PENNANT HILLS PARK
CONCEPT PLANMAY 2021SHEET 1 OF 4
PEDESTRIAN PATH MASTERPLAN
Council is planning to enhance the pathway connectivity at Pennant Hills Park. Potential pathway connections at various locations within the park have been identifi ed.
The works are envisioned to be undertaken in 2021, 2022 and in future years, based on funding availability.
The proposed pathways will provide:
• A network of safe pedestrian pathways connecting sports facilities, parking, and buildings.
• A section of existing informal parking along the road is proposed to be upgraded to paved parallel parking.
• The provision of safe pathways will result in loss of approximately eight parking spaces along the southern side of the road near the tennis courts. The improved path connections from other existing car parking areas will enable better connectivity to the tennis and netball facilities.
• Existing mature trees are proposed to be retained as part of these works.
• The paths will provide separation between pedestrians and vehicles.
• Traffi c calming measures such as additional speed humps and traffi c signs will be introduced.
Project Description
PEDESTRIAN PATH MASTERPLAN
Refer to Page 2
PENNANT HILLS PARK
CONCEPT PLANMAY 2021SHEET 2 OF 4
PROPOSED PATHWAYS AT NETBALL AND TENNIS COURTS
LEGEND
Roads
Unpaved Parking to be Paved
Existing Pathways
2021Planned Pathways (2.5m Wide)Planned Pathways (1.5m Wide)
2022 Planned Pathways
FuturePathway Works Subject to Funding
Availability
Loss of Approx. Eight Parallel Car Parking Spaces
TO PENNANT HILLS STATION
Pennant Hills Oval 3 Synthetic Field
Netball Courts
Tennis Courts
PENNANT HILLS PARK
Indoor Netball
Tennis Courts
Tennis Courts
Tennis Courts
Existing Parking
Existing Parking
Existing Parking
N
TO ADDITIONAL
PARKING
TO ARCHERY & HOCKEY FIELDS
NORTH
0 10 20 30 40 50 m
Existing pathway terminates at parking entrance near netball complex
View of parking and road interface View of substation at netball exit road View of netball exit road View of unpaved parking along the road connecting netball and tennis courts
Missing speed hump to be reinstalled
Entry to tennis building and carpark
Existing approx. 8 car parking spaces will be removed PLAN - PROPOSED PEDESTRIAN PATH CONNECTIVITY
SITE IMAGES
Netball/Tennis Pathway Works For 2021/2022
The proposal includes connecting paths with netball and tennis facilities. The proposal will be implemented in two stages;
STAGE 1The fi rst stage in 2021 involves the construction of new pathways near the existing carpark at the netball and tennis courts. This pathway is proposed to be extended along the existing path from Pennant Hills Oval 3 (Synthetic Field) to the netball courts.
The proposal also includes reinstalling the speed hump that was previously removed near Oval 3 and proposing an additional speed hump at the entrance road to Oval 3. Two speed limit signs are proposed as part of traffi c calming measures.
A second pathway is proposed at the southern side of tennis court overfl ow parking to the existing pathway network.
STAGE 2The second stage involves works in 2022 along the north-eastern side of the road connecting the netball and tennis carparks. The proposal involves upgrading the existing section of unpaved parallel parking to paved parking and a separate pedestrian path.
Approximately eight parallel car parking spaces will be removed to ensure safer pedestrian movement is achieved.
11
1
2
1
2
PENNANT HILLS PARK
CONCEPT PLANMAY 2021SHEET 3 OF 4
PROPOSED PATHWAYS AT NETBALL AND TENNIS COURTS
PLAN (STAGE 1) - PROPOSED PATHWAY CONNECTIVITY ALONG NETBALL STREETSCAPE
SECTION AA’ - CROSS SECTION OF PATHWAY ALONG STREETSCAPE AT NETBALL
SECTION BB’ - CROSS SECTION OF PATHWAY ALONG STREETSCAPE AT TENNIS COURTS
PLAN (STAGE 2) - PROPOSED PATHWAY CONNECTIVITY ALONG TENNIS COURT STREETSCAPE
1
2
A
A’
B
B’
Existing Pathways
2.5m Wide Proposed Pathway (Stage 1)
1.5m Wide Proposed Pathway (Stage 1)
1.5m Wide Proposed Pathway (Stage 2)
Proposed Paved Street Parking (Stage 2)
Surface Drain to be Upgraded (Stages 1 & 2)
LEGEND FOR PLANS:
EXISTING ROAD
EXISTING ROAD
PROPOSED PATH
PROPOSED PATH
PROPOSED PAVED STREET PARKING
EXISTING PARKINGSURFACE DRAIN TO BE UPGRADED
SURFACE DRAIN TO BE UPGRADED
TIE-IN TO EXISTING LANDSCAPE
TIE-IN TO EXISTING
LANDSCAPE
TIE-IN TO EXISTING
BUSHLAND
EXISTING PARKING DRIVEWAY
2% Slope
2% Slope
EXISTING PARKING
TENNIS COURTS
NETBALL COURTS
ENTRY NETBALL & PARKING
EXITNETBALL & PARKING
EXISTING ROAD
ENTRY / EXITTENNIS & PARKING
TENNIS COURTS
TENNIS COURTS
EXISTING ROAD
6.0m 2.0m 0.5m 5.5m0.6m
6.0m 2.3m 1.5m0.6m
PENNANT HILLS PARK
CONCEPT PLANMAY 2021SHEET 4 OF 4
PEDESTRIAN PATH MASTERPLAN
LEGEND
Roads
Parking
Buildings
Existing Speed Limit Signage (1 No.)
Proposed Speed Limit Signages (2 Nos.)
Existing Speed Hump Locations (3 Nos.)
Existing Speed Hump Signage
Proposed Speed Hump Locations (2 Nos.)
Proposed Speed Hump Signage
Britannia St.
Pennant Hills Oval 1
Pennant Hills Oval 2
Pennant Hills Oval 3
Synthetic Field
Netball Courts
Hockey Field
ArcheryField
Tennis Courts
Kurrajong St.
PENNANT HILLS PARK
Britannia St.
TO P
ENNANT
HILLS S
TATI
ON
Indoor Netball
LANE COVE NATIONAL PARK
Service Road
2
2
3
3
4
4
5
5
1
1
NORTH
0 25 50 75 100 m
Traffi c calming measures such as speed humps and speed limit signs are proposed to be implemented in 2021.
Two additional speed humps are proposed, one near the Oval 3 entrance road and the second one at the Oval 3 south-west side (the second hump previously existed but was not reinstated after the previous road improvements).
Only one speed limit information sign is present in the park. Two more speed limit signs are proposed to make the park users aware of the traffi c speed regulations.
These additional traffi c calming measures will improve the pedestrian safety.
Traffi c Calming Measures
TRAFFIC CALMING MEASURES