44
R D A M L L P METERI R RFP Issuanc Department Advertisemen Mandatory C atest Date/T atest Time/D Proposal Due Attac PERAL NG INSTALLA RFP Service e Date nt Dates ampus Site Time For Su Date for Sub e Date chment No. A B C D E F G H I J K L L-1 LTA COMM ATION & IMPL RF RFP ACT es Descript Observation bmittal of RF bmittal of RF RFP A Proposal Qualificati Non-Collu Certificate Subcontra DIR Regis Environme Non-Discr Agreemen Labor & M Performan Project La PLA Lette UNITY COL LEMENTATION FP NO.15-16/2 IVITIES SCH ion ns FP Question FP Response ATTACHME De ons Stateme usion Affidav e of Workers actors List stration Verif entally Susta riminatory Em nt Materials Pay nce Bond abor Agreem er of Assent LLEGE DIST N OF MBCx M 27 HEDULE Wedn Purch Wedn Wedn Date Camp per R ns 4:00 P three date f Respo es 4:30 P Tuesd 2:00 P Mond ENTS escription ent vit s Compensa fication ainable Proc mployment P yment Bond ment TRICT EASURES PR Date nesday, Marc hasing Depa nesday, Marc nesday, Marc and time for pus Site Obs RFP, Paragra P.M. (3) days bef for submittal onse PM day, April 19 PM day, April 25, ation Insuran curement Po Practices ROJECT ch 23, 2016 artment ch 23, 2016 ch 30, 2016 r each servation aph 1.6 fore latest l of RFP 9, 2016 , 2016 nce olicy

PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RDA

M

L

L

P

METERI

RRFP IssuancDepartment Advertisemen

Mandatory C

atest Date/T

atest Time/D

Proposal Due

Attac

PERAL

NG INSTALLA

RFP Servicee Date

nt Dates

ampus Site

Time For Su

Date for Sub

e Date

chment No. A B C D E F G H I J K L

L-1

LTA COMM

ATION & IMPLRF

RFP ACTes Descript

Observation

bmittal of RF

bmittal of RF

RFP A

ProposalQualificatiNon-ColluCertificateSubcontraDIR RegisEnvironmeNon-DiscrAgreemenLabor & MPerformanProject LaPLA Lette

UNITY COL

LEMENTATIONFP NO.15-16/2

IVITIES SCHion

ns

FP Question

FP Response

ATTACHME

De

ons Statemeusion Affidave of Workersactors List stration Verifentally Sustariminatory Emnt Materials Paynce Bond abor Agreemer of Assent

LLEGE DIST

N OF MBCx M27

HEDULE

WednPurchWednWednDate Campper R

ns 4:00 Pthree date fRespo

es 4:30 PTuesd2:00 PMond

ENTS

escription

ent vit s Compensa

fication ainable Procmployment P

yment Bond

ment

TRICT

EASURES PR

Date nesday, Marchasing Depanesday, Marcnesday, Marcand time for

pus Site ObsRFP, ParagraP.M. (3) days bef

for submittalonse PM day, April 19PM

day, April 25,

ation Insuran

curement PoPractices

ROJECT

ch 23, 2016artment ch 23, 2016ch 30, 2016r each servation aph 1.6

fore latest l of RFP

9, 2016

, 2016

nce

olicy

Page 2: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

The PeraltaEnergy MaRespondent 1. RFP

1.1. Met1.1.1.

1.1.2.

1.1.3.

1.2. Dist

(i) (ii) (iii)(iv)

(v)

allation & Imple

a Communitynagement Sts’ qualificat

ter EquipmeEquipmentinstall theitems/serviAgreementand incorpand implem Equipment monitoring other relatCollege, Minclude buiThe selectewith Meterarchiving, ainstallation MBCx musEquipment monitoring/requiremenGovernmen“Conservatand the AgGovernmenGovernmenproposed, t

trict RFP Ob

ConnecInstall n

) Calibrat) Provide

new meEnsure 2-10-16(MBCx)(Califordemonsperformthat are

ementation of M

y College DSystem (EMions and inc

nt and MBC. The Resp

e complete ces (collectit for Meter orated into t

mented in se

Capabilitiessystem for ted data at erritt Collegelding kWh, hed firm musr Equipmenand retrievalof the Mete

st [describeproposed

/reporting/mnts. nt Code §42tion Measuregreement isnt Code §42nt Code §42the cost to th

bjectives. By

ct all buildingnew BTU, nate existing Ee and instaleters that the bui

6), are prope) program. rnia Commstrate expe

mance of inse similar to th

MBCx Measure

District requeMS) subject corporate pro

Cx Equipmenpondent sele

Meter Eqvely “EquipmEquipment/Mthis RFP. M

eparate phas

s. The Equthe District tspecific fac

e and the Diheating hot wst deliver a ct that provil of energy per Equipmene basic ca by eachanagement

217 et. seqes” as that te an “Energy217.11(f). T217.16, basehe District a

y this RFP, t

gs with existatural gas anElectric Metel a new fron

ldings, listederly meteredThis MBCx

munity Colleerience in stalling energhe Equipme

es Project

ests organizto this RF

oposals for c

nt. ected pursuaquipment ament”) in acMBCx ServMeter Equipses.

uipment subto meter andcilities at itsistrict. The ewater energcomplete (tuides easy a

performancent, the selecapabilities/fuh Respondsystem me

. The equierm is used y Service CThe successed on experind other fac

the District’s

ing electricand electricityers nt end to the

d in Table 1 d in preparaprogram is

eges/Investocomplying

gy conservant.

PERALT

zations qualFP to submcompleting t

ant to this Rand MBCx ccordance wices & Equment and M

bject to thisd collect enes four locatienergy moniy and chilledurnkey) webaccessibility

e, at the whocted firm willunctions].Tdent must eeting the D

ipment and and defined

Contract” as sful Responience of the

ctors set forth

s primary goa

al sub-metersy meters

e existing EM

(See attachation for the

approved aor Owned

with CCation equipm

TA COMMUNI

ified to provit response

the Services

RFP will be rEquipment

with the termsipment (“Ag

MBCx Equipm

s RFP must ergy consumions: Collegitoring for thd water eneb-based eney, tracking, ole building lel install the

The Meter Eprovide

District’s ope

services sud in Governm

that term isndent will be contractor, h in this RFP

als are;

s to the Met

MS to conne

hed file Perae monitoring and adminis

Utility). C/IOU req

ment for CC

TY COLLEGE

vide and coes which ess.

required to pt along ws and condit

greement”) ament must b

provide a mption trend, ge of Alamee Meter Equrgy (where a

ergy monitorproblem invevel. Upon MBCx measEquipment a seamles

erational and

ubject to thiment Code §s used and e selected pthe type of

P.

ter Equipmen

ect all the e

alta Meter Libased com

stered by theResponde

uirements CC/IOU reba

Page|2

E DISTRICT

omplete the stablish the

provide and ith related tions of the attached to be installed

web-based usage and

eda, Laney uipment will applicable). ring system vestigation, completing

sures. The and MBCx ss energy d functional

is RFP are §4217.11(c)

defined in pursuant to technology

nt

existing and

ist for SOW mmissioning e CCC/IOU ents must and prior

ates/funding

Page 3: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.3. Pro39).conschThecon

1.4. Distto tRFP

1.5. Obt

ConOppResrou

1.6. Man

Equwithaffeimpothecamentatte

L

M

C

D

allation & Imple

p. 39. Fund. Responservation meduling requ

e selected firtractor, and

trict RFP Cohe District RP shall be in

SPP5O(5s

taining RFPntact. Theportunities” tspondents tinely chec

ndatory Camuipment andhin a campecting price pacts of site er materials

mpus obserirety of eac

end all man

CamLaney College

Merritt College

College of Alam

District

ementation of M

ds for the Eqndents musmeasures, inuirements form must alsfor the Distr

ontact. QueRFP Contac writing and

Seraphine NzPurchasing BPeralta Comm

01 5th AvenuOakland, Cal510) 466-72nzomo@per

. The RFP RFP maytab, then “Lwho have king the Dis

mpus Site Obd MBCx Equs are critior scheduleconditions rprovided by

rvation tourch campus odatory cam

mpus

meda

MBCx Measure

quipment arest demonstrncluding witor the Districso complete rict.

estions or othct set forth b

transmitted

zomo Buyer munity Colleue ifornia 946055 ralta.edu

P may be oy also be oList of Curre

obtained strict’s Purc

bservations.uipment inscal for Res

e. No adjusreasonably oy or on behas at the follobservation

mpus observ

DThursday11:00 AM

Thursday2:30 PM

Thursday1:00 PM

Thursday10:00 AM

es Project

e derived frorate experihout limitatict to secure and submit

her communbelow. All cby email, U

ege District

06

btained fromobtained onnt RFPs/Bidthe RFP;

chasing De

A completestallations atspondents’ stment is alobservable oalf of the Diowing date

n tour; the Rvation tours

Date/Time y, April 07, 201M

y, April 07, 201

y, April 07, 201

y, April 07, 201M

PERALT

om the Califoence with ion, compliaProp 39 fun all required

nications relcommunicatS Mail or fax

m the Distrin-line at wwds.” The DiResponden

epartment w

e understandt each camfull understllowed undeor reasonabistrict. The

es and timesRFP Respos.

16 Building900 FallOakland

16 Huey P.12500 COakland

16 Building555 RalAlameda

16 Departm333 EasOakland

TA COMMUNI

ornia Clean implement

ance with rnding allocad Prop 39 re

ating to thistions to the x. The Distr

ct by requeww.peralta.eistrict will nnts are so

web site for

ding of the cmpus and eatanding of ser the Agreely inferable District wil

s. Respondnse of a Re

Meeting Lg E, ground levelon Street d, CA. 94607

. Newton LoungCampus Drive d, CA. 94619

g A ph Appezzato a, CA. 94501

ment of Generast 8th Street d, CA. 94606

TY COLLEGE

Energy Jobing Prop 3

reporting, auated for the Eeports, for its

s RFP shall District rela

rict RFP Con

est to the Dedu, in the not maintai

olely respoaddenda to

conditions foach designasite conditioement for coby data, infoll conduct mdents must esponse wh

Location el

ge

Memorial Pkw

al Services

Page|3

E DISTRICT

s Act (Prop 39 energy uditing and Equipment. self, as the

be directed ating to this ntact is:

District RFP“Business

in a list of onsible for o this RFP.

or the Meter ated facility ons factors ost or time ormation or mandatory attend the

ho failed to

y

Page 4: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.7. Refconare

1.8. RFP

notereseacti

1.9. Res

com1.9.1

1.9.2

1.10. Eset

1.10.

1.10.

1.10.

2. Equipm

College (i) (ii)

allation & Imple

ference Matnection withnot infallible

P Activities; ed in the coerves the ivities.

spondent Qumply with the. Contract

be licensElectricaperforma

. DIR RegResponsDepartmmust coVerificati

Equipment Iforth in this 1. PLA Lett

AgreemeCouncil (AttachmeRespondthe Lette

2. PrevailinprevailingCode §1Californiathe WorkWAGE http://wwa copy oLabor Coof Industand enfo

3. Labor & required penal sushall be Admitted

ment. The Eof AlamedaMeter EquipMBCx.

ementation of M

terials. Theh this RFP: Be. Responde

Timeline. over page oright to m

ualifications.e following toors’ Licensesed by the l contractor

ance under tistered Con

se and at allent of Indusmplete andon incorpora

nstallation RRFP, Equipmter of Assenent between(“PLA”). A cent L. Attacdents must ter of Assent wg Wage Rag wage rate1773, the Da has determk is to be p

SCALE” ww.dir.ca.govof all applicaode. Duringtrial Relation

orce the ConMaterials Pto obtain a m of each Bin the form a

d Surety.

Equipment islocations. E

pment

MBCx Measure

e following Building pla

ents must ind

The RFP aof this RFPodify the R

. In additiono be deemede. PursuantContractorsat the time he Agreemetractor. Eacl times durin

strial Relation submit witated into this

Requirementment installa

nt. Performa the District

copy of the Pchment L-1thoroughly rewith their RFtes. Labor

e for the clasDirector of tmined the gperformed.

are av/dlsr/statistible prevailin the Work ans shall motractor’s pre

Payment BoLabor & Ma

Bond being and content

s for specificEquipment i

es Project

materials ans and drawdependently

activities andP. The foreRFP activit

n to other red qualified fot to Public C’ State Liceof submittin

ent. ch Respondeng performans (“DIR”) puth their RFs RFP.

ts. In additation is subjeance under tt and AlamePLA and amto this RFP eview the PFP Responsfor Equipme

ssification ofthe Departmenerally preCopies of

available cs_research

ng wage ratend pursuant

onitor complievailing wageond; Performaterial Paym100% of theincluded wit

c facilities onstallation m

PERALT

are availablwings with my verify the in

d schedule egoing notwties and/or

equired quaor award of tContract Codense Board ng the RFP

ent must bence under tursuant to LP Respons

ion to Equipect to the folthe Agreem

eda County mendments th

is the LettePLA and musses. ent installatif labor proviment of Indevailing rates

these deterfor revie

h.html. The es at conspict to Labor Coiance with pe rate obliga

mance Bondment Bond ae Contract Pth this RFP

on the Districmust be com

TA COMMUNI

e for reviewmeter locationformation.

for completwithstanding, r schedule

alifications, ethe Agreemede §3300, eas a B-GenResponse a

, at the timehe Agreeme

Labor Code §ses the form

pment confollowing requent is subjeBuilding anhereto are aer of Assentst include a

on shall be ded. Pursu

dustrial Relas of wages rminations, ew on successful cuous locatiode §1771.4prevailing wations d. The sucand a PerforPrice under t

and shall be

ct, Laney Completed in two

TY COLLEGE

w by Respons. The bui

ting RFP acthe Districtfor compl

each Responent. each Responneral Buildinand all at tim

e of submittinent, registere§1773.3. Rem of DIR R

orming to reuirements. ect to the Prod Construct

attached to tt described iduly execut

paid not lesuant to Califoations of thin the localientitled “PR

the inteResponden

ions as requ4(a)(4), the D

wage rate re

cessful Resrmance Bonthe Agreemee issued by a

ollege, Merro sequential

Page|4

E DISTRICT

pondents in ilding plans

ctivities are t expressly eting RFP

ndent must

ndent must ng or C-10 mes during

ng the RFP ed with the espondents Registration

quirements

oject Labor tion Trades this RFP as in the PLA. ted copy of

ss than the ornia Labor e State of ity in which REVAILING ernet at

nt shall post uired by the Department quirements

spondent is nd, with the ent. Bonds a California

ritt College, l phases:

Page 5: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

2.1. Equfaci

2.2. Cam

interela

2.2.1

2.2.2

2.2.3

allation & Imple

The followinwith constra

uipment and lities noted i

Building No. 1 2 3 4 5 6 7 8 9

10 11 12 13 14 15

mpus Descriended to be ated utility se. District.

Administ

. College buildingsconferenFifteen (1which is switchboThe HVAdirect excampus primary lsystem.

. Laney Coclassroommechanielectrical480V/277C to distis genera

ementation of M

ng generally aints and oth

Campus Fain Table 1 be

TabCamp

Merritt CollMerritt CollMerritt CollMerritt CollLaney CollLaney CollLaney CollLaney CollLaney CollLaney CollLaney CollCollege of College of District District

iptions. A brsummary in

ervices equipThe District

tration Buildi

of Alamedas with clasnce rooms. M15) KVA ele

then transfoard located AC system xpansion cofrom a centoop that serIt also has a

ollege. The ms, laboratocal spaces, l service is s7 (3- phase ribution panally compris

MBCx Measure

describes thher requirem

acilities. Theelow.

ble 1; PCCDpus

lege lege lege lege ege ege ege ege ege ege ege Alameda Alameda

rief descriptin nature. Tpment subjet location cng.

