28
Performance Improvement Branch ENTERPRISE AIRS d ENTERPRISE AIRSpeed 28 June 2011 NAE_ESC_FY10Accomplishments_28Sept2010 1 UNCLASSIFED / For Official Use Only

Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Performance Improvement Branch

ENTERPRISE AIRS dENTERPRISE AIRSpeed

28 June 2011

NAE_ESC_FY10Accomplishments_28Sept2010 1UNCLASSIFED / For Official Use Only

Page 2: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Questions

NAE_ESC_FY10Accomplishments_28Sept2010 2UNCLASSIFED / For Official Use Only

Page 3: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

AIRSpeed Fundamentals

• Properly manage RFT (Mission)

• Manage Inventory/Investment– Parts, equipment and facilities

• Reduce Operating Expenses (O&M,N, MPN)

• Create a Culture of Continuous Process Improvement– Identify and address interdependencies

– Identify and manage constraints

– Manage and reduce variability

– Eliminate non-value added activities

• Revolutionize the business of Naval Aviation

“Local decisions must be aligned to the global impact”“Local decisions must be aligned to the global impact”

NAE_ESC_FY10Accomplishments_28Sept2010 3UNCLASSIFED / For Official Use Only

Local decisions must be aligned to the global impactLocal decisions must be aligned to the global impact

Page 4: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Integration of CPI Methods

LEANEliminating Non-Value Added gActivities

1. Value from customers point of view2. Identify the Value Stream3. Develop Process Flow4. Create a Pull System5. Relentless Pursuit of Perfection

Theory of ConstraintsConstraint Mitigation

Six SigmaReducing Process Variation

CPI

1. Identify the Constraint2. Exploit the Constraint3. Subordinate to the Constraint4. Elevate the System’s Constraint

g1. D efine the issue/problem2. M easure the critical process3. A nalyze measured data 4. I mprove the process

NAE_ESC_FY10Accomplishments_28Sept2010 4UNCLASSIFED / For Official Use Only

y5. Repeat Step 1, as the Constraint

has probably moved5. C ontrol the process improvements

Page 5: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

BASIC TENANTS OF AIRSPEED

Vendors

Tenet #1: Create an integrated system that operates as a Pull system vs. a Push system.

Tenet #2: Right-size inventory to support actual demand usage patterns.

Maint.

O-LevelI-LevelD-LevellCP/DLABuffer

Time toReliably

Replenish (TRR)

Intermediate

Level Support

Supply

“Reducing inventory, investments, and costs by increasing the speed and responsiveness of the enterprise.” “Hold enough stock to cover maximum demand during the TRR”

Tenet #3: Match repair and repair costs (AFM/AVDLR) to actual Tenet #4: Move from the management of inventory levels to the

RFI

Tenet #3: Match repair and repair costs (AFM/AVDLR) to actual Demand Patterns

Buffer

Tenet #4: Move from the management of inventory levels to the management of the flow of inventory in time, i.e., Buffer

Management.

I-LevelD-LevellCP/DLA O-Level ACTWATCH & PLANOK

TRR = 9 days

Time Buffer

NAE_ESC_FY10Accomplishments_28Sept2010 5UNCLASSIFED / For Official Use Only

NRFINRFIDIFM

“Choke induction until needed to replenish a buffer”

3d 3d 3d

“Once a buffer is properly sized, Buffer Management ensures parts make it to the shelf on time to prevent outages.”

