Rule 14-46.001 F.A.C. Page 1 of 3 FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016 UTILITY PERMIT PERMIT NO:__________________________________ STATE ROAD INFORMATION County: Section: State Road No: Beginning Mile Post: Ending Mile Post: APPLICANT INFORMATION The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant. Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________ Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________ City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________ Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________ WORK DESCRIPTION The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation. Utility Work No: ___________________________ Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No TRAFFIC CONTROL (TCP) The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2. MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT): Name: ________________________________ Telephone ________________________ Email: _______________________________ COMMENCEMENT OF WORK The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated. Anticipated Start Date: ___________________ Calendar days needed to completed: ________ Collier 2392636216 Florida 90 30 CenturyLink Collier (FMOC) 10/25/2021 27.103 3530 Kraft Road #100 601 34105 This work activity is associated US Army Corps of Engineers Project ID: W912EP20R0016 Design Build for Picayune Strand Conveyance Features Culverts under US-41 Culverts Parallel to US-41. This permit will involve installing approximately 380 LF of 2-2” Conduits w/BFO-48 and BT-25 by HDD to replace the existing BFO & BT cable that is in conflict with the proposed culverts. Installation of above ground features will be required as well. This permit is associated with CTL WA # N.878006. [email protected] 2021-H-192-00244 03010000 (239) 263-6216 ext. ______ CenturyLink Collier (FMOC) Naples [email protected] 27.323 Anthony Zawacky Approved 2021-H-192-00244 Harris Giddens 10/18/2021

PERMIT NO:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Rule 14-46.001 F.A.C. Page 1 of 3

FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016

UTILITY PERMIT

PERMIT NO:__________________________________

STATE ROAD INFORMATIONCounty: Section: State Road No: Beginning Mile Post: Ending Mile Post:

APPLICANT INFORMATIONThe Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.

Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________

Contact Person: _____________________________________ Contact Person: ______________________________________Address: _____________________________________ Address: ______________________________________

City: _____________________________________ City: ______________________________________State: _____ State: _____ Zip: _________ Zip: _________

Telephone: _____________________________________ Telephone: ______________________________________Email: ____________________________________ Email: ______________________________________

WORK DESCRIPTIONThe Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation._____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________Utility Work No: ___________________________

Additional sheets are attached and are incorporated into this permit Yes NoFor FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No

TRAFFIC CONTROL (TCP)

The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.

MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):Name: ________________________________ Telephone ________________________ Email: _______________________________

COMMENCEMENT OF WORKThe UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.

Anticipated Start Date: ___________________Calendar days needed to completed: ________

Collier

2392636216

Florida

90

30

CenturyLink Collier (FMOC)

10/25/2021

27.103

3530 Kraft Road #100

601

34105

This work activity is associated US Army Corps of Engineers Project ID:W912EP20R0016 Design Build for Picayune Strand Conveyance Features Culverts underUS-41 Culverts Parallel to US-41. This permit will involve installingapproximately 380 LF of 2-2” Conduits w/BFO-48 and BT-25 by HDD to replace theexisting BFO & BT cable that is in conflict with the proposed culverts.Installation of above ground features will be required as well. This permit isassociated with CTL WA # N.878006.

[email protected]

2021-H-192-00244

03010000

(239) 263-6216 ext. ______

CenturyLink Collier (FMOC)

Naples

[email protected]

27.323

Anthony Zawacky

Approved2021-H-192-00244

Harris Giddens10/18/2021

Rule 14-46.001 F.A.C.

Page 2 of 3Florida Department of TransportationUTILITY PERMIT

December 14, 2016

PERMIT NO:_________________________________

APPLICANT SIGNATUREBy the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.

Date Notified: Name of other facility owners (attach additional sheets if necessary)._____________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ __________________________________________________________________________________________________

Utility Agency/Owner Utility Builder (when applicable)

Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________Name (printed): _____________________________________________ Name (printed): __________________________________________Title: ______________________________________________________ Title: ___________________________________________________

FDOT PROJECT INFORMATIONPursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits: _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________

FDOT SPECIAL INSTRUCTIONSIn accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit. __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________

Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No

PERMIT APPROVALBy signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.

Approving Engineer: _____________________________________________ Date: _______________Name: _____________________________________________

Title:______________________________________________

Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________

An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes NoRep. Name: _____________________________ Telephone _____________________ Email: _____________________________

10/18/2021

Joe Golden of Ferrovial Services must be contacted at least 2 business days inadvance of start of work at 281-740-2859 or 239-234-6500.

No Lane Closure Restrictions (Rural)

To our knowledge, there is no existing ITS/ATMS infrastructure within the limitsof this project.

