Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
RDA
M
L
L
P
METERI
RRFP IssuancDepartment Advertisemen
Mandatory C
atest Date/T
atest Time/D
Proposal Due
Attac
PERAL
NG INSTALLA
RFP Servicee Date
nt Dates
ampus Site
Time For Su
Date for Sub
e Date
chment No. A B C D E F G H I J K L
L-1
LTA COMM
ATION & IMPLRF
RFP ACTes Descript
Observation
bmittal of RF
bmittal of RF
RFP A
ProposalQualificatiNon-ColluCertificateSubcontraDIR RegisEnvironmeNon-DiscrAgreemenLabor & MPerformanProject LaPLA Lette
UNITY COL
LEMENTATIONFP NO.15-16/2
IVITIES SCHion
ns
FP Question
FP Response
ATTACHME
De
ons Statemeusion Affidave of Workersactors List stration Verifentally Sustariminatory Emnt Materials Paynce Bond abor Agreemer of Assent
LLEGE DIST
N OF MBCx M27
HEDULE
WednPurchWednWednDate Campper R
ns 4:00 Pthree date fRespo
es 4:30 PTuesd2:00 PMond
ENTS
escription
ent vit s Compensa
fication ainable Procmployment P
yment Bond
ment
TRICT
EASURES PR
Date nesday, Marchasing Depanesday, Marcnesday, Marcand time for
pus Site ObsRFP, ParagraP.M. (3) days bef
for submittalonse PM day, April 19PM
day, April 25,
ation Insuran
curement PoPractices
ROJECT
ch 23, 2016artment ch 23, 2016ch 30, 2016r each servation aph 1.6
fore latest l of RFP
9, 2016
, 2016
nce
olicy
Metering Insta April 25, 2016
The PeraltaEnergy MaRespondent 1. RFP
1.1. Met1.1.1.
1.1.2.
1.1.3.
1.2. Dist
(i) (ii) (iii)(iv)
(v)
allation & Imple
a Communitynagement Sts’ qualificat
ter EquipmeEquipmentinstall theitems/serviAgreementand incorpand implem Equipment monitoring other relatCollege, Minclude buiThe selectewith Meterarchiving, ainstallation MBCx musEquipment monitoring/requiremenGovernmen“Conservatand the AgGovernmenGovernmenproposed, t
trict RFP Ob
ConnecInstall n
) Calibrat) Provide
new meEnsure 2-10-16(MBCx)(Califordemonsperformthat are
ementation of M
y College DSystem (EMions and inc
nt and MBC. The Resp
e complete ces (collectit for Meter orated into t
mented in se
Capabilitiessystem for ted data at erritt Collegelding kWh, hed firm musr Equipmenand retrievalof the Mete
st [describeproposed
/reporting/mnts. nt Code §42tion Measuregreement isnt Code §42nt Code §42the cost to th
bjectives. By
ct all buildingnew BTU, nate existing Ee and instaleters that the bui
6), are prope) program. rnia Commstrate expe
mance of inse similar to th
MBCx Measure
District requeMS) subject corporate pro
Cx Equipmenpondent sele
Meter Eqvely “EquipmEquipment/Mthis RFP. M
eparate phas
s. The Equthe District tspecific fac
e and the Diheating hot wst deliver a ct that provil of energy per Equipmene basic ca by eachanagement
217 et. seqes” as that te an “Energy217.11(f). T217.16, basehe District a
y this RFP, t
gs with existatural gas anElectric Metel a new fron
ldings, listederly meteredThis MBCx
munity Colleerience in stalling energhe Equipme
es Project
ests organizto this RF
oposals for c
nt. ected pursuaquipment ament”) in acMBCx ServMeter Equipses.
uipment subto meter andcilities at itsistrict. The ewater energcomplete (tuides easy a
performancent, the selecapabilities/fuh Respondsystem me
. The equierm is used y Service CThe successed on experind other fac
the District’s
ing electricand electricityers nt end to the
d in Table 1 d in preparaprogram is
eges/Investocomplying
gy conservant.
PERALT
zations qualFP to submcompleting t
ant to this Rand MBCx ccordance wices & Equment and M
bject to thisd collect enes four locatienergy moniy and chilledurnkey) webaccessibility
e, at the whocted firm willunctions].Tdent must eeting the D
ipment and and defined
Contract” as sful Responience of the
ctors set forth
s primary goa
al sub-metersy meters
e existing EM
(See attachation for the
approved aor Owned
with CCation equipm
TA COMMUNI
ified to provit response
the Services
RFP will be rEquipment
with the termsipment (“Ag
MBCx Equipm
s RFP must ergy consumions: Collegitoring for thd water eneb-based eney, tracking, ole building lel install the
The Meter Eprovide
District’s ope
services sud in Governm
that term isndent will be contractor, h in this RFP
als are;
s to the Met
MS to conne
hed file Perae monitoring and adminis
Utility). C/IOU req
ment for CC
TY COLLEGE
vide and coes which ess.
required to pt along ws and condit
greement”) ament must b
provide a mption trend, ge of Alamee Meter Equrgy (where a
ergy monitorproblem invevel. Upon MBCx measEquipment a seamles
erational and
ubject to thiment Code §s used and e selected pthe type of
P.
ter Equipmen
ect all the e
alta Meter Libased com
stered by theResponde
uirements CC/IOU reba
Page|2
E DISTRICT
omplete the stablish the
provide and ith related tions of the attached to be installed
web-based usage and
eda, Laney uipment will applicable). ring system vestigation, completing
sures. The and MBCx ss energy d functional
is RFP are §4217.11(c)
defined in pursuant to technology
nt
existing and
ist for SOW mmissioning e CCC/IOU ents must and prior
ates/funding
Metering Insta April 25, 2016
1.3. Pro39).conschThecon
1.4. Distto tRFP
1.5. Obt
ConOppResrou
1.6. Man
Equwithaffeimpothecamentatte
L
M
C
D
allation & Imple
p. 39. Fund. Responservation meduling requ
e selected firtractor, and
trict RFP Cohe District RP shall be in
SPP5O(5s
taining RFPntact. Theportunities” tspondents tinely chec
ndatory Camuipment andhin a campecting price pacts of site er materials
mpus obserirety of eac
end all man
CamLaney College
Merritt College
College of Alam
District
ementation of M
ds for the Eqndents musmeasures, inuirements form must alsfor the Distr
ontact. QueRFP Contac writing and
Seraphine NzPurchasing BPeralta Comm
01 5th AvenuOakland, Cal510) 466-72nzomo@per
. The RFP RFP maytab, then “Lwho have king the Dis
mpus Site Obd MBCx Equs are critior scheduleconditions rprovided by
rvation tourch campus odatory cam
mpus
meda
MBCx Measure
quipment arest demonstrncluding witor the Districso complete rict.
estions or othct set forth b
transmitted
zomo Buyer munity Colleue ifornia 946055 ralta.edu
P may be oy also be oList of Curre
obtained strict’s Purc
bservations.uipment inscal for Res
e. No adjusreasonably oy or on behas at the follobservation
mpus observ
DThursday11:00 AM
Thursday2:30 PM
Thursday1:00 PM
Thursday10:00 AM
es Project
e derived frorate experihout limitatict to secure and submit
her communbelow. All cby email, U
ege District
06
btained fromobtained onnt RFPs/Bidthe RFP;
chasing De
A completestallations atspondents’ stment is alobservable oalf of the Diowing date
n tour; the Rvation tours
Date/Time y, April 07, 201M
y, April 07, 201
y, April 07, 201
y, April 07, 201M
PERALT
om the Califoence with ion, compliaProp 39 fun all required
nications relcommunicatS Mail or fax
m the Distrin-line at wwds.” The DiResponden
epartment w
e understandt each camfull understllowed undeor reasonabistrict. The
es and timesRFP Respos.
16 Building900 FallOakland
16 Huey P.12500 COakland
16 Building555 RalAlameda
16 Departm333 EasOakland
TA COMMUNI
ornia Clean implement
ance with rnding allocad Prop 39 re
ating to thistions to the x. The Distr
ct by requeww.peralta.eistrict will nnts are so
web site for
ding of the cmpus and eatanding of ser the Agreely inferable District wil
s. Respondnse of a Re
Meeting Lg E, ground levelon Street d, CA. 94607
. Newton LoungCampus Drive d, CA. 94619
g A ph Appezzato a, CA. 94501
ment of Generast 8th Street d, CA. 94606
TY COLLEGE
Energy Jobing Prop 3
reporting, auated for the Eeports, for its
s RFP shall District rela
rict RFP Con
est to the Dedu, in the not maintai
olely respoaddenda to
conditions foach designasite conditioement for coby data, infoll conduct mdents must esponse wh
Location el
ge
Memorial Pkw
al Services
Page|3
E DISTRICT
s Act (Prop 39 energy uditing and Equipment. self, as the
be directed ating to this ntact is:
District RFP“Business
in a list of onsible for o this RFP.
or the Meter ated facility ons factors ost or time ormation or mandatory attend the
ho failed to
y
Metering Insta April 25, 2016
1.7. Refconare
1.8. RFP
notereseacti
1.9. Res
com1.9.1
1.9.2
1.10. Eset
1.10.
1.10.
1.10.
2. Equipm
College (i) (ii)
allation & Imple
ference Matnection withnot infallible
P Activities; ed in the coerves the ivities.
spondent Qumply with the. Contract
be licensElectricaperforma
. DIR RegResponsDepartmmust coVerificati
Equipment Iforth in this 1. PLA Lett
AgreemeCouncil (AttachmeRespondthe Lette
2. PrevailinprevailingCode §1Californiathe WorkWAGE http://wwa copy oLabor Coof Industand enfo
3. Labor & required penal sushall be Admitted
ment. The Eof AlamedaMeter EquipMBCx.
ementation of M
terials. Theh this RFP: Be. Responde
Timeline. over page oright to m
ualifications.e following toors’ Licensesed by the l contractor
ance under tistered Con
se and at allent of Indusmplete andon incorpora
nstallation RRFP, Equipmter of Assenent between(“PLA”). A cent L. Attacdents must ter of Assent wg Wage Rag wage rate1773, the Da has determk is to be p
SCALE” ww.dir.ca.govof all applicaode. Duringtrial Relation
orce the ConMaterials Pto obtain a m of each Bin the form a
d Surety.
Equipment islocations. E
pment
MBCx Measure
e following Building pla
ents must ind
The RFP aof this RFPodify the R
. In additiono be deemede. PursuantContractorsat the time he Agreemetractor. Eacl times durin
strial Relation submit witated into this
Requirementment installa
nt. Performa the District
copy of the Pchment L-1thoroughly rewith their RFtes. Labor
e for the clasDirector of tmined the gperformed.
are av/dlsr/statistible prevailin the Work ans shall motractor’s pre
Payment BoLabor & Ma
Bond being and content
s for specificEquipment i
es Project
materials ans and drawdependently
activities andP. The foreRFP activit
n to other red qualified fot to Public C’ State Liceof submittin
ent. ch Respondeng performans (“DIR”) puth their RFs RFP.
ts. In additation is subjeance under tt and AlamePLA and amto this RFP eview the PFP Responsfor Equipme
ssification ofthe Departmenerally preCopies of
available cs_research
ng wage ratend pursuant
onitor complievailing wageond; Performaterial Paym100% of theincluded wit
c facilities onstallation m
PERALT
are availablwings with my verify the in
d schedule egoing notwties and/or
equired quaor award of tContract Codense Board ng the RFP
ent must bence under tursuant to LP Respons
ion to Equipect to the folthe Agreem
eda County mendments th
is the LettePLA and musses. ent installatif labor proviment of Indevailing rates
these deterfor revie
h.html. The es at conspict to Labor Coiance with pe rate obliga
mance Bondment Bond ae Contract Pth this RFP
on the Districmust be com
TA COMMUNI
e for reviewmeter locationformation.
for completwithstanding, r schedule
alifications, ethe Agreemede §3300, eas a B-GenResponse a
, at the timehe Agreeme
Labor Code §ses the form
pment confollowing requent is subjeBuilding anhereto are aer of Assentst include a
on shall be ded. Pursu
dustrial Relas of wages rminations, ew on successful cuous locatiode §1771.4prevailing wations d. The sucand a PerforPrice under t
and shall be
ct, Laney Completed in two
TY COLLEGE
w by Respons. The bui
ting RFP acthe Districtfor compl
each Responent. each Responneral Buildinand all at tim
e of submittinent, registere§1773.3. Rem of DIR R
orming to reuirements. ect to the Prod Construct
attached to tt described iduly execut
paid not lesuant to Califoations of thin the localientitled “PR
the inteResponden
ions as requ4(a)(4), the D
wage rate re
cessful Resrmance Bonthe Agreemee issued by a
ollege, Merro sequential
Page|4
E DISTRICT
pondents in ilding plans
ctivities are t expressly eting RFP
ndent must
ndent must ng or C-10 mes during
ng the RFP ed with the espondents Registration
quirements
oject Labor tion Trades this RFP as in the PLA. ted copy of
ss than the ornia Labor e State of ity in which REVAILING ernet at
nt shall post uired by the Department quirements
spondent is nd, with the ent. Bonds a California
ritt College, l phases:
Metering Insta April 25, 2016
2.1. Equfaci
2.2. Cam
interela
2.2.1
2.2.2
2.2.3
allation & Imple
The followinwith constra
uipment and lities noted i
Building No. 1 2 3 4 5 6 7 8 9
10 11 12 13 14 15
mpus Descriended to be ated utility se. District.
Administ
. College buildingsconferenFifteen (1which is switchboThe HVAdirect excampus primary lsystem.
. Laney Coclassroommechanielectrical480V/277C to distis genera
ementation of M
ng generally aints and oth
Campus Fain Table 1 be
TabCamp
Merritt CollMerritt CollMerritt CollMerritt CollLaney CollLaney CollLaney CollLaney CollLaney CollLaney CollLaney CollCollege of College of District District
iptions. A brsummary in
ervices equipThe District
tration Buildi
of Alamedas with clasnce rooms. M15) KVA ele
then transfoard located AC system xpansion cofrom a centoop that serIt also has a
ollege. The ms, laboratocal spaces, l service is s7 (3- phase ribution panally compris
MBCx Measure
describes thher requirem
acilities. Theelow.
ble 1; PCCDpus
lege lege lege lege ege ege ege ege ege ege ege Alameda Alameda
rief descriptin nature. Tpment subjet location cng.
