80
PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF THE FINANCE DIRECTOR PESCO, PESHAWAR No: 279 /FD/PESCO/CP&C Dated: 26/06/2013 Registrar National Electric Power Regulatory Authority, 2" d Floor, OPF Building G-5/2, Islamabad. Subject: TARIFF PETITION FOR FY 2013-14 Enclosed please find herewith Tariff petition for FY 2013-14 along with Tariff Petition fee amounting to Rs.699,540/- after deduction of Income Tax Rs. 44,652/- vide , cheque no. 17933416 dated 26-06-2013, copy of Board Resolution and Affidavit duly signed by the undersigned for further necessary action. Encl: As Above. Chief Executive Officer PESCO, Peshawar Tel: 9212025 Fax: 9212335/9211987

PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

  • Upload
    duongtu

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED

OFFICE OF THE FINANCE DIRECTOR PESCO, PESHAWAR

No: 279 /FD/PESCO/CP&C Dated: 26/06/2013

Registrar National Electric Power Regulatory Authority, 2"d Floor, OPF Building G-5/2, Islamabad.

Subject: TARIFF PETITION FOR FY 2013-14

Enclosed please find herewith Tariff petition for FY 2013-14

along with Tariff Petition fee amounting to Rs.699,540/- after deduction

of Income Tax Rs. 44,652/- vide , cheque no. 17933416

dated 26-06-2013, copy of Board Resolution and Affidavit duly signed

by the undersigned for further necessary action.

Encl: As Above.

Chief Executive Officer PESCO, Peshawar

Tel: 9212025 Fax: 9212335/9211987

Page 2: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PEE' HA ELECTRIC SUPPLY COMPANY LIMITED

r°-1-ZIFF PETITION FOR FY 2013-14

Prepared by

Peshawar Electric Supply Company Limited

June 2013

Head Office, Sakhi Chashma, Shami Road, Peshawar

Phone No. 091-9212025

Fax No. 091-9211987

Page 3: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Ilk Allied Ba WAPDA COLONY SAKHI CHASHAAA- P

PLS NC No. BRANCH CODE PL_q CHEQUE No.

0000000115100102 0701 13 17933416

Date

1

•44R-BEetRER

/77 S.

PAY

Alca. RUPE IV///)4 Ate viejtks.--r4/ R

as

ESCO(C.E)

Add. DrAvi cm-matragefoRmi

oPecrAfektra

EP GCts

F t'kP Po-t 0.1L.ezi)

lie 7 9 3 3 4 1600 II° 166Vitagelblkirt8

Page 4: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED PETITION FOR DETERMINATION OF CONSUMER END TARIFF

FOR FY 2013-14 Before

The Honourable National Electric Power Regulatory Authority

1. PETITION SUMMARY

1.1 Details of Petitioner

Peshawar Electric Supply Company Ltd. Wapda House, Shami Road, Peshawar

(referred hereunder as PESCO) was incorporated on 23rd April 1998. It was organized

to take over all the properties, rights, obligations and liabilities of Water and Power

Development Authority (WAPDA). NEPRA granted Distribution License

No.07/DL/2002 to PESCO on 30-04-2002 for electricity distribution in Khyber

Pakhtunkhwa jurisdiction of PESCO.

1.2 Representatives of PESCO

• Brig ® Tariq Saddozai , Chief Executive Officer

• Engr. Abdul Latif Khan, Chief Operation Officer

• Engr. Mussarat Gul, Chief Commercial Officer

• Engr. Muhammad Fida Khan, Chief Technical Officer / Chief Engineer T&G

(O&M)

• Engr. Aftab Ahmed Sethi, Chief Engineer (Development)

• Mr. Anwar ul Haq Yousafzai, Finance Director

• Mr. Khurshid Ahmad Orakzai, DG (HR)

2

Page 5: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

2. GROUNDS FOR PETITION

Respectfully submitted,

2.1 That NEPRA, under the regulation of Generation, Transmission and Distribution

of Electric Power Act, 1997 (hereinafter NEPRA Act), is responsible for

regulating the electricity sector in Pakistan which includes determining the

revenue requirement, tariffs and other terms and conditions for the supply of

electricity by the Generation, Transmission and Distribution Companies and to

recommend the same to the Federal Government for notification. For this purpose

NEPRA has laid down certain guidelines and procedures under the NEPRA Tariff

Standards and Procedures Rules, 1998.

7.? That PESCO, being a bonafide power distribution licensee, requires adequate

revenues in order to perform its obligatory duties prescribed by NEPRA under the

NEPRA Act, NEPRA Performance Standards (Distribution) Rules 2005, NEPRA

Consumer Eligibility Criteria 2003, Distribution: License of PESCO and other

Obligations as determined by NEPRA from time to time. The main source of

funding available to the petitioner for their revenue requirements are;

(i) generation of adequate revenue through tariff and (ii) funding / borrowings.

2.3 That in order to fulfill and perform its obligatory duties as mentioned above and

to ensure financial viability of PESCO by recovering its prudently incurred costs

and reasonable return, in order to upkeep and maintain its existing distribution

services / network and to support the future investments for expansion of

distribution services / network, this petition is being filed for FY 2013-14 through

its Chief Executive Officer PESCO who has been duly authorized to sign and file

this petition by the Board Of Directors, PESCO in its 80th Meeting held on

28-05-2013, placed at Annex-A.

3

Page 6: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

2.4 In pursuant to amendment in NEPRA Act 1997, PESCO submitted the Tariff

petition for determination of Consumer End Tariff for FY 2012-13 on

oth , ,y Ju

I 2012. NEPRA has determined the tariff of Rs 16.44 /Kwh for

FY 2012-13 on 15th Mar, 2013 against the notified tariff of Rs. 13.77 /Kwh for

FY 2011-12. The Tariff determined by NEPRA for FY 2012-13 was not sufficient

to meet the revenue requirement of PESCO; hence PESCO filed Review Motion

with NEPRA on 27th March, 2013. Pre-admission hearing of the same was held

on 02" May, 2013 but NEPRA has declined the Motion for leave for Review on

24-05-2013.

2.5 Subsequently, NEPRA vide letter No. NEPRA/R/TRF-212/3785-89

dated 22-04-2013 intimated PESCO that the Tariff Determination for FY 2012-13

cannot be notified in the official gazette because of the order passed by the

Peshawar High Court dated 30.06.2011, which states that "rise in Tariff should

not be made unilaterally by the NEPRA without the written consent of the

Provincial Government (Khyber Pakhtunkhwa) because of the mandatory

provisions of Article 157 of the Constitution". Accordingly, NEPRA requested

the Ministry of Water & Power to hold the notification until the decision is made

on the review petition filed by NEPRA against the orders of Peshawar High

Court. The decision of the same is still awaited.

2.6 On the writ Petition of Govt. of Khyber Pakhtunkhwa, Peshawar High Court has

issued stay order in June 2011 and February 2012 on charging of Fuel Price

Adjustment, accordingly PESCO could not able to pass on this legitimate cost to

its consumers. PESCO has been hit severely by the orders of the courts and

suffered an accumulated loss of about Rs. 35 Billion due to stay on Tariff w.e.f

September 2008 to September 2010 and Fuel Price Adjustment since March 2011

onwards.

4

Page 7: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

a) The detail of stay on tariff is as under:

Rupees In Million

Month FPA withheld due

to Stay order Billing Withheld

due to Stay Order Total Amount

Withheld

Sep-08 8.57 8.57 Oct-08 170.48 170.48 Nov-08 358.73 358.73 Dec-08 297.49 297.49 Jan-09 278.02 278.02 Feb-09 264.19 264.19 Mar-09 282.62 282.62 Apr-09 301.34 301.34 May-09 299.70 299.70 Jun-09 344.05 344.05

2008-09 2,605.20 2,605.20 Jul-09 443.91 443.91 Aug-09 458.32 458.32 Sep-09 (79.08) 493.24 414.17 Oct-09 124.66 474.29 598.95 Nov-09 324.19 537.52 861.71 Dec-09 276.78 502.89 779.67 Jan-10 213.97 476.93 690.90 Feb-10 508.56 632.24 1,140.80 Mar-10 508.10 771.41 1,279.51 Apr-10 284.35 846.82 1,131.17 May-10 397.82 977.14 1,374.96 Jun-10 526.46 928.76 1,455.22

2009-10 3,085.82 7,543.48 10,629.30 Jul-10 429.32 1,171.08 1,600.40 Aug-10 166.32 1,328.31 1,494.63 Sep-10 125.05 1,380.33 1,505.38 Oct-10 , 789.97 789.97

Amount withtheld

due to stay on Tariff 3,806.50 14,818.38 18,624.89

5

Page 8: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

b) The detail of stay on Fuel Price Adjustment is as under:

Month FPA withheld due

to Stay order Billing Withheld

due to Stay Order Total Amount

Withheld

Nov-10 - Dec-10

Jan-11

Feb-11 - - Mar-11 509.39 509.39 Apr-11 540.09 540.09 May-11 335.55 335.55 Jun-11 ■

677.99 677.99 FY 2010-11 2,063.02

on- 2,063.02

Jul-11 1,304.02 1,304.02 Aug-11 1,973.31 1,973.31 Sep-11 1,069.40 1,069.40 Oct-11 1,275.61 1,275.61 Nov-11 675.54 675.54 Dec-11 482.42 482.42 Jan-12 998.49 998.49 Feb-12 304.67 304.67 Mar-12 904.70 904.70 Apr-12 1,014.53 1,014.53 May-12 793.55 793.55 Jun-12 135.88 135.88

FY 2011-12 10,932.12 10,932.12

Jul-12 543.36 543.36 Aug-12 (P) (37.60) (37.60) Sep-12 (P) 33.98 33.98 Oct-12 (P) 24.46 24.46 Nov-12(P) 534.76 534.76

Dec-12 759.52 759.52 Jan-13 837.43 837.43 Feb-13 311.34 311.34 Mar-13 632.51 632.51 Apr-13 390.17 390.17 May-13 - - Jun-13 - -

FY 2012-13 4,029.95 4,029.95 Amount with held due to stay on FPA

17,025.09 17,025.09

G. Total (Tariff & FPA) 20,831.59 14,818.38 35,649.97

6

Page 9: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

2.7 According to NEPRA (Tariff Standards and Procedure) Rules, 1998 Part III

Clause 17 (3) (i) "tariffs should allow licensees the recovery of any and all

costs prudently incurred to meet the demonstrated needs of their customers,

provided that, assessments of licensees, prudence may not be required where

tariffs are set on other than cost - of - service basis, such as formula-based

tariffs that are designed to be in place for more than one year". But contrary

to that NEPRA issued conditional notifications of Fuel Price Adjustments

specifically for the period July 2012 to March 2013 resultantly in real sense Fuel

Price Adjustment was never a determined revenue of PESCO because of the

conditional decision of the Authority. Moreover Revenue Recognition as defined

in IASB framework, means incorporating an item that meets the following

criteria;

• " it is probable that any future economic benefit associated with the item

of revenue will flow to the entity", and

• "the amount of revenue can be measured with reliability"

2.8 Further it is pertinent to mention here that even though, the Honourable Authority,

in Para 14.3 of the Tariff Determination of PESCO for FY 2012-13 acknowledges

that Fuel Price Adjustment is a legitimate cost of PESCO and the Authority has

also issued the decision in writ petition No. 1772/2011 in favour of PESCO as

highlighted in para 9.12 of Tariff Determination yet the court, despite the decision

of Authority, has issued stay order on charging of Fuel Price Adjustment to

consumers of PESCO.

2.9 Keeping in view the foregoing Authority is requested to revise the monthly Fuel

Price Adjustment mechanism to Annual adjustment so as to avoid the legitimate

revenue loss to DISCOs due to stay orders.

2.10 Due to delayed notification of Tariff, stay on fuel price adjustment and

non-provision of the required Tariff - PESCO suffered a loss of

approx. Rs. 29 Billion during FY 2012-13.

7

Page 10: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

3 GROUNDS AND FACTS FORMING BASIS OF THE PETITION

The grounds and facts forming the basis of this petition are as under:

3.1 Under the 1997 NEPRA Act, NEPRA is responsible for determining tariffs and

other terms and conditions for the supply of electricity by the Generation,

Transmission and Distribution Companies and to recommend these to the Federal

Government, subject to the need to comply with guidelines, not inconsistent with

the provision of the NEPRA Act, laid down by the Federal Government. NEPRA

is also responsible for determining the process and procedures for reviewing

Tariffs and recommending Tariff adjustments.

3.2 This petition is being filed in pursuant to the section 31 (4) of the Regulation of

Generation, Transmission and Distribution of Electric Power Act, 1997.

3.3 The Distribution Margin of Rs. 1.18 /Kwh determined by NEPRA for FY 2012-13

was not sufficient to meet the PESCO revenue requirement and proposes

Distribution Margin of Rs. 2.25 /Kwh for FY 2013-14 on account of increase in

Asset Base, the Inflationary trend, Salaries and Maintenance of the Distribution

Network etc.

3.4 PESCO strongly feels that 28% T&D losses determined by NEPRA in its

determination for FY 2012-13 was unjustified and unrealistic keeping in view the

law & order situation in PESCO territory. The actual T&D losses during

FY 2012-13 were 33% (provisional), therefore, 31% target of Transmission and

Distribution losses for FY 2013-14 may be fixed keeping in view the T&D losses

for FY 2012-13.

NEPRA has been comparing the losses position of PESCO with that of the other

DISCO's. As a matter of fact the load of other DISCOs especially those of Punjab

mainly comprises of big loss free consumers which is a major contributing factor

towards reduction of % age losses. On the other hand, the main load of PESCO

comprises of small domestic consumers which are fed through scattered LT

Distribution network and lengthy 11 KV feeders emanating from distantly located

Grids. As evidence the loss free consumers of Hattar Industrial Estate has such an

effect on the losses of the Hazara Circle that it is very much comparable with

those of other DISCO's. The remaining 05 Circles comprises of hard area with

8

Page 11: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

those of other DISCO's. The remaining 05 Circles comprises of hard area with

FATA boundaries and dominating domestic customers, where the feeding

arrangements are through scattered and lengthy distribution networks and as such

the losses of these circles cannot be compared with those of other DISC'Os. The

following are main reasons for not reducing Technical and Administrative losses

to the desired level:

• Lengthy Transmission Lines.

• Undersize Conductor of the Transmission Lines.

• Over loaded grid system.

• High ratio of 11 KV Distribution line to 400 volts line (1:14).

• Partially damaged distribution transformers.

• Locally repaired distribution transformers.

• Very high percentage of Technical losses because of lengthy and out dated distribution

and Grid System.

4. OBJECTIVES OF THE PETITION

The aim of this petition is to obtain approval for the timely implementation of cost

reflective tariffs to yield PESCO's required revenues for FY 2013-14 and its

recovery from consumers.

The implementation of cost reflective tariffs will benefit consumers and PESCO,

as it will;

i. Enable PESCO to improve service quality and reliability.

ii. Provide adequate funds for the Operation, Maintenance and Expansion of

Distribution Network.

iii. Ensure the financial sustainability of PESCO.

9

Page 12: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

5. PESCO'S REVENUE REQUIREMENT

A) Power Purchase Price.

B) Distribution Margin.

C) Financial Charges on Term Finance Certificates (TFCs)

D) Prior Period Adjustment.

E) Working Capital.

F) Enterprise Resource Planning Cost.

A) POWER PURCHASE PRICE (PPP):

The actual PPP is regulated by NEPRA over the period, thus any subsequent

increase / decrease in the PPP determined by NEPRA is adjustable on monthly

basis or annual basis as proposed in the petition. The PPP set for FY 2013-14 is

Rs. 10.01 /Kwh.

B) DISTRIBUTION MARGIN:

The sum of the O&M Cost, Depreciation, Provision for Bad Debts and RORB

minus Other Income results in PESCO's Distribution Revenue. Dividing this by

the total units sold yields the average Distribution Margin per Kwh.

i) O&M EXPENSES

O&M expenses include Salaries & Wages. Repair & Maintenance.

Travelling, Vehicle Running and Other Expenses. Based on the impact of

increase in inflation, salaries and other allowances, the O&M Expenses for

FY 2013-14 have been projected at around Rs.1.60 /Kwh.

a) Salaries & Wages including employee's retirement benefits

amounting to Rs. 10,203 million is the major component of O&M

expenses. Since PESCO was incorporated as company in compliance with

power sector reform policy of Government of Pakistan and the WAPDA

employees working in Area Electricity board Peshawar gradually become

employees of the company in terms of the Man Power Transition Plan,

therefore PESCO had to Maintain the GOP pay scales and the terms of

10

Page 13: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

employment for the employees which were prevalent in WAPDA. The

GOP in its Annual Budget for FY2013-14 has increased the Pay and

Pension of Government employees @ 10%. Similarly 5% increase from

December 2013 onward is assumed as an effect of Annual Increment.

b) Employees Retirement Benefits have been based on the average of

annual increase in the last three years audited figures.

ii) REPAIR & MAINTENANCE EXPENSES:

Repair & Maintenance expenses of Rs.765 million have been assumed

@2.0 % of the net fixed assets that are Rs. 36,987 million. PESCO has to

maintain its old and over loaded system in order to ensure un-interrupted

power supply to the consumers, moreover cost of material has also

increased due to inflationary pressure. Repair and Maintenance budget is

required for the following.

1. Replacement of Power Transformers damaged at Grid Stations and

controlling Breakers, Isolators etc.

2. Repairs and Maintenance of 3,252 KM Transmission Lines.

3. Purchase of materials for Repair and Maintenance of 87 Nos Grid

Stations including 132 KV, 66 KV and 33 KV Grid Stations due to

break down.

4. Repair & Maintenance of 747 Nos 11KV feeders.

5. Repair & Maintenance of 32,816 KMs HT Lines.

6. Repair & Maintenance of 43,554 KMs LT Lines.

7. Repair & Maintenance of 55,473 Nos of Distribution Transformers

which are frequently damaged due to over loading.

8. Replacement of defective meters.

9. Repair & Maintenance of Office and Residential Buildings.

iii) TRAVELING EXPENSES:

Travelling Expenses have been projected as Rs. 169 Million for the

FY 2013-14.

11

Page 14: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

iv) VEHICLE RUNNING EXPENSES:

Vehicle Running Expenses has been projected as Rs. 178 Million for the

FY 2013-14. PESCO has a fleet of more than 700 vehicles. Most of the

vehicles are old and has •completed useful life of 10 years & need major

overhauling. Financial position of PESCO does not allow us to replace

them with new vehicles. We are left with no option but to maintain them.

Moreover the cost of POL & parts of vehicle is increasing due to inflation.

A part from that PESCO distribution system is spread all over

Khyber Pakhtunkhwa Province.

v) OPERATING EXPENSES:

Other Operating Expenses of Rs. 633 Million have been assumed and

include Rent, Rates and Taxes, Utility expenses, Communications, Office

Supplies, Professional Fees, Auditor Remunerations, Outsourced Services,

Management Fees, Electricity Bill Collection Expenses etc.

vi) DEPRECIATION

Depreciation for FY 2013-14 is calculated on the basis of the value of

existing Assets plus the additions in assets during the FY 2013-14. The

assets are depreciated on straight line method as per utility practice i.e

land @ 0 %, buildings and civil works @ 2%, Plant and machinery

@ 3.5%, office equipment and mobile plant (@ 10% and other assets (a)

10% based upon these assumptions the figure for depreciation has been

worked as Rs.1,779 Million.

vii) PROVISION FOR BAD DEBTS:

Provision for doubtful debts is made on the basis of ageing formula agreed

with the Auditors and approved by BoD PESCO. PESCO has projected

provision of bad debts amounting to Rs. 2,512 million for FY 2013-14

which is based on 1.90% of the projected sales to the consumers and

12

Page 15: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

95% recovery. PESCO is pursuing the recovery of arrears from its

consumers but due to the worst law and order situation in

Khyber PakhtunKhwa and non-payment culture particularly the attitude of

consumers residing in areas adjacent to TESCO, Administrative &

Political obligations do not allow us to take severe action against the

defaulters. Moreover disconnection creates law and order situation in

terms of road blockade, blast of transmission towers and attacks on

PESCO staff, Grid Stations and offices. Provision for Bad debts during

2012-13 was Rs.5,400 Million; therefore, provision of Rs. 2,512 Million

for FY 2013-14 is requested.

viii) RETURN ON RATE BASE (RORB):

NEPRA allowed 11.25% WACC to PESCO in its tariff determination for

FY 2012-13, the same rate has been taken as the basis for FY 2013-14 and

an amount of Rs. 2,766 million is assumed as RORB as per following

calculations:

Description Rupees in Million

FY 2013-14 Projected

Gross Fixed Assets In Operation—Opening Balance 48,560 Addition in Fixed Assets 6,208 Gross Fixed Assets In Operation—Closing Balance 54,768 Less Accumulated Depreciation 17,780 Net Fixed Assets in Operation 36,988 Add: Capital Work in Progress-Closing Balance 9,902 Investment in Fixed Assets 46,890 Less Deferred Credits 20,909 Regulatory Assets Base 25,980 Average Regulatory Assets Base 24,586 Rate of Return 11.25% Return on Rate Base 2,766

ix) OTHER INCOME:

The main sources of other income include Interest Income, Sale of Scrape,

Amortization of Deferred Credit, Rental & Service Income etc and it is

assumed to be 2,240 million for the FY 2013-14.

13

Page 16: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Based on above the projected Distribution Margin (DM) for FY 2013-14

would be as under: Rs. in Million

Description FY 2013-14 Projected

11,949 0 & M Expenses

Provision for Bad Debts 2,512

Depreciation 1,779

RORB 2,766

Gross DM 19,005

Less: Other Income (2,240)

Net DM 16,765

C) FINANCIAL CHARGES ON TFCs:

Ministry of Finance, Govt of Pakistan has arranged - through Power

Holding Private Limited - financing of Rs. 136 Billion on behalf of

Distribution Companies to reduce circular debt & to ensure the

un-interrupted power supply across the country (copy of letter of Ministry

of Water & Power, Government of Pakistan is enclosed at Annex-B). The

share of PESCO in Rs.136 Billion TFC issue is Rs.39 Billion. TFC's carry

interest of Kibor plus a spread of 2%, moreover interest charges of loan

from ADB / ERRA are also included. Accordingly Financial Charges of

Rs. 5,720 Million have been assumed to this account for the FY 2013-14.

D) PRIOR PERIOD ADJUSTMENT:

PESCO has claimed adjustment of Rs. 1,784 Million for FY 2013-14 on

account of Energy Purchase Price, Capacity Purchase Price, Use of

System Charges, Impact of Extra or Lesser Purchases, DM & Prior Period

Adjustment and Sales Mix Variance. Detail is at Form 6 (B).

It is pertinent to mention here that NEPRA Determines Quarterly/Annual

Adjustments on the basis of targeted losses whereas contrary to that the

14

Page 17: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Sales Mix Variance is calculated on the basis of actual losses which is

self-contradictory and needs to be revised and uniform policy may be

adopted / established. The authority on one hand is penalizing DISCOs by

deducting revenue on the basis of the targeted losses and on the other hand

also penalizes in a way by allowing Sales Mix Variance on actual basis

which needs to be reconsidered.

Adjustment regarding Sales Mix amounting to Rs. 3,285 Million and

Rs. 4,986 Million for FY 2011-12 & FY 2010-11 respectively was not

considered and disallowed by the Authority because of the abnormality in

Actual Sales Mix Data of residential class of consumers. This decision of

the Authority has badly affected the already weak liquidity position of

PESCO which has been hit by the stay orders of the Peshawar High Court

on Fuel Price Adjustment.

PESCO is of the view that, if there is any doubt in the data of residential

consumers than Sales Mix Variance related to the residential class of

consumers should have been disallowed by the Authority instead of flatly

refusing full amount of sales mix variance.

The calculation of Sales Mix Variance is at Form 6 (B).

15

Page 18: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

E) WORKING CAPITAL REQUIREMENT:

PESCO expect working capital requirement of Rs. 2,837 Million assuming

Nine (09) month delay in notification of Tariff based on Nine Month

Kibor at 9.5% capital cost plus 3% spiead. The detail is as under:

DESCRIPTION AMOUNT

Proposed Rate (Rs. /Kwh) 17.75

Notified Rate (Rs. /Kwh) 13.77

Difference in Rates (Rs. /Kwh) 3.98

Projected Units for 9 Months of FY 2013-14 (MKwh) 5,702

Revenue at Proposed Rate (Mln Rs.) 101,211

Revenue at Notified Rate (Mln Rs.) 78,517

Revenue Shortfall (Mln Rs.) 22,694

9 Month KIBOR plus 3% Spread (9.5% + 3%) 12.5%

Working Capital Requirement (Mln Rs.) 2,837

F) ENTERPRISE RESOURCE PLANNING

PESCO is planning to implement Enterprise Resource Planning system at

PESCO with the support of USAID. Initial Capital Cost will be borne by

USAID while maintenance cost will be borne by PESCO. ERP combines

all departments together into single integrated system that runs off a single

database so that these departments can share information and

communicate with each other. Accurate. timely and reliable information

will be available that will not only improve decision making but will also

help PESCO in reducing cost.

In general following benefits are expected from ERP implementation in

PESCO:

• Improved efficiency and reduced administrative time, effort and cost.

16

Page 19: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

• Timely information & decision support Real time business analysis.

• Performance evaluation at any instant & Elimination of repetitive activities.

• Availability of historical data for future analysis & forecasting.

• Enhanced user interactivity and better utilization of resources.

The detailed Cost Benefit Analysis of Enterprise Resource Planning

System at PESCO is as under:

Note: 11.25% wacc as determined by NEPRA has been used for discounting purposes

Min. Rs. Capital Cost to be borne by PDP

ERP Software and Implementation Cost 255.00

IT Infrastructure Cost 250.00

505.00

Min. Rs. Min. Rs.

0 & M Cost of PESCO O&M Cost PV of O&M

FY-2013-2014 3.00 3.00

FY-2014-2015 71.97 64.69

FY-2015-2016 92.54 74.77

FY-2016-2017 98.13 71.27

FY-2017-2018 101.78 66.45

OM cost in perpetuity after 2018 904.71 590.62

TOTAL OM 1,272.14 870.81

Min. Rs.

One time Capital Cost to be borne by PDP 505.00

0 & M costs to be borne by PESCO for ERP on perpetuity 1,272.14

Present Value of 0 & M costs to be borne by PESCO for ERP on perpetuity 870.81

Present value of future economic benefits using perpetuity 2,697.15

NPV of ERP Project for PESCO with PDP Financing 1,826.34

NPV of ERP Project for PESCO without PDP financing 1,321.34

Future Economic Benefits of ERP Project per annum Mln. Rs.

Estimated cost saving due to reduction in Man Hours in PESCO 179.66

Estimated increase in profitablity due to return on investment in PESCO 123.77

Total future economic benefits per annum 303.43

Present value of future economic benefits using perpetuity 2,697.15

17

Page 20: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

• INVESTMENT PLAN

Development Program has been projected as under:

Rs. In Million

GROSS 2012-13 2013-14 Provisional Projected

DOP 1,115 1,300 RE 3,000 3,355 ELR 600 450 Installation of TOU / AMR Meters 500 1,500 STG 2,255 1,155 Total investment 7,470 7,760

• STATEMENT OF REVENUE REQUIREMENT

DESCRIPTION FY 2013-14 Projected

Power Purchase Price Rs. Min 108,288

Distribution Margin Rs. Mln 16,765

Financial Charges Rs. Mln 5,720

Total Rs. Mln 132,558

Sale of Units MKwh 7,466

Average Tariff Rs./Kwh 17.75

6. RELIEF / DETERMINATION SOUGHT

• Approval of Category wise Tariff for FY 2013-14 — Form 27

• Approval of Revenue Requirement for FY 2013-14 — Form 20.

