    STABILITAS : Dinding Penahan Tanah (6 m)

    Kondisi Normal Kondisi Gempa

    a) Stabilitas Terhadap Guling a) Stabilitas Terhadap Guling

    |e| = m < B/6   = m OK! |e| = m < B/3   = m OK!

    b) Stabilitas Terhadap Geser b) Stabilitas Terhadap Geser  

    Fs = > OK! Fs = > OK!

    c) Reaksi tekanan tanah pondasi c) Reaksi tekanan tanah pondasi

    q1 = t/m2

    < qa = t/m2

    OK! q1 = t/m2

    < qae = t/m2

    OK!

    q2 = t/m2

    < qa = t/m2

    OK! q2 = t/m2

    < qae = t/m2

    OK!4.98 35.75 2.92

    1.67 1.50 1.43 1.20

    53.63

    15.57 35.75 13.41 53.63

    1.350.61 0.68 0.43

  • 8/15/2019 Perencanaan Turap Kukar

    3/23

    Tegangan baja dan beton

     Nama Bangunan :

     Lokasi :

    Kondisi Normal Tegangan ijin tekan beton (   ca) =  kg/cm

    Tegangan ijin tarik baja (  sa) =  kg/cm

    Tegangan ijin geser beton (   a) =  kg/cm2

    Rasio Modulus Young’s =

    Item

    b (cm)

     h (cm)

     d1 (cm) bel bel bawah atas

     d2 (cm) dpn dpn atas bwh

    d (cm)

     M (ton m)

     S (ton)

    Dimensi tulangan dan jarak antar tulangan (mm)

     Tul (As1) D 16 - D 16 - D 16 - D 16 -

     Tul (As2) D 13 - D 13 - D 16 - D 16 -

     Teg.   c OK! OK! NO! OK!

     Teg.   s OK! OK! NO! OK!

     Teg.   OK! OK! OK! OK!

    Kondisi Gempa Tegangan ijin tekan beton (   ca) =  kg/cm2

    Tegangan ijin tarik baja (  sa) =  kg/cm2

    Tegangan ijin geser beton (   a) =  kg/cm2

    Rasio Modulus Young’s =

    Item

    b (cm)

     h (cm)

     d1 (cm)

     d2 (cm)

    d (cm)

     M (ton m)

     S (ton)

    Dimensi tulangan dan jarak antar tulangan (mm)

     Tul (As1) D 16 - D 16 - D 16 - D 16 -

     Tul (As2) D 13 - D 13 - D 16 - D 16 -

     Teg.   c OK! OK! OK! OK!

     Teg.   s OK! OK! OK! OK!

     Teg.   OK! OK! OK! OK!

    110.0

    7.0

    0.33 1.39 4.51 1.61

    0.38 1.23 5.02 1.98

    4

    250

    3450

    9.75

    125

    Potongan A-A Potongan B-B Potongan C-C Potongan D-D

    100.0

    2300

    100.0

    105.0

    250

    7.0

    6.5

    21

    7.0

    103.0

    4

    7.0

    7.0

    Dinding Penahan Tanah (6 m)

    Dinding Penahan Jl. S. Parman – Tenggarong - Kukar 

    7.0

    98.0

    26

    12

    75

    43.0

    24

    22

    43.0

    100.0

    50.0

    7.0

    7.0

    100.0

    50.0

    125 125

    125

    113

    125

    5

    9

    571 3907 7411755

    Potongan DPT

    1725 90

    250

    5

    Potongan D-D

    100.0 100.0 100.0 100.0

    16

    Potongan A-A Potongan B-B Potongan C-C

    7.0 7.0 7.0 7.0

    110.0 105.0 50.0 50.0

    103.0 98.0 43.0 43.0

    7.0 7.0 7.0 7.0

    3 14 19 7

    3 26 21 4

    125

    Potongan DPT 250 250 125 125

    250 125 125

    5 28 87 15

    429 1758 3395 587

    D C

    BB

    A   A

    CD

    D C

    BB

    A   A

    CD

    urap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    4/23

    Stabilitas4/23

    1. Data Perencanaan

    1.1 Dimensi

    B = 4.05 m H = 6.00 m

    L = 1.00 m (panjang pias)

    b11 = 0.55 m b21 = 1.00 m

    b12 = 0.50 m b22 = 1.05 m

    b13 = 0.00 m b23 = 2.00 m

    h1 = 6.00 m h4 = 1.70 m

    h31 = 0.40 m hw1 = 0.00 m

    h32 = 0.10 m hw2 = 0.00 m

    1.2 Parameter 

    q = 2.20 t/m2 (untuk kondisi normal)

    = 0.00 t/m2 (untuk kondisi gempa) Potongan DPT

    γ c = 2.50 t/m

    γ w = 1.00 t/m

    Tanah urugan Tanah pondasi (asli) Angka keamanan

    γ soil = 1.80 t/m   γ s' = 1.50 t/m (=γ sat−γ w) Guling

    γ sat = 2.00 t/m cB = 0.00 t/m normal |e| 1.20

    α = 0.000 o (untuk analisis stabilitas) Reaksi tanah pondasi

    = 5.711o

    (untuk analisis struktur) normal qmaks

  • 8/15/2019 Perencanaan Turap Kukar

    5/23

    Stabilitas5/23

    (1) Beban vertikal

    No. Uraian W X W x X

    1 0.40 x 1.00 x 2.50 1.000 3.550 3.55

    2 0.50 x 1.05 x 2.50 1.313 2.525 3.31

    3 0.40 x 2.00 x 2.50 2.000 1.000 2.00

    4 0.50 x 0.10 x 1.00 x 2.50 0.125 3.383 0.42

    5 0.50 x 0.10 x 2.00 x 2.50 0.250 0.667 0.17

    6 0.50 x 5.50 x 0.55 x 2.50 3.781 2.867 10.84

    7 5.50 x 0.50 x 2.50 6.875 2.250 15.47

    8 0.50 x 5.50 x 0.00 x 2.50 0.000 2.000 0.00

    9 0.50 x 5.50 x 0.55 x 1.80 2.723 2.867 7.8010 1.00 x 5.50 x 1.80 9.900 3.550 35.15

