12
LAMPIRAN-A PETA STUDY RUTE ALTERNATIF

PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

LAMPIRAN-A

PETA STUDY RUTE ALTERNATIF

Page 2: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Kantor Camat RappociniKantor Catatan Sipil

Kantor Dinas

Lampiran 1 Rute Alternatif untuk Studi Jalan Trans-Sulawesi Mamminasata, Bagian C

Jl. Sultan Alauddin

Ke Mamminasa Bypass

Terhubung ke Jalan Lingkar

Ke Jalan Takalar - M.T.Bunga

1

1

2

2

3

3

PI1-1

PI1-4

PI1-3

PI1-2

PI1-5

End P

Start P.

PI2-1

PI2-2

PI2-3

Sungai Jeneberang

Terminal Bus Mallengkeri

Kantor Desa Taeng

Pekuburan Belaka

Pekuburan

Kantor BPN

Gudang Ikan Kaleng

Kantor Camat Barombong

Gudang Beras

Puskesmas Kanjilo

Pabrik Es

Kantor Desa Kanjilo

Sungai Bontorea

Pekuburan

Batas Kota Makassar / Kabupaten Gowa

BOKA

Terminal Bus Sungguminasa

Jl. Ke Desa Tamanyalleng

Jl. Ke TaengJl. Malino Ke Bili-Bili

Jalan Sheh Yusuf

Sekolah

Masjid dan/atau Gereja

Kantor Pemerintah Daerah

Fasilitas Publik yang Dekat Rencana Jalan Alignments

Peta Kunci untuk Jalan Trans-Sulawesi Mamminasata (Maros-Takalar)

Maros

Sungguminasa

B

Jl.Ir.Sutami

Jl.SultanAlauddin

C

D

A

2

1

3

Jl.

Per

intis

Middle

Ring Road

Jeneberang川

Makassar OldTown Area

Interchanges

Jl.Jendr

al S

udirm

an

Takalar

Jeneberang RiverBridge (350m)

Section A(Jl.Perintis Kemerdekaan)

Section B Alternative Route 1

(New Road)

Section C Alternative Route 2

(New Road)

Section D Alternative Route 2

(Existing Road)

(Middle Ring Road)

(Middle Ring RoadAccess)

(Boka -Takalar)

1

2

3

4

1

2

3

BOKA

Jembatan Sungai Jeneberang(Yang Ada)

3

Jl. Ke Panciro

KECAMATAN PALLANGGA

KECAMATAN SOMBAOPU

KECAMATAN BAJENG

KECAMATAN TAMALATE

Legend : Batas Kabupaten Batas Kecamatan

Page 3: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Lampiran 2 Rute Alternatif untuk Mamminasa Bypass Bagian Awal (Selatan)

M1

2

3

3

1

11

2

3

3

Sungai Jeneberang

Kanal Irigasi

Kanal Irigasi

Kanal Irigasi

Kanal Irigasi

Titik Pengawasan A Untuk Lokasi Jembatan Alternatif 1

Jalan Hertasning

Jalan Lingkar Tengah

Jalan Lingkar Tengah Terusan Selatan(Akses Selatan)

Jalan Malino

M2Sungai

Jeneberang

Sungai Jeneberang

Mamminasa Bypass Alt-1

Ke Takalar

Jalan Sultan Alauddin

Jalan Takalar - Tj. Bunga

Jalan Nasional

Sungguminasa

Jalan Lingkar Tengah Akses Tj.Bunga

LEGEND

National Roads(Present Trans-Sulawesi)Toll RoadsNote: Jl.Sutami (Toll/Expressway) is under construction by BOTOther existing roadsRoads required other than the FS roads

Mountain

Hill (4000ha)Appropriate for a satellite city (New Residential AreaDevelopment)

Wet low land

Rivers

Existing DevelopmentProjects (On-going/Plans)

Maros (Km 29.0)

Up To Takalar

Sungguminasa

M1

2 3

Jl.Perintis

Maros RiverTalo River

2

KIMA

2

5

5

Jl.Per

intis

Jl.Ir.Sutami

ENDSECTION(NORTH)

MIDDLESECTION

STARTSECTION(SOUTH)