. The Collessrooms, laMechanical ctrical servicformed 480at Building Cis generallyoling or no tralized heatrves all buildan adjacent
Laney Colleories, genera library bu
supplied to 4-wire) and
nels located ed of air ha
es Project
he Equipmeents for com
e Equipment
D EquipmenBuilding
Merritt ColleMerritt ColleMerritt ColleMerritt ColleLaney ColleLaney ColleLaney ColleLaney ColleLaney ColleLaney ColleLaney ColleCOA - BuildCOA - LibraDistrict AdmPhysical Pla
ion of each cThe conditionct to the Equ
comprises o
ege Of Alamab rooms, spaces, a l
ce is supplie0V/277 (3- pC to distribuy comprised
cooling. Ht plant (loca
dings. Each central plan
ege campus ral and privuilding, and the campus distributed at each ind
andling units
PERALT
ent requiremempleting Equ
t will be insta
nt Building Lg Descriptio
ege - Buildinege - Buildinege - Buildinege - Buildinege - Theateege – Buildinege – Buildinege - Libraryege - Bldg Aege - Buildingege - Admin Ting A
ary ministrative Cant
campus is pn of facilitiesuipment mus
of the Phys
meda campugeneral anibrary buildi
ed to the camphase 4-wirution panels d of air handHeating Hot ated inside B
building hast that provid
is comprisevate adminis
a student cs by Pacific from the maividual build
s with heatin
TA COMMUNI
ents, installauipment insta
alled at the c
Liston
g R 53,g P 44,g A 46,g D 75,r 44,
ng F 38,ng G 60,
75,53,
g B 43,Tower 53,
34,41,
Center 26,41,
presented bes, utility serst be verifiedical Plant B
us is comprisnd private ing and a smpus by Alare) and distlocated at edling units wWater (HH
Building C) as secondary
des cooling f
ed of collegestration officcenter buildGas & Elecain switchboding. The cang coils and
TY COLLEGE
ation sequenallation.
campuses a
Square Footage ,889 ,537 ,201 ,493 ,537 ,090 ,754 ,493 ,889 ,002 ,988 ,084 ,536 ,300 ,500
elow. The forvice infrastrd by each RBuilding and
sed of collegadministrat
tudent centemeda Municributed from
each individuwith heating
HW) is suppand is distri
y and tertiaryfor the buildi
e campus buce, conferening. Fifteentric and is tr
oard located ampus’s HVd cooling coi
Page|5
E DISTRICT
ncing along
and campus
ollowing are ructure and espondent.
d the main
ge campus tion office, er building. cipal Power m the main ual building. g coils and plied to the buted by a
y HHW loop ng.
ildings with nce rooms, n (15) KVA ransformed at Building
VAC systemils. Chilled
Metering Insta April 25, 2016
2.2.4
2.3. Met
gen
2.3.1
2.3.22.3
2.3
allation & Imple
Water (CcentralizeHHW loowater loo
. Merritt Cwith clasrooms, mKVA elec(3- phasdistributiocomprisecooling. plant (lobuildingscooling pthe camp
ter Equipmenerally descr
. Requiredwhich menergy cdemandsAlamedaEquipme(where amonitorinproblem building Equipmeof data demands
. General 3.2.1. Netwo
wireles3.2.2. Data C
stored by thedownloautomamust pand dausers probleform. charts.transpa
ementation of M
CHW) and ed plant (locops that servop systems.
College. Thessrooms, lamechanical sctrical servic
se 4-wire) aon panels loed of air ha Heating Hocated inside
s. Each buplant is beingpus buildings
ent. Performribed below.
d Capabilitieust provide
consumption s at specific a, Laney Coent will incluapplicable). ng system
investigatiolevel. The
ent. The intelogging/met
s of each bu
Meter Equiprk. Meter Ess based sysCollection. for a minim
e District peoad data froatically ftp (provide dataata analystsmust be abms. Level 2 For compa
. Having tharency. It
MBCx Measure
Heating Hcated insideve all buildin
e Merritt Coaboratories, spaces, a libce is supplie
and distributocated at e
andling unitsot Water (He Building Cuilding has sg constructes.
mance requ Meter Equi
s. The Equa web-basetrend, usagfacilities at
ollege, and de building The selectewith Meter
on, archivingproposed Ment of the fotering equipilding.
pment Requiquipment anstem. The data mum of two (2
ersonnel andom the sys(file transfer
a for at two d, and (2) sta
ble to drill dusers must rison, they m
he data avawill also su
es Project
ot Water (e the E Comngs. Each b
ollege campgeneral an
brary buildined to the caed from theach individu
s with heatinHHW) is supC) and is dsecondary a
ed (adjacent
uirements anpment spec
uipment subjed monitoringe and other
its four locaMerritt CollkWh, heatin
ed firm mustEquipment
g, and retrMeter Equipmollowing is topment that
irements nd software
must be tre2) years in ad its assignstem remoter protocol) tdifferent leveaff, faculty, sown in to thbe able to v
must also bailable in thupport gami
PERALT
HHW) is smplex) and isbuilding has
pus is compnd private ang, and a stmpus by PG
e main switual building.ng coils andpplied to thedistributed band tertiary to the existi
nd other Mcifications [s
ject to this Rng system for related dataations (“Metelege. The ng hot watehave a com
t that provrieval of enment must io describe thmonitors th
must operat
ended with ma web-basedned represenely, as well the data on els of usersstudents, anhe data to view and do
be able to chhis fashion ification amo
TA COMMUNI
supplied to s distributedsecondary a
rised of coladministratiotudent centeG&E and is tchboard loc The HVAd Direct Exe campus frby a primar
HHW looping HHW pla
eter Equipmsee below]
RFP includesor the Districa for electricer Equipmenenergy mo
r energy anmplete (turnkides easy
nergy perforntegrate withe requiremhe electrical
te on a local
minimum 15d location wintatives. Uas be ablea schedule
: (1) enginend membersinvestigate wnload usaghart the datwill aid theong academ
TY COLLEGE
the buildind by primaryand sometim
lege campuon offices, er building. F
transformedcated at BuC System is
xpansion coorom a centrry loop that p system. Cant) to provi
ment require
s the Meter ct to meter
cal, cooling ant”): District,onitoring for nd chilled wakey) web-baaccessibility
rmance, at th the propoents for the , cooling a
area netwo
5-minute intith easy rem
Users must e to have ted basis. Ters, energy s of the pubsuspected oge data in sa, e.g., bar
e District’s mic and adm
Page|6
E DISTRICT
gs from a y CHW and mes tertiary
us buildings conference Fifteen (15) d 480V/277 ilding C to s generally oling or no alized heat serves all
Currently a de CHW to
ements are
Equipment and collect
and heating College of the Meter
ater energy sed energy y, tracking,
the whole osed MBCx
installation nd heating
ork (LAN) or
tervals and mote access
be able to the system The system
managers, blic. Level 1 or reported preadsheet charts, pie practice of ministrative
Metering Insta April 25, 2016
2.3
2.3.3
2.3
2.3
2.3
allation & Imple
departreduct
3.2.3. Suppoor instwrittensystemability
. CCC/IOUprovide pand monmonitorinProgramcommissretro-commeteringsavings ithe MBCrequiremattemptsno guarascope is
3.3.1. kWh Mmeterscommumetersthe butotal kpower be moConnecondui
3.3.2. BTU Mon the naturathe totof ultrawater oand coreceptaMeasuIncorpoprovideshall pcontroTempeMS/TPshall bcompu
be NE3.3.3. Tempe
sensor
ementation of M
ments. Theion. Data for
ort. The Mettaller. The n assurance m expansionto do remote
U Complianproper metenetary rebang equipme. MBCx i
sioning. Themmissioning system will in the near tCx program
ments and b to ensure th
antee that thcomplete an
Metering. Es are connunicating wits may need ilding. For e
kWh consummeters to sw
ounted outsect U30 (or it and recept
Metering. Fonumber of nl gas, etc.) al BTU consasonic flow or chilled waonnect U30 acles, as req
urement Sysorated (or ed with each
provide the fol system: Enerature. OutP. Each BTbe re-prograuter required
MA4. erature sensrs and shall
MBCx Measure
e District war Level 2 useer Equipmenselected firmand guaran
n and replae upgrade, st Equipmen
ering to meeates. The ent in supps a unique
e monitoring(RCx) of bbe used as
term and sam, the propobe CCC/IOUhat the scope scope is cnd accurate.Electricity suected to ath Delta. Thto be installeach buildin
mption in thwitch gear.
side electricaequivalent) tacles, as rer each buildnon-electric For each bu
sumption in meter and
ater supply tto Local Arequired, to postem shall beequivalent).
h system. Pollowing poinnergy Total, tput signalsU meter shammable usi
d). Panels m
sors: Tempel be bath-ca
es Project
ants gamificers must be nt must be wm will clearntee. Manufacement parservice, repant. Meter et the CCC/
CCC/ IOUport of theire combinati supports M
buildings to a diagnostic
avings persisosed meter
U MBCx compe is complecomplete. Th. ub-meters aa Delta sysherefore, theled, depend
ng, the metee building. Provide andal panel toto Local Ar
equired, to poing, one or services ser
uilding, the mthe buildingsupply and
to the buildinea Network ower BTU me built and c A certificarovide a ONnts both at tEnergy Rateshall be se
all be factoryng the frontounted indo
erature sensoalibrated and
PERALT
cation to lesuccinctly a
well supporterly describe facturer musrts. Responair, data retriEquipment IOU MBCx offers incr Monitoringion of who
MBCx of the be identifiedc tool. It wilstence over ring solutionmpliant. T
ete and accuhe selected
are installedstem. In soey will need ting on the n
ering solution Installation
d install Nem enclose m
rea Networkower loggingmore BTU mrving the buimetering solg. Installatiod return temng. Connecvia Etherne
meters or loggcalibrated bate of NIST
NICON Systethe integral Le, Flow Rate
erial networky programmt panel keyp
oors shall be
ors shall be d matched
TA COMMUNI
ead to evenand clearly ped by the mathe level of
st demonstrndent must ieval, and mproposed bprogram for
centives to g Based Cle-building facilities rec
d, as part ol also be usethe long ter
n must meehe District
urate. Howefirm is oblig
on most bome cases,to be re-comnumber of en will be capn includes cma Enclosurmeters and/ok via Etherng equipmentmeters will bilding (.e.g hution will be
on includes: mperature sect Btu meteret cable. Inging equipmy a single mT* traceableem-10 BTU LCD and as e, Supply Tek protocol c
med for its sppad (no spece NEMA13, m
loop-power(NIST* trac
TY COLLEGE
n greater epresented. anufacturer,f support, a
rate longevitalso demo
manipulation.by Respondr energy useinstall whoommissioninmonitoring
ceiving Equipof a future ped to documrm. In orderet District ehas made
ever, the Disated to ensu
buildings. T the meter
mmissioned. lectric servicpable of calcconnection res and shoror logging et cable. Int. be installed, hot water, che capable of BTU metersensors on hr to U30 (or stall 110V c
ment. The enmanufacturee calibrationMeter. The outputs to temperature conforming tpecific applicial interfacemounted out
red current bceable) for t
Page|7
E DISTRICT
energy use
distributor, and provide ty for future nstrate the
dents must e reduction
ole building ng (MBCx) and retro-
pment, and project. The ment energy r to support established reasonable
strict makes ure that the
These sub-rs are not Additional
ces serving culating the of 3-phase
rt conduit to equipment.nstall 110V
depending hilled water,
calculating s consistingheating hot equivalent)
conduit and ntire Energy r, ONICON n shall be BTU meter the building and Return to BACnet®
cation, and e device or tdoors shall
based (mA) the specific
Metering Insta April 25, 2016
2.3
2M"
D A O
1.1
allation & Imple
tempethe enindividSensoisolato
3.3.4. Flow Mbe instthe mdownsinstallasystemmetallidetailsProvidDual Tcontra-averagEach standacalibrarate atand wia 0-15include
* U.S. Na Flow Me
2.3.4 Gas MMeter. 18-30"SmartElectr
Direct mass Accuracy +/-One-second
.1.1. Web Inweb-ba
ementation of M
rature rangenergy calculual temperars applied o
ors to reduceMeter: Refertalled either
manufacturerstream straigation hardwam shutdown
c pipe, instas see the attae an ONICO
Turbine Flow-rotating ax
ging circuit tflow meter
ard that is aation shall bet the calibratthin ± 2% of
5 V square we an isolated
ational Institu
eter Installat
Flow MetInstallation M
eter: Sierra 0 VDC or 100ronics" with
flow monito- 1% of readresponse to
nterface andased monito
MBCx Measure
e for each aation shall ature senso
on chilled wae condensatir to meter sc
in the suppr’s instructioght pipe runare necessaand shall b
all groundingached Flow ON Model Fw Meter for 2xial turbineso reduce meshall be i
accurate to e provided wted velocity,f rate over awave pulse.d contact clo
ute of Stand
tion Manua
ter Manual
640S series0-240VAC inPC configur
ring ing plus 0.5
o changes in
d Data Colleoring softwa
es Project
pplication. Tbe accurate
ors, sensor ater and mouon. chedule for ply or return ons with pns. Insertionary to enable hand inseg rings or pMeter Instal
F1100 Turbin2.5” and largs, with eleeasurementndividually within 0.1%
with each flo within ± 1%
a 50:1 turndo Bi-direction
osure output
dards and Te
l
s or equivalenput power wation softwa
%of full scaln flow rate
ection. Set uare. Set up
PERALT
The calculatee to within
matching, unted outdoo
specific flow pipe of theparticular an type flow e insertion
ertable up toprobes as relation Manu
ne flow meteger lines. Dectronic impt errors due wet-calibrat% and tracow meter. A% of rate ovown (from 0.nal meters sfor direction
echnology (o
ent. SteelMaswith 3/4-inch
are. Meter sh
le
up metering p web-based
TA COMMUNI
ed differenti+0.15°F (incinput offse
ors shall be
w meter typee system to attention pameters shaand remova
o 400 psi. Fequired. For al. er for 1.25”
Dual Turbine pedance-basto swirl and
ted against eable to N
Accuracy shaver a 10:1 tu.4 to 20 ft/s)shall be FB-n.
or equivalent
ss Industrialh diameter 3hall have the
software. Md interface,
TY COLLEGE
al temperatucluding the ets, and ca
equipped w
e. The flow be measure
aid to upstall be providal of the meFor installatio
flow meter
to 2” lines ameters sha
sed sensind flow profile
a primary IST*. A ceall be within
urndown (3.0. Output sign-1200 Series
t ISO standa
l Insertion M316SS probee following fe
Map each marranging e
Page|8
E DISTRICT
ure used in error from
alculations). with thermal
meter shall ed following tream and
ded with all eter without ons in non-installation
and F-1200 all have two g and an
e distortion. volumetric
ertificate of n ± 0.5% of 0 to 30 ft/s) nal shall be s and shall
ard)
Mass Flow e. Provide eatures:
meter to the each of the
Metering Insta April 25, 2016
1.1
1.2. Res
requ1.2.1
1.2.2
1.3. MBC1.3.1
1.3.2
1.3.3
allation & Imple
metersdownlo
.1.2. Data Ofollowiwith fo
CAMPUS CAMPUS BUILDIN INTVL_L DATA_T DATE_T USAGE –
spondents’ Puirements no. Delta Bu
either, (1overlaid Equipmesub-mete
. SpecifiedSOW. TDistrict, a
Cx Equipme. General.
buildingscombinatsupportsdocumenlong term B In
u L E
m Im U D
. Additionaof the (www.cccomplianand othe
. MBCx Eand relatthese semeasuresavings,
ementation of M
s with their oads for camOutput: Sysng data for e
ollowing namS_ID – CamS_ADDRES
NG_ID – BuilLENGTH – DYPE – TypeIME – Date – Energy us
Proposed Moted above auilding Mana) integrate wand connec
ent will pull thers. d Meter Equhe District at its sole disent. CCC/IOU
s or central tion of who the comm
nting energym. The progBenchmarkinnstallation ose of selecteog baseline
Evaluate bumeasures to mplement low
Using whole Document chal CCC/IOU
CCC/IOU cutilitypartne
nce with CCer monetary bquipment Sted materialrvices includ
es. In additiokW and
MBCx Measure
respective bmpus staff. tem will be each buildin
mes, tab delimmpus name (S – Campusding Name
Data interval e of data colland time sta
sage amount
Meter Equipmand followinagement Sywith the Distcted to the Dhe same da
uipment. Plehas identifiscretion, dec
offers inceplants with
ole-building missioning ey savings in tram requirem
ng to select tf whole builed buildingsenergy useilding operreduce enerw and no cobuilding and
hanges and tMBCx EquMBCx pr
ership.com).C/IOU MBCbenefits acccope. Thes, accessordes all activion the succebtu use re
es Project
buildings an
able to oug and metermited. (VarChar) s address (V(VarChar) length (Numected e.g. B
amp (Numert (Numeric)
ment. Propog ystem Interftrict’s Delta B
Delta Buildinta that is co
ease see theed and estcides if any r
ntives to thhin communmonitoring
effort by pthe near termments generhe best canlding meters
rations and rgy use ost measuresd other metetrain staff ipment Req
rogram can. The s
Cx Equipmencruing to the
District reqies and servties required
essful Respoeductions, a
PERALT
nd campus.
utput text orr type. Data
VarChar)
meric) BTU, kW, kWric)
osed Meter
face. The Building Mag Managemmmunicated
e document tablished threcommend
e District fonity college
and retro-roviding a m and increarally includedidate buildis to accurat
identify p
s ered data me
uirements. n be foun
successful nt requiremeDistrict. uests propovices, as ded to identify ondent will band greenh
TA COMMUNI
If required
r CSV files.a in rows for
Wh (VarChar
Equipment
proposed Mnagement S
ment Systemd the Delta s
labeled PCe listed soed solution
or implemen campuses-commission
diagnostic asing saving
e: ings tely establis
potential op
easure actua
Specific dend on theRespondentents to max
osals to provefined by CCand install c
be required tohouse gas
TY COLLEGE
d, set-up sch
Data will each custom
r)
must comp
Meter EquipSystem, or, (. The propo
system, via t
CC Metering lutions, or eis equal.
nting MBCx . MBCx is
ning. The tool, as w
gs persisten
sh the basel
perational a
al energy sav
etails and ree CCC/IOUt is respo
ximize incent
vide MBCx CC/IOU. Thcommissionio calculate eemissions
Page|9
E DISTRICT
heduled ftp
output the mer record,
ply with the
pment must (2) it will be osed Meter the existing
Installation equal. The
projects at s a unique
monitoring well as by ce over the
line energy
and capital
vings
quirements U website onsible for tive, rebate
Equipment he scope of ng focused energy cost
reductions
Metering Insta April 25, 2016
1.3
1.3
1.3
1.3
1.3
allation & Imple
associateCCC/IOUparticipatbuildings
3.3.1. Investicomple B
m B
Ee
Bththdcoods
Moamso
3.3.2. Implem Im
idsptrsae
VcointrQ
PDstr
3.3.3. Reportdetailinenergyfinanci
3.3.4. Traininrevised
3.3.5. Key De M
to
ementation of M
ed with all U requiremetion in the
s. The succegation Phasete the follow
Baseline Enemeters (at leaBuilding AsseEMS to iden
ach buildingBaseline Rephe baseline he District escription oontrols, opepportunities escription oubmitted alo
Measure Idepportunities nd cost estim
measure is reources and
mentation Phmplement Iddentified EEhould be imeriod from t
rending. If avings will bffect of the M
Verify Properhosen EEMperational
ndependentlyrending. Th
QuEST, Inc., Post-ImplemeDistrict once uccessful Rrending perioting Phase. ng which Ey savings, aal incentives
ng. The sud operating seliverables.
