Renaissance Risk is a trading name of Renaissance Experts Limited, a company registered in England & Wales. Company No. 6390351, Registered address: 30 Upper Park Road, Camberley, Surrey GU15 2EQ Renaissance Risk Safety in Numbers Peer review of the Atkins risk assessment for the proposed Chivas Brothers visitor centre adjacent to the Kennington Gasholders. A report by Renaissance Risk prepared for London Borough of Lambeth January 16, 2012

Peer review of the Atkins risk assessment for the proposed

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Peer review of the Atkins risk assessment for the proposed

Renaissance Risk is a trading name of Renaissance Experts Limited, a company registered in England & Wales.

Company No. 6390351, Registered address: 30 Upper Park Road, Camberley, Surrey GU15 2EQ

Renaissance Risk

Safety in Numbers

Peer review of the Atkins risk assessment for the proposed Chivas Brothers visitor centre adjacent to the Kennington Gasholders.

A report by Renaissance Risk prepared for

London Borough of Lambeth

January 16, 2012

Page 2: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

Document Issue Control Sheet

London Borough of Lambeth

Peer review of Atkins risk assessments for the Chivas Brothers superstore, New Park

Roundabout

Document Number - 11/01009/FUL/RR1

Issue Date Author Checked Purpose

1 16 January, 2012 SMA Draft

Notice “This report has been produced by Renaissance Risk for the London Borough of Lambeth for the specific purpose of being a review of the Atkins risk assessments for the “Beefeater Distillery” development and is only suitable for use in connection therewith. The report may not be used by any other party or for any other purpose without Renaissance Risk's express written permission. Renaissance Risk accepts no responsibility or liability for any unauthorised use or reliance upon any of the contents of this report.”

Page 3: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

Table of Contents

1. Summary ......................................................................................................................................... 1

2. Introduction & Understanding ..................................................................................................... 3

3. PADHI overview ............................................................................................................................ 4

4. Atkins risk assessment 5090979: Land Use Planning Assessment ............................................. 5

4.1. The Atkins gasholder risk assessment ................................................................................. 5

4.2. What is the risk? .................................................................................................................... 7

4.3. HSE call-in policy (in further detail) ..................................................................................... 8

4.4. Implications ......................................................................................................................... 10

4.5. Conclusions .......................................................................................................................... 12

Page 4: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

1

1. Summary

A planning application is to be submitted to the London Borough of Lambeth by Chivas Brothers for a proposed change of use at their Beefeater Distillery at the Kennington site. The proposal is for use of part of their building as a museum / visitor centre which is open to the general public. The site falls within HSE’s Consultation Zones of the nearby Kennington gasholder station. The output of HSE's codified methodology for considering risk in Land Use Planning is PADHI. The PADHI output for this proposed application is “Advise Against”. Since HSE would advise against the proposed change of use, the Local Planning Authority needs to have a full understanding of the nature and the quantum of the risks so that these can be set in context alongside more familiar planning issues in the decision-making process. Chivas Brothers has therefore commissioned a risk assessment report from Atkins in order to provide the planning committee of the LPA with further information on the risks at the proposed development. The LPA has requested Renaissance Risk to undertake an independent review of the Atkins report and to prepare a statement of opinion on the report's accuracy and veracity. This document is an addendum to that statement and contains further detail which may be of interest to the LPA and of value in the process of decision-making. Gasholders have a high degree of inherent “safety”. From the implementation of the Factories Act of 1961 to the current day, there have been no fatalities in the UK which have been caused as a direct result of an event initiating at a gasholder. This is also confirmed by information used by the HSE in developing their zone calculation methodology, which indicated that there have been no fatalities at gasholder sites in the UK for around 100 years [Ilkeston 19121]. More recently, the implementation of regulations to reduce major hazards, such as COMAH, DSEAR, and the like, has further ensured that residual risk has been reduced As Low As Reasonably Practicable (ALARP). This does not mean, however, that major events at gasholders cannot occur; there are several well-documented accidents in the UK which have caused property damage and injury, and certainly gasholder accidents overseas have caused significant numbers of fatalities to people in housing located very close to the gasholder. As development close to gasholders intensifies in the UK it is important to ensure that the safety aspects are fully considered.

1 A fatality caused by the drowning of an individual sheltering in a basement of a house during a gasholder fire,

and who was drowned when the gasholder water reservoir lost containment.