M2

1

2

3

1

2

3 4

4

Alternative 1(New Road / Ring Road)

Alternative 2(New Road / To Limbong)

Alternative 3(Existing Provincial Road)3

1

2

Mamminasa Bypass Start Section

Peta Kunci untuk Mamminasa Bypass

2

2

Titik PengawasanA

2

KECAMATAN BAJENG

KECAMATAN PALLANGGA

KECAMATAN TAMALATE KECAMATAN

SOMBA OPU

KECAMATAN BONTO MARANNU

KECAMATAN GALESONG UTARA

Legend : Batas Kabupaten Batas Kecamatan

Page 4: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Lampiran 3 Rute Alternatif untuk Mamminasa Bypass Bagian Tengah

Terminal Bandara Baru & Landasan Pacu

M1

M2

M1 M2

M1

M23

1

1

2

3

Sungai Maros

Kanal PDAM

Titik Pengawasan A

Jalan Hertasning

Gunung Moncongloe

LEGEND

National Roads(Present Trans-Sulawesi)Toll RoadsNote: Jl.Sutami (Toll/Expressway) is under construction by BOTOther existing roadsRoads required other than the FS roads

Mountain

Hill (4000ha)Appropriate for a satellite city (New Residential AreaDevelopment)

Wet low land

Rivers

Existing DevelopmentProjects (On-going/Plans)

Maros (Km 29.0)

Up To Takalar

Sungguminasa

M1

2 3

Jl.Perintis

Maros RiverTalo River

2

KIMA

2

5

5

Jl.Per

intis

Jl.Ir.Sutami

ENDSECTION(NORTH)

MIDDLESECTION

STARTSECTION(SOUTH)

M2

1

2

3

1

2

3 4

4

Mamminasa Bypass Middle Section

(New Road)

Alternative Route 2

(Existing Road Widening)

Alternative Route 1M1

M2

Peta Kunci untuk Mamminasa Bypass

Jalan Abdullah

Daeng Sirua

KECAMATAN BAJENG

KECAMATAN PALLANGGA

4

Rencana Lokasi Kota Satelit (Kota Baru)

KECAMATAN TAMALANREA

KECAMATAN BIRINGKANAY

A

KECAMATAN MARUSU

KECAMATAN MANGGALA

KECAMATAN SOMBAOPU

KECAMATAN BONTO MARANNU

Titik Pengawasan A

KECAMATAN MANDAI

KECAMATAN TANRALILI

Legend : Batas Kabupaten Batas Kecamatan

KECAMATAN MONCONGLOE

KECAMATAN PATTALLASSANG

Page 5: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Lampiran 4 Rute Alternatif untuk Mamminasa Bypass Bagian Akhir (Utara)

1

4

4

Titik Pengawasan Kota Maros

Sungai Maros

Pelurusan Sungai Maros

(Rencana)

Bukit Kariango (Elev.115m)

Terminal Bandara Baru & Landasan Pacu

1

M1

M2

Kota Maros

LEGEND

National Roads(Present Trans-Sulawesi)Toll RoadsNote: Jl.Sutami (Toll/Expressway) is under construction by BOTOther existing roadsRoads required other than the FS roads

Mountain

Hill (4000ha)Appropriate for a satellite city (New Residential AreaDevelopment)

Wet low land

Rivers

Existing DevelopmentProjects (On-going/Plans)

Maros (Km 29.0)

Up To Takalar

Sungguminasa

M1

2 3

Jl.Perintis

Maros RiverTalo River

2

KIMA

2

5

5

Jl.Per

intis

Jl.Ir.Sutami

ENDSECTION(NORTH)

MIDDLESECTION

STARTSECTION(SOUTH)

M2

1

2

3

1

2

3 4

4

Alternative 1(New Road / Avoiding Flood Plain)

Alternative 2(New Road)

Alternative 3(Existing Kabupaten)

Alternative 4(New Road / Mamminasata Plan)

3

4

1

2

Mamminasa Bypass End Section

Peta Kunci untuk Mamminasa Bypass

2

Daerah Resapan Banjir

(Rencana)

