4
PEY Midterm Evaluation (Due promptly on the 15 th of September, 2015) This evaluation should be completed approximately 4 months into the PEY internship. The student should upload the completed evaluation form on Blackboard. Student: Tim Meng Kin, Chong Supervisor: Mr. Sun Jie Discipline: Civil Engineering Titles: Head of Center Of Transportation Engineering School: University of Toronto Company: L.E.C.M. Student Number: 999704208 License Number: _________________ Telephone Number: 1- 647- 960 8300 Telephone Number: 853 8294 - 4488 Email: [email protected] Email: [email protected] Please first ticks the box, then comments and assesses appropriately. Please Assess and Comment on the Student’s Performance in the following Areas: Student is Progressing within Normal Development Expectations Student Requires Coaching and Further Development to Meet Expectations 1. Awareness of Company Goals (Appendix A)

PEY Midterm Evaluation (Use This One)

Embed Size (px)

DESCRIPTION

sdf

Citation preview

Page 1: PEY Midterm Evaluation (Use This One)

PEY Midterm Evaluation (Due promptly on the 15th of September, 2015)

This evaluation should be completed approximately 4 months into the PEY internship. The student should upload the completed evaluation form on Blackboard.

Student: Tim Meng Kin, Chong Supervisor: Mr. Sun Jie

Discipline: Civil Engineering Titles: Head of Center Of Transportation Engineering

School: University of Toronto Company: L.E.C.M.

Student Number: 999704208 License Number: _________________

Telephone Number: 1- 647- 960 – 8300 Telephone Number: 853 – 8294 - 4488

Email: [email protected] Email: [email protected]

Please first ticks the box, then comments and assesses appropriately.

Please Assess and Comment on the Student’s Performance in the following Areas:

Student is Progressing within Normal Development Expectations

Student Requires Coaching and Further Development to Meet Expectations

1. Awareness of Company Goals

(Appendix A)

□ □

2. Quality of Work (Appendix B)

□ □

3. Interpersonal and Communication Skills

(Appendix C)

□ □

4. Initiative (Appendix D)

□ □

5. Dependability (Appendix B)

□ □

Engineering Career Centre Page 1 of 2222 College St, Suite 106, Toronto, Ontario | www.engineeringcareers.utoronto.c a

Current Projects/Assignments:

Page 2: PEY Midterm Evaluation (Use This One)

Assigned: Follow up of projects of Macau International Airport and Macau Light Rail Transit

(LRT) system.

Current Project: Follow up of projects of Macau International Airport: 175 - PHC piles on

North and South bridge from NEM.

Supervisor’s Comments:

_________________________________________________________________________________________________

_________________________________________________________________________________________________

_________________________________________________________________________________________________

_________

Student’s Comments:

_________________________________________________________________________________________________

_________________________________________________________________________________________________

__________________________________________________________________________________

Supervisor’s Signature: _____________

Date: __________________________

Student’s Signature: _______________

Date: __________________________

Please keep a copy of the completed evaluation form for your records.

Note: The content of this form is confidential and solely for the purpose of the PEY Internship

Program.

Engineering Career Centre Page 2 of 2

Page 3: PEY Midterm Evaluation (Use This One)

222 College St, Suite 106, Toronto, Ontario | www.engineeringcareers.utoronto.c a

Page 4: PEY Midterm Evaluation (Use This One)