• Summary of Category wise Revenue' Requirement for FY 2013-14

Form 27A.

• Annual Sale Growth in units (Category-Wise) — Annexure —C.

• Annual consumer Growth (Category-Wise) — Annexure — C.

18

Page 21: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

7. SUMMARY OF EVIDENCE

In support of the petition in hand the standard formats are enclosed as per

requirement, Actual Sales Data upto May 2013 is also enclosed at Annexure-D.

8. KEY ASSUMPTIONS TO THE FINANCIAL PROJECTIONS

■ Total Unit Sales: The units projected for FY 2013-14 are 7,466 Million

against the expected units sold for FY 2012-13; 7,128 Million.

■ Target Transmission & Distribution Losses: The losses have been

projected at 31% for the FY 2013-14 against the expected losses of 33% for

FY 2012-13.

10. That in view of the grounds and facts mentioned above, it is respectively

prayed that while admitting and allowing this petition, the Tariff of PESCO for

the FY 2013-14 may very graciously be determined as proposed along with

Working Capital requirement, keeping in view the following:-

a. Ensuring the financial viability of the petitioner for the reliable supply of

electricity to its 2.77 Million consumers;

b. Timely Determination of Tariff along with its monthly adjustments or annual

adjustments as proposed, providing sufficient time to the petitioner for the

recovery of the Determined Revenue Requirement;

c. Fixing of target of T&D losses by taking a realistic approach;

d. Approving the investment plan of Rs: 7,760 Million;

e. Allowing Rs: 16,765 Million as Distribution Margin;

f. Any other relief.

THE PESHAWAR ELECTRIC SUPPLY COMPANY Ltd.

Through: Brig Tariq Saddozai Chief Executive Officer PESCO

19

Page 22: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

%NW Allied Ba WAPDA COLONY SAKHI CHASHMA- AR

PLS A/C No. BRANCH CODE PLS CHEQUE No.

0000000115100102 0701 13 17933416

Date

▪ PAY

.)5(../// y1L413 AY )IC5 I ,(71 (, • RUPEES '

DIRE N ESCO(C.E) Ad

Im I 79 3 3 4 L611'0 L 40 uyeiiigig ec or

INantia

Of '

anagerimmi LeralWer*Par'

Page 23: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

// Certified True Copy

ANNEX - A

PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED

Ph.091-89212025

OFFICE OF THE Fax- 091-9211987

COMPANY SECRETARY PESCO PESHAWAR

BOARD RESOLUTION

Board of Directors Peshawar Electric Supply Company Limited in its 80th BoD Meeting held on 28-5-2013 has authorized Chief Executive Officer PESCO to file Tariff Petition for FY 2013-14 with National Electric Power Regulatory Authority (NEPRA).

He alongwith other Officers of the Company indicated in the summary of the Petition are hereby authorized to sign individually or jointly the necessary documents, pay the necessary filing fee, appear before the Authority when needed and do all acts necessary for completion and processing of the application.

(Compan cretary)

Dated 03 /6/2013

Page 24: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

7Vff-,14-41P4(-Z-

-1Viri,IVgiFAI., • - -.,

2_

ig Tariq Saddozai) Chief Executive Officer

PESC0

A933071

III 1111111111111111111111111111111111111111

AFFIDAVIT

I Brig Tariq Mahmood Khan Saddozai S/0 Sardar Muhammad Ishaq Khan,

Chief Executive Officer, Peshawar Electric Supply Company Limited (Distribution

License No. 07/DL/2002) holding NIC No. 42301-6179572-7 being duly authorized

representative / Attorney of Peshawar Electric Supply Company Limited, hereby

solemnly affirm and declare that the contents of this Tariff Petition for FY 2013-14

including all supporting documents are true and correct to the best of my knowledge and

belief and that nothing has been concealed.

Deponent

Dated:- 25/06 /2013

Page 25: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

(IVRtharnma arhan Sction Officer F)

9209213

AI/J

No. PF-J5(06y2012-PHPL Governinent of Pakistan

Ministry of Water and Power Power Coordination, Policy and Finance Wing

ANNel -

Subject: NON — ACCOUNTAL OF TFC LOANS AND MARK UP BY DISCOS.

I am directed to refer to IESCO's letter No. 10305/FD/IESCO, dated IC-04-2013 cn the above subject and to state that CPPA is supplying electricity and DISCO's are required to pay on account of Power Purchase Price (PPA). DISCOs are not paying full cost of supply to CPPA. Resultantly, Circular Debt in Power Sector has been increasing time and again causing stuck-up of System. In FY 2011-12, obligations towards Power Generators could not be fulfilled. In order to overcome the vicious ccle

y involving Power Generators, Oil and Gas Companies and Refineries, GOP arranged TFC loans of PKR 239 billion through PHPL on comparatively low rates to pay of Power Generators involving higher mark — up cost. If DISCO's paid CPPA against PPP for onward payments to Power Generators there would be no need to arrange loans. 2.

Mark — up cost to be recorded in DISCO's books of accounts as the loans were arranged on behalf of DISCO's for non — payment / non — accountal of mark — up on bank loans arranged by PHPL. DISCOs may take-up the issues with NEPRA reuesting to allow them to transfer mark-up cost through their Tariff determination like i terest income in Tariff . 3.

t may be pointed out that liabilities of DiSCOs would not be affected by incorporating loans in their books of accounts as the loans would be replaced with CPPA's payables. CPPA's payables would be reduced to the extent of loans. Equity of the Companies would not be nega:lve and remain same.

arranged by it through PHPL. GOP is the owner of distribution companies being shareholder as well as guarantor of TF loans

4. In view of above it is advised to all DISCO's (except QESCO and SEPCO as they have

incorporated loans and the mark — up costs on these loans in their books of accounts) to incorporate

subject loans and mark — up on these loans in their book accounts and to accept debit credit notes issued by CPPA in respect of their share in loans and mark — up. DISCO's are also advised to make

Ministry dated-19113:2013. payment of mark — up to PHPL for onward payment to_banks under the new meth

-, ism issued by this 5. Compliance report is required to be submitted to thi shall be part of performance evaluation criterion of CEO.

rliest b 25-05-20 . s

Islamabad the, 19,' May, 2013

Chief Executive Officer MEPCO, Multan.

Chief Executive Officer HESCO, Hyderabad, Chief Executive Officer IESCO, Islamabad. Chief Executive Officer GEPCO, Gujranwala.

For information:

• Chief Eirecutive Officer FESCO, Faisalabad.

Chief Executive Officer LESCO, Lahore. Chief Executive Officer PESCO, Peshawar.

z a) The Chief Financial Officer, PEPCO WAPDA House Lahore b) The Chief Financial Officer, Power Holding Private Limited Islamabad

CC:

1., . PS to Additional Secretary Ministry of Water and Power. PA to Joint Secretary (Power), Ministry of Water and Power.

3. PA to Deputy Secretary (Power) ,Ministry of Water & Power 1 •

Direct() (.43 rot,

co

..)

Page 26: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

NO.OF CONSUMERS & %AGE GROWTH

Category 2008-09 2009-10 %Age

Growth 2010-11 %Age

Growth 2011-12 %Age

Growth 2012-13 (Projected)

%Age Growth (with projected)

2013-14 (Projected)

%Age Growth

Domestic 2136302 2225806 4.19 2295806 3.14 2361837 2.88 2439778 3.30 2525170 3.50 Commercial 251022 259127 3.23 266627 2.89 271688 1.90 278480 2.50 285721 2.60 Industrial 22737 23112 1.65 23512 1.73 28156 19.75 28860 2.50 29726 3.00 Bulk 825 865 4.85. 843 -2.54 875 3.80 884 1.00 901 2.00 Others 874 869 -0.57 911 4.83 1018 11.75 1059 4.00 1101 4.00 T/VVe II 25840 26372 2.06 26572 0.76 23190 -12.73 23422 1.00 23656 1.00 TOTAL 2437600 2536151 4.04 2614271 3.08 2686764 2.77 2772482 6.05 2866275 3.38

UNITS BILLED & %AGE GROWTH (Units in Million)

Category 2008-0e 2009-10 %Age

Growth 2010-11 °0 Age Growth

2011-12 %Age

Growth 2012-13 (Projected)

%Age Growth (with projected)

2013-14 (Projected)

%Age Growth

Domestic 3438.4 3867.4 12.48 4118.4 6.49 4047.6 -1.72 4065.47 0.44 4258.1 4.74 Commercial 408.3 464.1 13.69 522.1 12.48 552.9 5.89 545.23 -1.38 571.1 4.74 Industrial 1316.2 1372.4 4.27 1481.5 7.95 1777.1 19.96 1831.10 3.04 1917.9 4.74 Bulk 228.2 240.5 5.37 237.9 -1.04 518.1 117.73 538.01 3.85 563.5 4.74 Others 250.3 267.8 6.97 259.8 -2.98 23.5 -90.95 24.79 5.44 26.0 4.72 T/We I I 258.2 291.1 12.74 280.3 -3.73 142.4 -49.21 123.68 -13.12 129.5 4.74 TOTAL 5899.6 6503.3 10.23 6900.0 6.10 7061.5 2.34 7128.28 0.95 7466.0 4.74

Page 27: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

r's • r -

PESCO Tariff Statement Upto Mav,2013

at C egory

.--,

MDI Charged Sales Sale Mix

No. Of Consumers

Connec led .

Load (kW1) (kW)

Load Factor

. ("/,,age)

Distiibu lion

Losses

Applicable Rate Billed Amount Subsidy

Fixed Charges

Arneunt

Variable Charges

Fixed Cnargss

fRs/kW,'M

Variable Charges (Rs/kWh

Fixed Charges Rs. Mln

Variable Charges

(KW) (MkWh) (%age) Rs Mln Rs. Mln Rs Min

Residential - Al

UPTC1-50 Units per month 971 00 219.18 3.36 515061 0.00 1.74 0 00 380 62 0.00 229.25 Consumption Exceeding 50 Units 0.00 0 00 1-100 Units 552.60 8.47 987009 0.00 5 64 0 00 3114 23 0.00 6298.76 101-300 Units 1489 58 22.82 755402 0 00 6.69 0 00 9958 99 0,00 8816.92 301-700 Units I 654.66 10.03 137740 0 00 8.56 0.00 5605 90 0.00 4745.85 ABOVE 700 Units 711.25 10.90 37897 1)00 9.413 0 00 6744 33 0.00 1387.2'1 A-16 (03' T Peak

148750 00 1 i 12 0.17 3911 16.20 13 65 241 151 79 0.00 61.27

A-lb (03) T Off-Peak 45.07 0.69 5185 8.14 366 73 0.00 141.81 Tern. domestic E-1 i (55) 0 001 0 13 0.00 281 0 00 14.62 0.02, 1 84 0.00 0.50 TOTAL DOMESTIC 149721.00 3683.58 56.43 2442486

-- 2.43'

1- 26324.44 0.00 21690.57

Commercial - A2

Commercial Tariff (041 267 00 206.37 3.16 269294 112 14 65 0.03 3022 37 0.00 976.09 ,A-2b ;05) '22177 001 27.48 0.42 307 404 10.00 49 35; 274 71 0.00 199.96 A-2c(06)T Peak

1181498 00 45.17 0.69 069 7928 400 15 38

473 00 694 59 0.00 304 59 1.1,-26 106; T 3ff-Peek 220.52 3.38 7.84 1729 79 0.00 756.52

emp. ccmi E-111 (56) 0 00 0.95 0 01 1318 16 00

0.001 15 15

522.381 5736.61

0.00

0.00

427!

2243.421 (TOTAL COMMERCIAL 1303942.00 500.40 7.671 278847 '

I industrial '

6-1 107) 5974.001 91.50 1.40 15599 6 70 10.00 0.04 915 11 0.00 456.58 Ei -lb (09) T Peak

146059.00 15.34 1 0.24 8741 2 13 94

8.29 0.34

213 94

1

0.00' 84.55 B-113 (09) T Off Peak 84.17 1.29 697.55 0.00, 27E 09

16-2a1101 260624 00' 65.91 1 01 1237 406 9.21 105.941 607 01 0 00 352.91 : 8-2612) T Peak

1698273.00 36.16 0 055, 3149 403 15.56

684 911 562 61 0.00 243.37 i B-26112) T Off Peak 290.01 4.44 7.84 2272 97 0 001

0.004

000

982.084

313 02 1 0-3114) T Peak 1592567 00 45' .89 0.701

170 357. 14.72 568 991-

67 5 66 i Es-3(14'; T Off Peak 529.11) 6 11 -1

7 66 4053 09 --,

1879.59,

50 0 61 16.1-4(17) T Peak 1203064 00 70 21 08

9 339 13 84 .

408 12: ,

971 46 0.00i 1 8-1(170)1 Off Peak 493.19 7 56 7.26 3585 02 0.001 1844.54 . E-258! Temp 0 00 0.08 0.00 1 0 00 0 00

- A 0.00 6.31

I1O.; AL INDUSTRIAL 5446617.50 1721.56 26.37 28906 1768.341 14549 42 0.006932.67 rBuik Supply 1

1

1.C-1a (19) 1562 001 0.89 0,01 24 0 00 11 55 0 00. 10 33 -1

200 4.42' 0-16 (25) I 17327700 70.41 1.08 455 429 10.41 74.28] ?3309 0.001 3626U1 , ;',-1c (26', T Peak

129818 00 * ' 0.10 315 A C4

14 83

7.15 52 401- 97 35 0.00! 42.4-,

0-1c (26) T Off Peak I

31.09 0.48 747 35 0.00 105.38 1C-2a ;28; 116611 00 46.38 0.71 34 432 10 35 50 37 L 479 98

139 98

0.001 231.92

0 001 66.72 0-26 (29) T Peakr 138472 00 9.67 0.15

19 380 17-7-745

14 46

13 51

52 62 , 2.-21) (29., T 011 Peak 43.82 0.67 325 42 0.00, 155.56,

LC-36 38) -r Peak 47200.00

1 1-- 2.15 0 03

1 -I 360 1

-I- 16 99i

'

29 05 0.00. 15.704,

45, 04 .0-36 f38 T Off Peak 11.70 0 18 ----I -

7 11 83 19 0.00 TOTAL BULK SUPPLY 606360.001 222.65 3.41 847 1 246.66: 2139,93 i 3.00! 102Ei.8::'

--7 Agricultural 7-Wells - Tariff D i

---1 1

D-la (46) 11075.00, 7-1 15.69 0.24 1518 000 1 9 55 I 0 01. 149 78 0001 67.44

29.73 1 237.591

0.001 5421: I

D-2 (49.52) 371668,001 36.39 0 56 17297 T--

108

i„ 1

L ' . L

1--.

6 14

15.2004 - , 71

c

40.25,

49 ,,r___

-4 223.49

126 94 D-2 (47 48) T Peak 399737 00 1

8,35 0,13 4405

D-2 (47 48) T Off-Peak 41.82 0.64 292 35 0.001 125.461 TOTAL AGRICULTURAL TIWEL 782480 COI 102.24 1.57. 23220 90.15 . 793.56 29.73 1 484.-:7. Public Light PVT G (72,73) 0 00: 19.03 ; 019 1013 , 1 0 00 ' 10 E9 0 01! 202 73

23 25

83 95

r--

0.001 51 51 •

0.00! 6.251

0.001 115.10;

;Residential colonies H (76,79)

0 001 1,80

25594 00, 14.63 2.22.4

003 45

0.22' 5

t 1 0 00 I 12 95

1 361 -5 73

0,00 '

9 23 AJK Tariff K-1 (35)

AJK Tariff K-1 (36) T Peak 702E90 00 49.01 I- 0.75

23 ---1--

4 -I

1 1-

360 ) 15 06 , 7 50

1 252.97! 737 98

1595 1. %

0 001 300.6:11 'pik Tale K. 1 (361 T Off Peak 212.71 3.26 0.001 655 15 !Total AJK 276.34 4.23 28 1

-1---- 1 262.20; 2417.79 -;

3.001 1074.081 ICLi,mpaily 'total 9618004 001 6527.68 100.00 2775392 1

, 2892.27! 62187.78 9.73; 33513.39

Page 28: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 1 Peshawar Electric Supply Company Company Statistics

Peak demand during FY 2012-13 MW 2,840 Number of Consumers Number 2.77 Million

Area Sq Km 74,521

Circles Number 6

Divisions Number 33 Sub Divisions Number 147

Length of Feeders Km 32,816 Average Length of Feeders Km 43.93 Maximum Length of Feeder Km 142 Minimum Length of Feeder Km 7

Targe for new connections Number 80,000

Length of High Voltage Transmission lines (132 kV) Km 2,080 Length of STG lines (132, 66 and 33 kV) Km 3,252 Length of Low Voltage Distribution lines (400 V) Km 43,554

Number of HV transformers

Number 193

Number of burned down HV transformers

Number 12

Number of STG transformers

Number As above

Number of burned down STG transformers

Number Number of LV transformers

Number

55,473 Number of burned down LV transformers

Number

1,906 Strength Cost

Jun-13 Jun-14 Jun-13 Jun-14 Provisional Projected Projected Projected

Number of Employees 17,804 17,804

A Qualified Professionals . 395 395

Engineers 310 310

Others 85 85

B Staff 17,409 17,409 Technical 12,079 12,079 Clerical 1,140 1,140 Non Technical 4,190 4,190

Total 9,042 10,203

1

Page 29: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 2

Peshawar Electric Supply Company Profit & Loss Statement

Power Balances

2012-13 Projected

2013-14 Projected

Units Received [MkWh] 10,639 10,818

Units Lost [MkWh] 3,511 3,352

Units Lost [okage] 33% 31%

Units Sold [MkWh] 7,128 7,466

Revenue

Sales Revenue [Mln Rs] 60,247 132,558

Subsidy [Mln Rs] 36,854

Fuel Price Adjustment [Mln Rs] -

Total Sales Revenue [Mln Rs] 97,101 132,558

Rental & Service Income [Mln Rs] 123 129

Amortization of Def Credits [Mln Rs] 737 961

Other Income [Mln Rs] 2,274 1,149

Total Revenue [Mln Rs] 100,235 134,798

Wheeling Charges Income (TESCO) [Mln Rs] 1,203 1,980

Operating Cost -

Power Purchase Cost [Mln Rs] 107,081 108,289

Wheeling Charges [Mm Rs]

O&M Expenses [Mln Rs] 10,437 11,949

Depreciation [Mln Rs] 1,694 1,779

Amortization [Mln Rs] -

Provision for Bad Debt [Mln Rs] 5,400 2,512

Total Operating Cost [Mln Rs] 124,612 124,528

EBIT [Mln Rs] (23,174) 12,250

Financial Charges [Mln Rs] 5,972 5,720

EBT [Mln Rs] (29,146) 6,530

Tax [Mln Rs] 2,286

EAT [Mln Rs] (29,146) 4,245

WPPF [Mln Rs] -

Profit for the period [Mln Rs] (29,146) 4,245

While submitting Quarterly Petitions , this form should be submitted with actual Profit & Loss of of previous quarters

and projected profit & loss of next quarter. The Balance Sheet should be substantiated with notes to the accounts.

2

Page 30: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 3

Peshawar Electric Supply Company Profit & Loss Statement (2012-13)

Power Balances

Provisional

Month 1 Actual

Month 2 Actual

Month 3 Actual

1st Qrt Actual

Month 4 Actual

Month 5 Actual

Month 6 Actual

2nd Girt Actual

Month 7 Actual

Month 8 Actual

Month 9 Actual

3rd Qrt Actual

Month 10 Projected

Month 11 Projected

Month 12 Projected

4th Qrt Projected

Total Provisional

Units Received [MkWh] 1,100 1.116 990 3,206 902 850 842 2,594 822 677 810 2,309 835 886 810 2,531 10,639 Units Lost pkWhi 444 434 321 1,198 262 246 252 760 262 158 310 730 271 288 263 822 3,511 Units Lost Nagel 40.32% 38.89% 32.39% 37.38% 29.06% 28.93% 29.97% 29.31% 31.94% 23.31% 38.27% 31.63% 32.47% 32.47% 32.47% 32.47% 33.00% Units Sold IMKVVhi 657 682 669 2,008 640 604 589 1,833 559 519 500 1,579 564 598 547 1,709 7,128

Revenue

Sales Revenue pin Rs] 5,782 6,055 5,855 17,692 5,203.65 4,925.94 4,746.93 14,877 4,732 4,319 4,187 13,239 4,765 5,054 4,621 14,439 60,247 Subsidy [Min Rs] 3,470 3,641 3,591 10,702 3,393 3,128 3,007 9,527 2,786.19 2,535.57 2,468.40 7,790 3.085 3,235 2,514 8,834 36,854 Fuel Price Adjustment Mn Rs] - - - - - - - - - - - - - - Total Sales Revenue [Min Rs] 9,253 9,695 9,446 28,394 8,596 8,054 7,754 24,404 7,519 6,855 6,656 21,029 7,850 8,289 7,135 23,274 97,101 Rental & Service Income [Mln Rs] 11 12 12 35 11 10 10 32 10 9 9 27 10 10 9 30 123 Amortization of Defferred Credits ]Min Rs] 68 70 69 208 66 62 61 190 58 54 52 163 58 62 57 177 737 Other Income ]Min Rs] 224 157 206 587 198 180 139 517 156 114 137 407 252 267 244 763 2,274 Total Revenue ]Min Rs) 9,556 9,934 9,733 29,223 8,871 8,307 7,964 25,142 7,742 7,031 6,853 21,626 8,170 8,628 7,445 24,243 100,235 Wheeling Charges Income (TESCO) pen Rs] 112 118 125 354 137 129 90 357 69 65 69 203 95 101 92 288 1,203 Operating Cost

Power Purchase Cost . ErNvin

n Rs]

m 10,189 9,406 8,328 27,922 8,300 8,197 9,547 26,043 10,600 7,446 9,120 27,167 9,209 8,803 7,937 25,949 107,081 O&M Expenses 720 979 871 2,570 805 754 899 2,459 867 800 856 2,524 952 1,010 923 2,884 10,437 Depreciation [Min Rs] 157 161 156 474 146 141 137 424 132 127 125 384 136 144.20 131.84 412 1,694 Amortization [Mln Rs] - - -

Provision for Bad Debt [Min Rs] 843 738 567 2,149 390 308 213 911 478 380 289 1,146 394 418 382 1,194 Total Operating Cost [Mln Rs1 11,909 11,285 9,922 33,115 9,641 9,400 10,796 29,836 12,078 8,753 10,390 31,221 10,691 10,374 9,374 30,439 1245,406120 Wheeling Charges - - - - - - - ..

EBIT [Min Rs] (2,241) (1,233) (64) (3,538) (632) (964) (2,742) (4,337) (4,266) (1,657) (3,469) (9,392) (2,425) (1,645) (1,837) (5,908) (23,174) Financial Charges (Min Rs] 553 567 551 1,671 514 497 483 1,494 465 447 440 1,352 480 509 466 1,455 5,972 EBT [Min Rs] (2,794) (1,800) (615) (5,209) (1,146) (1,461) (3,225) (5,831) (4,731) _ (2,104) (3,909) (10,744) (2,905) (2,155) (2,303) (7,363) (29,146) Tax [Mln Rs] - EAT (Min Rs/ (2,794) (1,800) (615) (5,209) (1,146) (1,461) (3,225) (5,831) (4,731) (2,104) (3,909) (10,744) (2,905) (2,155) (2,303) (7,363) (29,146) WPPF [Min Rs]

Profit for the period [min nsi (2,794) (1,800) (615) (5,209) (1,146) (1,461) (3,225) (5,831) (4,731) (2,104) (3,909) (10,744) (2,905) (2,155) (2,303) (7,363) (29,146)

Page 31: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Peshawar Electric Supply Company

Profit & Loss Statement (2013-14)

Power Balances Units Received [WW1I]

Units Lost [MkINh]

Units Lost (16.oel

Units Sold IMINVh]

Revenue

Projected

Month 1

1.115

428

38%

687

Month 2

1,132

418

37%

714

Month 3

1,002

302

30%

700

let OR's Total

3,249

1,148

35%

2,101

Month 4

914

244

27%

670

Month 5

861

229

32%

632

Month 6

852

235

32%

617

2nd tart's Total

2,627

708

27%

1,919

Month 7

833

248

30%

585

Month 8

753

210

28%

543

Month 9

791

237

30%

554

3rd Ores Total

2,377

695

29%

1,682

Month 10

765

207

27%

558

Month 11

853

280

33%

573

Month 12

947

314

33%

633

4th Qrrs Total

2,565 801

31%

1,764

Total

10,818

3,352

31%

7,466

Sales Revenue [Min Rs] 12,198 12,677 12,428 37,303 11,896 11,221 10,955 34,072 10,387 9,641 9,836 29,864 9,907 10,174 11,239 31,320 132,558

Subsidy (Min Rsj - - - - -

Fuel Price Adjustment (Min Rs] - - - -

Total Sales Revenue [Min Rs] 12,198 12,877 12,428 37,303 11,896 11,221 10,955 34,072 t0,387 9,641 9,836 29,864 9,907 10,174 11,239 31,320 132,558

Rental & Service Income [Min Rs] 12 12 12 36 12 11 11 33 10 9 10 29 10 10 11 31 129

Amortization of Def Credits (Min Rsj 88 92 90 271 86 81 79 247 75 70 71 217 72 74 82 227 961

Other Income [Mln Rs( 106 110 108 323 103 97 95 295 90 84 85 259 86 88 97 272 1,149

Total Revenue Ram Rs( 12,404 12,891 12,638 37,933 12,097 11,411 11,140 34,647 10,562 9,804 10,002 30,368 10,075 10,345 11,429 31,849 134,798

Wheeling Charges Income (TESCO) Mn Fs( 182 189 186 557 178 168 164 509 155 144 147 446 148 152 168 468 1,980

Operating Cost

Power Purchase Cost m e Rs] 10,287 9,508 8,404 28,199 8,375 8,268 9,634 26,277 10,713 8,073 8,940 27,726 8,604 -8,542 8,939 26,086 108,289

Wheeling Charges Mtn Rs] -

O&M Expenses [Min Rs) 1.099 1,143 1.120 3,362 1,072 1.011 987 3,071 936 869 887 2,692 893 917 1.013 2,823 11,949

Depreciation

Amortization

[Min Rs)

(Mtn Rs)

129 132

-

133 394 136 139

-

147

-

423 151 153 156 460 159

-

163 180 502 1,779.