Page 5: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

2

Although there is no evidence that the Kennington gasholders are unsafe, it is incumbent on the developer to demonstrate, first, that the proposed development does not substantially increase the residual risk and, secondly, provide the LPA with sufficient information to allow the safety issues to be balanced against the socio-economic benefits. Additionally, whilst it is almost certain that the risks at the proposed development would be “acceptable” by UK standards, it is possible - though unlikely based on our understanding of the scale and type of development proposal - that the HSE could “call-in” a decision by the Local Planning Authority to grant this application. The introduction of additional people working and shopping within the hazard range of the Gasholders does increase residual risk and change the ALARP balance. A high quality risk assessment is therefore essential to support decision-making on the basis of safety for this development; the Risk Assessment by Atkins is, in our opinion, fit for this purpose.

Page 6: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

3

2. Introduction & Understanding

London Borough of Lambeth (LBL) has received a planning application for a change of use development by Chivas Brothers at their Beefeater Distillery at the Kennington site. The proposal is for use of part of their building as a museum / visitor centre which is open to the general public. The site falls within HSE’s Consultation Zones of the nearby Kennington gasholder station. The output of HSE's codified methodology for considering risk in Land Use Planning is PADHI. The PADHI output for this proposed application is “Advise Against”.

The HSE “Advise Against” is, as it states, advisory. It is for the LPA to ascertain the balance of the increase in residual risk being from the proposed development against the societal and economic benefits which would be derived from approving the planning application. As part of the process of understanding the nature and quantum of the risks, London Borough of Lambeth has engaged Renaissance Risk to undertake a peer review of the Atkins Risk Assessment. The document supplied by the applicant, which LBL has passed to Renaissance Risk for review is shown in table 2.1. Table 2.1 Documentation

Document Title Reference (date)

Land Use Planning Assessment of a Development at Beefeater Distillery, London

5090979 / Technical Note 2 (March 2011)

The specific site and the defined project boundary is shown in Figure 1, below.

Figure 1 - the proposed development site (bounded red) and consultation zones

Page 7: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

4

One of the difficulties in using PADHI is that the assessments are black & white; there is no room for the consideration of site-specific reduction in risk due to (for example) improved risk mitigation and protection of population groups. However, the HSE does recognise that the nature of their assessment of risk could lead to developments which have well-defined economic and social benefit being rejected on the basis of generic risk assumptions. During the Brit Oval inquiry, the HSE stated that the correct approach on safety issues for LPAs “is to consider the result of the PADHI assessment. If that result is an ‘Advise Against’ they are to give that advice the most careful consideration in their LUP decision-making and weigh it against the benefits of a planning application. Of course if they consider that (HSE) advice is over-cautious they can of course seek so to demonstrate through suitably qualified expert evidence.” Whilst not of direct relevance, it may be of interest to London Borough of Lambeth to know that the Institute of Gas Engineers and Managers publication (IGE/SR/4) provides safety recommendations in relation to developments around gas holder sites. This publication, which remains current, sets a distance of 18 metres within which buildings would not normally be allowed on the basis that gas released from minor leaks on gasholder seals could be drawn into any building within this distance and reach an ignition source. This rule of thumb is based upon calculation of the dispersion of gas from typical seal leaks in a range of typical wind speeds. This hazard has been considered by Atkins, but not in significant detail.

It is also relevant to note that The Greater London Authority planning report (PDU/Legislation & Regulation/MM July 2007) stated that “The HSE PADHI system is a useful tool for determining likely risks, however it can be determined that the current consultation zones proposed for hazardous sites may be too inflexible, resulting in advice from the HSE that is too rigid and not site specific. Where the HSE is minded to ‘Advise Against’ a development, the applicant should be requested to provide a more detailed site assessment that would allow for detailed site specific consideration by the HSE and ultimately the Planning Authority.”

The Applicant has therefore commissioned a Risk Assessment from Atkins which allows for site specific consideration to be taken into account. Although there are some elements within these Atkins reports which would benefit from clarification, we have reasonable confidence in expressing our opinion that they are substantially truthful.

3. PADHI overview

The HSE set the PADHI planning zones around Gasholders using a specific event; a decoupled seal resulting in a fireball involving 50% of maximum contents. The basis for this is a recent HSE review of gasholder accident statistics. This review identified a few apparent large ignited events and used these to propose that such events were credible enough to form the basis of the Land Use Planning Zones. Therefore, until relatively recently, Gasholder LUP Zones were of a much smaller radius. However no incidents have been identified by HSE which could reasonably be shown to behave with the damage consequences postulated by HSE.

