Performance Measurement System for Performance Measurement System for Wheel Shop Wheel Shop Rail Wheel Factory Rail Wheel Factory Bangalore INDIA Bangalore INDIA

Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Embed Size (px)

Citation preview

Page 1: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Performance Measurement System for Performance Measurement System for Wheel ShopWheel Shop

Rail Wheel FactoryRail Wheel FactoryBangalore INDIABangalore INDIA

Page 2: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process
Page 3: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Presentation OutlinePresentation Outline

• Introduction to the Plant• SWOT Analysis for the RWF as it is on

date• Existing scheme of Performance cost

measurement• Research hypothesis & findings

Page 4: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

BACKGROUNDBACKGROUNDof Setting Up of Setting Up

RWF/BANGLORE/INDIARWF/BANGLORE/INDIA§ Till the early 1980s, the Indian Railways

were heavily dependent on imports for meeting their requirement of wheels and axles

§ Indigenous capacity was only available in TISCO/JAMSHEDPUR and Durgapur Steel Plant (DSP)

Page 5: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

LIMITATIONS OF LIMITATIONS OF INDIGENOUS SOURCESINDIGENOUS SOURCES

§ The TISCO Plant was outdated and technically not capable of meeting the changing requirements of solid wheels and heavy axles for the newer designs of rolling stock.

§ The performance of DSP was very indifferent, suffering from labor strife and quality problems. Due to these reasons, the supplies from DSP were erratic and unreliable.

Page 6: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

SETTING UP OF WHEEL & AXLE SETTING UP OF WHEEL & AXLE PLANT(WAP) Now called asPLANT(WAP) Now called as

RAIL WHEEL FACTORY(RWF)RAIL WHEEL FACTORY(RWF)

• The Wheel & Axle Plant Project was thus conceived in 1972 for attaining self sufficiency inWTA and reduce imports besides using return scrap for wheels production

• The Project was sanctioned by the Planning Commission in 1978 at a cost of Rs.146 Crores with IDA funding

• Trial productions commenced in 1983• Wheel & Axle Plant was formally commissioned on

15th September, 1984

Page 7: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Organization Structure &EnvironmentOrganization Structure &Environment

• RWF is a Production Unit under Ministry of Railways,India• Headed by General Manager ,Special Secretary status

reporting to the Minister of Railways through Railway Board

• Functional autonomy limited in Budgeting,Pricing and Managerial Personnel recruitment-these activities coordinated by Board(mechanical directorate)

• Production schedule and distribution of manufactured products is predominantly determined by Railway Board

• Market structure is duopolistic-assured domestic takeoff• “Winds of change” are blowing now but very gently-latest is

Memorandum of Understanding between RWF & Board on Pricing policy on principles of marginal costing

Page 8: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Will the Wind become a Gale?

MR’s Rail Budget extract ; Reform Agenda“ Our Production Units have been catering mainly to

the needs of Indian Railways. Having acquired the State of the Art technology, Railway Production Units can now become competitive and can make their presence felt in the global market provided they are given the requisite autonomy. In order to facilitate this, it is proposed to restructure the production units as independent cost and profit centers”

Page 9: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

TECHNOLOGIES ADOPTED AT RWFTECHNOLOGIES ADOPTED AT RWF

Study and evaluation of advanced technologies available at that time led to adoption of following technologies for manufacture of wheels and axles:

WHEELS:Controlled Pressure Pouring Cast Wheel Technology set up under technology transfer agreement with Griffin Wheel Company(GWC), AMSTED Inc.,USA.

AXLES: Axle technology then current in European countries using a special purpose Long Forging Machine procured from M/s GFM, Austria.

Page 10: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

INITIAL PRODUCT RANGEINITIAL PRODUCT RANGE

Located in the garden city of Bangalore, RWF began production in 1984-85 with manufacture of:

• One type of wheel

• One type of wheel set

• Six types of axles

Page 11: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

TOT AGREEMENT WITH M/s AMSTEDTOT AGREEMENT WITH M/s AMSTEDFOR WHEEL MANUFACTUREFOR WHEEL MANUFACTURE

As part of technology transfer agreement RWF received:

• Griffin(GWC)s’ Standard Practice manual containing technical information and documentation pertaining to the relevant processes related to wheel manufacturing