. The Collessrooms, laMechanical ctrical servicformed 480at Building Cis generallyoling or no tralized heatrves all buildan adjacent

Laney Colleories, genera library bu

supplied to 4-wire) and

nels located ed of air ha

es Project

he Equipmeents for com

e Equipment

D EquipmenBuilding

Merritt ColleMerritt ColleMerritt ColleMerritt ColleLaney ColleLaney ColleLaney ColleLaney ColleLaney ColleLaney ColleLaney ColleCOA - BuildCOA - LibraDistrict AdmPhysical Pla

ion of each cThe conditionct to the Equ

comprises o

ege Of Alamab rooms, spaces, a l

ce is supplie0V/277 (3- pC to distribuy comprised

cooling. Ht plant (loca

dings. Each central plan

ege campus ral and privuilding, and the campus distributed at each ind

andling units

PERALT

ent requiremempleting Equ

t will be insta

nt Building Lg Descriptio

ege - Buildinege - Buildinege - Buildinege - Buildinege - Theateege – Buildinege – Buildinege - Libraryege - Bldg Aege - Buildingege - Admin Ting A

ary ministrative Cant

campus is pn of facilitiesuipment mus

of the Phys

meda campugeneral anibrary buildi

ed to the camphase 4-wirution panels d of air handHeating Hot ated inside B

building hast that provid

is comprisevate adminis

a student cs by Pacific from the maividual build

s with heatin

TA COMMUNI

ents, installauipment insta

alled at the c

Liston

g R 53,g P 44,g A 46,g D 75,r 44,

ng F 38,ng G 60,

75,53,

g B 43,Tower 53,

34,41,

Center 26,41,

presented bes, utility serst be verifiedical Plant B

us is comprisnd private ing and a smpus by Alare) and distlocated at edling units wWater (HH

Building C) as secondary

des cooling f

ed of collegestration officcenter buildGas & Elecain switchboding. The cang coils and

TY COLLEGE

ation sequenallation.

campuses a

Square Footage ,889 ,537 ,201 ,493 ,537 ,090 ,754 ,493 ,889 ,002 ,988 ,084 ,536 ,300 ,500

elow. The forvice infrastrd by each RBuilding and

sed of collegadministrat

tudent centemeda Municributed from

each individuwith heating

HW) is suppand is distri

y and tertiaryfor the buildi

e campus buce, conferening. Fifteentric and is tr

oard located ampus’s HVd cooling coi

Page|5

E DISTRICT

ncing along

and campus

ollowing are ructure and espondent.

d the main

ge campus tion office, er building. cipal Power m the main ual building. g coils and plied to the buted by a

y HHW loop ng.

ildings with nce rooms, n (15) KVA ransformed at Building

VAC systemils. Chilled

Page 6: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

2.2.4

2.3. Met

gen

2.3.1

2.3.22.3

2.3

allation & Imple

Water (CcentralizeHHW loowater loo

. Merritt Cwith clasrooms, mKVA elec(3- phasdistributiocomprisecooling. plant (lobuildingscooling pthe camp

ter Equipmenerally descr

. Requiredwhich menergy cdemandsAlamedaEquipme(where amonitorinproblem building Equipmeof data demands

. General 3.2.1. Netwo

wireles3.2.2. Data C

stored by thedownloautomamust pand dausers probleform. charts.transpa

ementation of M

CHW) and ed plant (locops that servop systems.

College. Thessrooms, lamechanical sctrical servic

se 4-wire) aon panels loed of air ha Heating Hocated inside

s. Each buplant is beingpus buildings

ent. Performribed below.

d Capabilitieust provide

consumption s at specific a, Laney Coent will incluapplicable). ng system

investigatiolevel. The

ent. The intelogging/met

s of each bu

Meter Equiprk. Meter Ess based sysCollection. for a minim

e District peoad data froatically ftp (provide dataata analystsmust be abms. Level 2 For compa

. Having tharency. It

MBCx Measure

Heating Hcated insideve all buildin

e Merritt Coaboratories, spaces, a libce is supplie

and distributocated at e

andling unitsot Water (He Building Cuilding has sg constructes.

mance requ Meter Equi

s. The Equa web-basetrend, usagfacilities at

ollege, and de building The selectewith Meter

on, archivingproposed Ment of the fotering equipilding.

pment Requiquipment anstem. The data mum of two (2

ersonnel andom the sys(file transfer

a for at two d, and (2) sta

ble to drill dusers must rison, they m

he data avawill also su

es Project

ot Water (e the E Comngs. Each b

ollege campgeneral an

brary buildined to the caed from theach individu

s with heatinHHW) is supC) and is dsecondary a

ed (adjacent

uirements anpment spec

uipment subjed monitoringe and other

its four locaMerritt CollkWh, heatin

ed firm mustEquipment

g, and retrMeter Equipmollowing is topment that

irements nd software

must be tre2) years in ad its assignstem remoter protocol) tdifferent leveaff, faculty, sown in to thbe able to v

must also bailable in thupport gami

PERALT

HHW) is smplex) and isbuilding has

pus is compnd private ang, and a stmpus by PG

e main switual building.ng coils andpplied to thedistributed band tertiary to the existi

nd other Mcifications [s

ject to this Rng system for related dataations (“Metelege. The ng hot watehave a com

t that provrieval of enment must io describe thmonitors th

must operat

ended with ma web-basedned represenely, as well the data on els of usersstudents, anhe data to view and do

be able to chhis fashion ification amo

TA COMMUNI

supplied to s distributedsecondary a

rised of coladministratiotudent centeG&E and is tchboard loc The HVAd Direct Exe campus frby a primar

HHW looping HHW pla

eter Equipmsee below]

RFP includesor the Districa for electricer Equipmenenergy mo

r energy anmplete (turnkides easy

nergy perforntegrate withe requiremhe electrical

te on a local

minimum 15d location wintatives. Uas be ablea schedule

: (1) enginend membersinvestigate wnload usaghart the datwill aid theong academ

TY COLLEGE

the buildind by primaryand sometim

lege campuon offices, er building. F

transformedcated at BuC System is

xpansion coorom a centrry loop that p system. Cant) to provi

ment require

s the Meter ct to meter

cal, cooling ant”): District,onitoring for nd chilled wakey) web-baaccessibility

rmance, at th the propoents for the , cooling a

area netwo

5-minute intith easy rem

Users must e to have ted basis. Ters, energy s of the pubsuspected oge data in sa, e.g., bar

e District’s mic and adm

Page|6

E DISTRICT

gs from a y CHW and mes tertiary

us buildings conference Fifteen (15) d 480V/277 ilding C to s generally oling or no alized heat serves all

Currently a de CHW to

ements are

Equipment and collect

and heating College of the Meter

ater energy sed energy y, tracking,

the whole osed MBCx

installation nd heating

ork (LAN) or

tervals and mote access

be able to the system The system

managers, blic. Level 1 or reported preadsheet charts, pie practice of ministrative

Page 7: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

2.3

2.3.3

2.3

2.3

2.3

allation & Imple

departreduct

3.2.3. Suppoor instwrittensystemability

. CCC/IOUprovide pand monmonitorinProgramcommissretro-commeteringsavings ithe MBCrequiremattemptsno guarascope is

3.3.1. kWh Mmeterscommumetersthe butotal kpower be moConnecondui

3.3.2. BTU Mon the naturathe totof ultrawater oand coreceptaMeasuIncorpoprovideshall pcontroTempeMS/TPshall bcompu

be NE3.3.3. Tempe

sensor

ementation of M

ments. Theion. Data for

ort. The Mettaller. The n assurance m expansionto do remote

U Complianproper metenetary rebang equipme. MBCx i

sioning. Themmissioning system will in the near tCx program

ments and b to ensure th

antee that thcomplete an

Metering. Es are connunicating wits may need ilding. For e

kWh consummeters to sw

ounted outsect U30 (or it and recept

Metering. Fonumber of nl gas, etc.) al BTU consasonic flow or chilled waonnect U30 acles, as req

urement Sysorated (or ed with each

provide the fol system: Enerature. OutP. Each BTbe re-prograuter required

MA4. erature sensrs and shall

MBCx Measure

e District war Level 2 useer Equipmenselected firmand guaran

n and replae upgrade, st Equipmen

ering to meeates. The ent in supps a unique

e monitoring(RCx) of bbe used as

term and sam, the propobe CCC/IOUhat the scope scope is cnd accurate.Electricity suected to ath Delta. Thto be installeach buildin

mption in thwitch gear.

side electricaequivalent) tacles, as rer each buildnon-electric For each bu

sumption in meter and

ater supply tto Local Arequired, to postem shall beequivalent).

h system. Pollowing poinnergy Total, tput signalsU meter shammable usi

d). Panels m

sors: Tempel be bath-ca

es Project

ants gamificers must be nt must be wm will clearntee. Manufacement parservice, repant. Meter et the CCC/

CCC/ IOUport of theire combinati supports M

buildings to a diagnostic

avings persisosed meter

U MBCx compe is complecomplete. Th. ub-meters aa Delta sysherefore, theled, depend

ng, the metee building. Provide andal panel toto Local Ar

equired, to poing, one or services ser

uilding, the mthe buildingsupply and

to the buildinea Network ower BTU me built and c A certificarovide a ONnts both at tEnergy Rateshall be se

all be factoryng the frontounted indo

erature sensoalibrated and

PERALT

cation to lesuccinctly a

well supporterly describe facturer musrts. Responair, data retriEquipment IOU MBCx offers incr Monitoringion of who

MBCx of the be identifiedc tool. It wilstence over ring solutionmpliant. T

ete and accuhe selected

are installedstem. In soey will need ting on the n

ering solution Installation

d install Nem enclose m

rea Networkower loggingmore BTU mrving the buimetering solg. Installatiod return temng. Connecvia Etherne

meters or loggcalibrated bate of NIST

NICON Systethe integral Le, Flow Rate

erial networky programmt panel keyp

oors shall be

ors shall be d matched

TA COMMUNI

ead to evenand clearly ped by the mathe level of

st demonstrndent must ieval, and mproposed bprogram for

centives to g Based Cle-building facilities rec

d, as part ol also be usethe long ter

n must meehe District

urate. Howefirm is oblig

on most bome cases,to be re-comnumber of en will be capn includes cma Enclosurmeters and/ok via Etherng equipmentmeters will bilding (.e.g hution will be

on includes: mperature sect Btu meteret cable. Inging equipmy a single mT* traceableem-10 BTU LCD and as e, Supply Tek protocol c

med for its sppad (no spece NEMA13, m

loop-power(NIST* trac

TY COLLEGE

n greater epresented. anufacturer,f support, a

rate longevitalso demo

manipulation.by Respondr energy useinstall whoommissioninmonitoring

ceiving Equipof a future ped to documrm. In orderet District ehas made

ever, the Disated to ensu

buildings. T the meter

mmissioned. lectric servicpable of calcconnection res and shoror logging et cable. Int. be installed, hot water, che capable of BTU metersensors on hr to U30 (or stall 110V c

ment. The enmanufacturee calibrationMeter. The outputs to temperature conforming tpecific applicial interfacemounted out

red current bceable) for t

Page|7

E DISTRICT

energy use

distributor, and provide ty for future nstrate the

dents must e reduction

ole building ng (MBCx) and retro-

pment, and project. The ment energy r to support established reasonable

strict makes ure that the

These sub-rs are not Additional

ces serving culating the of 3-phase

rt conduit to equipment.nstall 110V

depending hilled water,

calculating s consistingheating hot equivalent)

conduit and ntire Energy r, ONICON n shall be BTU meter the building and Return to BACnet®

cation, and e device or tdoors shall

based (mA) the specific

Page 8: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

2.3

2M"

D A O

1.1

allation & Imple

tempethe enindividSensoisolato

3.3.4. Flow Mbe instthe mdownsinstallasystemmetallidetailsProvidDual Tcontra-averagEach standacalibrarate atand wia 0-15include

* U.S. Na Flow Me

2.3.4 Gas MMeter. 18-30"SmartElectr

Direct mass Accuracy +/-One-second

.1.1. Web Inweb-ba

ementation of M

rature rangenergy calculual temperars applied o

ors to reduceMeter: Refertalled either

manufacturerstream straigation hardwam shutdown

c pipe, instas see the attae an ONICO

Turbine Flow-rotating ax

ging circuit tflow meter

ard that is aation shall bet the calibratthin ± 2% of

5 V square we an isolated

ational Institu

eter Installat

Flow MetInstallation M

eter: Sierra 0 VDC or 100ronics" with

flow monito- 1% of readresponse to

nterface andased monito

MBCx Measure

e for each aation shall ature senso

on chilled wae condensatir to meter sc

in the suppr’s instructioght pipe runare necessaand shall b

all groundingached Flow ON Model Fw Meter for 2xial turbineso reduce meshall be i

accurate to e provided wted velocity,f rate over awave pulse.d contact clo

ute of Stand

tion Manua

ter Manual

640S series0-240VAC inPC configur

ring ing plus 0.5

o changes in

d Data Colleoring softwa

es Project

pplication. Tbe accurate

ors, sensor ater and mouon. chedule for ply or return ons with pns. Insertionary to enable hand inseg rings or pMeter Instal

F1100 Turbin2.5” and largs, with eleeasurementndividually within 0.1%

with each flo within ± 1%

a 50:1 turndo Bi-direction

osure output

dards and Te

l

s or equivalenput power wation softwa

%of full scaln flow rate

ection. Set uare. Set up

PERALT

The calculatee to within

matching, unted outdoo

specific flow pipe of theparticular an type flow e insertion

ertable up toprobes as relation Manu

ne flow meteger lines. Dectronic impt errors due wet-calibrat% and tracow meter. A% of rate ovown (from 0.nal meters sfor direction

echnology (o

ent. SteelMaswith 3/4-inch

are. Meter sh

le

up metering p web-based

TA COMMUNI

ed differenti+0.15°F (incinput offse

ors shall be

w meter typee system to attention pameters shaand remova

o 400 psi. Fequired. For al. er for 1.25”

Dual Turbine pedance-basto swirl and

ted against eable to N

Accuracy shaver a 10:1 tu.4 to 20 ft/s)shall be FB-n.

or equivalent

ss Industrialh diameter 3hall have the

software. Md interface,

TY COLLEGE

al temperatucluding the ets, and ca

equipped w

e. The flow be measure

aid to upstall be providal of the meFor installatio

flow meter

to 2” lines ameters sha

sed sensind flow profile

a primary IST*. A ceall be within

urndown (3.0. Output sign-1200 Series

t ISO standa

l Insertion M316SS probee following fe

Map each marranging e

Page|8

E DISTRICT

ure used in error from

alculations). with thermal

meter shall ed following tream and

ded with all eter without ons in non-installation

and F-1200 all have two g and an

e distortion. volumetric

ertificate of n ± 0.5% of 0 to 30 ft/s) nal shall be s and shall

ard)

Mass Flow e. Provide eatures:

meter to the each of the

Page 9: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.1

1.2. Res

requ1.2.1

1.2.2

1.3. MBC1.3.1

1.3.2

1.3.3

allation & Imple

metersdownlo

.1.2. Data Ofollowiwith fo

CAMPUS CAMPUS BUILDIN INTVL_L DATA_T DATE_T USAGE –

spondents’ Puirements no. Delta Bu

either, (1overlaid Equipmesub-mete

. SpecifiedSOW. TDistrict, a

Cx Equipme. General.

buildingscombinatsupportsdocumenlong term B In

u L E

m Im U D

. Additionaof the (www.cccomplianand othe

. MBCx Eand relatthese semeasuresavings,

ementation of M

s with their oads for camOutput: Sysng data for e

ollowing namS_ID – CamS_ADDRES

NG_ID – BuilLENGTH – DYPE – TypeIME – Date – Energy us

Proposed Moted above auilding Mana) integrate wand connec

ent will pull thers. d Meter Equhe District at its sole disent. CCC/IOU

s or central tion of who the comm

nting energym. The progBenchmarkinnstallation ose of selecteog baseline

Evaluate bumeasures to mplement low

Using whole Document chal CCC/IOU

CCC/IOU cutilitypartne

nce with CCer monetary bquipment Sted materialrvices includ

es. In additiokW and

MBCx Measure

respective bmpus staff. tem will be each buildin

mes, tab delimmpus name (S – Campusding Name

Data interval e of data colland time sta

sage amount

Meter Equipmand followinagement Sywith the Distcted to the Dhe same da

uipment. Plehas identifiscretion, dec

offers inceplants with

ole-building missioning ey savings in tram requirem

ng to select tf whole builed buildingsenergy useilding operreduce enerw and no cobuilding and

hanges and tMBCx EquMBCx pr

ership.com).C/IOU MBCbenefits acccope. Thes, accessordes all activion the succebtu use re

es Project

buildings an

able to oug and metermited. (VarChar) s address (V(VarChar) length (Numected e.g. B

amp (Numert (Numeric)

ment. Propog ystem Interftrict’s Delta B

Delta Buildinta that is co

ease see theed and estcides if any r

ntives to thhin communmonitoring

effort by pthe near termments generhe best canlding meters

rations and rgy use ost measuresd other metetrain staff ipment Req

rogram can. The s

Cx Equipmencruing to the

District reqies and servties required

essful Respoeductions, a

PERALT

nd campus.