Provision for Bad Debt (Min Rs) 231 240 236 707 225 213 208 646 197 183 186 566 188 193 213 594 2,512

Total Operating Cost [Min Rs] 11,747 11,023 9,893 32,663 9,809 9,632 10,976 30,417 11,997 9,278 10,169 31,444 9,844 9,815 10,345 30,004 124,528

EBIT [Min Rs] 839 2,057 2,931 5,827 2,465 1,947 328 4,740 (1,279) 670 (20) (630) 379 682 1,252 2,313 12,250

Financial Charges (Min Rs] 526 547 536 1,610 513 484 473 1,470 448 416 424 1,289. 428 439 485 1,351 5,720

EBT 'Min Rs] 312 1,510 2,395 4,218 1,952 1,463 (145) 3,270 41,728) 254 (444) (1,918) (49) 243 767- 961 6,530

Tax [Min Rsi 109 529 838 1,476 683 512 (51) 1,144 (605) 89 (155) (671) (17) 85 268 336 2,286

EAT (Min Rs] 203 982 1,557 2,742 1,269 951 (94) 2,125 (1,123) 165 (289) (1,247) (32) 158 498 625 4,245

WPPF [Mtn Rs] - - - - - - -

Profit for the period [Min Rs) 203 982 1,557 2,742 1,269 951 (94) 2,125 (1,123) 165 (289) (1,247) (32) 158 498 625 4,245

• Where actual figures are available , these should be replaced by the actual figures

Page 32: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 4

Peshawar Electric Supply Company

Balance Sheet fin million Rupees1

Description Provisional FY 2012-13

Projected FY 2013-14

Intangible Fixed Assets Net Fixed Assets in Operations 32,558 36,987 Total Net Fixed Assets in Operations 32,558 36,987

Capital Work in Progress 8,350 9,902 Long Term Loans to Employees 241 313 Deferred Cost & Long Term Deposits

8,591 10,215 Current Assets

Stores & Spares 3,212 4,220 Trade Debts 26,766 29,984 Advances, Prepayments, Other Receivables 15,765 33,070 Tariff Subsidy (Receivable from GoP) 29,209 17,526 Receivable from Associated Companies 29,363 35,176 Cash & Bank Balances 2,743 2,861

Total Current Assets 107,058 122,837 Total Assets 148,207 170,038

Subscribed Equity 18,082 18,082 Unappropriated Profit (155,409) (151,164) Total Equity (137,327) (133,082)

Long Term Liability Security Deposits 1,937 2,227 Employee Retirement Benefits 12,311 13,916 TFCs & SUKUK Deferred Credits 17,716 20,909 Total Long Term Loan 49,719 51,219

Total Long Term Liability 81,682 88,272

Current Liability Current Maturity on Long Term Loans Subsidy Received in Advance from GoP Provision for Taxation Payable to NTDC 193,093 202,568 Creditors, Accrued and Other Liabilities 10,759 12,280

Total Current Liability 203,852 214,848

Total Liabilities and Commitments

Total Liabilities and Equity 148,207 170,038

While submitting Quarterly Petitions , this form should be submitted with actual balance sheet of pre% and projected balance sheet of next quarter. The Balance Sheet should be substantiated with notes t

5

Page 33: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 5

Peshawar Electric Supply Company

Cash Flow Statement fin million Rupees'

Description Provisional FY 2012-13

Projected FY 2013-14

Average Monthly Demand Index (MDI) [MW] Units Purchased [GWh] 10,639 10,818 Transmission Losses (132 kV) [GWh] Distribution Losses [GWh] Units Sold to Customers [GWh] 7,128 7,466

Average Tariff Required [Rs/unit] 16.46 17.76 Average Tariff Existing [Rs/unit], 13.77 16.45

Tariff Difference (Rs/unit] 2.69 1.32

Revenue from Sales 60,247 132,558 Collection from Required [%] 92% 95%

Inflows from Operations Collection from Current Sales 55,427 125,930 Prior Year Recovery 83 378 Total Inflows from Operations 55,510 126,308

Outflow from Operations Payment for electricity (to CPPA) 112,851 98,813 Distribution Service Cost (=DMC) , 9,237 10,499 Total Outflow from Operations 122,088 109,312

Surplus/Deficit from Operations

Inflows from Other Sources Capital Contributions 3,675 4,155 Consumer Security Deposits 202 291 Other Incomes 2,397 1,279 GOP Subsidy (Actual and Estimated) 31,029 11,684 Long Term Loan / Redeemable Capital 40,663 1,500 Total Inflows from Other Sources 77,966 18,908

Outflow Others Financial Charges 5,659 5,556 Repayment of Long Term Loans 313 165 Investment Program 7,470 7,760 Working Capital/other Changes (2,932) 22,305 Total Outflow Others 10,510 35,785

Surplus/Deficit Others

Total Inflows (Operations + Others) 133,476 145,216

Total Outflows (Operations + Others) 132,598 145,097

Opening Balance 1,865 2,743 Surplus/Deficit for Fiscal Year 878 119 Deficit from Financing/Loans

Closing Balance 2,743 2,861

6

Page 34: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 6

Peshawar Electric Supply Company Power Purchase (Actual for the Last Corresponding Period)

Month 1 Month 2 Actual Actual

Demand & Energy

Month 3 Actual

2012-13 (Provisional) Month 4 Month 5 Month 6

Actual Actual Actual Month 7

Actual Month 8

Actual Month 9

Actual Month 10

Actual Month 11

Actual Month 12

Projected Total

Projected

Units Received [MIOAlb] 1,100 1,116 990 902 850 842 822 677 810 835 886 810 10,639 MDI [MW] 2,139 2,129 1,895 1,863 1,866 1,944 1,808 1,718 1,784 2,067 1,966 2,060 1,937 Energy Purchase Price [Rs/ kWh] 7.30 6.65 6.61 7.03 7.23 8.96 10.55 8.31 9.14 8.50 7.75 7.35 7.86 Capacity Purchase Price [Rs/ kW/ M] 922 847 859 962 1,014 948 979 974 877 935 900 878 923 Transmission Charge [Rs/ kW/ m] 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.910

Power Purchase Cost Energy Charge [Mln Rs] 8,032 7,420 6,538 6,347 6,145 7,536 8,674 5,626 7,402 7,098 6,864 5,952 83,634 Capacity Charge [Mln Rs] 1,972 1,804 1,627 1,793 1,892 1,843 1,771 1,673 1,565 1,933 1,770 1,809 21,451 Transmission Charge Adjustment **

[Mln Rs]

[Mln Rs]

184 183 163 160 160 167 155 148 153 178 169 177 1,997

Total Operating Cost [Mln Rs] 10,189 9,406 8,328 8,300 8,197 9,547 10,600 7,446 9,120 9,209 8,803 7,937 107,081

FORM - 6 ( A)

Peshawar Electric Supply Company Power Purchase (Projected) 2013-14

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Total

Demand & Energy Units Received [MkVVh] 1,115 1,132 1,002 914 861 852 833 753 791 765 853 947 10,818 MDI [Mw] 2,142 2,132 1,897 1,865 1,869 1,947 1,811 1,721 1,786 2,070 1,969 2,063 1,939 Energy Purchase Price [Rs/ kWh] 7.31 6.66 6.62 7.04 7.24 8.97 10.57 8.32 9.15 8.51 7.76 7.36 7.86 Capacity Purchase Price [Rs/ kW/ M] 913 839 850 953 1,003 938 970 964 868 926 891 869 914 Transmission Charge [Rs/ kW/ M] 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910

Power Purchase Cost Energy Charge [Mln Rs] 8,148 7,537 6,628 6,438 6,233 7,640 8,802 6,267 7,236 6,510 6,619 6,969 85,027 Capacity Charge [Mln Rs] 1,955 1,788 1,613 1,777 1,875 1,827 1,756 1,658 1,551 1,916 1,754 1,793 21,262 Transmission Charge [Mln Rs] 184 183 163 160 161 167 156 148 153 178 169 177 1,999 Adjustment ** [Mln Rs] - - - - - Total Operating Cost [Mln Rs] 10,287 9,508 8,404 8,375 8,268 9,634 10,713 8,073 8,940 8,604 8,542 8,939 108,288

1

Page 35: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 6 ( B )

Quarterly Adjustments - Qrt

EPP Adjustment EPP - 1st month of the Qrt

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

Reference - 6.44 6.99 8.96 7.68 Actual 7.30 7.03 10.55 7.68 Disallowed 0.01 0.00 0.04 Fuel Price Adjustment Allowed 0.85 0.04 1.56

0.04 1.56 0.00 EPP - 2nd month of the Qrt

Reference - 6.70 6.31 7.64 6.54 Actual 6.66 7.23 8.31 6.54 Disallowed 0.02 0.00 0.04 Fuel Price Adjustment Allowed (0.06) 0.91 0.63

EPP - 3rd month of the Qrt Reference - 6.55 7.59 7.76 6.70 Actual 6.61 8.96 9.14 6.70 Disallowed 0.01 0.03 0.04 Fuel Price Adjustment Allowed 0.05. 1.33 1.33

9

Page 36: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

1st

mo

nth

of

the

Qrt

2nd

mo

nth

of

the

Qrt

3r

d m

on t

h o

f th

e Q

rt

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Target Losses for the quarter 28.00% 28.00% 28.00% 28.00%

1st month of the Qrt Units Received (MkWh) 1,100 902 822 835 Units to be sold (MkWh) 792 650 592 601 Units without Life line (MkWh) 761 624 568 577 Adjustment already given (Mln Rs) 648 - - Adjustment that should have been with allowed costs only (Min Rs) 937 35 1,281 Impact of disallowed costs (Mln Rs) 9 4 32 Remaining adjustment for the quarter only allowed (Mln Rs) 290 35 1,281 Remaining adjustment for the quarter with allowed & disallowed (Mln Rs) 298 40 1,313

Impact of lifeline from new reference 27 1 37 Impact of losses from new reference 262 10 359 Impact of change of base reference price/ Stay order by Peshawar High Court 25 885

290 35 1,281

28.00% 28.00% 28.00% 28.00% 2nd month of the Qrt - 4% 4% 4% Units Received.(MkVVh) 1,116 850 677 886 Units to be sold (MkVVh) 803 612 487 638 Units without Life line (MkWh) 771 587 468 612 Adjustment already given (Mln Rs) - Adjustment that should have been with allowed costs only (Mln Rs) (63) 776 426 Impact of disallowed costs (Min Rs) 24 3 27 Remaining adjustment for the quarter only allowed (Mln Rs) (63) 776 426 Remaining adjustment for the quarter with allowed & disallowed (Mln Rs) (39) 779 454

Impact of lifeline from new reference (2) 1 12 Impact of losses from new reference (18) 9 119 Impact of change of base reference price/ Stay order by Peshawar High Court (44) 766 295

(63) 776 426

3rd month of the Qrt 28.00% 28.00% 28.00% 28.00% Units Received (MkWh) 990 842 810 810 Units to be sold (MkWh) 712 606 583 583 Units without Life line (MkWh) 684 582 560 560 Adjustment already given (Mln Rs) - - Adjustment that should have been with allowed costs only (Min Rs) 52 1,121 1,080 Impact of disallowed costs (Mln Rs) 6 28 36 Remaining adjustment for the quarter (Min Rs) 52 1,121 1,080 Remaining adjustment for the quarter with allowed & disallowed (Mln Rs) 58 1,149 1,115

Impact of lifeline from new reference 1 32 31 Impact of losses from new reference 1 314 302 Impact of change of base reference price/ Stay order by Peshawar High Court 49 775 746

52 1,121 1,080

Total Adjustment on account of EPP allowed only (Mln Rs) 278 1,933 2,787 Total Adjustment on account of EPP allowed and disallowed (Mln Rs) 318 1,968 2,882

ct

Page 37: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

CPP ADJUSTMENT 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Ref for the 1st month of the Qrt 1.53 1.95 2.40 2.23

1st month of the Qrt Actual CPP per kWh 1.79 1.99 2.15 2.09 Delta CPP per kWh 0.26 0.03 (0.24) (0.13) Adjustment Required for the Month (Mln Rs) 290 29 (200) (110)

Price Variance 209 21 (144) (79) Impact of losses 81 8 (56) (31)

290 29 (200) (110)

Ref. for the 2nd month of the Qrt 1.90 1.87 2.09 1.92 2nd month of the Qrt Actual CPP per kWh 1.62 2.23 2.47 2.12 Delta CPP per kWh (0.29) 0.35 0.38 0.21 Adjustment Required for the Month (Mln Rs) (319) 301 259 185

Price Variance (229) 217 186 133 Impact of losses (89) 84 72 . 52

(319) 301 259 185

Ref. for the 3rd month of the qrt 1.92 2.15 1.84 1.82 3rd' month of the Qrt Actual CPP per kWh 1.64 2,19 1.93 2.35 Delta CPP per kWh (0.27) 0.04 0.10 0.52 Adjustment Required for the Month (Mln Rs) (269) 30 78 422

Price Variance (194) 22 56 304 Impact of losses (75) 8 22 118

(269) 30 78 422

Total Adjustment on account of CPP (Mln Rs) (298) 360 136 498

Price Variance (215) 259 98 358 Impact of losses (83) 101 38 139

(298) 360 136 498

to

Page 38: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

UoSC ADJUSTMENT 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Ref for the 1st month of the Qrt 0.17 0.21 0.22 0.25

1st month of the Qrt

Actual UoSC per kWh 0.17 0.18 0.22 0.24 Delta UoSc per kWh (0.01) (0.03) (0.01) (0.01) Adjustment Required for the Month (Mln Rs) (8.02) (27.96) (4.93) (11.94)

Price Variance (5.77) (20.13) (3.55) (8.59) Impact of losses (2.24) (7.83) (1.38) (3.34)

(8.02) (27.96) (4.93) (11.94)

Ref. for the 2nd month of the Qrt 0.18 0.20 0.22 0.20 2nd month of the Qrt Actual UoSC per kWh 0.16 0.19 0.22 0.22 Delta UoSc per kWh (0.02) (0.02) (0.01) 0.02 Adjustment Required for the Month (Mln Rs) (22.17) (12.79) (4.17) 19.53

Price Variance (15.96) (9.21) (3.00) 14.07 Impact of losses (6.21) (3.58) (1.17) 5.47

(22.17) (12.79) (4.17) 19.53

Ref. for the 3rd month of the qrt 0.20 0.20 0.25 0.20 3rd month of the Qrt Actual UoSC per kWh 0.16 0.20 0.19 0.26 Delta UoSc per kWh 0.04 (0.00) (0.06) 0.06 Adjustment Required for the Month (Mln Rs) 35.02 (2.87) (50.44) 47.07

Price Variance 25.22 (2.06) (36.32) 33.89 Impact of losses 9.81 (0.80) (14.12) 13.18

35.02 (2.87) (50.44) 47.07

Total Adjustment on account of UoSC (Mln Rs) 5 (44) (60) 55

Total Adjustment for the quarter allowed costs only (Mln Rs) (15) 2,249 2,864 552 Total Adjustment for the quarter allowed & Disallowed costs only (Mln Rs) 25 2,285 2,959 552

Page 39: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Impact of Extra or Less Purchases

Ref Unit Purchased ( MkWh ) 1st month of the CM

2nd month of the Qrt

3rd month of the QR

1138

922

1007

988

996

942

879

901

943

786

982

1041 3,067 2,926 2,723 2,809

Actual Unit Purchased ( MkWh ) 1st month of the Qrt 1.100 902 822 835 2nd month of the Qrt 1,116 850 677 886 3rd month of the Qrt 990 842 810 810

3,206 2,594 2,309 2,531

Difference ( MkWh ) 1st month of the Qrt (38) (86) (57) 49 2nd month of the Qrt 194 (146) (224) (96) 3rd month of the Qrt (17) (100) (133) (231)

139 (332) (414) (278)

PPP Ref ( Per kWh )

Ref PPP ( per kWh ) 1st month of the Qrt 8.14 9.15 11.57 10.16 2nd month of the Qrt 8.78 3.39 9.96 8 66 3rd month of the Qrt 8.66 9.95 9.80 8.72

Impact of extra Purchases ( Rs. Millions ) 1st month of the art (305) (785) (661) 499 2nd month of the Qrt 1,701 (1.225) (2,232) (834) 3rd month of the Qrt (151) (999) (1,301) (2.017)

1,245 (3,010) (4,194) (2,352)

Page 40: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

1,965.33 22.08

1,987.42 (88.91) (1.00)

2,054.24 23.08

2,077.32

1,874.98 1,140.62 1,800.01

21.07 12.82 - 20.22

1,896.05 1,153.44 1,820.23

212.95 180.28 - 178.45

2.39 2.03 - 2.01

1,662.03 960.35 - 1,621.56

18.67 10.79 18.22

1,680.70 971.14 1,639.78

PPP Reconciliation Total PPP for the 1st Month at reference (Rs.Million) Total PPP for the 2nd Month at reference (Rs.Million) Total PPP for the 3rd Month at reference (Rs.Million)

9,265 9,044 10,172 7,987

8,098 8,354 8,970 8,503

8,725 9,370 9,238 9,079

26,088 26,768 28,380 25,568

Actual PPP ( per kWh ) 1st month of the Qrt 9.26 9.20 12.90 10.02 2nd month of the Qrt 8.43 9.64 11.00 8.89 3rd month of the Qrt 8.42 11.34 11.26 9.30

Total PPP for the 1st Month at actual (Rs.Million) 10,189 8,300 - 10,600 8,364 Total PPP for the 2nd Month at actual (Rs.Million) 9,406 8,197 7,446 7,873 Total PPP for the 3rd Month at actual (Rs.Million) 8,328 9,547 9,120 7,532

27,922 26,043 27,167 23,769 18,792 60

Total Adjustment for Quarter 1,834 (725) (1,214) (1,800) Net Recoverable 1,230 (761) (1,330) (1,800)

DM & Prior Year Adjustment

Reference Distribution Margin (per Kwh) 0.89

0.89 0.89 0.89 Reference Prior year Adjustment (per Kwh) 0.01

0.01 0.01 0.01

Impact of increased unit purchased translated in the form of unit sold (per Kwh) 99.89

(239.27) (298.18) (200.50)

Impact of DM in Rs. Million

88.91 (212.95) (265.38) (178.45) Impact of Prior Period Adjustment in Rs. Million

1.00 (2.39) (2.98) (2.01)

Total (Rs Million)

89.91 (215.35) (268.36) (180.45)

Distribution Margin at reference units for the Qtr (Rs. Million) Prior Year Adjustment at reference units for the Qtr (Rs. Million) Total (Rs. Million)

Distribution Ma rgin at Actual Units for the Qtr (Rs. Million) Prior Year Adjustment at Actual units for the Qtr (Rs. Million) Total (Rs. Million)

Net Impact 89.91 (215.35) (182.30) (180.45)

6,369 9,598

3,229

(2,661)

1,055 161

1,784

Actual DM & PYA Recovered Actual DM & PYA at notified Rates

Net DM & PYA Adjustment

Impact of PPP Adjustment

Sales Mix

Impact of Disallowed Cost Prior Year Adjustment

(3

Page 41: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED (PESCO) PROFIT AND LOSS

Act. Act. Act. Act. Act. Act. Act. Act. Act. Act./Pro Act./Pro Act./Pro

Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13

Rs. In Million

TOTAL

Quantitative/Financial Data Units Purchased (Mkwh) Units Sold (Mkwh) Distribution Losses (MkWH) Distribution Losses (%age) Recovery (%age) Average Sale Rate (Rs/kwh) Average PPP Billed Rate (Rs/Kwh) Company Tarrif Subsidy Rate PPP Adjusted Distribution Margin

Nepra Standard Sales Actual Sales Extra losses Losses actual rate At Nepra Rate Sales Mix

1,100 657 444

40.32% 71.10%

0.72 792.35 656.74 135.61

1,910.50 1,867.31

7,659.94 7,128.27

531.67 7,369.19 7,321.10

(209.16) (306.92) (234.05) 216.27 264.62 360.83 184.18 292.51 230.83 84.59 89.71 82.02 1,055.44

14.09 5.28

15.51 1.12

9.26 8.80

13.77 803.29 681.78 121.51

1,727.89 1,673.19

1,116 682 434

38.89% 74.70%

14.22 5.34

13.80 1.50

8.43 8.88

712.49 669.01 43.48

613.94 598.73

990 669 321

32.39% 80.57%

14.12 5.37

12.45 1.19

8.75 8.42

649.59 640.00

9.60 128.89 132.14

902 640 262

29.06% 86.64%

13.43 5.30

12.97 1.04

9.20 8.13

611.96 604.09

7.87 104.86 108.31

850 604 246

28.93% 89.45%

13.33 5.18

13.57 1.01

8.15 9.64

605.90 589.29

16.61 218.52 228.69

842 589 252

29.97% 92.70%

13.16 5.10

16.20 1.37

11.34 8.06

591.76 559.39 32.37

435.01 445.67

822 559 262

31.94% 83.61%

13.44 4.98

18.95 1.54

12.90 8.46

487.28 519.05 (31.77)

(419.50) (437.41)

677 519 158

23.31% 86.99%

13.21 4.89

14.35 1.56

11.00 8.32

583.34 500.10 83.24

1,107.82 1,146.24

810 500 310

38.27% 90.10%

13.31 4.94

18.24 1.62

11.26 8.37

601.25 563.91 37.34

508.61 514.21

835 564 271

32.47%

13.62 5.17

15.19 1.77

10.25 8.45

637.69 598.09 39.61

539.44 545.38

886 598 288

32.47%

13.62 5.17

15.19 1.77

10.25 8.45

583.03 546.82 36.21

493.20 498.63

810 547 263

32.47%

13.62 5.17

15.19 1.77

10.25 8.45

10,639 7,128 3,511

33.00% 83.29%

13.62 5.17

15.02 1.42

10.07 8.45

tit

Page 42: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 7

Distribution Company Line Losses (Test Year)

Power Balances

2012-13 (Provisional) Month 1 Month 2

Actual Actual Month 3

Actual Month 4

Actual Month 5

Actual Month 6

Actual Month 7

Actual Month 8

Actual Month 9

Actual Month 10

Projected Month 11 Projected

Month 12 Projected

Total Provisional

Units Received Units Sold

[MkWh] 1,100 1,116 990 902 850 842 822 677 810 835 886 810 10,639

Units Lost [MkVVh] 657 682 669 640 604 589 559 519 500 564 598 547 7,128

Units Lost [MkWh] 444 434 321 262 246 252 262 158 310 271 288 263 3,511

Technical Losses [%age] 40% 39% 32% 29% 29% 30% 32% 23% 38% 32% 32% 32% 33%

Administrative Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Magel 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Technical Losses at Different Levels Transmission Losses 132 kV 11 kV Losses

[%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

LT Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Total Technical Losses [%age] 0% 0% - 0% -- 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

FORM - 7 (A)

Distribution Company Line Losses * (Projected)

Power Balances

2013-14 Month 1 Month 2 Month 3 Month 4- Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Total

Units Received Units Sold

[MkWh] 1,115 1,132 1,002 914 861 852 833 753 791 765 853 947 10,818

Units Lost [MkVVh] 687 714 700 670 632 617 585 543 554 558 573 633 7,466

Units Lost [MkVVh] 428 418 302 244 229 235 248 210 237 207 280 314 3,352

Technical Losses [%age] 38% 37% 30% 27% 27% 28% 30% 28% 30% 27% 33% 33% 31%

Administrative Losses [%age] 0% - 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Magel 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Technical Losses at Different Levels Transmission Losses 132 kV 11 kV Losses

[%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

LT Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Total Technical Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

* Where actual figures are available , these should be replaced by the actual figures.

15

Page 43: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 8 Operational and Technical Information

DISCO load factors on yearly basis 70%

NTDC/DISCO Delivery Points metering accuracy

DISCO metering accuracy For all customers (residential, commercial, industrial, etc.)

Estimated High Voltage Transmission lines losses (132 kV)

100.00%

All OK with ± 2.50%

5.30%

Page 44: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

85 910

1,939

12.00

1,999

913.70

1,939

12.00

21,262

7.86

10,818

85,027

(Table 11 - 11.33)

(Table 11 - 11.16)

(Table 11 - 11.17)

(Table 11 - 11.33)

Form 6 ( A)

10.01 Use of System Charges (NTDC)

10.02 Estimated Average Rate

10.03 Estimated Maximum Demand Indicator (MDI)

10.04 Number of Months (Fiscal Year)

10.05 Estimated Use of System Charges = (10.02 x 10.03 x 10.04)

10.06 Fixed/Capacity Charge

10.07 Estimated Average Rate

10.08 Estimated MDI

10.09 Number of Months (Fiscal Year)

10.10 Estimated Capacity Charge = (10.07 x 10.08 x 10.09)

10.11 Energy Charge

10.12 Estimated Average Energy Charge

10.13 Estimated Energy Purchase for Fiscal Year

10.14 Estimated Energy Charges = (10.12 x 10.13)

0.24 10.23 Prior Period Adjustement (Uncovered Costs)

Peshawar Electric Supply Company

Average Rate per Unit Purchased and Sold

- Weighted Average Cost per Unit Sold to Customers

10.15 Estimated Power Purchase Price = (10.05 + 10.10 + 10.14) 108,288

10.16 Average Rate per Unit Purchased = (10.15 / 10.13) 10.01

10.17 Estimated Energy Sold 7,466

10.18 Average Energy Rate per Unit Sold = (10.15 / 10.17) 14.50

10.19 Distribution Margin 16,765

10.20 Distribution Margin per Unit Sold = (10.19 / 10.17) 2.25

10.20A TFCs Interest charges 5,720

10.208 TFCs Interest charges per unit sold 0.77

10.21 Total Cost per Unit Sold to Customers = (10.20 + 10.18) 17.52

10.22 Estimated Revenue from Energy Sold (10.15 + 10.19)

10.24 Required Estimated Revenue from Energy Sold (10.22 + 10.23) 17.75

Page 45: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

11.01

11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17

11.18

11.19 11.20 11.21 11.22 11.23 11.24 11.25 11.26 11.27 11.28 11.29 11.30 11.31 11.32

Table 11 - CPPA Charges: Use of System, Capacity and Energy

Use of System Charges (NTDC1 1000

Fixed Use of System Rate

[Rs/kW] 4

Fixed Use of System Charges

[ Rs] 5=3 x 4

Energy [kWh]

6

Variable Use of System

Rate [Rs/kWh]

7

Variable Use of System Charges

[ Rs] 8 = 6 x 7

Sum Use of System Charges

[ Rs] 9

Month Year 1 2

Demand [kW]

3 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2,142,070 2,131,507 1,897,241 1,865,461 1,868,716 1,946,720 1,810,622 1,720,608 1,785,984 2,069,678 1,968,837 2,063,000

85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910

184,025,208 183,117,768 162,991,989 160,261,765 160,541,402 167,242,713 155,550,514 147,817,445 153,433,926 177,806,041 169,142,799 177,232,317

1,115,000,000 1,132,000,000 1,002,000,000

914,000,000 861,000,000 852,000,000 833,000,000 753,000,000 791,000,000 765,000,000 853,000,000 947,000,000

Capacity Rate per

kWh [ Rs/kWh ] 15=11 /6

184,025,207.78 183,117,768.07 162,991,989.19 160,261,765.21 160,541,402.21 167,242,712.51 155,550,513.89 147,817,445.41 153,433,925.83 177,806,041.23 169,142,799.08 177,232,316.58

Avg per month [MW] 23,270,445

1,939.20 85.910

Energy Charge

[Rs] 12

1,999,163,887 Avg per month [MWh]

10,818,000,000 901,500.00

Energy Rate per kWh

[ Rs/kWh ) 16=12/6

1,999,163,887

Final Rate per kWh

[ Rs/kWh ] 17 = 13 / 6

Capacity and Energy

Capacity Charge

[Rs] 11

Sum of all Charges

[Rs] 13 = 9+11+12

Use Of System Rate per kWh

[ Rs/kWh ] 14 = 9 / 6

Month Year 1 2

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

1,955,095,396 1,787,829,920 1,612,561,990 1,776,942,430 1,875,061,932 1,826,874,115 1,755,525,390 1,658,392,873 1,550,824,257 1,916,090,468 1,754,233,896 1,792,690,132

8,148,240,785 7,537,267,195 6,628,351,357 6,437,707,269 6,232,527,007 7,639,666,395 8,801,906,379 6,266,972,930 7,235,833,027 6,510,499,564 6,618,882,736 6,969,012,947

10,287,361,388.55 - 9,508,214,883.19 8,403,905,335.76 8,374,911,464.65 8,268,130,341.83 9,633,783,223.01