Page 8: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

5

It should be noted that HSE's assessment does not constitute a complete risk assessment. In order to do so, it would have to include a number of lesser events which have higher frequencies, but shorter hazard ranges. Whilst this does not affect the planning zones, the inclusion of such events is relevant to the risk at locations close to Gasholders. In short, therefore, it should be emphasised that the HSE assessment is primarily a screening tool which allows codified and consistent responses to be made to individual planning cases. Thus HSE only provide planning consultation to Local Authorities, and do not provide prescriptive advice. The PADHI system for Gas Holders uses the protection concept and Dangerous Dose, which is sometimes taken to represent a probability of fatality of around 1% for an average population, but is generally taken to correspond to a level of harm which would cause: v Severe distress to almost everyone, or;

v A substantial fraction of the exposed population needing medical attention, or;

v Some people to be seriously injured, requiring prolonged treatment, or;

v Any highly susceptible people possibly being killed.

4. Atkins risk assessment 5090979: Land Use Planning Assessment

4.1. The Atkins gasholder risk assessment

Our review has considered the Atkins report ‘Land Use Planning Assessment of a Development adjacent to the Kennington Gas Holder’ dated March 2011. We have also undertaken a limited amount of independent research. We have not reviewed the proposed application. Our working assumption is that it is not possible to reduce the floor area of the exhibition hall to below 250m2. Such a change would, however, reduce the Sensitivity Level such that PADHI would be expected to return a DAA result. Our understanding from the Atkins report is that the proposed development is of PADHI Development Type DT 2.4. From the building area given in the report Atkins derive PADHI sensitivity level SL2. We agree with both of these findings based on the information in the Atkins report; however we do consider that part of the development could be considered as a Development Type 1.1 - Workplaces. Whilst this does not materially impact the PADHI process, it is important to recognise that some of the people present are employees and not the public. The development site is within the Inner Zones of two gasholders and is classified as being within that zone. For the purposes of PADHI assessment, any car parking and landscaping associated with a development is not assessed independently to the building; the building is assessed on its own merits and the car park and landscaping adopts this PADHI decision.

Page 9: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

6

Figure 2: Planning Application Drawing - proposed exhibition hall layout

With an SL2 development within the Inner Zone, HSE’s PADHI decision matrix will indicate “Advise Against”. The decision matrix within PADHI does not exhibit the shading shown in the Atkins report, however this shading is shown in the HSE document SPC/Tech/Gen/22, which was the document detailing HSE's call-in policy and procedure at the time of the Atkins assessment. This document has since been updated, and the update omits this matrix. The revised HSE policy is outlined in Section 4.3, below. The Atkins report is a balanced qualitative / semi-quantitative risk assessment. It argues that the zones are subject to a large uncertainty. The HSE zones are set on the basis of (as HSE classify it) “Cautious Best Estimate” (CBE). Others, including Atkins, might classify the HSE approach as “excessively cautious”. The Atkins report argues that, based on the Inspector's report from the RAM Brewery Inquiry, the frequency of 10cpm is “excessively cautious”, particularly when used together with consequence modelling which is also considered as “perhaps too cautious”. Our own understanding largely supports the Atkins approach. We believe that the basic physics of Gasholder failure is such that events of the type selected by HSE as the representative case for setting Consultation Zones cannot occur in normal operation. There is no doubt that major failures of Gasholders have occurred, and can occur again, but neither the frequency nor the consequences of the controlling event chosen by HSE - a grounded Fireball with a likelihood of 10 cpm per year - is credible in our opinion. We should caution, however, that HSE's CBE approach and modelling of the representative event has been accepted by Planning Inspectors at two separate Planning Inquiries, the latest being the RAM Brewery Inquiry, albeit on both occasions it

Page 10: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

7

was recognised that significant levels of caution had been applied in HSE's selection of both frequency and consequence. There is little doubt that if this planning application were to go to an Inquiry, the Planning Inspector and Secretary of State (SoS) would again be likely to agree with HSE's interpretation and application of PADHI.

4.2. What is the risk?

There is no argument that additional people working in and visiting the proposed development will increase the residual risk from the gasholder facility. The issue to be determined are whether that level outweighs the benefits of the development.