• Factory lay out , M & P details

• Material Specifications,Vendor Information

• Training of Personnel at GWC, USA

Page 12: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Limitations of the agreement with M/s AmstedLimitations of the agreement with M/s Amsted

• GWC support was only for freight wheels and RWF was given 5 designs of freight wheels as part of technological support

• Process parameters for manufacture of coaching and locomotive wheels was not disclosed

• The agreement lapsed in 1991 and thereafter RWF has been on its own

Page 13: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

GROWTH OF WHEEL & AXLE PLANT GROWTH OF WHEEL & AXLE PLANT ––Now Now renamed as RAIL WHEEL FACTORYrenamed as RAIL WHEEL FACTORY

The initial capacity of the Plant was for manufacture of

WHEELS - 56,700

AXLES - 23,000

WHEEL SETS - 10,000

Page 14: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

INCREASE IN PLANT CAPACITYINCREASE IN PLANT CAPACITY

The increase in Plant capacity has been achieved through:

Measure Taken Year Installed CapacityWheel Axles Wheel sets

Commissioning 1984 56,700 23,000 10,000Incentive scheme 1990 67,500 35,000 35,0003rd Shift introduced 1995 67,500 48,000 35,000Augmentation (Ph I) 1998 95,000 48,000 35,000Augmentation (Ph II) 2003 1,15,000 48,000 48,000

Page 15: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

DIVERSIFICATION OF PRODUCT RANGEDIVERSIFICATION OF PRODUCT RANGE

After the termination of collaboration agreement with M/s Amsted, RWF has independently developed the following products:

May 93 915 mm dia. COACHING WHEEL

Aug 93 First ICF COACHING WHEELSET

Jan 95 840 mm dia CONTAINER WAGON WHEEL

Dec 95 915 mm diameter WAGON WHEELSET

Page 16: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

DIVERSIFICATION OF PRODUCT RANGE DIVERSIFICATION OF PRODUCT RANGE (continued)(continued)

Dec 95 CH-36 WHEELS & F -CLASS AXLESexported to USA

Dec 97 1097 mm diameter LOCOMOTIVE WHEEL

Aug 98 First MoV LOCOMOTIVE WHEELS

Sep 99 First MG COACHING WHEEL

Nov 01 First MG LOCOMOTIVE WHEEL

Page 17: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

QUALITYQUALITY

Customer satisfaction and delight have forever been the keywords in RWF’s philosophy.

Realizing the globally prevalent competitiveness in all industries, RWF became the first Production Unit of the Indian Railways to be certified to the ISO-9002: 1994 Standard in 1994.

RWF once again became the first Production Unit on Indian Railways to achieve accreditation to ISO-9001:2000 Standard in March 2001 – within three months of issue of the revision by ISO.

Page 18: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

ENVIRONMENTAL MANAGEMENTENVIRONMENTAL MANAGEMENT

RWF continued its trend of firsts by becoming yet again the first Production Unit on Indian Railways to achieve accreditation in June 1999 by M/s BVQI to ISO-14001: 1996 the coveted Standard for Environmental Management System.

Page 19: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

ACCREDITATION BY AARACCREDITATION BY AAR

RWF, in keeping with its World Class status has been accredited since November 1995 by the Association of American Railroads (AAR) for manufacture of wheels and axles for use in North American Railroads.

Wheels have been exported to North America worth USD 4,00,000/- .

Page 20: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

AWARDS & ACCLAMATIONSAWARDS & ACCLAMATIONS

The prestigious Golden Peacock Award for Quality Systems in 1997 by the Institute of Directors, India.

The Arch of Europe award for excellence in Quality in 1999 by the Business Initiative Directions, Europe.

The Golden Peacock Award for Environment Management Systems in 2002 by the Institute of Directors, India.

The micro-alloy cast steel locomotive wheel developed by RWF was found to be far superior to forged and cast wheels made in USA in respect of its wear resistant properties.

Page 21: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

RWF TODAYRWF TODAY

• RWF today is a World-Class manufacturer of wheels, axles and wheel sets for all types of rolling stock.

• The Plant has the distinction of not having even a single case of line failure of its products.

• With a staff strength of 2392,RWF has an annual turn over of over Rs 300 crores.