utput text orr type. Data

VarChar)

meric) BTU, kW, kWric)

osed Meter

face. The Building Mag Managemmmunicated

e document tablished threcommend

e District fonity college

and retro-roviding a m and increarally includedidate buildis to accurat

identify p

s ered data me

uirements. n be foun

successful nt requiremeDistrict. uests propovices, as ded to identify ondent will band greenh

TA COMMUNI

If required

r CSV files.a in rows for

Wh (VarChar

Equipment

proposed Mnagement S

ment Systemd the Delta s

labeled PCe listed soed solution

or implemen campuses-commission

diagnostic asing saving

e: ings tely establis

potential op

easure actua

Specific dend on theRespondentents to max

osals to provefined by CCand install c

be required tohouse gas

TY COLLEGE

d, set-up sch

Data will each custom

r)

must comp

Meter EquipSystem, or, (. The propo

system, via t

CC Metering lutions, or eis equal.

nting MBCx . MBCx is

ning. The tool, as w

gs persisten

sh the basel

perational a

al energy sav

etails and ree CCC/IOUt is respo

ximize incent

vide MBCx CC/IOU. Thcommissionio calculate eemissions

Page|9

E DISTRICT

heduled ftp

output the mer record,

ply with the

pment must (2) it will be osed Meter the existing

Installation equal. The

projects at s a unique

monitoring well as by ce over the

line energy

and capital

vings

quirements U website onsible for tive, rebate

Equipment he scope of ng focused energy cost

reductions

Page 10: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.3

1.3

1.3

1.3

1.3

allation & Imple

associateCCC/IOUparticipatbuildings

3.3.1. Investicomple B

m B

Ee

Bththdcoods

Moamso

3.3.2. Implem Im

idsptrsae

VcointrQ

PDstr

3.3.3. Reportdetailinenergyfinanci

3.3.4. Traininrevised

3.3.5. Key De M

to

ementation of M

ed with all U requiremetion in the

s. The succegation Phasete the follow

Baseline Enemeters (at leaBuilding AsseEMS to iden

ach buildingBaseline Rephe baseline he District escription oontrols, opepportunities escription oubmitted alo

Measure Idepportunities nd cost estim

measure is reources and

mentation Phmplement Iddentified EEhould be imeriod from t

rending. If avings will bffect of the M

Verify Properhosen EEMperational

ndependentlyrending. Th

QuEST, Inc., Post-ImplemeDistrict once uccessful Rrending perioting Phase. ng which Ey savings, aal incentives

ng. The sud operating seliverables.

MBCx Equipmool acceptab

MBCx Measure

installed meents. The bu

MBCx Progessful Respose. During wing: ergy Usage.ast 3 monthsessment. Entify operatiog. port. Submenergy use must inclu

of the faciliterating sche(commonly

of the analyong with live ntification. within each

mates for eaequired to hprojected sahase. dentified EEMs. No otplemented ithe beginninother proje

be subtracteMBCx projecr EEM Imples have beendata from y logged daroughout ththe District’

entation Datall EEMs h

Respondentod and begin The succes

EEMs were and additionas. uccessful Resequences a Key deliverment Implemble to the Di

es Project

easures. Suildings shogram; therefondent will bthe Investig

. Collect bas) and calcuEvaluate buonal deficie

it a Baselinein each bui

ude, at a ty includingedules, opereferred to

ysis approacversions of Use above

h building. ach measureave an M&V

avings.

EMs. The her projectsn the buildinng of baselicts are imp

ed from the mct. ementation. n implement

building sata, or sub-his process,s consultantta Collectionave been ve

will commn data collecssful Respoimplemente

al requireme

espondent wand functionrables for thementation Sstrict which

PERALT

Savings estiown in Tablefore the scobe required tgation Phase

aseline enelate annual ilding opera

encies and

e Report to ilding. A Baminimum, t

g lighting, berational deas a Finding

ch. All rawany spreads

e-referencedDevelop a pe and submiV plan ident

successful s which will ng during theine trending

plemented ameasured M

The succested properly

systems, wh-system ene, the select. n. The sucerified as im

mence the ction. ndent will sued, post-proents require

will providenality of builde MBCx progchedule. A identifies ac

TA COMMUNI

mates will be 1 above hope below to perform the, the succe

ergy use datenergy use

ations and tenergy effic

CCC/IOU aaseline Repothe baselin

boilers (DHWeficiencies, ags Log); and

w energy tresheet or oth data sourc

prioritization it to the Distifying the ap

Respondereceive a u

e MBCx prog to the comat the sameMBCx saving

ssful Respony. This will hether throergy use trected firm wi

cessful Resmplemented.

post-implem

ubmit a Finaoject annuaed for CCC/

e training foding systemsgram include

A Gantt chartctivities nece

TY COLLEGE

be consisteave been idwill apply t

he following essful Resp

ta from whofor each bui

trended poinciency oppo

and to Distriort will be se energy a

W), HVAC and energyd a narrativeend data user analyses

ces to identlist guided

trict for apprpproach, inc

nt will implutility energ

oject. This inmpletion of e time, their gs to determ

ndent will vebe done by

ough EMS ends, or thrill confer c

spondent wil. Upon verimentation e

al Report to al energy u/IOU MBCx

or campus ss. e, for each bt, or similar essary to co

Page|10

E DISTRICT

nt with the dentified for to all listed activities:

pondent will

ole building ilding. nts through ortunities in

ict detailing ubmitted to analysis; a equipment,

y efficiency e and visual sed will be . tify savings by savings oval. Each

cluding data

lement the y incentive ncludes the post-MBCx calculated

mine the net

erify that all y evaluating

trends or rough EMS losely with

ll notify the fication the

energy use

the District se, annual Equipment

staff in the

building: scheduling

omplete the

Page 11: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.4. PhainstResandbelomusacc

1.5. Equ

requincorequ

1.5.1

allation & Imple

Me

B L M C F C C S C

maTres

ased Meter allation and

spondents’ Pd completionow. Complest be in accoeptance of t

uipment Instauirements aorporate priuirements, in. Existing

existing selected ordinarilyall necesensure tinterrupti

ementation of M

MBCx Equipvents, critica

Baseline repoist of measu

MeasuremenCCC/IOU ForFinal report inCost documeCCC/IOU ForSystems manConstruction manager and

ssistant will The construcecommend cope.

Equipment aMBCx Equi

Proposal prin date for eaetion of the ordance witthe

Mi

allation Connd installed cing and sncluding withMechanicalequipment a

Respondey occur with ssary additiohat electricaion to campu

MBCx Measure

ment scopeal path and cort includingures that will nt &Verificatiorm E – verifincluding posentation rm D nual (if applic

Managemed constructio

be selectedction manageaction(s) to

and MBCx ipment instaicing and Scach Meter EMeter Equiph the follow

Melestone

MB

straints andat District dchedule cohout limitatio, Electrical, are aged. Ent must annewer equiponal expertial service isus operation

es Project

e for each bcompletion. baseline enbe impleme

on Plan for scation of me

st-MBCx ene

cable) ent - Awardon assistantd and directeer will subm

o keep the

Equipment allation mustchedule Proquipment anpment/MBCxing schedule

eter Equipm

BCx Equipm

Requiremedesignated lonsiderations

on the followand Plumb

Equipment snticipate hapment. For ise, spare ps restarted ins.

PERALT

uilding, inclu

nergy analysented selected meeasure compergy analysis

ded contrac. The consted by the P

mit weekly prproject on

Installation; t be completoposal mustnd MBCx Eqx Equipmene. RFP Res

ment Comp

Click here tClick here tClick here tClick here tClick here t

ment Click here tClick here tClick here tClick here t

ents. The Eqocations. Rs for Equipwing: bing Equipmservices are

aving to resexample, if

parts, etc., in a timely

TA COMMUNI

uding activit

sis.

easures pletion s

ctor will protruction maneralta Commrogress reposchedule an

Schedule. ted in separt incorporatequipment insnt installationsponses mu

pletion Dateto enter a dato enter a dato enter a dato enter a dato enter a da

to enter a dato enter a dato enter a dato enter a da

quipment muRespondentsment instal

ment: The e not necesssolve challean electricamust be immanner and

TY COLLEGE

ty durations

ovide for cnager and cmunity Colleorts to the Dnd budget,

The Meter rate sequente the requirestallation acn and relateust indicate

e ate. ate. ate. ate. ate.

ate. ate. ate. ate.

ust comply ws’ RFP Resplation const

District’s fasarily up to enges that

al shutdown mmediately a

d without un

Page|11

E DISTRICT

, milestone

construction construction ege District. District, and

and within

Equipment tial phases; ed phasing

ctivity noted ed activities review and

with District ponse must traints and

acilities and date. The might not

is required, available to nscheduled

Page 12: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.5.2

1.5.3

1.5.41.5

1.5

1.5

1.5

allation & Imple

. Re-Pipinfor accuverify hometeringhot/chillefor accurproposespiping reRFP Resaccurate

. Sub-MeteaddenduSystem. status ocommunRespond

. Site Limi5.4.1. Electric

proposthe Minterrusucceselectricof plaactivitieeliminainterru

5.4.2. Noise,within facilitieinstallasafety take inhours with th

5.4.3. Designfor MelocatioscheduLocatioDistrictinstalla

5.4.4. Asbestthat poincludeLocatioconseqand orespon

ementation of M

g. Existing rate flow m

ot/chilled wa. Respon

ed water piperate meterins an accurae-configuratiosponse mus hot/chilled wers. Sub-mm. The su A list of bu

of those meication links

dent will neetations. cal Servicesed electrica

Meter Equipmptions are ssful Responcal service snned shutdes. RFP ate disruptioptions. Odors, Acc

facilities thaes are in uation activitieor academic

nto account work. No pe foregoing

nated Meter eter Equipmon will be coule considerons. Locatt designatedation. tos Containortions of the ACCMs. Tons to facilquential lossother Districnsibility.

MBCx Measure

pipe installaeasurement

ater pipe rundents muste configurati

ng; (iii) if pipate meteringon. Responst incorporawater metermeters are b-meters aruildings that eters are as for somed to investig

Shut-Downal power shument. Ressubject to

ndent must shutdowns odowns or inResponses

ons to camp

cessibility. at are in useuse or occes causing ec activities. limitations

price or timelimitations.Equipment

ment installaonsidered orrations for ctions for insd Equipment

ing Construhe facilities The District litate Equipses for distuct approved

es Project

ations may nt of hot/chilln configuratt indicate iions; (ii) whe

pe configuratg solution wndents’ pricete all necesing. in place in

re connectedhave electr

attached. meters ar

gate and reco

n; Interruptiutdowns (witspondents’ acceptance

anticipate aor interruptionterruptions

must incopus operatio

Equipment e or otherwupied, the

excessive noPricing propon Equipme

e adjustmen

Locations. ation (“Equipr allowed. Rcompleting Mstallation of t Locations m

uction Matersubject to has survey

ment instalurbance of Ad Equipmen

PERALT

ot have 20-2ed water. tions to conn their RFether existintions are ins

without re-coe and schedssary work,

buildings ad to the Disricity sub-meMost meterre malfunctionnect the c

ion. Schedth locations

proposed e by the Dadvance planons and mu

as necessorporate proons by electr

installationsise occupiedDistrict ma

oise, odors oposals incorent installati

nt will be allo

Where thepment LocaRFP ResponMeter Equipm

Meter Equmust be app

rials (“ACCMEquipment

yed and remlation. All ACCMs (ount installati

TA COMMUNI

25 foot straigResponden

nfirm sufficieFP Responsng pipe confisufficient whonfiguration dule proposa

labor, mate

as outlined strict’s Delta eters (meterrs are opeoning. If

communicati

dule proposand durationelectrical s

District and nning and cst anticipatesary for cooposed mearical power

s will occur d. When fa

ay restrict oor other disrrporated intoion, includinowed for co

e District haations”) no nses must iment installauipment whiproved by the

M”). Respoinstallation

mediated ACcosts, cha

utside of theon location

TY COLLEGE

ght run lengts must indency for accses: (i) vergurations ar

hether the Rof piping oals incorporerials and s

in the accBuilding Ma

rs) and the rating propnecessary, ion links.

sals must ins) necessaervice shuteach cam

coordination e potential aontinuation oasures to mservice shu

in facilities acilities or aor prohibit ruption affeco RFP Respong provisionosts or time

s designatealternative ncorporate ation at the ch are not e District in

ondents aremay or areCMs at the

arges, actioe Equipmentns) are Re

Page|12

E DISTRICT

ths needed dependently curate flow rification of re sufficient Respondent r proposes

rated into a services for

companying anagement operational erly. The successful

indicate all ary to install t-downs or pus. The of planned

adjustments of campus mitigate or

ut-downs or

and areas areas within

Equipment cting health, onses must s for after-associated

ed locations installation

pricing and Equipment subject to

advance of

e cautioned e known to Equipment ns and all t Locations

espondent’s

Page 13: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

1.6. AgrwithResrequ

1.7. Pro

Scremon

2. RFP Re

2.1. Dist2.1.1

2.1.2

2.1.3

2.2. No modreprRFP

2.3. Erroin thof sshaDistclarclarmusdateclarDist

2.4. Pro

RFPcomRFPof th

allation & Imple

reement. Thh the successpondent shuested modi

posal shouleen shots anitoring syst

sponse Instrict Modifica. District R

portion oincluding

. Posting; RFP will will be pDistrict’s

. RespondEach Reaccess areceipt, rof a ResResponsany Resaddenda

Oral Clarifi

difications tresentative P. No Resp

ors/Discrepahis RFP or psuch error oall submit thetrict to any rrification resrification resst be submie/time for surification reqtrict RFP Co

hibited ComP, no Respommunicate wP. Any actuhe Respond

ementation of M

he form andssful Responhall set forthifications to

d include snd narrativeem.

tructions aations to RFPReservation of this RFPg without limiIssuance ofbe in writingosted on theweb site.

dent Responespondent isaddenda to review and ipondent to c

se for non-respondent; Ra.

ications/Modto the RFPof the Distrondent shall

ancies/Clarifiportions herer discrepance requested requested clsponse affeponse by wtted and ac

ubmittal of Rquests submontact set for

mmunicationsondent, or awith any othual or attempent’s RFP R

MBCx Measure

d content of ndent is incoh in Tab 6 terms and c

creen shotse will assist t

nd RequireP. of Rights.

P prior to thitation, the cf RFP Modifg in the forme District’s w

nsibilities fo solely respothis RFP; ancorporationcomply with esponsiveneResponden

difications. P or the rict is authorl rely on any

ications to Reof, the Rescy. Any Reclarificationarification w

ects the RFwritten addenctually receivRFP questionmitted therearth in Paragr

s. Except foany employeher employepted commuResponse.

es Project

f the Agreemorporated intof its RFPonditions inc

s and a narthe District to

ments.