Page 6: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Enterprise AIRSpeed Implementations• All Tasked are assigned, approved and funded by the Enterprise AIRSPeed Executive Steering

Committee (CNAF N41, N42 , COMFRC and HQMC)

• CVN/L-Class ImplementationsCVN/L Class Implementations• All CVN’s complete with the exception of CVN-71 (awaiting completion of RCOH, TBD 2012/2013)• L-Class complete

• USS PELELIU (LHA-5)• USS KEARSARGE (LHD-3)• USS BOXER (LHD-4)• USS BATAAN (LHD-5)

• L-Class outstanding• USS IWO JIMA (LHD-7) scheduled for 11-29 Jul 2011• USS Makin Island (LHD-8) TBD• USS BONHOME RICHARD (LHD-6) TBD• USS WASP (LHD 1) TBD• USS WASP (LHD-1) TBD

• IMA/MALS Status• 26 Completed to include follow-ups

• FRCFRC• Artisan Integration/TRR REDUX• 8 complete/ 2 in work

• E2E USMC Implementation • 2 complete/ 11 in work / 12 TBD over 9 TMS

NAE_ESC_FY10Accomplishments_28Sept2010 6UNCLASSIFED / For Official Use Only

Page 7: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Enterprise AIRSpeed Policy changes

• Green Belt NEC 9564• May 2009- Approved by NAVMAC• Jun 2009-CNAF message announcing Core Green Belt approval released

• Green Belt AQD• Sept 2010-Approved by NAVMAC

• CPI Handbook• Approved by CNAF

Posted on the following sites:• Posted on the following sites:SharePoint:https://www.portal.navy.mil/comnavairfor/N42/N422/n422b/AIRSpeed/Instructions%20%20References/Forms/AllItems.aspx

CPIMS:https://don.hqda.pentagon.mil/CPIMS/project/Summary1.epage?sp=Uhjigoqo0000hppodmam0000000https://don.hqda.pentagon.mil/CPIMS/project/Summary1.epage?sp Uhjigoqo0000hppodmam0000000

• Supply AIRSPeed Policy

• Proposed NAMP changes• In-route to NAMP voting committee

• Changes include: Adds Commanding Officer, Maintenance Officer, Division officer, Production Control, and WorkCenter Supervisor AIRSpeed billet responsibilities.

CS C Q f C

NAE_ESC_FY10Accomplishments_28Sept2010 7UNCLASSIFED / For Official Use Only

CSEC Questions are pending approval of this CP and subsequently the AMMT’s review and approval of proposed/applicable questions.

Page 8: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Critical Elements of CPI Success

• Leadership is engaged• Voice of the Customer drives improvements• CPI events aligned to strategic goals of the organization• A focused Implementation Plan is executed to maximize

resultsresults• Event outcomes are tracked and reviewed to sustain the

gains• CPI teams are properly resourced

– Trained and experienced personnel– Build self-sufficient infrastructure– Promotes culture change

NAE_ESC_FY10Accomplishments_28Sept2010 8UNCLASSIFED / For Official Use Only

• Replication opportunities are shared

Page 9: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Maintenance Officer requirements

• Understanding CPI methods, concepts and analysis tools• Designate the following leaders:• AIRSpeed / CPI Officer (NAMP requirement)• BMT administrator (Level II sites only) (NAMP requirement)

E l ti i ti f t i i i t NEC 6304/MOS 6049/6046– Evaluating incorporation of training into NEC 6304/MOS 6049/6046

• CPIMS administrator (NAMP requirement)– CNAF utilizes SharePoint to mitigate ships inability to access CPIMSg p y

• Establish and staff a CPI Work Center or Division, as applicable• Provide leadership and management oversight for the CPI

programprogram• Attend all tollgates reviews for CPI projects conducted within the

maintenance department

NAE_ESC_FY10Accomplishments_28Sept2010 9UNCLASSIFED / For Official Use Only

Page 10: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

NAMP RequirementsClass Requirements Compared

White Belt•Current NAMP Requirement: All Hands within 90 Days•Proposed NAMP Requirement: All Hands within 180 Daysp q y

Yellow Belt• Current NAMP Requirement: All Hands within 90 Days• Proposed NAMP Requirement: Command Designated Personnel

LCM Initial• Current NAMP Requirement: No Requirement• Proposed NAMP Requirement: All Hands within 180 Days

Champion / Project Sponsor• Current NAMP Requirement: No Requirement• Proposed NAMP Requirement: MO AMO MMCO PCO Division Officer and Command Designated PersonnelProposed NAMP Requirement: MO, AMO, MMCO, PCO, Division Officer and Command Designated Personnel

Green Belt•Current NAMP Requirement: Two qualified GBs per division and four certified AIRSpeed GBs in the core team.• Proposed NAMP Requirement: No Change.

