PERFORM PROGRAMDEVELOPMENT A. CAUSSADE
Key WorkProcess (1): Process Owner:
Work System OwnerEd Curry
Work System Enabling LeaderDane Theodore, Director
Priority Processes Owner Anibal Caussade, Project Mgr.
January 5, 2009
Perform ProgramDevelopment
Process Improvements
R TE NC EI IP
R TE NC EI IPGOVERNOR’S
STERLING AWARDGOVERNOR’S
STERLING AWARD
00 72 00 72
cocoa beach jr./sr. high school
cocoa beach jr./sr. high school
cafeteria palm bay high school
cafeteria palm bay high school
PERFORM PROGRAMDEVELOPMENT A. Caussade
MacroProcess: Process Owner:
Table of Contents1. Cover Sheet2. Table of Contents3. Facilities Design Internal and External Customers4. Macro Flow Chart - Manage Facility Design5. Key Work Process 1 Flow Chart - Perform Program Development6. DMAIC Lite Storyboard - Check Points 1-187. Key Work Process 1 8. Key-In-Process Measures Determination Form System Form9. BPS Process Management System10. Macro Process Control System Form11. Key Work Process 1 Process Control Form12. Countermeasure Matrix13. Countermeasure Action Plan Matrix14. Action Plan Root Cause #115. Action Plan Root Cause #216. Key Work Process Indicator Data
Process Selection Matrix Form
PERFORM PROGRAMDEVELOPMENT A. Caussade
MacroProcess: Process Owner:
FACILITIES DESIGN INTERNAL CUSTOMERSSchool Board
SuperintendentArea SuperintendentsDistrict AdministrationSchool Administration
FACILITIES DESIGN EXTERNAL CUSTOMERSState of Florida
Florida Department of EducationParents / Guardians
Students
NEED PROJECTDESIGN
?
?
DELIVERABLES:D1. Construction Scope of WorkD2. Bid DocumentsD3. Design Criteria PackageD4. Project PlansD5. Project SpecificationsD6. Approved Plans and Specifications
Q1 - Cost of Errors & Omissions as a % of Total Construction Cost
Q2 - % Variance from Design Schedule
Design / Build (D/B) Project?
Design / Bid /Build Project?
Q3 - % Variance from Design Budget
P1 - Pre-Design Schedule Milestones
NEED ISMET
SUPPORT BID & PERMIT ACTIVITIES
SUPPORT CONSTRUCTION & CONSTRUCTION CLOSEOUT ACTIVITIES
CONSTRUCTION &CLOSEOUT COMPLETE?
PROJECT DESIGN COMPLETE?
A&E CONTRACTCLOSEOUT COMPLETE?
?
?
?
YES
YES
YES
NO
NO
NO
P4 - Bid & Permit Support Schedule Milestones
P2 - Project Design Schedule Milestones
P3 - Cost Variance @ Design Deliverable Milestones
P7 - A&E Contract Closeout Schedule Milestones
P5 - Construction & Construction Closeout Support Schedule Milestones
P6 - Cost of Errors & Omissions as % of Construction Costs at Schedule Milestones
M/E/P Construction <$50,000 or Placement / Hookup of
Relocatable Units?
CLOSEOUT A&E CONTRACT
PERFORM PROGRAM DEVELOPMENT
DEVELOP BUDGET
DESIGN PROJECT
APPROVAL BYBOARD
PROGRAMBUDGETDCP
PROGRAMBUDGET
A&EAPPROVAL BY
BOARD
DEVELOP DESIGN CRITERIA PACKAGE
SELECT DESIGN / BUILDCONTRACTOR
SELECT A & E
D3
D4D5
D6
YESNO
?
GO TOFACILITIES
CONSTRUCTIONFLOW CHART
DEVELOP BID DOCUMENTS
APPROVAL BYBOARD
D1D2
YES
NOBOARD
APPROVALREQUIRED?
KWP 1
KWP 5
KWP 6
KWP 7
KWP 8
KWP 9
KWP 3
KWP 4
KWP 4
KWP 2
WHO
STEP
MacroProcess: Process Owner:
BPS SCHOOLBOARD
BPS FACILITIESSERVICES
BPS EDUCATIONALDEPARTMENTSAND SCHOOLS
CONTRACTARCHITECT & ENGINEER
APPROVAL BY BOARD
NEED
PERFORM
DEVELOP
DEVELOP
DEVELOP
QUESTION
QUESTION
APPROVE
APPROVE
APPROVE
QUESTION
DESIGN
SELECT
QUESTION
SUPPORT
SUPPORT
QUESTION
QUESTION
CLOSEOUT
MANAGED
MANAGEFACILITIES DESIGN D. THEODORE
FACILITIES SERVICES / Robert J. Wiebel & Anibal Caussade 12/08/08
?