Page 22: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

GROWTH IN RWF’S REGULAR PRODUCT GROWTH IN RWF’S REGULAR PRODUCT RANGERANGE

0

5

10

15

20

25

30

Wheels Axles Wheelsets

PRODUCT

TYP

ES

19842005

Page 23: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

MARKETING ACTIVITIES IN MARKETING ACTIVITIES IN RWFRWF

§ Marketing activities started during 1995 when IR demand reduced

§ Sales to non-railway customers accounted for under 2% of the annual turn over till 2001-02

§ In the current year, orders worth of Rs. 40 Crores(13% of turnover) have been secured from non-railway customers

§ The Plant eventually aims to target 30% of its turn over for orders from non-railway customers

Page 24: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

MARKETING PERFORMANCEMARKETING PERFORMANCE

Exports

Value of export - Rs.145.36 lakhs

Profit accrued - Rs. 18.42 lakhs

Countries - USA, Malaysia

Indigenous

Value of Indigenous orders - Rs. 54.70 Crores

Profit accrued - Rs. 4.3 Crores

Page 25: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

SWOT Analysis• RWF today stands at the crossroads.It is

necessary to take stock of the situation. The SWOT analysis looks like this

THREATSOPPORTUNITIES

WEAKNESSESSTRENGTHS

Page 26: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

STRENGTHSSTRENGTHS

• Modern manufacturing facility.

• Augmentation Works completed for increasing capacity of wheels, axles and wheel sets.

• A well-drawn out plan under implementation for phasing out of old machinery.

• Well-trained and committed workforce.

• Good in-house laboratories for testing of raw material and products.

Page 27: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

STRENGTHSSTRENGTHS (contd.)(contd.)

• Good facilities for maintenance of assets.

• Quality systems are in place.

• A fairly captive market for its products which utilizes 80-85% of the installed capacity.

• Excellent track record in terms of delivery and reliability of products.

Page 28: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

WEAKNESSESWEAKNESSES

• The financial health of the mother organization (IR) is not sound

• Requirement of Wheels,and other railroad consumables is sporadic and dependent on PLAN outlay for Rolling stock acquisition which is fluctuating demand

• The Plant design is very specialized and is equipped towards manufacture of only Wheels & Axles

Page 29: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

WEAKNESSES (contd.)WEAKNESSES (contd.)

• R&D facilities are inadequate to meet with the changing designs at a faster pace. Consequently development of any product takes a long time in being established through field trials.

• Development of new processes/raw material specifications has been more or less stagnant.

• The rejection and rework levels are higher than comparative figures for the Griffins Plant.

Page 30: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

WEAKNESSES (contd.)WEAKNESSES (contd.)

• Cost of production is higher due to high cost of scrap and electricity.

• Marketing infrastructure is extremely poor.

• Archaic costing and accounting principles applicable over IR are uniformly applied across the board in RWF. These procedures are not conducive to aggressive marketing.

• Delegation of powers for market penetration are limited.

• Staff morale likely to be affected due to uncertain future.

Page 31: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

WEAKNESSES (contd.)WEAKNESSES (contd.)

• Higher management only pays lip-service to marketing efforts. Inadequate delegation of powers at the field level results in delayed response to market queries.

• IR is obligated to give place orders for a part of its requirement to DSP as the augmentation and modernization of DSP was done at IR’s behest.

• Exposure of officials to developments made by other Plants is limited.

• Exposure to overseas customers and markets is practically non-existent.

Page 32: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

OPPORTUNITIESOPPORTUNITIES

• Autonomy in pricing will lead to better focus with Customer Segmentation

• Dual pricing policy (after satiating in house demand at installed capacity) can be considered

• ERP solutions for production,planning and control including costing systems can be planned

• Enter into MOU with the parent Ministry for autonomy in all areas of operations in exchange for adherence to predetermined performance benchmarks

Page 33: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

THREATSTHREATS

• Poor financial health of IR is resulting in reduced orders for RWF. The wagon acquisition in the X Plan has been drastically down-sized.

• Liberalization policy has enhanced the threat of cut-throat competition from emerging giants like China.

• The capacity of RWF and DSP combined exceeds the WTA requirements of IR. RWF faces a threat from DSP in respect of sharing of IR’s orders.

• Global railroad market space is reducing.

Page 34: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Survival in Future

• IR’s reducing requirement for WTA items, would result in an increased cost of production unless the Plant capacity can be fully utilized.