    11 1.00 x 0.00 x 1.80 0.000 3.550 0.00

    12 0.50 x 1.00 x 0.10 x 2.00 0.100 3.717 0.37

    13 0.50 x 2.00 x 0.10 x 2.00 0.200 0.667 0.13

    14 2.00 1.20 x 2.00 4.800 1.000 4.80

    q 2.20 x 1.55 3.410 3.275 11.17

     T o t a l(1 sampai dengan q) 36.476 95.178

    Pu1 0.00 x 4.05 x 0.50 x -1.00 0.000 2.700 0.00

    Pu2 0.00 x 4.05 x 0.50 x -1.00 0.000 1.350 0.00

    Total ( 1 sampai dengan Pu2) 36.476 95.178

    (2) Beban horisontal

      Koefisien tekanan tanah aktif 

    Ka =

      (untuk analisis stabilitas)

    α = 0.000 o δ = 0.000 o

    Cos2(φ -α) = 0.750 Sin(φ+δ) = 0.500

    Cos2α = 1.000 Sinφ = 0.500

    Cos(α+δ) = 1.000 Cosα = 1.000

    Ka = 0.333 untuk analisis stabilitas

      (untuk analisis struktur)

    α = 5.711 o δ = 20.000 o

    Cos2(φ -α) = 0.831 Sin(φ+δ) = 0.766

    Cos2α = 0.990 Sinφ = 0.500

    Cos(α+δ) = 0.901 Cosα = 0.995

    Ka' = 0.341 untuk analisis struktur 

      Koefisien tekanan tanah pasif 

    Kp =

    α = 0.000 o δ = 0.000 o

    Cos2(φ+α) = 0.750 Sin(φ+δ) = 0.500

    Cos2α = 1.000 Sinφ = 0.500

    Cos(α -δ) = 1.000 Cosα = 1.000

    Kp = 3.000

    qa1 = Ka x q = 0.733 ton/m

    qa2 =  Ka x (h1- hw1) x γ soil = 3.600 ton/m

    qa3 = qa1 + qa2 = 4.333 ton/m

    qa4 =  Ka x hw1 x (γ sat - γ w) = 0.000 ton/m

    qw 1 =  hw1 x γ w = 0.000 ton/m

    qw 2 =  hw2 x γ w = 0.000 ton/m

    qp1 =  Kp x h4 x (γ sat - γ w) = 5.100 ton/m

    2

    Cos2(φ -α)

    Cos2α x Cos(α+δ) x 1+Sin(φ+δ) x Sinφ

    Cos(α+δ) x Cosα

    2

    Cos2(φ+α)

    Cos2α x Cos(α -δ) x 1 -Sin(φ+δ) x Sinφ

    Cos(α -δ) x Cosα

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    6/23

    Stabilitas6/23

    No. Uraian H Y H x Y

    Pa1 0.733 x 6.00 4.400 3.000 13.20

    Pa2 3.600 x 6.00 x 0.50 10.800 2.000 21.60

    Pa3 4.333 x 0.00 0.000 0.000 0.00

    Pa4 0.000 x 0.00 x 0.50 0.000 0.000 0.00

    Pw1 0.000 x 0.00 x 0.50 0.000 0.000 0.00

    Pw2 0.000 x 0.00 x 0.50 0.000 0.000 0.00

    Pp1 -5.100 x 1.70 x 0.50 -4.335 0.567 -2.46

     T o t a l 10.865 32.34

    (3) Perhitungan stabilitas

      a) Stabilitas terhadap guling

      a) -1 Tanpa gaya angkat

    B = 4.05 m

    Σ W x X -  Σ H x Y 95.18 - 32.34

    X = = = 1.723 m

    Σ W 36.476

    B 4.05

    e = - X = - 1.723 = 0.302 m < B/6 = 0.675 m OK !

    2 2

      a) -2 Dengan gaya angkat

    B = 4.05 m

    Σ W x X -  Σ H x Y 95.18 - 32.34

    X = = = 1.723 mΣ W 36.476

    B 4.05

    e = - X = - 1.723 = 0.302 m < B/6 = 0.675 m OK !

    2 2

      b) Stabilitas terhadap geser 

      b)-1 Tanpa gaya angkat

      Gaya geser :   Σ H = 10.865 ton

      Tahanan : HR = µ x Σ W = 0.55 x 36.476 = 20.062 ton

    (koefisien geser : µ = 0.55 )

    HR 20.062

    Fs = = = 1.846 > 1.50 OK !

    Σ H 10.865

      b)-2 Dengan gaya angkat  Gaya geser :   Σ H = 10.865 ton

      Tahanan : HR = µ x Σ W = 0.55 x 36.476 = 20.062 ton

    (koefisien geser : µ = 0.55 )

    HR 20.062

    Fs = = = 1.846 > 1.50 OK !

    Σ H 10.865

      c) Reaksi tanah pondasi

    Σ W 6 x e

    q1,2 = x (1 + )

    B B

    36.476 6 x 0.302

    q1 = x (1 + ) = 13.036 t/m2

    < qa = 35.750 t/m2

    OK !

    4.05 4.05

    36.476 6 x 0.302

    q2 = x (1 - ) = 4.977 t/m2

    < qa = 35.750 t/m2

    OK !

    4.05 4.05

    4.977 t/m2

    - t/m2

    13.036 t/m2

    - t/m2

    pada kondisi , e > 0 pada kondisi, e < 0

    (dipakai) (tidak dipakai)

    Reaction of Foundation Soil in Case 1

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    7/23

    Stabilitas7/23

    2.2 Kasus 2 (Kondisi normal, tanpa beban hidup vertikal)

    0.55

    q = 2.20 t/m2

    0.50

    0.00

    6.00 5.50

    0.10

    0.00

    1.70 0.00

    0.40

    1.00 1.05 2.00

    Gaya yang bekerja pada kasus 2

    (1) Gaya Vertikal

    No. Uraian W X W x X

    1 0.40 x 1.00 x 2.50 1.000 3.550 3.55

    2 0.50 x 1.05 x 2.50 1.313 2.525 3.31

    3 0.40 x 2.00 x 2.50 2.000 1.000 2.004 0.50 x 0.10 x 1.00 x 2.50 0.125 3.383 0.42