10,712,982,282.16 8,073,183,248.03 8,940,091,210.07 8,604,396,073.57 8,542,259,431.18 8,938,935,395.83

0.17 0.16 0.16 0.18 0.19 0.20 0.19 0.20 0.19 0.23 0.20 0.19

1.75 1.58 1.61 1.94 2.18 2.14 2.11 2.20 1.96 2.50 2.06 1.89

7.31 6.66 6.62 7.04 7.24 8.97 10.57 8.32 9.15 8.51 7.76 7.36

9.23. 8.40 8.39 9.16 9.60

11.31 12.86 10.72 11.30 11.25 10.01 9.44

11.33 11.34 Avg Cap. Charge =

21,262,122,799 913.70

85,026,867,592 108,288,154,278 0.18 1.97 7.86 10.01

Page 46: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

DEMAND (Actual and Calculated)

Fiscal Year

Actual . Demand/Forec

ast (MW)

Change (MW)

Calculated Demand/ Forecast

(MW)

Change (MW )

Number of Consumers (Thousand)

Change (Thousand)

2000-2001 1332 / 1465 133.20 1557 / 1713 155.69 1691.27 96.00 2001-2002 1402 / 1542 140.20 1639 / 1803 163.89 1801.10 109.83 2002-2003 1476 / 1624 147.60 1725 / 1898 172.51 1882.18 81.08 2003-2004 1554 / 1709 155.40 1816 / 1998 181.59 1951.40 69.22 2004-2005 1635 / 1799 163.50 1911 / 2102 191.15 2043.31 91.91 2005-2006 1721 / 1893 172.10 2012 / 2213 201.21 2139.14 95.83 2006-2007 1812 / 1993 181.20 2118 / 2330 211.80 2277.03 137.89 2007-2008 1925 / 2118 192.50 2474 / 2721 247.40 2375.82 98.79 2008-2009 1797 / 1977 179.70 2773 / 3050 277.30 2437.60 61.78 2009-2010 1769 / 1946 176.90 2898 / 3188 289.80 2536.15 98.55 2010-2011 2101 / 2372 271.00 3075 / 3382 308.00 2646.92 110.77 2011-2012 2696 / 2858 188.72 3440 / 3677 236.74 2677.33 30.41 2012-2013 2757 / 2949 192.99 3720 / 4001 297.00 2767.70 90.37 2013-2014 3001 4092 2907.05 2014-2015 3166 4501 2998.96 2015-2016 3356 4952 3094.78

t9

Page 47: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Demand Actual/Forecasted and # of Customers

5000

4500

4000

3500

3000

to' c3 2500 O 0

2000 2

1500

1000

500

0

4952

v 3440

illr • -."1111-911111WAljalleg 0

1411011111101"W

_aa

1111444092

2907.05

2922 -.."‘

3294095if38.96

3094.78

=101111=miglitilmiur

own

2437.60

2898

2536.15

MI

a

• ' •

A 2101

169.081.2

...40 1402

mar Astriommell

1476

1951.40

1554

2043.31

1635

2139.14

2012

2277.03

11.111:Amigimmi:r375,044.824

2000-20012001-20022002-20032003-20042004-20052005-20062006-20072007-20082008-20092009-20102010-20112011-20122012-20132013-20142014-20152015-2016

—4-Actual Demand/For-ecast ---Calculated Demand/ Forecast —Ai—Number of Consumers (Thousand) (MW) (MW)

7-°

Page 48: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 11

Sold

12 months moving

Month [MWh] average Jul-10 640

Aug-10 620 Sep-10 602 Oct-10 600

Nov-10 572 Dec-10 576 Jan-11 552 Feb-11 534 Mar-11 525 Apr-11 523

May-11 565 June-11 669 July-11 655 581 Aug-11 667 583 Sep-11 656 587 Oct-1', 617 591

Nov-11 595 593 Dec ' ' 575 594 Jan-12 554 594 Feb-12 538 595 Mar-12 526 595 Apr-12 532 595

May-12 546 596 Jun-12 601 594 Jul-12 657 588

Aug-12 682 589 Sep-12 669 590 Oct-12 640 591 Nov-12 604 593 Dec-12 589 594 Jan-13 559 595 Feb-13 519 595 Mar-13 500 594 Apr-13 547 592

May-13 Jun-13

Table/Graph 14 - Sold Energy Evaluation and Setting up Sold Energy Average

592 Average Sold Energy for last 12 months 7,109 Assumed Average Load for next Fiscal Year

DISCO Evaluation of Sold Energy to Customers by using 12 month moving average [Sales in :AWN 680

660

56-0-41-71.17-

640

620

600

580

560

540

520

500 c-- > cil 0 z :::

i c_ 2 K > —

-.2 . O a . , aa -,,, 8 8 8 8 8 : ..' .:: :•

—40—Series1

.._ C- n o 0 2 F = 2- K a: 7 C. •,,

K c_. E z 9-'T 0 ▪ 0 t _ :a -:-...: ̀.2- 2 i -‹ -

R; R; R; R; ,T.; i, — N — NJ Z -r Z 61 '7 ; —WI— Series1

W LI

-

Page 49: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM-12

Month Load

ININ/14

12 months moving •1.1111•11.•

Jul-08 1994039 lglosso mos 1870114 1863632

Sap-OS 1874713 1885906

Oct-08 1711419 1159425 Nov-09 1597386 1847137

Deo08 1867851 1824599

Jan-09 1895080 1801536 Fob-09 1712142 1791803 Mar-09 1678708 1774344

Apr-09 1730940 1761808

May-09 2001660 1774350

Jun-09 2024217 1792502 Jul-09 2085975 1100763 Aug-09 2115175 1121446

Sep-09 2101670 1136280

Oct-09 2086559 1873035

Nov-09 1638120 1910953

Dec-09 1821715 1916326

Jan-10 1877633 1927117 Feb-10 1675350 1943916

Mar-10 1112590 1953263 Apr-10 1847630 1951778 May-10 1965890 1945689

Jun-10 1944647 1929489 Jul-10 2039985 1914202 Aug-10 1911797 1906419 Sep-10 2008960 1391341 Oct-10 1768790 1846377 Nov-10 1490660 1806513

Dec-10 1551250 1918326 Jan-11 1600890 1921562 Feb-11 1558550 19439115 Mar-11 1603080 1953263 Apr-11 1781200 1951778 May-11 2032393 1945689 Jun-11 2162479 1929489 Jul-11 2139112 1914202 Aug-11 2243984 1906419 Sep-11 2102977 1891340 Octal 2209856 1146377 Nov-11 1945669 1806513 Dec-11 1639726 1794577 Jan-12 1706375 1779399 Feb-12 1760979 1762469 Mar-12 1714405 1739741 Apr-12 1763318 1715500

May-12 1959320 1708565

Jun-12 1968080 1713407

Jul-12 1955670 1723323

Aug-12 2150580 1721133

Sap-12 2006040 1714563

Oct-12 1586290 1736281

Nov-12 1467300 1749664

Dec-12 1496500 1753010

Jan-13 1524240 1747717

Feb-13 1557820 1746257

Mar-13 1441750 1762074

Apr-13 1472410 1785982

May-13 1876100 1790483

Jun-13 2026188 1790751

Jul-13 2074660 1764941 Aug-13 2124300 1729005

Sep-13 1927200 1706983

Oct43 1846900 1689494

Nov-13 1627900 1691293

Dec-13 1536650 1725233 Jan-14 1460730 1778134

Feb-14 1540300 1137593

Mar-14 1631550 1906273

Apr-14 1759300 1979760

May-14 1930120 1930120

Jun-14 2029400 2029400

Table/Graph 13 - Load Growth Evaluation and Setting up Load Average PESCO Evaluation of Load Growth by using 12 months moving average

2500000

2000000

1500000

1000000

500000

0

Chart Title

A A Ai '

t - 14 AIM

11 pity 41.44r *Of .

rii I 4 E2 19. 1 $$ $ 1 ;. g ; " 1 '5" '9. al ; . ; ; . al ; al ; ; ; ; ; ; ; ; ; Z ; ;

—0-.Senes1 —41-5edes2

Page 50: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FROM -13

Asset register as the year ended at date 30-06-2014

No. Description

Cost Accumulated Depreciation Book Value as at

June 30,

2014

As at July 01,

2013

Addition/ deletions

As at June, 30

2014

As at July 01,

2013

Changes during the Year

As at June, 30

2014

A. Land

1 Freehold 297,446,984 1,603,683 299,050,567 - 299,050,567 2 Leasehold 878A00 - 878,400 - - 878,400

Total 298,325,384 1,603,583 299,928,967 - - - 299,928,967 B. Buildings

1 Residential Buildings 348,296,589 43,270,507 391,567,096 90,839,161 7,831,341.91 98,670,503.33 292,896,592

2 Non-Residential Buildings 503,194,778 503,194,778 131.238,126 10,063,895.56 141,302,021.68 361,892,756

3 GSO Residential Buildings 288,648,201 36,058,755 324,706,956 75,282,278 6,494,139.12 81,776,416.73 242,930,539

4 GSO Non- Residential Buildings 486,996,490 - 486,996,490 127,013,454 9,739,929.80 136,753,383 82 350,243.106

Total 1,627,136,058 79,329,262 1,706,465,320 424,373,019 34,129,306 458,502,326 1,247,962,994

C. Sub Transmission

1 132 KV Sub Transmission Lines 6,008,111,742 254,579,811 5,262,691,552 1,531,381,506 134,194,204 1,665,575,710 3,597,115,642

2 66 KV Sub Transmission Lines 672,889,223 50,915,962 723,805,185, 391,699,404 25,333,181 417,032,585 306,772,600

3 33 KV Sub Transmission Lines 213,848,393 - 213,848;393 43,336,375 7,484,694 50,821,069 163,027,324

Total 5,894,849,358 305,495,773 6,200,345,131 1,966,417,285 167,012,080 2,133,429,364 4,066,915,767

D. Grid Station

1 132 KV Grid Station 5,108,628,942 763,739,432 5,872,368,374 1,830.618,235 155,532,893 1,986,151,128 3,886,217,246

2 66 KV Grid Station 644,192,834 175,150,910 819,343,743 277,797,208 28,677,031 306,474,239 512,869,504

3 33 KV Grid Station 202,829,925 - 202,829,925 2,534,895 7,099,047 9,633,942 193,195,982

Total 5,955,651,700 938,890,342 6,894,542,042 2,110,950,338 191,308,971 2,302,259,310 4,592,282,732

E. 11 KV Distribution Equipments

1 11 KV Poles 6,311,013,043 1,039,347,535 6,350,360,578 1,529,764.861 172,262,620 1,702,027,481 4,648,333,097

2 11KV Line 5,387,895,107 624,637,227 6,012,532,334 1,682,982.228 210,438,632 1,893,420,860 4,119,111.474

3 Distribution Transformer 7,636,583,412 914,479,987 8,551,063,399 2,216,311,686 299,287,219 2,515,598,905 6,035,464,494

Total 18,335,491,562 2,578,464;750 20,913,956,311 5,429,058,775 681,988,471 6,111,047,246 14,802,909,065

F. LT Distribution Equipments

1 LT Poles 4,487,234,057 944,230,210 5,431,464,267 1,359,402,695 171,739,249 1,531,141,944 3,900,322,322

2 440 LT Distribution Line 4,724,839,693 630,144,227 5,354,983,920 1,428,305,796 187,424,437 1,615,730,233 3,739,253,687

3 220 LT Distribution Line - _ . - - - -

4 KWh Meters & Service Cable 6,329,221,789 620,327,181 6,949,548,970 2,611,243,413 243,234,214 2,854,477,627 4,095,071,344

5 Misc. Equipment - -

Total 15,541,295,539 2,194,701,619 17,735,997,158 5,398,951,904 602,397,901 6,001,349,804 11,734,647,353

G. Vehicles

1 132/66/33 KV GSO Vehicles 85,437,511 36,994,184 122,431,694 52,812,953 12,243,169.45 65,056,122 57,375,572

2 Vehicles 538,016,050 55,491,276 591,507,325 387,294,986 59,150,732.53 446,445,719 145,061,606

Total 621,453,560 92,485,459 713,939,020 440,107,939 71,393,902 511,501,841 202,437,179

H. Detail of General Plant Assets

1 Computer Equipment 119,222,983 8,173,747 127,396,730 81,393.802 12.739,672.98 94,133,475 33,263,255

2 Furniture 26,567,242 811,290 27,378,532 24,507,121 2,737,853.15 27,244,974 133,557

3 Workshop Equipment 30,013,910 - 30,013,910 27,063,808 2,898,813.04 29,962,621 51,289

4 Laboratory Equipment 39,401,779 - 39,401,779 35,528,932 3,805,515.85 39,334,448 67,331

5 Misc. Equipment 70,530,422 8,144,176 78,674,598 , 63,597,904 8,104,899.79 71,702,604 6,971,994

Total 285,736,336 17,129,213 302,865,548 232,091,568 30,286,555 262,378,122 40,487,426

Grand Total 48,559,939,497 6,208,100,000 54,768,039,496 16,001,950,827 1,778,517,186 17,780,468,013 36,987,571,484

Page 51: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 14

Aging of Accounts Receivables as on 30th June

Provisional

2012-13

Projected

2013-14 Outstanding for current year Rs In Million 7,400 5,730 Outstanding for more than 1 year Rs In Million 11,761 7,400 Outstanding for more than 2 years Rs In Million 9,257 11,761 Outstanding for more than 3 years Rs In Million 5,387 9,257 Outstanding for more than 4 years Rs In Million 3,185 5,387 Outstanding for more than 5 years Rs In Million 23,931 27,116 Total Receivables as on June 30, Rs In Million 60,921 66,651

Note: The debtor include arrears of ShabQadr division which are 100% irrecoverable

Page 52: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FROM - 15

10640 29851 Projected Ertrgy Sales by Tariffs

Category Voltage

Level

Energy Purchased

2012-13

GWh

Energy Sales

2012-13

, GWh

. Distribution

Losses

%age -

Sales

Growth

rate

Projection

2013-14

GWh

Sales

Growth Projection

Al Domestic

LV

LV

LV

LV

LV

LV

LV

LV

.

399

1,053

2,912

1,324

1,500

0

100

223

586

1,625

739.

837

0

56

44%

44%

44%

44%

44%

44%

44%

4.7%

4.7%

4'.7%

4.7%

4.7%

4.7%

233

614

1 : 702

774

e77

0

58

Flat Rate Fate

Upto - 50

1 -100

101 - 300

301 - 700

above 700

Temporary Domestic

Al (TOD)

Summary 7,288 4,0E5 44% 4.7% 4,253 A2 Commercial

LV

LV

LV

LV

311.08

47.09

367 48

1.32

233

• 35

275

1

25%

25%

. 25%

25%,

4.7%

4,7%

4.7%

6.1%

244

37

289

1

A2 - A

.3. 20 kki/

A2(21 TOD

Tr emporary C(iryi.y.i etc;iai

1- Summar./ 726.97 545 25% 4.7% 571 i Industry

LV

LV

LV

LV

HV

STG

STG

6%

, 5%

5%

5%

5%

5%

4.7%

4.7%

4.7%

4.7%

4.7%

.

4.7%

;17

103

91

347

633

828

B-1 403 V Upto 40 kW

81 (TOD

B-2 403V Uplo (41.500 kW)

B-2 400 V (TOO)

B-3 11'33 KV i TOD)

8-4 60'122.223 KV

18-4 66'1321220 KV (100j

118 37

103.39

92.04

349..86

638 01

831.28

• 112

.93

. 87

331

604

596 Summery! 1,932.06 1,831 5% 4.7% 1,913

Bulk Supply C-1(a) uplo 2C kW

C-1(b) above 20 kW

IC-1(c) ,TOD) 1D-2 11,33 KV

02 (TOD)

,C-3 ;(6/132/220 KV) i IC3 (TOD)

!Tempo' aiy(E2-iia E2iiti,E2iii;

1 K(Aj - A,31< 1 15(3) - KESC (Dining)

1K(C) Rawat Lat..

LV

LV

LV

I HV

STG

STG

STG

NV

HV

STG

HV

0 99

35 71

37.69

52.55

59.07

16.17

294.32

1

84

37

52

53

16

290

2%

2%

2%

2%

2%

2%

2%

4.1%

4.7%

4.7%

4.6%

4.7%

4.7%

4.7% .

68

I 35

54

6 !

I 17 .

304 .

rr Summary 546.50 538 2% 4.7% I 563

iTubewells

20

45

59

15%

15%

15%

4.7%

4.7%

4.7%

2'i

27

61

I ID-1 Scarp

D-1 (TOD)

D-2 (i) Runjab & Said

0-2 (iii NV/FP & Balochistao

AGRI TAN D-2 t11STOD

D-2 (in ST013

D-2 k 1 I: TOD

!,D-::.• (II) TOD

LV

LV

LV

LV

LV

LV

23.39

53 53

69.31

Seminary 146.23 124 151% 4.7% 1.._ L.0 Others -Tr

4.8%

4.3%

24

2

0-1/0-2 Public Lighting

13-1/H-2 Residential Colonies

1-Traction

I-J-Co-Generatioii

LV 1 23.67

NV ; 2.13

HV '

NV I I

23

2 i

.

4%

4%

-- Summary 1 26.02 25i 4.7% 1 26

,__ Total 10.640.6) 7, 1 281 23',, 1 --i---

4 1--

.7% 7 -,,, 1

Page 53: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 16

Peshawar Electric Supply Company

< I Operating Cost

2012-13 2013-14 Provisional Projected

A Power Purchase Cost

Energy Charge [Mln Rs]

Capacity Charge [Mln Rs]

Transmission Charge [Mln Rs] .

Adjustment * [Mln Rs]

Total Power Purchase Cost [Mln Rs]

* Provide the detail of adjustment

83,634 85,027

21,451 21,262

1,997 1,999

107,081 108,288

B Operation & Maintenance *

Employees Cost **

Salaries, Wages & Benefits [Mln Rs] 7,842 8,753

Retirement Benefits [Mln Rs] 1,200 1,450

Total Employees Cost [Mln Rs] 9,042 10,203

Admin Expenses [Mln Rs] 502 578

Repair & Maintenance [Mln Rs] 551 765

Travelling [Mln Rs], 147 169

Transportation [Min Rs] 149 178

Management Fee [Mln Rs] 37 42

Miscellaneous Expenses [Min Rs] 10 12

Total O&M [Mln Rs] 10,437 11,949

* The reasons of increase/ decrease in actual expenses against the determined expenses and the justification of the increase required for the period under consideration. ** The details of existing and increase in number of employees department wise along with cost and strength analysis should be provided

C Depreciation & Amortization

Depreciation [Mln Rs] 1,694 1,779

Amortization of Leased Assets [Mln Rs],

Total [Mln Rs] 1,694 1,779

D Provision for Bad Debts

Provision for bad debts *

[Mln Rs]

5,400 2,512

Bad debts written off

[Mln Rs]

Page 54: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

Distribution Margin Comparison FORM - 17 Peshawar Electric Supply Company

Actual Actual Determined Provisional Projected 2010-11 2011-12 2012-13 2012-13 2013-14

O&M Expenses 9,384 24,607 8465 15,837 14,461 Increase in % 21.8% 162.2% -65.6% -36% -9% Depreciation 1,263 1,457 1,647 1,694 1,779 RORB (16,034) (46,543) 2,003 (23,174) 2,766 Income Tax - - Other Income (3,833) (7,476) (2,517) (4,337) (2,240) Distribution Margin (9,219) (27,955) 9,598 (9,981) 16,765 Energy Sold 6,976 7,061 8,120 7,128 7,466 DM per unit (1.32) (3.96) 1.18 (1.40) 2.25 DM per unit increase -10.2% 199.6% -129.9% -65% -260.4%

'FA

Page 55: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 18

Peshawar Electric Supply Company Financial Charges

FY 2012-13 Provisional

FY 2013-14 Projected

A Long Term Loans

GOP loans

Foreign Loans

Bonds

TFCs

Others

Total

B Short Term Loan

Running Finance

Short Term Loan

Others 5,972. 5,720 Total 5,972 5,720

C Total Financial Charges (A+B) 5,972 5,720

Page 56: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM -19

Peshawar Electric Supply Company RORB Calculation

Determined

2010-11

Audited

2010-11

Audited

2011-12

Provisional Projected

2012-13 2013-14

A Gross Fixed Assets in Operation - Opening Bal [min Rs] 33,383 32,453 36,370 42,558 48,560

B Addition in Fixed Assets [Mln Rs] 3,696 3,917 6,187 6,002 6,208

C Gross Fixed Assets in Operation - Closing Bal [min Rs] 37,079 36,370 42,558 48,560 54,768

D Less: Accumulated Depreciation [roln Rs] 12,964 12,851 14,308 16,002 17,780

E Net Fixed Assets in Operation [min Rs] 24,115 23,519 28,249 32,558 36,988

F Add: Capital Work In Progress - Closing Bal (Mln Rs] 5,556 8,292 6,882 8,350 9,902

G Investment in Fixed Assets [Mln Rs] 29,671 31,812 35,132 40,908 46,890

-H Less: Deferred Credits [Mln Rs] 14,453 11,810 17,629 17,716 20,909

I Regulatory Assets Base [Mln Rs] 15,217 20,001 17,503 23,192 25,980

J Average Regulatory Assets Base [Mln Rs] 14,910 18,119 20,001 20,348 24,586

Rate of Return [%age] 17.31% 14.24% 11.25% 11.25% 11.25%

Return on Rate Base [Mln Rs] 2,581 - 2,581 2,250 2,289 2,766

Page 57: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 20

Peshawar Electric Supply Company

Revenue Requirement 2012-13 Provisional

2013-14 Projected

A Power Purchase Price [Mln Rs] 107,081 108,289

B DM

O&M [Mln Rs] 15,837 14,461

Depreciation [Min Rs] 1,694 1,779

RORB [Mln Rs] (23,174) 2,766

Other Income [Mln Rs] (4,337) (2,240)

Impact of Disallowed Losses [Mln Rs]

Total DM [Mln Rs] (9,981) 16,765

C Wheeling Charges Income (TESCO) [Mln Rs] -

D Revenue Requirement (A+B+C) [Mln Rs] 97,101 125,054

E Financial Charges TFC 136 Billion [min, Rs] 5,720

F Less/ (Excess) Recovery PYA [Mln Rs] - 1,784

G Total Revenue Requirement (D+E+F) [Mln Rs] 97,101 132,558

FORM - 20 ( A )

Revenue Requirement (per unit sold)

2012-13 Provisional

2013-14 Projected

7,128 7,466

A Power Purchase Price [Rs/ kWh] 15.02 14.50

B DM

O&M [Rs/ kWh] 2.22 1.94

Depreciation [Rs/ kWh] 0.24 0.24

RORB [Rs/ kWh] (3.25) 0.37

Other Income [Rs/ kWh] (0.61) (0.30)

Impact of Disallowed Losses [Rs/ kWh]

Total DM [Rs/ kWh] (1.40) 2.25

C Wheeling Charges

D Revenue Requirement (A+B+C) [Rs/ kWh] 13.62 16.75

E Financial Charges TFC 136 Billion 0.77

F Less/ (Excess) Recovery PYA [Rs/ kWh] 0.24

G Total Revenue Requirement (D+E+F) [Rs/ kWh] 13.62 17.75

30

Page 58: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 21 (A)

Peshawar Electric Supply Company Investment

A Investment Plan

2012-13 Provisional

2013-14 Projected

DOP (Min Rs) 1,115 1,300 ELR [Min Rs] 400 450 STG [Min Rs) 1,500 1,155 Village Electricification (Min Rs] 3,010 3,355 Others (TouiAmr Meters) (Mln Rs) 1,445 1,500 Total iMln Rs] 7,470 7,760

B Financing Arrangement

Local (Mln Rsl

Loan [Min Rs] 1,268 1,500 PSDP / Own Resources [Min Rs] 2,527 2,105 Grant (nimn Rsl

Consumer Contribution (min Rs! 3,675 4,155 Others (Please Mention) (Min Rsl

Total (Mln Rs) 7,470 7,760

_3/

Page 59: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

138 276

Rs. Million

Interest FY 2013-14

Rate % I Semi Annual Semi Annual I Total

Power Distribution Enhancement Project ADB Loan2438- PAK

ERRA ADB LOAN No. 2213 PAK

Power Distribution Enhancement Project ADB Loan2727- 15%

PAK

TFC Loan through Power Holding Pvt Ltd KIBOR +

3%

2

2,860 2,8601 5,720 Total _

138

4

16

2,702

4

16 i 31 ; . ,

2,702 i 5,404 i

4

Sr. No. Loans

17%

1%

FORM - 22 Peshawar Electric Supply Company

Interest on Development Loans

Page 60: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

!Interest Rate! Sr. No. Loan , i

I

2 ERRA ADB LOAN No. 2213 PAK 1.00%

3 ;Power Distribution Enhancement !Project ADB Loan2727-PAK

4 ITFC Loan through Power Holding jPvt Ltd

15.00%,

KIBOR + 3%

Power Distribution Enhancement Project ADB Loan2438-PAK

17.00%I 1

- IJ A 49,719 1 5,720 1 5,720 51,219 !

18 FORM - 23

Peshawar Electric Supply Company DEVOLPOMENT LOAN FOR FY 2013-14

Rs.ln Million FY 2013-14

0/Bal Disbursement 4 i

Interest ' Repayment ' C/Bal

.••

2,780 : 276 276 ; 2,780 1

931 9 9 - 931

1,132 1,500 31 31 - 2,632

44,876 5,404 5,404 44,876

Page 61: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 24

Peshawar Electric Supply Company BONDS

Interest FY 2011-12

Opening Closing Redemption

Rate Balance Balance

Interest

Charges

NIL

Page 62: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

STANDARD TARIFF PETITION FORMAT

Form -25 Domestic Consumers

Slabs

07/2012 to 03/2013

N o. Of Consumers U Unit Sold Revenue Rs. Million Average Rate

Rs/kWh 0-50 561300 174.3 297.6 1.7 1-100 1056164 444.9 2496.7 5.6 101-200 512241 743.0 4998.2 6.7 201-300 163747 489.3 3242.3 6.6 301-400 47745 238.7 2021.0 8.5 401-500 24257 175.6 1507.4 8.6 501-600 14309 86.5 753.0 8.7 601-700 4699 58.8 510.4 8.7 701-800 5603 75.2 888.3 11.8 801-900 7402 63.7 703.8 11.0 901-1000 1568 31.6 370.5 11.7 1001-1100 4115 54.5 615.3 11.3 TOTAL 2381548 2636 18404

Page 63: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

1

Actual tax paid during the FY 1st Qrt fldQi3rdQrt I 4rth Qrt

1,476 1 1,144 (671) 336 2,286

FORM - 26

Peshawar Electric Supply Company Provision for Tax

Rs. Million

Sr. No. Provision for Tax allowed

Provision for Tax

1,476 1,144 (671)1 336 2,286

36

Page 64: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 27

Distribution Company Existing & Proposed Tariff Statement Monthly, Quarterly as well as Consolidated

Description •

. MDI Charged Sales Sates Mix '' :NORA Existing Tariff ' . ' Proporrod NeOTariff Difference

• Fixed Charir•

Variable • • - charge . Riad China

• • Variable • Charge

' Flied Charge Variable

Charge (KW) (MkWh) (%ape) (Rs/kW/M) (Rs/kWh) (Rs/kW/M) (Rs/kWh) (Rs/kW/M) (Rs/kWh)

Residential -• Al Sanctioned Load Less Than 5Kw

UPTO-50 Units per month

Consumption Exceeding 50 Units

1--100 Units P/M

101-300 Units P/M

301--700 Units PIM

ABOVE 700 Units _ Time_of Day (TOD - Peak) For Load 5Kw & Above

Time of Day (TOD - Off-Peak For Load 5Kw & Above

Temporary E-1 (I) Residential Supply

260

-

-

-

7,799.