DELIVERABLE(S):
D1 - Project Go-Ahead Decision
D2 - Project Scope of Work
D2 - Completed Education Program Requirements
COMPLIES WITHCODES &
SBBC STANDARDS?
?
YES
SEEK INPUT FROM SCHOOL,AREA SUPERINTENDENT and
EDUCATIONAL PROGRAM MANAGERS
EDUCATIONREQUIREMENTS
MET?
YES
NO
D2
D1
D3
NO
DERIVE INPUT FROMCAPITAL IMPROVEMENT
PLAN and 5-YEAR WORK PLAN
COMPILE PROJECT SCOPE
REVIEW EDUCATION PROGRAM REQUIREMENTS
COMPLETEPROGRAM DEVELOPMENT
P1 - Area Superintendent & School Input Schedule Milestones
P2 -Educational Managers Input Schedule Milestones
P3 -Compile Project Scope Schedule Milestones
P4 -Complete ProgramDevelopment Schedule
Milestones
FACILITIES SERVICES / Robert J. Wiebel & Anibal Caussade 12/31/08
WHO
STEP
Key WorkProcess (1): Process Owner:
BPS SCHOOLBOARD
BPS FACILITIES SERVICES
BPS EDUCATIONAL DEPARTMENTS
AND SCHOOLS
NEED PROJECTDESIGN
NEED ISMET!
MANAGE FACILITIES DESIGNPROGRAM DEVELOPMENT D. THEODORE
NEED
SEEK
DERIVE
QUESTION
QUESTION
REVIEW
COMPILE
MANAGED
COMPLETE
Q1 - Pre-design Schedule Milestones % Variance
Q1.1 - Educational Input Received 30 Days From Need Decision
Q1.2 - Project Scope Compilation Within 60 Calendar Days From Need Decision
Q1.3 - Completed Education Program Within 90 Calendar Days From Education Program Requirements Review
ATTACHMENT A
Facilities Construction DMAIC Lite 1/13/2009 Page 1
INSTRUCTIONS: Please return your completed DMAIC Storyboard, along with your Process Control System (both flow chart and indicator information) and your completed Action Plan (see “Improve” checkpoint #10), via email to [email protected] and copy Steve Muzzy on all emails. Thank you, Bob Seemer, President & COO, Electronic Training Solutions, Inc. Priority Process Name: Manage Facilities Design
Work System / Leader: Dane Theodore
KWP 1 – Program Development DMAIC “Lite” Storyboard
DEFINE
1. Describe how the linkage between the process Q measures and the District’s KPIs (or strategic objective measures) was established and confirmed.
A. In order to achieve the milestones identified in the 2008/2009 BPS Strategic Plan, as it related to “Safe and Healthy Learning and Work and the Ten (10) Year Facilities Improvement Plan, the design of facilities must utilize a structured approach to controlling the cost of the design and the design implementation schedule. In light of this structured design approaches, constant monitoring of cost and schedule at all levels is imperative. Three (3) Macro Q Measures have been developed to collect cost and schedule data:
i. Q1 – Cost of Errors and Omissions as a percent of Total Construction Costs.
ii. Q2 – Percent (%) Variance from Design Schedule and Design Completion.
iii. Q3 – Percent (%) Variance from Design Cost.
2. Explain which process Q measure(s) will be improved. In order to identify the Macro Q Measure to improve, a Facilities Design Priority Process Selection Matrix and a Key-In-Process Measures Determination form were created. See attachments. After analyzing the data contained in each attachment, it was determined that Macro Q Measure Q2 will be improved by improving key work processes “Develop Bid Documents”.
3. Develop a theme statement which will focus your process improvement efforts. The theme statement must be consistent with the measure in checkpoint #2, above.
The process of developing program requirements for Capital Projects does not yield accurate information and data which is used to develop Capital Project Budgets.
ATTACHMENT A
Facilities Construction DMAIC Lite 1/13/2009 Page 2
DMAIC “Lite” Storyboard
MEASURE
4. List up to five (5) potential problem areas in this process and the associated P measure(s) for each.
A. Lack of or incomplete input from school staff, area superintendent and educational managers (CTE, ET, ESE, Food Services, etc.) and Plant Operations and Maintenance.