LCI Practitioner• Current NAMP Requirement: Two TOC Experts per division and four AIRSpeed TOC certified core members.• Proposed NAMP Requirement: No Change.

Black Belt• Current NAMP Requirement: One AIRSpeed core members certified as a Black Belt.• Proposed NAMP Requirement: No Change

NAE_ESC_FY10Accomplishments_28Sept2010 10UNCLASSIFED / For Official Use Only

• Proposed NAMP Requirement: No Change.Master Black Belt

• Current NAMP Requirement: No Requirement.• Proposed NAMP Requirement: No Change

Page 11: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

On-Line CPI Training Available

• Navy Knowledge On-line (NKO):– White Belt (NETC-LSSWB-1.0): Provides an introduction to CPI

i i l t l d b lprinciples, tools and vocabulary– Logistics Chain Management (NAVAIR-LCM-0001.3): Application of CPI

tools and methods

D f A i i i U i i• Defense Acquisition University:– CPI Familiarization (CLE 015): Familiarizes students with CPI

methodologies to improve overall organizational performance

– Intro to Lean Enterprise Concepts (CLE 004): Focuses on the lean concepts

– Lean Six Sigma for Manufacturing (CLE 007): Builds on CLE 004 and summarizes the most important lean tools and techniques

– Six Sigma: Concepts and Processes (CLE 008):Focuses on Six Sigma concepts providing an in-depth overview of Six Sigma processes and tools

NAE_ESC_FY10Accomplishments_28Sept2010 11UNCLASSIFED / For Official Use Only

Sigma processes and tools

Page 12: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Class Room CPI Training

• Yellow Belt: 1-2 days in length providing an overview of Lean, Six Sigma and Theory of ConstraintsLean, Six Sigma and Theory of Constraints

• Process Sponsor – Champion: 1-2 days in length providing an overview of CPI tools, charter development,

d t it id tifi tiand opportunity identification

• Green Belt: 5 days in length designed to equip Green Belt candidates with the necessary skills to participate inBelt candidates with the necessary skills to participate in and with experience lead improvement projects and events

• Black Belt: One week per month over a 4-5 month period for Green Belt certified candidates possessing the attitude and aptitude to carry out complex statistical

NAE_ESC_FY10Accomplishments_28Sept2010 12UNCLASSIFED / For Official Use Only

analysis projects

Page 13: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

EAS IT Analysis Tools

• Buffer Management Tool (BMT) - The primary purpose of the Buffer Management Tool (BMT) is it allows Maintenance and Supply to effectively operate within the Naval Aviation Enterprise (NAE) Continuous Processing Improvement (CPI) environment on a daily basis. The Buffer Management Tool (BMT) is an MS Access application designed to help “I” level work centers track their workload (historical and current) in a time domain. This tool was developed with business rules to manage work prioritization byTime to Reliably Replenish (TRR), with the emphasis on reliablility.

• Enterprise Logistics Analysis Tool (ELAT)• Pulls data from AFAST & R-Supply

F ilit t d t di f l ti hi b t ti d i t• Facilitate understanding of relationship between time and inventory• Analyze demand patterns and TRR• Enables site-to-site TRR comparison

• AIRSpeed Analysis Tool (AAT) - Is a CPI analysis tool to ensure that physical inventory is positioned appropriately with the correct supply quantities to meet customer demands Capabilities will include:correct supply quantities to meet customer demands. Capabilities will include:

• Access to On-Station TRR performance data• Opportunities to “right size” buffer sizes• Site-to-Site comparison of like items• Allows for comparison of the current buffer size decisions compared to historical buffer performance

• Continuous Process Management System (CPIMS) – DON centralized database used to track and report Lean Six Sigma (LSS)/Continuous Process Improvement (CPI) project data and benefits. It supports data sharing, real time information viewing, financial benefits metrics and complies with resource management guidance.