47,173

-

233.42

613.55

1,702.03

773.91 --

876.61

12.92

45.53

0.12

3.13%

8 22%

22.80%

10.37% -- .

11.74%

0.17%

0 61%

0.00%

-

-

-

-

4.00

15.00

16.50

18.50

20.50

20.50

15 50

20.50

-

-

-

-

-

- --

-

-

6 00

15 50

17.00

19.00

21.00

21 00

16 50

21 00

-

-

-

-

2 00

-

0.50

0.50

0 50

0 50

0 50

1 00

0 50 TOTAL DOMESTIC 55,232 4,258.08

4.. 57.03% - 16.79 - 17.37 - 0.58

Commercial - A2For Load Less 5KW

For Load requirement 5KW & Above

Time of Day (TOD - Peak)

Time of Day (TOD - Off-Peak

Temporary E-1(ii) Commercial Supply

- 173

217,613

142,340

783,798

-

244.37

36.99

_ 58.73

229.94.

1.04

3.27%

0.50%.

0.79%

3.08% _

0.01%

-

-

400

400

400

-

- 20. 50

19.00

20.50

15.50

20 50

-

400

_. 400

400

-

21 50

20.00

21 50

16.50

21 50

-

-

-

-

_

1.00

1 00

1.00

1 00

1 00 TOTAL COMMERCIAL 1,143,924 571.06 7.65% 0.80 18.39 0.80 19.39 - 1.00

INDUSTRIAL

B-1 upto 25 Kw (at 400/230 VOLTS)

B-lb (09) T Peak

B-1b (09) T Off Peak

B-2(a) exceeding 25-500 Kw (at 400 Volts)

B-2 (b) -TOD (Peak) exceeding 25-500 Kw (at 400 Volts)

8-2 -TOD (off- peak) exceeding 25-500 Kw (at 400 Volts)

B-3 TOD (peak) (for all loads upto 5000 Kw at 11, 33 KV)

B-3 - TOD (off-peak)

B-4 TOD (peak) (for all loads at 66, 132 KV & Above)

B-4 TOD (off-peak)

Temporary E-2 Industrial Supply

1,674

34,099

225,081

498,505

163,935

1,039,676

136,420

1,215,094

177,517

987,415

-

117.45

17.03

85.47

' _ 91.32

49.57

297.55

61.97

571 05.

94 92

531.42

0.11

1,57%

0.23%

1.14%,

1.22%

0.66%

3.99%

0.83%

7.65%

1 27%

7.12%

' 0 00%

-

_ 400

400

400

380

380

360

360

-

17.00

20.50 _ _ • 15.50

16.50 ---

20.50

15.30

20.50

15.20

20 50

15 10

20.50

_ _

___ 400

400

400

380

380

360

360

-

18 00

21.50

16.50

17.50

21.50

16.30

21 50

16 15

21 50

16 00

21 50

_

_

.

1.00

1.00

1.00

1.00

1 00

1 00

1 00

0 95

1 00

0 90

1 00 TOTAL INDUSTRIAL 4,479,417 1,817.85 25.69% 0.84 15.99 0.84 16.95 - 0.96

Single Point Supply (Bulk)

C-1 (a) Sanctioned Load Less than 5Kw

C-1 (b) Sanctioned Load 5Kw & upto 508 Kw

Bulk Supply C-1(c) for supply at 400/230 Volts 5Kw & upto 500 Kw Peak Bulk Supply C-1(c) (TOD) Off-Peak

C-2 (a) 11133 KV upto & including 5000 Kw

Bulk Supply C-2(b) (TOD) Peak 11/33 KV upto & including 5000 Kw Bulk Supply C-2(b) (TOD) Off-Peak 11/33 KV upto & including 5000 Kw Bulk Supply C-3 (b) (TOD) Peak at 66 Kv & above & sanctioned load above 5000 Kw Bulk Supply C-3 (b) (TOD) Off-Peak at 66 Kv & above & sanctioned load above 5000 Kw

-

1,930

242,482

8,427

48,333

125,473

18,695

104,565

4,320

43,400

• 1.01

88.38 -

7.72

31.15

54.14.

13.18

. 47.73

3.08

13.59

0.01%

1.18% -- - - - •

0.1p%

• 0.42%

. 0 73%

0)8% '

0.64%

0.04%

0.18%.

-

400

400

400

380

380

380 - -.- •

360

360

17.50

16.50

20 50

15 50

16 30

20.50

15.4o .___

20.50

15.30

_

.18 50

17.50

21 00

16 50

17 00

21 00

16 50

21.00

16.30

_ .

-

-

-

1 00

1 00

0 50

1 00

0 70

0.50

050

1 00

-

400

400

400

380

380

380 _ __

360

360

TOTAL BULK SUPPLY 597,625 259.99 3.48% 0.89 16.45 0.89 17.36 - 0.91 Agricultural T-Wells • Tariff D

0-1(a) Scarp Less than 5KW

0-2 Agri T/Well

D-1 (b) - Peak Scarp & Agricultural 5KW & Above

0-1 (to) Off-Peak Scarp & Agricultural 5KW & Above

_

15.404

461,312

40,441

192,607

-

20 71

47 45

11.47

49.91

0 28%

0.64%

0.15%

0.67%

-

200

200

200

_

17.00

16.50

20.50

15.30

.

-

200

200

200

17 25

16 75

20 75

15.50

-

-

0 25

0 25

0.25

0.20 TOTAL AGRICULTURAL T/WELL 709,764 129.54 1.74% 1.07 16.47 1.07 16.70 • 0.23 Public Lighting - Tariff-G

Residential Colony att. to industrial- H -- ---- K (AJK)

Time of Day (TOD - Peak)

Time of Day (TOD - Off-Peak

Rawat Lab

-

84,953 _ ,

96,609

474.377

-

23.80

2.16 -- - -

24.94

65.53

213 04

.

0.32%

0.03%

0.33%

0.88%

2.85%

0.00%

-

360

360

360

-

15.85

15.00

. 1616

20.50

15 30

-

-

-

360

360

360

16 85

16.00

17 GO

21 00

16 00

-

.

-

1 00

1.00 084

050

0 70

Company Total 7,641,901 7,466 100.00% 0.36 16.67 0.36 17.40 - 0.72

Page 65: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 27 ( A )

Distribution Company

Existing & Proposed Tariff Statement (Monthly, Quarterly as well as Consolidated)

Description MDI Charged • Sales NEPRA Existing Tariff Proposed Now•Tarlff :, Difference

Sales Mix Fixed Charge Variable

• • • . - Cluirge , Fixed Charge Variable Charge •.

Fixed cha• rtiii, Variable Charge

(KW) (MkWh) (%age) (MN Rs) (Min Rs) (Min Rs) (MN Rs) (MN Rs) (Min Rs) Residential - Al Sanctioned Load Less Than 5Kw

UPTO-50 Units per month

Consumption Exceeding 60 Units

1--100 Units P/M

101-400 Units P/M

301-.700 Units P/M

ABOVE 700 Units

Time of Day (TOD - Peak) For Load 5Kw & Above

Time of Day (TOD - OffPeak For Load 5Kw & Above

Temporary E-1 (i) Residential Supply

-

260

-

-

-

7,799

47,173

-

• -

233.42

.

613.55

1,702.03

77391

876.61 . 12.92

45.53

. 012

3.13%

0.00%

8.22% , 22.80%

10.37%

11.74% _ _.. . . _ . 0.17%

0.61%

0 00%

-

__

934

.__. 9,203

28,083

14,317

17,970

265

706

3

-

-

-

-

1

9,510

28 934 ,

14,704

18,409

271

751

3

-

-

-

-

-

467

307

851

387

438

6

46

0 - TOTAL DOMESTIC 55,232 4,258.08 57.03% 71,481 - 73,983 - 2,502 Commercial - A2

For Load Less 5KW

For Load requirement 5KW & Above

Time of Day (TOD -Peak) .

Time of Day (TOD - Off-Peak

Temporary E-1(ii) Commercial Supply

-

173

217,613

142,340

783.798

-

-

244.37

36.99

58.73

229.94

. 104

3.27%

0.50%

0;79%

atm%

. 001% •

- .

87

= 57

314

-

-

5,010

703

1,204

3,564

21

-

87

57

314

-

5,254

740

1,263

3,794

22

-

-

-

-

244

37

59

230

1 TOTAL COMMERCIAL 1,143,924 571.06 7.65% 458 10,502 458 11,073 - 571

B-1 upto 25 Kw (at 400/230 VOLTS)

B-lb (09) T Peak

B-lb (09) T Off Peak

B-2(a)exceeding 25-500 Kw (at 400 Volts)

B-2 (b) -TOD (Peak) exceeding 25-500 Kw (at 400 Volts)

B-2 -TOD (off- peak) exceeding 25-500 Kw (at 400 Volts)

B-3 TOD (peak) (for all loads upto 5000 Kw at 11, 33. KV) B-3 - TOD (off-peak)

B-4 TOD (peak) (for all loads at 66, 132 KV & Above)

B-4 TOD (off-peak)

Temporary E-2 Industrial Supply

1.674

34,099

225,081

498,505

163,935

1,039,676

136,420

1,215,094

177,517

987,415

-

117 45

17.03

85.47

91.32

49.57

297,55

61197

571.05

94.92

531 42

. 011

INDUSTRIAL

• 1 57%

0.23%

1.14%

1.22%

0.66%

3.99%,

0.13.3%

_ 7.65%

1 27%

7 12%

000%

-

-

199

66

416

52

462

64

355

-

1,997

349

1,325

1,507

1,016

4,552

1,270

8,680

1.946

8,024

2

-

199

66

416

2,114

366

1,410

1,598

1,066

4,850

1,332

9,221

2,041

8,503

2

-

-

-

-

-

-

-

117

17

85

91

50

298

62

541

95

478

0

52

462

64

355

. TOTAL INDUSTRIAL 4,479,417 1,917.85 25.69% 1,614 30,669 1,614 32,504 - 1,835

Single Point Supply (Bulk)

C-1 (a) Sanctioned Load Less than 5Kw

C-1 (b) Sanctioned Load 5Kw & upto 500 Kw Bulk Supply C-1(c) for supply at 400/230 Volts 5Kw & upto 500 Kw Peak Bulk Supply C-1(c) (TOD) Off-Peak

C-2 (a) 11/33 KV upto & including 5000 Kw

Bulk Supply C-2(b) (TOD) Peak 11/33 KV upto & including 5000 Kw Bulk Supply C-2(b) (TOD) Off-Peak 11/33 KV upto & Including 5000 Kw _

Bulk Supply C-3 (b) (TOD) Peak at 66 Kv & above & sanctioned load above 5000 Kw

Bulk Supply C-3 (b) (TOD) Off-Peak at 66 Kv & above & sanctioned load above 5000 Kw

-

1,930

242,482

8,427

48,333

125.473

18 695

104,565

4,320

43,400

-

1.01

88.38

7.72

31 15

54 14

13.18

47.73

3.08

1a59

001% _

1.18%

0.10%

0.42%

0 73%

0 18%

0.64%

0.04%

0.18%

97

3

19

48

7

40

2

16

-

18

1,458

158

483

883

270

735

63

208

-

97

3

19

48

7

40

2

_

19

1,547

162

514

920

277

787

65

222

-

-

-

-

-

-

-

1

88

4

31

38

7

52

2

14 16

TOTAL BULK SUPPLY 697,625 259.99 3.48% 231 4,276 231 4,512 - 237 Agricultural T-Wells - Tariff D

D-1(a) Scarp Less than 5KW

0.2 Agrl T/Well

0-1 (b) - Peak Scam & Agricultural 5KW & Above

0-1 (b) Off-Peak Scarp & Agricultural 5KW & Above

15,404

461,312

40,441

192,607

20.71

47 45

11 47

49.91

,

0.28%

064%

0.15%

0.67%

-

92

8

39

- 352

783

235

764

• -- -

92

8

39

357

795

238

774

-

-

5

12

3

10 TOTAL AGRICULTURAL T/WELL 709,764 129.54 1.74% 139 2,134 139 2,164 - 30

Public Lighting 7 Tariff-G

Residential Colony att. to Industrial - H

K (AJK)

Time of Day (TOD - Peak)

Time of Day (TOD - Off-Peak

Rawat Lab

-

84,953

96,609

474,377

-

23.80

2.16

24.94

65.53

213.04

-

0.32%

0.03%

0 33%

0.88%

2.85%

-

-

31

35

171

-

377

32

403

1,343

3,260

-

-

31

35

171

-

401

35

424

1,376

3,409

-

-

-

24

2

21

33

149

- Company Total 7,641,901 7,466 100.00% 2,678 124,477 2,678 129,880 - 5,403

Page 66: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 28

Distribution Company

Revenue & Subsidy Statement (Monthly, Quarterly as well

Description MDI Charged Sales •

Safes Mix • NEPRA Determined Tariff GOP Notified Tariff Subsidy

Fixed Charge Variable Charge Fixed Charge Variable

Charge Fixed Charge Variable Charge .

(KW) (MkWh) (%ate) (RVIONN) ORWIWN (Rs/kW/AA) (RsAVVN (RWMOM) (RSAVV11) Residential - Al Sanctioned Load Less Than 5Kw - 0 0% - UPTO-50 Units per month 260 233.42 3.13% - 4.00 2.00 - 2.00 Consumption Exceeding 50 Units - - 0.00% - - 1--100 Units P/M - 613.55 8.22% - 15.00 5.79 9.21 101-300 Units P/M 1,702.03 22.80% - 16.50 8.11 8.39 301--700 Units P/M

- -

773.91 10.37% - 18.50 12.33 6.17 ABOVE 700 Units 876.61 11.74% 20.50 15.07 - 5.43 Time of Day (TOD - Peak) For Load 5Kw & Above 7.799 12.92 0.17% 20.50 _ 13.99 - 6.51 Time of Day (TOD - Off-Peak For Load 5Kw & Above 47,173 45.53 0.61% 15.50 8.22 7.28 Temporary E-1 (i) Residential Supply - 0.12 0.00% - 20.50 15.50 - 5.00

TOTAL DOMESTIC 55,232 4,258.08 57.03% - 16.79 .. 9.66 - 7.13 Commercial - A2

- - 0% - - - - - For Load Less 5KW 173 244.37 3.27% 20.50 14.77 - 5.73

.___. 217,613 For Load requirement 5KW & Above 36.99 0.50% 400 19.00 400 9.72 9.28 Time of Day (TOD - Peak) 142,340 58 73 0.79% 400 20.50 400 13.20 7.30 Time of Day (TOD - Off-Peak 783,798 229.94 3.08% 400 15.50 400 8.01 7 49 Temporary E-1(ii) Commercial Supply - 1.04 0.01% - 20.50 15.00 - 5.50

TOTAL COMMERCIAL 1,143,924 571.06 7.65% 0.80 16.39 0.80 11.56 - 6.83 INDUSTRIAL - - 0.00% - 0.00 - B-1 upto 25 Kw (at 400/230 VOLTS) 1,674 117.45 1.57% - 17.00 10.51 - 6.49 B-lb (09) T Peak 34,099 17.03 0.23% - 20.50 13.99 6.51 B-lb (09) T Off Peak 225,081 85.47 1.14% - 15.50 8.22 - 7.28 B-2(a) exceeding 25-500 Kw (at 400 Volts)

B-2 (b) -TOD (Peak) exceeding 25-500 Kw (at 400 498,505 91.32 1.22% 400 16.50 400 9.14 7 36

Volts) 163,935 49.57 0.66% 400 20.50 400 12.77 7 73 B-2 -TOD (off- peak) exceeding 25-500 Kw (at 400 Volts) 1,039,676 297,55 3.99% 400 15.30 400 8.01 7.29 B-3 TOD (peak) (for all loads upto 5000 Kw at 11, 33 KV) 136,420 61.97 0.83% 380 20.50 380 1268 7.82 B-3 - TOD (off-peak) 1215,094 571.05 7.65% 380 15.20 380 7.75 7.45 B-4 TOD (peak) (for all loads at 66, 132 KV & Above) 177,517 94.92 1.27% 360 20.50 360 12.37 - 8.13 B-4 TOD (off-peak) 987,415 531.42 7.12% 360 15.10 360 7.46 7.64 Temporary E-2 Industrial Supply - 0.11 0.00% - 20.50 11.50 - 9.00

TOTAL INDUSTRIAL 4,479,417 1,917.85 25.69% 0.84 15.99 0.84 8.54 - 7.45 Single Point Supply (Bulk) - - 0.00% - 0 00 C-1 (a) Sanctioned Load Less than 5Kw 1,930 1.01 0.01% - 17.50 _ 11.55 _ 5.95 C-1 (b) Sanctioned Load 5Kw & upto 500 Kw 242,482 88.38 1.18% 400 16.50 400 10.35 - 6.15 Bulk Supply C-1(c) for supply at 400/230 Volts 5Kw & upto 500 Kw Peak 8,427 7.72 0.10% 400 20.50 400

13.01 7,49

Bulk Supply C-1(c) (TOD) Off-Peak 48,333 31.15 0.42% 400 15.50 400 8.01 - 7,49 C-2 (a) 11/33 KV upto & Including 5000 Kw 125,473 54.14 0.73% 380 16.30 380 10.25 - 6.05 Bulk Supply C•2(b) (TOD) Peak 11/33 KV upto & including 5000 Kw 18,695 13.18 0.18% 380 20.50 380 - 7.90 Bulk Supply C-2(b) (TOD) Off-Peak 11/33 KV upto & including 5000 Kw 104,565 47.73 0.64% , 380 15A0 380

12.60

7.75 7.65 Bulk Supply C-3 (b) (TOD) Peak at 66 Kv & above &

Bulk Supply C-3 (b) (TOD) Off-Peak at 66 Kv & above

4,320 3.08 . 0.04% 360 20.50 360 ' 12.18

8.32

& sanctioned load above 5000 Kw 43,400 13,59 0.18% 360 15.30 360 7.35

- 7.95

TOTAL BULK SUPPLY 597,625 259.99 3.48% 0.89 16.45 0.89 9.63 - 6.81 Agricultural T-Wells - Tariff D - - 0.00% - - - - D-1(a) Scarp Less than 5KW 15,404 20.71 0.28% - 17.00 10.00 _ 7.00 0-2 Agri T/Well 461,312 47.45 0.64% 200 16.50 120_ 6.77 80.00 9 73 D-1 (b) - Peak Scarp & Agricultural 5KW & Above 40,441 11.47 0.15% 200 20.50 200 13.00 7.50 D-1 (b) Off-Peak Scarp & Agricultural 5KW & Above 192,607 49.91 0.67% 200 15.30 200 8.00 7.30 TOTAL AGRICULTURAL T/WELL 709,764 129.54 1.74% 1.07 16.47 0.79 8.31 0.28 8.16 Public Lighting - Tariff-G - 23.80 0.32% - 15.85 13.73 - 2.12 Residential Colony att. to Industrial • H - 2.16 0.03% - 15.00 12.92 2.08 K (AJK) 84,953 24.94 0.33% 360 16.16 360 5,63 - 10.53 Time of Day (TOD - Peak) 96,609 65.53 0.88% 360, 20.50 360 13.30 - 7.20 Time of Day (TOD - Off-Peak 474,377 213.04 2.85% 360 15.30 360 7.92 - 7.38 Rawat Lab - : 0.00% Company Total 7,641,901 7,466 100% 0.36 16.67 0.35 9.48 0.00 7.20

31

Page 67: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM -28 ( A )

Distribution Company Revenue & Subsidy Statement (Monthly, Quarterly as well as Consoli

Description Sales Sales Mix NEPRA Determined Tariff GOP NotlfiedTariff - Subsidy

Flied Charge Variable Charge Fixed Chat." ,Variable

'Charge Fixed Charge Variable Charge

(MkWh) (%age) (Min Rs) (Mln Rs) (Min Rs) (MM Rs) (MM Rs) (MM Rs) Residential - Al Sanctioned Load Less Than 5Kw - 0 0% UPTO.50 Units per month 260 233.42 3.13% - 934 467 - 467 Consumption Exceeding 50 Units - - 0.00% - - - - - 1--100 Units P/M - 613.55 8.22% - 9,203 - 3,552 5,651 101-•300 Units P/M - 1,702.03 22.80% - 28,083 13,803 - 14,280 301--700 Units P/M 773.91 10.37% - 14,317 9,542 4,775 ABOVE 700 Units - 876.61 11.74% - 17,970 - 13,210 4,760 Time of Day (TOD - Peak) For Load 5Kw & Above 7,799 12.92 0.17% 265 181 84 Time of Day (TOD - Off-Peak For Load 5Kw & Above 47,173 45.53 0.61% 706 - 374 331 Temporary E-1 (i) Residential Supply - 0.12 0.00% - 3 2 1

TOTAL DOMESTIC 55,232 4,258.08 57.03% - 71,481 - 41,132 - 30,349 Commercial - A2 - 0% - - - - For Load Less 5KW 173 244.37 3.27% - 5,010 - 3,609 1,400 For Load requirement 5KW & Above 217,613 36.99 0.50% 87 703 87 360 _ . 343 Time of Day (TOD - Peak) 142,340 58.73 0.79% 57 1,204 57 775 429 Time of Day (TOD - Off-Peak 783,798 229.94 3 08% 314 3.564 314 1,842 1,722 Temporary E-1(ii) Commercial Supply - 1.04 0.01% - 21 - 16 6

TOTAL COMMERCIAL 1,143,924 571.06 7.65% 458 10,502 458 6,601 - 3,900 INDUSTRIAL - 0.00% - _ - - B-1 upto 25 Kw (at 400/230 VOLTS) 1,674 117.45 1.57% . 1,997 1,234 762 B-lb (09) T Peak 34,099 17.03 0.23% 349 - 238 111 B-lb (09) T Off Peak 225,081 85.47 1.14% - 1,325 - 703 - 622 _ B-2(a) exceeding 25-500 Kw (at 400 Volts) 498,505 91.32 - 1.22% 199 1,507 199 835 672 B-2 (b) -TOD (Peak) exceeding 25-500 Kw (at 400 Volts) 163,935 49.57 • 0.66% ' 66 1,016 ' 66 633 383

B-2 -TOD (off- peak) exceeding 25-500 Kw (at 400 Volts) 1,039,676 297.55 3.99% 416 4,552 416 2,383 2.169

B-3 TOD (peak) (for all loads upto 5000 Kw at 11, 33 - - KV) 136,420 61.97 0.83% 52 1,270 52 786 485

(3•3 - TOD (off-peak) 1,215,094 57105 7.65% 462 8,680 462 4,426 4,254 . _. B-4 TOD (peak) (for all loads at 66, 132 KV & Above) 177,517 94.92 1.27% 64 1,946 64 1,174 772 B-4 TOD (off-peak) 987,415 531.42 7.12% 355 8.024 355 _ 3,964 - 4,060 Temporary E-2 Industrial Supply - 0.11 0.00% - 2 - 1 1

TOTAL INDUSTRIAL 4,479,417 1,917.85 25.69% 1,614 30,669 1,614 16,377 - 14,291 Single Point Supply (Bulk) - 0.00% - - -

C-1 (a) Sanctioned Load Less than 5Kw. 1,930 1.01 0.01%

. _ 18 - 12 6 242,482 C-1 (b) Sanctioned Load 5Kw & upto 500 Kw 88.38 1.18% 97

MIK buppty L.-1(C) tor supply at 4UU/ZJU volts ORW & - - • 1.458 97 915 544

"nen VIA Wu. Dorsal, 8A27 7.72 0.10% 3. 158 3 100 58 Bulk Supply C-1(c) (TOD) Off-Peak 48,333 31.15 0.42% 19 483 19 249 233

C-2 (a) 11/33 KV upto & including 5000 Kw 125,473 54.14 0.73% , 48 883 48 555 328 Bulk Supply C-2(b) (TOD) Peak 11/33 KV upto & including 5000 Kw 18,695 13.18 0.18% , ' 7 ' 270 7 166 104 Bulk Supply C-2(b) (TOD) Off-Peak 11/33 KV upto & including 5000 Kw

104,565 47.73 0.64% 40 735 40 370 365

Bulk Supply C-3 (b) (TOO) Peak at 66 Kv & above & sanctioned load above 5000 Kw 4,320 3.08 0.04% 2 63 2 38 - 26

Bulk Supply C-3 (b) (TOD) Off-Peak at 66 Kv & above ' & sanctioned load above 5000 Kw 43,400 13.59 0.18% 16 208 16 100 108

TOTAL BULK SUPPLY 597,625 259.99 3.48% 231 4,276 231 2,505 - 1,771 Agricultural T-Wells - Tariff D - 0.00% - - D-1(a) Scarp Less than 5KW 15,404 20.71 0.28% - 352 - 207 145 D-2 Agrl TNVell 461,312 47.45 0.64% 92 783 55 321 37 462 D-1 (b) - Peak Scarp & Agricultural 5KW & Above 40,441 11.47 0.15% 8 235 8 149 86 0-1 (b) Off-Peak Scarp & Agricultural 5KW & Above 192,607 49.91 0.67% 39 764 39 399 364 TOTAL AGRICULTURAL TNVELL 709,764 129.54 1.74% 139 2,134 102 1,077 37 1,057 Public Lighting - Tariff-G - 23.80 0.32% - 377 - 327 - 50 Residential Colony atL to industrial - H - 2.16 0.03% - 32 - 28 - 4 K (AJK) 84,953 24.94 0.33% 31 403 31 140 263 Time of Day (TOD - Peak) 96,609 65.53 0.88%

. - 35 1,343 35 872 ._ . 472

Time of Day (TOD - Off-Peak 474,377 213.04 2.85% 171 3,260 171 1,687 - 1,572 Rawat Lab - - 0.00% - _ - - - Company Total 7,641,901 7,466 100% 2,678 124,477 2,641 70,747 37 53,730

40

Page 68: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM - 29

Distribution Company

Proposed Revenue & Subsidy Statement (Monthly, Quarterly as well as Consolidated)

OeiefiPtIon Sales ,'Sales Mix

Revenue as per new proposed Tariff

Remus ati per GOP Notified Tariff Subsidy

Fixed Charge

Variable Charge

Rod Charge

Variable Charge

Fixed Charge

Variable Charge

(MkWh) (%aio) (Rs/kW/M( (Rs/kWh) (Rs/kW/M) (Rs/kWh) (Rs/kW/M) Residential - Al Sanctioned Load Less Than 5Kw - 0%

(RS./kWh)

.. UPTO-50 Units per month 260 233 3.13% 6.00 - 200 _ 4.00 Consumption Exceeding 50 Units - - 0.00% - - 1- 100 Units P/M

_

101-300 Units - 614 8.22% - 15.50 - 5.79 - 9.71 P/M

301-700 Units P/M - 1,702 22.80% 8.11 8.89

ABOVE 700 774 10.37% - 19.00 - 12.33 - 6.67 Units_ - 877 11.74% 21.00 - 15.07 - 5.93 Time Day of (TOD • Peak) For Load 5Kw & Above

Time 7,799 13 0.17% - 21.00 - 13.99 7.01

of Day (TOD - Off-Peak For Load 5Kw & Above 47,173 46 0.61% - 16.50 - 8.22 8.28 Temporary E-1 (i) Residential Supply 0 0.00% 21.00 - 15.50 5.50 TOTAL DOMESTIC 55,232 4,258 57.03% 17.37 9.66 7.71 Commercial - A2 - - 0% - - - - -

For Load Less 5KW

For Load 173

- - '244 3.27% - 21.50 - 14.77 6.73

requirement 5KW & Above

Time 217,613 37 0.50% 400.00 20.00 400 9.72 - 10.28

of Day (TOD - Peak)

Time 142,340 59 0.79% 400.00 . 21.50 400 13.20 8.30

of Day (TOD - Off-Peak _ _ 783,798 230 3.08% 400.00 16.50 400 8.01 - 8.49 Temporary E-1(ii) Commercial Supply - 1 0.01% - 21.50 - 15.00 - 6.50 TOTAL COMMERCIAL 1,143,924 571 7.65% 0.80 19.39 0.80 11.56 - 7.83 INDUSTRIAL - - 0.00% - - - -

B-1 upto 25 Kw (at 400/230 VOLTS)

B-1b 1,674 " 117 1.57%' - 18.00 - 10.51 7.49

(09) T Peak

B-1b 34,099 17 0.23% - 21.50 . 13.99 - 7.51

(09) T Off Peak _ 225,081 85 1.14% - -

- 16.50 8.22 8.28 13-2(a) exceeding 25-500 Kw (at 400 Volts)

B-2 498,505 91 1.22% 400.00 17.50 400 9.14 8.36

(b) -TOD (Peak) exceeding 25-500 Kw (at 400 Volts) • 163,935 50 0.66% 400.00 21.50 400 12.77 - 8.73 E1-2 -TOD (off- peak) exceeding 25-500 Kw (at 400 Volts)

B-3 1,039,676 298 3.99% 400.00 16.30 400 8.01 8.29

TOD (peak) (for all loads upto 5000 Kw at 11, 33 KV)

B-3 - TOD (off-peak) 136,420 62 0.83% 380.00 21.50 380 12.68 - 8.82

B-4 TOD (peak) (for all loads at 66, 132 KV & Above) 1,215,094

177,517

571

95

7.65%

_1.27%

380.00 0.

