S.No
1 Mr.Raja Jan'11
S.No Points Discussed
1 Mr. Raja Jan'11
2 Mr.Raja Jan'11
3 Jan'11
4 Feb'11
o n s scussewith Mr.Sanjay
Responsibility
Timeline
Feasibility checking of Removing adhesivesin Sticky mat by eco
friendly chemicalinstead of Aqua Regiamethod
Responsibility
Timeline
r a s or e uc ngtwo melting for 9999-
Excess purity fromRecall products
Bulk scale goldrecovery from FingerStall by usingIndustrial WashingMachine
Mr.Raja/Mr.Meenakshisundaram
Gold loss reductionby using Titaniumcrucibles for Melting
Mr.Meenakshi
/Mr.Raja
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 2/17
Status
Status
Second batch, Goldrecovery process will becirculated by 22-01-11 and
Trials on eco friendlymethod, is going on
Bulk scale trials are goingon
ree me t ng are
completed and Finalconclusion will becirculated before an'11
It will be completed by thismonth end
Feasibility has to be
checked
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 3/17
S.No Responsibility
1
S.No Points Discussed Responsibility
1 Mr.Vajravel Raja
2 Mr.Maarajan
Points Discussed withMr.Sanjay Ranawade
Gold loss reduction throughexcess karatage bymaintaining 91.705 % purity
for 22 kt Ingots from 91.71 %urit .
Mr.Pathy/Mr.Vajravelraja
Effective collection of Wetdesprueing dust using Mats
drawing for making Wetdesprueing area as model
work place
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 4/17
Status
Mar'11
Status
Jan'11
Jan'11
Time line
Trials aregoing
Time lineeas y
has to be
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 5/17
S.No Time line
1 Jan'11
S.No Points Discussed Time line
1 Jan'11
2 Mr.Meenakshi Feb'11
o n s scussewith Mr.Sanjay
Responsibility
Input gold which iscoming from bankhas to be
checked/Analyzedbefore rocessin
Mr.MeenakshiSundaram
Responsibility
Gold loss study in ICPmachine will becompleted by Mr.
Meenakshi Sundaramwithin 11-09-10.
Mr.Meenakshi
sundaram
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 6/17
Status
Status
It will be completedby this month end
Due to ICP machinebreak down, it’s
will be completedby this month end
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 7/17
S.No Time line
1 Mr.TG Mar'11
2 Mr.TG Jan'11
3 Mr.TG Mar'11
4 Mr.TG Feb'11
S.No Points Discussed Time line
1 Mr.TG Feb'11
2
o n s scussewith Mr.Sanjay
Responsibility
System for checkinggold content inRefining Effluent
Experts view on Goldloss reduction
Stage wise goldaccounting atRefining area
Critical Processvalidation
/understanding at alldepts. for reducingthe Gold loss
Responsibility
Training Program for
CFT Members
Consolidation of Support which isrequired from
Technology cell
Mr.TG/Mr.Kanthanathan
28/01/2011
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 8/17
Status
Yet to be started
Status
scuss on e weenRefining team isplanned before 22-01-
11n a y w eexplored with Internal
It will be discussedwith Refining teamwithin 22-01-11
as een scussewith Mr.KSS and its
planned before thismonth end
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 9/17
S.No
1 Mar'11
o n s scussewith Mr.Sanjay
Responsibility
Timeline
Gold loss reductionthrough excess
karatage bymaintaining 91.705 %purity for 22 kt Ingotsfrom 91.71 % purity.