It is therefore appropriate for the Planning Authority to ask how strong this “Advise Against” is in order to balance an understanding of the strength of the AA against any known societal and economic benefits of the planning application. Atkins opinion, stated in their Risk Assessment, and which we agree with, is that even with the HSE set zones this is not a strong “Advise Against”. It is in the first block of “Advise Against” in the PADHI matrix but, given the binary nature of PADHI, this does not tell the full story. The inherent cautious best estimate nature of setting the HSE zones, and the existing land use around the gasholder lead to a reasonable conclusion that individual risks would remain largely unchanged and societal risks would be marginally increased by the presence of the superstore. Atkins support the latter conclusion with the calculation of Scaled Risk Integral for the site, which is one of the tests used by HSE to determine call-in for PADHI AA cases, and which Atkins show to be above HSE's “substantial risk” criterion, but well below HSE's call-in criteria. We agree with Atkins that there appear to be no issues arising from the major hazards present at this planning application which would be expected to automatically trigger a call-in decision by HSE. The HSE guidance which was in force at the time of the Atkins risk assessment (SPC/TECH/GEN/22) states: If the AA decision was based on a combination of SL and Zone that just gives an AA decision i.e. SL2 and IZ, SL3 and MZ or SL4 and OZ . . . a standard reply should be sent to the LPA . . . indicating that HSE will not ask for the case to be called in. No further action is required. This development is an SL2 and IZ, and thus, on the basis of the above, should not normally be considered for a call-in request. Since that date however, in August 2011, HSE published a new set of guidelines (SPC/TECH/GEN/45). This update (which was undertaken without any consultation) toughens up the guidance: removing the no call in if only one cell away advice and stiffening the test for applications in the SRI 500,000 to 750,000 range.

Page 11: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

8

Despite this change, and because we generally support the SRI calculations shown in the Atkins report which are far below the 500,000 trigger (see below) where HSE would “consider recommending call-in”: HSE has developed a method of assessing the degree of societal risk associated with a proposed development known as the Scaled Risk Integral (SRI). In appropriate cases HSE will apply SRI. Where the level of societal risk is substantial HSE will initiate its internal call-in procedure in order to give further consideration to the application. HSE will give the most serious consideration to the application where the level of societal risk is approaching intolerable such that development in the location would create serious public safety concerns. This would be cases where the SRI is between 500,000 and 750,000 which means that HSE will consider recommending call-in for cases of exceptional concern. Where the level of societal risk is so high that it is intolerable HSE will request call-in, this would be cases where the SRI exceeds 750,000.

The SRI in this case is expected to be between 100,000 and 200,000 (depending on

assumptions used), however the following comments2 regarding SRI have been made by

Martin Goose, who recently retired as the head of HSE's Major Hazards Assessment Unit:

It must be borne in mind that SRI can only be used in cases where HSE has carried an assessment of individual risk for the site in question. This is usually referred to as quantified risk assessment (QRA). Assessments using QRA are generally used for all toxic substances and some flammable substances where the hazardous effects, should there be loss of containment, are substantially directional. For most situations involving flammable substances, individual risk is not calculated and a system called the protection concept is used instead. SRI cannot be used as an aid to judgement in such cases.

Based on the above SRI quantum and commentary on the validity of SRI for judgement in cases such as this, we believe that it is again highly unlikely that HSE would request call-in for this development proposal.

4.3. HSE call-in policy (in further detail)

The following is taken from HSE's website (hse.gov.uk/landuseplanning/advice.htm): “In the last 30 years, HSE has only requested that five planning applications in England and Wales be called-in. In deciding whether or not to do this, HSE will consider a number of factors, including the type and size of the proposed development, and the numbers and type of people who will be exposed to the risk (is it a vulnerable population such as children, old people, etc?). HSE’s policy on deciding on potential call-in cases is contained in SPC/Tech/Gen/49.”

2 A Note on HSE's Use of Risk Integrals, Martin Goose, 2011

Page 12: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

9

The following has been extracted from SPC/Tech/Gen/49 (Version 1, 15 August 2011) to provide London Borough of Lambeth with further insight into HSE's policy and procedure when considering a call-in: Background . . . 6. It is an exceptional course of action for HSE to request that an application be called-in and it will only consider doing so in cases of exceptional concern or where important safety or policy issues are at stake. HSE will normally consider its role to be discharged when it is satisfied that the HSA/PA has given HSE’s advice the most careful consideration and it is acting in full understanding of that advice and the consequences that could follow. . . .

