Vol 6 Figure 5.4.10for PEIR
Main TunnelTBM Groundborne Noise Contours
- Frogmore Connection Tunnel
ThePoint,7thFloor,37NorthWharf Road,Paddington, LondonW2 1AF
Thames Water Utilities
Legend
Frogmore Tunnel TBM GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
2/12
Vol 6 Figure 5.4.11for PEIR
Main TunnelTBM Groundborne Noise Contours
- Greenwich Connection Tunnel
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Greenwich Tunnel TBM GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
3/12
HAMMERSMITH & FULHAM
HOUNSLOW
EALING
RICHMOND UPON THAMES
Vol 6 Figure 5.4.12for PEIR
Main TunnelTCR Groundborne
Noise Contours
Title:
Map Ref : ........................ .... 1PL03-NV-40029Date : .............. .............. ...... 2011/10/17Projection : ............... ........... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. (c) Crown copyright and database right 2009.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,Paddington, London W2 1AF
Thames Water Utilities
Legend
Local Authority Boundary
Main Tunnel TCR GBN
25dB
30dB
35dB
40dB
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vol 1-6 Figures Part 3
4/12
Vol 6 Figure 5.4.13for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
5/12
WANDSWORTH
HAMMERSMITH & FULHAM
Vol 6 Figure 5.4.14for PEIR
Main TunnelTCR Groundborne
Noise Contours
Title:
Map Ref : ........................ .... 1PL03-NV-40031Date : .............. .............. ...... 2011/10/17Projection : ............... ........... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. (c) Crown copyright and database right 2009.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,Paddington, London W2 1AF
Thames Water Utilities
Legend
Local Authority Boundary
Main Tunnel TCR GBN
25dB
30dB
35dB
40dB
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vol 1-6 Figures Part 3
6/12
Vol 6 Figure 5.4.15for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
7/12
Vol 6 Figure 5.4.16for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
8/12
Vol 6 Figure 5.4.17for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
9/12
Vol 6 Figure 5.4.18for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
10/12
Vol 6 Figure 5.4.19for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
8/3/2019 PEIR_Vol 1-6 Figures Part 3
11/12
Vol 6 Figure 5.4.20for PEIR
Main TunnelTCR Groundborne Noise Contours
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
Main Tunnel TCR GBN
L
8/3/2019 PEIR_Vol 1-6 Figures Part 3
12/12
WANDSWORTH
HAMMERSMITH & FULHAM
Vol 6 Figure 5.4.21for PEIR
Frogmore Connection TunnelTCR Groundborne
Noise Contours
Title:
Map Ref : ........................ .... 1PL03-NV-40101Date : ............ .............. ........ 2011/10/13Projection : .............. ............ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
DRAFT
&CONFIDEN
TIAL
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
WORK IN PROGRESSLegend
Local Authority Boundary
Frogmore Tunnel TCR
dB
25dB30dB
35dB
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.