    5 0.50 x 0.10 x 2.00 x 2.50 0.250 0.667 0.17

    6 0.50 x 5.50 x 0.55 x 2.50 3.781 2.867 10.84

    7 5.50 x 0.50 x 2.50 6.875 2.250 15.47

    8 0.50 x 5.50 x 0.00 x 2.50 0.000 2.000 0.00

    9 0.50 x 5.50 x 0.55 x 1.80 2.723 2.867 7.80

    10 1.00 x 5.50 x 1.80 9.900 3.550 35.15

    11 1.00 x 0.00 x 1.80 0.000 3.550 0.00

    12 0.50 x 1.00 x 0.10 x 2.00 0.100 3.717 0.37

    13 0.50 x 2.00 x 0.10 x 2.00 0.200 0.667 0.13

    14 2.00 x 1.20 x 2.00 4.800 1.000 4.80

     T o t a l (1 sampai dengan 14) 33.066 79.08

    Pu1 0.00 x 4.05 x 0.50 x -1.00 0.000 2.700 0.00

    Pu2 0.00 x 4.05 x 0.50 x -1.00 0.000 1.350 0.00

    Total ( 1 sampai dengan Pu2) 33.066 79.08

    (2) Gaya horisontal

      Koefisien tekanan tanah aktif 

    Ka = 0.333 (untuk analisis stabilitas)

    Ka ' = 0.341 (untuk analisis struktur)

      Koefisien tekanan tanah pasif 

    Kp = 3.000

    qa1 = Ka x q = 0.733 ton/m

    qa2 =  Ka x (h1- hw1) x γ soil = 3.600 ton/m

    qa3 = qa1 + qa2 = 4.333 ton/m

    qa4 =  Ka x hw1 x (γ sat - γ w) = 0.000 ton/m

    qw 1 =  hw1 x γ w = 0.000 ton/mqw2 =  hw2 x γ w = 0.000  ton/m

    qp1 =  Kp x h4 x (γ sat - γ w) = 5.100 ton/m

    No. Uraian H Y H x Y

    Pa1 0.733 x 6.00 4.400 3.000 13.20

    Pa2 3.600 x 6.00 x 0.50 10.800 2.000 21.60

    Pa3 4.333 x 0.00 0.000 0.000 0.00

    Pa4 0.000 x 0.00 x 0.50 0.000 0.000 0.00

    Pw1 0.000 x 0.00 x 0.50 0.000 0.000 0.00

    Pw2 0.000 x 0.00 x 0.50 0.000 0.000 0.00

    Pp1 -5.100 x 1.70 x 0.50 -4.335 0.567 -2.46

     T o t a l 10.865 32.34

    Pw1 Pa4

    Pa2

    Pa1

    qa2

    qa3qw1   qa4

    Pa3

    O

    9

    Pp1

    qa1

    qp1

    7

    1

    10

    12

    2 3

    4

    11

    Pw2

    qw2qu2   Pu2qu1

    Pu1

    14

    13

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    8/23

    Stabilitas8/23

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    9/23

    Stabilitas9/23

    (3) Perhitungan stabilitas

      a) Stabilitas terhadap guling

      a) -1 Tanpa gaya angkat

    B = 4.05 m

    Σ W x X -  Σ H x Y 79.08 - 32.34

    X = = = 1.413 m

    Σ W 33.066

    B 4.05

    e = - X = - 1.413 = 0.612 m < B/6 = 0.675 m OK !2 2

      a) -2 Dengan gaya angkat

    B = 4.05 m

    Σ W x X -  Σ H x Y 79.08 - 32.34

    X = = = 1.413 m

    Σ W 33.066

    B 4.05

    e = - X = - 1.413 = 0.612 m < B/6 = 0.675 m OK !

    2 2

      b) Stabilitas terhadap geser 

      b)-1 Tanpa gaya angkat

      Gaya geser :   Σ H = 10.865 ton

      Tahanan : HR = µ x Σ W = 0.55 x 33.066 = 18.186 ton(koefisien geser : µ = 0.55 )

    HR 18.186

    Fs = = = 1.67 > 1.50 OK !Σ H 10.865

      b)-2 Dengan gaya angkat

      Gaya geser :   Σ H = 10.865 ton

      Tahanan : HR = µ x Σ W = 0.55 x 33.066 = 18.186 ton

    (koefisien geser : µ = 0.55 )

    HR 18.186

    Fs = = = 1.67 > 1.50 OK !

    Σ H 10.865

      c) Reaksi tanah pondasi

    Σ W 6 x e

    q1,2 = x (1 + )

    B B

    33.066 6 x 0.612

    q1 = x (1 + ) = 15.567 t/m2

    < qa = 35.750 t/m2

    OK !

    4.05 4.05

    33.066 6 x 0.612

    q2 = x (1 - ) = 0.762 t/m2

    < qa = 35.750 t/m2

    OK !

    4.05 4.05

    0.762 t/m2 - t/m2

    15.567 t/m2

    - t/m2

    in case, e > 0 in case, e < 0

    (dipakai) (tidak dipakai)

    Reaksi Tegangan Tanah Pondasi Pada Kasus 2

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    10/23

    Stabilitas10/23

    2.3 Kasus 3 (Kondisi gempa)

    0.55

    0.50

    0.00

    6.00 5.50

    0.10

    0.00

    1.70 0.00

    0.40

    1.00 1.05 2.00

    Beban yang bekerja pada kasus 3

    (1) Beban vertikal = Same as Case 2

    (2) Beban horisontal

    φ = 30.00 o α = 0.000 o (untuk analisis stabilitas)   Φ = 7.970 o

    β = 0.00 o α = 5.711 o (untuk analisis strutural) (Φ =  Arc tan(Kh) )

    q = 0.00 t/m2 (for seismic condition) Kh = 0.14

      Koefisien Tekanan Tanah aktif 

    Kae =

      (untuk analisis stabilitas )

    α = 0.000   δ = 20.57

    tan δ = Sin φ Sin ( Φ + ∆ - β )

    1 − Sin φ Cos ( Φ + ∆ - β )

    sin ∆= Sin ( Φ +   β )

    Sin φ

    Sin (Φ+ β ) = 0.139 Sin φ = 0.500

    Sin ∆ = 0.278 sehingga   ∆ = 16.14

    Sin(Φ+∆-β) = 0.408 Cos(Φ+∆-β)= 0.913

    tan δ = 0.375

    Cos2(φ-Φ-α)= 0.859 Sin(φ+δ) = 0.772

    CosΦ = 0.990 Sin(φ-β-Φ) = 0.375

    Cos2α = 1.000 Cos(α-β) = 1.000

    Cos(α+δ+Φ = 0.878

    Kae = 0.399 (untuk analisis stabilitas)

      (untuk analisis struktur)