3

KECAMATAN SIMBANG

KECAMATAN MAROS BARU

KECAMATAN MANDAI

KECAMATAN TANRALILI

Legend : Batas Kabupaten Batas Kecamatan

KECAMATAN TURIKALE

Page 6: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Lampiran 5 Rute Alternatif Jalan Abdullah Daeng Sirua

M1

M1

M1

3

Kanal PDAM

Rencana Kota Baru (Kota

Satelit)

Jl. HertasningPanjang Total = 15.7km

KeSungguminasa

KeMalino

Sungai Jeneberang

Rencana Kawasan Industri Gowa

(KIWA)

Rawa

Rawa

Kanal PDAM

Kanal PDAM

Kanal PDAM

M1

Jembatan Sungai Tallo

1

1

2

Jl. Abdullah Daeng Sirua

Jl. Hertasning

Jalan Lingkar Tengah

Panjang = 2.5 kmPanjang = 1.3 km

Bagian A

Panjang = 5.1 km

Bagian D

Panjang = 0.8 km Perbatasan

Makassar / Maros

Jl. Lingkar Central

Bagian E (1.2km)

Bagian F (7.0km)

Sungai Tallo

Jalan Lingkar Tengah

Bagian C

Jl. Perintis Kemerdekaan

Jl. Pettarani

Gunung Moncongloe

Bagian B 2.3km

Bagian A 5.2km

Bagian C 3.7 km

Bagian D 4.5 km

Jl. Sultan Alauddin

Bypass Mamminasa

3

2

Jl. Abdullah Daeng SiruaPanjang Total = 17.9 km

Perbatasan Makassar / Gowa

LEGEND

Jalan Nasional(Trans-Sulawesi yang ada)Jalan TolCatatan: Jl.Ir.Sutami sedangconstruksi oleh BOT)Jalan lain yang adaJalan akan datang selain jalan FS

Gunung

Kawsan Bukit (4000ha)Sesuai untuk Kota Baru Satelit (Pembangunan Kawasan Penduduk)

Kawasan Banjir

Sungai

Maros (Km 29.0)

Ke Takalar

Sungguminasa

2

3

2

KIMA

2

5

5

Jl.Per

intis

Jl.Ir.Sutami

Sungai Maros1

1

1

2

Jl.LingkarTengah

KIWA

Sungai Tallo

SungaiJeneberang

2

Jalan FS oleh JICA

(Maros-Takalar) Jl. Pra-FS oleh JICA

Jl.Linkgar Luar

Bypass Mamminasa

Jl. Trans-SulawesiBagian Mamminasata

Jl. Hertasning

Jl. Abdullah DaengSirua

1

2

3

4

5Jl.J

endral

Sudirman

1

43Sekolah

Masjid dan/atau Gereja

Kantor Pemerintah Daerah

Fasilitas Publik Dekat dengan Rencana Jalan Alignment

Alternative 1(New Road)

Alternative 2(Existing Road)

Alternative 3(New 2-lane Road usingROW of PDAM)

Jl. Abdullah Daeng Sirua

2

1

3

Existing Road Widening(No Alternative Routes)

Jl. Hertasning

3

Bagian B

LEGEND

National Roads(Present Trans-Sulawesi Route)Toll RoadsNote: Jl.Ir.Sutami (Toll/Expressway) is under construction by BOT schemeOther existing roadsRoads required other than the F/S roads

Mountain

Hill (4000ha)Appropriate for a satellite city (New Residential AreaDevelopment)

Wet low land

Rivers

Existing DevelopmentProjects (On-going/Plans)

Jl. Boulevard Pannakukang

PemotonganPelurusan

KECAMATANMANGGALA

KECAMATANTANRALILI

KECAMATANSOMBAOPU

KECAMATANTAMALATE

KECAMATANRAPPOCINI

KECAMATANPANAKKUKANG

KECAMATANTAMALANREA

KECAMATANMONCONGLOE

KECAMATANBONTOMARANNU

KECAMATANPATTALLASSANG

KECAMATANPALLANGGA

KECAMATANBIRINGKANAYA KECAMATAN

MANDAI

Legend : Batas Kabupaten Batas Kecamatan

Page 7: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

LAMPIRAN-B

LUBANG UJI DAN PENAMPANG MELINTANG GEOLOGIKAL UNTUK JEMBATAN BESAR

Page 8: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Laporan Akhir (Ringkasan) Studi Rencana Pengembangan Jaringan Jalan Arteri Di Pulau Sulawesi dan Studi Kelayakan Pengembangan Jalan Arteri Prioritas Di Propinsi Sulawesi Selatan Maret 2008