Call-in criteria 8. When a HSA/PA has informed HSE that it is minded to go against its advice, HSE will consider whether to request that the application be called in by the SoS or, as the case may be, the Welsh Ministers or Scottish Ministers. HSE will consider all relevant factors, but will treat the presence of any of the following criteria as a significant factor in favour of requesting call-in. Any significant residential development or development for vulnerable populations in the inner zone:

v Close to the major accident hazard such that the consequences to people from a major accident are very severe;

v ‘Significant residential development’ means three or more residential units, thereby placing 8-10 people at high risk;

v A vulnerable population would include the young (e.g. schoolchildren), the elderly (e.g. residents of a nursing home), or the infirm (e.g. hospital patients). These population groups would be more susceptible to harm from the hazardous substance and more at risk as they would be difficult to evacuate in an emergency.

The risk of death from a major hazard exceeds the Tolerability of Risk (TOR) tolerability limit for a member of the public.

v If this limit is ever reached or given the uncertainty in calculating risk values the risks are so high that the actual risk from the site could have crossed the TOR limit.

There are substantial numbers of people in the proposed development exposed to a significant level of risk

v HSE has developed a method of assessing the degree of societal risk associated with a proposed development known as the Scaled Risk Integral (SRI). In appropriate cases HSE will apply SRI.

v Where the level of societal risk is substantial HSE will initiate its internal call-in procedure in order to give further consideration to the application;

v HSE will give the most serious consideration to the application where the level of societal risk is approaching intolerable such that development in the location would create serious public safety concerns. This would be cases where the SRI is between 500,000 and 750,000 which means that HSE will consider recommending call-in for cases of exceptional concern;

Page 13: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

10

v Where the level of societal risk is so high that it is intolerable HSE will request call-in, this would be cases where the SRI exceeds 750,000.

The endangered population is particularly sensitive.

v For example, the young, the elderly or those under residential medical care.

It is a challenge to HSE’s risk criteria for land use planning. For example, where a HSA/PA repeatedly sets aside HSE’s advice, which would result in a cumulative increase in the population around a major hazard installation/pipeline.

4.4. Implications

If a development only just fails to meet the LUP criteria, the HSE would not normally call it in, provided that the LPA understands the reasons for the HSE's advice and has made an informed decision, balancing the risks against socio-economic benefits. Our research into gasholder events, including those cited by the HSE, leads us to the considered opinion that whilst it is self-evident that major events can occur at Gasholder sites, no events in the UK in the last one hundred years have caused fatalities, nor could any be realistically described or modelled as a fireball, much less a grounded fireball of the type used by the HSE for setting the latest LUP zones around gasholders. Below, we have expanded on some of the issues which we believe are pertinent to the understanding of the risks, or should be given particular consideration by London Borough of Lambeth in the decision making process: 1. It is highly unlikely that a gasholder will fail catastrophically and instantaneously

release 50% of the contents.

2. We also believe that any “sudden” loss of gas from a gasholder should not be represented as a concentrated mass of natural gas at ground level that can then be modelled as a fireball event, which is the HSE approach to determine the revised consultation distances.

3. A grounded fireball event would be expected to have severe consequences as a

result of the size of the fireball and also the high levels of thermal radiation associated with the fireball, yet it appears that none of the events found in literature exhibit such characteristic damage. It is therefore possible that events which might be described as a “rising fireball” in reporting the event have occurred, but the consequences of such events are far less than those modelled by the HSE.

4. Historical information on minor incidents and accidents of gasholders is probably vastly underreported. At face value, HSE data from the 1970’s through the 1990’s indicates that the likelihood of a release in the latter years is some ten-times that in the 1970’s, yet one might expect the Gasholders that have been retained to be those which tend to be in better condition. An implication of this is that reporting of incidents in the 1970’s (and, we assume, prior to this) was imperfect, presumably because these incidents did not lead to any harm or damage to people or property outside the Gasholder area.

Page 14: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

11

5. With a working assumption that ignited releases would probably be recorded, particularly for significant events, two conclusions can be inferred from this. The first is that any frequency of a small release which is based solely on historical data going back to the 1950’s, or before, may be optimistic. A second conclusion is that the likelihood of any release of gas leading to a flammable event (which are much more likely to have been reported than minor events) is exceptionally low, which implies that the probability of ignition given a release is also low. This is particularly so since the mid-1980’s, since when - to our understanding - there have been few records of seal fires from gasholders.

6. Qualitative improvements appear to have resulted in quantitative reductions in

major events: inspection and maintenance have been improved; the change from town gas to natural gas will have had some effect, though this is perhaps balanced by an increase in the number of ignition sources close to gasholders.