10/15/2021

(239) 985-7856 ext. ______ [email protected]

Harris Giddens

Harris Giddens (digital signature)

[email protected]

DEBORAH GADOURY (digital signature)

Comcast10/15/2021Collier County Water and Sewer10/15/2021Crown Castle10/15/2021Summit Broadband10/15/2021Lee County Electric Co-op10/15/2021

DEBORAH GADOURY

2392346500Hugh Golden

Consultant Staff - MS1-96

2021-H-192-00244

There are NO FDOT constructions (proposed or underway).This work is NOT related to an approved Utility Work Schedule.

Approved2021-H-192-00244

Harris Giddens10/18/2021

Rule 14-46.001 F.A.C.

Page 3 of 3Florida Department of TransportationUTILITY PERMIT

December 14, 2016

PERMIT NO:_________________________________

CERTIFICATIONI, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.

Utility Agency/Owner Utility Builder (when applicable)

Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________Name (printed): _____________________________________________ Name (printed): ____________________________________________Title: ______________________________________________________ Title: ____________________________________________________

FINAL INSPECTION OF WORKThe work was inspected and found to be in non-compliance as noted below: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.

FDOT Inspector: _____________________________________________ Date: _______________Name: _____________________________________________

Title: ______________________________________________

2021-H-192-00244

Approved2021-H-192-00244

Harris Giddens10/18/2021

October 15, 2021

Ms. Jessica White, P.E.Ft. Myers Operation Center2981 NE Pine Island RoadCape Coral, FL 33909

RE: This work activity is associated US Army Corps of Engineers Project ID:W912EP20R0016 Design Build for Picayune Strand Conveyance Features Culvertsunder US-41 Culverts Parallel to US-41. The proposed work activity is locatedwithin the western r/w of US-41 (SR-90) and approximately 860 LF southeast ofTomato Rd. This permit will involve installing approximately 380 LF of 2-2”Conduits w/BFO-48 and BT-25 by HDD to replace the existing BFO & BT cable thatconflicts with the proposed culverts construction. Installation of above groundfeatures at HDD entry/exit points will be required as well. This permit is associatedwith CTL WA # N.878006.

Section: #03010000County: Collier

Dear Ms. White:

CenturyLink requests permission to construct, operate, and maintain buried telecommunicationfacilities within the project limits listed above. Please refer to the following permit submittal forapproval.

By copy of this letter the following utilities have been notified:

Collier County Water and SewerComcastCrown Castle

Lee County Electric Co-opSummit Broadband

Please address any questions concerning the permit drawings to Bill Case at (813) 558-3303 oremail [email protected] or Anthony Zawacky CenturyLink at (239) 263-6216 oremail [email protected]

CenturyLink3530 Kraft Road Suite #100Naples, FL 34105

Sincerely,

Anthony ZawackySenior Network Engineer

Approved2021-H-192-00244

Harris Giddens10/18/2021

CENTURYLINK (LOCAL)MARK-UPS PROVIDED BY:

36" DOC

PEDESTAL/OPTI-PED

HAND HOLE/VAULT/PULL BOX

UNDERGROUND CABLE MARKER

DEPTH OF COVER

BT(B)

BFOT(B)

LEGEND

BURIED TELEPHONE QUALITY LEVEL B

BURIED FIBER-OPTIC TELEPHONE QUALITY LEVEL B

100 BT / TO REMAINCTL /

UTILITY DISPOSITION

PLACEMENTRESPONSIBILITY

TYPE OF UTILITY

UTILITY OWNER

CTL = CENTURYLINK

PROPOSED DRAINAGE (BY OTHERS)

INDEX OF UTILITY PLANS

SHEET NO. SHEET DESCRIPTION

1 KEY SHEET2 PLAN & PROFILE VIEW

NFV = NOT FIELD VERIFIED

CTL

WC: MOI

SFLX

A 68

-016

3.07

RGB

MAR

K-U

PS (US A

RMY

COR

PS O

F E

NGI

NEERS C

ONVEYA

NCE F

EAT

URES C

ULV

ERTS

UNDER U

S 4

1) -

COL

LIER C

OUNTY

10

/15/

2021

U

RED = (a) TO BE REMOVED OR RELOCATED HORIZONTALLY,(b) TO BE PLACED OUT-OF-SERVICE (DEACTIVATED)

BUT LEFT IN PLACE OR REMOVE WHERE ACCESSIBLE,(c) NOT IN SERVICE BUT LEFT IN PLACE OR REMOVE

WHERE ACCESSIBLE,

GREEN = TO REMAIN IN PLACE WITH NO ADJUSTMENT

BROWN = (a) PROPOSED TO BE INSTALLED(b) EXISTING TO BE ADJUSTED VERTICALLY,

BUT REMAIN IN SAME HORIZONTAL ALIGNMENT

Approved2021-H-192-00244

Harris Giddens10/18/2021

4.01

W W

6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D)6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D)6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D)6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D) 6in FM (D)

8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C)8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C)8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C)8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C) 8in WM (C)