• Such an eventuality would make it even more difficult for RWF to effectively compete either in the Indian or the global market.

• It is becoming increasingly clear that to avoid getting caught in this vicious cycle, RWF has to make concerted efforts to fully utilize its Plant capacity and to bring down the cost of production to enable it to establish a competitive edge in the Indian & overseas market.

Page 35: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

THE MAGIC FORMULA• In fact the situation is such that both plant capacity utilization

and cost reduction have to go hand-in-hand as one is not possible without the other

• Low production higher overhead costs

• Higher production costs lower orders

• The captive IR market cannot account for booking of the entire capacity of RWF

• The Indian market for WTA is limited to sporadic requirements for CONCOR, Defense needs and some exports made by Wagon Builders. This market is not sustainable

•• The magic formula therefore appears to be The magic formula therefore appears to be to reduce costs and to reduce costs and penetrate the export marketpenetrate the export market

Page 36: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Existing Performance measurement Scheme Wheel Shop,Rail Wheel Factory

• Existing scheme is cost plus model• Costs of production allocated over

specified period of production of wheels• Overhead costs distributed to the finished

product-100% or ratio thereof• Batch costing of finished product is done

with no focus on intermediate product costs

Page 37: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Methodology for costing in Existing measurement scheme

Important materials for production purposes (about 50 items) constitute 90% of value of issues.

The actual consumption taken rather than booked expenditure under stores transactions.

High value shop arising and rejected materials from PWO - actual generation taken.

Expenditure on Labor and Electricity are charged based on actual payments made.

Expenditure booked against various Cost Centers gets charged off to PWO.

All indirect expenditures are treated as OH and charged off or apportioned to final products in a calendar month on a predetermined basis.

Page 38: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Research Hypothesis & Research Hypothesis & ValidationValidation

• Hypothesis is that Performance measurement scheme based on cost plus model of allocation of costs to the finished product is inadequate to evaluate the production process

• Regression analysis of Cost sheets of performance measurement for BOX N wagon unit cast wheel total Cost of wheel production(V5:dependent variable) linked to the manufacturing & non-manufacturing costs(independent variables V2:labor cost,V3:material costs,V4:total overheads costs)

Page 39: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Validation (continued)Validation (continued)

• Total cost of production for cast wheel V5= .02V2 + .778 V3 + .203 V4.

• This model indicates that total cost of wheel is primarily dependent on the costs of material (V3) and the total overheads (V4) with least impact of labor costs (V2) on the total cost of production.

• This does not indicate the inefficiencies in the processes or activities that contributes to high material and overhead costs towards the cost of wheel production.

• Good historical account of costs of production but is grossly inadequate for a process based manufacturing system that is in place at the wheel shop of the RWF.

Page 40: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Evolution of Performance Evolution of Performance measurement System for Wheel shopmeasurement System for Wheel shop

• Done with the articulation of the views of the stakeholders of the plant.

• Questionnaire with regard to the cost competitiveness of RWF products was administered to the stakeholders of the plant-selected at random.AnnexuresA1.doc

• Questionnaire on employee satisfaction was given to 110(one hundred and ten) respondents.AnnexuresA2.doc

• Total sample size surveyed in both the questionnaires was 150 out of 2355 employees of RWF (900 in wheel shop).

• 20(twenty) interviews were conducted on one to one basis with stakeholders.

• Stat Analysis of Basic Wheel Production data for 2005 captured. Research Hypothesis1.ppt.

Page 41: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

0.00

10000.00

20000.00

30000.00

40000.00

50000.00

60000.00

70000.00

80000.00

90000.00

100000.00

110000.00

120000.00

130000.00

140000.00

150000.00

160000.00

170000.00

CO

ST

IN R

s100

0'S

Dec-03 Jan-04 Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04

MONTH

WEIGHTED AVERAGE - WHEEL PRODUCTION COST SHEET

LABOUR

STOREST.O.H

TOTAL

Page 42: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

0

2000

4000

6000

8000

10000

12000

14000

16000

18000A

MO

UN

T (R

s)

APR-04 MAY-04 JUN-04 JUL-04

MONTH

AVERAGE COST REPORT per Wheel

LABOUR

STORES

T.O.H

UNIT RATE

Page 43: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

0

200

400

600

800

1000

1200

1400

1600A

MO

UN

T(R

s)