    α = 5.711 o  δ = 15.00 o

    Cos2(φ-Φ-α)= 0.921 Sin(φ+δ) = 0.707

    CosΦ = 0.990 Sin(φ-β-Φ) = 0.375

    Cos2α = 0.990 Cos(α-β) = 0.995

    Cos(α+δ+Φ)= 0.877

    Kae = 0.445 (untuk analisis struktur)

    2

    Cos2(φ−Φ−α)

    CosΦ x Cos2α x Cos(α +δ +Φ) x 1+Sin(φ +δ )x Sin(φ−β−Φ)

    Cos(α +δ +Φ) x Cos(α−β)

    Pa1

    qa1

    qa2qa3qw1

    Pa2

    Pa3Pw1

    O

    7

    1

    10

    12

    9

    2 3

    4

    11

    Pw2

    qw2

    Pp1

    qp1Pu1

    qu2   Pu2qu1

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    11/23

    Stabilitas11/23

      Koefisien tekanan tanah pasif 

    Kpe =

    α = 0.000 o  δ = 20.57 o

    Cos2(φ-Φ+α)= 0.859 Sin(φ−δ) = 0.164

    CosΦ = 0.990 Sin(φ+β-Φ) = 0.375

    Cos2α = 1.000 Cos(α-β) = 1.000Cos(α+δ−Φ)= 0.976

    Kpe = 1.585

    qa1 =  Kae x ( h1 - hw1) x γ soil = 4.309 ton/m

    qa2 = qa2 = 4.309 ton/m

    qa3 =  Kae x hw1 x (γ sat - γ w) = 0.000 ton/m

    qw 1 =  hw1 x γ w = 0.000 ton/m

    qw 2 =  hw2 x γ w = 0.000 ton/m

    qp1 =  Kp x h4 x (γ sat - γ w) = 2.695 ton/m

    No. Uraian H Y H x Y

    1 0.14 x 1.00 0.140 0.200 0.03

    2 0.14 x 1.31 0.184 0.250 0.05

    3 0.14 x 2.00 0.280 0.200 0.06

    4 0.14 x 0.13 0.018 0.433 0.01

    5 0.14 x 0.25 0.035 0.433 0.02

    6 0.14 x 3.78 0.529 2.333 1.24

    7 0.14 x 6.88 0.963 3.250 3.13

    8 0.14 x 0.00 0.000 2.333 0.00

    Pw1 0.50 x 0.00 x 0.00 0.000 0.000 0.00

    Pw2 0.50 x 0.00 x 0.00 0.000 0.000 0.00

    Pa1 0.50 x 4.31 x 6.00 12.928 2.000 25.86

    pa2 4.31 x 0.00 0.000 0.000 0.00

    Pa3 0.50 x 0.000 x 0.00 0.000 0.000 0.00

    Pp1 -2.695 x 1.70 x 0.50 -2.290 1.700 -3.89

     T o t a l 12.785 26.48

    (3) Perhitungan stabilitas

      a) Stabilitas terhadap guling

      a) -1 Tanpa gaya angkat

    B = 4.05 m

    Σ W x X -  Σ H x Y 79.08 - 26.48

    X = = = 1.591 m

    Σ W 33.066

    B 4.05

    e = - X = - 1.591 = 0.434 m < B/3 = 1.350 m OK !

    2 2

      a) -2 Dengan gaya angkat

    B = 4.05 m

    Σ W x X -  Σ H x Y 79.08 - 26.48

    X = = = 1.591 m

    Σ W 33.066

    B 4.05

    e = - X = - 1.591 = 0.434 m < B/3 = 1.350 m OK !

    2 2

    2

    Cos2(φ−Φ +α)

    CosΦ x Cos2α x Cos(α +δ−Φ) x 1−Sin(φ−δ )x Sin(φ +β−Φ)

    Cos(α +δ−Φ) x Cos(α−β)

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    12/23

    Stabilitas12/23

      b) Stabilitas terhadap geser 

      b)-1 Tanpa gaya angkat

      Gaya geser :   Σ H = 12.785 ton

      Tahanan : HR = µ x Σ W = 0.55 x 33.066 = 18.186 ton

    (koefisien geser : µ = 0.55 )

    HR 18.186

    Fs = = = 1.42 > 1.20 OK !

    Σ H 12.785

      b)-2 Dengan gaya angkat

      Gaya geser :   Σ H = 12.785 ton

      Tahanan : HR = µ x Σ W = 0.55 x 33.066 = 18.186 ton

    (koefisien geser : µ = 0.55 )

    HR 18.186

    Fs = = = 1.42 > 1.20 OK !

    Σ H 12.785

      c) Reaksi tanah pondasi

      c-1) pada kondisi , |e| < B/6 (dipakai)

    Σ W 6 x e

    q1,2 = x (1 + )

    B B

    33.066 6 x 0.434

    q1 = x (1 + ) = 13.414 t/m2 < qae = 53.625 t/m2 OK !4.05 4.05

    33.066 6 x 0.434

    q2 = x (1 - ) = 2.915 t/m2

    < qae = 53.625 t/m2

    OK !

    4.05 4.05

      c-2) pada kondisi, B/6 < |e| < B (tidak dipakai)

    2 x Σ W

    q1' = = = - t/m2

    qae = - t/m2

    3 x (B/2-|e|)

    2.915 t/m2

    13.414 t/m2

    - t/m2

    pada kondisi , e > 0 and e < B/6 pada kondisi, e > 0 and B/6 < e < B/3

    (dipakai) (tidak dipakai)

    - t/m2

    - t/m - t/m

    pada kondisi, e < 0 and |e| < B/6 pada kondisi, e < 0 and B/6 < |e| < B/3

    (tidak dipakai) (tidak dipakai)

    Reaksi tekanan tanah pada kasus 3

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    13/23

    Stabilitas13/23

    2.4 Kapasistas daya dukung tanah

    (1) Data perencanaan

    φB = 30.00o

    cB = 0.00 t/m2

    γ s' = 1.50 t/m3

    (=γ sat−γ w)

    B = 4.05 m z = 1.70 m L = 1.00 m (panjang pias)

    (2) Kapasitas daya dukung ultimate , (qu)

      Perhitungan kapasitas daya dukung tanah ultimate menggunakan perhitungan sebagai berikut :

      Rumus Terzaghi :

    qu =  (α x c x Nc) + (γ soil' x z x Nq) + (β x γ soil x B x Nγ )