The Distriche latest dacancellation fications. Mo

m of addendaweb site and

or Receipt, onsible for: nd (ii) indican of all adde(ii) above m

ess. The Dts must ac

The Districrequirementrized to provy oral clarific

RFP. If a Respondent shaespondent se in writing to

will be in writFP or othenda to the Rved by the ns as set foafter. All coraph 1.3 abo

or the Districee, officer, aee, agent or

nication in v

PERALT

ment that thto the RFP Response

corporated i

rative of theo evaluate a

ct expressly ate/time for of this RFP.odifications,a to this RFPd are acces

Review and(i) periodic rating in the enda issued

may result in District will ccess the D

ct will not ts hereof; vide oral claation or mod

espondent eall immediateeking clarifo the Districting; if in theer RespondRFP. All reqDistrict RFPrth in this Rommunicatioove.

ct RFP Contagent or repr representaviolation of t

TA COMMUNI

he District anfor review bacceptancento the Agre

e web-baseand compare

reserves thsubmission

, if any, madP. All addenssible by all

d Acknowlereviews of thRFP Respoby the Distrrejection of not distrib

District’s w

provide anyno employarifications odification to t

encounters etely notify thfication of a

ct RFP Contae sole judgmdents, the Dquests for cP Contact n

RFP; the Distons to the D

tact noted inpresentative ative of the the foregoing

TY COLLEGE

nticipates enby Respondee of the Agreement.

d monitoringe the varying

he right to n of RFP R

de by the Disnda modifyinResponden

dgement ofhe District’s onse the Rerict to the RFthe Respon

bute RFP aweb site for

y oral clarifee, officer, or modificatthe RFP.

errors or dishe District RFany portion oact. Respo

ment of the DDistrict will clarification ono later thantrict will not District shal

n Paragraphof a RespoDistrict relag will result

Page|13

E DISTRICT

ntering into ents. Each reement or

g software. g proposed

modify any Responses,

strict to the ng this RFPts from the

f Addenda.web site to

espondent’s FP. Failure dent’s RFPddenda to r any RFP

fications or agent or

tions to the

screpancies FP Contact of this RFPnses of the District, any

issue the of this RFPn the latestrespond to l be to the

h 1.3 of this ndent shall ting to this in rejection

Page 14: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

2.5. ProexeRes

2.6. Stat

comResStatfor n

2.7. Non

comTheRFP

2.8. Cer

Comof tsubRes

2.9. Sub

withpropone

2.10. DI

com

2.11. EnandcomEacform

2.12. No

andNonResDisc

2.13. Pu

CodsubsubrespResdiscResdiscjuris

allation & Imple

posal. A foecute and ssponse; failu

tement of mpleted/execspondent’s Rtement of Qnon-respons

n-Collusion Ampleted, dulye failure of aP Response

rtificate of mpensation the Respondbmit a complsponse will r

bcontractors h its RFP Reposed Subc

e-half (1/2) o

R Registratimpleted and

nvironmentald services tmpared to otch Respondem of Environ

on-Discrimind consultantsn-Discriminaspondent mucriminatory E

ublic Recordde §3426.1)bmitted in resbmission to ponsivenesssponse or poclosure as asponses, or closure if dissdiction, or

ementation of M

orm of Proposubmit the ure to do so w

Qualificationcuted StateRFP Respon

Qualificationssiveness.

Affidavit. Ty executed o Responden will result in

Workers CInsurance indent and suleted and exresult in rejec

List. Pursuesponse, on contractors, wf one percen

on Verificatexecuted fo

lly Sustainabthat minimizher goods aent must commentally Su

atory Emplos to the Dis

atory Employust completeEmployment

ds. Except ) and matersponse to ththe District

s the RFP Rortions there public recoportions th

sclosure is rwhich occu

MBCx Measure

osal is incorcompleted/

will result in

ns. Each ement of nse. The fais with its RF

The form of on behalf ofnt to submit n rejection of

Compensationcluded withubmitted witxecuted Cerction of the R

uant to Pubthe form of

who will pernt (1%) of th

ion. Each Rrm of DIR R

ble Procuremze adverse and servicesmplete, execstainable Pr

oyment Pracstrict engageyment Prace, execute at Practices C

for materiarials specifichis RFP are. The foreResponse oeof are “Tradord. The Dishereof, deemrequired by

urs through

es Project

porated into/executed Prejection of

RespondenQualificationlure of a Res

FP Response

Non-Collusf the Respona completedf the RFP R

on Insuranc the RFP mth the RFPrtificate of WRFP Respon

blic ContractSubcontract

rform/providee amount pr

Respondent Registration V

ment Policy. effects on

which servecute and subrocurement P

ctices. The e in non-discctices Certifind submit w

Certification.

ls deemed cally marked

e deemed pregoing notwf a Responde Secret” “Cstrict is not lmed to be operation oinadvertenc

PERALT

o the RFP. Proposal fothe RFP Re

nt must comns incorpospondent toe will result

sion Affidavindent and sd and execuesponse for

ce. The ust be compResponse.

Workers Comnse for non-

t Code §410tors List incoe portions oroposed by t

shall submVerification.

It is the po human hee the same bmit with thePolicy includ

District reqcriminatory ication is in

with the Resp

Trade Secrd “Confidenroperty of th

withstanding,dent who inConfidentialliable or respublic recor

of law, or byce, mistake

TA COMMUNI

Each Resporm with th

esponse for

mplete, exerated into

o submit a coin rejection

t included wsubmitted wiuted Non-Cor non-respon

form of Cpleted and d

The failurmpensation -responsiven

04, each Reorporated in

of the Work vthe Bidder fo

mit with its R

licy of the Dealth and thpurpose wit

e Respondended with the

quires that aemploymen

ncorporated pondent’s R

rets (as defntial” or “Prohe District an the Districndiscriminate” or “Proprieponsible forrds, includin

y an order oor negligen

TY COLLEGE

ondent muse Respondnon-respons

ecute and sthe RFP

ompleted anof the RFP

with the RFith the RFP

ollusion Affidnsiveness.

Certificate oduly executere of a ResInsurance wness.

espondent snto this RFP,valued at oror the Work.

RFP Respons

istrict to prohe environmth comparabnt’s RFP ReRFP.

all vendors, t practices. into the R

FP Respons

ined in Calioprietary” and public recct may rejecely notes thetary” and exr the disclosng those exf a court of

nce on the

Page|14

E DISTRICT

t complete, dent’s RFPsiveness.

submit the with the

d executed P Response

FP must be Response. avit with its

of Workers d on behalf

spondent to with its RFP

shall submit, a list of its r more than .

se the duly

cure goods ment when ble efficacy. esponse the

contractors A form of FP. Each se the Non-

ifornia Civil ll materials cords upon ct for non-hat its RFPxempt from ure of RFPxempt from

competent part of the

Page 15: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

Distto aportrespDistattobe sto cthatcom

2.14. RFsub

2.15. RF

part

2.16. No

ResRecmee

2.17. Bid2.17.

2.17.

allation & Imple

trict or its agany action otion of a Rponse to thtrict in any

orneys’ fees solely respo

compel disclot of a stake

mpetent juris

FP Responsbmit a respon

FP Document of this RFP

With RF

Upon A

otice of Intensponse to tcommendatieting at whic

d Protest. 1. Submitta

intent to with: (i) tDirector, the Distrforth, in supportinthe bid pAll factuevidenceDistrict a

2. District Rthe foredesignat

ementation of M

gents or repror proceedinRFP Responis RFP, eacaction or prarising therensible for thosure of suc

eholder, retadiction.

se Costs. Anse to this R

nts. Each RP shall be as

FP Respons

Award of Ag

nt to Award Athis RFP aon for award

ch award of t

al. Any Respaward the

he bid protePurchasing

ict’s Notice odetail, all

ng documenrotest; any m

ual contentioe. Any bid as invalid. Review and going, the ed by him/h

MBCx Measure

resentativesg wherein rnse deemech Respondroceeding frefrom. The e cost and d

ch materials;aining the re

All costs anRFP shall be

Respondent follows:

se

greement

Agreement. a Notice of d of the Agrethe Agreeme

pondent subAgreement

est is in writin not more thof Intent to Agrounds fo

ntation, legamatters not sons must bprotest not

Response. District’s D

her, shall re

es Project

. If the Distrequest is md exempt f

dent agrees rom and agparty submi

defense of th; the District’equested ma

nd expensesborne solely

shall review

ProposStatemNon-CoCertificSubconDIR ReEnvironNon-DCertificAgreemCertificBonds

The DistrictIntent to

eement and ent will be co

bmitting a RFprovided thng; (ii) the bhan five (5) cAward the Ar the bid pl authoritiesset forth in thbe supporte

conforming

Provided thDirector, Pueview and

PERALT

trict is requirmade for the from disclosto defend,

gainst any liitting materihe District in’s sole involvaterials unti

s incurred by and exclus

w, complete

sal ment of Qualollusion Affidcate of Workntractors Lisegistration Vnmentally Siscriminatorycation ment cates of Insu

t will issue tAward the the date, tim

onsidered.

FP Responsat each and

bid protest iscalendar dayAgreement; aprotest, incls and argumhe written bi

ed by compg with the fo

at a bid prourchasing oevaluate th

TA COMMUNI

red to defend disclosure sure hereunindemnify aability, incluals sought bn any action vement in al otherwise

by a Resposively by the

and submit

ifications davit

kers Compenst Verification ustainable Py Emp

urance

o RespondeAgreement

me, place of

e may file a d all of the s filed and reys following and (iii) the uding witho

ment in suppid protest shpetent, admoregoing sh

test is filed r such inde basis of

TY COLLEGE

d or otherwiof the conte

nder, by suand hold hauding withouby any other

or proceediny such actiordered by

ondent to pre Responden

t documents

nsation Insu

Procurementloyment

ents timely st describingf the Board o

protest of thfollowing ar

eceived by ththe date of iwritten bid p

out limitationport of the ghall be deem

missible andhall be rejec

in strict confividual(s) athe bid pro

Page|15

E DISTRICT

se respond ents of any ubmitting a armless the ut limitation r party shall ing seeking ion shall be

a court of

repare and nt.

s forming a

rance

t Policy Practices

submitting a g the Staff of Trustees

he District’s re complied he District’s issuance of protest sets n all facts, grounds for

med waived. creditable

cted by the

formity with as may be otest. The

Page 16: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

3. RFP Re3.1. Sub

3.1.1

3.1.2

3.1.3

3.1.4

3.2. RFPandResfor t

allation & Imple

District’s Respondthe bid p(or his/heequitableAgreemeRFP Resas a parcosts, alincluding

sponse Sub

bmittal of RF. Timely S

latest dawhich arwill be rdate/timesubmittin

. Submittafollows:

Respondedeliver RFtimely subResponseDistrict unsubmittal o

. Sealed Rthe followsealed e

. Number copy on original cink. Theof the RF

P Responsed must inclusponse in a the District’s

ementation of M

Director, Pudent submittiprotest. Theer designeee proceedinent, the Distrsponses. If rty thereto, ll attorneys’

g any appeal

bmittal FP ResponseSubmittals. ate/time set re not submrejected for e for submittng the sameal Location.

SerapPurchPeralt501 5Oakla

ents are encoFP Responsbmittal of Rs delivered

ntil deliveredof RFP RespRFP Responwing informanvelopes:

RFP NRespoRespoRespo

of Copies oa USB/Flashcopy of the Re original copFP Respons

e Format/Code the contformat and w

s rejection of

MBCx Measure

urchasing oing the bid p

e rendition ofe) is an exprgs relative rict’s disposilegal or equthe prevailifees and c

l arising ther

es. RFP Respoforth in the itted at or bnon-respon

tal or RFP R. RFP Respo

phine Nzomohasing Buyerta Communith Avenue

and, Californ

ouraged to pses to the aRFP Respo

to the Distrd from the cponses. nses. All RFation clearly

No. and Desondent Firm ondent Mailiondent Contof RFP Resh drive and eRFP Respopy of the RFe must be m

ontents. Eatents descriwith contentf such RFP R

es Project

r other indivprotest with af a written stress conditioto the RFP

ition of any buitable proceng party(iescosts incurrrefrom.

onses shall RFP for su

before the lansiveness. Responses w

onses shall

o r ty College D

ia 94606

personally dabove locatinses to therict’s centra

central mailro

FP Responsey noted and

scription Name ng Addresstact Person sponse. Eaeight (8) copnse must be

FP Responsmarked “COP

ch RFP Rebed below. ts conforminResponse fo

PERALT

vidual designa written statatement byon precedenP process, bid protest oeedings are is) shall recored in conne

be submittebmittal of R

atest date/timRFP Resp

will be retur

be addresse

District

deliver or retion. Respoe RFP Resl mailroom oom staff to

es must be sd prominentl

phone, fax ach Respondpies of the Rear signaturese must be mPY.”

sponse mus Failure of

ng to the folloor non-respo

TA COMMUNI

nated by himatement cony the Districtnt to the insthe District’

or the Districinstituted anover from thection with

ed as set foRFP Responme for submponses submrned unopen

ed and subm

tain a courieondents are sponse subare not dee

o the above

submitted iny displayed

and email addent must sRespondent’es where remarked “OR

st conform ta Respond

owing requironsiveness.

TY COLLEGE

m/her shall pcurring with ’s Director,

stitution of as intent to

ct’s decision nd the Distriche other paany such p

orth below pnses. RFP mitting RFP mitted afterned to the R

mitted to the

er service tosolely resp

bmittal locatemed subme-described l

sealed enve on the out

ddress submit an ors RFP Resp

equired in blIGINAL” and

to the followdent to submrements will

Page|16

E DISTRICT

provide the or denying

Purchasingany legal or

award the to reject all

ct is named arty(ies), as proceeding,

prior to the Responses Responsesr the latest Respondent

e District as

o personally ponsible for tion. RFP itted to the location for

elopes with tside of the

riginal, one ponse. The ue or black d all copies

wing format mit its RFP be a basis

Page 17: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

3.2.1

3.2.2

3.2.3

3.2.4

3.3. RFP3.3.1

3.3.2

3.3.3

3.3.4

3.3.5

allation & Imple

. General formattedtabbed wbelow. Acorner. binding,8½” x 11

. Cover Shsubmittinemail adRFP Res

. Letter ofinterest ostapled w

. Tabbed materialsease of i

P Response. Tab 1; P

Attachme. Tab 2; Q

incorporaproviding

. Tab 3; PassignedRespond

. Tab 4; Eand methmaterials(i) Q(ii) C(iii) C(iv) C

bR

. Tab 5; Respondeach pol

ementation of M

Requiremed with at lea

with the conteAll submittedDo not sub except for” folder. heet. Identifng the RFP dresses of tsponse. f Interest. of the Respwith other maSections of

s described dentification

Tabbed SeProposal. Coent 1. Qualificationated into thig explanationProposed Ted to completdent’s staff. Equipment Inhodology tos describing:

Quality controCompliance wCompliance wCommunicati

y the DistricRFP Respon

Insurance Cdent. Requicy of insura

Require

Workers

Employe

ComprehLiability damage liability) Professio

MBCx Measure

nts. All RFast 11 pointents conformd materials mbmit RFP Rr the upper

fy the submiResponse ahe Respond

Include a bondent in paterials respf RFP Resin Paragrap

n.

ctions. omplete and

s Statemens RFP as An(s) for any

eam. Identifte the Equip

nstallation Ap completing: ol and qualitwith schedulwith District ions by or b

ct for servicese must not Certificates. ired Certific

ance are as s

ed InsurancCertificate

Compensat

ers Liability

hensive (including

and a

onal Liability

es Project

FP responst font size. ming to the Tmust be bouResponse mleft corner

ittal as the Ralong with thdent’s princip

brief letter (nroviding the

ponding to thponse. Ea

ph 4.3 below

d execute th

nt. CompletAttachment 2response(s)fy the key mpment Install

pproach. Pr the Equipm

ty assurancele/completioestablished

between the s related to exceed ten Provide

cates of Insset forth belo

ce Policy e tion

General property

automobile

y

PERALT

ses must beEach sectio

Tabbed Sectund with onlymaterials instaple. All

RFP Responhe firm’s addpal contacts

no more the Equipmenthis RFP. ach RFP R

w in the orde

he form of P

te and exec2. Include i) to the Qual

members of tlation. Attac

rovide a desment Installa

e; on requireme

budgets; an Respondenthe Equipm(10) pages.copies of

surance andow.