APR-04 MAY-04 JUN-04 JUL-04

MONTH

AVERAGE COST REPORT per Wheel

AOHCOHFOHSOHDEPAMTPENSION

Page 44: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process
Page 45: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process
Page 46: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process
Page 47: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process
Page 48: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Cost Competitiveness Survey

• Analysis can be segmented in FIVE segments for responses as rated on RWF efforts in these following areas

• Existing organizational structure• Adequacy of cost management systems• Vendor management• Buoyancy of internal business process systems• Employee Productivity levels

Page 49: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Stakeholders Response in Cost Competitiveness Survey

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5

Scale of Response

Num

ber o

f Res

pons

es(s

egm

ent

wis

e)

OrganizationalStructure

Costmanagement

Vendormanagement

Businessprocesses

Employeeproductivity

Page 50: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Research Analysis for Research Analysis for Stakeholders Responses to Cost Stakeholders Responses to Cost

Competitiveness surveyCompetitiveness survey• Respondents surveyed perceive on an average (greater

than 45%) that the organizational structure and employee productivity levels are GOOD and satisfactory to the challenges of cost competitiveness strategies

• Weighted mean response to questions in the segments on rating of internal business processes and organizational structural adequacy is 3.295 and 3.223 on a scale of 1 to 5

• Composite index of respondents’ perception of cost competitiveness strategies of RWF is 3.090,which corresponds to a satisfaction level as GOOD at the present efforts of RWF in this regard

Page 51: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Stakeholders rating of Internal Business processes at RWF

0

2

4

6

8

10

12

14

16

1 2 3 4 5Scale of Response

Num

ber o

f Res

pond

ents

Concern for process timemeasurement

Impact of continuousimprovement of productionprocess

Effectiveness of preventivemaintenance schedules

Effectiveness of continuousfeedback mechanism

Quantum and Impact ofresearch in-house to improvethe product

Page 52: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Rating of buoyancy of Internal Business Rating of buoyancy of Internal Business Process systems in Wheel ShopProcess systems in Wheel Shop

• Majority stakeholders (57%) are sanguine with regard to the efficacy of the internal business processes in place at their plant

• Weighted mean response (3.295) on the scale of 1 to 5

• Interviews confirmed the stakeholders’ belief they were doing well but they could not authoritatively say what performance indices of similar plants mean to be the best in the world

Page 53: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Stakeholders Rating of Cost Management at RWF

0

2

4

6

8

10

12

14

16

1 2 3 4 5

Scale of Response

Num

ber o

f Res

pond

ents

Elimination of non valueaddition activities

Effect of JIT in productioncosts reduction

Impact of productimprovement throughreduction in rework on costsUnderstanding of nonconformance costs ofproduction by all staff

Page 54: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Rating of Cost measurement Rating of Cost measurement and management as practiced and management as practiced

at RWFat RWF• Significant segment of respondents(18%)believed that

steps taken are poor and unsatisfactory• 28% rated the response as fair and somewhat

satisfactory• 21% each rated the present system as good and very

good • 12% the existing cost management system as excellent • Majority of the respondents interviewed(14 on

20)perceive that cost performance measurement can be improved with focus on process improvements to reduce manufacturing costs with elimination of non-value addition activities

Page 55: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Stakeholders rating of Vendor management at RWF

0

5

10

15

20

25

1 2 3 4 5

Scale of response

Num

ber o

f Res

pond

ents

Efforts at improvementsin vendor relationships

Encouragement to longterm vendor relationships

Effect of cumbersomeprocedures in buildingvendor relationships Vendor rating systemefficacy

Prequalified vendorssystem efficacy

Inventory management

Page 56: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Rating of Rating of Vendor ManagementVendor Management at at RWFRWF

• Stakeholders’ rating on steps taken by RWF to improve vendor management including inventory management evoked a mixed response-40% believed that existing system at vendor rating/inventory management is adequate

• 67% believed that it is the cumbersome procedures that dictate procurement in government that hinders better customer-supplier relationship rather than lack of managerial talent

• Majority stakeholders (55%) weighted mean response to current RWF attempts at vendor management is 2.80(only somewhat satisfactory) in the scale of 1 to 5

Page 57: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Employee Satisfaction survey at Wheel Shop,RWF

0

50

100

150

200

250

300

350

1 2 3 4Scale of response

Num

ber

of R

esponse

s(se

gm

ent w

ise)