MBCx Equipmool acceptab
MBCx Measure
installed meents. The bu
MBCx Progessful Respose. During wing: ergy Usage.ast 3 monthsessment. Entify operatiog. port. Submenergy use must inclu
of the faciliterating sche(commonly
of the analyong with live ntification. within each
mates for eaequired to hprojected sahase. dentified EEMs. No otplemented ithe beginninother proje
be subtracteMBCx projecr EEM Imples have beendata from y logged daroughout ththe District’
entation Datall EEMs h
Respondentod and begin The succes
EEMs were and additionas. uccessful Resequences a Key deliverment Implemble to the Di
es Project
easures. Suildings shogram; therefondent will bthe Investig
. Collect bas) and calcuEvaluate buonal deficie
it a Baselinein each bui
ude, at a ty includingedules, opereferred to
ysis approacversions of Use above
h building. ach measureave an M&V
avings.
EMs. The her projectsn the buildinng of baselicts are imp
ed from the mct. ementation. n implement
building sata, or sub-his process,s consultantta Collectionave been ve
will commn data collecssful Respoimplemente
al requireme
espondent wand functionrables for thementation Sstrict which
PERALT
Savings estiown in Tablefore the scobe required tgation Phase
aseline enelate annual ilding opera
encies and
e Report to ilding. A Baminimum, t
g lighting, berational deas a Finding
ch. All rawany spreads
e-referencedDevelop a pe and submiV plan ident
successful s which will ng during theine trending
plemented ameasured M
The succested properly
systems, wh-system ene, the select. n. The sucerified as im
mence the ction. ndent will sued, post-proents require
will providenality of builde MBCx progchedule. A identifies ac
TA COMMUNI
mates will be 1 above hope below to perform the, the succe
ergy use datenergy use
ations and tenergy effic
CCC/IOU aaseline Repothe baselin
boilers (DHWeficiencies, ags Log); and
w energy tresheet or oth data sourc
prioritization it to the Distifying the ap
Respondereceive a u
e MBCx prog to the comat the sameMBCx saving
ssful Respony. This will hether throergy use trected firm wi
cessful Resmplemented.
post-implem
ubmit a Finaoject annuaed for CCC/
e training foding systemsgram include
A Gantt chartctivities nece
TY COLLEGE
be consisteave been idwill apply t
he following essful Resp
ta from whofor each bui
trended poinciency oppo
and to Distriort will be se energy a
W), HVAC and energyd a narrativeend data user analyses
ces to identlist guided
trict for apprpproach, inc
nt will implutility energ
oject. This inmpletion of e time, their gs to determ
ndent will vebe done by
ough EMS ends, or thrill confer c
spondent wil. Upon verimentation e
al Report to al energy u/IOU MBCx
or campus ss. e, for each bt, or similar essary to co
Page|10
E DISTRICT
nt with the dentified for to all listed activities:
pondent will
ole building ilding. nts through ortunities in
ict detailing ubmitted to analysis; a equipment,
y efficiency e and visual sed will be . tify savings by savings oval. Each
cluding data
lement the y incentive ncludes the post-MBCx calculated
mine the net
erify that all y evaluating
trends or rough EMS losely with
ll notify the fication the
energy use
the District se, annual Equipment
staff in the
building: scheduling
omplete the
Metering Insta April 25, 2016
1.4. PhainstResandbelomusacc
1.5. Equ
requincorequ
1.5.1
allation & Imple
Me
B L M C F C C S C
maTres
ased Meter allation and
spondents’ Pd completionow. Complest be in accoeptance of t
uipment Instauirements aorporate priuirements, in. Existing
existing selected ordinarilyall necesensure tinterrupti
ementation of M
MBCx Equipvents, critica
Baseline repoist of measu
MeasuremenCCC/IOU ForFinal report inCost documeCCC/IOU ForSystems manConstruction manager and
ssistant will The construcecommend cope.
Equipment aMBCx Equi
Proposal prin date for eaetion of the ordance witthe
Mi
allation Connd installed cing and sncluding withMechanicalequipment a
Respondey occur with ssary additiohat electricaion to campu
MBCx Measure
ment scopeal path and cort includingures that will nt &Verificatiorm E – verifincluding posentation rm D nual (if applic
Managemed constructio
be selectedction manageaction(s) to
and MBCx ipment instaicing and Scach Meter EMeter Equiph the follow
Melestone
MB
straints andat District dchedule cohout limitatio, Electrical, are aged. Ent must annewer equiponal expertial service isus operation
es Project
e for each bcompletion. baseline enbe impleme
on Plan for scation of me
st-MBCx ene
cable) ent - Awardon assistantd and directeer will subm
o keep the
Equipment allation mustchedule Proquipment anpment/MBCxing schedule
eter Equipm
BCx Equipm
Requiremedesignated lonsiderations
on the followand Plumb
Equipment snticipate hapment. For ise, spare ps restarted ins.
PERALT
uilding, inclu
nergy analysented selected meeasure compergy analysis
ded contrac. The consted by the P
mit weekly prproject on
Installation; t be completoposal mustnd MBCx Eqx Equipmene. RFP Res
ment Comp
Click here tClick here tClick here tClick here tClick here t
ment Click here tClick here tClick here tClick here t
ents. The Eqocations. Rs for Equipwing: bing Equipmservices are
aving to resexample, if
parts, etc., in a timely
TA COMMUNI
uding activit
sis.
easures pletion s
ctor will protruction maneralta Commrogress reposchedule an
Schedule. ted in separt incorporatequipment insnt installationsponses mu
pletion Dateto enter a dato enter a dato enter a dato enter a dato enter a da
to enter a dato enter a dato enter a dato enter a da
quipment muRespondentsment instal
ment: The e not necesssolve challean electricamust be immanner and
TY COLLEGE
ty durations
ovide for cnager and cmunity Colleorts to the Dnd budget,
The Meter rate sequente the requirestallation acn and relateust indicate
e ate. ate. ate. ate. ate.
ate. ate. ate. ate.
ust comply ws’ RFP Resplation const
District’s fasarily up to enges that
al shutdown mmediately a
d without un
Page|11
E DISTRICT
, milestone
construction construction ege District. District, and
and within
Equipment tial phases; ed phasing
ctivity noted ed activities review and
with District ponse must traints and
acilities and date. The might not
is required, available to nscheduled
Metering Insta April 25, 2016
1.5.2
1.5.3
1.5.41.5
1.5
1.5
1.5
allation & Imple
. Re-Pipinfor accuverify hometeringhot/chillefor accurproposespiping reRFP Resaccurate
. Sub-MeteaddenduSystem. status ocommunRespond
. Site Limi5.4.1. Electric
proposthe Minterrusucceselectricof plaactivitieeliminainterru
5.4.2. Noise,within facilitieinstallasafety take inhours with th
5.4.3. Designfor MelocatioscheduLocatioDistrictinstalla
5.4.4. Asbestthat poincludeLocatioconseqand orespon
ementation of M
g. Existing rate flow m
ot/chilled wa. Respon
ed water piperate meterins an accurae-configuratiosponse mus hot/chilled wers. Sub-mm. The su A list of bu
of those meication links
dent will neetations. cal Servicesed electrica
Meter Equipmptions are ssful Responcal service snned shutdes. RFP ate disruptioptions. Odors, Acc
facilities thaes are in uation activitieor academic
nto account work. No pe foregoing
nated Meter eter Equipmon will be coule considerons. Locatt designatedation. tos Containortions of the ACCMs. Tons to facilquential lossother Districnsibility.
MBCx Measure
pipe installaeasurement
ater pipe rundents muste configurati
ng; (iii) if pipate meteringon. Responst incorporawater metermeters are b-meters aruildings that eters are as for somed to investig
Shut-Downal power shument. Ressubject to
ndent must shutdowns odowns or inResponses
ons to camp
cessibility. at are in useuse or occes causing ec activities. limitations
price or timelimitations.Equipment
ment installaonsidered orrations for ctions for insd Equipment
ing Construhe facilities The District litate Equipses for distuct approved
es Project
ations may nt of hot/chilln configuratt indicate iions; (ii) whe
pe configuratg solution wndents’ pricete all necesing. in place in
re connectedhave electr
attached. meters ar
gate and reco
n; Interruptiutdowns (witspondents’ acceptance
anticipate aor interruptionterruptions
must incopus operatio
Equipment e or otherwupied, the
excessive noPricing propon Equipme
e adjustmen
Locations. ation (“Equipr allowed. Rcompleting Mstallation of t Locations m
uction Matersubject to has survey
ment instalurbance of Ad Equipmen
PERALT
ot have 20-2ed water. tions to conn their RFether existintions are ins
without re-coe and schedssary work,
buildings ad to the Disricity sub-meMost meterre malfunctionnect the c
ion. Schedth locations
proposed e by the Dadvance planons and mu
as necessorporate proons by electr
installationsise occupiedDistrict ma
oise, odors oposals incorent installati
nt will be allo
Where thepment LocaRFP ResponMeter Equipm
Meter Equmust be app
rials (“ACCMEquipment
yed and remlation. All ACCMs (ount installati
TA COMMUNI
25 foot straigResponden
nfirm sufficieFP Responsng pipe confisufficient whonfiguration dule proposa
labor, mate
as outlined strict’s Delta eters (meterrs are opeoning. If
communicati
dule proposand durationelectrical s
District and nning and cst anticipatesary for cooposed mearical power
s will occur d. When fa
ay restrict oor other disrrporated intoion, includinowed for co
e District haations”) no nses must iment installauipment whiproved by the
M”). Respoinstallation
mediated ACcosts, cha
utside of theon location
TY COLLEGE
ght run lengts must indency for accses: (i) vergurations ar
hether the Rof piping oals incorporerials and s
in the accBuilding Ma
rs) and the rating propnecessary, ion links.
sals must ins) necessaervice shuteach cam
coordination e potential aontinuation oasures to mservice shu
in facilities acilities or aor prohibit ruption affeco RFP Respong provisionosts or time
s designatealternative ncorporate ation at the ch are not e District in
ondents aremay or areCMs at the
arges, actioe Equipmentns) are Re
Page|12
E DISTRICT
ths needed dependently curate flow rification of re sufficient Respondent r proposes
rated into a services for
companying anagement operational erly. The successful
indicate all ary to install t-downs or pus. The of planned
adjustments of campus mitigate or
ut-downs or
and areas areas within
Equipment cting health, onses must s for after-associated
ed locations installation
pricing and Equipment subject to
advance of
e cautioned e known to Equipment ns and all t Locations
espondent’s
Metering Insta April 25, 2016
1.6. AgrwithResrequ
1.7. Pro
Scremon
2. RFP Re
2.1. Dist2.1.1
2.1.2
2.1.3
2.2. No modreprRFP
2.3. Erroin thof sshaDistclarclarmusdateclarDist
2.4. Pro
RFPcomRFPof th
allation & Imple
reement. Thh the successpondent shuested modi
posal shouleen shots anitoring syst
sponse Instrict Modifica. District R
portion oincluding
. Posting; RFP will will be pDistrict’s
. RespondEach Reaccess areceipt, rof a ResResponsany Resaddenda
Oral Clarifi
difications tresentative P. No Resp
ors/Discrepahis RFP or psuch error oall submit thetrict to any rrification resrification resst be submie/time for surification reqtrict RFP Co
hibited ComP, no Respommunicate wP. Any actuhe Respond
ementation of M
he form andssful Responhall set forthifications to
d include snd narrativeem.
tructions aations to RFPReservation of this RFPg without limiIssuance ofbe in writingosted on theweb site.
dent Responespondent isaddenda to review and ipondent to c
se for non-respondent; Ra.
ications/Modto the RFPof the Distrondent shall
ancies/Clarifiportions herer discrepance requested requested clsponse affeponse by wtted and ac
ubmittal of Rquests submontact set for
mmunicationsondent, or awith any othual or attempent’s RFP R
MBCx Measure
d content of ndent is incoh in Tab 6 terms and c
creen shotse will assist t
nd RequireP. of Rights.
P prior to thitation, the cf RFP Modifg in the forme District’s w
nsibilities fo solely respothis RFP; ancorporationcomply with esponsiveneResponden
difications. P or the rict is authorl rely on any
ications to Reof, the Rescy. Any Reclarificationarification w
ects the RFwritten addenctually receivRFP questionmitted therearth in Paragr
s. Except foany employeher employepted commuResponse.
es Project
f the Agreemorporated intof its RFPonditions inc
s and a narthe District to
ments.