B. Lack of complete facility standards.
C. Lack of Educations Specifications.
D. Lack input from Building Code Official.
E. Inadequate time to derive project scope.
F. Lack of program development procedures and checklists.
5. Select the most significant problem or opportunity and develop a problem statement which answers the questions:
A. What? B. When? C. Gap between actual and targeted values?
Problem: The lack of program requirements development procedures and check sheets causes excessive work to get the project program requirements identified and documented. Problem Statement: The lack of accurate information and data used to develop a Capital Project Budget is caused by poor facilities program development. Gap: During the fiscal years 05/06 – 07/08 there has been inconsistency between the Capital Project Budget and the first project estimate provided to the District from the General Contactor of Design Builder. There has been a historical positive and negative gap of TBD.
(Hint: You may want to refer to the six sigma DMAIC course material, checkpoint #9 of the “Measure” step, as you develop your problem statement.)
ATTACHMENT A
Facilities Construction DMAIC Lite 1/13/2009 Page 3
DMAIC “Lite” Storyboard
ANALYZE
6. List up to five (5) potential causes of the selected problem from checkpoint #5 in the “Measure” step.
A. Inadequate time and / or laziness prevent the timely completion of the program development.
B. Not well-defined, education and facilities program requirements prevent the timely completion of the program development.
C. On occasions, new projects/work needs to be incorporated to the curriculum creating another step in the process. This step is the approval of the work under the Capital Improvement Plan and 5-Year Work Plan.
D. Unqualified SBBC personnel developing program requirements.
E. Lack of understanding and communications between the Educational and the BPS staff prevent the timely completion of the program design.
F. Lack of department program development procedures and checklists.
7. List the root causes and describe the approach used to select them from among the others.
Root Causes Approach Used To Select Root Cause
A. Inadequate time Team consensus
B. Not well-defined program requirements Team consensus
C. New projects/work needs to be incorporated to the curriculum
Team consensus
D. Lack of cooperation Team consensus
E. Lack of understanding and communications Team consensus
F. Lack of department program development procedures and checklists.
Team consensus
ATTACHMENT A
Facilities Construction DMAIC Lite 1/13/2009 Page 4
DMAIC “Lite” Storyboard
IMPROVE
8. List the countermeasure(s) you considered for implementation for each selected root cause from the “Analyze” step.
A. Allocate ample time to investigate and do research to achieve a complete design program.
B. Allocate ample time to define program requirements.
C. Minimize the need to establish short-term programs that are not well defined.
D. Only allow well trained and experienced BPS Representatives in the development of the design program.
E. Understand the importance of having well trained and experienced staff with plenty of educational Code knowledge.
F. Establish a departmental procedures and checklists for the development of program requirements.
9. Determine the “effectiveness x feasibility” score for each countermeasure, and note the highest scores.
Root Cause Effectiveness Feasibility Overall Action
A 5 3 15 3
B 5 3 15 3
C 5 3 15 3
D 5 5 25 1
E 5 5 25 1
F 5 4 20 2
Root causes A&B and D&E will be combined into one countermeasure action plans.
(Hint: Refer to six sigma DMAIC course, checkpoint #18 of the “Improve” step.)
10. Develop an action plan for each countermeasure to be implemented which shows the following: A. What (description of countermeasure) B. When (projected start and end dates) C. Who (accountable person) D. Which organizations need to support you E. Estimated cost to implement
See attached sheet.
(Remember: Email your action plan(s) with this completed DMAIC “Lite” Storyboard, per instructions on page 1.)
ATTACHMENT A
Facilities Construction DMAIC Lite 1/13/2009 Page 5
DMAIC “Lite” Storyboard
IMPROVE
10. Countermeasure Action Plans:
A & B: BPS Director of Plant Operations and Maintenance or BPS Director of Planning and Project Management shall develop program development milestones schedule; track program definition development; track program development documents completions; document accuracy and timely milestone completions.
C: BPS Director of Plant Operations and Maintenance or BPS Director of Planning and Project Management shall encourage BPS Departments to establish proven and well define curriculum facilities requirements. A weight factor shall be considered to differentiate between simple and complex work.
D & E: See attached Action Plan #1.
F: See attached Action Plan #2.
ATTACHMENT A
Facilities Construction DMAIC Lite 1/13/2009 Page 6
DMAIC “Lite” Storyboard
CONTROL
11. Briefly explain how you know the root causes were reduced or eliminated.
Tracking design program development completions and accuracy will identify that the root cause of the problem has been reduced or eliminated.