Learning &Growthperspective

Motivationalissues

Page 58: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Learning and Growth perspectiveLearning and Growth perspectivefor Wheel shop employeesfor Wheel shop employees

• Employees Learning and Growth perspective at the Wheel shop of the plant was done for a total of 1100 responses

• Segmented in two categories-one is aspect of perceptions of Learning & Growth prospects and the second on Motivation available for the Wheel shop employees

• Weighted mean response; 2.9876 in a scale of 1-4, the majority of the employees are to a great extent satisfied with the opportunities provided for learning and growth in the Wheel shop of the plant as well as the schemes in place to foster Involvement and Motivation of the employees

• 56 out of 110 confirmed that they are in complete agreement to the view that they are actively encouraged to use innovative solutions to overcome problems in production line

Page 59: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Performance measurement system and Performance measurement system and

Activity cost drivers for Wheel shop, RWFActivity cost drivers for Wheel shop, RWF• Cost driver in the entire Wheel shop at present is the

HEAT. • In the Melt shop, the MELT tapped in the ladle in

Mt(metric tonnes) is the basic activity driver to be monitored and measured.

• The Mould room activity driver is Good wheels as cast .• The Cleaning room activity driver will be the number

of rough wheels processed into finished good wheels in a given time in first pass.

• Robust performance system will focus on activity drivers for each sub shop.

• Performance and cost measurement system will measure the input requirements of scrap which go into wheel production and calculating the output of good wheels .

Page 60: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Performance Measurement Performance Measurement Scheme For Wheel ShopScheme For Wheel Shop

• Set The Strategy:To produce low cost wheels• Melt shop: Melt quantity, &scrap melt loss measured• Mould room: Melt/heat in Mt qty returned, number of good wheels

cast, Pouring time/heat measured• Hot Wheel line: Sprue losses, hub cuts return measured• Cooling Yard: Wheels stacked >16 hours to be tracked• Cleaning room: Good wheels processed in 24 hours. Rejection of

wheels. Good wheels in first pass/Reworks• Establish review mechanism-persevere with measurements• CUSTOMER RESPONSE and Feedback to be established• Evaluation :What can be done to reduce Costs

Page 61: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Performance Measurement SchemePerformance Measurement SchemeWHEEL SHOPWHEEL SHOP

Melt shop: Melt quantity, &scrap melt loss measured.Mt/24 hour cycle, Energy per heat, materials/heat continue to measure

Mould room: Melt/heat in Mt qty returned, number of good wheels cast, Pouring time/heat measured.Consumables/heat, Pouring defect wheels, Risers, ladle temperatures to be measured as before.

Cooling Yard: Wheels stacked >16 hours to be tracked.

Cleaning room: Good wheels processed in 24 hours. Rejection of wheels. Good wheels in first pass/Reworks.

Final inspection

Good wheels

Scrap from Railways in Mt/heatReject wheels

Store depot

Input

stores

Returned stores

Page 62: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Transfer price mechanism for the Transfer price mechanism for the Wheel shop of RWFWheel shop of RWF

• Wheel shop in position of excess capacity with almost monopolistic market for the cast wheels

• Cost sensitivity in each of the sub shops through activity based incentive bonus mechanism

• Transfer price will be set at the Unit Cost basis of Melt as delivered by upstream shop-Melt and accepted by Mould

• Roughcast wheel is Cost in terms of the Melt quantity in Mt (metric tonnes)

Page 63: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Transfer price mechanism for the Transfer price mechanism for the Wheel shop of RWF(contd.)Wheel shop of RWF(contd.)

• Finished wheel is assigned the transfer price on the quantity of wheels processed in relation to the melt generated for that batch or HEAT

• Assignment of transfer price on the Melt and tracking the melt as it is transferred to the Mould /Cleaning room highlights inefficiencies in production of melt from scrap

• Transfer price of the melt in Cost/Mt and relating it to the finished product, the wheel, can be used to assign the incentive bonus to the Wheel shop-sub shop wise for activity based performance bonus scheme

• Incentive bonus amount proportionate to the savings made in transfer price savings for each set of sub shops settled in consultation with employees representatives on two part formula

Page 64: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Transfer price ModelTransfer price Model--Wheel shopWheel shop