    Faktor bentuk (Table 2.5 of KP-06)

    α = 1.14   β = 0.40

    Bentuk pondasi : 3 (persige, B x L)

    Bentuk pondasi   α β

    1 strip 1.00 0.50

    2 segi empat 1.30 0.40

    3 persige, B x L 1.14 0.40

    (B < L) (= 1.09 + 0.21 B/L)

    (B > L) (= 1.09 + 0.21 L/B)

    4 circular, diameter = B 1.30 0.30

    Faktor kapasitas daya dukung (Figure 2.3 of KP-06, by Capper)

    Nc = 36.0 Nq = 23.0 Nγ  = 20.0

    φ Nc Nq Nγ 

    0 5.7 0.0 0.0

    5 7.0 1.4 0.0

    10 9.0 2.7 0.2

    15 12.0 4.5 2.3

    20 17.0 7.5 4.7

    25 24.0 13.0 9.5

    30 36.0 23.0 20.0

    35 57.0 44.0 41.0

    37 70.0 50.0 55.0

    39 > 82.0 50.0 73.0

     (α x c x Nc) = 0.000

     (γ soil x z x Nq) = 58.650

     (β x γ soil x B x Nγ ) = 48.600

    qu = 107.250 t/m2

    (3) Kapasitas daya dukung tanah ijin, (qa)

    qa = qu / 3 = 35.750 t/m2

    (angka keamanan = 3 , kondisi normal )

    qae = qu / 2 = 53.625 t/m2

    (angka keamanan = 2 , kondisi gempa)

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    14/23

    Struktur14/23

    3. Perhitungan Struktur 

    3.1 Kondisi Normal

    (1) Dinding 0.55

    q = 2.20 t/m2

    0.50

    0.00

    5.50

    0.00 0.00

    0.10

    0.40 0.40

    1.00 1.05 2.00

    Diagram beban pada dinding untuk kondisi normal

    Ka = 0.341

    α = 5.711 o

    δ = 20.00 o

    cos (α+δ) = 0.901

    Kha = Ka x cos (α+δ) = 0.307

    a) Potongan A - A

    h = 2.75 m

    qa1 =  Kha x q = 0.675 ton/m

    qa2 =  Kha x h x γ soil = 1.519 ton/m

    No. Uraian Ha Y (dari A-A) Ha x Y

    Pa1 0.675 x 2.75 1.857 1.375 2.554

    Pa2 1.519 x 2.75 x 0.50 2.089 0.917 1.915

     T o t a l 3.946 4.469

    Sa = 3.946  ton Ma = 4.469 ton m

    b) Potongan B - B

    h = 5.50 m hw1 = 0.00 m hw2 = 0.00 m

    qa1 =  Kha x q = 0.675 ton/m

    qa2 =  Kha x h x γ soil = 3.039 ton/m

    qa3 = qa1 + qa2 = 3.714 ton/m

    qa4 =  Kha x hw2 x (γ sat - γ w) = 0.000 ton/m

    qw1 =  hw1 x γ w = 0.000 ton/m

    qw2 =  hw2 x γ w = 0.000 ton/m

    No. Uraian Hb Y (dari B-B) Ha x Y

    Pa1 0.675 x 5.50 3.714 2.750 10.214

    Pa2 3.039 x 5.50 x 0.50 8.357 1.833 15.321Pa3 3.714 x 0.00 0.000 0.000 0.000

    Pa4 0.000 x 0.00 x 0.50 0.000 0.000 0.000

    Pw1 0.000 x 0.00 x 0.50 0.000 0.000 0.000

    Pw2 0.000 x 0.00 x 0.50 0.000 0.000 0.000

     T o t a l 12.071 25.536

    Sb = 12.071  ton Mb = 25.536 ton m

    qa1

    qa4 qa3qw1

    Pw1   Pa4

    Pa2

    Pa1

    qa2

    Pa3   B

    A

    B

    A

    Pw2

    qw2

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    15/23

    Struktur15/23

    (2) Pondasi

    Kasus 1 (dengan beban hidup vertikal ) Kasus 2 (tanpa beban hidup vertikal)

    q = 2.20 t/m2

    q = 2.20 t/m2

    5.50 5.50

    0.00 0.00

    0.10 0.10

    0.40 0.40

    1.00 1.05 2.00 1.00 1.05 2.00

    pada kondisi, e > 0 pada kondisi, e > 0

    4.977 t/m2

    0.762 t/m2

    6.967 t/m2

    4.418 t/m2

    9.056 t/m2

    8.256 t/m2

    13.036 t/m2

    15.567 t/m2

    pada kondisi, e < 0 pada kondisi, e < 0

    - t/m2

    - t/m2

    - t/m2

    - t/

    - t/m2

    - t/m2

    - t/m2

    - t/

    Diagram pembebanan di pondasi pada kondisi normal

    a) Potongan C - C

    Kasus 1 (dengan beban hidup vertikal )

    No. Uraian Hc X (dari C-C) Hc x X

    1 0.400 x 2.00 x 2.50 2.000 1.000 2.000

    0.100 x 2.00 x 2.50 x 0.50 0.250 0.667 0.167

    2 -9.056 x 2.00 -18.112 1.000 -18.112

    -3.980 x 2.00 x 0.50 -3.980 1.333 -5.306

     T o t a l -19.842 -21.252

    Kasus 2 (tanpa beban hidup vertikal)

    No. Uraian Hc X (dari C-C) Hc x X

    1 0.400 x 2.00 x 2.50 2.000 1.000 2.000

    0.100 x 2.00 x 2.50 x 0.50 0.250 0.667 0.167

    2 -8.256 x 2.00 -16.512 1.000 -16.512

    -7.311 x 2.00 x 0.50 -7.311 1.333 -9.748

     T o t a l -21.573 -24.093

    Kasus 1 Sc = -19.842 ton Mc = -21.252 ton m

    Kasus 2 Sc = -21.573 ton Mc = -24.093 ton m

    1

    1

    C

    C

    D

    D

    4

    3

    26

    1

    C

    C

    D

    D

    3

    4

    3 1   3

    4

    5

    4

    62 2

    6

    26

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    16/23

    Struktur16/23

    b) Potongan D - D

    Kasus 1 (dengan beban hidup vertikal )