The Distriche latest dacancellation fications. Mo
m of addendaweb site and
or Receipt, onsible for: nd (ii) indican of all adde(ii) above m
ess. The Dts must ac
The Districrequirementrized to provy oral clarific
RFP. If a Respondent shaespondent se in writing to
will be in writFP or othenda to the Rved by the ns as set foafter. All coraph 1.3 abo
or the Districee, officer, aee, agent or
nication in v
PERALT
ment that thto the RFP Response
corporated i
rative of theo evaluate a
ct expressly ate/time for of this RFP.odifications,a to this RFPd are acces
Review and(i) periodic rating in the enda issued
may result in District will ccess the D
ct will not ts hereof; vide oral claation or mod
espondent eall immediateeking clarifo the Districting; if in theer RespondRFP. All reqDistrict RFPrth in this Rommunicatioove.
ct RFP Contagent or repr representaviolation of t
TA COMMUNI
he District anfor review bacceptancento the Agre
e web-baseand compare
reserves thsubmission
, if any, madP. All addenssible by all
d Acknowlereviews of thRFP Respoby the Distrrejection of not distrib
District’s w
provide anyno employarifications odification to t
encounters etely notify thfication of a
ct RFP Contae sole judgmdents, the Dquests for cP Contact n
RFP; the Distons to the D
tact noted inpresentative ative of the the foregoing
TY COLLEGE
nticipates enby Respondee of the Agreement.
d monitoringe the varying
he right to n of RFP R
de by the Disnda modifyinResponden
dgement ofhe District’s onse the Rerict to the RFthe Respon
bute RFP aweb site for
y oral clarifee, officer, or modificatthe RFP.
errors or dishe District RFany portion oact. Respo
ment of the DDistrict will clarification ono later thantrict will not District shal
n Paragraphof a RespoDistrict relag will result
Page|13
E DISTRICT
ntering into ents. Each reement or
g software. g proposed
modify any Responses,
strict to the ng this RFPts from the
f Addenda.web site to
espondent’s FP. Failure dent’s RFPddenda to r any RFP
fications or agent or
tions to the
screpancies FP Contact of this RFPnses of the District, any
issue the of this RFPn the latestrespond to l be to the
h 1.3 of this ndent shall ting to this in rejection
Metering Insta April 25, 2016
2.5. ProexeRes
2.6. Stat
comResStatfor n
2.7. Non
comTheRFP
2.8. Cer
Comof tsubRes
2.9. Sub
withpropone
2.10. DI
com
2.11. EnandcomEacform
2.12. No
andNonResDisc
2.13. Pu
CodsubsubrespResdiscResdiscjuris
allation & Imple
posal. A foecute and ssponse; failu
tement of mpleted/execspondent’s Rtement of Qnon-respons
n-Collusion Ampleted, dulye failure of aP Response
rtificate of mpensation the Respondbmit a complsponse will r
bcontractors h its RFP Reposed Subc
e-half (1/2) o
R Registratimpleted and
nvironmentald services tmpared to otch Respondem of Environ
on-Discrimind consultantsn-Discriminaspondent mucriminatory E
ublic Recordde §3426.1)bmitted in resbmission to ponsivenesssponse or poclosure as asponses, or closure if dissdiction, or
ementation of M
orm of Proposubmit the ure to do so w
Qualificationcuted StateRFP Respon
Qualificationssiveness.
Affidavit. Ty executed o Responden will result in
Workers CInsurance indent and suleted and exresult in rejec
List. Pursuesponse, on contractors, wf one percen
on Verificatexecuted fo
lly Sustainabthat minimizher goods aent must commentally Su
atory Emplos to the Dis
atory Employust completeEmployment
ds. Except ) and matersponse to ththe District
s the RFP Rortions there public recoportions th
sclosure is rwhich occu
MBCx Measure
osal is incorcompleted/
will result in
ns. Each ement of nse. The fais with its RF
The form of on behalf ofnt to submit n rejection of
Compensationcluded withubmitted witxecuted Cerction of the R
uant to Pubthe form of
who will pernt (1%) of th
ion. Each Rrm of DIR R
ble Procuremze adverse and servicesmplete, execstainable Pr
oyment Pracstrict engageyment Prace, execute at Practices C
for materiarials specifichis RFP are. The foreResponse oeof are “Tradord. The Dishereof, deemrequired by
urs through
es Project
porated into/executed Prejection of
RespondenQualificationlure of a Res
FP Response
Non-Collusf the Respona completedf the RFP R
on Insuranc the RFP mth the RFPrtificate of WRFP Respon
blic ContractSubcontract
rform/providee amount pr
Respondent Registration V
ment Policy. effects on
which servecute and subrocurement P
ctices. The e in non-discctices Certifind submit w
Certification.
ls deemed cally marked
e deemed pregoing notwf a Responde Secret” “Cstrict is not lmed to be operation oinadvertenc
PERALT
o the RFP. Proposal fothe RFP Re
nt must comns incorpospondent toe will result
sion Affidavindent and sd and execuesponse for
ce. The ust be compResponse.
Workers Comnse for non-
t Code §410tors List incoe portions oroposed by t
shall submVerification.
It is the po human hee the same bmit with thePolicy includ
District reqcriminatory ication is in
with the Resp
Trade Secrd “Confidenroperty of th
withstanding,dent who inConfidentialliable or respublic recor
of law, or byce, mistake
TA COMMUNI
Each Resporm with th
esponse for
mplete, exerated into
o submit a coin rejection
t included wsubmitted wiuted Non-Cor non-respon
form of Cpleted and d
The failurmpensation -responsiven
04, each Reorporated in
of the Work vthe Bidder fo
mit with its R
licy of the Dealth and thpurpose wit
e Respondended with the
quires that aemploymen
ncorporated pondent’s R
rets (as defntial” or “Prohe District an the Districndiscriminate” or “Proprieponsible forrds, includin
y an order oor negligen
TY COLLEGE
ondent muse Respondnon-respons
ecute and sthe RFP
ompleted anof the RFP
with the RFith the RFP
ollusion Affidnsiveness.
Certificate oduly executere of a ResInsurance wness.
espondent snto this RFP,valued at oror the Work.
RFP Respons
istrict to prohe environmth comparabnt’s RFP ReRFP.
all vendors, t practices. into the R
FP Respons
ined in Calioprietary” and public recct may rejecely notes thetary” and exr the disclosng those exf a court of
nce on the
Page|14
E DISTRICT
t complete, dent’s RFPsiveness.
submit the with the
d executed P Response
FP must be Response. avit with its
of Workers d on behalf
spondent to with its RFP
shall submit, a list of its r more than .
se the duly
cure goods ment when ble efficacy. esponse the
contractors A form of FP. Each se the Non-
ifornia Civil ll materials cords upon ct for non-hat its RFPxempt from ure of RFPxempt from
competent part of the
Metering Insta April 25, 2016
Distto aportrespDistattobe sto cthatcom
2.14. RFsub
2.15. RF
part
2.16. No
ResRecmee
2.17. Bid2.17.
2.17.
allation & Imple
trict or its agany action otion of a Rponse to thtrict in any
orneys’ fees solely respo
compel disclot of a stake
mpetent juris
FP Responsbmit a respon
FP Document of this RFP
With RF
Upon A
otice of Intensponse to tcommendatieting at whic
d Protest. 1. Submitta
intent to with: (i) tDirector, the Distrforth, in supportinthe bid pAll factuevidenceDistrict a
2. District Rthe foredesignat
ementation of M
gents or repror proceedinRFP Responis RFP, eacaction or prarising therensible for thosure of suc
eholder, retadiction.
se Costs. Anse to this R
nts. Each RP shall be as
FP Respons
Award of Ag
nt to Award Athis RFP aon for award
ch award of t
al. Any Respaward the
he bid protePurchasing
ict’s Notice odetail, all
ng documenrotest; any m
ual contentioe. Any bid as invalid. Review and going, the ed by him/h
MBCx Measure
resentativesg wherein rnse deemech Respondroceeding frefrom. The e cost and d
ch materials;aining the re
All costs anRFP shall be
Respondent follows:
se
greement
Agreement. a Notice of d of the Agrethe Agreeme
pondent subAgreement
est is in writin not more thof Intent to Agrounds fo
ntation, legamatters not sons must bprotest not
Response. District’s D
her, shall re
es Project
. If the Distrequest is md exempt f
dent agrees rom and agparty submi
defense of th; the District’equested ma
nd expensesborne solely
shall review
ProposStatemNon-CoCertificSubconDIR ReEnvironNon-DCertificAgreemCertificBonds
The DistrictIntent to
eement and ent will be co
bmitting a RFprovided thng; (ii) the bhan five (5) cAward the Ar the bid pl authoritiesset forth in thbe supporte
conforming
Provided thDirector, Pueview and
PERALT
trict is requirmade for the from disclosto defend,
gainst any liitting materihe District in’s sole involvaterials unti
s incurred by and exclus
w, complete
sal ment of Qualollusion Affidcate of Workntractors Lisegistration Vnmentally Siscriminatorycation ment cates of Insu
t will issue tAward the the date, tim
onsidered.
FP Responsat each and
bid protest iscalendar dayAgreement; aprotest, incls and argumhe written bi
ed by compg with the fo
at a bid prourchasing oevaluate th
TA COMMUNI
red to defend disclosure sure hereunindemnify aability, incluals sought bn any action vement in al otherwise
by a Resposively by the
and submit
ifications davit
kers Compenst Verification ustainable Py Emp
urance
o RespondeAgreement
me, place of
e may file a d all of the s filed and reys following and (iii) the uding witho
ment in suppid protest shpetent, admoregoing sh
test is filed r such inde basis of
TY COLLEGE
d or otherwiof the conte
nder, by suand hold hauding withouby any other
or proceediny such actiordered by
ondent to pre Responden
t documents
nsation Insu
Procurementloyment
ents timely st describingf the Board o
protest of thfollowing ar
eceived by ththe date of iwritten bid p
out limitationport of the ghall be deem
missible andhall be rejec
in strict confividual(s) athe bid pro
Page|15
E DISTRICT
se respond ents of any ubmitting a armless the ut limitation r party shall ing seeking ion shall be
a court of
repare and nt.
s forming a
rance
t Policy Practices
submitting a g the Staff of Trustees
he District’s re complied he District’s issuance of protest sets n all facts, grounds for
med waived. creditable
cted by the
formity with as may be otest. The
Metering Insta April 25, 2016
3. RFP Re3.1. Sub
3.1.1
3.1.2
3.1.3
3.1.4
3.2. RFPandResfor t
allation & Imple
District’s Respondthe bid p(or his/heequitableAgreemeRFP Resas a parcosts, alincluding
sponse Sub
bmittal of RF. Timely S
latest dawhich arwill be rdate/timesubmittin
. Submittafollows:
Respondedeliver RFtimely subResponseDistrict unsubmittal o
. Sealed Rthe followsealed e
. Number copy on original cink. Theof the RF
P Responsed must inclusponse in a the District’s
ementation of M
Director, Pudent submittiprotest. Theer designeee proceedinent, the Distrsponses. If rty thereto, ll attorneys’
g any appeal
bmittal FP ResponseSubmittals. ate/time set re not submrejected for e for submittng the sameal Location.
SerapPurchPeralt501 5Oakla
ents are encoFP Responsbmittal of Rs delivered
ntil deliveredof RFP RespRFP Responwing informanvelopes:
RFP NRespoRespoRespo
of Copies oa USB/Flashcopy of the Re original copFP Respons
e Format/Code the contformat and w
s rejection of
MBCx Measure
urchasing oing the bid p
e rendition ofe) is an exprgs relative rict’s disposilegal or equthe prevailifees and c
l arising ther
es. RFP Respoforth in the itted at or bnon-respon
tal or RFP R. RFP Respo
phine Nzomohasing Buyerta Communith Avenue
and, Californ
ouraged to pses to the aRFP Respo
to the Distrd from the cponses. nses. All RFation clearly
No. and Desondent Firm ondent Mailiondent Contof RFP Resh drive and eRFP Respopy of the RFe must be m
ontents. Eatents descriwith contentf such RFP R
es Project
r other indivprotest with af a written stress conditioto the RFP
ition of any buitable proceng party(iescosts incurrrefrom.
onses shall RFP for su
before the lansiveness. Responses w
onses shall
o r ty College D
ia 94606
personally dabove locatinses to therict’s centra
central mailro
FP Responsey noted and
scription Name ng Addresstact Person sponse. Eaeight (8) copnse must be
FP Responsmarked “COP
ch RFP Rebed below. ts conforminResponse fo
PERALT
vidual designa written statatement byon precedenP process, bid protest oeedings are is) shall recored in conne
be submittebmittal of R
atest date/timRFP Resp
will be retur
be addresse
District
deliver or retion. Respoe RFP Resl mailroom oom staff to
es must be sd prominentl
phone, fax ach Respondpies of the Rear signaturese must be mPY.”
sponse mus Failure of
ng to the folloor non-respo
TA COMMUNI
nated by himatement cony the Districtnt to the insthe District’
or the Districinstituted anover from thection with
ed as set foRFP Responme for submponses submrned unopen
ed and subm
tain a courieondents are sponse subare not dee
o the above
submitted iny displayed
and email addent must sRespondent’es where remarked “OR
st conform ta Respond
owing requironsiveness.
TY COLLEGE
m/her shall pcurring with ’s Director,
stitution of as intent to
ct’s decision nd the Distriche other paany such p
orth below pnses. RFP mitting RFP mitted afterned to the R
mitted to the
er service tosolely resp
bmittal locatemed subme-described l
sealed enve on the out
ddress submit an ors RFP Resp
equired in blIGINAL” and
to the followdent to submrements will
Page|16
E DISTRICT
provide the or denying
Purchasingany legal or
award the to reject all
ct is named arty(ies), as proceeding,
prior to the Responses Responsesr the latest Respondent
e District as
o personally ponsible for tion. RFP itted to the location for
elopes with tside of the
riginal, one ponse. The ue or black d all copies
wing format mit its RFP be a basis
Metering Insta April 25, 2016
3.2.1
3.2.2
3.2.3
3.2.4
3.3. RFP3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
allation & Imple
. General formattedtabbed wbelow. Acorner. binding,8½” x 11
. Cover Shsubmittinemail adRFP Res
. Letter ofinterest ostapled w
. Tabbed materialsease of i
P Response. Tab 1; P
Attachme. Tab 2; Q
incorporaproviding
. Tab 3; PassignedRespond
. Tab 4; Eand methmaterials(i) Q(ii) C(iii) C(iv) C
bR
. Tab 5; Respondeach pol
ementation of M
Requiremed with at lea
with the conteAll submittedDo not sub except for” folder. heet. Identifng the RFP dresses of tsponse. f Interest. of the Respwith other maSections of
s described dentification
Tabbed SeProposal. Coent 1. Qualificationated into thig explanationProposed Ted to completdent’s staff. Equipment Inhodology tos describing:
Quality controCompliance wCompliance wCommunicati
y the DistricRFP Respon
Insurance Cdent. Requicy of insura
Require
Workers
Employe
ComprehLiability damage liability) Professio
MBCx Measure
nts. All RFast 11 pointents conformd materials mbmit RFP Rr the upper
fy the submiResponse ahe Respond
Include a bondent in paterials respf RFP Resin Paragrap
n.
ctions. omplete and
s Statemens RFP as An(s) for any
eam. Identifte the Equip
nstallation Ap completing: ol and qualitwith schedulwith District ions by or b
ct for servicese must not Certificates. ired Certific
ance are as s
ed InsurancCertificate
Compensat
ers Liability
hensive (including
and a
onal Liability
es Project
FP responst font size. ming to the Tmust be bouResponse mleft corner
ittal as the Ralong with thdent’s princip
brief letter (nroviding the
ponding to thponse. Ea
ph 4.3 below
d execute th
nt. CompletAttachment 2response(s)fy the key mpment Install
pproach. Pr the Equipm
ty assurancele/completioestablished
between the s related to exceed ten Provide
cates of Insset forth belo
ce Policy e tion
General property
automobile
y
PERALT
ses must beEach sectio
Tabbed Sectund with onlymaterials instaple. All
RFP Responhe firm’s addpal contacts
no more the Equipmenthis RFP. ach RFP R
w in the orde
he form of P
te and exec2. Include i) to the Qual
members of tlation. Attac
rovide a desment Installa
e; on requireme
budgets; an Respondenthe Equipm(10) pages.copies of
surance andow.
MinimCov
In accordan
One Million
Two Millionper occuDollars ($aggregateOne Millionper claim a
TA COMMUNI
e submittedon of the RFtions descripy one staple
n binders, ssubmitted m
nse and an idress, telep in connectio
an one (1) t. The lette
Response mer described
Proposal incl
cute the Quin Tab 2 anlifications Stthe Respondch resumes
scription of tation. The f
ents; nd nt, the Distrient Installat. Certificates
d minimum
mum Respoverage Amonce with law
n Dollars ($1
n Dollars ($urrence/Fou$4,000,000)
n Dollars ($and Two Mil
TY COLLEGE
on 8½” x FP Responsptions in Pare in the uppespiral bindimaterials mu
dentificationhone/fax nuon with this
page) exprer of interest
ust include therein and
luded with th
ualifications y separate tatement. dents’ staff of all key m
the proposedforegoing m
ict and otheion. This po
of Insurancoverage a
ndent ount w
,000,000)
$2,000,000) ur Million ) in the
$1,000,000) lion Dollars
Page|17
E DISTRICT
11” paper se must be ragraph 4.3 er left hand ing or any ust fit into a
n of the firm umbers and RFP or the
ressing the t should be
all of the d tabbed for
his RFP as
Statement attachment
that will be members of
d approach ust include
ers retained ortion of the
ce for the mounts for
Metering Insta April 25, 2016
3.3.6
3.3.7
3.3.8
3.3.9
3.3.1
3.3.1
3.3.1
3.3.1
4. Evaluat
allation & Imple
. Tab 6; A
Agreemeidentify modificatdeletion amendmmust setmodificatshall notRFP ResAgreemeawardedmodificatof the Agbinding u(ii) the Dmodificatrepresen
. Tab 7; EInstallatioMBCx Eqleast the (i) se
E(ii) C
DTAsRe
. Tab 8; Nincluded
. Tab 9; Cof CertifiD.