817 818 819 820 821 822 823

57" DOC

64" D

OC

58" DOC

78" DOC

69" DOC

66" DOC

63" DOC

63" DOC

66" D

OC

68" D

OC

65" D

OC

55" DOC

60

" DOC

53" DOC

65" DOC

63" DOC

64" DOC

U

UG MARKER(TO BE REMOVED)

60" DOC

63" DOC

75" D

OC

72" DOC

81" DOC

44" D

OC

40" D

OC

39" D

OC

39" D

OC

30" D

OC

30" D

OC

24" D

OC

33" D

OC

33" DOC

32" D

OC

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B) BFOT(B)

BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)BFOT(B)

25 BT / PLACE OUT-OF-SERVICECTL-LOCAL /

36 BFOT / PLACE OUT-OF-SERVICECTL-LOCAL /

PROPOSEDCTL-LOCALPEDESTAL

PROPOSEDCTL-LOCALHAND HOLE

25 BT / TO REMAINCTL-LOCAL /

36 BFOT / TO REMAINCTL-LOCAL /

PROPOSEDCTL-LOCALPEDESTAL

PROPOSEDCTL-LOCAL

HAND HOLE

25 BT / TO REMAINCTL-LOCAL /

36 BFOT / TO REMAINCTL-LOCAL /

34'

116'

15.2'39.8'

39.8'

STA. 818+00, 34' RTBEGIN BORE

STA. 821+80, 34' RTEND BORE

APPROX

. TEMP

MOT R

OAD LIM

ITS

US 41 (TAMIAMI TRAIL)

110'

25.6'

21'

25.7'

20.5'

110'

APPROX. 860' TOTOMATO ROAD

APPROX. 5,840 LF TOSAN MARCO RD (CR 92)

PROPOSED 380 LF BORE AT 10' MIN.BELOW BOTTOM OF CULVERTS(2) 2" CONDUITS WITH 25 BT & 48 BFOT (CTL-LOCAL)

200' R

/W15

0'50

'14

7'53

'13

1'

35'

34'

3'

BFOT(B)BFOT(B)

10' MIN

.

10' MIN

.

10' MIN

.

12°

12°

PROPOSED BOX CULVERT(BY OTHERS)

PROPOSED BOX CULVERT(BY OTHERS)

PROPOSED BOX CULVERT(BY OTHERS)

EXIST. GRADE ATPROPOSED ALIGNMENT

EXIST. BT & BFOT(TO REMAIN)

EXIST. BT & BFOT(TO REMAIN)

PROPOSEDPEDESTAL

PROPOSEDHAND HOLE PROPOSED

PEDESTALPROPOSED

HAND HOLE

PROFILE VIEWSCALE: 1" = 40' HORIZ.

1" = 8' VERT.

818+00 819+00 820+00 821+00 822+00 823+00

PROPOSED 380 LF BORE AT 10' MIN.BELOW BOTTOM OF CULVERTS(2) 2" CONDUITS WITH 25 BT & 48 BFOT (CTL-LOCAL)

PLAN & PROFILE VIEW

N

1" =

40'

US ARMY CORPS OF ENGINEERSJACKSONVILLE DISTRICT CONTRACT PLANS

ROAD NO. COUNTY FINANCIAL PROJECT ID

DESCRIPTIONDATE DESCRIPTION DATEREVISIONS

SHEETNO.

C:\68 Projects\68-0163.00 LUMEN FL NPLS\68-0163.07 US41 and CR92 USACE Culverts RGB Permitting\Drawings\ROW Permit\68-0163.07 ROW Permit_CTL-Local.dwgDuarte, Alvaro 10/15/2021 2:12:05 PM

  

 

  

  

US 41 W912EP20R0016 2 

 

 

  

  

COLLIER

   

0

8

4

-4

-8

-12

-16

0

8

4

-4

-8

-12

-16

Approved2021-H-192-00244

Harris Giddens10/18/2021

N.878006RELO - NPSE ATC CULVERTS US-41 & CR 92

MOSIFLXA

11-16-2021

NAPLESANTHONY ZAWACKY239-263-6216

CODY BECKERAYRES ASSOCIATES

DAVID EUBANKS239-920-5937

DAVID EUBANKS239-920-5937

95412851S27E N.T.S. 1 3

1

10/15/2021

NAPLES, FL - US 41THIS PROJECT IS REQUIRED TO PLACEAPPROXIMATELY 380' OF BFO48, BFC25-24, & BFO192ALONG US 41 TO RESOLVE CONFLICTS WITH US ARMYCORPS PROJECT #W912EP20R0016 INSTALLATION OFBOX CULVERTS UNDER ROAD. THIS PROJECTPROPOSED REMOVAL/PLACEMENT OF FACILITIESIMPACTED BY THE PROPOSED BOX CULVERTS.