NAE_ESC_FY10Accomplishments_28Sept2010 13UNCLASSIFED / For Official Use Only

Page 14: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

BMT Summary Report site 1

NAE_ESC_FY10Accomplishments_28Sept2010 14UNCLASSIFED / For Official Use Only

Page 15: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

BMT Summary Report site 2

NAE_ESC_FY10Accomplishments_28Sept2010 15UNCLASSIFED / For Official Use Only

Page 16: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

BMT Summary Report site 3

NAE_ESC_FY10Accomplishments_28Sept2010 16UNCLASSIFED / For Official Use Only

Page 17: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

BMT Reports RR17 Radar Transmitter

NAE_ESC_FY10Accomplishments_28Sept2010 17UNCLASSIFED / For Official Use Only

Page 18: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

BMT Reports VLK9 Radar Receiver

NAE_ESC_FY10Accomplishments_28Sept2010 18UNCLASSIFED / For Official Use Only

Page 19: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Best Practices Replication Process

Event: COC RecognitionCPIMSEvent:-Process-Practice

ValidationRecognition

Data Entry

NAE_ESC_FY10Accomplishments_28Sept2010 19UNCLASSIFED / For Official Use Only

Promulgation

Page 20: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

“Capturing” NAE Best Practices Process Flow

M&SCM/ ESC

NAVAIR 6.7.2.1PIB

• Provided SA on Best Practice Initiatives• Retrieve Data Communication • Provided SA on Best Practice Initiatives

• Have visibility on Millstones and obstacles

• Ability to engage where appropriate to remove obstacles across competing t k h ld

Retrieve Data Communication Package entered from respective COC, from CPIMS

• Prepare Brief to MSC&M/ ESC• Problem statement

POA&M

COC/ Stakeholders

stakeholders• POA&M

• Stakeholder Obstacles

Opportunity SustainmentCommand CO/

Executive Project Sponsor/ Champion

Respective NAEChain of

Command/ Process Owner

• Validate NAE Strategic alignment• Completed Project with replication

potential

Entry into appropriate Policy/ Business Practice

Documents

Governing process/ business practice• Validate NAE Strategic alignment

• Identify stakeholders (NAMP / DLA/ ICP/ etc.) and appropriate policy document

• Create POA&M to implement/ resolve/ pilot

potential

• Sustain process locally

• Determines if it fits replication criteria

• Submit Best Practice Replication

• Governing process/ business practice documents will be updated to ensure new “improved” best practice will survive a personnel turnover.

• CPIMS will maintain the history of the process and change s for future use,

NAE_ESC_FY10Accomplishments_28Sept2010 20UNCLASSIFED / For Official Use Only

• Complete Data Communication Package to capture blueprint for moving forward

• Concur/ Reject in CPIMS

Submit Best Practice Replication Request (define what part of project may be replicated)

• Select Best Practice replication request in CPIMS

process and change s for future use, and validation of improvement.

Page 21: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Steps for success

• Embrace AIRSpeed CPI & choose excellence as the norm.

• Communicate the Mission, Vision, and Goals of the organization to all personnel – it’s not just a sign on the wall.

• Determine level of CPI talent you have on board.

• Use AMAs to clarify NAMP requirements and disseminate best practices.

C f f• Use CPI principles to find areas to improve and evalute everything you do from a process perspective.

• Ensure all hands participate in CPI events and apply concepts to their own jobs and work areas.

Fi d t iti fFind opportunities for success…..