0. Tab 10; E) for easervices the Resp
1. Tab 11; DVerificati
2. Tab 12; form of E
3. Tab 13; the form
tion Criteria
ementation of M
Agreement Tent (RFP Attany term otion, by am
of existingents to exis
t forth the sption or obje, however, bsponse doe
ent will be de the Agreetion. Notwitgreement inupon the DisDistrict at otions by a
ntative of theEquipment Son Servicesquipment asfollowing:
equential aEquipment CCC/IOU reqDistrict financThe proposeActivities deschedule for
RFP varies fxplanation inon-Collusionwith this RF
Certificate of cate of Wor
Subcontractach subcontvalued at or
pondent. DIR Registraon (RFP AttEnvironmen
EnvironmentNon-Discrimof Non-Disc
a.
MBCx Measure
Terms and Ctachment I) or conditionendment tog provisionsting provisiopecific text oction to any
be deemed tes not identeemed to haement, sucthstanding thn any Respostrict unlessr prior to thwritten inst
e District. Schedule. s, which incs set forth in
and phased
quirements fcial incentiveed schedulescribed in Pthe Consult
from the con the proposn Affidavit.
FP as AttachWorkers Co
rkers Compe
tors List. Cotractor to thr greater tha
ation Verificatachment F).ntally Sustaally Sustaina
minatory Emcriminatory E
es Project
Conditions. and must,
n of the A existing pr
ns. Whereons or additof the requesy existing tethe District’stify modificaave agreed
ch Respondhe inclusion ondent’s RFs: (i) the Agrhe time of atrument dul
Provide a pcorporates t Paragraph
completion
for Meter Ees. e must inc
Paragraph 2tant Servicesmpletion dased scheduleComplete a
hment C. ompensationensation Ins
omplete the e Responde
an one-half o
ation. Comp. inable Procable Procure
mployment PEmployment
PERALT
($2,000,000
Each Respoin Tab 6 of
Agreement wrovisions, ade any reqtional provissted amenderm, conditios acceptanceations to ter
to all terms dent must
of any requFP Responsereement is aaward of thly executed
proposed scthe mileston2.6. Respo
n of the M
quipment a
corporate a.3 of this Rs Activities d
ate(s) noted e. nd execute
n Insurancesurance inclu
form of Subent that willof one perce
plete and ex
curement Poement Policy
Practices CePractices C
TA COMMUNI
0) in the agg
ondent musttheir respe
which the ddition of auested moions, Tab 6 ment or addon or provise thereof. Arms or cond
and conditiexecute th
uested modife, such modawarded to she Agreemed by an au
chedule for nes for Meondents’ sch
Meter Equip
nd MBCx E
t least theRFP. If a R
described inin Paragrap
the form of
e. Completeuded with th
bcontractors provide wo
ent (.05%) of
xecute the fo
olicy. Comy (RFP Attacrtification. C
Certification (
TY COLLEGE
gregate
t thoroughlyctive RFP RResponden
additional prdification cof the RFP
dition. A Resion in the
Any Respondditions of thons set forthe Agreemefications to adifications ssuch Respont has acce
uthorized em
completing tering Equip
hedules mus
pment and
Equipment to
e ConsultanRespondent’sn Paragraphph 2.3, inco
Non-Collusi
e and execuhis RFP as A
s List (RFP Aork, labor, mf the price p
orm of DIR R
plete and echment G). Complete a(RFP Attach
Page|18
E DISTRICT
review the Responses,nt requests ovisions or
consists of P Response espondent’s Agreementdent whose
he attached h therein; if ent without any portion
shall not be ondent; and epted such mployee or
Equipment pment and
st include at
the MBCx
o maximize
nt Services s proposed
h 2.3 of this orporate an
on Affidavit
te the form Attachment
Attachment materials or roposed by
Registration
execute the nd execute
hment H).
Metering Insta April 25, 2016
4.1. Evaexpwhicack“bespurpattriadjuinitiaResandRec
4.2. RFP
knoDistevaandreviproc
4.3. Distand
4.4. Inte
resplocaResResthe Resman
allation & Imple
aluation Critperience, knoch provides nowledges ast value.” poses of thibuted to eaustment for al screeningsponses priod subject to commendati
Price propPrior ConProposedQualificatSuitabilityDistrict anPrior perfResponsi
P Responseowledge andtrict will initi
aluation crited scoring of ew RFP Recess.
trict Reservad discussions
erviews. Thponsive RFPation designspondents wspondents tointerview co
sponse and ndatory for:
ementation of M
teria. Awarowledge andthe best va
and agrees Accordingly
is RFP, theach criterionany RFP R
g to interviewor to the Staf
adjustmenton described
posal nsultant Servd schedule tions, skills ay of proposend others enormance of veness to R
e Screeningd expertise wally screen ria set forth RFP Respoesponses to
ation of Righs with Respo
e District mP Response
nated by thewill not be peo respond toommittee wiapproach to(i) managem
MBCx Measure
rd of the Ad skills to coalue to the Dthat factors
y, each Rese “best valuen as set fo
Response asws and negff Recommet. Final evd in Paragra
Eval
vices experie
and experiened personnengaged by thsimilar servi
RFP requirem
g. A technwith the CoRFP Respoin the RFP
onses, Distrio provide br
hts. The Disondents con
may conduct e. Each inte District. ermitted at tho questions pth additionao completinment person
es Project
Agreement wmplete the C
District. By other than pspondent sue” shall con
orth below. s the RFP
gotiations. Aendation desvaluation critaph 5.7 below
uation Crite
ence
nce of propol to engage
he District to ices
ments
ical screeninsultant Se
onses and s. In the solect Shared Groader Distr
strict exprescerning thei
interviews terview will Formal preshe interviewposed by the
al details of tg Equipmen
nnel of the R
PERALT
will be to aConsultant Ssubmitting a
price alone aubmitting a nsist of the Scoring ofResponse e
Any and all scribed in Pateria scoringw.
eria
osed personnin collaboraprovide rela
ng committrvices subje
score RFP Re discretion
Governance rict internal
ssly reserver responsive
of selected be schedulesentations (
ws. The prime District’s ithe relative nt InstallatioRespondent
TA COMMUNI
a RespondeServices whoa RFP Respare relevant
RFP Respfollowing faf evaluationevaluation pevaluation c
aragraph 5.7g will be es
nel ative efforts ated services
tee (consistiect to this RResponses i
of the DistrCommitteescommunity
s the right te RFP Resp
Respondened for a onei.e. PowerP
mary purposenterview combenefits of tn. Attendawith author
TY COLLEGE
ent with deo submits th
ponse, the Rto determin
ponse agreeactors, with n criteria is process proccriteria scor7 below are stablished in
W5515
with the s
5
25
ing of indivRFP) appoinin accordancict, followings may be reinput to th
o conduct nonses.
nts timely sue (1) hour p
Point presene of the intemmittee andthe Respondnce at the irity to bind a
Page|19
E DISTRICT
monstrated he Proposal Respondent ation of the es that for the weight subject to
ceeds from ring of RFPpreliminary n the Staff
Weight 50 5
0 5 5
0 5
viduals with nted by the ce with the g screening equested to e selection
negotiations
ubmitting a period at a
ntations) by erview is for d to provide dents’ RFPinterview is and commit
Metering Insta April 25, 2016
the Instthe RFPdiscRespresfull
4.5. Negnegthe for havRessubdisc
4.6. Awa
Dist
4.7. Recof tBoaRecevades
4.8. Dist
info
allation & Imple
Respondentallation. FaDistrict with
P Responsecussions, thspondents wsent at the sand complet
gotiations/Digotiations an
District’s neall Respond
ve the sole spondent babject matterscussion or ne
ard of Consutrict’s Board
commendatihe Consulta
ard of Truscommendatialuation critescribed abov
trict Reservormalities in R
ementation of M
t; and (ii) thailure of a Reh all personne for non-r
he following will be randoscheduled dte authority t
scussions. d/or discussegotiations/ddents, or difdiscretion tosed on the Ds reflected egotiation w
ultant Servicof Trustees
on for Awardant Servicesstees for aon will desc
eria after comve.
ved Rights. RFP Respon
MBCx Measure
e Respondeespondent t
nel identifiedresponsiven
proceduresomly selectedate/time of to bind the R
The Districsions with ondiscussions ffering areaso establish tDistrict’s revin the RFP
with the Resp
ces Agreeme.
d of Agreems will preparaward of thcribe the bampleting the
The Distrinses or to re
[END
es Project
ent’s persono attend its
d hereinabovess. To s will be imed by the Dits interview
Respondent
ct may, in tne or more owith Respo
s of inquiry the nature a
view of the RP Response pondent.
ent. Award
ment. Districre and submhe Agreemasis for the e RFP scree
ct reserveseject all RFP
D OF SECTI
PERALT
nel proposeinterview at
ve will resultensure fair
mplemented:District; and w with the D.
the sole disof the Respondents mayfor differentand scope
Respondent’ that the D
of the Agre
ct staff respomit a writtenent (“Staff Staff Reco
ening, intervi
s the right P Responses
ON]
TA COMMUNI
ed for complt the time ant in rejectionr and impa: (i) the ord(ii) each R
District, its pr
scretion of tondents. Thy include idet Respondeof negotiatios RFP Resp
District belie
ement will o
onsible for con recommen
Recommenommendationiews and/or
to waive s.
TY COLLEGE
etion of the nd place desn of such Reartial negotiader of inter
Respondent rincipals or
the District, he nature anentical areasnts. The Dons/discussiponse and theves require
only be by a
ompleting prndation to thndation”). n, including negotiation
minor irreg
Page|20
E DISTRICT
Equipment signated by espondent’s ations and rviews with must have others with
engage in nd scope of s of inquiry
District shall ions with a he areas or
e additional
ction of the
rocurement he District’s
The Staff scoring of
processes
ularities or
RFP for MeteProposal (AttaApril 25, 2016
To the Boarto provide th 1. Proposa
(“RespoAgreemwithin th
2. Respond
the Resin the RServicesexaminethe Agredays of
3. Addenda
of the DAddendareceipt omatters
4. Price Pr
4.1. LumcomtherDol(inccom
ering Installatiochment A)
rd of Trusteehe complete
al Submissindent”); if thent included
he Contract T
dent Acknowpondent hasFP; (ii) conds as deemeed the Agreeeement; andthe date of t
a. The RespDistrict and a. The Reof all Addenraised by al
AddendaNumber
roposal. mp Sum Fixemplete the Mreto for a lulars ($_____
cluding a pmplete Meter
on & Implemen
es of the Per the Consult
ion. This he Agreemed with the RFTime set fort
wledgements: (i) carefullducted invesed reasonaement; (iv) bd (v) commithis Proposa
pondent ackthat the Prospondent fu
nda issued bl Addenda, t
a r
Add
Ye Ye Ye Ye
ed Price ProMeter Equipmump sum, fix__________)personnel ber Equipment
ntation of MBC
P(At
ralta Commutant Services
Proposal ent is awardFP and shallth therein.
ts. By submy reviewed atigations of t
able and prbeen affordetted to acce
al.
knowledges oposal incorurther acknoby or on behthis Proposa
denda ReceRespond
es Nes Nes Nes N
oposal for Mement Installaxed price of). The foreenefits/burdInstallation,
Cx Measures Pr
PROPOSALttachment A
unity Colleges as follows
is submitteed to the Rel complete C
mitting this Pand examinethe scope audent by th
ed the opporeptance of t
its receipt ofrporates theowledges thhalf of the Dal may be rej
eived by ent o o o o
eter Equipmation and otf _________egoing is alen), materi, overhead a
roject; RFP N
PERALT
L A)
e District (“D:
ed by ___espondent,
Consultant S
Proposal, thed the resound requiremhe Respondrtunity to reqhis Proposa
f the followine matters adhat if the ReDistrict and tjected for no
Addenda IP
Yes Yes Yes Yes
ment Installatther obligati__________ll-inclusive, als, equipm
and administ
No. _15-16-27__
TA COMMUNI
District”), the
__________the Respon
Services, for
he Respondeurce and refe
ments for comdent; (iii) cquest clarifical by the Dis
ng Addendaddressed inespondent dthat this Proon-responsiv
IncorporateProposal
No No No No
tion. The Reons under t__________including w
ment and strative costs
_
TY COLLEGE
undersigne
___________ndent shall e
the Contrac
ent acknowlerence mate
mpleting the carefully revcation or expstrict within
a issued by o each of thdoes not acoposal incorpveness.
ed Into
espondent pthe Agreeme___________without limitaservices ne and profit.
Page | 21
E DISTRICT
d proposes
_________ execute the ct Price and
ledges that erials noted Consultant
viewed and planation of ninety (90)
or on behalf e following
cknowledge porates the
proposes to ent relating _________ ation, labor cessary to
RFP for MeteProposal (AttaApril 25, 2016
4.2. MetEqu
B
ering Installatiochment A)
ter Equipmeuipment insta
Building No.