MinimCov

In accordan

One Million

Two Millionper occuDollars ($aggregateOne Millionper claim a

TA COMMUNI

e submittedon of the RFtions descripy one staple

n binders, ssubmitted m

nse and an idress, telep in connectio

an one (1) t. The lette

Response mer described

Proposal incl

cute the Quin Tab 2 anlifications Stthe Respondch resumes

scription of tation. The f

ents; nd nt, the Distrient Installat. Certificates

d minimum

mum Respoverage Amonce with law

n Dollars ($1

n Dollars ($urrence/Fou$4,000,000)

n Dollars ($and Two Mil

TY COLLEGE

on 8½” x FP Responsptions in Pare in the uppespiral bindimaterials mu

dentificationhone/fax nuon with this

page) exprer of interest

ust include therein and

luded with th

ualifications y separate tatement. dents’ staff of all key m

the proposedforegoing m

ict and otheion. This po

of Insurancoverage a

ndent ount w

,000,000)

$2,000,000) ur Million ) in the

$1,000,000) lion Dollars

Page|17

E DISTRICT

11” paper se must be ragraph 4.3 er left hand ing or any ust fit into a

n of the firm umbers and RFP or the

ressing the t should be

all of the d tabbed for

his RFP as

Statement attachment

that will be members of

d approach ust include

ers retained ortion of the

ce for the mounts for

Page 18: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

3.3.6

3.3.7

3.3.8

3.3.9

3.3.1

3.3.1

3.3.1

3.3.1

4. Evaluat

allation & Imple

. Tab 6; A

Agreemeidentify modificatdeletion amendmmust setmodificatshall notRFP ResAgreemeawardedmodificatof the Agbinding u(ii) the Dmodificatrepresen

. Tab 7; EInstallatioMBCx Eqleast the (i) se

E(ii) C

DTAsRe

. Tab 8; Nincluded

. Tab 9; Cof CertifiD.

0. Tab 10; E) for easervices the Resp

1. Tab 11; DVerificati

2. Tab 12; form of E

3. Tab 13; the form

tion Criteria

ementation of M

Agreement Tent (RFP Attany term otion, by am

of existingents to exis

t forth the sption or obje, however, bsponse doe

ent will be de the Agreetion. Notwitgreement inupon the DisDistrict at otions by a

ntative of theEquipment Son Servicesquipment asfollowing:

equential aEquipment CCC/IOU reqDistrict financThe proposeActivities deschedule for

RFP varies fxplanation inon-Collusionwith this RF

Certificate of cate of Wor

Subcontractach subcontvalued at or

pondent. DIR Registraon (RFP AttEnvironmen

EnvironmentNon-Discrimof Non-Disc

a.

MBCx Measure

Terms and Ctachment I) or conditionendment tog provisionsting provisiopecific text oction to any

be deemed tes not identeemed to haement, sucthstanding thn any Respostrict unlessr prior to thwritten inst

e District. Schedule. s, which incs set forth in

and phased

quirements fcial incentiveed schedulescribed in Pthe Consult

from the con the proposn Affidavit.

FP as AttachWorkers Co

rkers Compe

tors List. Cotractor to thr greater tha

ation Verificatachment F).ntally Sustaally Sustaina

minatory Emcriminatory E

es Project

Conditions. and must,

n of the A existing pr

ns. Whereons or additof the requesy existing tethe District’stify modificaave agreed

ch Respondhe inclusion ondent’s RFs: (i) the Agrhe time of atrument dul

Provide a pcorporates t Paragraph

completion

for Meter Ees. e must inc

Paragraph 2tant Servicesmpletion dased scheduleComplete a

hment C. ompensationensation Ins

omplete the e Responde

an one-half o

ation. Comp. inable Procable Procure

mployment PEmployment

PERALT

($2,000,000

Each Respoin Tab 6 of

Agreement wrovisions, ade any reqtional provissted amenderm, conditios acceptanceations to ter

to all terms dent must

of any requFP Responsereement is aaward of thly executed

proposed scthe mileston2.6. Respo

n of the M

quipment a

corporate a.3 of this Rs Activities d

ate(s) noted e. nd execute

n Insurancesurance inclu

form of Subent that willof one perce

plete and ex

curement Poement Policy

Practices CePractices C

TA COMMUNI

0) in the agg

ondent musttheir respe

which the ddition of auested moions, Tab 6 ment or addon or provise thereof. Arms or cond

and conditiexecute th

uested modife, such modawarded to she Agreemed by an au

chedule for nes for Meondents’ sch

Meter Equip

nd MBCx E

t least theRFP. If a R

described inin Paragrap

the form of

e. Completeuded with th

bcontractors provide wo

ent (.05%) of

xecute the fo

olicy. Comy (RFP Attacrtification. C

Certification (

TY COLLEGE

gregate

t thoroughlyctive RFP RResponden

additional prdification cof the RFP

dition. A Resion in the

Any Respondditions of thons set forthe Agreemefications to adifications ssuch Respont has acce

uthorized em

completing tering Equip

hedules mus

pment and

Equipment to

e ConsultanRespondent’sn Paragraphph 2.3, inco

Non-Collusi

e and execuhis RFP as A

s List (RFP Aork, labor, mf the price p

orm of DIR R

plete and echment G). Complete a(RFP Attach

Page|18

E DISTRICT

review the Responses,nt requests ovisions or

consists of P Response espondent’s Agreementdent whose

he attached h therein; if ent without any portion

shall not be ondent; and epted such mployee or

Equipment pment and

st include at

the MBCx

o maximize

nt Services s proposed

h 2.3 of this orporate an

on Affidavit

te the form Attachment

Attachment materials or roposed by

Registration

execute the nd execute

hment H).

Page 19: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

4.1. Evaexpwhicack“bespurpattriadjuinitiaResandRec

4.2. RFP

knoDistevaandreviproc

4.3. Distand

4.4. Inte

resplocaResResthe Resman

allation & Imple

aluation Critperience, knoch provides nowledges ast value.” poses of thibuted to eaustment for al screeningsponses priod subject to commendati

Price propPrior ConProposedQualificatSuitabilityDistrict anPrior perfResponsi

P Responseowledge andtrict will initi

aluation crited scoring of ew RFP Recess.

trict Reservad discussions

erviews. Thponsive RFPation designspondents wspondents tointerview co

sponse and ndatory for:

ementation of M

teria. Awarowledge andthe best va

and agrees Accordingly

is RFP, theach criterionany RFP R

g to interviewor to the Staf

adjustmenton described

posal nsultant Servd schedule tions, skills ay of proposend others enormance of veness to R

e Screeningd expertise wally screen ria set forth RFP Respoesponses to

ation of Righs with Respo

e District mP Response

nated by thewill not be peo respond toommittee wiapproach to(i) managem

MBCx Measure

rd of the Ad skills to coalue to the Dthat factors

y, each Rese “best valuen as set fo

Response asws and negff Recommet. Final evd in Paragra

Eval

vices experie

and experiened personnengaged by thsimilar servi

RFP requirem

g. A technwith the CoRFP Respoin the RFP

onses, Distrio provide br

hts. The Disondents con

may conduct e. Each inte District. ermitted at tho questions pth additionao completinment person

es Project

Agreement wmplete the C

District. By other than pspondent sue” shall con

orth below. s the RFP

gotiations. Aendation desvaluation critaph 5.7 below

uation Crite

ence

nce of propol to engage

he District to ices

ments

ical screeninsultant Se

onses and s. In the solect Shared Groader Distr

strict exprescerning thei

interviews terview will Formal preshe interviewposed by the

al details of tg Equipmen

nnel of the R

PERALT

will be to aConsultant Ssubmitting a

price alone aubmitting a nsist of the Scoring ofResponse e

Any and all scribed in Pateria scoringw.

eria

osed personnin collaboraprovide rela

ng committrvices subje

score RFP Re discretion

Governance rict internal

ssly reserver responsive

of selected be schedulesentations (

ws. The prime District’s ithe relative nt InstallatioRespondent

TA COMMUNI

a RespondeServices whoa RFP Respare relevant

RFP Respfollowing faf evaluationevaluation pevaluation c

aragraph 5.7g will be es

nel ative efforts ated services

tee (consistiect to this RResponses i

of the DistrCommitteescommunity

s the right te RFP Resp

Respondened for a onei.e. PowerP

mary purposenterview combenefits of tn. Attendawith author

TY COLLEGE

ent with deo submits th

ponse, the Rto determin

ponse agreeactors, with n criteria is process proccriteria scor7 below are stablished in

W5515

with the s

5

25

ing of indivRFP) appoinin accordancict, followings may be reinput to th

o conduct nonses.

nts timely sue (1) hour p

Point presene of the intemmittee andthe Respondnce at the irity to bind a

Page|19

E DISTRICT

monstrated he Proposal Respondent ation of the es that for the weight subject to

ceeds from ring of RFPpreliminary n the Staff

Weight 50 5

0 5 5

0 5

viduals with nted by the ce with the g screening equested to e selection

negotiations

ubmitting a period at a

ntations) by erview is for d to provide dents’ RFPinterview is and commit

Page 20: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

Metering Insta April 25, 2016

the Instthe RFPdiscRespresfull

4.5. Negnegthe for havRessubdisc

4.6. Awa

Dist

4.7. Recof tBoaRecevades

4.8. Dist

info

allation & Imple

Respondentallation. FaDistrict with

P Responsecussions, thspondents wsent at the sand complet

gotiations/Digotiations an

District’s neall Respond

ve the sole spondent babject matterscussion or ne

ard of Consutrict’s Board

commendatihe Consulta

ard of Truscommendatialuation critescribed abov

trict Reservormalities in R

ementation of M

t; and (ii) thailure of a Reh all personne for non-r

he following will be randoscheduled dte authority t

scussions. d/or discussegotiations/ddents, or difdiscretion tosed on the Ds reflected egotiation w

ultant Servicof Trustees

on for Awardant Servicesstees for aon will desc

eria after comve.

ved Rights. RFP Respon

MBCx Measure

e Respondeespondent t

nel identifiedresponsiven

proceduresomly selectedate/time of to bind the R

The Districsions with ondiscussions ffering areaso establish tDistrict’s revin the RFP

with the Resp

ces Agreeme.

d of Agreems will preparaward of thcribe the bampleting the

The Distrinses or to re

[END

es Project

ent’s persono attend its

d hereinabovess. To s will be imed by the Dits interview

Respondent

ct may, in tne or more owith Respo

s of inquiry the nature a

view of the RP Response pondent.

ent. Award

ment. Districre and submhe Agreemasis for the e RFP scree

ct reserveseject all RFP

D OF SECTI

PERALT

nel proposeinterview at

ve will resultensure fair

mplemented:District; and w with the D.

the sole disof the Respondents mayfor differentand scope

Respondent’ that the D

of the Agre

ct staff respomit a writtenent (“Staff Staff Reco

ening, intervi

s the right P Responses

ON]

TA COMMUNI

ed for complt the time ant in rejectionr and impa: (i) the ord(ii) each R

District, its pr

scretion of tondents. Thy include idet Respondeof negotiatios RFP Resp

District belie

ement will o

onsible for con recommen

Recommenommendationiews and/or

to waive s.

TY COLLEGE

etion of the nd place desn of such Reartial negotiader of inter

Respondent rincipals or

the District, he nature anentical areasnts. The Dons/discussiponse and theves require

only be by a

ompleting prndation to thndation”). n, including negotiation

minor irreg

Page|20

E DISTRICT

Equipment signated by espondent’s ations and rviews with must have others with

engage in nd scope of s of inquiry

District shall ions with a he areas or

e additional

ction of the

rocurement he District’s

The Staff scoring of

processes

ularities or

Page 21: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeteProposal (AttaApril 25, 2016

To the Boarto provide th 1. Proposa

(“RespoAgreemwithin th

2. Respond

the Resin the RServicesexaminethe Agredays of

3. Addenda

of the DAddendareceipt omatters

4. Price Pr

4.1. LumcomtherDol(inccom

ering Installatiochment A)

rd of Trusteehe complete

al Submissindent”); if thent included

he Contract T

dent Acknowpondent hasFP; (ii) conds as deemeed the Agreeeement; andthe date of t

a. The RespDistrict and a. The Reof all Addenraised by al

AddendaNumber

roposal. mp Sum Fixemplete the Mreto for a lulars ($_____

cluding a pmplete Meter

on & Implemen

es of the Per the Consult

ion. This he Agreemed with the RFTime set fort

wledgements: (i) carefullducted invesed reasonaement; (iv) bd (v) commithis Proposa

pondent ackthat the Prospondent fu

nda issued bl Addenda, t

a r

Add

Ye Ye Ye Ye

ed Price ProMeter Equipmump sum, fix__________)personnel ber Equipment

ntation of MBC

P(At

ralta Commutant Services

Proposal ent is awardFP and shallth therein.

ts. By submy reviewed atigations of t

able and prbeen affordetted to acce

al.

knowledges oposal incorurther acknoby or on behthis Proposa

denda ReceRespond

es Nes Nes Nes N

oposal for Mement Installaxed price of). The foreenefits/burdInstallation,

Cx Measures Pr

PROPOSALttachment A

unity Colleges as follows

is submitteed to the Rel complete C

mitting this Pand examinethe scope audent by th

ed the opporeptance of t

its receipt ofrporates theowledges thhalf of the Dal may be rej

eived by ent o o o o

eter Equipmation and otf _________egoing is alen), materi, overhead a

roject; RFP N

PERALT

L A)

e District (“D:

ed by ___espondent,

Consultant S

Proposal, thed the resound requiremhe Respondrtunity to reqhis Proposa

f the followine matters adhat if the ReDistrict and tjected for no

Addenda IP

Yes Yes Yes Yes

ment Installatther obligati__________ll-inclusive, als, equipm

and administ

No. _15-16-27__

TA COMMUNI

District”), the

__________the Respon

Services, for

he Respondeurce and refe

ments for comdent; (iii) cquest clarifical by the Dis

ng Addendaddressed inespondent dthat this Proon-responsiv

IncorporateProposal

No No No No

tion. The Reons under t__________including w

ment and strative costs

_

TY COLLEGE

undersigne

___________ndent shall e

the Contrac

ent acknowlerence mate

mpleting the carefully revcation or expstrict within

a issued by o each of thdoes not acoposal incorpveness.

ed Into

espondent pthe Agreeme___________without limitaservices ne and profit.

Page | 21

E DISTRICT

d proposes

_________ execute the ct Price and

ledges that erials noted Consultant

viewed and planation of ninety (90)

or on behalf e following

cknowledge porates the

proposes to ent relating _________ ation, labor cessary to

Page 22: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeteProposal (AttaApril 25, 2016

4.2. MetEqu

B

ering Installatiochment A)

ter Equipmeuipment insta

Building No.

