: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Current Activities & Circulation

!16Peel Park Masterplan | Supporting Document

Page 17: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Current Services & Amenities

!17Peel Park Masterplan | Supporting Document

Page 18: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

9

Final Masterplan

Peel Park Masterplan | Supporting Document

Page 19: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Masterplan | Supporting Document 19

Masterplan VisionPeel Park will be a place for all members of the community to enjoy a range of recreation, leisure and sporting activities, whilst retaining the natural, rural and cultural values of the site.

Page 20: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Key PrinciplesPeople • Encourage social interaction and engagement• Ensure human activity interacts positively with natural processes• Restrict impact on adjoining residents• Ensure safe access and egressFacilities • Develop a multi-use park which balances the provision of sport, recreation and nature

spaces • Ensure maintenance requirements are considered and integrated into the initial design

process • Provide recreation and leisure facilities for all ages and abilities• Ensure that facilities provide for balanced use – active and passive recreation• Provide areas suitable for sport training and junior competition which can

accommodate winter and summer sports• Provide inter-connected yet age appropriate informal play and adventure activitiesEnvironment • Integrate and enhance existing bushland, landscape and geographic features in site

design • Retain and celebrate natural and cultural heritage values• Retain existing park character – low key, rural character

Objectives

Sport and Recreation • Provide a place for older adults to exercise• Enhance the existing BMX track and provide a place for younger children to learn to

ride• Provide for two junior cricket fields• Level sporting fields enough so that they can be used for junior sport and training with

a graded surface to ensure safe footing• Provide lighting to sports fields for training purposes• Provide storage for sporting equipment and canteen• Provide an active sporting hub with seating and shade for spectatorsCulture and Play • Provide places for young children and youth to play informally• Include opportunities for nature play• Provide public art that engages and contributes to placemakingImproved Amenities • Increase amenities and picnic facilities for informal gatherings of groups• Improve shade cover• Provide toilets near the picnic/play area that are open to the public• Ensure parking is provided which matches the carrying capacity of facilities and

settings• Adopt sustainability principles within design to ensure efficient use of resources

(water, electricity etc) including water sensitive urban design principlesOpen Green Space

• Provide access to water• Retain bushland areas and high value treesAccess and Pathways • Provide connections and improvements with pedestrian / cycleway• Provide lighting to high use areas to ensure safe access and egress• Maximise community access• Investigate traffic management or traffic calming to enhance safety for cyclists and

pedestrians

!20

Training UsePeel Park has been designated as a training and junior competition sporting space due to the following constraints: • Too small• Feeder roads not compatible• Noise• Insufficient parking• Cannot level fields sufficiently without compromising the integrity of the park

Peel Park Masterplan | Supporting Document

Page 21: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Funding

Sporting Use

• Sporting fields in flexible configuration for summer and winter sport• No permanent goal posts• Two cricket pitches• Training facilities for soccer and rugby• Graded sports field area at 1:50 to provide a safer and more usable playing surface.• Sporting area capable of accommodating two junior cricket fields and modified fields

for winter sports• Sports field lighting (design and location is to be determined but must be to

Australian Standards for training purposes and is to minimise light spill and glare)• Irrigated sports field• Multi-use hardcourt

Pedestrian Access & Pathways

• New pedestrian entry points off Pecks Road and Arthur Phillip Drive• Upgraded existing paths• Circuit path around Peel park to be accessible shared pedestrian and cycle path• Pathways to link into wider Redbank Network

Parking

• Sufficient provisions for sporting and general use• Multiple options to disperse traffic and access various parts of the park• Formalised and sealed car parks off O’Dea Place, Pecks Road and Arthur Phillip

Drive

Dog Off-Leash Area

• Fenced• Provide shelter and seats

Amenities

• Shade• Toilet including disability access

• Upgraded sports amenities building including a new sports storage area• A hub with paving, seating and shade trees• Some seating to be incorporated into the embankment

Informal Recreation & Play Areas

• Upgraded and expanded playground to better connect with BMX area and toincorporate junior and senior play areas, fitness area, toilets and picnic facilities

• Play area to incorporate shade, fencing, seating, proprietary play equipment , natureplay

• BMX track retained and relocated• Informal spaces for kick-a-bout and play• Fitness station• Heritage interpretation – Pansy line

Environment

• High value trees retained• Existing bush track to be retained and upgraded where required• Weed removal and vegetation regeneration to be carried out in bushland areas• Shade trees and landscaping• “Wet Meadow” retained

The Masterplan will be funded in large part by the developer – Redbank Communities, with Council funding residual items as funding allows.

Masterplan Inclusions

!21Peel Park Masterplan | Supporting Document

Page 22: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Final Masterplan

Peel Park Masterplan | Sup por t ing Docum en t 22

Page 23: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Final Masterplan - Sports Field Line Markings

Peel Park Masterplan | Sup por t ing Docum en t 23

Page 24: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Final Masterplan - Cut & Fill

m25 50 1000

874.28 m2

959.62 m2

3 429.96 m2

2 042.90 m2

2 092.91 m2

2 103.10 m2

4 217.23 m2

2 789.98 m2

1 018.54 m2

1 472.11 m2

1 125.15 m2

1 064.03 m2

9.39 m2

11.89 m2

32.28 m2

250.49 m2

2 001.72 m2

181.52 m2

1 906.36 m2

36.00

37.00

37.00

38.00

38.00

36.50

37.50

37.50

19

1919

1919

1919

19

1921

21

21

22

22

23

23

24

24

25

25

25

25

26

26

26

27

27

28

28 29

29

30

31

32

33

36

36

36

34

32

30

31

29

28

33

35

29

14,417m2

12,961 m2

Peel Park Boundary

Redbank Site Boundary

Overhead Electrical Line

High Voltage Overhead ElectricalLine & Power Poles with 30mwide Electrical Easement

Cut

Existing Contours for Peel Park(1.0m intervals)

Proposed Contours for Peel Park(1.0m intervals)

Fill

Built Path

Proposed Path

Existing Path

Existing Tree & Tree Protection Zone

P e e l P a r k C u t a n d F i l l D i a g r a m Scale: 1:750@A1, 1:1500@A3 Date 16.07.18

Legend

!24Peel Park Masterplan | Supporting Document

Page 25: Peel Park Masterplan Supporting Document V3 · Introduction Peel Park Masterplan | Supporting Document Peel Park is a district level park that sits within the context of a larger

Peel Park Final Masterplan - Cross Sections

Cricket OvalExisting

Path

Creek & embankmentBMX circuit &mounds

Carriageway &Street Parking

SharedPath

Modified FieldExisting Tree

Pow

er p

oles

Dog

off l

eash

fenc

e

Dog

off l

eash

fenc

e

Cricket Pitch

Existing Ground Line1:6

1:40

Shared Path

1:6 Embankment

1:40 Playing Field

36

35

34

33

32

Existing Ground Line

Carriageway &Street Parking

0 10 m5020Scale 1: 500

0 5 m102.5Scale 1: 100

S e c t i o n s A c r o s s F i e l d

L o n g s e c t i o n 1 : 5 0 0

D e t a i l s e c t i o n 1 : 1 0 0

Date 19.07.18

!25Peel Park Masterplan | Supporting Document