360.00 8.40

16.15

21.50

380

360

7.75

12.37 .. 9.13 B-4 TOD (off-peak) 987,415 531 7.12% 360.00 16.00 360 7.48 - 8.54 Temporary E-2 Industrial Supply - 0 0.00% - 21.50 - 11.50 - 10.00

TOTAL INDUSTRIAL 4,479,417 1,918 25.69% 0.84 16.95 0.84 8.54 - 8.41 Single Point Supply (Bulk) - 0.00% - - - - - C-1 (a) Sanctioned Load Less than 5Kw 1,930 1 0.01% 18.50 11.55 - 6.95 C-1 (b) Sanctioned Load 5Kw & upto 500 Kw 242,482 88 1.18% 400.00 17.50 400 10.35 7.15 Bulk Supply C-1(c) for supply at 400/230 Volts 5Kw & upto 500 Kw Peak 8,427 8 0.10% 400.00 21.00 400 13.01 7.99 Bulk Supply C-1(c) (TOD) Off-Peak 48,333 31 0.42% 400.00 16.50 400 8.01 8.49 C-2 (a) 11/33 KV upto & including 5000 Kw 125,473 54 0.73% 380.00 17.00 380 10.25 6.75 Bulk Supply C-2(b) (TOD) Peak 11/33 KV upto & Including 5000 Kw 18,695 13 0.18% 380.00 21.00 380 12.60 - 8.40 Bulk Supply C-2(b) (TOD) Off-Peak 11/33 KV upto & including 5000 Kw 104,565 48 0.64% 380.00 16.50 380 7.75 - 8.75 Bulk Supply C-3 (b) (TOD) Peak at 66 Kv & above & sanctioned load above 5000 Kw 4,320 3 0.04% 360.00 21.00 360 12.18 8.82 Bulk Supply C-3 (b) (TOD) Off-Peak at 66 Kv & above & sanctioned load above 5000 Kw 43,400 14 0.18% 360.00 16.30 360 7.35 - 8.95

TOTAL BULK SUPPLY 597,625 260 3.48% 0.89 17.36 0.89 9.63 7.72 Agricultural T-Wells - Tariff D - - 0.00% - - - - i 0- 1(a) Scarp Less than 5KW 15,404 21 0.28% - 17.25 10.00 -

-

7.25 - D-2 Agri T/Well 461,312 47 0.64% 200.00 16.75 120 6.77 80.00 9.98 13-1 (b) - Peak Scarp & Agricultural 5KW & Above _ 40,441 11 0.15% 200.00 20.75 200 13.00 - 7.75 D-1 (b) Off-Peak Scarp & Agricultural 5KW & Above 192,607 50 0.67% 200.00 15.50 200 8.00 - 7.50 TOTAL AGRICULTURAL T/WELL 709.764 130 1.74% 1.07 16.70 0.79 8.31 0.28 8.39 Public Lighting - Tariff-G

24 0.32% 0 16.85 13.73 3.12 Residential Colony att. to industrial - H

K - 2 0.03% 0 16.00 0 12.92 3.08 (AJK) 84,953 25 0,33% 360 17.00 360 5.63 - 11.37

Time of Day (TOD - Peak)

Time 96,609 66 0.88% 360 21.00 360 13.30 7.70

of Day (TOD - Off-Peak

Rawat Lab 474,377 213 2.85% 360 16.00 360 7.92 8.08

- - 0.00% 0 - 0 - - Company Total 7,641,901 7,466 100% 0.36 17.40 0.35 9.48 0.00 7.92

it,

Page 69: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FORM -29 ( A )

Distribution Company

Proposed Revenue & Subsidy Statement (Monthly, Quarterly as well as Consolidated)

Gesoripdon Sides sales

Mix

Revenue as per new , proposed Tariff

^ R0%411140 as per GOP Notified Tariff Subsidy

,Fixed Charge

Variable Charge

Fixed Charge

Variable Charge

Fixed Charge

Variable Charge

(MkWh) . (%age) (Mtn Rs) (Mln Rs) (MM Rs) (Mln Rs) (Min Rs) (Mln Rs)

Residential • Al Sanctioned Load Less Than 5Kw 0% _

UPTO-50 Units per month ,260 233 3.13% - 1,401 467 934 Consumption Exceeding 50 Units - - 0.00% - - - - - 1--100 Units P/M - • 614 8.22% - 9,510 - 3,552 - 5,958 101-300 Units P/M 1,702 22.80% - 28,934 - 13,803 15,131 3017700 Units P/M - 774 10.37% - 14,704 9,542 - 5,162 ABOVE 700 Units - 877 11.74% - 18,409 13,210 5,198 Time of Day (TOD • Peak) For Load 5Kw & Above 7,799 13 0.17% - 271 - 181 91 Time of Day (TOD - Off-Peak For Load 5Kw & Above 47,173 46 0.61% - 751 - 374 377 Temporary E-1 (i) Residential Supply - 0 0.00% - 3 - 2 1

TOTAL DOMESTIC 55,232 4,258 57.03% - 73,983 - 41,132 - 32,851 Commercial - A2 - - 0% - - - - For Load Less 5KW 173 244 3.27% - 5,254 - 3,609 - 1,645 _ For Load requirement 5KW & Above

___ 217,613 37 0.50% 87 740 87 360 - 380 Time of Day (TOD - Peak) 142,340 59 0.79% 57 1,263 57 775 487 Time of Day (TOD - Off-Peak 783,798 230 3.08% 314 3,794 314 1,842 1,952 Temporary E-1(i)) Commercial Supply - 1 0.01% - 22 - 16 7

TOTAL COMMERCIAL 1,143,924 571 7.65% 458 11,073 458 6,601 - 4,471 INDUSTRIAL - - 0.00% - - - 13-1 upto 25 Kw (at 4001230 VOLTS) 1,674 117 1.57% - 2,114 - 1,234 880 B-lb (09) T Peak 34,099 17 0.23% - 366 - 238 128 B•lb (09) T Off Peak 225,081 85 1.14% - 1,410 703 708 B-2(a) exceeding 26-600 Kw (at 400 Volts) 498,505 91 1.22% 199 1,598 199 835 - 763 B-2 (b) •TOD (Peak) exceeding 25-600 Kw (at 400 Volts) 163,935 50 0.66% 66 1,066 66 633 433 B-2 -TOD (off- peak) exceeding 26-600 Kw (at 400 Volts) 1,039,676 298 3.99% 416 4,850 416 2,383 2,467 B-3 TOD (peak) (for all loads upto 5000 Kw at 11, 33 KV) 136,420 62 0.83% 52 1,332 52 786 547 B•3 - TOD (off-peak)

. . 1,215,094 . . 571 7.65% 462 9.221 462 4,426 4,796

B-4 TOD (peak) (for all loads at 66, 132 KV & Above) 177,517 95 1.27% 64 2,041 64 1,174 - 867 B-4 TOD (off-peak) 987,415 531 7.12% 355 8,503 355 3,964 4,538 Temporary 6.2 Industrial Supply - 0 0,00% - 2 - 1 - 1

TOTAL INDUSTRIAL 4,479,417 1,918 25.69% 1,614 32,504 1,614 16,377 - 16,126 Single Point Supply (Bulk) - 0.00% - - C-1 (a) Sanctioned Load Less than 5Kw

.._ 1,930 1 0.01% 19 - 12 • 7

C-1 (b) Sanctioned Load 5Kw & upto 600 Kw 242,482 88 1.18% 97 1.547 97 915 632

Bulk Supply C-1(c) for supply at 400/230 Volts 5Kw & unto NO Kw Peak 8,427 8 0.10% 3 162 3 100 62

Bulk Supply C-1(c) (TOD) Off-Peak 48.333 31 0.42% 19 514 19 249 - 264

C-2 (a) 11/33 KV upto & including 5000 Kw 125,473 54 0.73% 48 920 48 555 - 365

Bulk Supply C-2(b) (TOD) Peak 11/33 KV upto & including 5000 Kw 18,695 13 0.18% 7 277 7 166 111

Bulk Supply C-2(b) (TOD) Off-Peak 11/33 KV upto & including 5000 Kw 104,565 48 0.64% 40 787 40 370 418

Bulk Supply C-3 (b) (TOD) Peak at 66 Kv & above & sanctioned load above 5000 Kw 4.320 3 0.04% 2 65 2 38 27

Bulk Supply C-3 (b) (TOD) Off-Peak at 66 Kv & above & sanctioned load above 5000 Kw 43,400 14 0.18% 16 222 16 100 - 122

TOTAL BULK SUPPLY 597,625 260 3.48% 231 4,512 231 2,505 - 2,008 Agricultural T-Wells - Tariff D - - 0.00% - - - - -

D-1(a) Scarp Less than 5KW 15,404 21 0.28% - 357 - 207 - 150 D-2 Agrl T/Well 461,312 47 0.64% 92 795 55 321 37 474 D-1 (b) - Peak Scarp & Agricultural 5KW & Above 40,441 11 0.15% 8 238 8 149

_ . 89

D-1 (b) Off-Peak Scarp & Agricultural 5KW & Above 192,607 50 0,67% 39 774 39 399 - 374 TOTAL AGRICULTURAL T/WELL 709,764 130 1.74% 139 2,164 102 1,077 37 1,087 Public Lighting - Tariff-G 24 0.32% 401 327 74 Residential Colony att. to industrial - H - 2 0.03% - 35 - 28 7 K (AJK) 84,953 25 0.33% 31 424 31 140 - 284 Time of Day (TOD - Peak) 96,609 66 0.88% 35 1,376 35 872 505 Time of Day (TOD - Off-Peak 474,377 213 2.85% 171 3,409 171

_ . 1,687 1,721 Rawat Lab - 0.00% - - - - - Company Total 7,641,901 7,466 100% 2,678 129,880 2,641 70,747 37 59,133

Page 70: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCC Tariff StatemeNt For 0: 2012

Category MDI

Charged Sales Sale Mix No. Of

Consumers

Conner. r i Applicable Rate Billed Amount Subsidy Amount tad 1

Load (kW)

I Load

Factor

Dist-0u tion

Losses Fixed

Charges (Rs!kW/(v1

Variable Chores es (Rs/kWh

Fixed Charges Rs. Mln

Variable Charges Rs Mln

Fixed Charges Rs. Mln

Variable Charges Rs. Mlii (KW) (MkWh) (84,age) (kVV)TY(,age)

Residential - Al

UPTO-50 Units per month 572 17.94 2 73 416531 0.00 1.85 0.00 33.26 0.00 18 99

Consumotion Exceeding 50 Units 0.00 0 00

1-100 Units 45.69 6.96 875355 0.00 5 58 0.00 254.88 0 00 516 59

101-300 ∎ (nits 143.40 21.83 794925 0.00 6 76 0.00 968.75 0.00 998 52

301-700 Units 84.55 12.87 205449 0.00 8.73 0.00 737.80 0 00 583.37

ABOVE 700 Units 87.24 13.28 69574 0.00 11.07 0.00 965.82 0.00 176 21

A-16 )03) T Peak 10652 1.23 0.19 1782

0.00 13. 63

8.14 0.00

16.79 0.00 6 76 ----1 A-16 (03)T Ofi-Feek 4.67 0 71 2363 33.00 0.00 15 31

Temp. domestic E-1 i (58..i 0 0.01 0 00 258 (.00 18.33 0.02 0.11 0.00 0 03

TOTAL DOMESTiC 11224 384.71 58.56 2366237 0.02 3015.41 0.00 2315.77

Ccminerciai - A2

Commercial Tariff (04) 78 4--

23.96 3 65 265472 400 14.72 0.03 352.66 0 00 113 33

A-2h (05i 1 16151 3.64 0 55 442 400 9 95 6.46 36.24 0.00 26 52 -t-

A-2806)1" Peak. i105880 3.97 060

4852 392 15.03 41.50 59.69 0 001 26 18

A-2c 1051 T Of'-Peak -1 19.39 2 95 -1-8

7 88 152.85 0 00 67 03 1

Temp cord E-•,;. (551 1

0 0.09 0 01 1230 15.88 0.00 1.35 0,00 0 38

TOTAL COMMERCIAL 1 122115 51.05 7.77 272026 R 47.99 602.79 0.00 233.43

, Industrie! -1---

:

B-1 (07) 31 9.90 1 51 187511 -t- i 0.00 10.12 0.00 100.19 0 00 1 49 41

B-16 ∎O9) 7 Peak -I- 56037 -

1.29 0.20 ______, •

5424 1

-1 14.01 07 -0

18 01 0.0C1 7 09

B- lb (119i T Off Peak I 7.53 1.15' H i '

-+- 8 34 62.81 0 00 24.71

B-2a(101 -17-32,70 7.92 1 21 1562 435 9 23 14.10 73 08 0 0e i 42 44 I

) T Peak B-21,112 1380,3 3.11 0 47 2307 '15.64

-1 7BE

, 56.33,

48.69

0 0 0

20 95 ---i B-2h1 12) T Off Peas 25.37 3 86 ,

':

6 I 1990,1 0.00 56 02

[B-3114) T Peak 148138 3.90 0 59: 162 345 1-14'" 8'

7 01

7 56.31 51.05

0.00, 26 61

5-3,14, 7 GP Peak 48.92 7.45 i 367.48 0.00' 173 651

B-4(17, T Peak 115416 4.87 0 74 13.91 360 1--

7.30 ----i

41.55 : E7 69 0.00 34 70

5-4(17 -) '1.- Off Pea!,. 44.94 6 84 ,

' 4 327 83 0 OC 163 0G3 +

E-2155-, Temp 1 0 0.01 0.00 1 0.00 0.00 0 CC 0 05 •

TOTAL INDUSTRIAL I 469798 157.77 24.02 28217 ____[ 162.66 1322.00 0.0C 633.72

Bulk Su .

0-15 (19; 168 0.08 0.01 27 I • 0.00 11.67 0 00 0.91 0.00• 39

C.- I b (2•5 ! 181E7 9.65 1 47 553 • j r 433 i 10 68 7.88 133.04 0 OC I 49 70

,..-1c ,,26I T Peal, 1325: 0.49 0.08 2121 , 1419 47,9 _.:_____J

-, •,--, 4.20

7.31 00C 321

1_C-lc (26) I Oft Peak 0 44 _I_ 22.11/ 0 eci 9 74, 7.87 ,

0.001 25 10 C-2a 128; _i___ 11902 5.02 0.76 34 It-

382 I 1028 4 .55 51.61

0.97 0.15 17

351 , '14 49

' 7 46

, 5.16 14 05 0 OC1 6 69 C-2b (23; T Peek l , .

---I ,35,5t, 0.71 1 34 63 0 XI 16 49 C-26 (28` T Oft Peal: 4.64

C-:-.10 (2,8) T Peal, --I--

5240 0.24 0 04 1 13.57

' 361 ''..89 3.2 I 0 001 1 78

C-31) (361 7 Off P;;:a'A 1.61 0.25 -1'

- - 7 14 11.50 0 00: 6 20

0.001 119.29 TOTAL BULK SUPPLY i 5933 , 25.58 3.90 844 1 . 23.68 248.54

Agricultural T-Viels -Tariff D , I

D-13.145) I 112 1 1.77 0.27 1982 0.00 10.10 0.00 17.82 0.00' --t-

7 59

D-2 09,52) ; 34802 5.46 0 84 17516 109 5 90 3 80 32.37 2 78: 35 81

0 94 0 14 3718 205 b-

26.82 7.50 15 74 0 0C; 3.081 -7 ID-2 (47 48T Peek L 36648 8)-2 (47 48) '1011-Peak 4.62 0 70 - • - 7.76 35 86 0 00,

i 12.86_,

2.74 63.34 TOTAL AGRICULTURAL TIWEL 72570 12.80 -1.95 23216 -Li

11.30 101.79

0 00' 5 76

0.00;

1 0 71

0 X! 23 90

(Public Light PVT G (72,73) 0

C

5369

2.53

0.20

3.05

0 39

0.461

0.03`

8

996

,

.

• 0:00 13.91

0.00 12.99

359 I 5 64

0.01

0.00

1.93

35 20

2.65

17.19

Residential colonies H (76,791

AJK. Tariff K..1 (351

AJK Tariff K-1 (36) T Peak 49318 3.74 0 57 20

i 15.12 360 17.75 56.46 1 0 CC , 23 16

15.32 2 33 1 7.51 ' 115.03 0 001 47 13 AJK Tariff K-1 (361 T OP Peak

Total AJK 51626 22.10 3.37 28 19.68 188.68 0.101 94 32

Company Total 806867 655.74 100.110 2691609 265.34 5617.06 2.781 3467 34

4.3

Page 71: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Thriff Statement For C;) 2012

Category MDI

Charged Sales Sale Mix No Of

Consumers

Connec ted

Load ikWi

Load Factor (%age)

Applicable Rate Billed Amount Subsidy Amount 7 Distnbu

tion Losses

Fixed Chaaes

(RsfkVV/M

Variable Charges (Rs/kWh

1

Fixed Charges Re. Mln

Variable Charges Rs Mln

Fixed Charges Rs. Mln

Variable Charges Rs. Mln (KW) (MkWh) ('/age) (kW)

Residential - Al

UPT0-50 Units per month 168.00 16.65 2.44 387954 0.00 1 84 0,00 30 66 0 00 17.45

Consumption Exceeding 50 Units 0 00 0.00

1--100 Units 45.21 6.63 861687 0 00 5.66 0.00 256 12 G 00 516.48

101-300 Units 148 34 21.76 821636 0 00 6 78 0 00 1005 55 0 00 1003.80

301--700 Units 38 31 12.95 209233 0 00 8.77 0 00 774 73 0 00 716.39

ABOVE 700 Units 108.62 15.93 83801 0.00 10.99 0.00 1194 09 0 00 220.47

A-16103) I Peak 11372 00 1.38 0.20 1826 0.00 13.73 0.00

18 96 0.00 7.61

A-16 (03) T Off-Peak 5 26 0 77 2420 8 18 43 00 0 00 17.25

Temp. domestic E-1 i (55) 0.00 004 0.01 261 0.00 15.71 0.00 0,55 C 00 0 14

TOTAL DOMESTIC 11540.00 413.81 60.70 2368818 0.00 3323.66 0.00 2499.59

Commercial - A2

:Commercial Tariff (04) 12.00 23.69 3.48 265573 0 14 70 0.00 348.41 0.00 112.07

A-26 (05) 16562.00 3,53 0.52 438 400 10.02 6.74 35 40 C' 00 25.71

A-2c(06)T Peak 107315 00 4.06 . 0.60 4968

. 406 14.57 43.59

59 16 0 00 26.07

;r-2c (06) T Off-Peak 19 83 2.91 . 7 89 156.45 C. 00 68,93

Temp. coml E-1ii (56) 0 00 0.09 0.01 1232 15.84 0.00 1 41 0 00 0 40

!TOTAL COMMERCIAL 1124189.00 51.21 7.51 272211 50.33 600 83 0 00 233.19

rIndustriai

6-1 (07) 43.00 9.62

1 26

1.41

0.19

18563

5628

0 00

0

10.43

14 05

0.00

0 00

'100 33

17.76

C 00

0 00

48 01

6.971 13-16 (09) T Peak --I 7229 00

B-lb (09) T Off Peak 7.36 1.08 8 36 61.52 0 00 24.13

B-2a1 10) 31868.00 8.94 1.31 1557 406 9 30 12.95 83 16 0 00 47 92 --i-

B-26(1217 Peak 14224 00 9 3.33 0.49 2335 408 15.52 58 04

51 73 C 00 22.43. H

B-26(121 T Off Peak 26.30 3.86 7.82 205 58 G 00 89. )41

B-3(14) 7 Peak 121890 00 3 49 0.51 163 382

14.63 46 56 51 10 0.00 23.831

B-3(14) T Off Peak 42.09 6.17 7.61 , 320 50 G 00 149.44

B-4(17) 7 Peak 106806 00 5.65 0,83 9 .. 360

13.87 39 17 78 40 C 00 40 31

B-40 7i T Off Peak 45 52 6 66 . 7.27 331 15 0 00 170.26

E-2(561 rams 0 00 0.00 0 00 1 . • 0.00 0 00 C 00 0.02

TOTAL INDUSTRIAL 472739.00 153.58) 22.53 28256 156.72 1301.23 0.00 622.46

Bulk Supply

C-1a )19) 147.00 0,09 0.01 27 0 00 11 53 0.00 0 98 C 00 0.42

C-16 251 . 17612 00 7 33 1.08 5441 400 10 36 7.04 75 93 L.00 37.75

C-1c (2611 Peak 9289.00 0 53 0 08

221 400 14.77 3.72 7 87 0 00 3 4601

C-1c (26) T Off Peak 2.88 0.42 I 7 72 2223 0.00 9.77

C-2a (28) 13451.00 5 48 0 80 34 380 10 28 5.11 56 32 C 00 27.40

(0-26 (29) T Peak 14905 00 0 91 0 13 17 380

14.51 5.66 13 15 C 00 6.25

C-26 (29) 7 Off Peak 4,63 0.68 7 47 34 59 0.00 16.45

C-36 (38) T Feak 6040.00 022 0.03 1 359 13,59 2 17

2.97 C 00 1.60

0-21) (38) T Off Peak 1 50 0.22 l 7 15 10 74 C 00 5.79

TOTAL BULK SUPPLY 61444.00 23.57 3.46 844 23.70 224.78 0.00 108.881

A. ricultutal T-Wells - Tariff ID

0-1a (46) 937.00 1 75 0.26 1957 0.00 7.52 0.00 13 17 0.00 7,53

D-2 149,52 34249.00 3.64 0.53 17462 110 6 63 3.77 24 15 2 74 23.78

D-2 (47,481 T Peak 35478.00 0 81 0.12 3803 196 17,75 6.95

14.37 0 00 5,26

C)-2 (47 48) T Off-Peak 4.04 0 59 1-8-719, 33 07 0 00 12 11

TOTAL AGRICULTURAL T/WEL 70664.00 10.24 1.50 23222 10.72 84.76 2.74 48.68

Public Light PVT G (72,73) 0.00 1 63 0.24 996 0 00 14 09 0.00 22 96 0 00 4.35

Residential colonies H (76,79) 0.00 0.21 0 03 45 i 0 OG 12.93 0.00 2 65 0.00 0.71

AJK Tariff K-1 (35) 11016.00

00 49376

4.63

4 16

0 68

0,61

6

20

360 5.63

15.15 360

3,97

17 96

26 07 0 00

63.091 0 00

36.45

25.82 AJK Tariff K-1 (361T Peak

AJK Tariff K-1 (361 T Off Peak 18.74 2.75 7.53 141 08 C 00 57 73

Total AJK 51829.00 27.54 4.04 28 21.93 230.24 0.00 120.00

Company Total ;792405.00 681.78 100.00 2694420 263.40 5791 11 2.74 3637.85

4 y

Page 72: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

FESCO Tariff Statement For 09 2012

r

Category MDI

Char ed Sales Sale Mix

No Of Consumers

tnr7iec ten

Load rkWi

Load Factor

• Distribu

bon Losses

Applicable Rate Billed Amount Subsid Amount

Fixed Charges

(Rsl‘W/M

Variable Charges (Rs/kWh

Fixed Charges Rs Min

Variable Char es Rs. Min

Fixed Charges Rs. Mln

Variable Charges Rs Mal (KW) (MkVVh) (%age) (kW) (%age) '

Residential - Al • UFTO-50 Units per month 44 00 17.10 2.56 403196 0 00 1.79 0 00 30 55 0 00 17.96 Consum.tion Exceedin. 50 Units

U 00 0.00 -100 Units 42.47 6 35 841668 0 00 5 69 0 00 241 57 C 00 481.90

101--300 Units 149.52 22.35 812591 0.00 6.82 0.00 1019 53 0 00 1074.96 301-700 Units 95.39 14.26 227632 0 00 8.80 0 00 839 05 0 00 714.77 ABOVE 700 Units 101.88 15.23 82719 . , 0 00 10.22 0.00 1041 26 0 00 199.16 A-lb (03) T Peak

12303 00 1 39 0.21 1910 • ,

. - 7 88 •

8.45 0.22 11.77 0.00 7.67

A b (031 T Off-Peak 5.46 0.82. 2532 • 5.03 27 48 0 00 17.91 Temp domestic E-1 i (55) 0.00 0 01 0.00 263 0 00 16.67 0.00 0 15 0 00 0.04 TOTAL DOMESTIC 12347.00 413.23 61.77 2372511 0.22 3211.36 0.00 2514.36 Commercial • A2

Commercial Tariff (04) '12 00 23 28 3.48 265901 0 14.72 0 00 342 71 0 00 110.11 A-26 (05) 15506.00 3.40 0.51 431 421 9.96 6.65 33 91 0 00 24.78 A-2c(061T Peak

111382.00 4 25 0 64 5068 404 14 14

45 02 60 13 0 00 26 47 A-2c (06) T Off-Peak 20.76 3.10 7.95 164 98 0 00 72 62 Tern. coml E-lii '56) 0.00 0.11 0.02 1243 15.68 0.00 1 74 000 0.50 TOTAL COMMERCIAL 127200.00 51.81 7.74 272643 51.67 603.47 0.00 234.49 Industrial

8-1 (07) 8.30 9.17 1 37 18484 0 00 10.04 0 00 92.08 C 00 45.75 B lb (09) T Peak

70E6.30 1 20 0.18 5699 0 14.05

0.00 16 88 C 00 6.62 B-'16 (09) T Off Peak 7.44 1.11 8 36 62 24 0 00 24.41 B-2a(10) I 29177.00 8.00 1.20 1538 390 8 93 11 38 71 46 0 00 42 82 B-26(12) 1 Peak