C

1 MCo

2 MCo

3 MCo

4 MCo

5 LaCo

6 LaCo

7 LaCo

8 LaCo

9 LaCo

10 LaCo

11 LaCo

12 CoofAl

13 CoofAl

14 Di

on & Implemen

ent Price Proallation is br

Campus

erritt ollege

MB

erritt ollege

MB

erritt ollege

MB

erritt ollege

MB

aney ollege

LT

aney ollege

LB

aney ollege

LB

aney ollege

LL

aney ollege

LB

aney ollege

LB

aney ollege

LA

ollege f lameda

L

ollege f lameda

B

istrict DA

ntation of MBC

oposal Breaoken down a

Meter EBuilding

DescriptioMerritt CollegBuilding R

Merritt CollegBuilding P

Merritt CollegBuilding A

Merritt CollegBuilding D

Laney CollegTheater Laney CollegBuilding F Laney CollegBuilding G Laney CollegLibrary

Laney CollegBldg A

Laney CollegBuilding B

Laney CollegAdmin Towe

Library

Building A

District Administratio

Cx Measures Pr

akdown. Thamong the b

Equipment P

on Pro

ge

_____

($____

ge

_____

($____ge

_____

($____ge

_____

($____ge _____

ge ($____

ge _____($____

ge

_____

($____ge

_____

($____

ge

_____

($____ge r

_____

($____

_____

($____

_____

($____

on

_____

($____

roject; RFP N

PERALT

he foregoingbuildings sub

Proposed Pposed Mete

___________

__________

___________

__________

___________

__________

___________

_____________________

__________

_____________________

___________

__________

___________

__________

___________

__________

___________

__________

___________

__________

___________

__________

___________

__________

No. _15-16-27__

TA COMMUNI

g price propbject to Mete

Pricing er Equipme

___________

____)

___________

____)

___________

____)

___________

____)

___________

____)

_________________)

___________

____)

___________

____)

___________

____)

___________

____)

___________

____)

___________

____)

___________

____)

_

TY COLLEGE

posal compleer Equipmen

nt Installati

_____ Dolla

_____ Dolla

_____ Dolla

_____ Dolla

_____ Dolla

__________

_____ Dolla

_____ Dolla

_____ Dolla

_____ Dolla

_____ Dolla

_____ Dolla

_____ Dolla

Page | 22

E DISTRICT

eting Meter nt as

ion Price

rs

rs

rs

rs

rs

____Dollars

rs

rs

rs

rs

rs

rs

rs

Page 23: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeteProposal (AttaApril 25, 2016

4.3. Lum

comlum($__persEqu

4.4. MBCEquinst

ering Installatiochment A)

15 Di

Totapr

mp Sum Fixemplete the Mp sum, fix__________sonnel beneuipment InstaCx Equipmeuipment installation at ea

Task/Ph

InvestigatioPhase

ImplementaPhase

Reporting P

Total MBCEquipmentfor Camps

Task/Ph

InvestigatioPhase

ImplementaPhase

Reporting P

on & Implemen

istrict P

al (must beroposed in P

ed Price ProMBCx Equipmxed price ___). The foefits/burden)allation, oveent Price Proallation is bach campus

hase

on __

($_

ation __

($_

Phase __

($_

Cx t Price

s

__

($_

hase

on __

($_

ation __

($_

Phase __

ntation of MBC

Physical Plan

equal to prParagraph 4

oposal for MBment installaof ______

oregoing is a), materials,rhead and a

oposal Breakroken down

s as follows:

M

__________

__________

__________

__________

__________

__________

__________

__________

L

__________

__________

__________

__________

__________

Cx Measures Pr

nt

_____

($____

rice 4.1)

_____

($____

BCx Equipmation and oth___________all-inclusive, equipment

administrativkdown. The

n by the prin

MERRIT COLPrice

___________

_______)

___________

_______)

___________

_______)

___________

_______)

LANEY COLPrice

___________

_______)

___________

_______)

___________

roject; RFP N

PERALT

___________

__________

___________

__________

ment Installather under th__________, including wt and servicve costs and e lump sum ncipal activit

LLEGE (MCProposal

__________

__________

__________

__________

LLEGE (LC)Proposal

__________

__________

__________

No. _15-16-27__

TA COMMUNI

___________

____)

___________

____)

tion. The Rehe Agreemen__________without limitaces necessaprofit. fixed price pties to comp

C)

__ Dollars

__ Dollars

__ Dollars

__ Dollars

)

__ Dollars

__ Dollars

__ Dollars

_

TY COLLEGE

_____ Dolla

_____ Dolla

espondent pnt relating th

___________ation, labor (ary to comp

proposed forplete MBCx

C

C

Page | 23

E DISTRICT

rs

rs

proposes to hereto for a __ Dollars (including a plete Meter

r the MBCx Equipment

Time to Complete

Phase

Time to Complete

Phase

Page 24: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeteProposal (AttaApril 25, 2016

5. Proposa

requiredacknowlexceptioand/or areject _______

6. Schedul

necessaincorpor

7. Award o

solely ininformal

8. Bid Prot

acknowlprevailincosts incis bindinexpress

ering Installatiochment A)

Total MBCEquipmentfor Camps

Task/Ph

InvestigatioPhase

ImplementaPhase

Reporting P

Total MBCEquipmentfor Camps

al Exceptiond to complledges that ons/exclusioaffect the na

this Pro__________

le Proposalary the Consrated into Ta

of Agreemenn the Districities in the R

tests; Attornledges and ang party in jucurred in cong upon theterms of Pa

on & Implemen

($_

Cx t Price

s

__

($_

hase

on __

($_

ation __

($_

Phase __

($_

Cx t Price

s

__

($_

s/Exclusionsete the Co

if the Disns set forthature, scopeoposal for___________

. The undsultant Servab 7 of the R

nt. The Resct’s Board oRFP process

neys Fees aagrees to thudicial proce

onnection wite Respondearagraph 3.1

ntation of MBC

__________

__________

__________

COLL

__________

__________

__________

__________

__________

__________

__________

__________

s. The Proponsultant S

strict determ below affe

e or other rer non-res_______.

dersigned Rices in acco

Respondent’s

spondent ackof Trustees s or the Distr

and Costs. he provisionseedings aristh any such nt and enfo4 of the RFP

Cx Measures Pr

_______)

___________

_______)

LEGE OF APrice

___________

_______)

___________

_______)

___________

_______)

___________

_______)

posal incorpServices, exmines in thect material equirementsponsiveness

Respondent ordance withs RFP Resp

knowledges and that th

rict may reje

By submittins of Paragrasing out of a

judicial procorceable agaP.

roject; RFP N

PERALT

__________

ALAMEDA (CProposal

__________

__________

__________

__________

porates all wxcept as ne District’s terms of the

s of the Cons. Th

proposes h the Proposponse.

that action he District

ect all Propos

ng this Propaph 3.14 of ta bid protestceedings anainst the Re

No. _15-16-27__

TA COMMUNI

__ Dollars

COA)

__ Dollars

__ Dollars

__ Dollars

__ Dollars

work, labor, noted below

sole discree Consultannsultant Sere except

to completesed Consult

to award thmay waive sals.

posal, the Rthe RFP relat to recover nd that Paraespondent in

_

TY COLLEGE

C

materials anw. The Retion that ant Services rvices, the Dions/exclusio

e activities tant Services

e Agreemenminor irreg

Respondent ating to the its attorneys

agraph 3.14n accordanc

Page | 24

E DISTRICT

Time to Complete

Phase

nd services Respondent any of the Agreement

District may ons are:

and tasks s Schedule

nt is vested gularities or

specifically right of the s’ fees and of the RFPce with the

Page 25: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeteProposal (AttaApril 25, 2016

The individrepresents Respondent _____________Signature _____________Name Printed or (________) ____Area Code and T

ering Installatiochment A)

ual executinto the Distrt and to bind

______________

______________r Typed

_____________Telephone Numb

on & Implemen

ng this Proict that: (i) hd the Respon

______________

______________

______________ber

ntation of MBC

posal on behe/she is dundent to this

__________

__________

___________

Cx Measures Pr

ehalf of theuly authorizes Proposal; a

roject; RFP N

PERALT

e above-ideed to execuand (ii) this P

No. _15-16-27__

TA COMMUNI

entified Respute this ProProposal is c

_

TY COLLEGE

pondent waposal on becomplete an

Page | 25

E DISTRICT

arrants and ehalf of the d accurate.

Page 26: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterQualifications April 25, 2016

This Qualificemployee oQualificationResponse n

1. Contact

1.1. Res

1.2. For

1.3. Con

2. Prior M

equipmedistrict pfollowingsequent Responthat a Rthe Resand/or C

ing InstallationStatement (Att

cations Statof the Respns Statemenon-respons

t Informatio

spondent Na

m of Entity.

Corp____(State

Part____(Desc

Limi

Limi

Join____(Iden

Sole____(Iden

ntact Person

Name

Street Ad

Phone/F

Email Ad

Metering andent installatiprovided by g format. Attial “Assignm

ndents are cRespondentspondent (California K

& Implementaachment B)

tement mustpondent. Fnt concurreive and rejec

on

ame. ______

Check appr

poration __________e of Incorporat

tnership __________cribe type of pa

ted Liability

ted Liability

t Venture __________

ntify each mem

e Proprietors__________

ntify all equity on.

ddress/City/S

ax

ddress

d MCBx Exons complethe Respon

ttach additioment No.” nu

cautioned tht failed to dor Respon

K-12 public

ation of MBCx M

QUALIFICA(At

t be compleFailure of aently with thcted.

__________

ropriate box

__________tion & Corporat

__________artnership i.e.,

Company

Partnership

__________ber of Joint Ve

ship __________owners)

State

xperience. eted by Resndent (or Rnal summarmbering.

hat if the Didisclose andent’s predschool dist

Measures Proje

ATIONS STAttachment B

eted by eacha Respondehe Respond

__________

.

___________te Registration

___________general partne

p

___________enture and form

___________

Provide a spondent for

Respondent’sries as neces

istrict deterd identify Adecessor) tricts within

ect; RFP No. 1

PERALT

ATEMENTB)

h Respondeent to submdent’s RFP

___________

__________No.)

__________ership, limited p

__________m of entity of ea

__________

summary ofr a K-12 schs predecessssary and id

rmines baseALL other cto Californ

n the past te

5-16/27

TA COMMUNI

ent and execmit the com Response

___________

_________

_________ partnership)

_________ ach Joint Ventu

_________

f ALL otherhool district sor). Providdentify each

ed on the Dconsulting nia communen (10) year

TY COLLEGE

cuted by an mpleted and

will rende

_

urer)

r Prop 39 mor commun

de the summadditional s

District’s invservices prnity collegers which ar

P a g e | 26

E DISTRICT

authorized d executed r the RFP

meter/MCBx nity college mary in the ummary by

vestigation rovided by e districts

re identical

Page 27: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterQualifications April 25, 2016

or similis subje

AS

Cl

GminInanO

Fi

Cl

AS

Cl

GminInanO

Fi

Cl

3. Essenti

followingmeet mi

ing InstallationStatement (Att

lar to the Cect to reject

SSIGNMEN

lient name

eneral deeters/MCBxstalled stallation Da

nd end datesriginal Price

nal Adjusted

lient Contac

SSIGNMEN

lient name

eneral deeters/MCBxstalled stallation Da

nd end datesriginal Price

nal Adjusted

lient Contac

al Minimumg qualificationimum qual

& Implementaachment B)

Consultant Stion for non

T NO. 1

escription x equipm

ates (beginns)

d Price

t Person

T NO. 2

escription x equipm

ates (beginns)

d Price

t Person

m Qualificatons criteria wifications cri

ation of MBCx M

Services de-responsive

of ment

ning

Name: Position Address

Phone/F Email

of ment

ning

Name: Position Address

Phone/F Email

tions. Any rwill result in teria.

Measures Proje

escribed in eness.

___

n/Title ___

s ___

___

Fax ___

___

___

n/Title ___

s ___

___

Fax ___

___

response of rejection of t

ect; RFP No. 1

PERALT

the RFP, th

_____________

_____________

_____________

_____________

_____________

_____________

_____________

_____________

_____________

_____________

_____________

_____________

f a Respondthe Respond

5-16/27

TA COMMUNI

he Respond

____________

____________

____________

____________

____________

____________

____________

____________

____________

____________

____________

____________

dent indicatindent’s RFP

TY COLLEGE

dent’s RFP

_____

_____

_____

_____

_____

_____

_____

_____

_____

_____

_____

_____

ng “not qualiResponse fo

P a g e | 27

E DISTRICT

Response

ified” to the or failure to

Page 28: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterQualifications April 25, 2016

3.1. Res

covDol

3.2. Res

the

3.3. Res

3.4. Res

limit

3.5. Res

Sub

3.6. Hasfindfor a

3.7. At abeecon

3.8. At aResdish

3.9. With

servRes

ing InstallationStatement (Att

spondent haerage limitslars ($4,000

Yes

No (

spondent poClassificatio

Yes

No (

spondent is c

Yes

No (

spondent hats in accorda

Yes No (

spondent isbcontractor o

Yes No

s any public ing that the a public wor

Yes ( No

any time duren convictedstruction pro

Yes ( No

any time duspondent behonesty?

Yes ( No

hin the pasvices to whspondent.

& Implementaachment B)

as obtaineds of at least,000) in the

(not qualified

ossesses a von(s) of Cont

(not qualified

currently a D

(not qualified

as obtained ance with ap

(not qualified

s ineligible on a public w(not qualifie

agency, witResponden

rks project or(not qualified

ing the last f of a crime oject? (not qualified

uring the laeen convicte

(not qualified

st five (5) yhich the Res

ation of MBCx M

d a current t Two Millioaggregate.

d)

valid and curtractors’ Lice

d)

DIR Register

d)

a current Wpplicable law

d)

for award works projeced)

thin the pasnt or any prer a public wod)

five (5) yearinvolving an

d)

ast five (5) d of a feder

d)

ears, one ospondent w

Measures Proje

Commerciaon Dollars ($

rrently in goense require

red Contract

Workers Comw.

of public wct pursuant to

t ten (10) yeedecessor toorks contrac

rs, has Respny federal, s

years, has ral or state c

or more conwas a party

ect; RFP No. 1

PERALT

al General $2,000,000)

ood standinged by the RF

tor?

mpensation

works conto Labor Cod

ears conduco the Respoct?

pondent or astate, or loca

the Responcrime involvi

ntract(s) to to have be

5-16/27

TA COMMUNI

Liability po per occurr

g California CFP?

policy of ins

tracts or tode §1777.1 o

cted proceedndent is not

ny predecesal law relate

ndent or aning fraud, th

provide woeen termina

TY COLLEGE

licy of insurence and F

Contractors’

surance with

o perform wor 1777.7.

dings that ret a “respons

ssor to the Rd to a privat

ny predecesheft, or any o

ork, labor, mated for def

P a g e | 28

E DISTRICT

urance with Four Million

license for

h coverage

work as a

esulted in a ible” bidder

Respondentte or public

ssor to theother act of

materials or fault of the

Page 29: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterQualifications April 25, 2016

4. Backgro4.1. Res

4.1.1

4.1.2

4.1.3

4.1.4

4.2. Cla4.2.1

ing InstallationStatement (Att

Yes ( No

ound. spondent Ex1. Years In

monitorin

2. Prior Trabusinesscurrent tr

If “Yes” Respond

3. Prior AssresponseRFP com

If “No” prtrade/bus

4. Officers Respondpercent (of businethe prior

If “Yes”: of all sucand (iii) other firmDistrict. District’scurrent ewere prcorporatDistrict wsubject t

ims and Dis1. Pending

or other

& Implementaachment B)

(not qualified

xperience. n Business. ng equipmen

ade/Businesss under a trarade/busines

Yes

No on a sepa

dent in the pr

signments. e to Paragrampleted by R

Yes

No

Not Arovide a sumsiness name

and Equitydent current(10%) or moess entity thten (10) yea

Yes

No (i) identify alch other firmgenerally dems, compaResponde

s investigaequity ownreviously etion, partnewith work, lto rejection

putes. Claims anddisagreeme

ation of MBCx M

d)

The Respnt under Res

s Name. Haade name oss name?

arate attachrior ten (10)

Do the prior aph 2 aboveRespondent

Applicable mmary of eae(s) using th

y Owners. tly or previoore in any othat providedars?

ll such equitms, companescribe the wnies, corpo

ents are cation that a ers, officer

employed bership or olabor, equip

n for non-res

Disputes. ent relating t

Measures Proje

pondent haspondent’s c

as the Respor business

hment identyears.

assignmente include all under a prio

ach other asse summary

Is any cuously emplother firm, co work, mate

ty owners, ofies, corporawork, materrations, parutioned thaResponden

rs and emplby or ownother businpment or sesponsivene

The Responto or arising

ect; RFP No. 1

PERALT

s installed current trade

pondent, in tname that i

tify all prior

ts identified assignment

or trade/busin

signment coformat set fo

urrent equityoyed by or ompany, corperials, equip

fficers and eations, partnrials, equipmrtnerships oat if the Dint failed to loyees of Rned equity ness entityervices, the ess.

ndent is pres out of a pr

5-16/27

TA COMMUNI

utility consue/business n

the prior tenis different t

r trade/busin

and disclosets similar to ness name?

ompleted unorth in Parag

y owner, oowned an

poration, papment or ser

employees; (erships or o

ment or servor other bustrict deter fully disclo

Respondentin any o

y that prev Responden

sently engagrivate or pub

TY COLLEGE

umption mename. _____

n (10) years than the Re

ness name

ed in the Rethose descr

?

der Respongraph 2.

fficer or emequity inte

artnership orrvices to the

(ii) provide thother businevices providesiness entitrmines basose and idet who are cuther firm,

viously provnt’s RFP Re

ged in a clablic contract

P a g e | 29

E DISTRICT

etering and ________

conducted espondent’s

s used by

espondent’s ribed in the

dent’s prior

mployee of rest of ten r other form e District in

he name(s) ess entities; ed by such ties to the

sed on the entify ALL urrently or company,

viding the esponse is

aim, dispute for energy

Page 30: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterQualifications April 25, 2016

4.2.2

4.2.3

The undersbehalf of thpersonal knconducted aresponses tthis Qualificinformation fact in any District deteResponse sprocess. Executed th I declare un

ing InstallationStatement (Att

conservacompens

If “Yes” oother dis

2. Prior ClaengagedcompensRespond

If “Yes” odisagree

3. Judgmenoutstandwhich ari

If “Yes” odisagree

igned is dulye above-ide

nowledge of all necessaryto this Qualifcations Statthat would rof the resp

ermines that shall be dee

his___ day o

nder penalty

& Implementaachment B)

ation servicsation or in w

Yes No

on a separatagreement.

aims and Dis in a claim,

sation or adent.