C
1 MCo
2 MCo
3 MCo
4 MCo
5 LaCo
6 LaCo
7 LaCo
8 LaCo
9 LaCo
10 LaCo
11 LaCo
12 CoofAl
13 CoofAl
14 Di
on & Implemen
ent Price Proallation is br
Campus
erritt ollege
MB
erritt ollege
MB
erritt ollege
MB
erritt ollege
MB
aney ollege
LT
aney ollege
LB
aney ollege
LB
aney ollege
LL
aney ollege
LB
aney ollege
LB
aney ollege
LA
ollege f lameda
L
ollege f lameda
B
istrict DA
ntation of MBC
oposal Breaoken down a
Meter EBuilding
DescriptioMerritt CollegBuilding R
Merritt CollegBuilding P
Merritt CollegBuilding A
Merritt CollegBuilding D
Laney CollegTheater Laney CollegBuilding F Laney CollegBuilding G Laney CollegLibrary
Laney CollegBldg A
Laney CollegBuilding B
Laney CollegAdmin Towe
Library
Building A
District Administratio
Cx Measures Pr
akdown. Thamong the b
Equipment P
on Pro
ge
_____
($____
ge
_____
($____ge
_____
($____ge
_____
($____ge _____
ge ($____
ge _____($____
ge
_____
($____ge
_____
($____
ge
_____
($____ge r
_____
($____
_____
($____
_____
($____
on
_____
($____
roject; RFP N
PERALT
he foregoingbuildings sub
Proposed Pposed Mete
___________
__________
___________
__________
___________
__________
___________
_____________________
__________
_____________________
___________
__________
___________
__________
___________
__________
___________
__________
___________
__________
___________
__________
___________
__________
No. _15-16-27__
TA COMMUNI
g price propbject to Mete
Pricing er Equipme
___________
____)
___________
____)
___________
____)
___________
____)
___________
____)
_________________)
___________
____)
___________
____)
___________
____)
___________
____)
___________
____)
___________
____)
___________
____)
_
TY COLLEGE
posal compleer Equipmen
nt Installati
_____ Dolla
_____ Dolla
_____ Dolla
_____ Dolla
_____ Dolla
__________
_____ Dolla
_____ Dolla
_____ Dolla
_____ Dolla
_____ Dolla
_____ Dolla
_____ Dolla
Page | 22
E DISTRICT
eting Meter nt as
ion Price
rs
rs
rs
rs
rs
____Dollars
rs
rs
rs
rs
rs
rs
rs
RFP for MeteProposal (AttaApril 25, 2016
4.3. Lum
comlum($__persEqu
4.4. MBCEquinst
ering Installatiochment A)
15 Di
Totapr
mp Sum Fixemplete the Mp sum, fix__________sonnel beneuipment InstaCx Equipmeuipment installation at ea
Task/Ph
InvestigatioPhase
ImplementaPhase
Reporting P
Total MBCEquipmentfor Camps
Task/Ph
InvestigatioPhase
ImplementaPhase
Reporting P
on & Implemen
istrict P
al (must beroposed in P
ed Price ProMBCx Equipmxed price ___). The foefits/burden)allation, oveent Price Proallation is bach campus
hase
on __
($_
ation __
($_
Phase __
($_
Cx t Price
s
__
($_
hase
on __
($_
ation __
($_
Phase __
ntation of MBC
Physical Plan
equal to prParagraph 4
oposal for MBment installaof ______
oregoing is a), materials,rhead and a
oposal Breakroken down
s as follows:
M
__________
__________
__________
__________
__________
__________
__________
__________
L
__________
__________
__________
__________
__________
Cx Measures Pr
nt
_____
($____
rice 4.1)
_____
($____
BCx Equipmation and oth___________all-inclusive, equipment
administrativkdown. The
n by the prin
MERRIT COLPrice
___________
_______)
___________
_______)
___________
_______)
___________
_______)
LANEY COLPrice
___________
_______)
___________
_______)
___________
roject; RFP N
PERALT
___________
__________
___________
__________
ment Installather under th__________, including wt and servicve costs and e lump sum ncipal activit
LLEGE (MCProposal
__________
__________
__________
__________
LLEGE (LC)Proposal
__________
__________
__________
No. _15-16-27__
TA COMMUNI
___________
____)
___________
____)
tion. The Rehe Agreemen__________without limitaces necessaprofit. fixed price pties to comp
C)
__ Dollars
__ Dollars
__ Dollars
__ Dollars
)
__ Dollars
__ Dollars
__ Dollars
_
TY COLLEGE
_____ Dolla
_____ Dolla
espondent pnt relating th
___________ation, labor (ary to comp
proposed forplete MBCx
C
C
Page | 23
E DISTRICT
rs
rs
proposes to hereto for a __ Dollars (including a plete Meter
r the MBCx Equipment
Time to Complete
Phase
Time to Complete
Phase
RFP for MeteProposal (AttaApril 25, 2016
5. Proposa
requiredacknowlexceptioand/or areject _______
6. Schedul
necessaincorpor
7. Award o
solely ininformal
8. Bid Prot
acknowlprevailincosts incis bindinexpress
ering Installatiochment A)
Total MBCEquipmentfor Camps
Task/Ph
InvestigatioPhase
ImplementaPhase
Reporting P
Total MBCEquipmentfor Camps
al Exceptiond to complledges that ons/exclusioaffect the na
this Pro__________
le Proposalary the Consrated into Ta
of Agreemenn the Districities in the R
tests; Attornledges and ang party in jucurred in cong upon theterms of Pa
on & Implemen
($_
Cx t Price
s
__
($_
hase
on __
($_
ation __
($_
Phase __
($_
Cx t Price
s
__
($_
s/Exclusionsete the Co
if the Disns set forthature, scopeoposal for___________
. The undsultant Servab 7 of the R
nt. The Resct’s Board oRFP process
neys Fees aagrees to thudicial proce
onnection wite Respondearagraph 3.1
ntation of MBC
__________
__________
__________
COLL
__________
__________
__________
__________
__________
__________
__________
__________
s. The Proponsultant S
strict determ below affe
e or other rer non-res_______.
dersigned Rices in acco
Respondent’s
spondent ackof Trustees s or the Distr
and Costs. he provisionseedings aristh any such nt and enfo4 of the RFP
Cx Measures Pr
_______)
___________
_______)
LEGE OF APrice
___________
_______)
___________
_______)
___________
_______)
___________
_______)
posal incorpServices, exmines in thect material equirementsponsiveness
Respondent ordance withs RFP Resp
knowledges and that th
rict may reje
By submittins of Paragrasing out of a
judicial procorceable agaP.
roject; RFP N
PERALT
__________
ALAMEDA (CProposal
__________
__________
__________
__________
porates all wxcept as ne District’s terms of the
s of the Cons. Th
proposes h the Proposponse.
that action he District
ect all Propos
ng this Propaph 3.14 of ta bid protestceedings anainst the Re
No. _15-16-27__
TA COMMUNI
__ Dollars
COA)
__ Dollars
__ Dollars
__ Dollars
__ Dollars
work, labor, noted below
sole discree Consultannsultant Sere except
to completesed Consult
to award thmay waive sals.
posal, the Rthe RFP relat to recover nd that Paraespondent in
_
TY COLLEGE
C
materials anw. The Retion that ant Services rvices, the Dions/exclusio
e activities tant Services
e Agreemenminor irreg
Respondent ating to the its attorneys
agraph 3.14n accordanc
Page | 24
E DISTRICT
Time to Complete
Phase
nd services Respondent any of the Agreement
District may ons are:
and tasks s Schedule
nt is vested gularities or
specifically right of the s’ fees and of the RFPce with the
RFP for MeteProposal (AttaApril 25, 2016
The individrepresents Respondent _____________Signature _____________Name Printed or (________) ____Area Code and T
ering Installatiochment A)
ual executinto the Distrt and to bind
______________
______________r Typed
_____________Telephone Numb
on & Implemen
ng this Proict that: (i) hd the Respon
______________
______________
______________ber
ntation of MBC
posal on behe/she is dundent to this
__________
__________
___________
Cx Measures Pr
ehalf of theuly authorizes Proposal; a
roject; RFP N
PERALT
e above-ideed to execuand (ii) this P
No. _15-16-27__
TA COMMUNI
entified Respute this ProProposal is c
_
TY COLLEGE
pondent waposal on becomplete an
Page | 25
E DISTRICT
arrants and ehalf of the d accurate.
RFP for MeterQualifications April 25, 2016
This Qualificemployee oQualificationResponse n
1. Contact
1.1. Res
1.2. For
1.3. Con
2. Prior M
equipmedistrict pfollowingsequent Responthat a Rthe Resand/or C
ing InstallationStatement (Att
cations Statof the Respns Statemenon-respons
t Informatio
spondent Na
m of Entity.
Corp____(State
Part____(Desc
Limi
Limi
Join____(Iden
Sole____(Iden
ntact Person
Name
Street Ad
Phone/F
Email Ad
Metering andent installatiprovided by g format. Attial “Assignm
ndents are cRespondentspondent (California K
& Implementaachment B)
tement mustpondent. Fnt concurreive and rejec
on
ame. ______
Check appr
poration __________e of Incorporat
tnership __________cribe type of pa
ted Liability
ted Liability
t Venture __________
ntify each mem
e Proprietors__________
ntify all equity on.
ddress/City/S
ax
ddress
d MCBx Exons complethe Respon
ttach additioment No.” nu
cautioned tht failed to dor Respon
K-12 public
ation of MBCx M
QUALIFICA(At
t be compleFailure of aently with thcted.
__________
ropriate box
__________tion & Corporat
__________artnership i.e.,
Company
Partnership
__________ber of Joint Ve
ship __________owners)
State
xperience. eted by Resndent (or Rnal summarmbering.
hat if the Didisclose andent’s predschool dist
Measures Proje
ATIONS STAttachment B
eted by eacha Respondehe Respond
__________
.
___________te Registration
___________general partne
p
___________enture and form
___________
Provide a spondent for
Respondent’sries as neces
istrict deterd identify Adecessor) tricts within
ect; RFP No. 1
PERALT
ATEMENTB)
h Respondeent to submdent’s RFP
___________
__________No.)
__________ership, limited p
__________m of entity of ea
__________
summary ofr a K-12 schs predecessssary and id
rmines baseALL other cto Californ
n the past te
5-16/27
TA COMMUNI
ent and execmit the com Response
___________
_________
_________ partnership)
_________ ach Joint Ventu
_________
f ALL otherhool district sor). Providdentify each
ed on the Dconsulting nia communen (10) year
TY COLLEGE
cuted by an mpleted and
will rende
_
urer)
r Prop 39 mor commun
de the summadditional s
District’s invservices prnity collegers which ar
P a g e | 26
E DISTRICT
authorized d executed r the RFP
meter/MCBx nity college mary in the ummary by
vestigation rovided by e districts
re identical
RFP for MeterQualifications April 25, 2016
or similis subje
AS
Cl
GminInanO
Fi
Cl
AS
Cl
GminInanO
Fi
Cl
3. Essenti
followingmeet mi
ing InstallationStatement (Att
lar to the Cect to reject
SSIGNMEN
lient name
eneral deeters/MCBxstalled stallation Da
nd end datesriginal Price
nal Adjusted
lient Contac
SSIGNMEN
lient name
eneral deeters/MCBxstalled stallation Da
nd end datesriginal Price
nal Adjusted
lient Contac
al Minimumg qualificationimum qual
& Implementaachment B)
Consultant Stion for non
T NO. 1
escription x equipm
ates (beginns)
d Price
t Person
T NO. 2
escription x equipm
ates (beginns)
d Price
t Person
m Qualificatons criteria wifications cri
ation of MBCx M
Services de-responsive
of ment
ning
Name: Position Address
Phone/F Email
of ment
ning
Name: Position Address
Phone/F Email
tions. Any rwill result in teria.
Measures Proje
escribed in eness.
___
n/Title ___
s ___
___
Fax ___
___
___
n/Title ___
s ___
___
Fax ___
___
response of rejection of t
ect; RFP No. 1
PERALT
the RFP, th
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
f a Respondthe Respond
5-16/27
TA COMMUNI
he Respond
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
dent indicatindent’s RFP
TY COLLEGE
dent’s RFP
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
ng “not qualiResponse fo
P a g e | 27
E DISTRICT
Response
ified” to the or failure to
RFP for MeterQualifications April 25, 2016
3.1. Res
covDol
3.2. Res
the
3.3. Res
3.4. Res
limit
3.5. Res
Sub
3.6. Hasfindfor a
3.7. At abeecon
3.8. At aResdish
3.9. With
servRes
ing InstallationStatement (Att
spondent haerage limitslars ($4,000
Yes
No (
spondent poClassificatio
Yes
No (
spondent is c
Yes
No (
spondent hats in accorda
Yes No (
spondent isbcontractor o
Yes No
s any public ing that the a public wor
Yes ( No
any time duren convictedstruction pro
Yes ( No
any time duspondent behonesty?
Yes ( No
hin the pasvices to whspondent.
& Implementaachment B)
as obtaineds of at least,000) in the
(not qualified
ossesses a von(s) of Cont
(not qualified
currently a D
(not qualified
as obtained ance with ap
(not qualified
s ineligible on a public w(not qualifie
agency, witResponden
rks project or(not qualified
ing the last f of a crime oject? (not qualified
uring the laeen convicte
(not qualified
st five (5) yhich the Res
ation of MBCx M
d a current t Two Millioaggregate.
d)
valid and curtractors’ Lice
d)
DIR Register
d)
a current Wpplicable law
d)
for award works projeced)
thin the pasnt or any prer a public wod)
five (5) yearinvolving an
d)
ast five (5) d of a feder
d)
ears, one ospondent w
Measures Proje
Commerciaon Dollars ($
rrently in goense require
red Contract
Workers Comw.
of public wct pursuant to
t ten (10) yeedecessor toorks contrac
rs, has Respny federal, s
years, has ral or state c
or more conwas a party
ect; RFP No. 1
PERALT
al General $2,000,000)
ood standinged by the RF
tor?
mpensation
works conto Labor Cod
ears conduco the Respoct?
pondent or astate, or loca
the Responcrime involvi
ntract(s) to to have be
5-16/27
TA COMMUNI
Liability po per occurr
g California CFP?
policy of ins
tracts or tode §1777.1 o
cted proceedndent is not
ny predecesal law relate
ndent or aning fraud, th
provide woeen termina
TY COLLEGE
licy of insurence and F
Contractors’
surance with
o perform wor 1777.7.
dings that ret a “respons
ssor to the Rd to a privat
ny predecesheft, or any o
ork, labor, mated for def
P a g e | 28
E DISTRICT
urance with Four Million
license for
h coverage
work as a
esulted in a ible” bidder
Respondentte or public
ssor to theother act of
materials or fault of the
RFP for MeterQualifications April 25, 2016
4. Backgro4.1. Res
4.1.1
4.1.2
4.1.3
4.1.4
4.2. Cla4.2.1
ing InstallationStatement (Att
Yes ( No
ound. spondent Ex1. Years In
monitorin
2. Prior Trabusinesscurrent tr
If “Yes” Respond
3. Prior AssresponseRFP com
If “No” prtrade/bus
4. Officers Respondpercent (of businethe prior
If “Yes”: of all sucand (iii) other firmDistrict. District’scurrent ewere prcorporatDistrict wsubject t
ims and Dis1. Pending
or other
& Implementaachment B)
(not qualified
xperience. n Business. ng equipmen
ade/Businesss under a trarade/busines
Yes
No on a sepa
dent in the pr
signments. e to Paragrampleted by R
Yes
No
Not Arovide a sumsiness name
and Equitydent current(10%) or moess entity thten (10) yea
Yes
No (i) identify alch other firmgenerally dems, compaResponde
s investigaequity ownreviously etion, partnewith work, lto rejection
putes. Claims anddisagreeme
ation of MBCx M
d)
The Respnt under Res
s Name. Haade name oss name?
arate attachrior ten (10)
Do the prior aph 2 aboveRespondent
Applicable mmary of eae(s) using th
y Owners. tly or previoore in any othat providedars?
ll such equitms, companescribe the wnies, corpo
ents are cation that a ers, officer
employed bership or olabor, equip
n for non-res
Disputes. ent relating t
Measures Proje
pondent haspondent’s c
as the Respor business
hment identyears.
assignmente include all under a prio
ach other asse summary
Is any cuously emplother firm, co work, mate
ty owners, ofies, corporawork, materrations, parutioned thaResponden
rs and emplby or ownother businpment or sesponsivene
The Responto or arising
ect; RFP No. 1
PERALT
s installed current trade
pondent, in tname that i
tify all prior
ts identified assignment
or trade/busin
signment coformat set fo
urrent equityoyed by or ompany, corperials, equip
fficers and eations, partnrials, equipmrtnerships oat if the Dint failed to loyees of Rned equity ness entityervices, the ess.
ndent is pres out of a pr
5-16/27
TA COMMUNI
utility consue/business n
the prior tenis different t
r trade/busin
and disclosets similar to ness name?
ompleted unorth in Parag
y owner, oowned an
poration, papment or ser
employees; (erships or o
ment or servor other bustrict deter fully disclo
Respondentin any o
y that prev Responden
sently engagrivate or pub
TY COLLEGE
umption mename. _____
n (10) years than the Re
ness name
ed in the Rethose descr
?
der Respongraph 2.
fficer or emequity inte
artnership orrvices to the
(ii) provide thother businevices providesiness entitrmines basose and idet who are cuther firm,
viously provnt’s RFP Re
ged in a clablic contract
P a g e | 29
E DISTRICT
etering and ________
conducted espondent’s
s used by
espondent’s ribed in the
dent’s prior
mployee of rest of ten r other form e District in
he name(s) ess entities; ed by such ties to the
sed on the entify ALL urrently or company,
viding the esponse is
aim, dispute for energy
RFP for MeterQualifications April 25, 2016
4.2.2
4.2.3
The undersbehalf of thpersonal knconducted aresponses tthis Qualificinformation fact in any District deteResponse sprocess. Executed th I declare un
ing InstallationStatement (Att
conservacompens
If “Yes” oother dis
2. Prior ClaengagedcompensRespond
If “Yes” odisagree
3. Judgmenoutstandwhich ari
If “Yes” odisagree
igned is dulye above-ide
nowledge of all necessaryto this Qualifcations Statthat would rof the resp
ermines that shall be dee
his___ day o
nder penalty
& Implementaachment B)
ation servicsation or in w
Yes No
on a separatagreement.
aims and Dis in a claim,
sation or adent.