YES YES YES

NO

Approved2021-H-192-00244

Harris Giddens10/18/2021

AutoCAD SHX Text
PEDESTAL
AutoCAD SHX Text
HAND HOLE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
REMOVE
AutoCAD SHX Text
PROPOSED CTL BURIED CABLE (OPEN TRENCH)
AutoCAD SHX Text
PROPOSED CTL CONDUIT (DIRECTIONAL BORE)
AutoCAD SHX Text
EXISTING CTL BURIED CABLE
AutoCAD SHX Text
EXISTING CTL BURIED FIBER-OPTIC CABLE
AutoCAD SHX Text
EXISTING CTL BURIED CABLE (RETIRE IN PLACE)
AutoCAD SHX Text
EXISTING CTL BURIED FIBER-OPTIC CABLE (RETIRE IN PLACE)
AutoCAD SHX Text
ABBREVIATIONS: BFC = BURIED FILLED COPPER BFO = BURIED FIBER-OPTIC
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
CENTERLINE OF ROAD
AutoCAD SHX Text
WHITE LINE/EDGE OF TRAVEL
AutoCAD SHX Text
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT. THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF LUMEN BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.
AutoCAD SHX Text
ENGINEERING CONTACT
AutoCAD SHX Text
CONTRACT ENGINEER
AutoCAD SHX Text
TOWNSHIP:
AutoCAD SHX Text
RANGE:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
COMPANY:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
FW PROJECT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
DESC:
AutoCAD SHX Text
SECTION:
AutoCAD SHX Text
WC CLLI:
AutoCAD SHX Text
CONSTRUCTION COORDINATOR
AutoCAD SHX Text
COMMUNITY NAME
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
CITY:
AutoCAD SHX Text
EXCH KEY:
AutoCAD SHX Text
REM KEY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
Held Order Information
AutoCAD SHX Text
Narrative/Special Remarks
AutoCAD SHX Text
Job Location:
AutoCAD SHX Text
Service Order #
AutoCAD SHX Text
Customer Name:
AutoCAD SHX Text
Customer Address:
AutoCAD SHX Text
Customer Terminal:
AutoCAD SHX Text
Misc. Information
AutoCAD SHX Text
List all associated projects
AutoCAD SHX Text
Site Location ID # (BVAPP)
AutoCAD SHX Text
Right of Way Required
AutoCAD SHX Text
State Permit Required
AutoCAD SHX Text
County Permit Required
AutoCAD SHX Text
City Permit Required
AutoCAD SHX Text
Additional Permit Information
AutoCAD SHX Text
Trench Open Date:
AutoCAD SHX Text
Cut Sheets:
AutoCAD SHX Text
FW Contracts:
AutoCAD SHX Text
RZ
AutoCAD SHX Text
CZ
AutoCAD SHX Text
Cable Assignment:
AutoCAD SHX Text
F1:
AutoCAD SHX Text
F2:
AutoCAD SHX Text
Cross Connect:
AutoCAD SHX Text
WFMT PROJECT
AutoCAD SHX Text
NOTIFY CONVERSATION NUMBER
AutoCAD SHX Text
DEVELOPER CONTACT
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
SPLICING COORDINATOR
AutoCAD SHX Text
ECD:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Permit Information
AutoCAD SHX Text
SHEET 2