Mr.Pathy/Mr.Vajravelraja
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 10/17
Status
Trials aregoing
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 11/17
S.No Status
1 Jan'11
S.No Points Discussed Status
1 Mr. Senthil Jan'11 Pending
o n s scussewith Mr.Sanjay
Responsibility
Timeline
One model BenchWork table atDownstream with
Effective dustcollection
Mr.Senthil/Mr.Balu
Ongoing
Responsibility
Timeline
Feasibility of Mechanized cheppalcleaning
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 12/17
S.No Time line
2 Mr.Raja Jan'11
3 Mar'11
4 Mr.TG Mar'11
5 Jan'11
6 Mr.TG Jan'11
7 Jan'11
8 Mr.TG Mar'11
9 Mr.TG Feb'11
o n s scussewith Mr.Sanjay
Responsibility
Feasibility checking of Removing adhesivesin Sticky mat by eco
friendly chemicalinstead of Aqua Regiamethod
Gold loss reductionthrough excesskaratage bymaintaining 91.705 %purity for 22 kt Ingotsfrom 91.71 % purity.
Mr.Pathy/Mr.Vajravelraja
System for checkinggold content inRefining Effluent
Feasibility of goldrecovery from AHUduct
Mr.Kanthanathan/Mr.Raja
Experts view on Goldloss reduction
Work table atDownstream withEffective dustcollection
Mr.Senthil/Mr.Balu
Stage wise goldaccounting atRefining area
Critical Processvalidation/understanding at alldepts. for reducingthe Gold loss
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 13/17
10 Jan'11
11 Jan'11
S.No Points Discussed Time line
1 Jan'11
2 Mr.TG 13/01/2011
3 Mr.Raja Jan'11
4 Jan'11
5 Mr. Senthil Jan'11
6 Mr.TG Feb'11
7 Mr. Raja Jan'11
coming from bankhas to bechecked/Analyzedbefore processing
Mr.MeenakshiSundaram
collecting suspended
particles at shopfloor.
Mr.Senthil/Mr.
Kanthanathan
Responsibility
Gold loss study in ICPmachine will be
completed by Mr.Meenakshi Sundaramwithin 11-09-10.
Mr.Meenakshisundaram
Discussion with SMTfor
1. Wearing Cap atinside the shop floor
2. Reducing no of
personal jewels @shop floor
people
Gold Recovery fromVinyl Sheet
Cleaning the entireAHU system
Mr.Kanthanathan/Mr.Raja
Feasibility of
Mechanized cheppalcleaning
Training Program forCFT Members
two melting for 9999- ingots
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 14/17
8 28/01/2011
9 Mar'11
10 Mr.Raja Jan'11
11 Jan'11
12 Jan'11
13 Feb'11
14 Mr.Maarajan Jan'1115 Mr.Meenakshi Feb'11
Consolidation of Support which isrequired from
Technology cell
Mr.TG/Mr.Kanthanathan
Gold Loss due to
excess karatage
Mr.Pathy/Maa
rajan
Excess purity fromRecall products
recovery from FingerStall by usingIndustrial WashingMachine
Mr.Raja/Mr.Meenakshisundaram
Effective collection of Wet desprueing dustusing Mats
Mr.VajravelRaja
Gold loss reductionby using Titaniumcrucibles for Melting
Mr.Meenakshi/Mr.Raja
drawing for makingWet desprueing area
as model work place Comparison
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 15/17
Status
Trials are going
On going
Yet to be started
Second batch, Goldrecovery process will becirculated by 22-01-11and Trials on eco friendlymethod, is going on
Discussion betweenRefining team is plannedbefore 22-01-11
1.6 gm of pure gold isrecovered from 3 ductsand all the ducts will becleaned within Jan'11
Initially It will be exploredwith Internal experts
It will be discussed withRefining team within 22-01-11
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 16/17
Status
Its planned on 29-01-11
Pending
It will be completed bythis month end
It will be completed bythis month end
Due to ICP machine break
down, it’s will becompleted by this monthend
SMT meeting is plannedbefore 31-01-11
will be circulated by 22-01-11
with Mr.KSS and itsplanned before this
month end
Bulk scale trials are goingon
8/7/2019 Pending activities
http://slidepdf.com/reader/full/pending-activities 17/17
Trials are going oncompleted and Finalconclusion will becirculated before Jan'11
It will be completed bythis month end
Feasibility has to bechecked
Feasibility has to bechecked