    No. Uraian Hd X (dari D-D) Hd x Y

    3 0.400 x 1.00 x 2.50 1.000 0.500 0.500

    0.100 x 1.00 x 2.50 x 0.50 0.125 0.333 0.042

    4 5.500 x 1.00 x 1.80 9.900 0.500 4.950

    0.000 x 1.00 x 2.00 0.000 0.500 0.000

    0.100 x 1.00 x 2.00 x 0.50 0.100 0.667 0.067

    5 2.200 x 1.00 2.200 0.500 1.1006 -4.977 x 1.00 -4.977 0.500 -2.489

    -1.990 x 1.00 x 0.50 -0.995 0.333 -0.332

     T o t a l 7.353 3.838

    Kasus 2 (tanpa beban hidup vertikal)

    No. Uraian Hd X (dari D-D) Hd x Y

    3 0.400 x 1.00 x 2.50 1.000 0.500 0.500

    0.100 x 1.00 x 2.50 x 0.50 0.125 0.333 0.042

    4 5.500 x 1.00 x 1.80 9.900 0.500 4.950

    0.000 x 1.00 x 2.00 0.000 0.500 0.000

    0.100 x 1.00 x 2.00 x 0.50 0.100 0.667 0.067

    6 -0.762 x 1.00 -0.762 0.500 -0.381

    -3.656 x 1.00 x 0.50 -1.828 0.333 -0.609

     T o t a l 8.535 4.568

    Kasus 1 Sd = 7.353 ton Md = 3.838 ton mKasus 2 Sd = 8.535 ton Md = 4.568 ton m

    3.2 Kondisi gempa

    (1) Dinding 0.55

    0.50

    0.00

    5.50

    5.60

    0.00 0.00

    0.10

    0.40 0.40

    1.00 1.05 2.00

    Diagram pembebanan pd dinding untuk kondisi gempa

    Kae = 0.445

    α = 5.711 o

    δ = 15.00 o

    cos (α+δ) = 0.935

    Khea = Kae x cos (α+δ) = 0.416 Kh = 0.14

    a) Potongan A - A

    h = 2.75 m

    qa1 =  Khae x h x γ soil = 2.060 t/m

    No. Uraian Hae Y (dari A-A) Hae x Y

    1 0.500 x 2.750 x 0.275 x 2.500 x 0.140 0.132 0.917 0.121

    2 2.750 x 0.500 x 2.500 x 0.140 0.481 1.375 0.662

    3 0.500 x 2.750 x 0.000 x 2.500 x 0.140 0.000 0.917 0.000

    Pa1 2.060 x 2.750 x 0.500 2.833 0.917 2.597

     T o t a l 3.447 3.380

    Sae = 3.447  ton Mae = 3.380 ton m

    2

    Pa2

    Pa1

    qa2

    qa1

    qa3

    Pa3

    A   A

    B B

    1 3

    Pw1 Pw2

    qw2qw1

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    17/23

    Struktur17/23

    b) Potongan B - B

    h = 5.50 m hw1 = 0.00 m hw2 = 0.00 m

    qa1 =  Khae x h x γ soil = 4.406 t/m

    qa2 = qa1 = 4.406 t/m

    qa3 =  Khae x hw1 x ( γ sat - γ w) = 0.000 t/m

    qw1 =  hw1 x γ w = 0.000 ton/m

    qw2 =  hw2 x γ w = 0.000 ton/m

    No. Uraian Hbe Y (dari B-B) Hbe x Y

    Pa1 4.406 x 5.50 x 0.50 12.115 1.833 22.211

    Pa2 4.406 x 0.00 0.000 0.000 0.000

    Pa3 0.000 x 0.00 x 0.50 0.000 0.000 0.000

    Pw1 0.000 x 0.00 x 0.50 0.000 0.000 0.000

    Pw2 0.000 x 0.00 x 0.50 0.000 0.000 0.000

    1 0.500 x 5.50 x 0.55 x 2.50 x 0.14 0.529 1.833 0.971

    2 5.500 x 0.50 x 2.50 x 0.14 0.963 2.750 2.647

    3 0.500 x 5.50 x 0.00 x 2.50 x 0.14 0.000 1.833 0.000

     T o t a l 13.607 25.828

    Sbe = 13.607 ton Mbe = 25.828 ton m

    (2) Pondasi

    pada kondisi, e < B/6 pada kondisi, B/6 < e < B/3

    5.50 5.50

    0.00 0.00

    0.10 0.10

    0.40 0.40

    1.00 1.05 2.00 1.00 1.05 2.00

    pada kondisi, e > 0 dan e < B/6 pada kondisi, e > 0 dan B/6 < e < B/3

    2.915 t/m2

    - t/m2

    5.507 t/m2

    8.229 t/m2

    - t/m2

    13.414 t/m2

    - t/m2

    pada kondisi, e < 0 dan |e| < B/6 pada kondisi, e < 0 dan B/6 < |e| < B/3

    - t/m2

    - t/m2

    - t/m2

    - t/

    - t/m2

    - t/m2

    - t/m2

    Diagram pembebanan pondasi pada kondisi gempa

    D

    1

    1

    C

    C

    D

    D

    2

    4

    5

    3   1

    C

    C

    D

    D

    2

    3

    4

    3 1   3

    4   4

    6

    62

    2

    6

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    18/23

    Struktur18/23

    a) Potongan C - C

    No. Uraian Hce X (dari C-C) Hce x X

    1 0.400 x 2.00 x 2.50 2.000 1.000 2.000

    0.100 x 2.00 x 2.50 x 0.50 0.250 0.667 0.167

    2 -8.229 x 2.00 -16.459 1.000 -16.459

    -5.185 x 2.00 x 0.50 -5.185 1.333 -6.913

     T o t a l -19.393 -21.205

    Sce = -19.393 ton Mce = -21.205 ton m

    b) Potongan D - D

    No. Uraian Hde X (dari D-D) Hde x X

    3 0.400 x 1.00 x 2.50 1.000 0.500 0.500

    0.100 x 1.00 x 2.50 x 0.50 0.125 0.333 0.042

    4 5.500 x 1.00 x 1.80 9.900 0.500 4.950

    0.100 x 1.00 x 2.00 x 0.50 0.100 0.667 0.067

    5 -2.915 x 1.00 -2.915 0.500 -1.458

    -2.592 x 1.00 x 0.50 -1.296 0.333 -0.432

     T o t a l 6.914 3.669

    Sde = 6.914 ton Mde = 3.669 ton m

    3.3 Momen rencana dan gaya geser 

    (1) Momen rencana dan gaya geser pada tiap kasus

    Uraian Momen rencana Gaya geser  

    Normal Gempa Normal Seismic

    Kasus 1 Kasus 2 Kasus 3 Kasus 1 Kasus 2 Kasus 3

     Potongan A - A 4.469 4.469 3.380 3.946 3.946 3.447

     Potongan B - B 25.536 25.536 25.828 12.071 12.071 13.607

     Potongan C - C 21.252 24.093 21.205 19.842 21.573 19.393

     Potongan D - D 3.838 4.568 3.669 7.353 8.535 6.914

    (2) Momen rencana dan gaya geser yang digunakan untuk perhitungan struktur 

    Uraian Momen rencana Gaya geser  