139490.0-0 3 19 0.48 2401 404 15.67

7 89 56 41 49 99 0 00 21.48

B-26112) T Off Peak 24.41 3 65 192 68 0.00 8276 8-3(141T Peak

141726.00 3.22 0 48 166 370 14.64

52.37 47 11 0 00 21.95 B-2114) T Of' Peak 44.57 6 66 7.62 339.69 C 00 158 26' B-;,17) 7 Peak

99777.00 4.74 0.71 360 13 84_1

35 92 7.26

65 68 0 00 33.83 6-4(17) T Off Peak 35.14 525 255 19 0 00 131 44 8-2(58) Temp 0.00 0 01 0.00 1 0.00 0 00 C. 00 0.04 TO4-A..L. INDUSTRIAL 463462.00 141.10 21.09 28298 156.001 1193.00 C.00 569.34, Bulk Supply

C-lai19i 134 00 0 09 0 01 27 0.00 11.57 0 00' 1 03 C` 00 044 C-16 (25) 17862.00 7.26 1.09 539 495. 10.36 8 84 75 461 C 00

C 00

37 51

4.55 C-1c (26) 1 Peak 144E7 CO I-- 070

3 41

0.10

0.51 226 '00 14.76

5 78 10 34

C-lc (261 T Off Peak 7.7 i 26 28 C 00 11 55 C-2a r28) 12797.00 5 18 0.77 34 I 486 10.32 6 22 53 44 G 00 25.90 C-26129) T Peak

15136 00 1.11 0 17 17 360 14 50

5 75 16 07 0 00 7.65 C-26129) T Off Peak 5 46 082 7.46 40.71 C 00 19 37 C-3b (38) T Peak

6200 00 0 22 0 03 360 13.56

2.23 2 99 0 00 1.61 C-36 (38) T Off Peak 1.41 021 I 7.13 10 06 0 00 5.43 TOTAL BULK SUPPLY 66586.00 24.86 3.72 844 28.82 236.40 0.00 114.02,I

A ricultural T-Wells - Tariff 0 0-la (46) 1140 00 1.79 0.27 1952 i 0.00 10 12 0 00 18 06 QUO 7.68' 0-2 (49,52) 34171.00 3 98 0.59 17454 109 6.81 3.73 27 08 2 73 25.97, D•2 (47 48) T Peak

39330.00 0 81 0 12 3850 215 17 28

8.57 13 91 C 00 5.23 D-2 (47,48) T Off-Peak 4.06 0.61 7 98 32 36 0 00 12 ,7 TOTAL AGRICULTURAL T/WEL 75141.00 10.62 1.59 23256 i 12.30 91.41 2.73 51.051

4 30 Public Light PVT G (72,73) 0.00 1 61 0.24 996 0.00 13 16 0 00 21.18 0 00 Residential colonies H (76,79) 0.00 0.24 0.04 45 0 00 12.93 0 00 3 13 0 00 0.84 AJK Tariff K-1 (35) 2000 00 1.48 0 22 5 360 6.11 0.72 9 05 0 00 11.66 AJK Tariff K-1 (36) T Peak

54376 00 4.66 0.70 23 360 15 14

19.58 70 58 0 00 28.90

AJK Tariff K-1 (36) T Off Peak 19.40 2 90 7.52 145 88 C 00 59 74 Total A,11( 51829.00 25.54 3.82 26 20.30 225.81 0.00 100.311 Company Total !796565.00 669.01 100.00 2698621 . 259.39 5585.40 2.73 3588.71

ar

Page 73: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Tariff Statement For 10 2012

Category

Cnar ed MD)

Sales Sale Mix No. Of

Consumers

bonnet led

Load (kW)

Load Factor

Disiribu lion

Losses

A, licable Rate Billed Amount Subsidy Amount

Fixed Char. es

Variable Fixed Char.es Char. es

Variable Char.es

Fixed Char es

Variable Char.es (KW) (MkWh) (%)tage) 1 kW) (%age) (Rs/kW/M (Rs/kWh Rs. Min Rs. Mln Rs. Mln Rs. Mln

Residential - Al

UPTO-50 Units .er month 13 00 16.98 2 65 399675 0 00 1.24 0.00 20.99 0.00 17.56 Consum. ion Exceedin 50 Unils

0 00 0.00 1--100 Units 44.60 6.97 860986 0 00 5.51 0.00 245.78 0.00 539.00 101--300 Units 153.24 23 94 843954 0 00 6.70 0 00 1026 51 0 00 1013.61 301-700 Units 79.62 12.44 198051 0.00 8.49 0.00 675 85 0 00 560.09 ABOVE 700 Units 89.67 14.01 70806 0.00 8.19 0.00 734 07 0.00 195 54 A--lb (03 T Peak 1.06 0 17 1987

0.00 18.98 20.17 0 00 5.86 12344 00 A-lb (03) T Off-Peak 4.34 0.68 2634

0.00 11 30 49 04 0.00 14.24

Tern. domestic E-1 i (55) C.00 0.00 0.00 265 0.00 0 00 0.00 0 00 0 00 0.01 TOTAL DOMESTIC 12357.00 389.51 60.86 2378358 0.00 2772.41 0.00 2345.89 Commercial - A2

Commercial Tariff (04) 8.90 21.80 3.41 266448 0 14 39 0 00 313 68 0 00 103.06 A: 2b (05) 14009 00 3.14 0.49 415 400 9.96 5 60 31 22 0 00 22.62 A-2c(06)T Peak

105686.00 4.17 0.65 5165 397 15 35 64 06 0 00 27.68

A 2c (061T Off-Peak 20.38 3 18 41 99

7 99 162 81 C 00 70 36 Tern. coml E-1ii (56) 0.00 0.08 0 01 1250 19.74 0.00 1 50 0 00 0.34 TOTAL COMMERCIAL 119703 00 49.56 7.74 273275 47.59 573.27 0.00 224.26 Industrial

B-1 (07) 17.00 9.36 1.46 18399 0.00 9.17 0.00 85 89 0 00 46.71 B lb (09) T Peak 1.24 0.19 5800 2.98 16.04 0 00 6 81 10254.00

B-lb (09) T Off Peak 8 61 1.35 0.02

7.73 66.52 0 00 28 24 B-2a(10) 313444.00 6.69 1 05 1524 J 402 9 67 12.23 64 71 6 00 35 81 B-26(12) T Peak

J 2 94 0 46 2449 406 15.57 45 78 0 00 19.79 148085.00

B-2b(12) T Off Peak 25.58 4.00 59.24

7.84 200.55 0 00 86.71 8-3(14) 7 Peak 3 96 0 62

167 360 _1

7 61 .

14.61 50.94 57.80 C. 00 26.99 , 141635.00

6-3(14) T Off Peak 46.92 7 33 356 94 0 00 166 64 6-4(171T Peak 4 81 0 '5

360 13 84 34.15

7.26

66 53 0 00 34.29 B-4(17) T Off Peak

94855.00 34 76 5 43 252 25 C 00 130 00

6-2(58) Temp 0.00 0.01 0 00 1 0.00 0.00 C 00 0.03 TOTAL INDUSTRIAL 469207.00 144.87 22.64 28349 156.58 1213.01 0.00 582.01

!Bulk Supply_

C-1a (19) 137.00 0.08 0.01 26 0 00 11.52 0 00 0 0,1 0.00 0.39 C-lb (25) 17469 00 6.37 0 99 535 400 13.38 6.99 66 06 0 00 32.78 C- lc (26) T Peak

13043 CO 0 531 0 08 231 ---r-- 400

385

14 55 5 22 7 90 0 00 3 45

C-lc 126) T Off Peak 2.10 0 42 7.76

10 04 4 48

20 97

42 47

0 00

G 00

9.17

21.15 C-2a (28) 11624.00 4 23 0.66 34 C-2b (29) T Peak

13530 00 0.86 0 Is 17 380 14.51

7 47 5.14 12 48 0 00 5.93

C-2b i29) T Off Peak 4.10 0 64 30 59 0 00 14.54 0-3b (38) T Peak 0.20 0 03

360 13.46 1.74 2 70 C 00 1.47 ---, 4840 00

C-3b )38) T Off Peak i 0.96 0 lb 7 08 6 78 0 00 3.68 TOTAL BULK SUPPLY 60643.00 20.03 3.13 844 23.57 190.86 0.00 92.57 A. ricultural T-Wells - Tariff 0

D la (46) 1066.00 1.65 0.26 1926 0.00 10 02 0.00 16.49 0 00 7.08 D-2 (49,52) 35876 00 4.52 0 71 17423 109 4.43 3.92 20 03 2 87 29.53 D-2 (47.48)1 Peak

36779 00 0 74 0.12 392

1 200 6.02

7.37 11 87 0 00 4.82 D-2 (47,48) T Off-Peak 3.77 0 59 7.40 27 88 0 00 11.31 TOTAL AGRICULTURAL T/WEI. 73721.00 10.68 1.67 23276 11.29 76.27 2.87 52.73 Public Light PVT G (12,73) 0.00 2.97

0.16

0.39

4.36

0.4_6

0 02

0.06

0 68

998

45

5

23

,

0.30

0.00

370

360

-2.53

12.90

-66.41

11.49

0.00

0.00

0.74

19.75

-7.52

2.00

26 10

50 33

C 00

C 00

0 00

0.00

7.93

0.54

3.09

27.17

Residential colonies H (16,79) 0.00

2000.00

54865 00

AJK Tariff K-1 (35)

'AJK Tariff K-1 (36) T Peak

AJK Tariff K-1 (36) T Off Peak 17.46 2 73 5 71 99 61 0 00 53.77 Total AJK 51829.00 22.23 3.47 28 I 20.49 123 44 0.00 84.02 Company Total 787460.00 640.00 100.00 2705176 259.52 4944.14 2.87 3389.95,

Page 74: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PE)IICO Tariff Statement Fo, 11 2012

Connoc tee

MCI No Of Loa() Charged Sales Sale Mix Consumers (kW)

(KW; (Mk1/11h) (%age) kWi

Applicable Rate Billed Amount Subsidy Amount Dishibu

tion Fixed Losses Charges

(Rs.lkVV/M

Category

Fixed Charges

Variable Charges

Rs. Min Rs Min

000 18.24

000 0 00

0.00 598.67

000 854.13

COO 419.67

000 122.31

COO 5.00

0.00 10.77

000 0 03

0.00 2028.83

0 00 90.74

0.00 20.481

00 29.86

0 00 73 55

0 00 0.43

0.00 215.06

0 00

C 00

49.16

6 96

Variable Charges (Rs/kWh

Fixed Charges R.):. Min

Variable Charges_ Rs Mln ("rage)

Residential - Al

UPTO-50 Units per month

Consumption Exceeding 50 Unit

1--100 Units

101-300 Units

301-700 Units

54.00 17.62 2.92 414235 0 00 0.85 0 00 14 95

47 41

149.56

58.6E

62 90

0 91

3.28

7 85

24 77

9.71

903930

854913

150281

000 535

0 CO 6.50

0 00 8.22

0 00 7.79

0.00 _14 44

8 60

0.00 -1.25

000

000

000

000

253 72

972 66

482 31

489 82

13 09

28 23

-0 01

ABOVE 700 Units

A-113(03)T Peak

A-lb (031T Off-Peak

Tern domestic E-1 1(55)

1041

0.15

054

GOO

55882

2082

2759

268

11404 00 0 00

000 0.01 0 00

TOTAL DOMESTIC

Commercial - A2

Commercial Tariff (04;

11458 00 34048 56.36 2384350 0.00 2254.77

14.00 19 18 3.18 267066 0 14 333 0.00 275 55

28 35

68 05

167 63

1 45

541.03

A-2b (05)

12469.00 2 82 0.47

4

108479.00 .39 0 73

21431 355

0.00 0.10, 0 02

120962.00 47.921 7.93

394 393 10 04 4.90 A-2c(06)T Peak

A•2c (06) T Off-Peak

Temp ccml E•lii (56)

TOTAL COMMERCIAL

Industrial

8-1 (07)

15.51 5299 406 44.04 7 82

1260

274019 0 00

48.94

- 4.00 9 85) - 1.63 B-lb .09) T Peak 126' 021 ' 7466 00 B-lb (09) I Off Peak 7 59 1 26

25854.00 6 061 1 00

2 901 0 48 14563500

24 87 1 4 12

4 30 0 71 -1 142267 00 46.47 7.69

7.30 1.21 1105371.00

49 57 8.21

0.00 001 000

14/9966.00 160.20 26.52

18283

5927

0.00 10 07 0 00 99 24

14 08 17 78 0 00 63 66 0 00 24.91

56 413 C 00 32.27

45 63 C.00 19.52

8.38 B-2a( I())

B-201121 T Peak

B-2b1 12) T Off Peak

B-3(14) T Peak

T Off Peak

lb-4(17) If Peak

B-4(17) T Or! Peak

6 2;513) Temp

TGIAL INDUSTRIAL

Bulk Supply

1489 407 932 10 53

15.73

7.93

1 14.63_1

7.61

1382

7.26

2528 400 58.20 197 16

6294

353 34

100 90

359 25

000

1356 88

0 00 84 32

29.37

165 141

52 071

185.40

0 03

649.15

0 00 175 384

--I 360

54 59 L 00 .2 C 00 9 38 29 C 00

000

0 00

1 0 00 28412 161.61

C-la (19) 133.00 0.09 001 C-lb (25) I 17944.00 6 00 0 99

1--- C- lc (26) T Peak

-1 10165 00 0.56 009 c_lc 126, T Off Peak __

2.33 0.38 C-2a (28) 1 10075.00 3 36 0 56 C-21» (29) T Peak -1 -1 10128 00 0 74 0 12 C-21) (29, T Off Peak 3.13 0 52

C-36 (38)T Peak 0 18 0.03 3520.00 C-31)133) T Off Peak 0.132'1 0 14

I TOTAL BULK SUPPL.1 1 51966.00 17.20 2.85 lAgricultural T-Walls - Tariff D I

26 0 00

400

11 53

10 38

14.74

7.70

0.00

0 98 0 00

62 30 C00

827 000

17.90 C 00

35 12 0 00

10.75 0 00

23 36 000

237 000

5 80 C 00

166.85 0.00

15 34 0.00

22.72 2 70

16 12 C 00

41 01 0 00

95.19 2 70

22 46 0 00

2.07

4 05

0 42 530 7.18; 30.92

236 364 400 4.07 7.88

16.79

512

11.12

1.29

3.15

80.33

34 380 10.46

14.50

7 46

3 83

17 380 385

13.45 i. 707

361 1 27

20.20

0.00

844

D-la (413) 1019.00

0-2149.52) ■ 33796 00 3 47 D-2 (47 48) T Peak 7-- 0 97 40467 00 D-2 (47 48) T Off-Peak 5 37

TOTAL AGRICULTURAL TMIEL 75262.00 11.55

Public Light PVT G (72,73) 0.00 1.60

Residential colonies I-1(76,79)1 0.00 0.16 AJK Tariff K-1 (35) 8.00 0.72

I-- AJK Tariff K-1 136) T Peak

----1 E3742 00 4 48

1_,AJK Tariff K-1 (361T Off Peak i 1979 Total A.IK , 51829.00 24.99 Company Tutal !791462.00 604.09

173' 0.29

0 57

0.16

089

1912 0 00 8.86

656

16.53

7.63

7.44

22 63

6.34

16.12

52.53

4.27

17411 0001 109 3.67

3958 214 8 64

1.91

0.26

0.03

012

0 74

23281 12.31

0.00

0.00

0.00

1003 0 GO

000

0

14.05

12.86

5.63

15 14

7.52

45 C 00 0 56

0.00 5 66

0 00 27.60

0 00 60.94

0 00 94.39

2.70 3125.1:_ki

5

67.85 23 360 22.95 3 28

4.14

100.00

148 77 28 22.95 220-67

2711982 266.01 4659.92

(t7

Page 75: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Tariff Statement F3," 12 2012

Category

Cnarged MDI

Sales Sale Mix No Of

Consumers

onnec ted

Load (M/Vi ;kW)

Load Factor (%ege)

Distribu bon

Losses

Applicable Rate Billed Amount Subsidy Amount

Fixed Charges

(RsikW/M

Variable Charges (RsikVVh

Fixed Charges Rs Mln

Variable Charges Rs Mln

Fixed Charges Rs. Mln

Variable Charges Rs Mln

(KW) (MkWh) (%age)

Residential • Al

UPT0-50 Units per month 56 00 18 63

51 69

3 16

8 77

797881

634853

0 00

0.00

1.80

5.65

0.00

0.00

33 63

292 25

0 00

0 00

0 00

19.33

0.00

621.31

Consumption Exceeding 50 Units

1--100 Units

101-300 Units 141 27 23 97 829922 0 30 6.65 0.00 938 99 0 00 728 11 301-700 Units 47 47 8.06 108417 0 00 8.42 0.00 399.76 0.00 409.48 ABOVE 700 Units 61 21 10 39 14970 0.00 6.97 0.00 426 36 0 00 113.32 A-lb (03) I Peak 0.74 0.13 2177

0 00 13 51 0 00 9 98 0 00 4.07

A-1b 1031 T Off-Peak 11760.00

3.19 0.54 2886 8.04 25 67 0 00 10.47 Temp domestic E-1 i (55) 0.00 0.01 0 00 269 0 00 11.00 0.00 C 11 0 00 0.04 TOTAL DOMESTIC 11816.00 324.21 55.02 2391375 0.00 2126.75 0.00 1906.14 Commercial - A2

Commercial Tariff (04i 19 00 17.08 2.90 267602 0' 14 43 0 00 246 45 0 00 80.77 A-2b 105) 9627.00 2.09 0.36 377 • 425 10.18 4.10 21 31 0 00 15.24 A-2c(06)T Peak 4 11 0 70

5480 402 15 80 41 64 92 0 00 28.23 103939 00

A-2c (06) T Off-Peak 20.06 3 40 7 88 157 98 0 00 68.70 Tem. con)! E-1ii (56) 0 00 0 08 0.01 1266 • 14 00 0.00 1 05 0 00 0.34 TOTAL COMMERCIAL. ,113595.00 43.41' 7.37 274725 ' . ' 45.86 491.71 0 00 193.27 Industrial

6-1 (07) ' 1701.00 9.20 1 56 18104 • 0 00 9.35 • 0.00 86.00 0 00 45.89 B-1b i 09) T Peak In 0.23

6139 0 14.04 0.00 19 36 0 00 7 60 b (09) T Off peak

1

6-1 8706 00

I 7.93 1.35 8 36 66.33 0 00 26.02 -13-2a(10) 22810 00 5 96 1.01 1460 411 8 33 9.37 49 64 0 00 31.93 B-2b(12) T Peak 3.65 0 62

2592 407 15.44 60 23 56 35 0 00 24 55

8-20(12) T Off Peak 1481'i6.00

26 96 4 58 7 78 209 76 G 00 91.40' 6-3(14i T Peak 4 48 0 76

168 263 14.61 65 51 0 00 30.57 8-- 3(14) T Oft Peak i--

186432.00 47.46 8.05 7.61

49 05. 360 98 0.00 168.48

6.-4117) T Peak 7.22 1 23 9 360 13 83 99 86 L 00 51.45

9-4(17) T Off Peak 113503 00

50 65 8.59 7.25 40 86l

367 33 0.00 189 421

0 02

667.36

1E12(58) Temp 0.00 0 00 0.00 0 00 0 00 0 00 TOTAL INDUSTRIAL 529965.00 184.89 27.98 284731 159.51 1381.12 0.00 Burk Supply

0_-1a(19, 1'3000 0.0E1 0.01 26 0.00 11 55 0.00 097 C00 042 C-1b i25) 151.000 5 46 0 93 519 415 10 48 6.29 57 23 C 00 28.12 C-1c (26) T Peak 0.55 0 09

247 28 14 87 4 29 8 21 0 00 3.58

C-1G i26) T Oft Peak 10016 00

2.40 0 41 7 77 18 64 0 00 8.'31 C-2a (28) 1 9441 00 3 69 0 63 34 393 11 07 3.71 40 84 0 00 18.45 C-2b (29) T Peak

11962 00 0 83 0 14 17 380 14.58

7 50 4.55 12.04 0 00 5.70

C-2b (29) T Off Peak 3.26 0.55 24 47 0 GO 11.58 C-3b (38) T Peak 0.191 0.03 3360 00 r_ 1

844

360 13.47 2 51 0 00 1 37 C-3b (38' T Off Peak

i 0.92 0 16 7 08

1 211 6 53

20.051 171.44

f_; 00

0.00

3.55

80.89 TOTAL BULK SUPPLY 50081.00 17.38 2.98 Agricultural T-Wells - Tariff 0

0-la (46) 994.00 1 62 0.28 1859 0 00 8 97 0 00 14.56 G 00 6.98 D-2 (49.521 33590,00 3.67 0.62 17390 109 6 55 3.67 24 03 2 69 23.94 0-2 (47 481 T Peak 0 97 0 16

4016 200 8 20 7 7 97

54 0 00 6.31 D-2 (47,48) T Off-Peak

37678.00 4 96 0 84 -

---1 3 78 18 78 0 00 14.89

TOTAL AGRICULTURAL TANEI4 72262.00 11.22 1.90 23265 11.211 65.34 2.69 52.12 Public Light PVT G (72,73) 0.00 1.90

0 14

0.32

0.02

1005

45

• 0.00

0.00

12.09

12 95

0.00 22 93

0 00 1 80

0 00

0 00

5.07

0.49 Residential colonies hi (76,791 I 0.00

AJK Tariff K-1 (35) 1000 00 0 74 0 13 5 I 360 5 66 0 36 4.19 0 00 5.53 AJK Tariff K-1 (36) T Peak

-■ 66705 00 4.70 . 080 23 i 360 1473 .

7.32 24.01 69 19 0 00 29.12

AJK Tariff K-1136) T Off Peak 01_001 20.70 3.51 i 151 46 0 00 63 74 Total AJK 1 51829.00 26.13 4.43 28 1

24.37 224.84 6.00 98.69 Company Total 829552.00 58928 100.00 2719760

r . 1 I 261.00 4485.93 2.69 3004.04

Page 76: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Tariff Statement For 01 2313

Category MIDI

Charged Sales Sale Mix No. Of

Consumers

onnec tea

Load (kW) (kW

I I:Asti-11)u

Load' Lion Factorj Losses e•.,agel

Applicable Rate

Fixed Variable Charses Charses

(Ra101V/M (Rs/kWh

Billed Amount Subsid Amount

Fixed Charses Rs. Mln

Variable Charges

Fixed Charges

Variable Chars es (KW) (11,1kVVil) (cl.agei

Rs. Min Rs Min Rs. Mln Residential - Al

UPT0-50 Units per month 42 00 • 21.15 3.78 495625 0 00 1 94 0.00 40.96 0 00 Consumption Exceeding 50 Units 0 00

22.16

1-100 Units 54 63 9 7 1005865 0.00 5.74 0.00 313.73 0 00

0.00

101--300 Units 124 09 22 '8 743566 0 00 6.66 0 00 826 45 0.00

611 63

626.47

316,82 301--700 Units 40.66 7.27 107263 0.00 8E32 0.00 350 48 0 00 ABOVE 700 Units 50.25 8.98 45805 0 GO 9.46 0.00 475.47 0.00 98.91 A-lb (03) T Peak

12211 00 0 83 0 15 2439 176.89 13.82

2.16 11 43 0 00 4 56 A-lb (03) I Off-Peak 3.43 0 61 3233 8.22 28 21 0 00 11.25 Temp. domestic E-1 i (55) 0.00 0 01 0.00 271 0 00 17.50 0.00 021 0 00 0.05 TOTAL DOMESTIC 12253.00 295.04 52.74 2404067 2.16 2046.94 0.00 1691.84 Commercial - A2

Commercial Tariff (04) 16.00 15.55 2.78 268101 0 14 99 0.00 233 02 0 00 73 53 5 -26 (05) 9022.00 2.01 0.36 361 400 10.00 3 61 20 04 0 00 14.59 A-2c(06)T Peak

103331 00 3 92 0.70 5977 400 15 53

41.35 60 94 0 00 26.76 A-2o (06) T Off-Peak 19.16 3 43 7.81 149 70 0 00 65.74 Temp coral E-iii (56) 0.00 0.08 0.01 1285 15 73 0.00 1 18 0 00 0.34 TOTAL COMMERCIAL 112372.00 40.71 7.28 275724 44.96 464.1111 0.00 180.97 Industrial

6-1 (07) 2662.00 8.03 1 43 17753 0 00 10.64 0.00 85 36 0 00 40 05 8-16 (09)1- Peak 10847 00 1 34 0.24

6513 15 14 04 0 16 18 83 0 00 7.39 B-lb (09) T Off Peak 7.39 1.32 I 8.36 61 76 0.00 24.24 B-2a(10, 21297.00 5.60 1.00 1416 401 9.25 8 55 51 76 0 00 30 00 0-26(12) T Peak

155097 00 3 37 0.60 2686 406 15 63 62 98 52 68 C.00 22.99 0-26(121T Off Peak 25 61 4.58 7.87 201 62 C 00 86.83 B-3(14) T Peak

135541.eo 4.48 0 80 169 336 1528 .

45.54 68 38 0 00 30 53 0-3(14) T Off Peak 47 98 8 58 7.95 381 55 0 00 170 35 B-4(17) T Peak 7.77 1.39 1 158 1381 .

