Pelton turbines – horizontal

Pelton turbines – horizontal - koessler.com · Pelton turbines – horizontal. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x PH1c-700/160 Output: 2 x 1489 kW Head: 711 m Speed:

Embed Size (px)

Citation preview

Pelton turbines –horizontal

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH1c-700/160Output: 2 x 1489 kW Head: 711 mSpeed: 1500 min-1Year: 2010Country: Switzerland

BIASCA

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH1c-1400/185Generators Output: 2 x 3546 kW Inlet valves Head: 1147 mHydraulic governors Speed: 1000 min-1Erection and commissioning Year: 2009

Country: Turkey

CAKIRMAN

GLAFKOS

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH2C-1100/330Inlet valves Output: 2 x 2922 kW Hydraulic governors Head: 266 mErection and commissioning Speed: 600 min-1

Year: 2008Country: Greece

AGORIANI

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2c-792/210Generator Output: 1990 kW Inlet valve Head: 377 mHydraulic governor Speed: 1000 min-1Erection and commissioning Year: 2005

Country: Greece

KATHARO

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH2-780/240Inlet valves Output: 2 x 515 kW Hydraulic governors Head: 130 mErection and commissioning Speed: 600 min-1

Year: 2005Country: Greece

KATARAKTIS

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x PH2c-680/210Generators Output: 2 x 1205 kW Inlet valves Head: 274 mHydraulic governors Speed: 1000 min-1Erection and Commissioning Year: 2005

Country: Greece

SCHWARZENBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2c-780/240Generator Output: 327 kW Inlet valve Head: 93 mHydraulic governor Speed: 500 min-1Intake equipment Year: 2005Erection and commissioning Country: Austria

ALTOFFA - Drinking water plant

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PHc1-650/65Shut-off valves Output: 163 kW Generator Head: 544 mBypass-system Speed: 1500 min-1Electrical equipment Year: 2003Erection and commissioning Country: Austria

SCHILD

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2c-1060/115Inlet valve Output: 1055 kWHydraulic governor Head: 677 mErection and Commissioning Speed: 1000 min-1

Year: 2002Country: Switzerland

GAZILER

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 3 x PH2c-1150/355Inlet valves Output: 3 x 3739 kW Governor system Head: 284 mGenerators Speed: 600 min-1Electrical equipment Year: 1999Erection and commissioning Country: Turkey

SEEWIGTALBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2-860/180Inlet valve Output: 1716 kW Hydraulic governor Head: 437 mIntake structure Speed: 1000 min-1Erection and commissioning Year: 1999

Country: Austria

GUMPENBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: PH2-770Inlet valve Output: 1314 kW Digital turbine controller Head: 372 mHydraulic governor Speed: 1000 min-1Steel structure Year: 1993Erection and Commissioning Country: Austria