Melt shop:Melt qty to be cost on Unit Mt of melt as transferred to Mould room

Mould room: Wheels cast measured per cost of Mt of melt. Value addition cost in this shop not attempted

Cleaning room: Transfer price per wheel measured as outcome of complete processing

Set Transfer price for MELT Compare MELT price to finish wheel cost.(Rs./Mt)

Inc.Bonus to MELT staff Inc.bonus to other than Melt staff on savings of Finish wheel price rather than

on savings at this Price fixed rate per finish good wheel as per current system

Page 65: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

BSC for Wheel shop, RWFBSC for Wheel shop, RWF

• Perspectives of Internal business processes, Learning& Growth derived from the evaluation of responses to the Questionnaires, interviews with key plant personnel & Performance measurement system

• Internal Business Processes PERSPECTIVE Objectives :

1. Increase the output Melt /Heat, optimize production2. Lowest cost producer of steel3. Value creation with suppliers4. Encourage innovation5. Ensure safety 6. Environment sustainability

Page 66: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Balanced ScoreCardBalanced ScoreCard--Internal Business Internal Business ProcessesProcesses for Wheel Shopfor Wheel Shop

• Measures1. No. of good wheels/heat,

maximizeYield,least rejects2. Employee cost/tonne of

melt3. Supplier rating4. Cost reduction from

innovation5. Accident/man day6. Reclamation savings

• Units1. Numbers, %

2. Rs./Mt of melt3. Index %4. Rs. in Crores5. %6. Rs. in Crores

Page 67: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Learning & Growth Perspective for Wheel shop

Objectives1. Enthused and happy employees2. Manage knowledge, training& development of employees

Measures1. Satisfaction Index2. Training records/Aptitude bank

Units1. % recorded

2. database

Targets & Initiatives are Deliberately kept open for the Wheel shop to take appropriate steps to adopt the BSC

Page 68: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

What should RWF do?What should RWF do?The Road AheadThe Road Ahead

I. Performance Cost Measurement§ Adoption of a performance measurement system

based on activity cost drivers specific to sub shops§ Focus of cost control shifts to activities in progress

and not a post mortem of allocation of costs to a manufactured product

§ Plant’s assessment of high input cost of production requires fixing of uniform administered price of scrap sourced at different rates from Zonal railways

§ Trimming of the high administrative overheads in procurement, personnel, finance inclusive of managerial cadre establishment costs

Page 69: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Recommendations(continued)Recommendations(continued)

II. Performance Bonus system§ Adoption of sub shop two part performance bonus

system for all Wheel shop staff on fixed rate / finished good wheel

§ Introduction of the Transfer price mechanism for wheel as it is handed over from the melt shop to the downstream shops

III. Vendor management§ Establish long term relationships with pre-

qualified, approved and reputed vendors of quality material

§ Just in Time Usage of pre-inspected quality material from credible and reputed vendors

§ Start as a pilot project for high value consumables

Page 70: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Recommendations(continued)Recommendations(continued)

IV. International collaboration and Performance benchmarks

§ Export subsidy to match reduction in manufacturing costs done by the plant

§ Reaffirm RWF performance indices are in line if not better than international cast railroad wheels manufacturers

§ Collaboration agreement with a reputed global partner, as a WIN-WIN strategy, to make a presence in the international railroad equipment and spares (wheels/axles) market

Page 71: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

Reach the DestinationReach the DestinationV. Organization restructuring and autonomy§ Redesign motivational packages as a PSU under GOI§ RWF can implement Employee Stock Options (ESOPs) § Memorandum of understanding can detail greater

devolution of financial, marketing and managerial autonomy to the plant

§ Assured delivery of first sale of products to the parent Ministry and the balance production for sale to trade at pricing policies to be ratified by the Board of Directors of the corporation

§ Equity holding to be listed(GOI can be principal shareholder)

§ Market forces will determine the viability or otherwise of this railroad consumables manufacturing unit

Page 72: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

FOOD FOR THOUGHTFOOD FOR THOUGHT

“Not everything that counts can be counted;not everything that can be counted counts.”

Albert Einstein

Page 73: Performance Measurement System for Wheel Shop Rail · PDF fileRAIL WHEEL FACTORY(RWF) • The Wheel & Axle Plant Project was thus ... manufacturing • Factory lay out ... • Process

THANK YOU