B-1

Lampiran B Lubang Uji dan Penampang Melintang Geologikal

untuk Jembatan Besar

Lampiran B.1: Jembatan Maros (Jembatan No.1-5) pada Mamminasa Bypass

Lampiran B.2: Jembatan Jeneberang No.1 (Jembatan No. 1-31) pada Mamminasa Bypass

Lampiran B.3: Jembatan Tallo (Jembatan No. 2-6) pada Jalan Trans-Sulawesi Mamminasata

Lampiran B.4: Jembatan Jeneberang No.2 (Jembatan No. 2-11) pada Jalan Trans-Sulawesi Mamminasata

Page 9: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Laporan Akhir (Ringkasan) Studi Rencana Pengembangan Jaringan Jalan Arteri Di Pulau Sulawesi dan Studi Kelayakan Pengembangan Jalan Arteri Prioritas Di Propinsi Sulawesi Selatan Maret 2008

B-2

Lampiran B.1 Lubang Uji dan Penampang Melintang untuk Jembatan Maros pada Mamminasa Bypass

Bor

e H

ole

No.

08 a

t Lef

t Ban

kB

ore

Hol

e N

o.09

at R

iver

Cen

ter

Bor

e H

ole

No.

10 a

t Rig

ht B

ank

Geo

logi

cal C

ross

Sec

tion

Page 10: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Laporan Akhir (Ringkasan) Studi Rencana Pengembangan Jaringan Jalan Arteri Di Pulau Sulawesi dan Studi Kelayakan Pengembangan Jalan Arteri Prioritas Di Propinsi Sulawesi Selatan Maret 2008

B-3

Lampiran B.2 Lubang Uji dan Penampang Melintang untuk Jembatan Untuk Jembatan Jeneberang No.1 pada Mamminasa Bypass

Bor

e H

ole

No.

02 a

t Lef

t Ban

kB

ore

Hol

e N

o.01

at R

ight

Ban

k

Bor

e H

ole

No.

03 a

t Riv

er C

ente

r

Geo

logi

cal C

ross

Sec

tion

Page 11: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Laporan Akhir (Ringkasan) Studi Rencana Pengembangan Jaringan Jalan Arteri Di Pulau Sulawesi dan Studi Kelayakan Pengembangan Jalan Arteri Prioritas Di Propinsi Sulawesi Selatan Maret 2008

B-4

Lampiran B.3 Lubang Uji dan Penampang Melintang untuk Jembatan Tallo pada Jalan Trans-Sulawesi Mamminasata Road

Bor

e H

ole

No.

13 a

t Lef

t Ban

kB

ore

Hol

e N

o.14

at R

iver

Bed

Bor

e H

ole

No.

15 a

t Rig

ht B

ank

Geo

logi

cal C

ross

Sec

tion

Page 12: PETA STUDY RUTE ALTERNATIFBore Hole No.08 at Left Bank Bore Hole No.09 at River Center Bore Hole No.10 at Right Bank Geological Cross Section Laporan Akhir (Ringkasan) Studi Rencana

Laporan Akhir (Ringkasan) Studi Rencana Pengembangan Jaringan Jalan Arteri Di Pulau Sulawesi dan Studi Kelayakan Pengembangan Jalan Arteri Prioritas Di Propinsi Sulawesi Selatan Maret 2008

B-5

Lampiran B.4 Lubang Uji dan Penampang Melintang untuk Jembatan Jeneberang No.2 pada Jalan Trans-Sulawesi Mamminasata

Bor

e H

ole

No.

3 at

Lef

t Ban

kB

ore

Hol

e N

o.2

at R

iver

Bas

in

Bor

e H

ole

No.

1 at

Rig

ht B

ank

Geo

logi

cal C

ross

Sec

tion