Yes No

on a separatment.

nts. Are thing against tise out of or

Yes No

on a separatment.

y authorizedentified Resp

each of they and approfications Staement are render any ronses. Theany respon

emed non-re

f _________

of perjury un

ation of MBCx M

ces/equipmewhich compe

te attachme

sputes. Thedispute or

additional tim

te attachme

ere any judthe Respondare related

te attachme

d to executepondent. The responsesopriate inquiratement. Thecomplete anresponse to e above-idese herein is

esponsive an

__________

nder Californ

___

___

Measures Proje

ent in whicensation is s

ent, provide d

e Respondedisagreememe or in w

nt, provide d

dgments, orddent or any in any mann

nt, provide d

e this Qualifiche undersigs to this Quries to detere undersignnd accuratebe false or ntified Respfalse or mis

nd the Resp

_ 20__ at___

nia law that

__________

__________

ect; RFP No. 1

PERALT

ch the Resought from

details of ea

ent has, withnt in which which comp

details of su

ders, decreeof the officener to a priva

details of su

cations Statned warrantalifications

rmine the trued declares

e; there are misleading a

pondent acksleading or cpondent will

__________ (City

the foregoin

__________ (Signatu

__________

5-16/27

TA COMMUNI

espondent the Respond

ach such pe

hin the pastthe Responpensation w

uch pending

es or arbitraers or equity ate or public

uch pending

tement undets and repreStatement auth, complet and certifieno omissio

and there arknowledges contains misnot further

___________and State)

ng is true and

___________re)

___________

TY COLLEGE

is seeking dent.

nding claim

t seven (7) yndent soughwas sought

claim, dispu

ation awardowners of R

c contract?

claim, dispu

er penalty ofesents that and/or that teness and as that the re

ons of matere no misstaand agrees

sstatements participate

________.

d correct.

___________

___________

P a g e | 30

E DISTRICT

additional

, dispute or

years been t additional t from the

ute or other

ds pending, Respondent

ute or other

f perjury on he/she has he/she has accuracy of esponses to erial fact or atements of s that if the

of fact, the in the RFP

_

_

Page 31: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterNon-Collusion April 25, 2016

STATE OF COUNTY O I, ________

(Type

the _______

foregoing Rundersigned

1. The partnership,

2. The

3. The

false or shaother respoResponse.

4. The

communicatoverhead, padvantage contract.

5. All s

6. The

thereof, or tany fee to aany membe

Execute

I declareand correct. _____________Signature _____________Name Printed or (________) ____Area Code and T

ing InstallationAffidavit (Attac

CALIFORNOF ________

___________d or Printed Nam

__________ (Title)

RFP Respond declares, s

RFP Respo, company, a

RFP Respo

Respondenam bid, and onse or any

Respondetion, or confprofit or cosagainst the

tatements c

Respondenthe contentsany person, cer or agent th

ed this ____

e under pen.

______________

______________r Typed

_____________Telephone Numb

& Implementachment C)

IA __________

__________me)

_________ o

nse (“the Restates and ce

onse is not association,

onse is genu

t has not dirhas not dir

one else to

nt has notference withst element o public bod

ontained in t

nt has not, d thereof, or corporation, hereof to effe

day of ____

nalty of perju

______________

______________

______________ber

ation of MBCx M

NON-COL(ATT

______

________, b

of ________

espondent”)ertifies that:

made in thorganization

ine and not

rectly or indirectly or indo put in sha

t in any mh anyone to of the bid pdy awarding

the RFP Res

directly or indivulged infopartnership

ectuate a co

________, 20

ury under th

__________

__________

___________

Measures Proje

LLUSION AFTACHMENT

being first du

___________(Respond

. In conne

he interest on or corpora

collusive or

rectly induceirectly collud

am RFP Res

manner, dirfix the bid p

price or thatg the contra

sponse and

directly, subormation or

p, company, ollusive or sh

0__ at _____

e laws of th

ect; RFP No. 1

PERALT

FFIDAVIT T C)

uly sworn, de

__________dent Name)

ection with t

of, or on beation.

sham.

ed or soliciteded, conspirsponse, or

rectly or inprice, or that of any oth

act or of an

related doc

bmitted the data relativeassociation,

ham RFP Re

__________(City, County an

he State of C

5-16/27

TA COMMUNI

eposes and s

____, the pa

he foregoin

ehalf of, an

ed any otherred, conniveto refrain fr

ndirectly, soat of any othher respondnyone intere

uments are

RFP Respoe thereto, or, organizatioesponse

__________nd State)

California tha

TY COLLEGE

says that I a

arty submittin

g RFP Res

ny undisclos

r respondented, or agreerom submitt

ought by aer bidder, o

dent, or to sested in the

true.

nse or any r paid, and won, bid depo

___________

at the forego

Page | 31

E DISTRICT

am

ng the

sponse, the

ed person,

t to put in a ed with any ting a RFP

agreement, or to fix any secure any e proposed

breakdown will not pay, sitory, or to

__.

oing is true

Page 32: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterCertificate of WApril 25, 2016

I,___

__________

1. I

“t

2. I

iac

__________(Consultant Nam

By: ____

(Signa

____

(Name

ing InstallationWorkers Compe

CER

__________(N

__________

am aware t

“Every emplothe following

(a) Ba

(b) BinwRd

am aware nsured agaaccordance commencing

__________me)

__________ature)

__________e Printed or Type

& Implementaensation Insura

RTIFICATE

___________Name)

___________(Consul

that Californ

oyer except g ways:

By being insuuthorized to

By securing fnsure either which may beRelations of

ue to his or

that the provainst liabilitywith the pro

g the perform

___________

___________

___________ed)

ation of MBCx Mance (Attachme

OF WORKE(ATT

_______ the

___________tant Name)

ia Labor Cod

the state sh

ured against write compe

from the Direas an indivie given upoability to seher employe

visions of Cy for workovisions of t

mance of this

___________

__________

__________

Measures Projeent D)

ERS’ COMPTACHMENT

e _________

__________

de § 3700(a

hall secure th

t liability to pensation ins

ector of Induidual employ

on furnishinglf-insure andees.”

California Labkers’ compethat code, as Contract.

______

_______

_______

ect; RFP No. 1

PERALT

PENSATIONT D)

__________ (Title)

_____, decla

a) and (b) pro

he payment

pay compenssurance in th

ustrial Relatiyer, or one e

g proof satisfd to pay any

bor Code §3ensation or and I will co

5-16/27

TA COMMUNI

N INSURANC

__________)

are, state an

ovides:

of compens

sation in onehis state.

ions a certifiemployer in factory to thy compensa

3700 requireto undert

omply with s

TY COLLEGE

CE

_________of

d certify tha

sation in one

e or more in

cate of consa group of

he Director oation that ma

e every empake self-inssuch provisi

Page | 32

E DISTRICT

f

t:

e or more of

surers duly

sent to self-employers,

of Industrial ay become

ployer to be surance inions before

Page 33: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFSuAp

Pr

Na Au

FP for Metering Insubcontractors List (April 25, 2016

roject AA

ame of Bidder:

uthorized Sign

(A) Licensed Na

Subcontra

tallation & ImplemeAttachment E)

AAA

: ____________

nature: _______

ame of actor

entation of MBCx M

_____________

_____________

(B)Subcontractor

or Shop Ad

A

Measures Project; R

SUBCON(Att

_____________

_____________

Office, Mill ddress

Attach addition

RFP No. 15-16/27

PERALTA COMM

TRACTORS LIachment E)

____

____

Sub-cTrade or

W

nal page(s) as r

MUNITY COLLEGE

ST

(C) ontractor r Portion of

Work

required

E DISTRICT

(DSubconContraLicens

D) ntractor actors’ se No.

Page | 33

Page 34: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterDIR VerificatioApril 25, 2016

I am the ___

submitting tMeasures PDepartment

1. The Bid

DIR Reg

2. If the BRegistraBidder cnecessaRegistra

3. The Biddduration

4. The Bidsubmitte

5. The BidBidder’sWork, thidentified

6. The Bidall sub-tWork; asubcont

7. If any ofmislead

I have persCalifornia la Executed th

__________(Signature)

__________(Name, typed or

ing Installationon Registration

__________(Title/Positio

the accompProject; RFPt of Industria

der’s DIR Rgistration is J

Bidder is awation will occcompleting aary to renewation while p

der, if awardn of the Work

der has inded with the B

dder has prs Subcontrache Bidder wd in the Bidd

der’s solicitatier subcontrnd (ii) prospractors who

f the stateming, the Bidd

sonal first haaw that the fo

his ____ day

__________

__________r printed)

& Implementa(Attachment F

D

___________on)

panying PropP No. 15-1

al Relations (

Registration NJune 30, 20_

warded the Ccur: (i) priorall obligationw the Biddeerforming W

ded the Contk.

ependently Bid Proposal

rovided the ctors’ List or

will provide thder’s Subcon

ation of subractors mustpective subcare DIR reg

ments herein der’s Bid Pro

and-knowledoregoing is t

y of _______

___________

___________

ation of MBCx MF)

IR REGISTR(A

___ of _____

posal for R6/27. The (“DIR”).

Number is: ____.

Contract forr to expirations under theer’s DIR RegWork under th

tract for the

verified thatl of the Bidde

DIR Registr within twenhe District wntractors Lis

contractor bt be DIR regcontractors mgistered cont

are false ooposal is sub

dge of all oftrue and corr

___________

____

____

Measures Proje

RATION VEttachment F

___________

FP for MeteBidder is c

__________

r the Work on of the Ce Contract fogistration sohe Contract.

Work will re

t each Subcer is current

tration Numnty-four (24) with the DIRt.

bids includedgistered contmay only sotractors.

r omit matebject to rejec

f the foregoirect.

__, 20___ a

ect; RFP No. 1

PERALT

RIFICATIONF)

__________(Bidder Name)

ering Installcurrently reg

________. T

and the exontract Timeor the Work,o that there.

emain a DIR

contractor idtly a DIR reg

mber for eachours of the

R Registratio

d notice to ptractors at a

olicit sub-bids

rial facts renction for non

ing. I decla

t _________(City

5-16/27

TA COMMUNI

N

__________

lation & Impgistered as

The expiratio

xpiration date for the W, the Bidder

e is no laps

registered c

dentified in tgistered cont

ch subcontre opening o

on Number f

prospective all times durs from and

ndering a stn-responsive

are under pe

__________and State)

TY COLLEGE

___ (“Bidder”

plementationa contracto

on date of th

te of the BiWork; or (ii) pr will take alse in the Bi

contractor fo

he Subconttractor.

ractor identiof Bid Proposfor each su

subcontracting performacontract wit

tatement to eness.

enalty of pe

__________

Page | 34

E DISTRICT

”)

n of MBCx or with the

he Bidder’s

dder’s DIR prior to the l measures dder’s DIR

or the entire

ractors List

ified in the sals for the bcontractor

tors that: (i) ance of the h lower-tier

be false or

erjury under

__.

Page 35: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterEnvironmentalApril 25, 2016

It is the pSustainabilitthe environcomparablecreate and the procureremanufactulow-toxicity grown foodspromote conDistrict's SL The Districhttp://www.policy_FINALenvironmen Each RespoSustainabilit

ing Installationlly Sustainable

policy of thty) to purchament, when

e efficacy. sustain marment of envured produccleaning su

s, compostantracting wit

LBE program

ct’s Environperalta.edu/pL_3-31-08.pdtally sustain

ondent mustty Policy wit

& ImplementaProcurement P

EN

he Peralta ase productn compared The Distric

rkets for envvironmentallycts, FSC cerupplies and ble utensils,h businesse

m.

nmental Suprojects/4/Pdf click on

nable purcha

t execute anh the Respo

ation of MBCx MPolicy (Attachm

NVIRONMENPROCU

(At

Communitys or serviceto other pr

t recognizevironmentally sustainablrtified lumbeGreen Seal , non-polysty

es in close pr

stainability urchasing%2the District

asing policy.

nd submit thondent’s RFP

Measures Projement G)

NTALLY SUUREMENT Pttachment G

y College s that minimroducts ands that enviry sustainabe products,

er, Energy Sapproved c

yrene food croximity, to r

Policy is 20ProcedureServices C

e executed P Response

ect; RFP No. 1

PERALT

USTAINABLPOLICY G)

District (Bomize the advd services thronmentally le products,such as pro

Star rated eqchemicals, locontainers, nreduce our c

available fes/BP_2_40

Center tab a

Statement oe.

5-16/27

TA COMMUNI

LE

oard Policy verse effectshat serve th

responsible, and is comoducts with quipment, loocally sourcnon-petroleucarbon footp

for review 0_Environmeand then P

of Complian

TY COLLEGE

2.40, Envs on human he same pue purchasin

mmitted to ehigh recyclew and no V

ced organic/sum-based inprint and to p

and/or dowental_Sustaiurchasing t

ce With Env

Page | 35

E DISTRICT

vironmental health and

urpose with g will help ncouraging ed content,

VOC paints, sustainably ks, and will

promote the

wnload at: inability_Po view the

vironmental

Page 36: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterStatement of CApril 25, 2016

Responden The long-teproduced aservice prom

____

*If “yes” desthe District w__________

__________

__________

__________

__________

__________

__________

I am authorbehalf of ththe foregoin By: ____

(Signa

____(Type

Title ____ Date ____

ing InstallationCompliance wit

ST

nt: ________

erm goal of and deliveremote the Dis

___Yes* _

scribe in thewill promote __________

__________

__________

__________

__________

__________

__________

rized to exee above-ide

ng is true and

__________ature)

__________d or Printed Nam

__________

__________

& Implementath Environment

TATEMENT SUS

__________

the Districtd in an env

strict’s Enviro

______No

e following hthe District’

___________

___________

___________

___________

___________

___________

___________

ecute this Stentified Respd correct.

___________

___________me)

___________

___________

ation of MBCx Mtally Sustainab

OF COMPLSTAINABLE

(Att

__________

t is to purcvironmentallonmentally S

ow the prods Environme

___________

___________

___________

___________

___________

___________

___________

tatement of pondent. I d

_________

_________

_________

_________

Measures Projele Procuremen

LIANCE WITPROCURE

tachment G

________

chase produly sustainabSustainable

duct or servientally Susta__________

__________

__________

__________

__________

__________

__________

Compliancedeclare unde

ect; RFP No. 1nt Policy (Attac

PERALT

TH ENVIRONEMENT POLG-1)

ucts with zeble manner.Procuremen

ce that the ainable Proc__________

__________

__________

__________

__________

__________

__________

e with Envirer penalty o

5-16/27 hment G-1)

TA COMMUNI

NMENTALLLICY

ero waste, h Does Re

nt goal?

Respondentcurement go___________

___________

___________

___________

___________

___________

___________

ronmental Sof perjury un

TY COLLEGE

LY

high recycleespondent’s

t propose toal. __________

__________

__________

__________

__________

__________

__________

Sustainabilitynder Californ

Page | 36

E DISTRICT

ed content, product or

o provide to

_________

_________

_________

_________

_________

_________

_________

y Policy on nia law that

Page 37: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeStatement April 25, 20

Respond I hereby discriminnot discrrace, ethand exprpolitical Order No I am autbehalf ofpenalty oherein is Dated: _ By: _

(S

_(N

etering Installaof Non-Discrim

016

STATEM

dent: _____

certify that tnation, whereriminate agahnicity, natioression, disaaffiliation. To. 11246 (as

thorized to f the Responof perjury untrue and co

__________

__________Signature)

__________Name typed or pr

tion & Implememinatory Emplo

ENT OF NO

___________

the above-ide employee

ainst any emonal origin, rability, pregnThe Respon

s amended b

execute thindent. I havnder the lawrrect.