4.01

U

N.878006RELO - NPSE ATC CULVERTS US-41 & CR 92

MOSIFLXA

11-16-2021

NAPLESANTHONY ZAWACKY239-263-6216

CODY BECKERAYRES ASSOCIATES

DAVID EUBANKS239-920-5937

DAVID EUBANKS239-920-5937

95412851S27E 1" = 40' 2 3

1

10/15/2021

Approved2021-H-192-00244

Harris Giddens10/18/2021

AutoCAD SHX Text
UG MARKER (TO BE REMOVED)
AutoCAD SHX Text
PROPOSED CTL-LOCAL PEDESTAL
AutoCAD SHX Text
PROPOSED CTL-LOCAL HAND HOLE
AutoCAD SHX Text
PROPOSED CTL-NATIONAL HAND HOLE
AutoCAD SHX Text
PLACE 380 LF OF (2) 2" CONDUITS WITH BFO192 (CTL-NATIONAL) & 380 LF OF (2) 2" CONDUITS WITH BFO48 & BFC25-24 (CTL-LOCAL) BY DIRECTIONAL BORE AT 10' MIN. BELOW BOTTOM OF CULVERTS (ELEV. -11.5')
AutoCAD SHX Text
PROPOSED CTL-LOCAL PEDESTAL
AutoCAD SHX Text
PROPOSED CTL-LOCAL HAND HOLE
AutoCAD SHX Text
PROPOSED CTL-NATIONAL HAND HOLE
AutoCAD SHX Text
817
AutoCAD SHX Text
818
AutoCAD SHX Text
819
AutoCAD SHX Text
820
AutoCAD SHX Text
821
AutoCAD SHX Text
822
AutoCAD SHX Text
823
AutoCAD SHX Text
<-12663
AutoCAD SHX Text
6087->
AutoCAD SHX Text
BFO192
AutoCAD SHX Text
<-12663
AutoCAD SHX Text
<-12663
AutoCAD SHX Text
6087->
AutoCAD SHX Text
6087->
AutoCAD SHX Text
BFO192
AutoCAD SHX Text
BFO192
AutoCAD SHX Text
NOTES: 1. DIG & EXPOSE BFO. DIG & EXPOSE BFO. CUT & SWING INTO PROPOSED HAND HOLE.
AutoCAD SHX Text
DIG & EXPOSE 15 LF OF BT CABLE. CUT & SWING INTO PROPOSED PED.
AutoCAD SHX Text
DIG & EXPOSE 15 LF OF BT CABLE. CUT & SWING INTO PROPOSED PED.
AutoCAD SHX Text
US 41
AutoCAD SHX Text
1
AutoCAD SHX Text
LD#1 (LOCAL) WBJ = 10 WBD = 1 WBHF = 2 BFO48 = 10 BFO48C = 60 BFO48C = 60 BM2C = 2 BM2D = 2 BM2E(6)A = 10 BM2E(6)B = 5 H01(145-288) = 36 BHF(30X48X36) = 1 BM53PL(8) = 1 HBSO(9.8X24) = 1 BD5 = 1 BFC25 = 15 HC1(>100) = 25 BM2(5/8)8 = 2
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
LD#2 (NATIONAL) BHF(30X48X36)=1 BM53PL(8) = 1 NOTE: BURY HH 2' BELOW GRADE
AutoCAD SHX Text
LD#3 (NATIONAL & LOCAL) BM60(2)2PD = 380 BM60(2)2PD = 380 BFO48C = 380 BFC25C = 380 XXBM53
AutoCAD SHX Text
LD#4 (LOCAL) WBJ = 10 WBD = 1 WBHF = 2 BFO48 = 10 BFO48C = 60 BFO48C = 60 BM2C = 2 BM2D = 2 BM2E(6)A = 10 BM2E(6)B = 5 H01(145-288) = 36 BHF(30X48X36) = 1 BM53PL(8) = 1 HBSO(9.8X24) = 1 BD5 = 1 BFC25 = 15 HC1(>100) = 25 BM2(5/8)8 = 2
AutoCAD SHX Text
LD#5 (NATIONAL) BHF(30X48X36)=1 BM53PL(8) = 1 NOTE: BURY HH 2' BELOW GRADE
AutoCAD SHX Text
6087-> EWOMGR_25_24
AutoCAD SHX Text
<-12663 XX-XXXXXX-036
AutoCAD SHX Text
BFO192
AutoCAD SHX Text
EXIST. WETLAND LINE
AutoCAD SHX Text
10' MULTI-TRAIL
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT. THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF LUMEN BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.
AutoCAD SHX Text
TOWNSHIP:
AutoCAD SHX Text
RANGE:
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
DESC:
AutoCAD SHX Text
SECTION:
AutoCAD SHX Text
WC CLLI:
AutoCAD SHX Text
EXCH KEY:
AutoCAD SHX Text
REM KEY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
ECD:
AutoCAD SHX Text
ENGINEERING CONTACT
AutoCAD SHX Text
CONTRACT ENGINEER
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
COMPANY:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
FW PROJECT
AutoCAD SHX Text
CONSTRUCTION COORDINATOR
AutoCAD SHX Text
COMMUNITY NAME
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
CITY:
AutoCAD SHX Text
WFMT PROJECT:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
SPLICING COORDINATOR