18 89 107 29, 0 00 55.39 119436.00 8-4(17i 1 Off Peak 51.75 9 25 7 24 374 86 1 0 00 193.54 E-2(581 Temp 0.00 0.01 0.00 1 ' 0 00 0 00 0 00 0.03 TOTAL INDUSTRIAL 1494972.00 163.33 29.20 28547 136.12 1404.09 0.00 661.03 Bulk Supply

C-la (19) 125 00 0.08 001 26 0 00 11.54 0 00 0 90 0 00 0.381 0-16 (251 15450.00 6.37 1.14 508 441 10.36 6.82 66 05 G 00 32.82 C-lo i26) T Peak 11329 00 0 64 0.11

258 406 14 84 4.60 9 .49 0 00 4 5 C-lc (26) T Off Peak 2.94 0 5: 7 75 22 82 0.00 9 98' C-2a (28) 10678.00 4.59 0 80 34 660 10.33 7.05 46 46 0.00 22.48 , ______H

6.69' C-26 (29) T Peak

14767 CO 0.97 0 17 17 380 14.38

5.61 13.94 0 00 C-26 (29) T Off Peak 4 23 0.76 7.40 31 30 0.00 15.02 C-36 (38) T Peak

3560.00 0 21 004 360 13.49

1 28 2.78 0 00 1.51 C-36 (381T Off Peak 1 08 0.19 710 765 000 4.15 TOTAL BULK SUPPLY 55905.00 21.02 3.76 844 25.36 201.39 0.00 97.18 Agricultural T-Welis - Tariff D

9-la 146) 949.00 1 31 0.23 1811 0 00 10.16 0 00 13 35 C.00 5.65 9-2 (49,52) 33424.00 2.80 0.50 17375 110 6.60 3.66 18 44 2 67 18.25 D-2 (47,481 1 Peak 36542 00 0.79 0.14

4085 201 13. 13.31 7.35 10 47 C 00 5.12 D-2 (47,48) T Off-Peak 3.93 0.70 6.14 24.14 0.00 11.79

TOTAL AGRICULTURAL 81WEL 70915.00 8.83 1.58 23271 11.01 66.40 2.67 40.80 Public Light PVT G (72,73) 0.00 1.78 0.32 1009 0.00 9 65 0.00 17 18 C' 00 4 75 Residential colonies H (76,79) 0.00 0.15 0.03 45 0 00 12.95 0 00 1.93 0 00 0.52 AJK Tariff K-1 (35) 1.00 0.62 0 11 5 0 52.63 0.00 32 47 C 00 4 85 AJK Tariff K-1 (36) T Peak

81374.00 4.98 0 89 23 360 15.16

29 29 75 43 0 00 30.85 AJK Tariff K-1 (36) T Off Peak 22 96 4 10 7 53 172 84 7 00 70.70 Total AJK 51829.00 28.55 5.10 26 29.29 280.74 0 00 106.41 Company Total 798260.00 559 38 100.00 2733535 f---

248.90 4483.55 2.67 2783.51

tiq

Page 77: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Tariff Statement For 02 2013

Category

Charged MDI

Sales Sale Mix No. Of

Consumers

Connec led

Load (kW)

Load Factor

Distnbu lion

Losses

Applicable Rate Billed Amount Subsidy Amount

Fixed Charges

(Rs/kW/M

Variable Charges (Rs/kWh

Fixed Charges Rs Mln

Variable Charges Rs. Mln

Fixed Charges Rs. Min

Variable Charges Rs Mln

(KW) (AlkVVh) (vioage) (kW) (%sgel '

Residential - Al

UPTO-50 Units per month 0._ 8.00 23 71 4.57 567264 0.00 1.89 0 00 Consumption Exceeding 50 Units 44.71 0 00

0.00

24 93

1--100 Units 56.05 10.80 1039795 0 00 5.64 0 00 316 29 0.00

0.00

101-300 Units 111.63 21.51 677181 0.00 6 57 0.00 733 73 0 00

600.25

301-700 Units 30 58 5.89 84731 0 00 8.10 0.00 247 82 0 00

519.04

ABOVE 700 Units 41 80 8 05 41695 0 00 9 56 0 00 399 77 0.00

258.13

A-lb (03) T Peak 24565 00 0 90 0.17 2534

0.00 13.08 0 00 11 84

31 03

0.00

0 00

4.99

80.48

A-lb 103) T Off-Peak 3 98 0.77 3360 . 7.79 Temp. domestic E-1 i (55) 0.00 0.01 0.00 272 0 00 15.56 0 00 0 14 0 00

13.07

TOTAL DOMESTIC 24573.00 268.67 51.76 2416832 0.00 1785.33 0.00

0 03

1500.93 Commercial - A2

Lcornmerz.;a1 Tariff (041 10.03

8491.00

14.58 2.81 268502 0 14 48 0 GO 211 13 0 00 68 98 A-2b (05) 2 00 0.39 346 400 9 99 3.40 19 98 0 00 c-.-2c(06)T Peak 104016 0 0 4.09 0 79

6473 403 15 62 41 92 63 88 0 00

14.57

27 79 A-2c (06) T Off-Peak 19.97 3.85 7.89 157 68 0 00 68.60

042

180.37

Temp corn! E-Iii (56) ' 0.00 0.09

40.74

0.02

7.85

1292

276613 16.06 0.00

45.32

1 51

454.18

0 00

0.00 TOTAL COMMERCIAL 1112517.00 Industrial

6-i (07) 834.00 721 1.39 17383 . 23 98 10.48 0.02 75 62 0.00 36.00 B-lb (09) T Peak 1.49 0 29 6941 14 Ott 8

0.22 20 96 0 00 8.20 9357.00 -I IT ( l. 6-15 09) T Off Pea . 735 1 42 24 09

' 24 838 61.56 000 B-2a(10) 20727.00 5 02 0 97 1405 399 9.25 8.28 46 47 0.00 26.93 B-2b112) T Peak 3 10 0.60

2775 40.2 [..-25.66 • 7 89

63 781 48 51 0 00 20.85

85 94

H 158606.00 B-2b(12) T Off Peak 25 35 4.88

199 96 G 00 B-3(14) 0 Peak 4 °.--- G-76 -I 139831 00,---- 169 426 14.75 59'4 59.571 C 00 27.63 B-3/14) T Off Peal 48.11 9 27 7.68 369 36 0 00 170.80 BA 17) T Peak 6.51 1 25

352 13.82 89 95 C. 00 46.41 5-4;17i 1 Oft Pe Peak 107069.00

44.76 8 62 7.25 37.68

324 47 0 00 167 40 E-2(53) Temp 0.00 0.01 0.00 1 0.00 0 00 0 00 0.02 10 iAL INDUSTRIAL 489730.00 152.96 29.47 28683 169.55 1296.60 0.00 614.27 Bulk Supply

C-la (19i 141 00 0.08 002 25 0 00 12.50 0 00 1 05 0 .00 0.42

32.28 0-18 (251 15384.00 6 27 1.21 500 428 10 36 6 59 64 95 0 00 C-1c. i25) I Peak 81 0.16

268 , 00 [0 14.69

7.6 7 6.05 .- 11 95 0 00 5.28 C-lc (26) T Off Peak

15113 00 0.65 3 36

25 90 6 00 11.44 C-2a (28) 11202 00 4.84 0 93 34 394 10 33 4.41 50 03 0 00 24 22 C-2b (29) T Peak 0.95 0.16 17

.

380 1_14.38

7 40 4.90 13 72 0 00 6.58 12889 00

C-2b (29) T Off Peak 4 45 0 86 32 90 0 00 15 78 C-3b (38; T Peak 0 19 0.04

. 360 13 49 1 64 2 56 C 00 1.39 4560 00

C-3b (38) T Off Peak 0 97 --I- 0 19 7.10 6 88 C 00 3 TOTAL BULK SUPPLY • 59289.00 21.95 4.23 845 • • 23.59 209.94 0.00

73

101.13 Agricultural T•Wells - Tariff 0

D-1a (4b) 1404 00 1 09 0 21 1758 0.00 5:33 0.00 5 82 C 00 4.69 0-2 (49.52) 33598 00 2.03 0.39 17399 109 8.54 3.65 17 31 2 69 13 23 0-2 (47,48) T Peak 0.63 0 12 15 68 -13 09 9 91 0 00

3-2 (47 481 T Off-Peak 1 2 79 0 54

4.11 7.24 20 15 0 00 8 35 TOTAL AGRICULTURAL TM/E1 68824.00 6.53, 1.26 23234 -9.44 53.19 2.69 30.381 .ublic Light PVT G (72,73) 0.00 1 55 0.30

0.03

0.15

1011

45

5

0 00 14.06

0.00 12.94

360 5.65

0.00

0.00

0.36

21 85

2 07

4 33

0 00

0 00

0 00

4 15

0.56

6.03

Residential colonies H (76,79) 0.00 0.16 ;..iK Tariff K-1 (35) ! 1000.00 0.77 .11( Tariff K-1 (36) T Peak 5.08 0.98

23

28

361) 15 08

31.20

31.56

76 66 0.00 31.52 01 86659 00

;JK Tariff K-1 (36) T Off Peak 20.64 3.98

5.10 7.49 154 59

235.58

0 00

0.00

63 56

101.11 Total AJK I 51829.00 26.49 i 3omparly Total 1806762.00 619.05 100.00 2747291 260.58 4058.74 i 2.69 2532.88

se

Page 78: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Tariff Statement For 03 2013 (uodateat

F

Category MDI

(KW) Sales

(MkWh) Sale Mix (%age)

No. Of Consumers

Connec red

Load (kW) (kW)

T- IDistribu Load I tion

Factor Losses (°i.age)

Apsiiceble Rate Billed Amount Subsidy Amount

Charged Fixed Charges

(Rs/kW/M )

Variable Charges (RsikVVh

i

Fixed Charges Rs Mln

Variable table Charges Rs. Min

Fixed Charges Rs. Min

Variable Charges Rs Min

Residential • Al

24 22 UPTO-50 Units per month 6 00 4 84 561300 0 00 1 98 0,00 47 87 Consumption Exceeding 50 Unds 0

0.00 25.42

1-100 Lints 57.20 11 44 1056164 0 00 5.69 0 00 325 27 101-300 Units 112.66 22 53 675988 0 00 602.89

301--700 Units 35.25 7.05 91018 0.03

0 00

6 66 0.00 750 85 0 00 574 13 8.41 0.00 296.27 ABOVE 700 Units 35.29 7 06 36676

0 00

0.00

237.66

57 17 A-16 (03) T Peak 2335.00 0 78 0 16 2705

0 OC 9.56 0 00 337.35

A-16 (03) T Off-Peak 0 00 13.76 0 00 4.32 3.56 0 71 3585 8.19 0.00 10.79

29 19 0 Temp. domestic E-1 i (55) 0.00 0 00 0 00 280 C; 00 15 04 0.00 0.06

00 11 69

TOTAL DOMESTIC 16191.00 268.98 53.79 2427716 0.00

0 00 0 01

1513 Commercial - A2 1797.64 0.00

0 Commercial Tariff (04) 38.00 14.32 2.86 269004 0 14 64 0 00 67.72 A-26 (05) 7434 00 1 60 0 32 342 400 0.00 209.6E

9 95 • 2 971 15 94 A-2c(06)T Peak

17136 00 3.66 0 73

3 58 6805 05 15.17

7.72 6 54 59 25

0 00

0 00

11.66

26.08 A-2c (06) T Off-Peak 17.89 f-138.05 Tem. corn) Eft ii • 56) G 00 0 08 0.02 1305 •

. 16.07 1

0 00, 1.33

46.09L 424.23

I 0

0 00

0 00

0.00

60 77

0.37 TOTAL COMMERCIAL. 113967.00 37.55 7.51 277456 Industrial - • 166.60

8-1707) B-lb T

352 00 6.76 1 35 17017 ' • , -28 T 15.55 01 71. 33 0 00 (09) Peak 1.54 0 31 •

7378 ' -.0_14 07 21.72 .0

0.00 0 00

0 00

33.74

8 50 8846 OC

B-16 (09) T Off Peak 6 83 1.37 •

. , 8.38 57 20 22 39, 1.8±2a(10) 19287 00 4.26 0 85 1380 401 ' T-- 9.26 7 731 39 40 000 T Peak 3 07 0 61 2658 • 15.36_f' 403

8 39,- 47.20 7.74 175 51 4_

0 00

0 00

22.81

20.6 1]

[B-26(12) 20844,00

B-2b,121 T Oft Peak

-1- 1-

.--- 22.69 4.54

-1- --- 8-3(14) Peak 4.02 0.80 170 -t-

I- 76.88

274.2

16-37 T.1

1'90708 B-3(14) T Orr Peak 45.96 9 19

1 1463 58 811 C 00 I

382 - 7 4 53( 7.61- I 8.,-,117) 1 Peak 7 6 30

39.95

1 26

7 99

,_;_ 349 86 0 00

8-4(17) T Off Peak 1 16074.00 91-- 13.83 1 87 17 C 00 44.53

149.42,

360 I. 7.26

5 791 18-2f68) Temp 1 0.00

1 . G.00 0 00 1

J 289 91 1).00 0 00 I 0 0 00 TC7AL INDUSTRIAL • 496351 00 • 141.36 28.27 28813 166.51 1 1'198.11

0 02

569.93 1 bulk Supph; 1 I 0

0.00

C-1a (19i

C-16 (25. 164 00

146E8.00

0 CIE

5.79

0 02

11C

25 7 L-__

496 r---- 1

400

0 11 57 0 001 0 90 0 00 0.7,9 10.20 c_Ic (26) 1" Peak 0.63

2.86

0 13

0.57 273

I

H t----- I 6327 , 59 041 000 2681

1 c 1261 T Off Peak 2347.00 14 91) , 0 OG .00 0 94 .

9 45r

_00.1_7 781 22 28 0 00

412

9.71 C-2a (25.

C-26 (29) T Peak 10848 00

1755 00

3.36

0.82

0 67

0.16

_L -1--- 341 394 10 211 1 427, 34 50 -,-- 000 16 78

1- 14 75 0 00 5 65 10-2n (29) T Off Peak 3.67 0.73 17 I 380 1 0 67i-'12 07

7 59 27 37

1 ,1 C-36 (33) T Peak

320 00 0.16

0 82

00'3

0 16 1 13 5,

I . -_.....! 2 18

0 00

0 00

13.04

1.18 C-36 (331T Off Peak '

359 0 11 , 11 000 317 TOTAL BULK SUPPLY 54413.00 18.20 3.64 846

I 585 T 21.66 174.15 ____, 0 00 83.85 Ao,icultural T-Wells - Tariff 0 ' 1

D-la if_16i 80E 00 1 01 0 20 1697 0 10.04 0

0

10.18 0 1)-2 (49.521 33061 00 2 03 0 41 17360 6.49 324 98 1 00

13 20 2 64

4.36

,0‘-2 (47 48) T Peak 4125.90 0.46 0.10

4149 195 '6.94 1 0 81

9.35

8 11 C 00

18 02 260

49.51 2.64

13.28

3.12

6 91

I - ,D-z (47 48) 1 Off-Peak I-- 2 30 0 46 7.82 IOTAL AGRICULTURAL TIWEI 651-(5.00 5.83 1.17 23206

'Public L !Wit PVT G (72,73) 0.00 1.45 0 29 1011 ti 14.14 27.66

0 00 20 43 0 00 'Residential colonies N (76,79) 0.00

1200,00

0 13

0.74

0.03

0 15

45

5 u

3511

13.01

5 65

0.00 1.70 0 00

G 00

0 00

3.86

046

5 86

29.17

-Tariff i AJK K-1 (35)

JK 0.43

3.94

4.20

76.50 Tariff K-1 (381 T Peak 4.71 0.94

23 360 D6.26 .1 •AJK Tariff K-1 (36i T Off Peak

10932 00 21.13 4.23 j 8 08 170.66 65.08

•10071•71

kTotal AJK 51829.00 28.58 5.31 28.00 I 26.24 251.36

0 00

LLompany Total 757926.00 530.10 100.00 2759121.00 ' , 269.87, 3917.13

0.00

2.64 2465.751

Si

Page 79: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

41: PESCO Tariff Statement For 04 2013 U dated

No. Of Consumers

Conrec led

Load (kW) (kW)

1 . I •-.ii u Load 1 lion

Factor! Losses

Applicable Rate Billed Amount Subsidy Amount C3tegory MO

Chacged (K5';

Sales Sale Mix Fixed

Charges Variable Charges.

Fixed Charges

Variable Fixed Charges

Variable Charges I MkW/10; (%age) (%age) - - iRs.k.W/M

_L_ (Rs/kWh

(

Charges Rs Min Rs Mln Rs. Mln Rs Min

[Residential - Al

UPTC-5C Liras per mor,th 7 00 23 19 4 24 540390 . 0.00 1.92 • 0.00 44 52 0 00 Consumption Exceeding 50 Units

54 60 9 98 1013046 000 5.75 0 00 0 00

24 37

1-100 Units

101-300 Units 124.20 22 70 736267 0 00 6 73 313 81 614.86

0.00 835 61 0 00 301-700 Units 39 81 7.28 103943 0 00 8.56 0 00 340 77 644.39

ABOVE 700 Units 35 74 6 53 34975 0 00 9 89 0 00 353 55

0.00

C 00

243.70

A-lb (03) T Peak 1887 00 0.87 0 16 2837

0 00 13 83

8 23 0 CO 12 04 0.00

76 62

4.60 A-lb (03) T Off-Peak 3 36 0 61 3761

280 1-- 27 69 1)00 11.03 Temp. domestic E-1 i (55) 0 00 0.02 0 00 0 00 16.24 0 00 0 34 0 00 TOTAL DOMESTIC 12697.00 281.81 51.51 2435499 0.03 1926.34 0.00

0 08;

Commercial - A2 1606

Cornrneicial Tariff 104; I 35 00 15 71 2.87 269481 0 14 98 0.00 235 21 C 00 74 29 A-2b (05) 6342.00 1.73 0 32 332 401 9 98 2 54 17 231 G 00 4-2c(06T Peak 17335 00 4.23 0.77

7095 401 15 77 66 67 C 00

1257

4-2c !061 T Off-Peak 20.64 3 77 7 71 6 se 20.41

'0.44 Jen2p. coin' E-1,i 156) r---

0.00 0.08 0 01 1312 17 87 000

159 12

1 39

C; 00

C 00 TOTAL COMMERCIAL 114993.00 42.38 7.75 278220 46.12 479.62 0.00

0 35,

Ii ostnal 187.17

5-1 (07) 165.00 6.95 1.27 16739 0 10.00 0 69 45 0 00 B -1b i09, T Peak 9464.30 1 61 0.30

7624 0 13 69 22 11 0 00 i

34.69

B-lb (09) T 0 11 Peak 771 141 8.15 0 00

62 82 0 00

8 90

25 29 B-tat 156-, E. 30 4.29 0 76 130G, 401

400 ,---

9 71

15.50

7 8:

23.00 13-21)(12) T Peal, 22573 0,1

12589 00

3 70 0 68 '-'H 1 2972

6.29 41 68 C; 00 1- 57.37 0 00 24 91 B-:,,(12i T Cff Peak

•-;-- 30 54 5 56 i 9C3 :3849 1 00

--1 103.53 B-314 T meat 4 90 0.90 ;

170 i :381 14 61 ;

71 541 00 ,B-2114) T Off Peak 54.44 9 95 1 7.60 4 791- . ■:

414 01 • : 00

3340

193 28 1 E-407) T Peak -, I-- 8 14 149 '

9 360 13 64 5 84' 11267, , 00

379 06 58.06'

195 :',2 B-1(17) 2 Off Peak

16213 00 52.23 9 55 H

7 26 E-2::,c,) Temp 0.00 6 01 0 00

00 0 00 i 0 ! '; 00

--1 0.33. TO-AL INDUSTRIAL 516553.00 174.53 31.99 28815 • ' 171.82; 1469.19. ' 00 700.39. 3018 Sully

_l ____

C- la 19: 14 700 008 0 01 24 0 11 61 .i____

0.00, 086! :: 00 0 381 C-1b (25) 13292.00 5 23 0 96 489 ; 432 10.38 5.74 54 23 G 00 C-lc (26; T Peak

1745 00 0 54 0 10 281 1 401 14 89H 8 03 C 00

26.911

3.50!

8.39 1

19.221

C-lc (26, I' Off Peak 2 47 0 45 0 70 19 24-1 C 00 ___17.78

C-2a (28) 7576 00 3 86 0 71 34 I

45i1_4. 10.28

380 I 14 33

4r-77.37 3 47 39 71 u 00

10 17 0 00 C-2b (29) T Peak

1549.00 0 "cl 0 '13 17 C-26 (29i T Otf Peak 2 97 0.54 0.59

21 86 0 00

4 90;

10 531 C-3b 138.! T Peak 280 00 G 17 0 03

-1-- 0.81 0 15

1 13 50 361 1-.._..._. 2 30 C GO C- 3o '.331 -7 Off Pea;: 7 1C

0 10 _r______ 5 7 L 00 .•

1.25

3 •, -7; TOTAL BULK SUPPLY 45357.00 16.84 3.08 846 I Agricultural T-Wells - Tariff D ,

18 63 162.2'1! 2.00 78.30 ,

13-1a ■46. 867 00 1.04 0 19 1665 0 15 55 0 1616 000 4T1';

16.12;

3.151

7,-2 (49 521 , 32.744 00 2 47 0 45 17337 109 6 23 3 53 .

15 36 2 62 0-2 (47,48) T Peak 0.48 0.09 4220 i

183 17 43_1

6 04 8 45 C 00 4369 00

3-2 (47 48) T Off-Peak _±._ 2.46

6.47

0 45

1.16

0 80 19 92 (; 00 7.4-31

31.'71 TOTAL AGRICULTURAL T11/46.! 683'18.00 23222 9.59i 59.9:it-2 62 ;,-ublic Lignt PVT 5 (72,73) --- 0.00

0.00

1000.00

0.78

0 12

0.77

0 14

0 02

0 1,

1012 45

5 ' 0

361.)

15.40

13 OD

5 65

000; 12.01 000

0 GO 1 571 f": 00

4 L 00

208i

0.411 I

6 OS.

24

Residential colonies H 176,79)

";..1K Tariff K-1 (35)

\JK Tariff K-1 (36) -l. Peak 11576.00 3 95 0 72

231- ' 380 16 69 - 8.29

0 26 371

65 96 .3 00 kJi: Tariff K-1 (36) T Off Peak 19.47 3.56 ' ---4•

)---

4 17 . 161 421 C 00

50,4

59.951

90.35 1

fatal AJK 51829.00 24.19 4.42 28.00; 25.23; 231.75. 0 00 ...;ompaa Total T807747.00 547 11 100.00 2767607.06; i 271 42 4344.581 2.62 269C 67)

52-

Page 80: PESHAWAR ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF

PESCO Tariff Statement For 95 2313 (updated) 1--

1 C.

MD! Charged Sales

tctegory ea

Sale Mix No. Of

Conspirers

-Cromer:

Loa) ,;kW)

Load Factor

, Distribu

bon Losses

_Applicable

Fixed Charges

(RsikW/M

Rale

Variable Charges )tsikVV11

Billed Amount Subsidy

Fixed Charct9s Rs. Min

Amount

Variable Charges Rs. Mln

Fixed Charges Rs. Min

Variable Charges Rs. Mln (Kkk) (MI(Wh) (%age) (kW) (0/Age;

1,Residendal - Al

! ,....PT0-50 Units per morin '110 21.98 3.92 5(5061 000 1 75 0.00 38.52 C.00 22 82 Consumption Exceeding 50 Units

0 00 0 00 11-100 Units 53.07 9.46 987009 0 00 5.67 0 CO 300 80 C 00 595.18 L101-300 Units 131 56 23 44 755402 0.00 6 69 0.00 880 36 C 00 782.78 i.:4,1--700 Units 54 34 9 68 137740 0 00 8.48 0 00 461 06 C 00 285.76 1A.BO7E 700 Units 36.66 5 53 37897 0.00 8 91 0 00 326 77 C 00 60.89 A-16 O., ; Peak

13284 00 1.03 0 18 3911 0 C)0 14.56

0.00 14.93 C.00 5.65 IA-lb ;03) T Off-Peak 4 52 0.81 5185 0•0+0 0._i,___ 6.67 39.20 0 00 14.84 Temp domestic E-1 i (55) 600 0 01 0 00 281 0 00 1,3.41 0 00 0 18 C 00 0.04

!TOTAL DOMESTIC 13265.00 333.16 54.03 2442486 0.00 2061.83 0 00 1767.96 )Commercial - A2

!Ccmineicial Tariff (04) 25.00 17 23 3 07 269294 C 14.74 0 co: 253 90 C 00 81 49 , A-26 (05) 5954 00 7

1 51 0.27 307 400 9.97 2.38 15 09 0 00 11 02! !A-2c(c.)8)T Peak

-i 11.5356.00 4.3C) 0 77 7928 388 15.76

45 13 67 84 0 00 29 95 'A-2c 105) I Off-Peak 21.01 3.74 7.74 162 54 0 00 71.77 'Temp. con) E-1ii (56) h.- 0.00 0 09 0 02 1318 14 34 0 00 1.23 C 00 0.39 TOTAL COMMERCiAL 122328.00 44.15 7.87 278847 47.51 500.60 4.00 194.61. industrial 0

H

B•1 (07) I 167.00 5.45 097 15599 191 08 9.11 003 49 62 G00 27 18 13716106; i Peak i

--1 10348 00 1.73 1 031 3 8741 '14. 17

8 44 0 01 i- 24 48 700 952

Le-lb (09, T Of Peak 8.43 1 50 -

71 14 C 00 5.7.66' B-2a(10) 1 11311. 30 3.17 0 56 1237 400 9 20 4 53 17 I. GC) 16 99' 6-26112) 1 Peak

I 7923-..)70

1538U2 00-

1:0298 a.

3 79 0.66 3149 398 1507 k- 71 25 --- °8 67-T

1 77: :?.51 77

: 00 LS-2, ,12; T ere Peak

-5-- B 3;14) 1 Pea),

----)

?2.32 576 . 2E ".7 .

00i 199 56

.34 72 5 091 ^091

28 16 19.01

6.89 1.2:

170

--T-

. -1 ,;36 15 °1 52 C21 7 at 1

6 )0' ' ' 001 5-2(14 I Of Peak i

5 :1-/ ; T oeak -T

6.4(171'1- 06 Peak

-Li

438 •i7I', G 00 199.37

9 ' H 360 83 1_13 43.24 1--

I

953: 001 49. , 4 43.921 7.83 . 7.26 318 71 i ' 00 164.27.

' i.-11",: T ,...:, 00 C.00 1--

0.00 000

171.18 1

0001

1414.20

0_i

, 00

0.00

TT-- ---) 0.02:

662.94, 1C-AL INDUSTRIAL :5438'-6.06 186.96 29.75 2890u e:uik Supply _____ i

---1- 0-15 ,19) 136 0'; 0 08 0 0 , 2a' 0 00 11.50 0 00 0 86i 0 00

I.' 00

. 9 37,

-, 74 rd); . , - • O-161251 0 102'9900 466 083

T-T-TI 455 449 10 47 4.59: 48 7 7

C-1 C c26 T Peak 1 'I 'i 666 co

70)5.00 1.--

,:- .54

2.84

0 lr --- 0.51

315 .

-1 400

15 in ----I 7 88

8 0:21 4 €71- C .00

2 (5LUG

H )

3 531 C..;-1c (26)T Off Peak

9 63 ! C-2a (28: F 287 0,51 34 466

380

10.284 327.

14 31 1

---4 3 81 7 36 1

1-• 29 4(1'

11.54

)': 00

C 00

14 ..:4 j 5.561

C-26 )29) T Peak 10026 00 0.81 G.14

18 C 26 n 2.91 T Off Peak 3.28 0 58

1-- 24 14 C 00 11 641 0-3U (36) T Peak

2880 0(0 0.18 0 03 361

i 13 49 ITT 2 :•.0601 1.04

5 64

C 00 1.28! C-36 (38i T Oti Peak 0 79 0 14 7.09 1 I. 00 3.06! TOTAL 6ULK SUPPLY 41942.00 16.04 2.8G 847

1 I 17,34 153.41 0.00 73.42

,t,griouli.ural T-Wells - Tariff 0

12 05 9 5101 0.01

3.56

0

981

8 79

600

2 59

3.991

15.061

4 751

D-1a (46) 83000 C93 0.17 1518 0-2 (49.52) 32367 00 2.31 0.41 17297 110 3.81 I 0-2 (47 48) T Peak

38421 00 0.73 0 13 4405 .

• 77

.

13.70 -2.96

0.61

10.02 0 00 D-2 (47 48) -1- Off-Peak 3 50 0 62 . • 6..32

1

22 15

49 77

0 00

'2.59

10.511

34.30 1 TOTAL AGRICULTURAL T/WEL 71606.00 7.47 1.33 23220 ---I. Public Lloh, PVT G (72,73) G.00 1.23

0 00 0.13

0.22

0.02 45

1013 0,00

. 0.00

11.39

12.99

0.00

0 00

14.05

1 71

C. 00

C 00

--i

0.461 Residential colonies H (76,19)

A..1k. Tariff K-1 (35) 1000 00 0.71 0 13 5

n-

360

360 I

5 65 I

15.83 _I

0 36

19.80 •

4.02

55.93

C. 00

0 00

1 5 601

25.831 AJK Tariff K-1 (38) T Peak

55011.90 4 17 0.74 23

3 05 AJK Tariff K-1 (36) T Off Peak 17.12 7 86 1 134.63 C 00 52 741

84;)71

2822.161

Total AJK 51229.00 22.00 3.92 28 I 20.16 1 204,38 u 00 Company Total 844842.1)0 661.13 100.00 2775392 I 256.841 4400.16 1 7 59

S3