12. Briefly explain how you know the problem was reduced.
By performing gap analysis between the Program Development Budgeted cost and the first project cost submitted by the CM / DB.
13. Briefly explain how you know the theme measure was improved.
By performing gap analysis between the Program Development Budgeted cost and the first project cost submitted by the CM / DB
14. Explain how you will prevent this problem from recurring.
By following new formal program development procedures and checklists and performing gap analysis between the Program Development Budgeted cost and the first project cost submitted by the CM / DB
15. Identify which other BPS locations should consider implementing your countermeasures.
Other District departments that develop program requirements and budgets.
16. Identify what other BPS locations could learn from this project.
Other District departments that develop program requirements and budgets.
17. List the remaining problem areas in this process.
The Macro Key Work Process (KWP) 2 should be the next process to go through the DMAIC process.
18. List the key lessons learned from this process improvement.
It is important to gather all pertinent information during the information gathering phase including third party information to facilitate the completion of the design program development documents.
FACILITIES DESIGN PRIORITY PROCESS SELECTION MATRIX FORM
Selection Factor Work Processes Importance x Gap = Point Score
Priority Rank
Seek Input From School and Area Superintendent 5 5 25 1
Derive Input From Capital Improvement Plan and 5-Year Work Plan
5 4 20 2
Seek Input From Educational Program Managers 5 3 15 3
Compile Project Scope 5 4 20 2
Select Criteria Architect 5 5 25 1
Complete Program Development 5 3 15 3
SCALE: 5 = Extreme 4 = High 3 = Moderate 2 = Low 1 = None
KEY IN-PROCESS MEASURES DETERMINATION FORM Macro Outcome Measures Work Process In-Process Measures
P1 – Area Superintendent and School Input Schedule Milestones
P2 – Educational Manager’s Input Schedule Milestones
P3 – Compile Project Scope Schedule Milestones
P4 – Select Criteria Architect Schedule Milestones
Q2 - % Variance from Design Schedule
P5 – Complete Program Development Schedule Milestones
BPS Process Management System
Work System: Manage Facilities Design Leader: A. Caussade
Owner Members Key Work Priority Processes Name Email Name Email
1. 2. 3. KWP1 Perform Program
Development
4. 1. 2. 3. KWP2 Develop Budget
4. 1. 2. 3. KWP3 Develop Bid
Documents
4. 1. 2. 3. KWP4 Approval By Board
4. 1. 2. 3. KWP5 Develop Design
Criteria Package
4. 1. 2. 3. KWP6 Design Project
4.
BPS Process Management System
Work System: Manage Facilities Design Leader: A. Caussade
Owner Members Key Work Priority Processes Name Email Name Email
1.
2.
3. KWP7 Support Bid & Permit Activities
4.
1.
2.
3. KWP8 Support Construction and Construction Closeout Activities
4.
1.
2.
3. KWP9 Closeout A&E Contract
4.
Countermeasures Matrix:
EFFECTIVENESS X FEASIBILITY = OVERALL ACTION
PROBLEM
ROOT CAUSECOUNTER-MEASURE
PRACTICALMETHODS
Scale: 1 = Negligble 2= Somewhat 3= Moderate 4= Very 5 = Extreme
KWP1 - Program Development
The lack of accurate information and data used to develop a Capital Project Budget is caused by poor facilities program development.
Inadequate time and / or laziness prevent the timely completion of the program development
Not well-defined, education and facilities program requirements prevent the timely completion of the program development
On occasions, new projects/work needs to be incorporated to the curriculum creating another step in the
Unqualified SBBC personnel developing program requirements
Lack of understanding and communications between the Educational and the BPS staff prevent the timely completion of the program design
Lack of department program development procedures and checklists.
Allocate ample time to investigate and do research to achieve a complete design program
Allocate ample time to define program requirements
Minimize the need to establish short-term programs that are not well defined
Only allow well trained and experienced BPS Representatives in the development of the design program
Train BPS Staff in the development of the educational facility requirements.
Train BPS Staff on educational-code facility requirements.
Understand the importance of having well trained and experienced staff with plenty of educational Code knowledge
Establish a departmental procedures and checklists for the development of program requirements
Develop a realistic task milestone schedule to investigate / research program requirements
Develop a realistic task milestone schedule to investigate / research program requirements
Educational and Facilities Staff to develop well define curriculum facilities requirements
BPS Facilities staff to develop program development procedures and checklists.