    Normal Gempa Normal Gempa Potongan A - A 4.469 3.380 3.946 3.447

     Potongan B - B 25.536 25.828 12.071 13.607

     Potongan C - C 24.093 21.205 21.573 19.393

     Potongan D - D 4.568 3.669 8.535 6.914

    Catatan : - Momen pada potongan C-C < Momen pada potongan B-B

    - Momen pada potongan D-D < Momen pada potongan B-B

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    19/23

    Penulangan 19/23

    Kebutuhan tulangan dan kontrol tegangan

     Kondisi Normal N ame of Structure : Dinding Penahan Tanah (6 m)

     Location : Dinding Penahan Jl. S. Parman – Tenggarong - Kukar  

    Dinding (bagian atas) Dinding (bagian bawah) Pondasi Pondasi

    Potongan A-A Potongan B-B Potongan C-C Potongan D-D

    belakang depan belakang depan bawah atas bawah atasMomen rencana M   kg.cm   446,876 2,553,579 2,409,326 456,807

    Gaya geser (titik) S   kg   3,946 12,071 21,573 8,535

    Gaya aksial N   kg   0 0 0 0

    Tinggi h   cm   110.0 105.0 50.0 50.0

    Selimut beton d'   cm   7.0 7.0 7.0 7.0

    Tinggi efektif d   cm   103.0 98.0 43.0 43.0

    Lebar efektif b   cm   100.0 100.0 100.0 100.0

    Rasio modulus Young's n   -   21 21 21 21

    Kebutuhan tulangan   Asreq cm2   2.00 12.27 27.33 5.18

    Dipasang tulangan 16~250 13~250 16~125 13~250 16~125 16~125 16~125 16~125

    ?

    Beton As   cm2   8.04 5.31 16.08 5.31 16.08 16.08 16.08 16.08

    Batasan penulangan U   cm   20.11 ok 40.21 ok 40.21 ok 40.21 ok

    Jarak dari grs netral x   cm   17.04 22.57 14.00 14.00

    Tegangan tekan   σc   kg/cm2   5.4 25.0 89.8 17.0

    Tegangan tekan ijin   σca   kg/cm2   75.0 75.0 75.0 75.0

    ok ok check ok

    Teganan tarik   σs   kg/cm2   570.9 1754.7 3907.4 740.8

    Tegangan tarik ijin   σsa   kg/cm2   2300.0 2300.0 2300.0 2300.0

    ok ok check ok

    Tegangan geser    τ   kg/cm2   0.38 1.23 5.02 1.98

    Tegangan geser ijin   τa   kg/cm2   6.50 6.50 6.50 6.50

    ok ok ok ok

    Momen tahanan Mr     kg.cm   1,290,177 2,830,871 1,151,488 1,034,475

      Mr untuk daerah tekan Mrc   kg.cm   2,542,856 3,486,479 1,151,488 1,034,475

      x untuk Mrc   cm   12.472 17.065 11.415 10.973

    σs untuk Mrc   kg/cm2   5815.5 3978.4 2661.3 2558.3

      Mr untuk daerah tarik Mrs   kg.cm   1,290,177 2,830,871 1,618,513 1,600,542

      x untuk Mrs   cm   14.060 20.162 14.402 13.948σc untuk Mrs   kg/cm2   34.6 55.2 96.8 102.9

    Tulangan bagi (>As/6 dan >Asmin) 1.34 0.88 2.68 0.88 2.68 2.68 2.68 2.68

    13~250 13~250 13~250 13~250   13~250 13~250 13~250   13~250

    Luas tulangan As   cm2   5.31 5.31 5.31 5.31 5.31 5.31 5.31 5.31

    ok ok ok ok ok ok ok ok

    Minimum requirement of dist ribution bar As min = 4.50 cm2

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    20/23

    Penulangan 20/23

    Kebutuhan tulangan dan kontrol tegangan

    Kondisi gempaName of Structure : Dinding Penahan Tanah (6 m)

    Location : Dinding Penahan Jl. S. Parman – Tenggarong - Kukar  

    Dinding (bagian atas) Dinding (bagian bawah) Pondasi Pondasi

    Potongan A-A Potongan B-B Potongan C-C Potongan D-D

    belakang depan belakang depan bawah atas bawah atas

    Momen rencana M   kg.cm   338,000 2,582,846 2,120,487 366,878

    Gaya geser (titik) S   kg   3,447 13,607 19,393 6,914

    Gaya aksial N   kg   0 0 0 0

    Tinggi h   cm   110.0 105.0 50.0 50.0

    Selimut beton d'   cm   7.0 7.0 7.0 7.0

    Tinggi efektif d   cm   103.0 98.0 43.0 43.0

    Lebar efektif b   cm   100.0 100.0 100.0 100.0

    Rasio modulus Young's n   -   16 16 16 16

    Kebutuhan tulangan   Asreq cm2   1.00 8.20 15.83 2.74

    Dipasang tulangan 16~250 13~250 16~125   13~250 16~125   16~125 16~125   16~125

    Beton As   cm2   8.04 5.31 16.08 5.31 16.08 16.08 16.08 16.08

    Batasan penulangan U   cm   20.11 40.21 40.21 40.21

    Jarak dari grs netral x   cm   15.05 20.03 12.52 12.52

    Tegangan tekan   σc   kg/cm2   4.6 28.2 87.2 15.1

    Tegangan tekan ijin   σca   kg/cm2   112.5 112.5 112.5 112.5

    ok ok ok ok

    Teganan tarik   σs   kg/cm2   428.9 1758.3 3395.5 587.5

    Tegangan tarik ijin   σsa   kg/cm2   3450.0 3450.0 3450.0 3450.0

    ok ok ok ok

    Tegangan geser    τ   kg/cm2   0.33 1.39 4.51 1.61

    Tegangan geser ijin   τa   kg/cm2   9.75 9.75 9.75 9.75

    ok ok ok ok

    Momen tahanan Mr     kg.cm   1,847,093 3,972,390 1,351,558 8,219,054

      Mr untuk daerah tekan Mrc   kg.cm   3,253,890 4,355,292 1,351,558 21,022,947

      x untuk Mrc   cm   10.874 14.789 9.703 25.698

    σs untuk Mrc   kg/cm2   7605.6 5171.9 3393.4 8986.8

      Mr untuk daerah tarik Mrs   kg.cm   1,847,093 3,972,390 2,206,255 8,219,054

      x untuk Mrs   cm   12.093 17.171 12.004 28.154σc untuk Mrs   kg/cm2   58.3 92.3 161.9 48.2