N.878006RELO - NPSE ATC CULVERTS US-41 & CR 92

MOSIFLXA

11-16-2021

NAPLESANTHONY ZAWACKY239-263-6216

CODY BECKERAYRES ASSOCIATES

DAVID EUBANKS239-920-5937

DAVID EUBANKS239-920-5937

95412851S27E 1" = 40' 3 3

1

10/15/2021

Approved2021-H-192-00244

Harris Giddens10/18/2021

AutoCAD SHX Text
0
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
-4
AutoCAD SHX Text
-8
AutoCAD SHX Text
-12
AutoCAD SHX Text
12%%D
AutoCAD SHX Text
12%%D
AutoCAD SHX Text
PROPOSED BOX CULVERT (BY OTHERS)
AutoCAD SHX Text
PROPOSED BOX CULVERT (BY OTHERS)
AutoCAD SHX Text
PROPOSED BOX CULVERT (BY OTHERS)
AutoCAD SHX Text
EXIST. GRADE AT PROPOSED ALIGNMENT
AutoCAD SHX Text
EXIST. BT & BFOT (TO REMAIN)
AutoCAD SHX Text
EXIST. BT & BFOT (TO REMAIN)
AutoCAD SHX Text
PROPOSED PEDESTAL
AutoCAD SHX Text
PROPOSED HAND HOLE
AutoCAD SHX Text
PROPOSED PEDESTAL
AutoCAD SHX Text
PROPOSED HAND HOLE
AutoCAD SHX Text
PROFILE VIEW SCALE: 1" = 40' HORIZ. 1" = 8' VERT.
AutoCAD SHX Text
0
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
-4
AutoCAD SHX Text
-8
AutoCAD SHX Text
-12
AutoCAD SHX Text
-16
AutoCAD SHX Text
818+00
AutoCAD SHX Text
819+00
AutoCAD SHX Text
820+00
AutoCAD SHX Text
821+00
AutoCAD SHX Text
822+00
AutoCAD SHX Text
-16
AutoCAD SHX Text
PLACE 380 LF OF (2) 2" CONDUITS WITH BFO192 (CTL-NATIONAL) & 380 LF OF (2) 2" CONDUITS WITH BFO48 & BFC25-24 (CTL-LOCAL) BY DIRECTIONAL BORE AT 10' MIN. BELOW BOTTOM OF CULVERTS (ELEV. -11.5')
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT. THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF LUMEN BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.
AutoCAD SHX Text
TOWNSHIP:
AutoCAD SHX Text
RANGE:
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
DESC:
AutoCAD SHX Text
SECTION:
AutoCAD SHX Text
WC CLLI:
AutoCAD SHX Text
EXCH KEY:
AutoCAD SHX Text
REM KEY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
ECD:
AutoCAD SHX Text
ENGINEERING CONTACT
AutoCAD SHX Text
CONTRACT ENGINEER
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
COMPANY:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
FW PROJECT
AutoCAD SHX Text
CONSTRUCTION COORDINATOR
AutoCAD SHX Text
COMMUNITY NAME
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
CITY:
AutoCAD SHX Text
WFMT PROJECT:
AutoCAD SHX Text
NAME:
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
SPLICING COORDINATOR

Approved2021-H-192-00244

Harris Giddens10/18/2021

FLORIDA DEPARTMENT OF TRANSPORTATION CHARLIE CRIST GOVERNOR

STEPHANIE KOPELOUSOS SECRETARY

District One * Bartow Maintenance Office2740 State Road 60 West * Bartow, FL 33830-8749

(863) 519-4300 * (863) 534-7067 (Fax) * MS 1-84www.dot.state.fl.us

UTILITY PERMIT CHECKLIST

This checklist must be completed and submitted with the permit.

ITEMS TO BE COMPLETED ON THE PERMIT APPLICATION (REV 10/02)

(Please check ( ) the boxes when completing)

1. Ensure name of applicant (this must be owner of the utility or public body or corporation responsible for utility)and corporate seal appear on the permit application.

2. State Road number, section number and milepost of proposed work must appear on application.

3. Scope of work must be written on front of permit. This must agree with the information on the drawings.

**NOTE Special conditions and Special Instructions area on permit application shall be leftblank. This is for department use only.

4. Must have 4 copies of application package with drawings. Must have original signatures on (8) of them. Plansshall be on 11”x 17” multipurpose paper on a scale no smaller than l”=50’ as required in the plans preparationmanual.

5. Must list all known utility owners in the area. Attach copy of written notices to utilities.

MINIMUM ENGINEERING INFORMATION REQUIRED

1. Plan view of proposed work (Only sheets pertaining to the Department’s R/W will be accepted).

A. Show offset distance of installation from edge of travel lane (white line), and from the right of way line.

B. Show existing pavement width, including auxiliary lanes and medians.

C. Show distances to FDOT R/W limits on both sides of state road.

D. Show offset distances of existing utilities in relation to proposed installation.

Approved2021-H-192-00244

Harris Giddens10/18/2021

Utility & Right of Way ChecklistPage 2 of 2

www.dot.state.fl.us

E. Furnish cross-sections of proposed installations showing existing utilities. Show offset and depthdimensions of proposed and existing utilities. Sometimes more than one cross section may be requiredto accurately reflect the proposed work. When showing jack and bore installations, the distance fromend of casing to the edge of pavement must be shown. Also, depth from roadway surface to the top ofcasing must be shown.

F. List materials to be used (pipe size, wall thickness, type, cable size, etc.)

G. List method of installation (open trench, pole-mounted attachment, directional bore, etc.)

H. Letter of authorization from property owners is required if driveways or parking lots have to be opencut. Show all open cuts on plans.

2. Maintenance of traffic to be submitted by someone that holds the new work zone traffic control advancedtraining certification. All work zones to be set up and maintained by someone that has the work zone trafficcontrol intermediate level training. This is required as of January 2002. Please furnish copies of the certification.