5
3
3
3
3
5
5
5 5
5 4
5 15
15
15
15
20
25 Yes
No
No
No
No
Yes
DMAIC LITE STORYBOARD – IMPROVE – CHECKPOINT 10
Countermeasure Action Plans COUNTERMEASURE
PROJECTED START DATE
PROJECTED END DATE
ACCOUNTABLE PERSON
SUPPORT ORGANIZATION ESTIMATED COST
1. Only allow well trained and experienced BPS Representatives in the development of the design program.
2. Understand the importance of having well trained and experienced staff with plenty of educational Code knowledge.
Week 1 Week 11 BPS PM Support is required from the Educational Program Directors and School Principal
Cost of staff to develop, conduct and attend training classes.
Establish a departmental procedures and checklists for the development of program requirements.
Week 1 Week 6 BPS PM Support is required from the Educational Program Directors and School Principal
Cost of staff to develop and publish Program Development procedures and checklists.
Date:
Owners:
Conduct In-
1 2 3 4 5 6 7 8 9 10 11 12 Comments
Scheduled
Completed
Scheduled
Completed Monitor throughout progress
Scheduled
Completed Submit documents throughout
Scheduled Monitor throughout progress
Completed
Facilities Staff
Schedule Training
Develop Training Course Framework
Facilities Design - KWP (1) Perform Program Development Action Plan #1
Root Cause:
Countermeasure:
Practical Method:
BPS PM
13/1/09
Facilities PM
4
Week
Train Facilities and Eduational Staff
No. Task Accountable Person
1
2
Schedule and conduct Program Development Training Kickoff Meeting
Facilities Staff
Unqualified BPS Program Development Personnel
Conduct Facilities Program Development Code and Requirements Development Training
3 Facilities PM
Date:
Owners:
1 2 3 4 5 6 7 8 9 10 11 12 Comments
Scheduled Monitor throughout progress
Completed
Scheduled Monitor throughout progress
Completed
Scheduled Monitor throughout progress
Completed
Scheduled Monitor throughout progress
Completed
Scheduled Monitor throughout progress
Completed
Lack of Departmental Procedures and Checklists
Conduct Facilities Program Development Code and Requirements Development Training
Conduct In-House Program Development Training
5Approve and Release Program Development Procedure and Checklists.
Facilities Staff
3
4
Week
Add, Change and / or Delete Program Development Procedure and Checklists.
No. Task Accountable Person
1
2
Schedule and conduct Program Development Procedure and Checklist Kickoff Meeting
Facilities Staff
Facilities PM
Facilities Staff
Schedule and conduct Program Development Procedure and Checklist Kickoff Review Meeting
Develop Program Development Procedure and Checklists
Facilities Design - KWP (1) Perform Program Development Action Plan #2
Root Cause:
Countermeasure:
Practical Method:
BPS PM
13/1/09
Facilities PM
MANAGE FACILITIESDESIGN
MANAGE FACILITIESDESIGN
A. Caussade
Process Improvement
Document TreeMacro
Process: Process Owner: Document Title:
MACRO DMAIC LITE STORYBOARD
MACRO PCS
MACRO FLOWCHART
MACRO PRIORITY PROCESSSELECTION MATRIX FORM
MACRO KEY IN-PROCESSMEASURES DETERMINATION
SYSTEMS FORM
MACRO DMAIC LITE STORYBOARD
MACRO PRIORITY PROCESSSELECTION MATRIX FORM
KWP9 CLOSEOUT A&ECONTRACT FLOW CHART
KWP9 ACTION PLAN(s)
KWP9COUNTERMEASURE
MATRIX
KWP9 INDICATOR DATA
KWP1 DMAIC LITE STORYBOARD
KWP3 DMAIC LITE STORYBOARD
KWP1 PRIORITY PROCESSSELECTION MATRIX FORM
KWP3 PRIORITY PROCESSSELECTION MATRIX FORM
KWP1 PERFORM PROGRAM
DEVELOPMENT FLOWCHART
KWP3 DEVELOPBID DOCUMENTS
FLOW CHART
KWP1 ACTION PLAN(s) KWP3 ACTION PLAN(s)
KWP1COUNTERMEASURE
MATRIX
KWP3COUNTERMEASURE
MATRIX
KWP1 INDICATOR DATA KWP3 INDICATOR DATA
Note 1: May be required if flow chart has internal work processin addition to individual steps.
Note 1Note 1
Key Work Processes 1 - 9
1st DMAIC Lite Storyboard 2nd DMAIC Lite Storyboard 3rd DMAIC Lite Storyboard