7/24/2019 Petronas Overall SCC Project Briefing
1/10
ENGINEERING,PROCUREMENT,CONSTRUCTION
ANDCOMMISSIONING(EPCC)FOR
REFINERYANDPETROCHEMICALINTEGRATEDDEVELOPMENT(RAPID)
STEAMCRACKERCOMPLEX(SCC)PROJECT
Date:
Venue:
7/24/2019 Petronas Overall SCC Project Briefing
2/10
Introduction
ProjectTitle RAPIDSteamCrackerComplex(SCC)Project
BusinessObjective Tomeetboth domesticandAsiasenergyandchemicalsdemand.
ProjectOWNER PRPCRefineryandCrackerSdn. Bhd.
CONTRACTOR Consortium of ToyoEngineeringCorporationandToyoEngineering&
ConstructionSdn.Bhd.
ProjectCoverage 1. SteamCrackerUnit
2. PygasHydrogenation Unit
3. ButadieneExtraction
Unit
4. BenzeneExtractionUnit
5. IsobutyleneExtractionUnit
6. Utilities
7/24/2019 Petronas Overall SCC Project Briefing
3/10
RAPIDProjectOverview OverallScope
RAPID Project
Petronas Refinery & Petrochemical Corp. (PRPC)
Refinery SCC Petchem Utilities
Tank
Farm
Non-
Process
Offsite &
Inter-
connect
Evonik
(chem.)
PDWT
(marine)
RGT2
(regas)
PCP
(power)
State
Projects
Other
Projects
External
Facilities
3rd Parties
RAPID Toyosscope
7/24/2019 Petronas Overall SCC Project Briefing
4/10
PETRONAS PROJECTLEADERSHIPTEAM(PLT)
INTEGRATEDPROGRAMMANAGEMENTTEAM(IPMT)DIRECTORATE
REFINERY
PACKAGE1,2,3,4
TANKAGE
PACKAGE22A
FLARE
PACKAGE14
INTERCONNE
CTING
PACKAGE
14
STEAMCRACKER
PACKAGE5
PETROCHEMICAL
PACKAGE6A,6B,7,8,9,11,26*
SOLIDHANDLING&
WAREHOUSING
PACKAGE12
OFFSITES&UTILITIES
PACKAGE14
INDUSTRIALGASPRODUCTION
PACKAGE15
EFFLUENTPLANTTREATMENT
PACKAGE
16INCINERATOR
PACKAGE17
HVPOWERDISTRIBUTION
PACKAGE13
SITEPREPARATION
WORKS
PACKAGE18
NONPROCESS
BUILDING
PACKAGE19
CONSTRUCTION
INFRA
PACKAGE20
RAWWATER
TREATMENTPLANT
PACKAGE20
TECHNICAL
CONTRACTS
PACKAGE21
PCP(PengerangCogenerationPlant)
Evonik
RegasTerminal2
PDWT(PengarangDeepWaterTerminal)
:Critical
:Noncritical
:
Site,
Infra,
Building
*6A:LLDPE, 6B:LDPE, 7:Polypropylene, 8:CPU,PPU,BPA,
9:Elastomers, 11:EO/EG, 26:PolyCarbonate
RAPIDProjectOverview OverallMatrix
7/24/2019 Petronas Overall SCC Project Briefing
5/10
PKG No. Plants (Awarded at the same time) EPC ContractorPkg.1 Refinery 1 (RFCC, PRU, etc.) CTCI / Chiyoda
Pkg.2 Refinery 2 (CDU, ARDS, HCDU) Sinopec
Pkg.3 Refinery 3 (CCR, NHT, DHT, etc.) T-R
Pkg.4 Refinery 4 (SRU, ARU, SWS, etc.) Petrofac
Pkg.5 Steam Cracker Complex (SCC) TOYO
Pkg.22A Storage Tank Yard Punj Lloyd
PKG No. Other Facilities EPC Contractor
PCP Pengerang Co-generation Plant (2000MW) Siemens, MMC
PDWT Pengerang Deep Water Terminal (Tanks/Jetty) Dialog, Vopak,
Johor Government
RGT-2 Regasification Terminal 2 (2.0MMT/Y) Samsung C&T