Yes No
on a separatment.
nts. Are thing against tise out of or
Yes No
on a separatment.
y authorizedentified Resp
each of they and approfications Staement are render any ronses. Theany respon
emed non-re
f _________
of perjury un
ation of MBCx M
ces/equipmewhich compe
te attachme
sputes. Thedispute or
additional tim
te attachme
ere any judthe Respondare related
te attachme
d to executepondent. The responsesopriate inquiratement. Thecomplete anresponse to e above-idese herein is
esponsive an
__________
nder Californ
___
___
Measures Proje
ent in whicensation is s
ent, provide d
e Respondedisagreememe or in w
nt, provide d
dgments, orddent or any in any mann
nt, provide d
e this Qualifiche undersigs to this Quries to detere undersignnd accuratebe false or ntified Respfalse or mis
nd the Resp
_ 20__ at___
nia law that
__________
__________
ect; RFP No. 1
PERALT
ch the Resought from
details of ea
ent has, withnt in which which comp
details of su
ders, decreeof the officener to a priva
details of su
cations Statned warrantalifications
rmine the trued declares
e; there are misleading a
pondent acksleading or cpondent will
__________ (City
the foregoin
__________ (Signatu
__________
5-16/27
TA COMMUNI
espondent the Respond
ach such pe
hin the pastthe Responpensation w
uch pending
es or arbitraers or equity ate or public
uch pending
tement undets and repreStatement auth, complet and certifieno omissio
and there arknowledges contains misnot further
___________and State)
ng is true and
___________re)
___________
TY COLLEGE
is seeking dent.
nding claim
t seven (7) yndent soughwas sought
claim, dispu
ation awardowners of R
c contract?
claim, dispu
er penalty ofesents that and/or that teness and as that the re
ons of matere no misstaand agrees
sstatements participate
________.
d correct.
___________
___________
P a g e | 30
E DISTRICT
additional
, dispute or
years been t additional t from the
ute or other
ds pending, Respondent
ute or other
f perjury on he/she has he/she has accuracy of esponses to erial fact or atements of s that if the
of fact, the in the RFP
_
_
RFP for MeterNon-Collusion April 25, 2016
STATE OF COUNTY O I, ________
(Type
the _______
foregoing Rundersigned
1. The partnership,
2. The
3. The
false or shaother respoResponse.
4. The
communicatoverhead, padvantage contract.
5. All s
6. The
thereof, or tany fee to aany membe
Execute
I declareand correct. _____________Signature _____________Name Printed or (________) ____Area Code and T
ing InstallationAffidavit (Attac
CALIFORNOF ________
___________d or Printed Nam
__________ (Title)
RFP Respond declares, s
RFP Respo, company, a
RFP Respo
Respondenam bid, and onse or any
Respondetion, or confprofit or cosagainst the
tatements c
Respondenthe contentsany person, cer or agent th
ed this ____
e under pen.
______________
______________r Typed
_____________Telephone Numb
& Implementachment C)
IA __________
__________me)
_________ o
nse (“the Restates and ce
onse is not association,
onse is genu
t has not dirhas not dir
one else to
nt has notference withst element o public bod
ontained in t
nt has not, d thereof, or corporation, hereof to effe
day of ____
nalty of perju
______________
______________
______________ber
ation of MBCx M
NON-COL(ATT
______
________, b
of ________
espondent”)ertifies that:
made in thorganization
ine and not
rectly or indirectly or indo put in sha
t in any mh anyone to of the bid pdy awarding
the RFP Res
directly or indivulged infopartnership
ectuate a co
________, 20
ury under th
__________
__________
___________
Measures Proje
LLUSION AFTACHMENT
being first du
___________(Respond
. In conne
he interest on or corpora
collusive or
rectly induceirectly collud
am RFP Res
manner, dirfix the bid p
price or thatg the contra
sponse and
directly, subormation or
p, company, ollusive or sh
0__ at _____
e laws of th
ect; RFP No. 1
PERALT
FFIDAVIT T C)
uly sworn, de
__________dent Name)
ection with t
of, or on beation.
sham.
ed or soliciteded, conspirsponse, or
rectly or inprice, or that of any oth
act or of an
related doc
bmitted the data relativeassociation,
ham RFP Re
__________(City, County an
he State of C
5-16/27
TA COMMUNI
eposes and s
____, the pa
he foregoin
ehalf of, an
ed any otherred, conniveto refrain fr
ndirectly, soat of any othher respondnyone intere
uments are
RFP Respoe thereto, or, organizatioesponse
__________nd State)
California tha
TY COLLEGE
says that I a
arty submittin
g RFP Res
ny undisclos
r respondented, or agreerom submitt
ought by aer bidder, o
dent, or to sested in the
true.
nse or any r paid, and won, bid depo
___________
at the forego
Page | 31
E DISTRICT
am
ng the
sponse, the
ed person,
t to put in a ed with any ting a RFP
agreement, or to fix any secure any e proposed
breakdown will not pay, sitory, or to
__.
oing is true
RFP for MeterCertificate of WApril 25, 2016
I,___
__________
1. I
“t
2. I
iac
__________(Consultant Nam
By: ____
(Signa
____
(Name
ing InstallationWorkers Compe
CER
__________(N
__________
am aware t
“Every emplothe following
(a) Ba
(b) BinwRd
am aware nsured agaaccordance commencing
__________me)
__________ature)
__________e Printed or Type
& Implementaensation Insura
RTIFICATE
___________Name)
___________(Consul
that Californ
oyer except g ways:
By being insuuthorized to
By securing fnsure either which may beRelations of
ue to his or
that the provainst liabilitywith the pro
g the perform
___________
___________
___________ed)
ation of MBCx Mance (Attachme
OF WORKE(ATT
_______ the
___________tant Name)
ia Labor Cod
the state sh
ured against write compe
from the Direas an indivie given upoability to seher employe
visions of Cy for workovisions of t
mance of this
___________
__________
__________
Measures Projeent D)
ERS’ COMPTACHMENT
e _________
__________
de § 3700(a
hall secure th
t liability to pensation ins
ector of Induidual employ
on furnishinglf-insure andees.”
California Labkers’ compethat code, as Contract.
______
_______
_______
ect; RFP No. 1
PERALT
PENSATIONT D)
__________ (Title)
_____, decla
a) and (b) pro
he payment
pay compenssurance in th
ustrial Relatiyer, or one e
g proof satisfd to pay any
bor Code §3ensation or and I will co
5-16/27
TA COMMUNI
N INSURANC
__________)
are, state an
ovides:
of compens
sation in onehis state.
ions a certifiemployer in factory to thy compensa
3700 requireto undert
omply with s
TY COLLEGE
CE
_________of
d certify tha
sation in one
e or more in
cate of consa group of
he Director oation that ma
e every empake self-inssuch provisi
Page | 32
E DISTRICT
f
t:
e or more of
surers duly
sent to self-employers,
of Industrial ay become
ployer to be surance inions before
RFSuAp
Pr
Na Au
FP for Metering Insubcontractors List (April 25, 2016
roject AA
ame of Bidder:
uthorized Sign
(A) Licensed Na
Subcontra
tallation & ImplemeAttachment E)
AAA
: ____________
nature: _______
ame of actor
entation of MBCx M
_____________
_____________
(B)Subcontractor
or Shop Ad
A
Measures Project; R
SUBCON(Att
_____________
_____________
Office, Mill ddress
Attach addition
RFP No. 15-16/27
PERALTA COMM
TRACTORS LIachment E)
____
____
Sub-cTrade or
W
nal page(s) as r
MUNITY COLLEGE
ST
(C) ontractor r Portion of
Work
required
E DISTRICT
(DSubconContraLicens
D) ntractor actors’ se No.
Page | 33
RFP for MeterDIR VerificatioApril 25, 2016
I am the ___
submitting tMeasures PDepartment
1. The Bid
DIR Reg
2. If the BRegistraBidder cnecessaRegistra
3. The Biddduration
4. The Bidsubmitte
5. The BidBidder’sWork, thidentified
6. The Bidall sub-tWork; asubcont
7. If any ofmislead
I have persCalifornia la Executed th
__________(Signature)
__________(Name, typed or
ing Installationon Registration
__________(Title/Positio
the accompProject; RFPt of Industria
der’s DIR Rgistration is J
Bidder is awation will occcompleting aary to renewation while p
der, if awardn of the Work
der has inded with the B
dder has prs Subcontrache Bidder wd in the Bidd
der’s solicitatier subcontrnd (ii) prospractors who
f the stateming, the Bidd
sonal first haaw that the fo
his ____ day
__________
__________r printed)
& Implementa(Attachment F
D
___________on)
panying PropP No. 15-1
al Relations (
Registration NJune 30, 20_
warded the Ccur: (i) priorall obligationw the Biddeerforming W
ded the Contk.
ependently Bid Proposal
rovided the ctors’ List or
will provide thder’s Subcon
ation of subractors mustpective subcare DIR reg
ments herein der’s Bid Pro
and-knowledoregoing is t
y of _______
___________
___________
ation of MBCx MF)
IR REGISTR(A
___ of _____
posal for R6/27. The (“DIR”).
Number is: ____.
Contract forr to expirations under theer’s DIR RegWork under th
tract for the
verified thatl of the Bidde
DIR Registr within twenhe District wntractors Lis
contractor bt be DIR regcontractors mgistered cont
are false ooposal is sub
dge of all oftrue and corr
___________
____
____
Measures Proje
RATION VEttachment F
___________
FP for MeteBidder is c
__________
r the Work on of the Ce Contract fogistration sohe Contract.
Work will re
t each Subcer is current
tration Numnty-four (24) with the DIRt.
bids includedgistered contmay only sotractors.
r omit matebject to rejec
f the foregoirect.
__, 20___ a
ect; RFP No. 1
PERALT
RIFICATIONF)
__________(Bidder Name)
ering Installcurrently reg
________. T
and the exontract Timeor the Work,o that there.
emain a DIR
contractor idtly a DIR reg
mber for eachours of the
R Registratio
d notice to ptractors at a
olicit sub-bids
rial facts renction for non
ing. I decla
t _________(City
5-16/27
TA COMMUNI
N
__________
lation & Impgistered as
The expiratio
xpiration date for the W, the Bidder
e is no laps
registered c
dentified in tgistered cont
ch subcontre opening o
on Number f
prospective all times durs from and
ndering a stn-responsive
are under pe
__________and State)
TY COLLEGE
___ (“Bidder”
plementationa contracto
on date of th
te of the BiWork; or (ii) pr will take alse in the Bi
contractor fo
he Subconttractor.
ractor identiof Bid Proposfor each su
subcontracting performacontract wit
tatement to eness.
enalty of pe
__________
Page | 34
E DISTRICT
”)
n of MBCx or with the
he Bidder’s
dder’s DIR prior to the l measures dder’s DIR
or the entire
ractors List
ified in the sals for the bcontractor
tors that: (i) ance of the h lower-tier
be false or
erjury under
__.
RFP for MeterEnvironmentalApril 25, 2016
It is the pSustainabilitthe environcomparablecreate and the procureremanufactulow-toxicity grown foodspromote conDistrict's SL The Districhttp://www.policy_FINALenvironmen Each RespoSustainabilit
ing Installationlly Sustainable
policy of thty) to purchament, when
e efficacy. sustain marment of envured produccleaning su
s, compostantracting wit
LBE program
ct’s Environperalta.edu/pL_3-31-08.pdtally sustain
ondent mustty Policy wit
& ImplementaProcurement P
EN
he Peralta ase productn compared The Distric
rkets for envvironmentallycts, FSC cerupplies and ble utensils,h businesse
m.
nmental Suprojects/4/Pdf click on
nable purcha
t execute anh the Respo
ation of MBCx MPolicy (Attachm
NVIRONMENPROCU
(At
Communitys or serviceto other pr
t recognizevironmentally sustainablrtified lumbeGreen Seal , non-polysty
es in close pr
stainability urchasing%2the District
asing policy.
nd submit thondent’s RFP
Measures Projement G)
NTALLY SUUREMENT Pttachment G
y College s that minimroducts ands that enviry sustainabe products,
er, Energy Sapproved c
yrene food croximity, to r
Policy is 20ProcedureServices C
e executed P Response
ect; RFP No. 1
PERALT
USTAINABLPOLICY G)
District (Bomize the advd services thronmentally le products,such as pro
Star rated eqchemicals, locontainers, nreduce our c
available fes/BP_2_40
Center tab a
Statement oe.
5-16/27
TA COMMUNI
LE
oard Policy verse effectshat serve th
responsible, and is comoducts with quipment, loocally sourcnon-petroleucarbon footp
for review 0_Environmeand then P
of Complian
TY COLLEGE
2.40, Envs on human he same pue purchasin
mmitted to ehigh recyclew and no V
ced organic/sum-based inprint and to p
and/or dowental_Sustaiurchasing t
ce With Env
Page | 35
E DISTRICT
vironmental health and
urpose with g will help ncouraging ed content,
VOC paints, sustainably ks, and will
promote the
wnload at: inability_Po view the
vironmental
RFP for MeterStatement of CApril 25, 2016
Responden The long-teproduced aservice prom
____
*If “yes” desthe District w__________
__________
__________
__________
__________
__________
__________
I am authorbehalf of ththe foregoin By: ____
(Signa
____(Type
Title ____ Date ____
ing InstallationCompliance wit
ST
nt: ________
erm goal of and deliveremote the Dis
___Yes* _
scribe in thewill promote __________
__________
__________
__________
__________
__________
__________
rized to exee above-ide
ng is true and
__________ature)
__________d or Printed Nam
__________
__________
& Implementath Environment
TATEMENT SUS
__________
the Districtd in an env
strict’s Enviro
______No
e following hthe District’
___________
___________
___________
___________
___________
___________
___________
ecute this Stentified Respd correct.
___________
___________me)
___________
___________
ation of MBCx Mtally Sustainab
OF COMPLSTAINABLE
(Att
__________
t is to purcvironmentallonmentally S
ow the prods Environme
___________
___________
___________
___________
___________
___________
___________
tatement of pondent. I d
_________
_________
_________
_________
Measures Projele Procuremen
LIANCE WITPROCURE
tachment G
________
chase produly sustainabSustainable
duct or servientally Susta__________
__________
__________
__________
__________
__________
__________
Compliancedeclare unde
ect; RFP No. 1nt Policy (Attac
PERALT
TH ENVIRONEMENT POLG-1)
ucts with zeble manner.Procuremen
ce that the ainable Proc__________
__________
__________
__________
__________
__________
__________
e with Envirer penalty o
5-16/27 hment G-1)
TA COMMUNI
NMENTALLLICY
ero waste, h Does Re
nt goal?
Respondentcurement go___________
___________
___________
___________
___________
___________
___________
ronmental Sof perjury un
TY COLLEGE
LY
high recycleespondent’s
t propose toal. __________
__________
__________
__________
__________
__________
__________
Sustainabilitynder Californ
Page | 36
E DISTRICT
ed content, product or
o provide to
_________
_________
_________
_________
_________
_________
_________
y Policy on nia law that
RFP for MeStatement April 25, 20
Respond I hereby discriminnot discrrace, ethand exprpolitical Order No I am autbehalf ofpenalty oherein is Dated: _ By: _
(S
_(N
etering Installaof Non-Discrim
016
STATEM
dent: _____
certify that tnation, whereriminate agahnicity, natioression, disaaffiliation. To. 11246 (as
thorized to f the Responof perjury untrue and co
__________
__________Signature)
__________Name typed or pr
tion & Implememinatory Emplo
ENT OF NO
___________
the above-ide employee
ainst any emonal origin, rability, pregnThe Respon
s amended b
execute thindent. I havnder the lawrrect.