    Tulangan bagi (>As/6 dan >Asmin)

    13~250 13~250 13~250 13~250 13~250 13~250 13~250 13~250

    Luas tulangan As   cm2   5.31 5.31 5.31 5.31 5.31 5.31 5.31 5.31

    Luas tulangan minimum As min = 4.50 cm2

    Turap KuKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    21/23

    +

    D16~250

    D13~250

    D13~250

    D13~250

    D16~125 D13~250

    D13~250

    D13~250

    D13~250 D13~250

    D16~125 D16~125 +

    +

    D16~125

    D13~250 D16~125 D13~250

    Volume beton = m3

    Berat tulangan = kgBerat tulangan tiap m3 = kg/m3

    0.55

    4.05

    Dinding Penahan Tanah (6 m)Skema Penulangan

    Potongan Dinding Penahan Tanah

    6.00

    0.00

    0.00

    0.10

    0.40

    0.00

    200.35

    0.50 0.00

    3.000

    32.64

    3.000

    6.14

    1.00 1.05 2.00

    D

    A   A

    B B

    C

    CD

      uKar.xls-12/16/2015

  • 8/15/2019 Perencanaan Turap Kukar

    22/23

    1 Dimensions : 2 Loading Data :

    Loading : a. Permanent Load ; b. Temporary Load

    P = Axial Load ( w/o foundation weight )P = 36.48 ton ; P = 16.00 ton

    Vx = Shear ( x - direction )Vx = 13.61 ton ; Vx = 6.00 tonVz = Shear ( z - direction )Vz = 1.50 ton ; Vz = 2.50 tonMx = Moment ( x - direction )Mx = 25.83 ton. m ; Mx = 1.50 ton.mMz = Moment ( z - direction )Mz = 0.60 ton.m ; Mz = 0.90 ton.m

    3 Reaction :

    Footing weight, Wf = Wp + Wc + Ws + Wt = 8.088 ton

    Wp = Pedestal weight = 4.284 ton

    Wc = Pile Cap weight = 2.760 ton

    Ws = Soil weight on Footing = 0.594 ton

    Ws = Slab weight on Footing = 0.450 ton

      Total Loading : a. Permanent Lo ; b. Temporary LoadPt = Total Axial Load = P + Wf

    Pt = 44.564 ton Pt = ##### ton

    Pedestal / Column : Vx = 13.61 ton ; Vx = 6.00 ton

    length, lp = 105.0 cm Vz = 1.50 ton ; Vz = 2.50 ton

    width, wp = 100.0 cm Mtx = 23.43 ton. m ; tx = 10.24 ton.m

    depth, hp = 170.0 cm Mtz = 3.15 ton. m ; tz = 5.15 ton.m

    Foundation : Eccentricity, ( = e) : a. Permanent Lo ; b. Temporary Load

    length, lc = 230.0 cm (min = 216.0 cm) epx = (A+E) - lc/2

    width, wc = 100.0 cm (min = 96.0 cm) epx = 0.100 m

    depth, hc = 50.0 cm (min = 55.0 cm) ex = 0.526 m ; ex = 0.425 m

     A = 50.0 cm (min = 48.0 cm) ez = 0.071 m ; ez = 0.214 mB = 130.0 cm (min = 120.0 cm) so, ex1 = 1.176 m ; ex1 = 1.075 m

    C = 50.0 cm (min = 48.0 cm) ex2 = 0.124 m ; ex2 = 0.225 m

    E = 75.0 cm ez1 = ez2 = ez = 0.071 m ; 1 = ez2 = ez = 0.214 m

    Others :4 Pile Reaction :

    Slab thk., hs = 15.0 cm if any ) Pile-1 : P1 = 47.14 ton ; P1 = 27.01 ton

    Soil thk., ht = 25.0 cm if any ) P2 = 86.55 ton ; P2 = 45.25 ton

    Pile Data : PC405 Check Pile Reactions vs Allowable :

    Length L = 27.0 m (from Soil Invest.)

    Dia/Rec = 40.0 Dari hasil perhitungan daya dukung tanah, maka dapat digunakan Allow.Comp. all = 70.0 ton (from Soil Invest.) tiang pancang Ø40cm dengan kedalaman 26.2 m

     Allow.Tension all = 35.0 ton (from Soil Invest.) kekuatan 1 tiang pancang adalah 91.2 ton

    Lall = 6.0 ton (from Soil Invest.)

    Pile Foundation

          h    s

          h     t

          h    c

          h    p

          C

          C

    B   A A

    Elc

        w    c

    P

    V

    Mx

    Mz

    Vz

    lp

        w    p

    1   2

    X

    Z

  • 8/15/2019 Perencanaan Turap Kukar

    23/23

    Data Daya Dukung Tiang Pancang berdasarkan Hasil Sondir 

    No.

    Titik  Kedalaman Cn/qc JHP

    (M)   Kg/cm2 Kg/cm

    2   Ø40cm Ø50cm Ø60cm

    S-1   24.8 150 1310 118.1 140.8 171.3

    S-2   26.2 150 1062 91.24 116 141.6

    S-3   25.6 150 1332 112.8 143 174

    S-4   25 150 1210 103.1 130.8 159.3

    S-5   25.2 150 1414 119.4 151.2 183.8

    S-6   24.8 150 1314 111.4 141.2 171.8

    S-7   25.2 150 1448 122.1 152.1 187.9

    S-8   25.4 150 1470 123.9 156.3 190.5

    S-9   25.4 150 1064 91.4 116.2 141.8

    S-10   25.6 150 1284 109 138.2 168.2

    Daya Dukung Ijin

    (ton)