• Increased sortie effectiveness

• Reduced demand/consumption pattern

Reduced TAT for scheduled maintenance events• Reduced TAT for scheduled maintenance events

• Potential for manpower savings

• Potential to close RFT gap

NAE_ESC_FY10Accomplishments_28Sept2010 21UNCLASSIFED / For Official Use Only

(page 29 of “The CNAF Handbook for AIRSpeed and Continuous Process Improvement (CPI)”)

Page 22: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

CPI End State Objectives

• CPI is an organizational philosophy that is part of the way we do business

• CPI is used to provide high quality support of mission readiness at affordable costaffordable cost

• CPI is understood and valued by stakeholders and process ownersy p

• Every major organization has a CPI Implementation Champion

NAE_ESC_FY10Accomplishments_28Sept2010 22UNCLASSIFED / For Official Use Only

Page 23: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

AIRSpeed Points of Contact

•Enterprise AIRSpeed Project Office (AIR 6.7.2.1)•CDR Jim Parish, 301-995-2973CDR Jim Parish, 301 995 2973•Brenda Sanders, 301-757-2642

•COMNAVAIRFOR N422•Mr. John Vilicich, 619-545-1320

•COMFRC•Mr Arthur Reiersen 619-733-8515•Mr. Arthur Reiersen, 619 733 8515

•HQMC ASL-40

NAE_ESC_FY10Accomplishments_28Sept2010 23UNCLASSIFED / For Official Use Only

•Major John DiGiovanni, 703-693-971333

Page 24: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Questions

NAE_ESC_FY10Accomplishments_28Sept2010 24UNCLASSIFED / For Official Use Only

Page 25: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

Backup Slide

NAE_ESC_FY10Accomplishments_28Sept2010 25UNCLASSIFED / For Official Use Only

Page 26: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

5S

• A process and method for creating and maintaining an organized, clean, high-performance workplace

• A conditioning discipline for continuous process i timprovement

• Creates a proper environment for standard work

• Pre-requisite to perfect quality

• Encourages visual controlEncourages visual control

• Intolerant to waste

NAE_ESC_FY10Accomplishments_28Sept2010 26UNCLASSIFED / For Official Use Only

• Places high value on safety

Page 27: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

The Steps of 5S

CELL / AREA

RED TAGTAG NUMBER

CATEGORY1. Raw Material2. WIP3. Finish Materials4. Tools

5. Supplies6. Equipment7. Furniture8. Office Materials

9. Books/Magazines10. Other:

TAG DATE TAGGED BY

ITEM NAME

QUANTITY

REASON TAGGED

DISPOSITION REQUIRED1. Discard2. In Cells Storage3. Long Term Storage

4. Reduce Inventory5. Sell / Transfer6. Other:

ACTION TAKEN DATE

CELL / AREARED TAG LOCATOR

TAG NUMBER

• Sort– Segregate & Discard– Red Tag ProcessRED TAG LOCATOR Red Tag Process

• Straighten• Arrange & Identify• Physically rearrange - organizey y g g

• Shine• Clean Daily• Remove reasons for contaminants

• Standardize• Revisit Frequently• Implement visible signals to ensure team

d t diunderstanding• Sustain

• Motivate To Sustain• Develop communication strategies

NAE_ESC_FY10Accomplishments_28Sept2010 27UNCLASSIFED / For Official Use Only

• Develop communication strategies• Involve Leadership

Page 28: Performance Improvement Branch ENTERPRISE AIRS … AIRSpeed.pdf · 2011-07-02 · • USS PELELIU (LHA-5) • USS KEARSARGE (LHD-3) • USS BOXER (LHD-4) • USS BATAAN (LHD-5) •

5S – Before & After PEB’s

Before 5SBefore 5S

A Place for Everything

EverythingEverything in its Place

NAE_ESC_FY10Accomplishments_28Sept2010 28UNCLASSIFED / For Official Use Only

After 5S