**NOTE** Show method of Right of Way restoration. Sod is required. Seed and mulch may beacceptable on a case-by-case basis. Must be approved during the review stages of thepermit.

All permit applications are field reviewed for accuracy. Providing additional detail in thepermit data submitted reduces the possibility of requests for additional information orclarification.

Rev. 10/07/02

Approved2021-H-192-00244

Harris Giddens10/18/2021

FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE

FORT MYERS OPERATIONS CENTER2981 N.E. PINE ISLAND ROAD

CAPE CORAL, FL 33909PHONE: (239) 656-7800 / FAX: (239) 656-7742

PLEASE PRINT ON LEGAL SIZE PAPER

PERMIT APPLICATION DATA REV. 01-

2006

A Department of Transportation permit is required before any facility is installed on the right-of-way,whether it is for aerial or underground installations, special provisions for exceptions are outlined in theutility accommodation guide.

Permittee: CenturyLink

Company Engineer: Anthony Zawacky Phone: (239) 263-6216

1. SR # 90 US # 41 SR Section 010000Local Name of Road / Street: Tamiami Trail

2. Proposed: copper & fiber cable to, parallel, cross/or both in ROW of a state road within city limits of Naples orbetween cities of and in the county of Collier.

3. Submit a plan and cross-section view of proposed construction. Separate cross-sections are required at eachchange in lateral alignment.

4. Proposed utility to be in ROW for distance of 380 feet Starting at 860 FT North South East West from C/L of Tomato Rd Ending at 5,840 FT North South East West from C/L of San Marco(give location, such as dedicated streets or cross-roads, number of feet to such location)

5. Distance from proposed utility to the edge of pavement: Apprx., 15 - 25 FT

6. Distance from proposed utility to the ROW line: Apprx., 110 - 116 FT

7. Width of ROW on each side of C/L of pavement: 50 FT North South East Westand 0 FT North South East West

8. Width of pavement: 35 FT

9. Width of median (typical, if applicable): n/a FT

10. Width of sidewalk: 6 FT

11. Does the proposed installation include above ground appurtenance? Yes No 8 CU FT

12. Is the appurtenance located at the ROW line? Yes No

13. Will conduit or casing be utilized in placement of proposed utility? Length 380 (pavement width +16 FTminimum) Wall thickness: 0.216

14. Will existing utility be removed? Yes No If so, what and how much?

15. Will any existing facilities be used to place the proposed utility? Yes No If so, what? Pedestals, Handholes

16. If utility is a natural gas line, give maximum operating pressure: N/A PSI Provisions for venting:

17. Submittal all other utilities on cross-section maps. Make separate cross-section details for each change inlocation, and repeat items five (5) and ten (10).

18. Will any highway pavement be cut? Yes No

19. Indicate approximate location, depth and sizes of all utilities within ROW limits. Submit name of owners andcity or town from which they operate. Collier County Water and Sewer, Comcast, Lee County Co-op, SummitBroadband and Crown Castle

ADDITIONAL COMMENTS:

Approved2021-H-192-00244

Harris Giddens10/18/2021

Title: NNPL 2370 VANDERBILT BEACH

Location: Naples

Engineer: Walter AlvarezTownship/Taxcode

Manager:

1100 - Collier

Brian Whaley

Exchange:

NNPL7408

CO:NNPL

Map:

Scale: Phone:239-263-6222

WO Create:

04/02/2007

Print Date:

05/03/2007

Work Order:

39220289

Sheet: Of:1 2

QUAZITE BOX & COVER ASSEMBLY (30"x48"x18")

- ALL DIMENSIONS ARE IN INCHES UNLESS OTHERWISE SPECIFIED

CenturyLink

Approved2021-H-192-00244

Harris Giddens10/18/2021

Title: MARBELLA ISLES FIBER FEEDER

Location: Naples

Engineer: Walter AlvarezTownship/Taxcode

Manager:

1100 - Collier

Brian Whaley

Exchange:

NNPL7408

CO:NNPL

Map:

Scale: Phone:239-263-6222

WO Create:

01/01/2015

Print Date:

01/01/2015

Work Order:

39220289

Sheet: Of:6 6

QUAZITE BOX & COVER ASSEMBLY (30"x60"x31")

- ALL DIMENSIONS ARE IN INCHES UNLESS OTHERWISE SPECIFIED

CenturyLink

Approved2021-H-192-00244

Harris Giddens10/18/2021

10/5/21, 10:17 AM Exactix

https://exactix.sunshine811.com/findTicketByNumberAndPhone(print:print/ticketText) 1/2

Ticket : 278102389 Rev:000 Taken: 10/05/21 10:07ET

State: FL Cnty: COLLIER GeoPlace: NAPLES CallerPlace: NAPLES Subdivision:

Address : Street : US 41 Cross 1 : TOMATO RD Within 1/4 mile: Y

Locat: DESIGN REQUEST FOR R/O/W TO R/O/W ON US 41 STARTING AT A POINT OF 840FT SE OF TOMATO RD GOING SE ON US 41 FOR 400FT : Remarks : IN RESPONSE TO RECEIPT OF A DESIGN TICKET, SSOCOF PROVIDES THE ORIGINATOR OF THE DESIGN TICKET WITH A LIST OF SSOCOF MEMBERS IN THE VICINITY OF THE DESIGN PROJECT. SSOCOF DOES NOT NOTIFY SSOCOF MEMBERS OF THE RECEIPT BY SSOCOF OF A DESIGN TICKET. IT IS THE SOLE RESPONSIBILITY OF THE DESIGN ENGINEER TO CONTACT SSOCOF MEMBERS TO REQUEST INFORMATION ABOUT THE LOCATION OF SSOCOF MEMBERS' UNDERGROUND FACILITIES. SUBMISSION OF A DESIGN TICKET WILL NOT SATISFY THE REQUIREMENT OF CHAPTER 556, FLORIDA STATUTES, TO NOTIFY SSOCOF OF AN INTENT TO EXCAVATE OR DEMOLISH. THAT INTENT MUST BE MADE KNOWN SPECIFICALLY TO SSOCOF IN THE MANNER REQUIRED BY LAW. IN AN EFFORT TO SAVE TIME ON FUTURE CALLS, SAVE YOUR DESIGN TICKET NUMBER IF YOU INTEND TO BEGIN EXCAVATION WITHIN 90 DAYS OF YOUR DESIGN REQUEST. THE DESIGN TICKET CAN BE REFERENCED, AND THE INFORMATION ON IT CAN BE USED TO SAVE TIME WHEN YOU CALL IN THE EXCAVATION REQUEST. *** LOOKUP BY MANUAL *** : Grids : 2600C8136C 2600D8136C

Work date: 10/05/21 Time: 10:02ET Hrs notc: 000 Category: 6 Duration: UNKNOWN Due Date : 10/07/21 Time: 23:59ET Exp Date : 11/04/21 Time: 23:59ET Work type: DESIGN Boring: N White-lined: N Ug/Oh/Both: U Machinery: N Depth: UNK Permits: N N/A Done for : DESIGN

Company : AYRES ASSOCIATES Type: OTHR Co addr : 8875 HIDDEN RIVER PKWY Co addr2: SUITE 200 City : TAMPA State: FL Zip: 33637 Caller : MARIA BAUCOM Phone: 813-978-8688 Ext: 3365 BestTime: 8-5 Mobile : 813-924-4182 Fax : 813-978-9369 Email : [email protected]

Submitted: 10/05/21 10:07ET Oper: SHE Mbrs : CNTL01 CPW592 CTV413 L3C900 LCC295 NN1882 OTC811

Approved2021-H-192-00244

Harris Giddens10/18/2021

10/5/21, 10:17 AM Exactix

https://exactix.sunshine811.com/findTicketByNumberAndPhone(print:print/ticketText) 2/2

* Responses are current as of 10/05/2021 10:17 AM

No CENTURYLINKCNTL01

FIBER, TELEPHONE BILL MCCLOUD(850) 599-1444

THOMAS STURMER(720) 578-8090

TAC CENTER(800) 778-9140

No COLLIER COUNTYSTAKE & LOCATESCPW592

SEWER, WATER ERIC FEY(239) 252-1037

COLLIER COUNTYSTAKES & LOCATES(239) 252-5924

AFTER 5:00 PM /ON-CALL LOCATOR(239) 825-1444

No COMCASTCTV413

CATV JOSH DAVIS(239) 253-7642

HFC HELP DESK(855) 962-8525

No CENTURYLINKL3C900

FIBER NETWORKRELATIONS(877) 366-8344 x2

TECH ON DUTY(877) 366-8344 x3

TECH ON DUTY(877) 366-8344 x3

No LEE COUNTYELECTRIC CO-OPLCC295

ELECTRIC, STREETLIGHTS

TOM BAILEY(239) 656-2414

STEWART DUNLAP(239) 656-2419

BRIAN WILT(239) 340-4108

No CROWN CASTLE NGNN1882

FIBER FIBERDIG TEAM(888) 632-0931 x2

CROWN CASTLEFIBER NOC(855) 933-4237 x1

No SUMMITBROADBANDOTC811

FIBER, TELEPHONE MICHELLE DANIEL(407) 996-1183

JASON ZOFFINGER(727) 403-4913

NETWORKOPERATION CENTER(407) 996-1188

Ex. Circum Service Area Utility Type(s) Contact Alt. Contact Emergency Contact Positive Response

Approved2021-H-192-00244

Harris Giddens10/18/2021