________

__________

__________rinted)

entation of MBCoyment Practice

ON-DISCRIM(Atta

__________

dentified Ress are treate

mployee or areligion, ageancy, coverendent will aby Executive

s Statemenve personal

ws of the sta

_________

_________

Cx Measures Pes (Attachment

MINATORY Eachment H)

__________

spondent wiled with dignapplicant fore, marital staed veteran st all times c

e order No.11

nt of Non-D knowledge te of Califor

_________

_________

Project; RFP Nt H)

PERALTA

EMPLOYME)

_

ll maintain aity and respr employmenatus, sexuastatus, protecomply with1375).

iscriminatoryof all of the

rnia that the

o. 15-16/27

A COMMUNIT

ENT PRACT

a work enviropect. The Rnt because l orientation

ected genetich all provisio

y Employmee foregoing. e information

TY COLLEGE D

TICES

onment freeRespondentof gender, c

n, gender idec informationons of Exec

ent Practice I declare u

n I have prov

Page | 3

DISTRICT

e from does

color, entity n and cutive

es on under vided

37

Page 38: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterLabor & MaterApril 25, 2016

ing Installationrials Payment B

AGREEME

& ImplementaBond (Attachme

NT FOR ME

ation of MBCx Ment J)

ETER/MBCx(ATTA

Measures Proje

x EQUIPMENACHMENT

ect; RFP No. 1

PERALTA C

NT AND REI)

5-16/27

OMMUNITY C

ELATED SER

Pa

COLLEGE DIST

RVICES

age | 38

TRICT

Page 39: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterLabor & MaterApril 25, 2016

KNOW ALLSurety and with their reunto PERAL__________in lawful mexecutors, a

WHEREAS,Contract foMeasures Pthe Obligeetherein are i WHEREAS,prompt, full services use NOW THERClaimant forthe Work; (iunder the CDevelopmenSection 130Contract the The term “Cincluding wior furnishingthe Work unwere sold, letheir assigns In the evenlabor, materand reasona The Suretyalteration, dWork to beContract Dothe Surety h

ing Installationrials Payment B

L MEN BY __________

espective heLTA COMM__________

money of theadministrato

TH

, the Obliger the Work Project; RFP for performincorporated

, by the termand faithfu

ed, or reaso

REFORE, ifr all labor, mii) of amoun

Contract; andnt Departme020 of the en this obliga

Claimant” shthout limitatg labor, matnder the Coneased or rens and succe

nt that suit isrials or serviable attorney

, for value deletion, add performed

ocuments, shhereby waive

& ImplementaBond (Attachme

LABO

THESE P__________

eirs, executoMUNITY COL___________e United Strs, successo

HE CONDIT

ee, by resodescribed a

P No. 15-16mance of thed herein by t

ms of the Conl payment tnably requir

f the Principmaterials or s

ts due unded (iii) of amouent from wagUnemploymation shall b

hall refer to aion, all persoterials or sentract Documnted. This Boessors, a righ

s brought oices provideys fees purs

received, hdition, or an

thereunderhall in any wes notice fro

ation of MBCx Ment J)

OR & MATE(Att

RESENTS __________ors, administLLEGE DIST

___________ates, well aors and assig

TION OF TH

lution of itsas RFP for

6/27. WHEREe Work, the Ahis referenc

ntract Documto any Claimred for use, i

pal shall proservices useer the Unemunts requireges of the em

ment Insurane void; othe

any person, ons and enti

ervices usedments, withoond shall inuht of action u

n this Bonded or furnishesuant to Calif

ereby stipuly other mod, the Specif

way limit, resom the Oblige

Measures Proje

RIALS PAYtachment J)

that we, __________, atrators, succTRICT (“the__________and truly to gns, jointly a

IS OBLIGAT

s Board of r Metering EAS, the PrAgreement a

ce and made

ments, the Pmant, as hen the perform

omptly, fullyed or reason

mployment Ind to be dedumployees ofnce Code wrwise, it sha

corporationities describ or reasona

out regard foure to the beupon this Bo

by any Claed by such Cfornia Civil C

lates and adification to fications or strict or otheee of any su

ect; RFP No. 1

PERALTA C

YMENT BON)

___________s Principal,

cessors and e Obligee”) fo____ Dollars be made, and severall

TION IS SUC

Trustees haInstallationincipal, has and all othe

e a part here

Principal is rereinafter demance of th

y and faithfnably requirensurance Coucted, withhef the Principwith respectall be, and re

n, partnershied in Califor

ably requiredor whether senefit of all Cond.

aimant for aClaimant, thCode §9554

agrees that the terms othe Drawing

erwise affect uch change,

5-16/27

OMMUNITY C

ND

__________are jointly aassigns, he

or payment s ($_______

we bind ouy.

CH THAT:

as awardedn & Implementered into

er Contract Deof.

equired to fufined, for ale Work.

fully make ped for use inode for workeld and paid

pal and its Sut to work aemain, in full

ip, proprietornia Civil Cod for use in such labor, mClaimants so

amounts duehe Surety sh.

no change,of the Contrgs, or any oits obligatioextension o

Pa

COLLEGE DIST

__________and severalleld and firmlof the pena

___________urselves, ou

d to the Primentation oo an AgreemDocuments s

urnish a bonll labor mate

payment: (i)n the performk or labor ped to the Empubcontractond labor unforce and e

orship or othode §9100, p

the performmaterials or o as to give t

e such Claimall pay for th

extension ract Documeother portio

ons under thof time, altera

age | 39

TRICT

____, as y, along y bound

al sum of _______) ur heirs,

ncipal a f MBCx

ment with set forth

d for the erials or

) to any mance of erformed ployment rs under nder the effect.

er entity providing mance of

services them, or

mant for he same

of time, ents, the n of the is Bond; ation,

Page 40: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterLabor & MaterApril 25, 2016

deletion, adContract Do IN WITNES__________

______

By:

Title: _ (Attac

_____

By:

(AttacAcknoCertifiFact’s

Co

_____(Conta _____(Stree _____(City, (_____Teleph _____(Emai

ing Installationrials Payment B

ddition or othocuments, th

SS WHEREO_, 20__ by th

______________(

__________(Signature) __________(Typed or Pr

______________

h Notary Public

______________

__________(Signature of __________(Typed or Pr

h: (i) Attornowledgment ocation; and (iii) Signature)

ontact nameemail add

______________act Name)

______________et Address)

______________State & Zip Code

__) __________hone

______________l address)

& ImplementaBond (Attachme

her modificahe Drawings

OF, the Princheir duly aut

_____________(Contractor-Prin

______________

______________rinted Name)

______________

c Acknowledgem

______________(Surety N

______________f Attorney-In-Fac

______________rinted Name of A

ney-In-Fact Ceof Authorizing

Notary Public A

e, address, dress for no

______________

______________

______________e)

____ (______) __

______________

ation of MBCx Ment J)

tion to the Cor the Spec

cipal and Suthorized age

______________ncipal Name)

______________

______________

______________

ment of Principa

______________Name)

______________ct for Surety)

______________Attorney-In-Fact)

ertification; (ii) Signature oAcknowledgem

telephone otices to the

______________

______________

______________

_____________Fax

______________

Measures Proje

Contract Doccifications of

urety have eent or repres

______________

______________

______________

______________

al’s Signature)

______________

______________

______________

) Notary Puon Attorney-F

ment of Attorney

number ande Surety

______________

______________

______________

_

_

ect; RFP No. 1

PERALTA C

cuments, theany other p

executed thisentative.

___

___

___

___

___

___

___

blic Fact y-In-

d

__

__

__

5-16/27

OMMUNITY C

e Work to bportion of the

s instrumen

Pa

COLLEGE DIST

be performede Contract D

t this _____

age | 40

TRICT

d under the ocuments.

____ day of

Page 41: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterPerformance BApril 25, 2016

KNOW ALLand ______respective PERALTA __________in lawful moadministrato

WHEREAS,for the WoProject; RF WHEREAS,the Agreempart hereof WHEREAS,the Principa NOW THERobligations the Contracindemnify alosses, liabibe incurredperformancemodificationthis obligatio The Surety,Time, adjusterms of theDrawings shhereby waivof Contract Work to be In the evenPrincipal’s oSurety of thContract, thelection to Contract Dohowever, thshall be suunreasonab

ing InstallationBond (Attachme

L MEN BY T__________heirs, execCOMMUNIT

__________oney of the Uors, success

T

, the Obligeerk described

FP No. 15-16

, the Principment and all

by this refer

, by the termal’s prompt, f

REFORE, ifand things t

ct Documentsnd save harility and dam

d by the Obe of any orns, and ameon shall be v

for value retment of the

e Contract Dhall limit, resves notice frPrice, alteraperformed u

t of the Oblobligations the Principal’e Surety sheither remeocuments aat the proceubject to th

bly withheld,

& Implementaent K)

THESE PRE___________cutors, admTY COLLE___________United Statesors and ass

THE CONDI

e, by resolud as RFP f6/27

pal, has enteother Contraence.

ms of the Cofull and faith

f the Principto be done as as they marmless the Omages, claimbligee by rer all of the endments, thvoid; otherw

eceived, heree Contract PDocuments, strict or otheom the Obligations, deletunder the Co

igee’s termithereunder, s breach or all notify Obdy the defand complete

edure by whihe advancelimited or re

ation of MBCx M

PERFO(At

ESENTS tha__________inistrators, GE DISTRI

___________es, well and signs, jointly

ITION OF TH

tion of its Bfor Meterin

ered into an act Docume

ntract Docuful performa

pal shall prand performay be modifiObligee and ms, judgmeneason of th

terms or thhereto, and ise, it shall b

eby stipulaterice, alteratithe Work torwise impairgee of any stions, additioontract Docu

nation of thewithin twendefault of t

bligee in writault or breace the Work ich the Suree written aestricted. Th

Measures Proje

ORMANCE Bttachment K

at we, _______, as Princisuccessors ICT (“the O__________truly to be mand several

HIS OBLIGA

oard of Trusng Installati

agreement wents set forth

ments, the Pance of the W

romptly, fullymed by the P

ed or amendall of its off

nts, liens, coe failure orhe obligatioany warran

be, and rema

es and agreons, deletion

o be performr Surety’s obsuch changeons or other ments, or th

e Contract dty (20) days

the Contractting of Suretch of the Prat its own

ety undertakepproval of

he insolvenc

ect; RFP No. 1

PERALTA C

BOND K)

__________ipal, are join

and assigObligee”) fo______ Dollmade, we binly.

ATION IS SU

stees has awion & Impl

with the Obh therein are

Principal is rWork of the C

y and faithfPrincipal in sded from timficers, agentosts, and feer default onns of the C

nties or guaain, in full fo

es that no cns, additions

med thereundbligations ores, adjustmemodification

he Drawings

due to the Ps after writtet Documentsty’s assumptrincipal or toexpense (“tes to dischathe Oblige

cy of the Prin

5-16/27

OMMUNITY C

__________ntly and sevns, held ar payment ars ($_____nd ourselves

UCH THAT:

warded to thementation

ligee for pere incorporat

required to fuContract Do

fully performstrict accordme to time; ats and emploes of every dn the part oContract Dorantees reqrce and effe

change, adjus, or any othder, or to thObligee’s ri

ents of Contns to the Coor the Spec

Principal’s ben notice frs and Obligtion of obligao take charthe Notice o

arge its obligee, which ancipal or the

COLLEGE DIST

__________verally, alongnd firmly bof the pen

__________s, our heirs,

he Principal n of MBCx

rformance oted herein a

urnish a boncuments.

m each andance with th

and if the Prioyees from description, of the Princocuments, inuired thereu

ect.

ustment of thher modificahe Specificatghts hereunract Time, a

ontract Docucifications.

reach or derom the Oblee’s terminaations hereurge of the Wof Election”)gations undeapproval she Principal’s

Page | 41

TRICT

, as Surety g with their

bound unto nal sum of _________) executors,

a Contract Measures

f the Work; and made a

nd ensuring

d all of thehe terms of ncipal shall any and all which may

cipal in the ncluding all under; then

he Contract tions to the tions or the

nder; Surety adjustments uments, the

efault of the igee to the ation of the under by its Work of the ); provided, er this Bond hall not be

denial of a

Page 42: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterPerformance BApril 25, 2016

failure of peprompt, diligNotice of EPrincipal or In the evenhereinaboveperformanceseverally liaPrincipal’s obligations tthe then remcosts of perperformanceshall be deePrice. If suibe jointly anObligee the IN WITNES__________

_________

By: _

(_(

Title: _ (Attach NSignature)

_______

By: _

( _(

(Attach: (AcknowledCertificatioAttorney-In

ing InstallationBond (Attachme

erformance ogent inquiry

Election or fto complete

nt the Surete, the Oblige or defaultable to the Ofailure of pthereunder, maining balarformance, de or default emed to inclit or other prnd severally rewith, inclu

SS WHEREO_, 20____ by

______________(Contra

______________Signature)

______________Typed or Printed

______________

Notary Public)

______________

______________Signature of Atto

______________Typed or Printed

(i) Attorney-In-dgment of Auon; and (iii) n-Fact’s Signatu

& Implementaent K)

or default unand investi

for its failure the Work.

ty fails to isgee may tht or to comObligee for

performance including wiance of the damages an

under the Cude the cosroceeding is liable for pading without

OF, the Priy their duly a

______________actor-Principal N

______________

______________d Name)

______________

c Acknowledg

______________(Surety Name)

______________orney-In-Fact for

______________d Name of Attorn

Fact Certificatthorizing SignNotary Public

ure.)

ation of MBCx M

nder the Coigation of sue to promp

ssue its Nohereafter caplete the Wall damageunder the

ithout limitatContract P

nd other costContract Do

sts or value obrought upo

ayment to tht limitation, a

ncipal and authorized a

______________Name)

______________

______________

______________

gement of P

______________

______________Surety)

______________ney-In-Fact)

tion; (ii) Notarature on Atto

c Acknowledge

Measures Proje

ontract Docuuch denial, tly remedy

tice of Elecause the cu

Work. The Ps and costsContract D

tion the costrice; providets sustained

ocuments shof any Chanon this Bondhe Obligee oattorneys’ fe

Surety haveagent or repr

______

______

______

_____

Principal’s

_______

_______

_______

ry Public orney-Fact ement of

ect; RFP No. 1

PERALTA C

uments shallbe justificatthe failure

ction to Oblure or remPrincipal ans sustained Documents ts of cure or ed that the d by the Oblhall be limitenges to the Wd by the Obliof all costs, ees.

e executed resentative

Contactnumber a

____________(Contact Name ____________(Street Addres ____________(City, State & Z (______) ____Telephone ____________(Email address

5-16/27

OMMUNITY C

l not by itseion for Sureof performa

igee within medy of thend the Sureby the Oblior default completion Surety’s liabigee upon th

ed to the peWork which igee, the Suexpenses an

this instrum

t name, addnd email ad

to the Su

______________e)

______________ss)

______________Zip Code)

__________ (__

______________s)

COLLEGE DIST

elf, without thety’s failure ance or def

the time pe Principal’sty shall be gee as a rein its perfoof the Work

bility hereunhe Principal

enal sum heincreases th

urety and Prind fees incu

ment this __

dress, telephddress for nurety

_____________

_____________

_____________

_____) ________Fax

_____________

Page | 42

TRICT

he Surety’s to give the fault of the

rovided fors failure of

jointly andesult of theormance ofk exceeding nder for the ’s failure of reof, which he Contract ncipal shall

urred by the

____day of

hone notices

_______

_______

_______

_______

________

Page 43: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterProject Labor AApril 25, 2016

ing InstallationAgreement (At

& Implementatachment L)

ation of MBCx M

PROJECT L(A

Measures Proje

LABOR AGttachment L

ect; RFP No. 1

PERALTA C

REEMENTL)

5-16/27

OMMUNITY CCOLLEGE DIST

Page | 43

TRICT

Page 44: PERALTA COMMUNITY COL LEGE DISTRICT · 17.16, base e District a this RFP, t s with exist tural gas an lectric Mete l a new fron ldings, listed rly metered This MBCx unity Colle rience

RFP for MeterPLA Letter of AApril 25, 2016

ing InstallationAssent (Attach

& Implementament L-1)

ation of MBCx M

PLA LET(Att

Measures Proje

TTER OF Atachment L

ect; RFP No. 1

PERALTA C

ASSENT L-1)

5-16/27

OMMUNITY CCOLLEGE DIST

Page | 44

TRICT