MOLF Material Offloading Facility Zelan Construction
Pkg.14 Utility and Offsite Facilities for RAPID Technip-Fluor (EPCm)
S/P Site Preparation Phase 1 & 2 Menta Construction
Gadang Holdings
RAPIDProjectOverview EPCCContractors
7/24/2019 Petronas Overall SCC Project Briefing
6/10
Project Outline Location(Pengerang)
Pengerang to Tanjung Pelepas : ~145kmPengerang to Pasir Gudang: ~75km
PasirGudangand
TanjungLangsat
(PublicPort)
RAPIDSITE
MarineTerminal
(PDWT)&Regas2 RamuniaYard
and
Jetty
PelabuhanTanjung
Pelepas
(PublicPort)
7/24/2019 Petronas Overall SCC Project Briefing
7/10
Raffinate 1 Methanol
Ethylene
Propylene
ButadieneROG
MTBE
C3 Cut
Raw C4 Raffinate 2Raffinate 1
Full Range Naphtha
isoButane Recycle
Raffinate 2
Raffinate 3HDT Naphtha
Raw PyGas C6 Benzene
H2C3/C4 LPG
C5 Recycle C7-C8, C9+
C6 Recycle
Power & Utilities
Effluent
OSBL Facilitie
ISBL Facil ities
SCUUnit 2100
(1,291 kTA)
BDU
Unit 2400(185 kTA)
PGHUnit 2500(660 kTA)
as feed
BZUUnit 2600(175 kTA)
MTBE
Unit 3420(550 kTA)
RFCC(PKG 1)
SGP(PKG 3)
CDU(PKG 2)
NHT(PKG 3)
C4 SpecialtyMEK
Utility Center(PKG 13, 14 & 15)
SCC CoolingTower
Unit 4730(28 cells)
SCC Tank FarmUnit 5210(41 units)
SCC Flare StackUnit 6420(2 stacks)
EffluentPlant(PKG 16A)
Refinery
Petchem Flare StackUnit 6430(2 stacks)
Petchem Plants
3.Project Outline BlockFlow
7/24/2019 Petronas Overall SCC Project Briefing
8/10
EDC
(=LOA)
18Jul14
CD
(T0)15Aug14
PA
(M58)29May19
RFSU
(M52)30Nov18
Engineering/Procurement/Construction
Commissioning
StartUp
PTR
51.5Months 6Months28Days
TimeGuarantee:57.5Months (BDtoPA)
MC
(M49)
31Aug
18
(48.5Months) (3Months)
KOM
(M1)
25Aug
14
28Days
1st Invoice
SigningtheContract
PerformanceBond
InsuranceCertificate
ParentCompanyGuarantee
Tripartite
Agreement
w/LicensorConsortiumAgreement
LegalOpinion
Project Outline OverallTimeline
7/24/2019 Petronas Overall SCC Project Briefing
9/10
M12(b) M16(e) M40(e) M52(e)M49(e)
CD
01 Jul 2015
Handover of Site Area
Haulage Road available
30 Nov 2015
MOLF available
for offloading
30 Nov 18
Facility
RFSU
31 Aug 2018
MechanicalCompletion
30 Nov 2017
Power & Steam
available at BL
01 Nov 2015
Deep U/G work
start
01 Dec 2015
Piling start
01 Apr 2016
Heavy lifting
start
01 Jun 2016
Piping fabrication
start
01 Aug 2016
Piping installation
start
01 Dec 2017
Commissioning
start
01 Nov 2017
Loop testing
start
31 Aug 2017
Water & Air
available at BL
M37(e)
M21(b)
M12(b)
M16(b) M17(b)
M16(e)
M23(b)
M25(b) M41(b)
M49(e)
M40(b)
M37(e) M40(e) M52(e)
01 Aug 2017
Loop testing
start
M37(b)
Project Outline KeyMilestones
T0
7/24/2019 Petronas Overall SCC Project Briefing
10/10
THANKYOU
Q&