7. Many mechanical systems exhibit variable failure rates over time approximating to

what is termed a ‘bathtub curve’; the rate of failure just after commissioning and at the end of useful life will be significantly higher than the average. An argument could be put forward to show that significant failures which are recorded in the early 1900’s are as a result of ‘infant mortality’. Any installation (such as this gasholder site) which has successfully passed this infant mortality stage and is being well-maintained should exhibit a low failure rate.

8. A number of flammable events associated with gasholders in the early 20th Century

were caused by poor practices which would not be allowed today.

9. As an example, the mechanism of ignition for the most of the ignited events recorded by the HSE Brit Oval partial disclosure and found during the course of our own research would, in our opinion, and with the exception of high-energy knock-on events and terrorism events, all be prevented under the current regulations (e.g. DSEAR) intended to provide additional measures of safety in hazardous zones.

10. The frequency of gasholder failure and flammable gasholder events is therefore far lower than in the early years of the 20th Century.

11. As the proposed development should not affect the frequency or outcome of any event which might occur at the Gasholder site, the individual and societal risk levels to the existing, unchanged population groups will not be in any way affected by the development.

12. One way to look at risks is to divide them into two distinct types: voluntary and involuntary. Voluntary risks are undertaken with knowledge of the possible consequences. Before participating in such activities (flying across the country or scuba diving), people are aware of the chance of injury or death and accept the risk. In contrast, involuntary risks are those that are unwittingly taken or are outside the public's control. Examples of involuntary risk are exposure to air pollution or lightning strikes.

13. The HSE would generally advise against individual risk levels which would be significant compared to other risks to which they are exposed in everyday life.

Page 15: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

12

14. Table 4.1, below, is a comparison of the risk per annum of a “dangerous dose or worse” from the consultation zone controlling event at Kennington against the annual risk of death averaged over the entire population for more familiar risks, the latter being taken from the HSE website (HSE) with the exception of England and Wales homicide risk which was extracted from The Scottish Government website (The Scottish Government, 2000).

Table 4.1: Risk comparison (UK wide unless otherwise stated, italicised categories refer to the Chivas Brothers Beefeater Distillery development)

Cause Annual risk

Cancer (Fatality) 1 in 387

Injury & poisoning (Fatality) 1 in 3137

Road accidents (Fatality) 1 in 16800

Homicide (Fatality, England & Wales) 1 in 74627

Gas incident (Fatality) 1 in 1510000

Most Exposed Worker3 (Dangerous Dose) 1 in 1000000

Lightning (Fatality) 1 in 18700000

Typical Customer (Dangerous Dose) 1 in 20000000

Most Exposed Worker4 (Fatality) 1 in 100000000

Typical Customer (Fatality) 1 in 2000000000

15. We note from the HSE documents that LUP policy is to permit development where this might only cause a minimal increase in fatalities. This development would appear to fall within that criterion.

16. This development will increase the residual risk at Kennington, but the likely

individual risk is low and the associated increases in societal risk are likely to be marginal, and should be considered by the LPA against the social and other benefits of this development.

17. A summary of desirable design features includes:

v Restrict usage of open spaces / roof terraces; v Minimise window openings facing gasholders; v Specify shatterproof and thermal glass for windows facing gasholders; v Ensure adequate provision is made for evacuation away from the gasholders in

the event of minor events and fires.

4.5. Conclusions

Although there is no evidence that the Kennington gasholder is unsafe, it is incumbent on the developer to demonstrate, first, that the proposed development does not substantially increase the residual risk and, secondly, provide the LPA with sufficient

3 Dangerous dose or worse; assumes an occupancy of 1. 4 Based on the HSE model that a dangerous dose equates to 1% fatality probability.

Page 16: Peer review of the Atkins risk assessment for the proposed

PEER REVIEW OF RISK ASSESSMENTS IN RESPECT OF GASHOLDER LUP January 16, 2012

13

information to allow the safety issues to be balanced against the socio-economic benefits. Having reviewed the document, discussed it briefly with Atkins, and tested it against our own knowledge of gasholder Land Use Planning, we have confidence in stating that the Risk Assessment by Atkins is adequate to fulfil this purpose. We agree with Atkins that there is should be no more than a very low likelihood - based on the known criteria that HSE states it uses - that this proposed development will result in a call-in request by HSE on safety grounds.