________
__________
__________rinted)
entation of MBCoyment Practice
ON-DISCRIM(Atta
__________
dentified Ress are treate
mployee or areligion, ageancy, coverendent will aby Executive
s Statemenve personal
ws of the sta
_________
_________
Cx Measures Pes (Attachment
MINATORY Eachment H)
__________
spondent wiled with dignapplicant fore, marital staed veteran st all times c
e order No.11
nt of Non-D knowledge te of Califor
_________
_________
Project; RFP Nt H)
PERALTA
EMPLOYME)
_
ll maintain aity and respr employmenatus, sexuastatus, protecomply with1375).
iscriminatoryof all of the
rnia that the
o. 15-16/27
A COMMUNIT
ENT PRACT
a work enviropect. The Rnt because l orientation
ected genetich all provisio
y Employmee foregoing. e information
TY COLLEGE D
TICES
onment freeRespondentof gender, c
n, gender idec informationons of Exec
ent Practice I declare u
n I have prov
Page | 3
DISTRICT
e from does
color, entity n and cutive
es on under vided
37
RFP for MeterLabor & MaterApril 25, 2016
ing Installationrials Payment B
AGREEME
& ImplementaBond (Attachme
NT FOR ME
ation of MBCx Ment J)
ETER/MBCx(ATTA
Measures Proje
x EQUIPMENACHMENT
ect; RFP No. 1
PERALTA C
NT AND REI)
5-16/27
OMMUNITY C
ELATED SER
Pa
COLLEGE DIST
RVICES
age | 38
TRICT
RFP for MeterLabor & MaterApril 25, 2016
KNOW ALLSurety and with their reunto PERAL__________in lawful mexecutors, a
WHEREAS,Contract foMeasures Pthe Obligeetherein are i WHEREAS,prompt, full services use NOW THERClaimant forthe Work; (iunder the CDevelopmenSection 130Contract the The term “Cincluding wior furnishingthe Work unwere sold, letheir assigns In the evenlabor, materand reasona The Suretyalteration, dWork to beContract Dothe Surety h
ing Installationrials Payment B
L MEN BY __________
espective heLTA COMM__________
money of theadministrato
TH
, the Obliger the Work Project; RFP for performincorporated
, by the termand faithfu
ed, or reaso
REFORE, ifr all labor, mii) of amoun
Contract; andnt Departme020 of the en this obliga
Claimant” shthout limitatg labor, matnder the Coneased or rens and succe
nt that suit isrials or serviable attorney
, for value deletion, add performed
ocuments, shhereby waive
& ImplementaBond (Attachme
LABO
THESE P__________
eirs, executoMUNITY COL___________e United Strs, successo
HE CONDIT
ee, by resodescribed a
P No. 15-16mance of thed herein by t
ms of the Conl payment tnably requir
f the Principmaterials or s
ts due unded (iii) of amouent from wagUnemploymation shall b
hall refer to aion, all persoterials or sentract Documnted. This Boessors, a righ
s brought oices provideys fees purs
received, hdition, or an
thereunderhall in any wes notice fro
ation of MBCx Ment J)
OR & MATE(Att
RESENTS __________ors, administLLEGE DIST
___________ates, well aors and assig
TION OF TH
lution of itsas RFP for
6/27. WHEREe Work, the Ahis referenc
ntract Documto any Claimred for use, i
pal shall proservices useer the Unemunts requireges of the em
ment Insurane void; othe
any person, ons and enti
ervices usedments, withoond shall inuht of action u
n this Bonded or furnishesuant to Calif
ereby stipuly other mod, the Specif
way limit, resom the Oblige
Measures Proje
RIALS PAYtachment J)
that we, __________, atrators, succTRICT (“the__________and truly to gns, jointly a
IS OBLIGAT
s Board of r Metering EAS, the PrAgreement a
ce and made
ments, the Pmant, as hen the perform
omptly, fullyed or reason
mployment Ind to be dedumployees ofnce Code wrwise, it sha
corporationities describ or reasona
out regard foure to the beupon this Bo
by any Claed by such Cfornia Civil C
lates and adification to fications or strict or otheee of any su
ect; RFP No. 1
PERALTA C
YMENT BON)
___________s Principal,
cessors and e Obligee”) fo____ Dollars be made, and severall
TION IS SUC
Trustees haInstallationincipal, has and all othe
e a part here
Principal is rereinafter demance of th
y and faithfnably requirensurance Coucted, withhef the Principwith respectall be, and re
n, partnershied in Califor
ably requiredor whether senefit of all Cond.
aimant for aClaimant, thCode §9554
agrees that the terms othe Drawing
erwise affect uch change,
5-16/27
OMMUNITY C
ND
__________are jointly aassigns, he
or payment s ($_______
we bind ouy.
CH THAT:
as awardedn & Implementered into
er Contract Deof.
equired to fufined, for ale Work.
fully make ped for use inode for workeld and paid
pal and its Sut to work aemain, in full
ip, proprietornia Civil Cod for use in such labor, mClaimants so
amounts duehe Surety sh.
no change,of the Contrgs, or any oits obligatioextension o
Pa
COLLEGE DIST
__________and severalleld and firmlof the pena
___________urselves, ou
d to the Primentation oo an AgreemDocuments s
urnish a bonll labor mate
payment: (i)n the performk or labor ped to the Empubcontractond labor unforce and e
orship or othode §9100, p
the performmaterials or o as to give t
e such Claimall pay for th
extension ract Documeother portio
ons under thof time, altera
age | 39
TRICT
____, as y, along y bound
al sum of _______) ur heirs,
ncipal a f MBCx
ment with set forth
d for the erials or
) to any mance of erformed ployment rs under nder the effect.
er entity providing mance of
services them, or
mant for he same
of time, ents, the n of the is Bond; ation,
RFP for MeterLabor & MaterApril 25, 2016
deletion, adContract Do IN WITNES__________
______
By:
Title: _ (Attac
_____
By:
(AttacAcknoCertifiFact’s
Co
_____(Conta _____(Stree _____(City, (_____Teleph _____(Emai
ing Installationrials Payment B
ddition or othocuments, th
SS WHEREO_, 20__ by th
______________(
__________(Signature) __________(Typed or Pr
______________
h Notary Public
______________
__________(Signature of __________(Typed or Pr
h: (i) Attornowledgment ocation; and (iii) Signature)
ontact nameemail add
______________act Name)
______________et Address)
______________State & Zip Code
__) __________hone
______________l address)
& ImplementaBond (Attachme
her modificahe Drawings
OF, the Princheir duly aut
_____________(Contractor-Prin
______________
______________rinted Name)
______________
c Acknowledgem
______________(Surety N
______________f Attorney-In-Fac
______________rinted Name of A
ney-In-Fact Ceof Authorizing
Notary Public A
e, address, dress for no
______________
______________
______________e)
____ (______) __
______________
ation of MBCx Ment J)
tion to the Cor the Spec
cipal and Suthorized age
______________ncipal Name)
______________
______________
______________
ment of Principa
______________Name)
______________ct for Surety)
______________Attorney-In-Fact)
ertification; (ii) Signature oAcknowledgem
telephone otices to the
______________
______________
______________
_____________Fax
______________
Measures Proje
Contract Doccifications of
urety have eent or repres
______________
______________
______________
______________
al’s Signature)
______________
______________
______________
) Notary Puon Attorney-F
ment of Attorney
number ande Surety
______________
______________
______________
_
_
ect; RFP No. 1
PERALTA C
cuments, theany other p
executed thisentative.
___
___
___
___
___
___
___
blic Fact y-In-
d
__
__
__
5-16/27
OMMUNITY C
e Work to bportion of the
s instrumen
Pa
COLLEGE DIST
be performede Contract D
t this _____
age | 40
TRICT
d under the ocuments.
____ day of
RFP for MeterPerformance BApril 25, 2016
KNOW ALLand ______respective PERALTA __________in lawful moadministrato
WHEREAS,for the WoProject; RF WHEREAS,the Agreempart hereof WHEREAS,the Principa NOW THERobligations the Contracindemnify alosses, liabibe incurredperformancemodificationthis obligatio The Surety,Time, adjusterms of theDrawings shhereby waivof Contract Work to be In the evenPrincipal’s oSurety of thContract, thelection to Contract Dohowever, thshall be suunreasonab
ing InstallationBond (Attachme
L MEN BY T__________heirs, execCOMMUNIT
__________oney of the Uors, success
T
, the Obligeerk described
FP No. 15-16
, the Principment and all
by this refer
, by the termal’s prompt, f
REFORE, ifand things t
ct Documentsnd save harility and dam
d by the Obe of any orns, and ameon shall be v
for value retment of the
e Contract Dhall limit, resves notice frPrice, alteraperformed u
t of the Oblobligations the Principal’e Surety sheither remeocuments aat the proceubject to th
bly withheld,
& Implementaent K)
THESE PRE___________cutors, admTY COLLE___________United Statesors and ass
THE CONDI
e, by resolud as RFP f6/27
pal, has enteother Contraence.
ms of the Cofull and faith
f the Principto be done as as they marmless the Omages, claimbligee by rer all of the endments, thvoid; otherw
eceived, heree Contract PDocuments, strict or otheom the Obligations, deletunder the Co
igee’s termithereunder, s breach or all notify Obdy the defand complete
edure by whihe advancelimited or re
ation of MBCx M
PERFO(At
ESENTS tha__________inistrators, GE DISTRI
___________es, well and signs, jointly
ITION OF TH
tion of its Bfor Meterin
ered into an act Docume
ntract Docuful performa
pal shall prand performay be modifiObligee and ms, judgmeneason of th
terms or thhereto, and ise, it shall b
eby stipulaterice, alteratithe Work torwise impairgee of any stions, additioontract Docu
nation of thewithin twendefault of t
bligee in writault or breace the Work ich the Suree written aestricted. Th
Measures Proje
ORMANCE Bttachment K
at we, _______, as Princisuccessors ICT (“the O__________truly to be mand several
HIS OBLIGA
oard of Trusng Installati
agreement wents set forth
ments, the Pance of the W
romptly, fullymed by the P
ed or amendall of its off
nts, liens, coe failure orhe obligatioany warran
be, and rema
es and agreons, deletion
o be performr Surety’s obsuch changeons or other ments, or th
e Contract dty (20) days
the Contractting of Suretch of the Prat its own
ety undertakepproval of
he insolvenc
ect; RFP No. 1
PERALTA C
BOND K)
__________ipal, are join
and assigObligee”) fo______ Dollmade, we binly.
ATION IS SU
stees has awion & Impl
with the Obh therein are
Principal is rWork of the C
y and faithfPrincipal in sded from timficers, agentosts, and feer default onns of the C
nties or guaain, in full fo
es that no cns, additions
med thereundbligations ores, adjustmemodification
he Drawings
due to the Ps after writtet Documentsty’s assumptrincipal or toexpense (“tes to dischathe Oblige
cy of the Prin
5-16/27
OMMUNITY C
__________ntly and sevns, held ar payment ars ($_____nd ourselves
UCH THAT:
warded to thementation
ligee for pere incorporat
required to fuContract Do
fully performstrict accordme to time; ats and emploes of every dn the part oContract Dorantees reqrce and effe
change, adjus, or any othder, or to thObligee’s ri
ents of Contns to the Coor the Spec
Principal’s ben notice frs and Obligtion of obligao take charthe Notice o
arge its obligee, which ancipal or the
COLLEGE DIST
__________verally, alongnd firmly bof the pen
__________s, our heirs,
he Principal n of MBCx
rformance oted herein a
urnish a boncuments.
m each andance with th
and if the Prioyees from description, of the Princocuments, inuired thereu
ect.
ustment of thher modificahe Specificatghts hereunract Time, a
ontract Docucifications.
reach or derom the Oblee’s terminaations hereurge of the Wof Election”)gations undeapproval she Principal’s
Page | 41
TRICT
, as Surety g with their
bound unto nal sum of _________) executors,
a Contract Measures
f the Work; and made a
nd ensuring
d all of thehe terms of ncipal shall any and all which may
cipal in the ncluding all under; then
he Contract tions to the tions or the
nder; Surety adjustments uments, the
efault of the igee to the ation of the under by its Work of the ); provided, er this Bond hall not be
denial of a
RFP for MeterPerformance BApril 25, 2016
failure of peprompt, diligNotice of EPrincipal or In the evenhereinaboveperformanceseverally liaPrincipal’s obligations tthe then remcosts of perperformanceshall be deePrice. If suibe jointly anObligee the IN WITNES__________
_________
By: _
(_(
Title: _ (Attach NSignature)
_______
By: _
( _(
(Attach: (AcknowledCertificatioAttorney-In
ing InstallationBond (Attachme
erformance ogent inquiry
Election or fto complete
nt the Surete, the Oblige or defaultable to the Ofailure of pthereunder, maining balarformance, de or default emed to inclit or other prnd severally rewith, inclu
SS WHEREO_, 20____ by
______________(Contra
______________Signature)
______________Typed or Printed
______________
Notary Public)
______________
______________Signature of Atto
______________Typed or Printed
(i) Attorney-In-dgment of Auon; and (iii) n-Fact’s Signatu
& Implementaent K)
or default unand investi
for its failure the Work.
ty fails to isgee may tht or to comObligee for
performance including wiance of the damages an
under the Cude the cosroceeding is liable for pading without
OF, the Priy their duly a
______________actor-Principal N
______________
______________d Name)
______________
c Acknowledg
______________(Surety Name)
______________orney-In-Fact for
______________d Name of Attorn
Fact Certificatthorizing SignNotary Public
ure.)
ation of MBCx M
nder the Coigation of sue to promp
ssue its Nohereafter caplete the Wall damageunder the
ithout limitatContract P
nd other costContract Do
sts or value obrought upo
ayment to tht limitation, a
ncipal and authorized a
______________Name)
______________
______________
______________
gement of P
______________
______________Surety)
______________ney-In-Fact)
tion; (ii) Notarature on Atto
c Acknowledge
Measures Proje
ontract Docuuch denial, tly remedy
tice of Elecause the cu
Work. The Ps and costsContract D
tion the costrice; providets sustained
ocuments shof any Chanon this Bondhe Obligee oattorneys’ fe
Surety haveagent or repr
______
______
______
_____
Principal’s
_______
_______
_______
ry Public orney-Fact ement of
ect; RFP No. 1
PERALTA C
uments shallbe justificatthe failure
ction to Oblure or remPrincipal ans sustained Documents ts of cure or ed that the d by the Oblhall be limitenges to the Wd by the Obliof all costs, ees.
e executed resentative
Contactnumber a
____________(Contact Name ____________(Street Addres ____________(City, State & Z (______) ____Telephone ____________(Email address
5-16/27
OMMUNITY C
l not by itseion for Sureof performa
igee within medy of thend the Sureby the Oblior default completion Surety’s liabigee upon th
ed to the peWork which igee, the Suexpenses an
this instrum
t name, addnd email ad
to the Su
______________e)
______________ss)
______________Zip Code)
__________ (__
______________s)
COLLEGE DIST
elf, without thety’s failure ance or def
the time pe Principal’sty shall be gee as a rein its perfoof the Work
bility hereunhe Principal
enal sum heincreases th
urety and Prind fees incu
ment this __
dress, telephddress for nurety
_____________
_____________
_____________
_____) ________Fax
_____________
Page | 42
TRICT
he Surety’s to give the fault of the
rovided fors failure of
jointly andesult of theormance ofk exceeding nder for the ’s failure of reof, which he Contract ncipal shall
urred by the
____day of
hone notices
_______
_______
_______
_______
________
RFP for MeterProject Labor AApril 25, 2016
ing InstallationAgreement (At
& Implementatachment L)
ation of MBCx M
PROJECT L(A
Measures Proje
LABOR AGttachment L
ect; RFP No. 1
PERALTA C
REEMENTL)
5-16/27
OMMUNITY CCOLLEGE DIST
Page | 43
TRICT
RFP for MeterPLA Letter of AApril 25, 2016
ing InstallationAssent (Attach
& Implementament L-1)
ation of MBCx M
PLA LET(Att
Measures Proje
TTER OF Atachment L
ect; RFP No. 1
PERALTA C
ASSENT L-1)
5-16/27
OMMUNITY CCOLLEGE DIST
Page | 44
TRICT